To: jeevacationftmaitcom[jeevacabon©gmail.com]; Jeffrey Epsteinbeeyacation©gmail.corn]
From: brice gordon
Sent Tue 3/6/2012 10:58:35 AM
Subject: Fwd: FW: Heavy Material
Jeffrey
Rich is requesting your approval to purchase heavy material
we need this if we are to continue pours this week
do we have your approval for 38k heavy material
Forwarded messa
From: Monique Har
Date: Mon, Mar 5, 201 at :
Subject: FW: Heavy Material
To: Brice Gordon
Cc: Rich Kahn Thomas Metnick "cM~
Brice,
Per your request total estimated cost for project needing aggregate on LSJ (Stone, Columbian
Sand, & Manufactured Sand) is $38,216.66. (Trucking included $6,561.00) Detail as followed
below.
Grotto 35 yards = $3,039.62
Flag Pole 75 yards = $6,521.17
Heli pad 40 yards = $3,178.92
Triangle 60 yards = $5,222.34
Sundial 10 yards = $667.89
Five Palms 65 yards = $5,901.28
Duct Bank 80 yards @ Five Palms including 3 add loads of MFS for underground work =
$11,502.72
Misc Pour 25 yards = $2,182.72
I can also provide the total dollar amount of sand, MFS, and stone per each job if needed.
MONIQUE HARRY
Project Administrator
LSJ, LLC
EFTA_R1_00499381
EFTA02002198
From:
To:
CC
Subject: FW: Heavy Material
Date: Wed, 22 Feb 2012 13:07:40 -0400
Rich,
Average of material used is based on type of concete mix. (cx. Dcvii mix dry, 4000 psi, grout
mix) This estimation is based on an average of 1500 lbs of stone per yard, 600 lbs of columbian
sand per yard, and 1200 lbs of Manf Sand per yard. (2000 lbs = 1 ton)
Per Tom's estimation below an approx 390 yards of concrete will be batched which breaks down
to:
293 tons of stone (requested 400 tons)
117 tons of Col (requested 500 tons)
324 tons of MFs (requested 500 tons)
Note: Material that is not batch which is taken by bucket or bakkero is used in motar mix for
stone walls and concrete walls, dry repair of roads (holes), Lanscaping
MONIQUE HARRY
Project Administrator
L5J, LLC
Date: Wcd, 22 Feb 2012 10:40:53 -0500
Subject: Re: FW: Heavy Material
From:
To:
Monique ...good day ... a rough estimate of yards of concrete per project remember there
are approx 4000 lbs of materials in a yard of concrete..
EFTA_R1_00499382
EFTA02002199
I grotto approx 35 yds to go
2 flag pole road 75 yds
3 heli road approx 40 yds
4 triangle approx 60 yds
5 sundial 10 yds to go
6 Five palms 65 approx 65 yds
7 duck bank @ five palms 80 yards + 3 truck loads of MFS sand for underground work
8 misc pours approx 25 yds ...
that's all i have on the schedule for concrete placement at this time..
On Wed, Feb 22, 2012 at 10:01 AM, Monique Harry <moniqueharry@hotmail.com> wrote:
I need your help. Rich wants an estimate of how many tons will go to each one of
the projects below. 500 tons of columbian 500 tons of MFs and 400 tons of #57
stone.
MONIQUE HARPY
Project Administrator
LSJ, LLC
From:
Subject: Re: Heavy Material
Date: Wed 22 Feb 2012 09:22:58 -0500
To:
you had asked for 500 tons of each component
can you please allocate estimate of use for each project
thank you
Richard Kahn
HBRK Associates Inc.
On Feb 21, 2012, at 8:15 AM, Monique Harry wrote:
EFTA_R1_00499383
EFTA02002200
Current Inventory:
Manufacturing Sand - 2 loads
Columbian Sand - 1load
Stone - 2 loads
Projects Concrete will be used for:
1. Five Palms - Side walks/terraces
2. Grotto - Steps
3. Flagpole pool - Road
4. Heli Pad - Road
5. Triangle - Road
6. Sundial - Slab
MONIQUE HAPPY
Project Administrator
LST, LLC
Subject: Fwd: Heavy Material
From:
Date: Fri, 17 Feb 2012 16:01:24 -0500
CC:
To:
Can you please provide me with inventory currently on hand in addition to specific details
on what this will be used for rather than misc island concrete
thank you
Richard Kahn
HBRK Associates Inc.
From: iAmi
Date: February 14, 2012 12:04:34 PM
EFTA_R1_00499384
EFTA02002201
EST
To: Rich Kahn
Subject: Heavy Material
Good Day Rich,
Attached for your approval 3 LS) purchase request for Heavy Material
1. Manufacturing Sand 500 tons = $26,120.00
2. Columbian Sand 500 tons = $40,400.00
3. #57 Stone 500 tons = $18,360.00
Total = $84,880.00 (includes cost of Trucking)
Due to my absence on Friday and Monday, currently 3 loads of stone and 3
loads of Manf. Sand is being pick up at Heavy
Material without following the proper protocol.
Estimated cost is $6,200.00 so, I'm hereby
requesting $6,500.00 to be place on our account
to cover the cost.
MONIQUE HAPPY
Project Administrator
L5T, LLC
Brice Cordon
Little Saint James
EFTA_R1_00499385