VIP Priorities:
• MC Gazebos sylvester
• MC Service gates w/10ft Colums (_plus carpenter) Ir s
• All service gates. New wood needed (Tunnel, Engineering & Heli)
• roads Tr? Za
• Five palms bid & Franks electric?
• Flagpole bid? —"‘ •to
• Engineering doors g,
• Steel buildings ,
• Sables swithces trench bid
• ro trench
• cement for hell gsj? .
• pebble beach seocnnd floor,
• grotto. .
• gym. floors. layout. .
• internet. etc.
• gsj dock house.
• jet ski docks. .
• trees.?
See page 2
6/9/2019 8:30am White Table Notes
EFTA00258915
Little Saint James
EFTA00258916
6/9/2019 8:30am White Table Notes
-Do not install GYM Doors
to find help if needed
-Five Palms Completion date needed 7:30am 6/10/19
MC Columns for New Driveway. Gates should look like flagpole pool side
gate.
will do all Trash Runs at 3pm going forward everyday
to call asap (Need answers 6/10/2019)
-What are black tubing on R/O Bld. (Need answers 7:30am 6/10/2019)
-Engineering Doors (Need answers 6/10/2019)
-Hire Outside Contractors for Big Projects & Building
-Pictures needed of every project from start to finish '
=arriving end of June
-Tiki Kitchen Counter top (Find local vendor for purchase) Conan
-Order Fly bags
-Close all Cabana doors if no guests. Cabana doors with "No view" should stay
closed
-Install Washers & Dryers in housekeeping first thing 7:30am 6/10/19
-Fix Master Bedroom Steam shower
-7:45am 6/10/2019
H irst thing in the morning 6/10/19 cans for "H" at GSJ Helipad.
-Bubbler (Barge) 4 Cement trucks from HM for GSJ Helipad
-Trenching Bid needed asap (Time Sensitive)
to work at Grotto
-Order Heavy Duty Wall bracket to hold 82' Samsung TV
-Dupson to spray Main Compound (Caterpillar infestation)
EFTA00258917
VIP Priorities:
.57
MC Gazebos sylvester7D
•
MC Service gates w/10ft Colums (=plus carpenter) -•
All service gates. New wood needed (Tunnel, Engineering & Heli)
roads
Five palms bid & Franks electric?
Flagpole bid?
Engineering doors .
Steel buildings ,
t ables swithces trench bid
ro trench
cement for hell gsj? .
pebble beach seocnnd floor,
grotto..
gym. floors. layout. .
internet. etc.
gsj dock house.
jet ski docks. .
trees.?
9a
I00
EFTA00258918
r New LSJ-GSJ Mandatory Punchlist 5-17-19 smartsheet
LSJ/GSJ Punchlist
Purchasing, Shipments & Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tropical FL 6/5, sail
6/7 - EDA on STT 6/11. Clear. pickup equipment 6/12 - Seth and crew
1 LSJ/GSJ (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1.
,c e LLRCest°re Room, 2. Living Room, 3. Onice.4. Twin Bedroom, 5. Master Bedroom.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym.
Project ON HOLD until the decorators come, per JE. Will review with
LSJ MC Kitchen JE Banquette decorators for different ideas.
3 Master Bedroom JE Pillow Should know more after our trip on June 3rd.
4 Emergency Room SJE EKG Machine Order EKG Machine. JE to advise.
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the door openings. Awaiting quote
from TJ "Home Theater Marker for Black/ Lt Curtains same
Theater Room Blackout Cur.ains custom measurements as existing panels. confirmed New
measurements:12 Panels of 9ft Long (108i
4 Panels of lift 3in Long (135in), All 12 Panels are 4ft Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/301.
Order 2 Samsung Washers: on STT 5/28 cleared, off-loaded, awaiting
6 Housekeeping Washers pickup for transport to LSJ.
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded, awaiting
7 Housekeeping Dryers pickup for transport to LSJ.
Gym flooded on 5/30. all equipment moved to F2/0 Storage on 5/30.
8 Gym Flooded Floor removal began 5/31/2019.
9 Sam's Place Furniture Order Living room furniture & Kitchen Table
Solar lights from China - departed from China 5121 - 45 days to MIA -
10 Solar Lights EDA FL 7/3.
LSJ/GSJ
11 LSJ/GSJ Sun Umbrellas Order 15 Cream Colored Sun Urrbrellas. JE will choose.
12 Theater Room Drapes/Curtains Wrinkle out the Drapes/ Curtains in the Theater
Order lighting for the Saltpond water fountain. Arriving to the Palm
13 LSJ Salt Pond Fountain Light Beach house on 5/30. Arriving on plane 6/3
14 LSJ Helipad Medical K t Purchase Medical items for Helipad Office
15 Chillax Room Chillax Deep Clean Chillax room. Smells funny
Exported on June 9.2019 9:3934 PM BOT Page 1 If 18
EFTA00258919
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date Completion Date Date
Date
5/6/2019 6/12/2019 6/13/2019
5/17/2019
5/17/2020
5/17/2021
5/17/2022
5/17/2019 5/17/2019 5/28/2019
5/17/2019 5/17/2019 5/28/2019
5/21/2019
5/17/2019
12/13/2018 12/20/2018 7/27/2019
5/17/2019
6/5/2019 5/25/2019
5/16/2020 5/23/2018 6/3/2019 6/4/2019
5/16/2020 5/23/2018 6/3/2019 6/4/2019
6/4/2019
Exported on June 9.2019 9 33 34 PM SOT Page 2 of 18
EFTA00258920
I
Construction & Projects
Hell pad and tunnel gates are installed and ready for wood skin.
engineering and jurassic gates are due to be brought out to LSJ on
17 Welding - Weld ng Wed., the 12th and installed. the wood skins will start as a carpenter
Welder becomes available, likely mid week next week.
The two side windows are installed, just needing finish plaster. The
18
Five Palms Large Windows large opening door panels are being built.
19 Grotto
20 New Road Road Project
cheduled to deliver and begin install by 5/31; will work around
21 LSJ Generator Room Contractors Hurncane Shutters weather. The installation will take around 10-14 work days.
22 GSJ Cottage & Contractors Expert Builders Completion Date ? (6-8 weeks)
Forms and lighting installation complete by 5/25. Concrete pour TBD.
23
GSJ ifelipad Helipad JE advise 'H" to be Bigger. JE to review 6/5
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
24
LSJ Tunnel Skin it Recommend going with Allied.
-eviewed and approved drawings 5/22. approval and sign off of
25
Wreckshop 40x60 Bld. the plans will be sent to Buck Steel 5/24.
PJliod has provided estimate. Waiting on Buck Stool. Recommend going
26 HM Storage & Contractors 00x00 Bld. with Allied.
Install Vents in Fuel storage room. educed initial quote by 4500;
27 LSJ Fuel Room Reefco Vents ordered 5/24; EDA on STT by June 1 th and will then schedule
28 Engineering & Contractors Doors Install Engineering doors. as estimate forthcoming.
Staff Cottage - 5/27 JB submitted the chaMinor Permit Application
Forms for the GSJ Cottage toMnd=o review the portions
already filled out; 'toted the portions he neecs assistance fillirg
out/signing, along with a checklist of the items still needed to complete
29 GSJ Staff Cottage Permits the application. 5/28 nompleted the permit application, requested
the IRB tax clearance and proper tax clearance letter, and asked JE
to sign as noted.flill notify Monce tax clearance letters back; =
off-island until 6/2 - on his retum will submit the drawings and maps etc
to.who will submit the completed application on behalf of the owner.
30 GSJ Barn Permits Permits: Barn -.awaiting selection of supplier and specs.
31 GSJ Terrace Permit Build 75 foot round terrace.
32 GSJ Pool Extension Permit Extend current pool to 80 feet from 15 feet.
Waterfall (Tiki or Juggly
33
Park) Slab
34 Gym Contractors Doors Bid coming from
-
35 Flagpole Pool Illir Contractors Shade Structure Waiting for three bids-
36 Flagpole Pool Contractors Freezer JE advised not to order a freezer.
Exported on June 9.2019 9:33:34 PM BOT Page 3 of 18
EFTA00258921
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date Completion Date Date
Date
05/28/19
05/21/19 5/24/2019
5/28/19
5/31/19 6/21/19
8/1/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Exported on June 9. 2019 9:33:34 PM 8OT Page 4 of 18
EFTA00258922
Description
Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
37 LSJ Tlki Hut a. Contractors Freezer awaiting pickup for transport to LSJ.
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
39 Dock LSJ Permits under review by CZM.
Christmas Cove
40 Moorings Moorings Request moorings for Christmas Cove
Sell old Generatohri to coordinate sale of the old generators.
41 Old Generators Old Generators =to speak wit
42 Flagpole Pool & Contractors Shade Structure Shade structure is replacing need fcr awning.
43 Five Palms Franks Electric Electrical work to be done at Five Palms
44 Five Palms Concrete Need more direction from JE. He was not pleased with current layout.
45 GSJ R/O n Contractors 2nd R/0 Intake oming 5/23
46 GSJ New Dock Dock Expansion JE said stop work on 5/21
47 GSJ New Dock Water Sport Ramp JE said stop work on 5/21
and MIMMarrive Sunday, June 2, AA Flight 1391
48 2:57PM. depart Tuesday. June 4. AA Flight 943 2:41PM. Monday 6/3
"Global review the existing facilities, discuss the recent/previous improvements,
LSJ/GSJ Cables I ech" Underwater Cable plans for both sides and thoughts on the project approach, etc.
49 ACOE has reviewed the permits; their comments were addressed by
Permit Underwater Cable LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to c STX) owns
and operates a trenching company. r ou like to
conduct a site visit to review the project prior o suomitting a bid. He can
Heavy Machinery be available week of 6/3. Ills rental includes the trenching equipment
Trencher and an operator.
51 LSJ Library Roofing & Trim
52 LSJ Ilk] Hut Kitchen Order Corian countertop for Tiki Hut Kitchen
Carpentry
Awaiting quote from this project involves new shower
53 LSJ MB Bath Shower Tiles hardware, plumbing, and tile work
Build 2 Gazebos at the MC. Mockup design given tol by JE. 4ft
54 LSJ Main Compound Gazebo on each side of the centered 3ft wide door.
55 Tunnel Entrance Tunnel Gate Materials needed to skin the gate frame
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame
57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on
this. Should have better idea 931 of completion date.
Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18
EFTA00258923
Initiation Date Projected Arrival start Date Tentative Completion
Order Date
Date Completion Date Date
5/10/2019 5/28/2019
5/28/19
5/23/19
6/5/19
6/5/19
5/15/2019
5/17/2019
5/17/2019
5/17/2019
Exposed on June 9, 2019 9:33:34 PM 8OT Page 6 of 18
EFTA00258924
58 GSJ Tad Terrace Wooden Furniture Chest is complete. Lighting to be installed by 5/25.
Order thatch to be installed after Hurricane Season. (70) rolls ordered,
69 LSJ/GSJ Tiki sheds Thatch on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT.
60 Barn ? Barn Supplier to be awarded
61 GSJ Terrace Chandelier
62 Sam's Race Bedroom Repair Ceiling. Lighting socket needed
83 Holy Shit Point Structure Build Dock structure same as LSJ
64 LSJ TlldHut Coral Store egan tile work today 5/31.
65 Cabana 1 Shower Tile Shower floor is not draining properly in Cabana 1
68 Flagpole Pool Kickplate Install Kickplate
67 GSJ Tiki Bar Fix Cabinet & Drawers
Cut Carpet to size. Carpet to long. Need to be centered under both
68 GSJ Guest BR Carpet
beds
69 GSJ Pool 2 Wooden Steps Demo and rebuild new steps. Steps to match existing stairs at the MC
//
18
79 70 TN Terrace Brown Paint Deck to be stained
80 71 LSJ Dock Polyurathane Polyurathane Boardwalk
81 72 Tunnel Roof In progress. Repair holes on tunnel roof
82 73 Christmas Cove Structure Material to arrive 5/28: work to start 5/28.
63 74 Sam's Place Bedroom Paint after repairs are made
84 75 Main Compound Theater Roof Top Coat
85 76 GSJ Entrance Staircase Paint steps in epoxy grey
86 7.7 Grotto Steps Paint steps in white
8/ 78 Main Compound Ceiling Stain ceiling above the White Table
88
89 Phones, Internet & WIFI
90 79 Emergency Room Fax Pending setup of Efax account
80 LSJ Island Emergency PA System Island wde system for intruders
81 GSJ Island Emergency PA System Island wide system for intruders
Order 87 TV for Chillax Room and proper wall mount 1"5/29/19 -
82
Chillax 87 TV Pricesmart will have the 82" Samsung in stock
Order a Heavy Cuty Wall Bracket to hold the 82" Samsung TV in the
83 Chillax
Chillax 82' TV Wall mount
Exported on June 9.2019 9:33:34 PM B0T Page 7 01 18
EFTA00258925
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date Completion Date Date
Date
5/17/2019 5/25/19
5/17/2019 5/22/2019
5/17/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
6/5/2019
5/17/2019
6/6/2019
5/17/2019
5/17/2019
5/17/2019 5/24/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
5117/19
5/17/19 5/23/19
5/17/19 5/23/19
5/16/19 5/23/19 6/9/19 6/7/19
6/9/2019
Exported on June 9. 2019 9 33 34 PM BOT Page 8 of 18
EFTA00258926
Who Items Description
Completion date. [5-29-19 All Wifi, Access Points and switches and
95 84 LSJ/GSJ WIFI currently waitng on 5 addition switches to handle the distribution of
New WIFI System existing phone services.] [5-29-19] GSJ Wifi is in progress this week]
96
Camera setup at Christmas Cove"' Pending
Units and Panels as per email 5/24/19 [5/29/
"To order Yeti Solar
J Deck Nest
85 GSJ Cameras Camera is active)
97
98 R/O & Englneedng
Order Pump for Cistern 1 for LSJ to complete system. (JOH)
99 86 placed the order for the pump 5/24. Production time is weeks - the
LSJ Cistern 1 Cistern Pump factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7/21
too Gemini
87 GSJ R/O R/O Container
eawa er Systems On Island on GSJ
101 & Gemini
88 GSJ R/O parts R/O Parts
eawater Systems On Island
102 99 R/O Water Smiley Water Testing 5/24 Anna °mailed last toot results (3/2017).
