From: jeffrey E. <jeevacation@gmail.com>
Sent: Wednesday, July 1, 2015 9:56 PM
To: Daphne Wallace
Subject: Re: Pre-fab Building bids - July 1, 2015
74
On Wed, Jul 1, 2015 at 10:28 PM, Daphne Wallace mailto > wrote:
Greetings Sir,
I contacted Jaredian =o confirm that the scope of work they submitted for the structural steel b=ildings they
designed for the RO Garage roof and the proposed New Mechanic=l Building were suitable for the 80 by 80 building that
you have requested=bids for.
John advised that an 80 foot wide building would not fit on the =ight - we presumed you are proposing to place
this building where the curr=nt Buck Steel building sits - due to space restrictions.
The building th=y designed has a maximum width of 74 feet. To increase to 80 feet yo= would have to excavate
into the driveway leading to the Iguana crossing a=d to your Main compound driveway. They avoided this area because
of =he electrical and other underground infrastructure that runs under that dr=veway.
Do you wish for me to proceed, as you requested, with obtaining quo=es for an 80 by 80, or do you wish to
reduce to 74 by 80?
Respectfully, =C2 Daphne
please =ote
The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute
inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use,
disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have
received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to
jeevacation@gmail.com <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof,
including all attachments. copyright -=11 rights reserved
EFTA_R1_01622136
EFTA02497256