EFTA00148264
Securing Plan
• Clearing Teams assigned to this operation will arrive on Little Saint James on
August 12, 2019
• Clearing Teams will arrive at the dock located on the North West Tip of the
Island
• For the purpose of clearing and securing the Island, the Island will be broken up
into 4 zones
• There will be a total of 4 Teams assigned to clearing and securing the island
• Each zone will have a designated Team assigned to clearing and securing
their zone
• The Team Leader for each team will be responsible for labeling each structure,
and documenting the location of the structure.
EFTA00148265
Little Saint James Island
HE
EFTA00148266
Zones
James Island
• Ledges Of- Little St Jcim
EFTA00148267
EFTA00148268
EFTA00148269
Zone 3
EFTA00148270
Zone 4
10
Ledges of Latle St Jamec •
EFTA00148271