103
104 Lighting & Electrical
105 90 Cabanas 1-4 Dimmers Install Dimmers
106 91 Flagpole Pool Dimmers Dimmers not working properly
107 MC Planter & Palm
92 MC New Planter Tree Lighting In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at
108 93 TiId Waterfall Pond Fountain the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane.
109 Flagpole Pool Run wires and plugs properly. Make hole in cabinets if needed. Plugs
94 Kitchen and wires should not be soon
110 95 GSJ Peters Point Sdar Lights/Other Lighting facing Peters Point for Safety
111 Cabana 1 Rope Light Test in place. JE advise that we order more. Brighter than what's
96 installed at the moment.
112 97 Master Bedroom Wall Sconce Wall sconce does not come on around the Master. Timer to be set
6:30pm -5am ?
98 GYM Equipment & Audio Wiring need to be done for GYM Equipment & Audio
99 Chillax Phone Plug Replace or fix phone/Internet plug in Chillax
100 Sam's Place Bedroom Repair Ceiling. Lighting socket needed
117 PkunbIng & Fteeko
1;h 101 GSJ Master BR Master Bath No Hot water
Exported on June 9. 2019 9 33 34 PM BOT Page 9 of 18
EFTA00258927
Initiation Date Projected Arrival Tentative Completion
Order Date Date Start Date Completion Date Date
5/17/19 5/23/19
5/22/19 6/4/19 6/11/19 5/23/19
5/17/2019 5/24/2019 7/21/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019 5/23/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
6/4/2019
6/5/2019
5/17/2019
Exported on June 9.2019 9:33:34 PM SOT Page 10 of 18
EFTA00258928
Replace ay handler for the Library..Illordered 5/27; current lead
102 Library Reefco Air Handler time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking cn the progress.
103 IT Server Room Reefco NC Unit Temp a/c installed. Beard ordered. Waiting on schedule.
Cabana 1-4 Air Shipping next week and hopes to have by May 31st. Goal is to install
105 Reefco NC Unit
Conditioning Units week of June 3rd. PM already on routire schedule for Cabana 4.
106 GSJ Reefco NC Unit PM already on routine schedule. Bedroom, Kitchen & Living Room
107 LSJ Laundry Reefco A/C Unit Housekeeping NC is not working
124
125 _ Landscaping, Irrigation Si Etna wads
126 108 LSJ Landscaping Irrigation Install irrigation for new palms
127 109 GSJ Stones Stones Stones from GSJ tc LSJ to create and fix all Stone walls
Order Pesticides & Fertilizer for all plants and palms.Meviewed
inventory - requested only fertilizer and landscaping equipment.
Chemicals & Lawnmower Headquarters quote for Stihl and Silky equipment
128 110 LSJ / GSJ Landscaping Landscaping
Equipment approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
129 Island Wide Landscapers Orange Vines Remove all Orange Vines from plants cn Island. Main Compound &
111 Island wide. Orange vines will kill the plants
130 112 LSJ Main Compound Pillars Build 10ft. Pillars by the MC new planter
131
132 Wreckshop & Heavy Machinery Operators
Exported on June 9.2019 933.34 PM BOT Page 11 or IS
EFTA00258929
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date
Date Completion Date Date
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
Exported on June 9. 2019 033:34 PM BOT Page 12 of 18
EFTA00258930
We are working On the Quadski, 1st - The ECU was not communicating
with the computer - we found an issue with a w re pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Blipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has beer worked on. There's no water lime
and I the land use - The clutch should not be worn out? The machine is
havirg the fluids replaced aid get is started to evaluate why your
mechanic was lookng at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is oroken in Half -The Muffler is loose connecting
113 HM Equipment Quadskl
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap is missirg - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request In
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week — If the clutch needs work add probably another week!
This information will all be on a report - Befot we repair we will be
making contact for approval
114 HM Equ pment Fuel Truck I Flatbed Turn Fuel truck into Flatbed
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
115
NM Equ prnent Electric Carts sent for undercoating (Rust proofing process) 5131.
116 HM Equipment ProGator John Deere does not manufacture electric progators.
Arrived on STT 5/22. Cleared, of-loaded, awaiting transport to LSJ.
117 NM Equipment Roller MG will schedule barge to pick up directly from Tropical Shipping STT.
118 Old Heavy Machinery Removal awaiting Barge
119 GSJ Engineering Shed Berm Create Berm to block LSJ view across from the RIO Containers
140 120 JE Bike Bike Handle Replace Bike handle
141 121 GSJ Hydroseeder Hydroseeder Axle to be purchased asap
142 122 Polaris Bike Valve needed for Polaris bike
143 123 GSJ Trenching Trenching Area & Description needed
144 124 LSJ Tlici Hut Tiki Parking Create Parking & Driveway at LSJ T ki Hut. JE to advise 6/5
145 125 Wreckshop Office Clean office immediately 615
145
147 Marine, Barge & Water Sports
126 GSJ Water Front Sail Boat Remove damaged sail boat
1 127 Christmas Cove Boat debrs Remove boat debris
Exported on June 9.2019 9.33:34 PM BOT Page 13 01 18
EFTA00258931
Initiation Date Projected Arrival Tentative Completion
Order Date Start Date
Date Completion Date Date
4/2/2019
5/17/2019
5/17/2019 5/10/2019 6/11/2019
5/17/2019
5/17/2019
6/6/2019
6/6/2019
6/6/2019
6/5/2019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
Exported on June 9, 2019 9:33:34 PM BOT Page 14 of 18
EFTA00258932
128 New Crew Boat Crew Boat
Install Fenders: (4) fenders purchased 'ram Blue Ocean Tackle Mc.
129 AYH / Blg N Fenders 5/24. Production lead time is 10 weeks. WA to production completion
8/2.
152 130 - AYH Big N Cleats Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
131 AYH/Big N Blankets the flange blankets were too short and are being re-manufactured.
Weather permitting. still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5 Weather permitting, still possibly Monday 6/10 Work
continues on the intake strainers and new cutouts in the hull were mace
to support the new Flanders and pipe that was found to oe necessary.
132 PR / Big N PR Repairs Corrosion ate the last ones. Paint Is being applied in the favorable
weather. Per 5 " I'm sorry, I don't have an answer as yet" He
waiting on ..ontractor to give him answers on the
hydraulic. e wi i con inue o call Barge arrival home could be
between June 10th-15th
155 133 PR / Big N Nana Take Nana to Offshore to get tie Engines Checked
Nautica delivered 5/18/19. Fiberglass modifications in progress on
starboard side. will start cutting tubes off on Saturday 6/8 to be
156 134 Nautica Boat - AiC, A/C shipped off. requested estimate for bow thrust e•lacement $3400
Tubes, Structure before shipping(just need okay from JEE andMto proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
6/4 offshore scheduled maintenance replace both timing belts. sportis
135 Sports Boat NC dropped off 830am.... 6/4 work completed at 13Dpm picked up by PC
6/4
Cleaning, Organizing & DEMO
136 GYM GYM Demo Flooring in the GYM
Vahtles
Dealership diagnosed a leaking hose in the air conditioning system.
IM3i Caribbean Auto Hose ordered 5/29: EDA on S- 1 5 tus ness days (6/5). A complete
137 JE Denali Mart NC service was performed on the Denali and the rear orake pads changed.
will schedule the hose install once the part arrives.
Insurance Coverage 8 Repairs to e. awaiting estimate
uto Accident from uto Repair - by 5/31. ill take the vehicle to
138 LSJ Suburban epairs Guardian 5/30 for adjuster's inspec
Pods & Power Wasting
Exported on June 9.2019 9:33:34 PM 13OT Page 15 of 16
EFTA00258933
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date
Date Completion Date Date
5/17/2019
5/17/2019 5/24/19 8/2/2019
5/17/2019
4/23/2019 6/10/2019
6/5/2019 6/10/2019
5/17/2019 05/18/19 06/20/19
6/4/19 6/4/19 6/4/19
6/3/2019
5/17/2019
Exposed on June 9. 2019 9:33:34 PM BOT Page 16 of 18
EFTA00258934
+ v 'I
一p炔el>
佩 \I4汕』i1 ^坞-
罗特I
继盎垒驽绪叫" ——c勘…b 韬
蚕二矍二
雠射・
i
烁…叫鲈
鬻一旷
痴狮懵
L
闲;枉J-G5 )
一动r
螽qb;v -属i11(,YfmJ 彻UI
一Y…籼厂<一斟。4 乙4・喈
-14 烊卫6
\辑
<4c r / mbv<44b癍/鸵L 驻4
-1 融蜘・16v匕勘*1和$, c一啦b碡冼 </
氨b 画庙1.S 厂寝矗豳L』
呵鲴才包I , ‘山 一,奖二诞l、tt:』u,O号儿
上{眢'Sn 一(!A勘A』t
尸扒u 』——1 二一n 万 一’一-
一竺孪一产威——吻(!墙?・ 9 灰Y5@<2丌擞{0
5 ynr 慧……
一0>喇_p 芽凸Sj
此 一山角c眉汁a -西铱寸>毗计也6
二一-
一
③ 一
镊豳风p 、 。 @N姻1ivt 脚磁*
N妯辊麦钮侈扑〉蚌@*略LA4 Kz
⑧知r辄
b俨劝骼1蝗P幽t青扃
蕊鼻馏鬻蠹鞒 & 、燃盐
一⑧曲t&ML[&J6 →
思震蠹矗
一 舢硼鲍#pI竺。u
EFTA00258935
name project
date lot
5 — 0,6 1. /C-ette,A-s
ER--ethoni-
T
tasks Pt-
-e- tArdza cry
x.:Hzts Cocktiyer
—4. .7e 5th- or° so if. -73unker)
The,c-II-6 63)
Pez, ,
kin;ps\--
-'r kook bas. ae*A teAst are4. Loan
c*.
--a- 1 nerrA 4nde4-ree lc" L63 •
n-g-rces-ktt,rAvre. 6/ or.
Snle_ 60.4%,-- IL
ok_
rii..Nb.0.5 ca.41c4Ae per4topmt - gs)
to
`i• ci c e?ntert'seA 44. e 2-enLar Oel-to t trioca
--tisC r endirk. CYRR. 1 Cris-t itocjat FR.?
6 Aaceo a.atsstc„
ord\c,.. .
kilt: -6-1044A Gir.Stnce-tia)
c cuna LIZ- re piano t-testir
MeDu2 C/evieft
vim:v13 py
p etAroac.•• cf_yek SorreeS
\Anne-≥ e e 1 9chatis.,D;)e.e.)
-ft•-• teN
eat , 1Je z0 I.Art:,‘ex.Aten- B.)
-ke &. %neetv row? , 4 er-ekezaap QA-icer
ctraslau\ ?\e-Jic-\ •
.5\.„,;hers rte- . Deao-k t retrcia-
.
-4R. \Act+) e>oresi.cre d!tatt
\n\as. •
Co\thare\ cry ri4e.ina.
EFTA00258936
tasks
- tow y city t-x.s.vakt.r Vtiktte •
• rtearik-er ‘oackxh. er -k-tAa a aror, , cokicaD
- 1-Act_tic et ‘ncasss ' Ecten,k L.:t\)retty tintrQo
Pat 1.ses,0 r, 7
VCArien •
Aare, \Jr:PA:LA..1.A •
--*•••• LorA-Ve ? 3;r. ts- \A tewcre sk-e tkomu t tinneAtre •
COAC CMAr .
rdeticit. 41,t-cc irtAre.
- Kr et 4 -47r 4 LAStrOgn..) cefee.r.• 1-1.0.4*4.
pketrAc,r ra VtiAtal en. Ce.,\neunas.
sta- tae, reJeer - 4745 Ce.Affir.uno, kne.244.4
- %.-Zerr ""Ze&A.e. rD ra-k 4r.e.e. Ve 5 as
EFTA00258937
C
-.--...___,,.,,, ,_
EFTA00258938
SEM TASK SCOPE MANAGER CONTRACTOR/LW STAFF START DATE COMPLETION DATE
ENGINEERING - EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Broken boats Offshore Marine
MARINE Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTiCA Little C- needs new engines Offshore Marine
GSJ - SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut: Starting 14th January. Max 4-5 weeks barring no
GSJ - BACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
GSJ - BACK OF THE HOUSE causes changes to layout inside building drawn.
G.5.1 Staff Cottage and Bedroom Addition: Tile is being laid, siding
GSJ - STAFF COTTAGE to start, roof installation in progress, window door install 1PK Development 2/1/2019
Stairs and Grotto Sun Louvers: E8 pricing received. Was told to
put them off and sun louver company will do this? EB can still do
LSJ - GROTTO this if green light is given. It will be 2 weeks from start date. ' Expert Builders
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. 9 has missing scope off verbal, so sent detailed scope
us - FIVE PALMS for pricing. JPK Development/Expert Builders
LSJ- FIVE PALMS Five Palms dome Samson Builders
LS1- FIVE PALMS Five Palms electrical
ISJ • GYM Gym doors to be replaced EGS -
d.51- RO RO still not working properly: Seawater Intake pump LSI Gemini Seawater Systems ..._
LSJ - MECHANICAL BUILDING Engineering doors still not even delivered Taylor, Cotton & Ridley
LS1- ELECTRICAL Rusted tights
ISJ - LANDSCAPING No solar lights Innovations (CHINA)
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
L51- MAIN COMPOUND flooring company). JPK Development/LSJE
LS1- MAIN COMPOUND Cabana tile redo? JPK Development?
151- MAIN COMPOUND Chillax bath
Cabana and Chillax Floors: AHF has been contacted. JPK and Ali F
151- MAIN COMPOUND to discuss pricing for insurance. JPK/AHF
LSJ-MAIN COMPOUND Chillax Tray Ceiling
Tiki kitchen: The samples awaiting approval, kitchen dencid, tile
LSJ - TiKI HOUSE is next step, then cabinets, etc. LSJE 1/25/2019
Big Tack o finish deck 2 days, roof starting (leaves 3.5
0351 -TAO HOUSE weeks for roof install and finishes Brian Bates 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
151- OFFICE PAVILION each roof). BWC on site 7th January 11am to review. JPK/Augustus Henry/BWC
EFTA00258939
EFTA00258940
MBR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each root).
LSI - MAIN COMPOUND BWC on site 7th January 11am to review.
Cabana 4 roof: Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on ate 7th
Si - MAIN COMPOUND January 11am to review.
