From: Daphne Wallace
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: ann rodriquez alMila>, Rich Kahn we llia
Subject: Photos - September 11, 2015
Date: Fri, 11 Sep 2015 22:24:44 +0000
Attachments: LSJ_Punchlist_9-11-15.xls; MBR_flooring_(1).JPG; MBR_flooring_(2).JPG;
MBR_flooring_(3).JPG; MBR_flooring_(4).JPG; MBR_flooring_(5).JPG;
MBR_flooring_(6).JPG; MBR_flooring_(7).JPG; Pebble_Beach_(1).JPG;
Pebble_Beach_(2).JPG; Pebble_Beach_(3).JPG; Pebble_Beach_(4).JPG;
Pebble_Beach_(5).JPG; Pebble_Beach_(6).JPG; Pebble_Beach_(7).JPG;
Pebble_Beach_(8).JPG; Pebble_Beach_(9).JPG; Pebble_Beach_00).JPG;
Pebble Beach 11 .JPG; Pebble Beach (12).JPG;
1).JPG;
2).JPG;
3).JPG;
4).JPG;
5).JPG;
6).JPG;
7).JPG; Waterfall_cistern.JPG; Gym_A-
C_shed_(1).JPG; Gym_A-C_shed_(2).JPG; Gym_A-C_shed_(3).JPG; Gym_A-
C_shed_(4).JPG; Dining_Terrace_ceiling_fans_changed.JPG; Fuel_Depots_(1).JPG;
Fuel_Depots_(2).JPG; Fuel_Depots_(3).JPG; Fuel_Depots_(4).JPG; Fuel_Depots_(5).JPG;
Fuel_Depots_(6).JPG; Fuel_Depots_(7).JPG; Fuel_Depots_(8).JPG; Fuel_Depots_(9).JPG;
Fuel_Depots_(10).JPG; Fuel_Depots_(11).JPG; Fuel_Depots_(12).JPG;
Fuel_Depots_(I 3).JPG; Fuel_Depots_(14).JPG; Fuel_Depots_(15).JPG;
Kitchen_island_cabinetry_(1).JPG; Kitchen_island_cabinetry_(2).JPG;
Kitchen island cabinetry_(3).JPG; Kitchen_island_cabinetry_(4).JPG;
Kitchen island cabinetry_(5).JPG
Greetings Sir,
September 11 photos for your review and comments:
MBR flooring - sanding #3 completed and epoxy applied - Pokey on site 9/13 for sanding #4
Pebble Beach - clean up continues - Danny received your directive for a smooth finish - he is to calculate the
amount of yards of concrete needed and get a quote from Heavy Materials and the pump truck company - Danny
says the pump trucks should be able to get all the way down to the beach
Stone wall along road to Info Center - in progress
Waterfall cistern - slab poured today - block laying on 9/14
Gym A/C shed - painting completed
Dining Terrace ceiling fans changed out from the rusty ones
Fuel Depots - RanVar came out to calibrate the fuel depots and uncovered severe rusting and 4 leaks - 3 in the
diesel and 1 in the premium gas depot - they will make repairs, but are strongly recommending both depots be
changed within the year - they are preparing the quote for the replacement - in the meanwhile they will complete
the repairs and cleaning needed for continued function and the upcoming Terminal Facility License inspection
EFTA00846509
Kitchen cabinetry in island - repairs being done on the cabinets in the island
Attached also for your review and comments is the Punch List updated 9/11/15.
Respectfully submitted, Daphne and Anna