ENGINEERING - EQUIPMENT Dump truck
ENGINEERING -EQUIPMENT Fuel truck
—
ENGINEERING -EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher __
G51 - GENERATORS Generators not yet online
651-SEPTIC Septic not yet connected San Jan Botanica _
G51 - RO RO delivered end of January 2019 Gemini Seawater S tems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GS1 - RO container. Gemini Seawater Systems _
LSJ - TERMINAL FACILITY Pumps not working
1S1-TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guys
G51 -TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guys
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
LSI - PEBBLE BEACH on wall. 8 weeks tentative finish. ISIE 3/8/2019
Roads not started: Roads -Mto confirm schedule.
Tentative start date January in discussion with
tS1- ROADS lawyers on credit.
LSJ- MAIN COMPOUND Master shower
LSJ-LANDSCAPING Palm trees- need start date Me r's Turf & Landscape Nursery
L51- ADMIN Staffing JE
L51- FLAGPOLE POOL Countertops: FL kitchen company to come down
LSJ- MAIN COMPOUND Cabanas 1.4 Vanities: FL kitchen company to come down
G51 - STAFF COTTAGE Furniture for Staff Cottage It,
ISJ - MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax JE, Stark Carpet
MICHELLE- 5 TRANSPORT Big N repairs Marina Del Rey PR
I.51- MECHANICAL BUIWING Engineering building fixed
GST - MECHANICAL BUILDING Engineering building new one built Ailed Steel
ENGINEERING - EQUIPMENT Carts Palmetto Motorsports
1ST - LANDSCAPING landscape equipment ____
LSJ - LANDSCAPING Fertilizer and spraying Site One Landscape
651- DOCKS Docks construction
LS1- DOCK Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
Si - RO cable between the RO plant and the seawater pump station. Gemini Seawater S stems
EFTA00258941
Conduit Bank LIJ - Seawater and Fiber - started: WAPA Switches
LSI • ELECTRICAL to be purchased
Stone Wan to be built Schedule and budget established - starting
LSJ - MAIN COMPOUND 10th January 3/29/2019
W- MAIN COMPOUND Main compound pool awnings to be put up
Fiber to be run
MARINE Jet skis
MARINE Boat trailers South Florida Trailers
Water trailers ABI Attachments
ISJ- MAIN COMPOUND Shower tiles to be redone JPK Development
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our slab (with post leave-outs) -
LSI- LANDSCAPING erect post and . ___ _ _
LSI - LANDSCAPING Nursery steps to be fixed JPK Development
W- MAIN COMPOUND Cabanas curtains _ 1/18/2019
ISJ • MAIN COMPOUND Kitchen banquette Custom Canvas
W- MAIN COMPOUND Cabanas Bed Netting Custom Canvas
EFTA00258942
~
• . .
•
EFTA00258943
1p 4 1. e i * i
ge-
oct -
sac
b4 tio -Parr*
P
r)Wilite —
asupl Ai .61fIlOw
EFTA00258944
Y
LOCATION TASK SCOPE. MANAGER CONTRACTOR LS1 STAFF START DATE COMPLETION DATE
ENGINEERING - EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Broken boats Offshore Marine
MARINE Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTICA Little C- needs new engines Offshore Marine
GS1- SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut: Starting 14th January. Max 4.5 weeks barring no
GS1- EtACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Building/Generator bunker. Need an Architect for
plumbing/electrical drawings for RO system design. This will
GSJ - BACK OF THE HOUSE Causes changes to layout inside building drawn.
GSJ Staff Cottage and Bedroom Addition: Tile is being laid, siding
GSJ - STAFF COTTAGE to start, roof installation in progress, window door install JPK Development 2/1/2019
Stairs and Grotto Sun Louvers: EB pricing received. Was told to
put them off and sun louver company will do this? EB can still do
151-GROTTO this if green light is given. It will be 2 weeks from start date. Expert Builders
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. ES has missing scope off verbal, so sent detailed scope
ISJ - FIVE PALMS for pricing. JPK Development/Expert Builders
1.51- FIVE PALMS Five Palms dome Samson Builders
IS) - FIVE PALMS Five Palms electrical
LS) - GYM Gym doors to be replaced EGS
LSJ-RO RO still not working properly: Seawater Intake pump LS1 Gemini Seawater Systems
LS1- MECHANICAL BUILDING Engineering doors still not even delivered
13.1- ELECTRICAL Rusted Lights
LS1- LANDSCAPING No solar li hts Innovations (CHINA)
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
LS1- MAIN COMPOUND flooring company). JPK Development/LSJE
IS)- MAIN COMPOUND Cabana tile redo? JPK Development?
151- MAIN COMPOUND Chillax bath
Cabana and Chillax Floors: AMP has been contacted. JPK and AHF
LSJ- MAIN COMPOUND to discuss pricing for Insurance. JPKJAHF
LSJ - MAIN COMPOUND Chillax Tray Ceiling
Tiki kitchen: Tile samples awaiting approval, kitchen demo'd, tile
LSJ - 'OKI HOUSE is next step, then cabinets, etc. 1L31E 1/2S/2019
Big Tilri o finish deck 2 days, roof starting (leaves 3.5
GS.I -TIM HOUSE weeks for roof install and finishes 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal Pokey on site 7th January 9am to review. (4.5 weeks
LSJ - OFFICE PAVILION each roof). BWC on site 7th January 11am to review.
EFTA00258945
MBR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
LSI - MAIN COMPOUND BWC on site 7th January 11am to review.
Cabana 4 roof: Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LS1- MAIN COMPOUND January 11am to review.
ENGINEERING - EQUIPMENT Dump truck
ENGINEERING - EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher
651- GENERATORS Generators not yet online
GS1 - SEPTIC Septic not yet connected San Jan Botanica
GS1 - RO RO delivered end of1anuary 2019 Gemini Seawater 5 • ms
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GS1- RO container. Gemini Seawater Systems
LSI -TERMINAL FACILITY Pumps not working
LS1- TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guy
GS1- TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guy
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
LS1- PEBBLE BEACH on wall. 8 weeks tentative finish. LSJE 3/8/2019
Roads not started: Jeffers 2 Roads - tc:i confirm schedule.
Tentative start date 14th January. rin discussion with
LS1-ROADS lawyers on credit.
LS1- MAIN COMPOUND Master shower
LS1- LANDSCAPING Palm trees- need start date Meyers Turf & Landscape Nursery
LSJ - ADMIN Staffing 1
LSI - FLAGPOLE POOL Countertops: FL kitchen company to come down
LS1- MAIN COMPOUND Cabanas 1-4 Vanities: FL kitchen company to tome down
651- STAFF COTTAGE Furniture for Staff Cottage JE/
LS1- MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax 1 Stark Carpet
MICHELLE'S TRANSPORT Big N repairs Marina Del Rey PR
LSJ - MECHANICAL BUILDING Engineering building fixed
G51 • MECHANICAL BUILDING Engineering building new one built Allied Steel
ENGINEERING - EQUIPMENT Carts Palmetto Motorsports
LSI - LANDSCAPING Landscape equipment
LS1- LANDSCAPING Fertihzer and spraying Site One Landscape
GSJ - DOCKS Docks construction
L51- DOCE Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
L51- RO cable between the RO plant and the seawater pump station. Gemini Seawater Systems
EFTA00258946
Conduit Bank LSI • Seawater and Fiber - started: WAPA Switches
LSI - ELECTRICAL to be purchased
Stone Wall to be built Schedule and budget established - starting
LSI - MAIN COMPOUND 10th January 3/29/2019
L.51- MAIN COMPOUND Main compound pool awnings to be put up
Fiber to be run
MARINE Mt skis
MARINE Boat trailers South Florida Trailers
Water trailers ABI Attachments
LSJ - MAIN COMPOUND Shower tiles to be redone JPI( Development
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our slab (with post leave-outs) -
1.51- LANDSCAPING erect post and
151- LANDSCAPING Nursery steps to be fixed JPK DeveSoment
151- MAIN COMPOUND Cabanas curtains 1/18/2029
L51- MAIN COMPOUND Kitchen banquette Custom Canvas
LS3- MAIN COMPOUND Cabanas Bed Netting Custom Canvas
EFTA00258947
4 1 4 4 4 4
taAwayi:iThatk
•
Sex_
1144agEX_____ ArAatilimuts_th .
eathdo...O
751,01-
w 411 /-Q.Leasi_
thloix bei-44-
___cithlartgank initotane42346d0.4e.,
LawArt
‘tit
_ball 04 III to
Aht.L.Y.icAttim_egfranas.... bak E
6,44±1thiria4,92.2
et
- lAkcdec Out
•- t
EFTA00258948
CONTRACTOR/LSJ STAFF START DATE COMPLETION DATTi_
LOCATION TASK scopc MANAGER
Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT
Broken tractors Caribbean Motoring
ENGINEERING - EQUIPMENT
Broken boats Offshore Marine
MARINE -BOATS
Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE
Little C - needs new enifines Offshore Marine
MARINE - NAUTICA
Dead Solar batteries Pro Solar
GSJ - SOLAR FARM
No Quonset hut Starting 14th January. Max 4.5 weeks barring no
Expert Builders 2/15/2019
651- BACK OF THE HOUSE DPNR issues
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
GSJ - BACK OF THE HOUSE causes changes to layout inside building drawn.
GS1Staff Cottage and Bedroom Addition: Tile is being laid, siding
IN< Development 2/1/2019
CiSJ -STAFF COTTAGE to start, roof installation in progress, window door install
Stairs and Grotto Sun Louvers: EB pricing received. Was told to
put them off and sun lower company will do this? EB can still do
this if green light is given. It will be 2 weeks from start date. Expert Builders
LSI - GROTTO
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. ES has missing scope off verbal, so sent detailed scope
for pricing. JPK Development/Expert Builders
L.S1- FIVE PALMS
Five Palms dome Samson Builders
LSI - FIVE PALMS
LS.1- FIVE PALMS Five Palms electrical
Gym doors to be replaced (GS
LSJ -GYM
Gemini Seawater S ms
1SJ - RO RO still not working properly: Seawater intake pun* lS1
LSI - MECHANICAL BUILDING Engineering doors still not even delivered
ISJ - ELECTRICAL Rusted Lights
No solar lights Innovations (CHINA)
151-LANDSCAPING
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
flooring company). 117K Development/LSJE
LSJ - MAIN COMPOUND
Cabana tile redo? JPK Development?
LSJ - MAIN COMPOUND
til - MAIN COMPOUND ChIllax bath
Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
to discuss pricing for insurance. JPK/AHF
LSJ - MAIN COMPOUND
LS1- MAIN COMPOUND Chillax Tray Ceiling
Tiki kitchen: Tile samples awaiting approval, kitchen clamed, tile
WE 1/25/2019
LS1.1110 HOUSE is next step, then cabinets, etc.
Big Tiki o finish deck 2 days, roof starting (leaves 3.5
1/ 32/ 2019
GS1 - TIKI HOUSE weeks for roof install and finishes
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
each roof). BWC on site 7th January 11am to review. JPK. 'BWC
(Si -OFFICE PAVILION
EFTA00258949
MBR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (45 weeks each roof).
LSJ - MAIN COMPOUND BWC on site 7th January 11am to review. JP
Cabana 4 roof: Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LS1- MAIN COMPOUND January 11am to review. Inc
ENGINEERING - EQUIPMENT Dump truck
ENGINEERING - EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher
GSJ- GENERATORS Generators not yet online
GSJ -SEPTIC Septic not yet connected San Jan Botanlca
GSJ-RO RO delivered end of January 2019 Gemini Seawater Systems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GSJ-RO container. Gemini Seawater Systems
LSJ- TERMINAL FACILITY Pumps not working
LS1-TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/26u
651-TECHNOLOGY No Reliable WIFI or Internet OuLsourced VITA/2G
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
LSJ - PEBBLE BEACH on wall. 8 weeks tentative finish. LSM 3/8/203'
Roads not started: Jeffers 2 Roads • o confirm schedule.
Tentative start date 14th January n discussion with
LSJ • ROADS lawyers on credit.
LSJ - MAIN COMPOUND Master shower
LS1- LANDSCAPING Palm trees - need start date Meyer's Turf & Landscape Nursery
ISJ - ADMIN Staffing JE
LSJ • FLAGPOLE POOL Countertops: FL kitchen company to come down
LSJ- MAIN COMPOUND Cabanas 1'4 Vanities: FL kitchen company to come down
65J -STAFF COTTAGE Furniture for Staff Cottage JE
LSI • MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax JE Stark Carpet
MICHELLE'S TRANSPORT Big N repairs Marina Del Rey PR
LSJ - MECHANICAL BUILDING Engineering building fixed
GSJ- MECHANICAL BUILDING Engineering building new one built Allied Steel
ENGINEERING - EQUIPMENT Carts Palmetto Motorsports
LSJ - LANDSCAPING landscape equipment
LSJ - LANDSCAPING Fertilizer and spraying Site One Landscape
GSJ - DOCKS Dodcs construction
LSJ - DOCK Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
LS1-RO cable between the RO plant and the seawater pump station. Gemini Seawater Systems
EFTA00258950
•
'Conduit Bank L51 - Seawater and Fiber - started: WAPA Switches
L5/: ELECTRICAL to be purchased
—I---
Stone Wall to be built: Schedule and budget established - starting
(Si - MAIN COMPOUND '10th January 3/29/2019
L51- MAIN COMPOUND`. Wain compound pool awnings to be put up
filer to be run
MARINE Jet skis
MARINE ;Boat trailers
Water trailers .. .___.
LSJ - MAIN COMPOUND i Shower tiles to be redone ._... _.
Pergola waterfall to be poured and shelter built : Need to
,establish layout of post, then our slab (with post leave-outs)-
LSI:LANDSCAPING erect post and
LSI - LANDSCAPING __ J_Nurkery ;cps to be fixed— .. .1
-MAIN COMPOUND 'Cabanas curtains _ 1/18/2m9
- MAIN COMPOUND IKitchen banquette __ 'Custom Canvas
W- MAIN COMPOUND •Cahanasi;d Netting *Custom Canvas
EFTA00258951
LOCATION TASK SCOPE MANAGER CONTRACTOR 151 STAFF START DATE COMPLETION DATE
ENGINEERING -EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Broken boats Offshore Marine
MARINE Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTICA Little C- needs new engines Offshore Marine
651-SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut: Starting 14th January. Max 4.5 weeks barring no
GSJ- BACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
651- BACK OF THE HOUSE causes changes to layout inside building drawn.
GSJ Staff Cottage and Bedroom Addition: Tile is being laid, siding
GSJ-STAFF COTTAGE to start, roof installation in progress, window door install JPK Development 2/1/2019
Stairs and Grotto Sun Louvers: ES pricing received. Was told to
put them off and sun louver company will do this? EB can still do
LSJ - GROTTO this if green light is given. It will be 2 weeks from start date. Expert Builders
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. E8 has missing scope off verbal, so sent detailed scope
LSJ - FIVE PALMS for pricing. JPK Development/Expert Builders
LSJ- FIVE PALMS Frye Palms dome Samson Builders
L.51- FIVE PALMS Five Palms electrical
LSI -GYM Gym doors to be replaced EGS
LII - RO RO still not working properly: Seawater Intake pump LS1 Gemini Seawater tems
LSJ - MECHANICAL BUILDING Engineer' doors still not even delivered
LSJ- ELECTRICAL Rusted Lights
LSJ-LANDSCAPING No solar lights Innovations {CHINA
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
LSJ- MAIN COMPOUND flooring company). JPK Development/LSJE
151- MAIN COMPOUND Cabana tile redo? JPK Development?
LSJ - MAIN COMPOUND Chillax bath
Cabana and Chillax Floors: AHF has been contacted. JI1K and AHF
151- MAIN COMPOUND to discuss pricing for insurance. JPK/AHF
151- MAIN COMPOUND Chillax Tray Ceiling
Tiki kitchen: Tile samples awaiting approval, kitchen demo'd, tile
LSJ -TIKI HOUSE is next step, then cabinets, etc. ISLE 1/25/2039
Big Tiki: Brian to finish deck 2 days, roof starting (leaves 3.5
GSJ -TUG HOUSE weeks for roof install and finishes 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
LSI - OFFICE PAVILION each roof). BWC on site 7th January 11am to review. JP BWC
EFTA00258952
MBR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
LS1- MAIN COMPOUND BWC 041 site 7th January 11am to review. JPISBWC
Cabana 4 roof: Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LSJ - MAIN COMPOUND January 11am to review, JPI BWC
ENGINEERING - EQUIPMENT Dump truck
ENGINEERING - EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher
GSJ - GENERATORS Generators not yet online
GSJ-SEPTIC Septic not yet connected San Jan Botanica
GSJ-RO RO delivered end of January 2019 Gemini Seawater Systems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GSJ-RO container. Gemini Seawater Systems
LSJ - TERMINAL FACILITY Pumps not working
LSJ -TECHNOLOGY No Reliable WIFI or Internet Outsourced
VIYA/2Guys
GSJ-TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guys ____
Pebble beach not poured: To begin next week on rebar footing ■
and pour for FDs. Then stone wall and roof schedule dependent
LSJ • PEBBLE BEACH on walL 8 weeks tentative finish. LSJE 3/8/2019
Roads not started: 2 Roads o confirm schedule.
Tentative start date 14th January. in discussion with
LS1 - ROADS lawyers on credit.
LSJ - MAIN COMPOUND Master shower
LSJ - LANDSCAPING Palm trees- need start date Meyer's Turf & Landscape Nursery
L.S1 - AMAIN Staffing
LSJ • FLAGPOLE POOL Countertops FL kitchen company to come down
LSJ-MAIN COMPOUND Cabanas 1-4 Vanities: FL kitchen company to come down
GSJ -STAFF COTTAGE Furniture for Staff Cottage JE
LSI - MAINCOMPOUND Wardrobes for all Cabanas and Carpets for Chilly( Jr Stark Carpet
MICHELLE'S TRANSPORT Big N repairs Marina Del Rey PR
LSJ - MECHANICAL BUI WING Engineering building fixed
G51- MECHANICAL BUILDING Engineering buikfing new one but Allied Steel
ENGINEERING -EQUIPMENT Carts Palmetto Motorsports
131- LANDSCAPING Landscape equipment
LSI - LANDSCAPING Fertilizer and spraying Site One Landscape
GSJ - DOCKS Docks construction
L.S1 - DOCK Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
L.S1 - RO table between the RO plant and the seawater pump station. Gemini Seawater Systems
EFTA00258953
Conduit Bank LSJ - Seawater and Fiber - started: WAPA Switches
LSJ - ELECTRICAL to be rchased
Stone Wall to be built• Schedule and budget established -starting
IS)- MAIN COMPOUND 10th January 3/29/2019
IS) - MAIN COMPOUND Main compound pool awnings to be put up
Fiber to be run
MARINE Jet skis
MARINE Boat trailers South Florida Trailers
Water trailers ABI Attachments Ir
15)- MAIN COMPOUND Shower tiles to be redone JPK Development
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leave-outs) -
LS) - LANDSCAPING erect post and
LS) - LANDSCAPING Nursery steps to be faced JPK Development
LSJ-MAIN COMPOUND Cabanas curtains 1/18/20)0
LSJ • MAIN COMPOUND Kitchen banquette Custom Canvas
IS)- MAIN COMPOUND Cabanas Bed Netting Custom Canvas
EFTA00258954
LOCATION TASK SCOPE NA ER CON CTOR/LSJLfaE i START DATE COMPLETION DATE
ENGINEERING - EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Broken boats Offshore Marine
MARINE Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTICA Little C- needs new engines Offshore Marine
GSJ - SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut: Starting 14th January. Max 4.5 weeks barring no
GSJ - BACK OF THE HOUSE DPNR Issues Expert Builders 2/ 15/ 2019
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
GSJ - BACK OF THE HOUSE causes changes to layout inside building drawn.
GSJ Staff Cottage and Bedroom Addition: The Is being laid, siding
651- STAFF COTTAGE to start, roof Installation in progress, window door install JPX Development 2/1/2019
Stairs and Grotto Sun Louvers: ED pricing received. Was told to
put them off and sun lower company will do this? ES can still do
LSJ -GROTTO this if green light is given. It will be 2 weeks from start date. IIIII Expert Builders
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. EB has missing scope off verbal, so sent detailed scope
ISJ - FIVE PALMS for pricing. 1PK Development/Expert Builders
LSI - FIVE PALMS Five Palms dome Samson Builders
LSJ - FIVE PALMS Five Palms electrical
L.51 -GYM Gym doors to be replaced EGS
(Si - RO RO still not working properly: Seawater Intake pump LS1 Gemini Seawater 5 ms
1.51- MECHANICAL BUILDING Engineering doors still not even delivered
LSI - ELECTRICAL Rusted Lights
LSJ-LANDSCAPING No solar r is Innovations (CHINA)
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
L51-MAIN COMPOUND flooring company). 1PK Development/L.51E
LSJ - MAIN COMPOUND Cabana tile redo? JPK Development?
LSJ - MAIN COMPOUND Chillax bath
Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
LSJ- MAIN COMPOUND to discuss prldng for insurance. JPK/AHF
1.51- MAIN COMPOUND Chilies Tray Ceiling
Tiki kitchen: Tile samples awaiting approval, kitchen demo'd, tile
LSJ -1110 HOUSE Is next step, then cabinets, etc. LSE 1/25/2319
Big Trki=to finish deck 2 days, roof starting (leaves 3.5
GSJ -'1110 HOUSE weeks for roof Install and finishes 1/31/20:9
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
ISJ - OFFICE PAVIUON each roof). BWC on site 7th January 11am to review. JPreWC
EFTA00258955
MR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
LSJ - MAIN COMPOUND BWC on site 7th January 11am to review. JP BWC
Cabana 4 root. Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LSJ - MAIN COMPOUND January 11am to review. JP BWC
ENGINEERING - EQUIPMENT Dump trudt
ENGINEERING - EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher
651- GENERATORS Generators not yet online
GSJ-SEPTIC Septic not yet connected San Jan Botanica
G51-RO RO delivered end ofJanuary 2019 Gemini Seawater S tems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GSJ-RO container. Gemini Seawater Systems
151- TERMINAL FACIU1Y Pumps not working
LSJ-TECHNOLOGY No Reliable WIFI or Internet: Outsourced VITA/26u s (Earl)?
GSJ - TECHNOLOGY No Reliable WIR or Internet Outsourced VIYA/2G (Earl)?
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
151- PEBBLE BEACH on wall. 8 weeks tentative finish. LSJE 3/8/2019
Roads not started: Roads .o confirm schedule.
Tentative start date 14th January. a indiscussion with
L.51- ROADS lawyers on credit.
LS1- MAIN COMPOUND Master shower
L.51- LANDSCAPING Palm trees - need start date Meyer's Turf & Landscape Nursery
LSI -ADMIN Staffing JE
IS1- FLAGPOLE POOL Countertops: FL kitchen company to come down
L.51- MAIN COMPOUND Cabanas 1-4 Vanities: Fl. kitchen company to comedown
GSJ-STAFF COTTAGE Furniture for Staff Cottage J
L.51- MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax 1 Stark Carpet
MICHELLE'S TRANSPORT Big N repairs Marina Del Rey PR
I.S1- MECHANICAL BUILDING Engineering building fixed
gs1- MECHANICAL BUILDING Engineering building new one built Allied Steel
ENGINEERING-EQUIPMENT Carts Palmetto Motorsports
ISJ • LANDSCAPING landscape equipment
LSJ-LANDSCAPING Fertilizer and spraying Site One Landscape
G51- DOCKS Docks construction
LSI - DOCK Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
LSI RO cable between the RO plant and the seawater pump station. Gemini Seawater S tems
EFTA00258956
Conduit Bank 1S1 -Seawater and Fiber • started: WAPA Switches
LS1- ELECTRICAL to be purchased
Stone Wall to be built Schedule and budget established - starting
(Si - MAIN COMPOUND 10th Tanuax 3/29/2019
LS1 • MAIN COMPOUND Main compound pool awnings to be put up
Fiber to be run
MARINE Jet skis
MARINE Boat trailers South Florida Trailers
Water trailers ABI Attachments
151- MAIN COMPOUND Shower tiles to be redone 1PK Develo ment
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leave-outs) -
151 - LANDSCAPING erect post and
LSJ • LANDSCAPING Nursery steps to be fixed JPK Development
LSJ - MAIN COMPOUND Cabanas curtains 1/18/2019
Iii • MAIN COMPOUND Kitchen banquette Custom Canvas
ISJ - MAIN COMPOUND Cabanas Bed Netting Custom Canvas
EFTA00258957
Rough Notes/Punch List from January 6, 2019 meeting on LSJ
JE, and attending
1. Confirm turbo charger for lull was on plane — confirmed. Brice sent picture.
2. order new lull
3. order new dump truck
4. order new fuel truck
5. order new flat bed
6. order new tractor
7. order new hydro seeder
8. order new man lift
9. order new push lawn mower
10. order new roller
11. order new trencher
12. order new larger fertilizer sprayer
13. order hydraulic hose machine
14. order tire changer for commercial vehicles
15. order new jet ski
16. Confirm condition of most recently purchased tractor and what needs to be done to it
to make it fully operable.
17. Nautica and Sportis are both to be ready by January 30, 2019
18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica
and Sportis are back up and running — est. to start by Feb 1.
19. new barge that is wider to accommodate two concrete trucks
EFTA00258958
20. barge and "Bubbler(sp?)
21. Omega Electric — Darren to handle demand letter after getting backup from
22. Pro Solar— follow up with
23. Generator Bunker — Architect and Engineer
24. nonage — addition and main — by February 15, 2019
25. Gym — Replace Equipment
26. Fiber to be installed for RO by Feb 20, 2019
27. RO for GSJ — work to be done; and by whom
28. Step Up Transformer for Cable
29. Step down transformer for Cable
30. Need to engineer a switch for when Cable from LSJ to GSJ fails
31. Engineering doors (28) — confirm arrival dates
32. Chillax Bath A/C — Reefco — when will it be finished
33. Roof Materials — No new EFIS — check wit
34. Septic Tanks — hole dug — dates from Adam Cook
35. WIFI — Review ABL bids by Friday — Brice to send bids to Darren and Darren to review.
36. (Dock?) pebble beach — Friday
37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019
38. Wooden Nursery Steps — JE to review
39. Service Doors and Service Gates — Bamboo Coverings
40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or
January 10, 2019
EFTA00258959
I
41. Planter by Pool wall
42. Christmas Cove Dock
43. Tiki Hut Kitchen —JE to choose color
44. Nursery Steps —JE to review
45. Waterfall layout — JE to review
46. Grotto —JE to review
47. Five Palms Electrical — Answer by January 9, 2019
48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019
49. Maids and crew — Decision regarding .o serve as point person for supervision
50. Debris and materials on top of RO to be cleaned up immediately
51. Cost You Less— to sort out by January 10, 2019
52. LSJ —_doing Roads — DKI to speak to RK
53. Dock Lights — to follow up with the person hired for this work
54. Staff Bathrooms
55. Under Cabana 2 — storage and piping
56. Island Oxygen bottles
57. First Aid Kits for all locations on both Islands
58. Pool Heater
59. Cistern Drains for Main Compound
60. Hurricane Prep Materials organized and accounted for
61. Solar System for Flagpole on GSJ
62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc.
•
EFTA00258960
63. Staff Cottage Dryer — Purchase one appropriate for propane use
64. Pool Rooms electrical panels replacement
65. Power to beach for Captains below staff cottage.
66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift
67. Blue Beach office — electric transformer
68. Staff Cottage water heater issues —dugout underneath Staff Cottage.
69. Refurbish water distribution manifold
70. Furniture package ato complete by January 11, 2019
71. Pebble Beach house — 2 additional crew members requested
72. Security — including power & internet to docks so motion detecting Ring devices can be
installed
73. ,. o review household supplies and cleaning equipment and materials needed
74. Water flowing up hillside on G51 [location not clear from notes]
75. New kitchen fridge for cottage
76. Countertops and Vanities everywhere on GSJ and LSJ
77. Pinto's people —June 17
EFTA00258961
Little Saint James
EFTA00258962
LOCATION PE NAGER CONTRACTOR/LSJ STAFF START DATE COMPLETION DATE
ENGINEERING -EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Caribbean Motoring
MARINE • BOATS Broken boats Offshore Marine
MARINE Maude." - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTICA Little C- needs new engines Offshore Marine
GSJ - SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut Starting 14th January. Max 45 weeks barring no
G.S.I- BACK OF THE HOUSE DPNR Issues Expert Builders 2/15/2019
No RO BuildIng/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
0551- BACK OFTHE HOUSE causes changes to layout Inside building drawn.
651Staff Cottage and Bedroom Addition: Tile is being laid, siding
GEJ -STAFF COTTAGE ,..„,, to start, roof installation in progress, window door install JPK Development 2/1/2019
Stairs and Grotto Sun Louvers: EB pricing received. Was told to
put them off and sun louver company will do this? EB can still do
15$ -GROTTO this if green light is given. It will be 2 weeks from start date. Expert Builders
Five Palms Windows and Doors: Reviewing MI( bid on 7th
January. EB has missing scope off verbal, so sent detailed scope
1.51- FIVE PALMS for pricing. JPK Development/Expert Builders
LS1- FIVE PALMS Five Palms dome Samson Builders
LSJ - FIVE PALMS Five Palms electrical
LSI- GYM Gym doors to be replaced EGS
LS1- RO RO still not working properly: Seawater intake pump IS) Gemini Seawater Systems
LSJ - MECHANICAL BUILDING Engineering doors still not even delivered
L.51- ELECTRICAL Rusted Lights
IS) - LANDSCAPING No solar lights Innovations (CHINA)
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
LSI - MAIN COMPOUND flooring company)„- JPK Development/LSJE
LSJ- MAIN COMPOUND Cabana tile redo?" JPK Development?
LSJ - MAIN COMPOUND Chillax bath
-.- Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
L.51- MAIN COMPOUND to discuss pricing for insurance. JPK/AHF
ISJ - MAIN COMPOUND Chillax Tray Ceiling
Tiki kitchen: Tile samples awaiting approval, kitchen demo'd, tile
LSJ-Tila HOUSE is next step, then cabinets, etc. WE 1/25/2019
Big Tad: Brian to finish deck 2 days, roof starting (leaves 3.5
GSJ -11KI HOUSE weeks for roof Install and finishes 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub- ...
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
LSJ- OFFICE PAVILION each roof). BWC on site 7th January 11am to review. aBWC
EFTA00258963
MBR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
LSJ - MAIN COMPOUND BWC on site 7th January 11 am to review. IPK WC
Cabana 4 root Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LS1- MAIN COMPOUND January 11am to review. JP BWC
ENGINEERING -EQUIPMENT Dump truck — .
ENGINEERING • EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING-EQUIPMENT Trencher
GIP - GENERATORS Generators not yet online
G5J• SEPTIC Septic not yet connected 1 San Jan Botanica
GS) - Ft° RO delivered end of January 2019 I Gemini Seawater Systems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GS1- RO container. Gemini Seawater Systems
LS1- TERMINAL FACIUT/ Pumps not working
LS1- TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2Guys
CM-TECHNOLOGY No Reliable WIFI or Internet: Outsourced VIYA/2Guys
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
LSJ- PEBBLE BEACH on wall. 8 weeks tentative finish. ISM 3/8/2019
Roads not started: • Roads o confirm schedule.
Tentative start date 14th la nueryan discussion with
LSJ - ROADS lawyers on credit.
LSJ- MAIN COMPOUND Master shower
LSJ - LANDSCAPING Palm trees- need start date Meyer's Turf & Landscape Nursery
Lal - ADMIN Staffing JE
LSI - FLAGPOLE POOL Countertops:. FL kitchen company to come down
LSJ - MAIN COMPOUND Cabanas 1-4 Vanities: FL kitchen company to come down
Gal - STAFF COTTAGE ' Fumlbare for Staff Cottage JE
LSJ- MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax JE Stark Carpet
MICHELLE'S TRANSPORT Big N repairs Marina Del Rey PR
LSJ - MECHANICAL BUILDING Engineering building fixed
GSJ - MECHANICAL BUILDING Engineering building new one built Allied Steel
ENGINEERING -EQUIPMENT Carts Palmetto Motorsports
LS)-LANDSCAPING Landscape equipment
LSJ-LANDSCAPING Fertilizer and spraying Site One Landscape
GSI - DOCKS Docks construction ..,
IS)- DOCK Dock- IPE American Export
Cables to be run: Installation and termination of the fiber optic
LSJ-RO cable between the RO plant and the seawater pump station. Gemini Seawater Systems
EFTA00258964
Conduit Bank LSJ - Seawater and Fiber - started: WAPA Switches
Lil - ELECTRICAL to be purchased
Stone Wall to be built: Schedule and budget established - startin
LS1- MAIN COMPOUND 10th January
LS1- MAIN COMPOUND 3/29/2019
Main compound pod awnings to be put up
Fiber to be run
MARINE Jet skis
_
MARINE Boat trailers 4 - South Florida Trailers
Water trailers ABI Attachments
LS1- MAIN COMPOUND Shower tiles to be redone JPIC Deve meet
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our slab (with post leave-outs) -
LS1- LANDSCAPING erect post and
LS1 • LANDSCAPING Nursery steps to be fixed 1PK Development
L51- MAIN COMPOUND Cabanas curtains
ILS1- MAIN COMPOUND 1/18/2019
Kitchen banquette Custom Canvas
LS1- MAIN COMPOUND Cabanas Red Netting Custom Canvas
EFTA00258965
5p -o461 *
--------7"
EFTA00258966
New LSJ-GSJ Mandatory Punchlist 5-17-19 • smartsheet
•"` MANDATORY
2 LSJ/GSJ Punchlist
3
4 Purchasing. Shipments & Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tro FL 6/5, sail
6/7 - EDA on STT 6/11. Clear, pickup equipment 6/12 a
Restore & (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on 1.
LSJ/GSJ ore LC Room, 2. Living Room, 3. Office,4. Twin Bedroom, 5. Master Be room.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym.
Project ON HOLD until the decorators come, per JE. Will review with
LSJ MC Kitchen & JE Banquette decorators for different ideas.
3 Master Bedroom JE Pillow Should know more after our trip on June 3rd.
■
4 Emergency Room & JE EKG Machine Order EKG Machine. JE to advise.
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the doo' openings. Awaiting quote
from T "Home Market" for Black/ ut Curtains same
Theater Room & JE Blackout Curtains custom measurements as existing panels. —confirmed New
measurements:12 Panels of 9ft Long j108in
4 Panels of 11ft 3in Long (135in). All 12 Panels are 4k Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/30).
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
6 Housekeeping Washers pickup for transport to LSJ.
Order 2 Samsung Dryers' on STT 5/28 - cleared, off-loaded, awaiting
7 Housekeeping Dryers pickup for transport to LSJ.
Gym flooded on 5/30. all equipment moved to R/O Storage on 5'30
8 Gym Flooded Floor removal began 5/3112019.
9 Sam's Place Furniture Order Living room furniture & Kitchen Table
Solar lights from China - departed from China 5/21 - 45 days to MIA -
10 LSJ/GSJ Solar Lights EDA FL 7/3.
11 LSJ/GSJ Sun Umbrellas Order 15 Cream Colored Sun Umbrellas. JE will choose.
12 Theater Room Drapes/Curtains Wrinkle out the Drapes! Curtains in the Theater
Order lighting for the Saltpond water fountain. Arriving to the Palm
13 LSJ Salt Pond Fountain Light Beach house on 5/30. Arnving on plane 6/3
14 LSJ Helipad Medical Kit Purchase Medical items for Helipad Office
15 Chillax Room Chillax Deep Clean Chillax room. Smells funny
Exported on June 0, 2019 6:07.52 AM BOT Page 1 of 18
EFTA00258967
--r-tmesatagnitwimmmi
Custom welding has stated that he will be moving the
Custom
Welding gate sections cut to LSJ 5f Little C but cannot proceed with the
16 Welding - Terrance
installation due to the rain. told hm to proceed with moving the
Philip
Welder material to the island for now.
17 Five Palms Large Windows Large Windows on each side to be installed
18 Grotto
19 New Road Road Project
20 LSJ Generator Room Contractors Hurricane Shutters
Mweather.chodulod to deliver and begin install by 5/31; wiA work around
The installation will lake around 1O-14 work days.
21 GSJ Cottage Contractors Expert Bui!dors Completion Date ? (6-8 weeks)
Forms and lighting installation complete by 5/25. Concrete pour TED.
22 GSJ Helipad Holipad JE advise "H" to bo Bigger. JE to review 6/5
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
23 LSJ Tunnel Skin it Recommend going with Allied.
neviewed and approved drawings 5/22. MG approval and sign off of
24 Wrockshop 40x60 Bid. the plans will be sent to Buck Stool 5/24.
Allied has provided estimate. Waiting on Buck Steel. Recommend going
25 HM Storage M S. Contractors 00x00 Bld. ? with Allied.
Install Vents in Fuel storage room, educed initial quote by 4500.
26 LSJ Fuel Room Reek° Vents ordered 5/24; EDA on STT by June 15th and will then schedule install.
27 Engineering % Contractors Doors Install Engineering doors.laas estimate forthcoming.
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out; JB noted the portions he needs assistance filling
out'signing, along with a checklist cf the items still needed to complete
28 GSJ Staff Cottage Permits the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and progrgy tax clearance letter, and aske
to sign as noted. EK will notify Ice tax clearance letters back;
off-island until 6/2 - cn his return wit submit the drawings and maps o c
to EK, who will submit the completed application on behalf of the owner.
29 - GSJ Barn Permits Permits: Barn -.waiting selection of supplier and specs.
30 GSJ Terrace Permit Build 75 foot round terrace.
31 GSJ Pool Extension Permit Extend current pool to 80 feet from 15 feet.
32 Waterfall (Tiki or Juggly
Park) Slab
33 Gym Contractors Doors Bid coming from
34 Flagpole Pool Contractors Shade Structure Waiting for three bids EB, Mr.
35 Flagpole Pool Contractors Freezer JE advised not to order a freezer.
Expellee on June 6. 2019 0.07:52 AM BOT Page 3 of 18
EFTA00258968
I mS Description
Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
36 LSJ TIkl Hut
M S' Contractors Freezer awaiting pickup for transport to LSJ.
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
37 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
38 Permits under review by CZM.
Dock LSJ
39 Christmas Cove
Moorings Moonngs Request moorings tor Christmas Cove
40 Sell old • o coordinate sale of the old generators,
Old Generators Old Generators =to speak with
Generator•
41 Flagpole Pool Shade Structure Shade structure is replacing need for awning.
42 Five Palms Franks Electric Electrical work to be done at Five Palms
43 Five Palms Concrete Need more direction from JE. Ho was no: pleased with current layout.
44 GSJ Ft./O Contractors 2nd R/O Intake 5/23
45 GSJ New Dock Dock Expansion JE said stop work on 5/21
46 GS.) New Dock Water Sport Ramp JE said stop work on 5/21
47
1 ..arrive Sunday, June 2, AA Flight 1391
ues ay, une 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
LSJ/GSJ Cables rolobal I ech Underwater Cable plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
48 Permit Underwater Cable LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to STX) owns
and operates a trenching company. wou like to
49 conduct a site visit to review the project prior to submitting a bid. He can
Heavy Machinery be available week of 6/3. His rental includes the trenching equipment
Trencher and an operator.
50 LSJ Library Roofing 8 Trim
51 LSJ Fadlty Entrance Service Gates Carpenters will skin gates after welder hangs frames. Material on site.
52 Awaiting quote from his project involves new shower
LSJ MB Bath Shower Tiles hardware, plumbing, an e wo
LSJ Main Compound Mockup Planter Mockup built (Measurments still in question) In-progress. On hold until
53 JE advise.
54 Tunnel Entrance Tunnel Gate See #49
55 LSJ Helipad Heli Service Gate See #49
56 Build Dock Box with Bench similar to Yacht interior orking on
LSJ Dock Water Sport Dock Box this. Should have better idea 5/31 of completion
Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18
EFTA00258969
57 Christmas Cove Container shed Structure complete, lo paint (Paint began 5124)
Small Dock box Small dock boxes for Towellaial other items (Measurments ?) Is this
58 GSJ Tiki Terrace new or is this the dock box already built?
59 GSJ Ilk Terrace Wooden Furniture Chest is complete. Lighting to be installed by 5/25.
Order thatch to be installed after Hurricane Season. (70) rolls ordered.
60 LSJ/GSJ Tiki sheds Thatch
on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT.
61 Barn ? Barn Supplier to be awarded
62 GSJ Terrace Chandelier
63 Sam's Place Bedroom Repair Ceiling. Lighting socket needed
64 GSJ New Dock Dock Shed Build New Dock Shed. JE to Advise (4 Posts in place at sight) See #70
65 LSJ TikiHut Coral Stone •egan tile work today 5/31.
66 Cabana 1 Shower Tile Shower floor is not draining properly
67 Flagpole Pool Kickplate Install Kickplate
68 GSJ Tiki Bar Fix Cabinet & Drawers
69 GSJ Guest BR Carpet Cut Carpet to size. Carpet to long. Need to be centered under both
beds
70 Main Compound Ceiling Stain ceing above the White Table
71 Tiki Terrace Brown Paint Deck to be stained
72 LSJ Dock Polyurethane Polyurethane Boardwalk
73 Tunnel Roof In progress. Repair holes on tunnel roof
74 Christmas Cove Structure Material to arrive 5/28; work to start 5/28
75 Sam's Place Bedroom Paint after repairs are made
Phones. Internet & WWI
76 Emergency Room Fax Pending setup of Efax account
77 LSJ Island Emergency PA System Island wide system fur intruders
78 GSJ Island Emergency PA System Island wide system for intruders
Order 82" TV for Chillax Room and proper wall mount •- 5/29/19 -
79 Chillax 82" TV Pricesmart will have the 82" Samsung in stock
Completion date. (5-29-19 All Will, Access Points and switches and
80 LSJ!GSJ WIFI currently waiting on 5 addition switches to handle the distribution of
New WIFI System existing phone services.) [5-29-19I GSJ Will is in progress this week)
Exported on June 6. 20f 9 6.07:52 AM DOT Page 7 of 18
EFTA00258970
No. Area VVho
Camera setup at Christmas Cove— Pending o order Yeti Sonar
Units and Panels as per email 524/19 (5/29/19 GSJ Dock Nest
81 GSJ Cameras Camera is active)
11/O & Engineering
Order Pump for Cistern 1 for LSJ to complete system.iiiiJca4)
placed the order for the pump 5/24. Production time is s - the
82 LSJ Cistern 1 Cistern Pump factory confirmed that to Tyler 5128. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7/21
Gemini
83 GSJ R/0 eawater Systems R/O Container On Island on GSJ
Gemini
84 GSJ R/O parts Seawater Systems RiO Parts On Island
85 R/O Water Water Testing 5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
86 Cabanas 1-4 Dimmers Install Dimmers
87 Flagpole Pool Dimmers Dimmers not working properly
MC Planter & Palm Tree
88 MC New Planter Lighting In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at
89 Tiki Waterfall Pond Fountain the PB house on Thursday 5/30 Can be shipped by Carluz once
package arrives at the house, or on the plane.
Run wires and plugs property. Make hole in cabinets if needed. Plugs
90 Flagpole Pool Kitchen and wires should not be seen
91 GSJ Peters Point Solar Lights/Other Lighting facing Peters Point for Safety
Test in place. JE advise that we order more. Brighter than what's
92 Cabana 1 Rope Light installed al the moment.
Wall sconce does not come on around the Master. Timer to be set
93 Master Bedroom Wall Sconce 6:30pm -yam ?
94 GYM Equipment & Audio Wiring need to be done for GYM Equipment & Audio
95 Chillax Phone Plug Replace or fix phone/Internet plug in Chillax
Plumbing & Reetco
96 GSJ Master BR Master Bath No Hot water
Replace air handler for the Library. Dave ordered 5/27; current lead
97 Library Reelco Air Handler time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
Exported on June 6. 2019 6.07 52 AM DOT Page 9 of 18
EFTA00258971
98 IT Server Room Reefco NC Unit Temp a/c installed. Board ordered. Waiting on schedule.
.__
Cabana 1-4 Air Shipping next week and hopes to have by May 31st. Goal is to install
99 Reefco NC Unit week of June 3rd. PM already on routine schedule fcr Cabana 4.
Conditioning Units
100 GSJ Reefco A/C Unit PM already on routine schedule. Bedroom. Kitchen & Living Room
101 LSJ Laundry Reefco NC Unit Housekeeping NC is not working
Landscaping, krIgation & Slone walls
Install Solar light on GSJ so JE can see those lights from Master
102 GSJ Solar Lights Solar lights Bedroom on LSJ.
103 LSJ Landscaping Irrigation Install irrigation for new pa'ms
104 GSJ Stones Stones Stones from GSJ to LSJ to create and fix all Stone walls
Plant oleanders on the left side of the MC staircase (behind the parking
on the Beach). (50) 3 gallon White Oleanders purchased 5/22 from ABC
105 - GSJ White Oleanders Nursery. Cliff updated container EDA on STT 5/29; should be off-loaded
and available for LSJ to pick up on 5/31, pending weather.
(12) Ficus trees (6-T OA) and (200) 3 gallon White Fountain grass
Ficus & White Fountain purchased 5/22 from ABC Nursery. Cliff updated container EDA on SIT
106 Grass 5/29; should be off-loaded and available for LSJ to pick up on 5/31,
pending weather.
Jute Erosion Control JE sourced on Online Fabric Store; purchased 5000 yards for all LSJ
107 Cloth and GSJ erosion control projects. EDA to Tropical FL 6/7.
Order Pesticides & Fertlizer for all plants and palmaeviewed
inventory - requested only fertilizer and landscaping equipment.
Chem ca's & Lawnmower Headquarters quote for Stihl and Silky equipment
108 LSJ / GSJ Landscaping Landscaping Equipment approved 5/29 and order placed SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
109 GSJ Beach Landscapers Teak Furniture Move teak furniture oft of GSJ waterfront to Flagpole at Holy Shit Point
Remove all Orange Vines from plants on Island. Main Compound &
Island Wido Landscapers Orange Vines Island wide. Orange vines will kill tre plants
110
Wrecicshop & Heavy Machiny Operators
Exported on June 6. 2019 6:07:52 AM GOT Page 11 of 18
EFTA00258972
We are working On the Quadski, 1st - The ECU was not communicating
with the computer - we found an issue With a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Bhpper. bilge ) are all working
properly.
The Nexl thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
111 HM Equipment Quadski
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump any -If things go well the machine could be done by
end of next week - If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval
112 HM Equipment Fuel Truck / Flatbed Turn Fuel truck into Flatbed
113 HM Equipment Mules Kawasaki does not manufacture electric vehicles yet
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
114 HM Equipment Electric Carts sent for undercoating (Rust proofing process) 5/31.
John Deere does not manufacture electric progators, only electric
115 HM Equipment ProGator gators.
116 Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
HM Equipment Roller MG will schedule barge to pick up directly from Tropical Shipping STT.
117 Old Heavy Machinery Removal
118 GSJ Engineenng Shed Berm Create Berm to block LSJ view across from the WO Containers
119 GSJ Trenching Trenching Area & Description needed
120 LSJ Tiki Hut Tiki Parking Create Parking & Driveway al LSJ Tiki Hut. JE to advise 6/5
121 Wreckshop Office Clean office immediately 6/5
Marine, Barge & Water Spode
Nautica Boat - NC, Nautica delivered to Offshore Marine Subbase 05/1819. Offshore
122 NC Marine has scheduled Jesus the tube guy for 5f31 to remove tube and
Tubes, Structure
ship out. Fiberglass repairs will start right after.
123 Sports Boat NC
Exported on June 0 2019 6.07.52 AM BOT Page 13 of 18
EFTA00258973
Description
124 GSJ Water Front Sail Boat Remove damaged sail boat
125 Christmas Cove Boat debris Remove boat debris
126 New Crew Boat Crew Boat
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
127 AYH / Big N Fenders 5/24 Production lead time is 10 weeks. EDA to production completion
8/2.
128 AYH / Big N Cleats Install Cleats at AYH Barge slip
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
129 AYH/Blg N Blankets
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 65. Weather permitting, still possibly Morday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support tho now Flanders and woo that was found to be necessary.
130 PR / Big N PR Repairs Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per s 6/ " I'm sorry, I don't have an answer as yet" He's
waiting o ontractor to give him answers on the
hydraulic. He will continue to call Barge arrival home could be
een June 10th-15th
131 PR / Big N Nana Take Nana to Offshore to get the Engines Checked
Cleaning, Organizing & DEMO
132 GYM GYM Demo Flooring in the GYM
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
133 JE Denali n Caribbean
Auto Marl NC
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed
jaMvill schedule the hose install once the part arrives.
Insurance Coverage & Repairs to he made ill awailing estimate
134 LSJ Suburban Mi lz& Cliffs Auto
cpa rs Accident from Cliffs Auto Repair - by 5/31. Carlos wi I to e t e vehicle to
Guardian 5/30 for adjusters inspection.
Pools & Power Washing
Everette/ on JJne 6. 2D19 607 52 AM 8O7 Page 15 of 18
EFTA00258974
GAt
EFTA00258975
L 1ON TASK SCOPE CONTRACTOR/LSJ STAFF START DATE COMPLETION DATE
ENGINEERING - EQUIPMENT Broken lulls Caribbean Motoring
ENGINEERING -EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Broken boats Offshore Marine
MARINE Nautica - rotten wood on floor and midship entrance BVI Painters
MARINE - NAUTICA Little C- needs new engines Offshore Marine
GSI -SOLAR FARM Dead Solar batteries Pro Solar
No Quonset hut: Starting 14th January. Max 4.5 weeks barring no
GSJ- BACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This will
GSJ- BACK OF THE HOUSE causes changes to layout inside building drawn.
GSJ Staff Cottage and Bedroom Addition: Tile is being laid, siding
GSJ -STAFF COTTAGE to start, roof installation In progress, window door Install JPK Development 2/1/2019
Stairs and Grotto Sun Louvers: EB pricing received. Was told to
put them off and sun louver company will do this? ES can still do
LSJ - GROTTO this if green light is given. It will be 2 weeks from start date. Expert Builders _
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. ES has missing scope off verbal, so sent detailed scope
LSJ- FIVE PALMS for pricing. JPK Development/Expert Builders
LSJ- FIVE PALMS 4 Five Palms dome Samson Builders
LSJ - FIVE PALMS Five Palms electrical '
LSI - GYM Gym doors to be replaced EGS
LSJ - RO RO still not working properly: Seawater intake pump LSJ Gemini Seawater toms
LSJ - MECHANICAL BUILDING Engineering doors still not even delivered
LSJ - ELECTRICAL Rusted Lights
1.51- LANDSCAPING No solar lights Innovations (CHINA)
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (2 weeks from arrival of
LSJ- MAIN COMPOUND flooring company). JPK Development/LSJE
LSJ - MAIN COMPOUND Cabana tile redo? JPK Development?
LSJ - MAIN COMPOUND Chilax bath
Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
LS) - MAIN COMPOUND to discuss pricing for insurance. JPK/AHF
LSI - MAIN COMPOUND Chillax Tray Ceiling
Tki kitchen: Tile samples awaiting approval, kitchen demo'd, tile
L51- TIKI HOUSE is next step, then cabinets, etc. LSIE 1/2S/7019
Big Tiki: Brian to finish deck 2 days, roof starting (leaves 3.5
GSJ -TIKI HOUSE weeks for roof install and finishes 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
L51- OFFICE PAVILION each roof). BWC on site 7th January 11 am to review. JPK WC
EFTA00258976
•
.4
EFTA00258977
MBR roof material not Ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
131- MAIN COMPOUND BWC on site 7th January 11am to review. JPK :WC
Cabana 4 roof: Awaiting BWC Sub-proposal. Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
LSJ - MAIN COMPOUND January 11am to review. JPK BWC
ENGINEERING - EQUIPMENT Dump truck
ENGINEERING - EQUIPMENT Fuel truck
ENGINEERING - EQUIPMENT Flat bed
ENGINEERING - EQUIPMENT Trencher
GSJ - GENERATORS Generators not yet online
GS1- SEPTIC Septic not yet connected San Jan !total-flea
GS! - RO RO delivered end of January 2019 Gemini Seawater S stems
Pumps: Interconnecting piping, power and control conduits,
power to the seawater pump station and the anchoring of the
GSJ-RO container. Gemini Seawater Systems
LSJ -TERMINAL FACILITY Pumps not working
LSJ -TECHNOLOGY No Reliable WIFI or Internet Outsourced VIYA/2GM
GSJ -TECHNOLOGY No Reliable WIFI or Internet Outsourced VITA/2G
Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
LS1- PEBBLE BEACH on wall. 8 weeks tentative finish. LSJE 3/8/2019
Roads not started:M Roads - confirm schedule.
Tentative start date 14th January. n discussion with
LS1-ROADS lawyers on credit.
LSJ - MAIN COMPOUND Master shower
LS1- LANDSCAPING Palm trees- need start date Meyer's Turf & Landscape Nursery
LS1- ADMIN Staffing 1
LS1- FLAGPOLE POOL Countertops: Ft kitchen company to come down
LSJ • MAIN COMPOUND Cabanas 1-4 Vanities: FL kitchen company to come down
GSJ -STAFF COTTAGE Furniture for Staff Cottage 1
LSJ- MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Chillax 1 Stark Carpet
MICHELLE'STRANSPORT Big N repairs Marina Del Rey PR
LSJ- MECHANICAL BUILDING Engineering building fixed
G51- MECHANICAL BUILDING Engineering building new one built Allied Steel
ENGINEERING - EQUIPMENT Carts Palmetto Motorsports
LSJ - LANDSCAPING Landscape equipment
LS! -LANDSCAPING Fertilizer and spraying Site One Landscape
GSJ - DOCKS Docks construction
LS1-DOCK Dock - IPE American Export
Cables to be run: Installation and termination of the fiber optic
1.51 - RO cable between the RO • rant and the seawater pump station. Gemini Seawater S tems
EFTA00258978
EFTA00258979
Conduit Bank 15.1 - Seawater and Fiber - started: WAPA Switches
LSJ - ELECTRICAL to be purchased
Stone Wall to be built: Schedule and budget established -starting
LSJ- MAIN COMPOUND 10th January 3/29/2019
LSJ - MAIN COMPOUND Main compound pool awnings to be put up
Fiber to be run
MARINE Jet skis
MARINE Boat trailers South Florida Trailers
Water trailers Mill Attachments
LSJ - MAIN COMPOUND Shower tiles to be redone PK Development
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our slab (with post leave-outs) -
I.S1- LANDSCAPING erect post and
L51- LANDSCAPING Nursling steps to be Fixed JPK Development
LSJ- MAIN COMPOUND Cabanas curtains 1/18/2019
LS1- MAIN COMPOUND Kitchen banquette Custom Canvas l-----
LSJ- MAIN COMPOUND Cabanas Bed Netting CustomCanvas
EFTA00258980
0
,-
/A
EFTA00258981
LSJ and GSJ Schedule smartsheet
Project Name Eno A5.sinew, d To. Note:.
I Task Name Finish Assigned To Comments
_
It
2 GSJProtects:
3 North Teal=
4. Site Work • Grading
S Dig Out Small Gen Bunker CMU Infill
6I Underground Electric
7I Wire Mesh! Framework fcc Pad tbd
11! Concrete Pour tbd Center Point Set 805/18 by JEE
9 Saw Cuts and Sealing tbd
10 Sign Off (Work Up to Standards)
11
12. RO System GSJ
13 Onsito Delivery LSJ Awaiting delivery
14; Installation and testing LSJ
15' Seawater Intake Gemini need to clig
16
17. GSJ W9 Tld 01125/19 finish cool! last 5101decking Monday
18
19. GSJ Bunker Building RO/Gen Contractors to Bid (ES /JPK?) DPNR - Need Archkect
20 Site Prep LSJ o dig out bunker area layout)
21' Construction TBO (Select Contractor) 12 week Construction Schedule (CMU Inn)
22: Testing of Equiplment
23. Sign Offs
. _
21
25 RiShirtOleh / extend 0 Hut hnbh 102/15!19 DPNR Issues proceeding
26 Repair and Extend D Hut EB EB to Stan 15th their Mason broke his Hp back on 15th
27I Roller Doors EB
281 Sign Offs
2e
30. GSJ Staff Cottage Rohn 02/01/18 DPNR - Starting Back Thursday Interior
31 GSJ Septic Tank Beckett
32: Construction
33;
34.
Furniture Package
Sign Offs .
M e order
35•
36 GSJ Main House Septic Tank Finish slopped after DPNR visit, told to proceed Jan 2nd
37 Installation of New System BackM
Page 1 of S
EFTA00258982
Project Name End Assigned To. Noles
38 Demo/Avon Of Old Sysy1ern
39. Site Work I Sign Otrs
40,
41 GSJ FT Work Contractor
42 ALV , 11/30/18 start -MI
43
44 ' LSJ Projects:
45;
46! Main Compound Wall Finish 03/29119 IIMO coma out fritiaTalked to him last Friday to confirm
471
48! Master Roof Finish tbd Al materials on LSJ I SST - Receiving 2 more bids this week
49.
501 Master Bathroom Finish
51.. Extend terrace - Design TB Confirmed JEE to decide
52. New Shower Hardware i Plumber SA
53. Repair Shower/ Light Tile Work
54. New Shower Floors
551.
56 Ubrary Roof Finish tbd Ai ouldrials on LSJ I SST - Receiving 2 more bids the week
57,
58 Flag Pool Cabana Interior Finish 1 ma Temp Counters to start, ordering from FL
59: Kitchen Remodel
60:
611 Main Compound Cabanas tbd Final Couinters / Punchlist cleanJp / Floors to be redone CB-3
62 Countertops EB From FL now?
63 Move In LSJ In Progress 2/4
64
651 Chilax Room tbd , I
66. NC Unit le reefco ,1 In Progress
! .. .
67
i .
68, Tild .Kitchen
._ 1 01/25/19 Demo done • tile next then cabinets installed, counter tops, finishes
! . .. .
69 Electrical f Pkimbing _ . . tied Contractor •=1
70t Larger Stone Apron Front , tbd Contactor Use new Cannix
. . . ... . ..... .
71..
i . .
72' Dock Shelter
73: New Decking tbd . LSJ IPE order amount confirmed - design needs confirmation and to be purchased
74, Storage Lockers tbd Sample material on Dcck - Waiting Approval
75i
Page 2 of 5
EFTA00258983
Project Name End Assigned To. Notes
76 Small dock Shelters
77 Planters LSJ St: want planters'
78
79 Pops Garden
80 Order New Shade House JEE to review onsde
81
82 Generator 2 Rebuild Finish sent VR to time° 11-27 due back 11-30, install then testing (2 Hours)
83:
84 : Engineering Building
85,
86
Demo / Construct new Building tbd Design tbd
M eachad Out to nth comments, no response yet (10)10)
87 Pebble Beach
88 Fisherman Hut 03/08/19 Redlg Footing and Start Pour
89 Foundation
Push after NYD to dig out agaln, lay rebar, pour FDs
90
91 Five Palms Reviewing Bids now / Glass order reviewed and resubmit requested
92i New Roof tbd Design TBD • new gold Dome tpricing with drawing given by LSJ
•
93 Light Site Writ tbi Design TBD Garden design needed for wall and slab
94 . New lAfindows tbd Design TBD Received bid, had issues. Revise and resubmit
95 New Doors tbd Design TBD Need to select new doors for opening size for contractors
96:
97'
New electric / Feeder line tbd Design TBD
O W do walk through with contractor (electrical)
98. Staff Bathrooms/ Gas Station
•
99 Doors and Hardware replace :bit
101 Window Replacement tbd
101 Plumbing issues t tbd
. .
102i Concrete tbd
103.
104. IT Issues
105, New Ce I Tcwer Bid tbd
106
107: Permitting
108. Cables LS.I-GSJ
109 Dock LSJ4i3SJ
110, Building Permits
111.
112: Emergency Room
113. Design Material Ust tbd owner to confirm
114 Design Approval
Page 3 of 5
EFTA00258984
Pro,ezt Nam::
115 Equipment Orders
118 Installation
117
118 Ranger Building
119 Roof Repair 780 awaltin9 Permits
120 New Doors TBD awaking permits
121
122 Roads
123 • 'Ging Revisions Jan 14th tentative start date given by
124
125 Service Gates Finish
126 Build New Gates Bamboo for Gates
127 Installation LSJ Carpenters? Or EB for said wadc
128
129 Boat Us*
130 Sportis Tube Replacement Finish lbd Capidrs
131 Little C Refit tbd GptEis
132 Big N Muffler Nish td GeplaYle
133
134 EquIplinent
135 71.12550 and LSJ EDA to IX
136 272 D2 Skid Steer tbd LSJ 7X 10/31 . EDA to FL pencing
137 John Deer Trader Ibd LSJ elected model and pricing
138
139
140
LM
141 Palm Tree Ughlk19 Ongoing
142 Courtyard Wilting Ongoing
143 Pool cabana kitchen electric Ongoing
114 Chiba AC Ongoing
—
14 Dock Lighting and eiectric Ongoing ----.
14 Camera for Staff cottage Penang
147 Cistern drains for Main Compound Penang
148 ductank from GenBld to Tunnel Ongoing
149 Movie Room Speakers Ongoing
150 ReplacePool Heater Ongoing
151 Repair both Fuel Pumps Ongoing —..---.... _.
15 Repair Diesel Feeding Dispencer Pending
1 Install Water Distribution Pumps LSJ Pending
Page 4 al 5
EFTA00258985
154 Refurbish water distribution manifold • ongoing
I
155 Instal New Sewage Lilt LW l Ongoing
156 Fix Waterheater Staff Cottage !. Per.ding
157. LSJ TAi Kitchen Remodel EaictriciPlumbing Ongoing
158 Blue Beach Transformer Replacement Mo Culsoute
159 Electrical and Data to 5 Palms : Charles Electric to Price
160. Electrical Conduit Work at Tower : Craning
161. Solar System and Electnc Pebbte Beach Roof Done - Ongoing
162', Romer to Beach for Captains Pending
!
163: Filter Replacement Seawater Intake Pending
164 Refurbish Fire System GenBld Pending
..
165' Fuel Truck Replacement Penang • Quotes TO be eared
166' Replacement of Elec Panels Pool Rooms • Pending ,
. .. ..
167' Electric out to new waterfall area 'pending
168 Replace NI Exterior Light Trim to White l pending
169. Replace AA Exterior Switches ! Ongoing
170: Staff Cottage Dryer Change to Propane '. Pending
171. install Lights for Lthrary Statues : Fencing
172 New Awnings Both Pcol Areas : . Penang
i
17; Install Treatment Plant , Ongoing
. New
... Sewage
... .
174f .Nara New Generators GSJ i Pending
175 Install Electric GSJ Tikl i Ongoing
176 Replace Batteries csA Solar
180
181
182:
Page 5 of 5
EFTA00258986
& Co., Inc. Schedule of Values
Arden, NC 28704 DATE
dba
1/6/19
LSJ
Residence: Deposit
DESCRIPTION QTY
1
RATE
PROJECT
LSJ
25,000.00
TOTAL
25,000.00
I.
Demolition and Dry-in includes remove existing copper and dry in 1 23,600.00 23,600.00
Copper: bend copper and install, all locked and soldered. I 19,500.00 19,500.00
Roofing Installation I 45,400.00 45,400.00
Library: Deposit 1 25,000.00 25,000.00
Demolition and Dry-in: includes remove existing copper and dry-in I 21,800.00 21,800.00
Copper: bend and install, all locked and soldered 1 22,500.00 22,500.00
Roofing 1 34,000.00 34,000.00
• il AI .
. • ,
Si
• .. ...
e
. '2 .1
.... •
•:--
TOTAL S216,80(100
Phone # Fax U E-mail
EFTA00258987
aileSineari ress- " c;
7 Week Look.Ahead Schedule 9r
sma eet
,. CSJ Congo ovoino JON
. ''''
"'tornt
_ ~Jalon V. vndow ace wal
2 LSJ NO Mam ; Ol/25/11 _ IEJ N Proono no sotbdtna
SI Re..Itioii — — - - — : 1 if jg. ii — in flth NV. 2 Nos. Roof ~~~ 3.5
" P~se
4 Flow VS Mlin EelltdoW iiiaint
i
Myt Sbles% abedule and doelden ~NON ~Woon IppNJen
0.HUI . Ik oren*
.. .
EB
.
sn Plagt«,
_ .
EO vaal% bo 14 In d Pen (Flouw brOke IDt No./ NO e3 oene boom? tl• FWNR bbbll
%OOM 0~
RO Baldad/Elvtim OSJ
' ONS,
. TOO
la VW.) "
by. b»nv
Swe mee an Pecrbenz
o NOP new wedt ve stoer ~Q ond plos lor AN Non Eva ~e and tva esejá; timp:NVV es wan Inwas ba IS
w "neeg ./ rade ~p leg RO cooss dompt na bode oma ~nes »Vr/4~ bobt. ;Poon
Caban,] :M : IN ItS/ • In Wegens IN tod os and Now molmt ~Oho rh« claim OlMboso ~WO 12 ~ka bom NVV« NOV. OVFOrY1
5 Pens lid SV /Eb Hot Steve ColJel No Man. molen oe rde Eb No Nana com• CII WOW e* wang ~ad wood lot Mn le plm
L311-ROOM SS . JPIO PON". 1 OwS • Nv SOroc ~bod ION dub ~Nl. PSV clOolng Ool lIonOrd B vn to look V lOS ~Sv lor Na NCW OW Slo 000dnp Ni I I sen ~V
. -
Non. MI Oa2 kl Prowas ES phOw ~And. Wol toni to ovt torn el ond otn kv" ~pro ob de Pin EB en na do lbb epeworpa webbaillb 50 2 ~as fit" •Isrl ah ,
M 2 Reeds . 10 Hot Stoned
in Provo.
~Con, me Schobde/ lal eten Om Vn Nis clicussloi VIP Ob Y+pwnn cnOl
tobbd N nostiMb eilul N tost tra roo. *oh ffoth oos isf ~Do» woo poe end dope WO 2 woolo toni b» Val 6«.•
~NIM Peso
~~~ers. of Mom Gil ~ooms ! tol . titY Stan.] on.nbw; optorn • POL
C0ea SOM 1.$1 • SY/ end Pim M in Printte Stoned
EMMY pomill.S.1 Ž OvMnt ov Stoned Cv*/
Pf*Abn Pao LU : SIM Nv &inca Gordt..
1 I Palm ElowINI M Hor Srne]
PI Propvol
M aa rnWed vn lor vee Mercur vtlicolonoob
Pl. ~Vn NOP» doen
Pool catone ~en M OPndboy
20 MC Capes I.4 Coorton Iltd in Peten. Fl ~et compleiy W aow dcon
JI Colon. TW Pabo? •M Hot Sar«
22 Cabans and ENEN Nare ž IV tiv Swood AliF No boe omwind no« erMir to chaw orbleg lor ~en
22 Set trwl• OM l sd sp Sene] nired b codlern INNI wok of ven
. _
Expoled en January 6, 2019 8.01:12 AM PST Page 1 of 1
_
EFTA00258988
m+1,\Airpild
EFTA00258989
New LSJ-GSJ Mandatory Punchlist 5-17-19 smartsheet
**** MANDATORY
LSJ/GSJ Punchlist
Purchasing, Shipments 8 Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tro4.cal FL 6/5, sail
Restore & 6/7 - EDA on STT 6/11. Clear, pickup equipment 6112 nd crew
LSJ/GSJ More LLC (2-3) arrive 6/12 - rernediation begins 6/13. (5) areas on 1.
Room, 2. Living Room, 3. Office,4. Twin Bedroom, 5. Mager Bedroom.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added -3. Gym.
Project ON HOLD until the decorators come, per JE. Wilreview with
2 LSJ MC Kitchen nJE Banquette decorators for different ideas.
3 Master Bedroom JE Pillow Should know more after our trip on June 3rd.
4 Emergency Room JE EKG Machine Order EKG Machine. JE to advise.
Purchase Black blackout fabric for the curtains. No ligfl should
penetrate from anywhere. including the door openings.Awaiting quote
from TJ "Home Theater Market" for Black(Bl out Cutains same
5 Theater Room JE Blackout Curtains custom measurements as existing panels. nfrmed New
measurements: 12 Panels of 9ft Long (108in)
4 Panels of 11ft In Long (135in), All 12 Panels are411 Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/3O).
6 Housekeep ng Order 2 Samsung Washers: on STT 5/28 - cleared,off-loaded, awaiting
Washers
pickup for transport to LSJ.
7 Housekeeping Order 2 Samsung Dryers: on STT 5/28 - cleared. offloaded, awaiting
pickup for transport to LSJ.
8 Gym Gym flooded on 5/30. all equipment moved to RIO Storage on 5/30.
Floor removal began 5/31/2019.
9 Sam's Place Order Living room furniture & Kitchen Table
liCe
1C/ Solar lights from China - departed from China 5/21 - 45 days to MIA -
LSJ/GSJ Solar Lights EDA FL 7/3.
11 LSJ/GSJ Sun traibeellati Order 15 Cream Colored Sun Umbrellas. JE *1choose.
12 Theater Room Dra Cu ins Wrinkle out the Drapes/ Curtains in the Theater
13 Order lighting for the Saltpond water fountain. Arriving to the Palm
LSJ Salt Pond Fountain Light Beach house an 5/30. Arriving on plane 6/3
14 LSJ Holipad Medical Kit Purchase Medical items for Helipad Office
15 Chillax Room Chillax Deep Clean Chillax room. Smells funny
Exported on June 5, 2019 5:40.29 PM BOT Paw 1 of 18
EFTA00258990
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date Completion Date Date
Date
5/6/2019 6/12/2019 6/13/2019
5/17/2019
5/17/2020
5/17/2021
5/17/2022
5/17/2019 5/17/2019 5/28/2019
5/17/2019 5/17/2019 5/28/2019
5/21/2019
5/17/2019
12/13/2018 12/20/2018 7/27/2019
5/17/2019
6/5/2019 5/25/2019
5/16/2020 5/23/2018 6/3/2019 6/412019
5/16/2020 5/23/2018 6/3/2019 6/4/2019
6/4/2019
Exported on June 5. 2019 5.40.29 PM BOT
EFTA00258991
-In's41 fl=ims", Construction & Projects
Custom welding has stated that he will be moving the
gate sections out to LSJ 5/29 on Little C but cannot proceed with the
16 installation due to the rain. Mike told him to proceed with moving the
Welder material to the island for now.
17 Five Palms Large Windows on each side to be installed
18 Grotto
19 New Road
scheduled to deliver and begin install by 5/31; will work around
-20 LSJ Generator Room & Contractors Hurricane Shutters weather. The installation will take around 10-14 work cays.
21 GSJ Cottage & Contractors Expert Builders Completion Date ? (6-8 weeks)
Forms and lighting installation complete by 5/25. Concrete pour TBD.
22 GSJ Helipad Helipad JE advise "H" to be Bigger. JE to review 6/5
Re-Skin the Tunnel. Quote from Allied. Waiting on BucK Steel.
23 LSJ Tunnel Skin it Recommend going with Allied.
Mevieweci and approved drawings 5/22.Mapproval and sign off of
24 Wnockshop 40x60 Bid. the plans will be sent to Buck Steel 5/24.
Allied las provided estimate. Waiting on Buck Steel. Recommend going
25 HM Storage Contractors 00x00 Bld. ? with Alied.
Install Vents in Fuel storage room._ reduced intial quote by 4500;
-26 LSJ Fuel Room Reefco Vents ordered 5/24; EDA on STT by June 15th and will then schedule install.
27 Engineering & Contractors Doors Install Engineering doors. has estmate forthcoming.
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
Forms for the GSiii( ottage to EK and Dig to review the portions
already filled out; noted the portions he needs assistance filling
outi'signing, along wi h a checklist of the items still needed to complete
28 GSJ Staff Cottage Permits the application. 5/28 EK completed the permit appkation, requested
the IRB tax clearance and progaly tax clearance letter and asketa
to sign as noted. EK will notify Monce tax clearance letters backM
off-island until 6/2 - on his return will submit the drawings and maps etc
to EK, who will submit the completed application on behalf of the owner.
29 - GSJ Bam Permits Permits: Barn -.awaiting selection of supplier and specs.
30 GSJ Terrace Permit Build 75 foot round terrace.
31 GSJ Pool Extension Permit Extend current pool to 80 feet from 15 feet.
Waterfall (Tiki or Juggly
32 Park) Slab
33 Gym Contractors Doors Bid coming from -
34 Flagpole Pool Contractors Shade Structure Waiting for three bids: BI
35 Flagpole Pool Contractors Freezer JE advised not to order a freezer.
Exported on June 5.2019 5:4029 PM BOT Page 3 of 18
EFTA00258992
Projected Arrival Tentative Completion
Initiation Date Order Date Start Date Completion Date Date
Date
05/28/19
05/21/19 5/24/2019
5/28/19
5/31/19 6/21/19
8/1/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Exported on June 5. 2019 5:40.29 PM BOT Page 4 of 18
EFTA00258993
npticn
Order Freezer for Tlid hut kitchen: on STT 5/28 - cleared, off-loaded,
38 LSJ TIM Hut Contraotcrs .Freezer awaiting pickup for transport to LSJ.
Under CZM review for permittng: 1. Temporary Barge ramp (GSJ
37 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
38 Dock LSJ Permits under review by CZM.
Christmas Cove
39 Moorings Mcorings Request moorings for Christmas Cove
Sell old Generators: to coordinate sale of the old generators,
40 Old Generators Old Generators o spear wit
41 Flagpole Pool Shade Structure Shade structure is replacing need for awning.
42 Five Palms Franks Electric Electrical work to be done at Five Palms
43 Five Palms Concrete Need more cirection from .;E. He was not pleased with current layout.
44 GSJ R/O Contractors 2nd P/0 Intake oming 5/23
45 GSJ New Dock Dock Expansion JE said stop wcrk on 5/21
46 GSJ New Dock Water Spert Ramp JE said stop wcrk on 5/21
and arrive Sunday. June 2. AA Flight 1391
47 2:57PM. cepart ues ay, une 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
LSJ/GSJ Cables Global Tech Underwater Cable plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
48 Underwater Cable LSJE; permit expected to be issued In the next 30-45 days.
Permit
3 estimates have been submitted to STX) owns
and operates a trenching company. like to
49
Heavy Machinery 1 conduct a site visit to review the projec prior o su mitting a bid. He can
be ava lable week of 6/3. His rental includes the ranching equipment
50
Trencher
LSJ Library
1
. and an operator.
51 LSJ FaclIty Entrance Service Gates Carpenters will skin gates after welder hangs frames. Material on site.
Awaiting quote from this project involves new shower
52 LSJ MB Bath Shower Tiles
hardware. plumbing. and tile work
Mockup bdilt (Measurments still in question) In-progress. On hold until
53 LSJ Main Compound Mockup Planter
JE advise.
54 Tunnel Entrance Tunnel Gate See #49
55 LSJ Helipad Heli Service Gate See #49
56 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht nteriorl=working on
this. Should have better idea 5/31 of completion da e.
Exported on J..ine 5, 2019 5:40.29 PM BOT Page 5 of 18
EFTA00258994
Projected Arrival start Date Tentative C e
Initiation Date Order Date
Date Completion Date Cate
-7
5/10/2019 5/28/2019
_ 5/2EV19
5/23/19
I-
i
.•••r . of .. • •••im • •• •••••.••-•r••• •. .••••.••••• •••.•••••. . i•...... .•••• •••a• M••••••• •• •••••• • ..ly• • =•••••••• • a, ••• et ..••• 0.• • 4.•••••• • ••• • • 6..1
i
I
I
1
-t -t-
i
1 --- - - -
I
1
I
1
L i
!
i
8/6/19
-4- r _I. 4- 4
5H512019 I
1
• 1 •
I 4
Exported on Juno 6.2019644029 PM BOT Page 6 of18
EFTA00258995
Items Description
57 Christmas Cove Container shed Structure complete, • paint (Paint began 5/24)
Small dock boxes for Towels and other items (Measurments ?) Is this
58 GSJ TIM Terrace Small Dock box new or is this the dock box Bran already built?
59 GSJ Tlkl Terrace Wooden Furniture Chest is complete. Lighting to be installed by 5/25.
60 LSJ/GSJ Tikl sheds Thatch Order thatch to be installed after Hurricane Season. (70) rolls ordered,
on ST T 5/22. Cleared, awaiting pick up from tropical Shipping SI T.
61 Barn? Barn Supplier to be awarded
62 GSJ Terrace Chandelier
63 Sam's Place Bedroom Repair Ceiling. Lighting socket needed
64 GSJ New Deck Dock Shed Build New Dock Shed. JE to Advise (4 Posts in place at sight) See #70
65 LSJ TildHut Coral Stone began tile work today 5/31.
66 Cabana 1 Shower Tile Shower floor is not draining properly
67 flagpole Pool Kickplate Install Kickplate
68 GSJ Tiki Bar Fix Cabinet & Drawers
69 GSJ Guest BR Carpet Cut Carpet to size. Carpet to long. Need to be centered under both
beds
70 Main Compound Ceiling Stain ceiling above the White Table
71 Tlki Terrace Brown Paint Deck to be stained
72 LSJ Dock Polyurathane Polyurathane Boardwalk
73 Tunnel Roof In progress. Repair holes cn tunnel roof
74 Christmas Cove Structure Material to arrive 5/28; won( to start 5/28.
75 Sam's Place Bedroom Paint after repairs are made
Phones,!Swint & WIFI
76 Emergency Room Fax Pending setup of Efax account
77 LSJ Island Emergency PA System Island wide system for intruders
78 GSJ Island Emergency PA System Island wide system for intruders
Order 87 TV for Chillax Room and proper wall mount "'5/29/19 -
79
Chillax 82" TV Pricesmart will have the 87 Samsung in stock
Completion date. [5-29-19 All Wifi, Access Points and switches and
80 LSJ/GSJ WIFI currently waiting on 5 addition switches to hancle the distribution of
New WIFI System existing phone services.] [5-29-19) GSJ Wifi is in progress this week)
Exported on „brie 5.2019 5:40.29 PM 00T Page 7 of 18
EFTA00258996
Initiation Date Order Date Projected Arrival Tentative Completion
Date Start Date
Completion Date Date
5/17/2019 5/31/19
5/17/2019
5/17/2019 5/25/19
5/17/2019 5/22/2019
5/17/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
6/5/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
5/17/2019 5/24/19
5/17/2019
5/17/2019
5/17/19
5/17/19 5/23/19
5/17/19 5/23/19
5/16/19 5/23/19 6/9/19
5/17/19 5/23/19
Exported on June 5. 2019 5:4O29 PM BOT
Page 8 of 18
EFTA00258997
Camera setup at Christmas Cove*" Pending Mike to order Yeti Solar
Units and Panels as per email 5/24/19 [5/29/19 GSJ Dock Nest
81 GSJ Cameras Camera s active]
RIO & Engineering
Order Pump for Cistem 1 for LSJ to complete cystem..JCH)
the order for the pumps 5/24. Production time is weeks - the
82 LSJ Cistern 1 & JCH Cistern Pump factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on SIT 7/21
& Gemini R/O Container
83 GSJ RIO Seawater Systems On Island on GSJ
& Gemini R./O Parts
84 GSJ R/O parts eawater Systems On Island
85 R/O Water & Smiley Water Testing 5/24Memailed last test results (3/2017).
Lighting & Electrical
86 Cabanas 1-4 Dimmers Install Dimmers
87 Flagpoe Pool Dimmers Dimmers not working properly
MC Planter & Palm Tree
88 MC New Planter Lighting In progress
Add Lighting to Water Fountain. Ordered 5/23: scheduled to arrive at
89 Mkt Waterfall Pond Fountain the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane.
Run wires and plugs properly. Make hole in cabinets if needed. Plugs
90 Flagpole Pool Kitchen and wires should not be seen
91 GSJ Peters Point Solar Lights/Other Lighting facing Peters Point for Safety
Test in place. JE advise that we order more. Brighter than what's
92 Cabana 1 Rope Light
installed at the moment.
Wall sconce does not come on around the Master. Timer to be set
93 Master Bedroom Wall Sconce 6:30pm -5am ?
94 GYM Equipment & Audio Wiring need to be done fcr GYM Equipment & Audio
95 Chlliax Phone Plug Replace or fix phone/Internet plug in Chillax
Plumblrg & Reek')
96 GSJ Master BR Master Bath No Hot water
Replace air handler for the Library.iMirdered 5727; current lead
97 Library Reefco Air Handler time 7-8 weeks plus transit time (4-5 days) Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
Exported on June 5.2019 5 40 29 PM ROT Page 9 of 18
EFTA00258998
I Projected Arrival Tentative I Completion
Initiation Date Order Date Date Start Date Completion Date I Date
9 23/19 I
, 5/22/19
,_..._ 6/4/19
_._.. . ._ .------ ! 6/11/19
-1--_______,_______— .— . ._--...................................... i
I 1
• i 1 I
I I
• 917/2019 5/24/2019 i 7/21/2019 I
i I
5/17/2019 • I
—...... ........ --- —.----I
:5117/2019 I
1— 1
i
I
1 61172019
• 5/17/2019
, r --- ------ — -- -- -- ----i s
r-
I I
917/2019
1 —4- - I.-- I •--1i
I i i
:5/172019 523/2019 --
i I
. 5/17/2019 —... ___.. _ ___
6/17/2019
i...• -- ---- —T
- -
— i — I
. 6/17/2019 __r_
I
—
5/17/2019
1 -
.4
T
L i_
1
--i
6/4/2019 ' _ __ ___ . _ ...1.-.....-. -_-.1 -. -......--1- - --- - -.I
•, 6/4/2019
r ,
--r-
i/17/2011 7,T .i
I ,
! i
5/17/2019 • . __ _ ______-_ _. __ ____L____- _ -..... .. - .-..;
Exported on June 5, 2019 5:4029 PM BOT Pane 100118
EFTA00258999
Who Items Description
98 IT Server Room Reefco A/C Unit Temp a/c Installed. Board ordered. Waiting on schedule.
Cabana 1.4 Air Reefco
Shipping next week and hopes to have by May 31st. Goal is to install
99 Conditioning Units NC Unit week of June 3-d. PM already on routine schedule for Cabana 4.
100 GSJ Reefco NC Unit PM already on routine schedule. Bedroom, Kitchen & Living Room
101 LSJ Laundry Reefco NC Unit Housekeeping NC is not working
LaniecipIng, Irrigation & Stone walls
Install Solar light on GSJ so JE can see those I ghts from Master
102 GS.) Solar Lights Solar Ights
Bedroom on LSJ.
103 LSJ Landscaping Irrigation Install irrigation for new palms
104 GSJ Stones Stones Stones from GSJ to LSJ to create and fix all Stone walls
Plant oleanders on the left side of the MC staircase (behind the parking
on the Beach). (50) 3 gallon White Oleanders purchased 5'22 from ABC
105 - GSJ White Oleanders Nursery. Cliff updated container EGA on STT 5/29: should be off-loaded
and available for LSJ to pick up on 5/31. pending weather.
(12) Ficus trees (6-T OA) and (200) 3 gallon White Fountain grass
106 Ficus & White Fountain purchased 5,22 from ABC Nursery. Cliff updated container EDA on STT
Grass 5129; should be off-loaded and available for LSJ to pick up on 5/31,
pending weather.
107 Jute Erosion Control JE sourced cn Online Fabnc Store; purchased 5000 yards for all LSJ
Cloth and GSJ erosion control projects. EDA to Tropical FL 67.
Order Pesticides & Fertilizer for all plants and palms: Meviewed
inventory - requested only fertilizer and landscaping equipment.
Chemicals & Lawnmower Headquarters quote for Stihl and Silky equipment
108 LSJ / GSJ Landscaping Landscaping Equipment approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Muth and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
109 GSJ Beath Landscapers Teak Furniture Move teak furniture off of GSJ waterfront to Flagpole at Holy Shit Point
Remove all Orange from plants on Island. Main Compound &
Island Wide Landscapers Orange Vises
110 Island wide. Orange vines will kill the plants
Wreckahop & Heavy Machinery Operators
Exported on June 5, 2019 5:4029 PM BOT Pape 11 nf 18
EFTA00259000
Projected Arrival I Start Date Tentative r Completion
Initiation Date Order Date
Date Completion Date Date
1_
5/17/2019
_ •_ _• _ _
5/17/2019
4
15/1712019
_
' 5/17/2019
• 5117/2019
• 5/17/2019
I
!
1-
5/17/2019 5/22/2019 . 15/31/2019
:- - I
1 5/31/2019
5/17/2019 5/22/2019
L
5/27/2019 5/28/2019 8/16/2019
1 -
5/17/2019
i 6/5/2019
ty5/2019
A --
Exported on June 5. 2019 5:40:29 PM GOT Paps 12 of 18
EFTA00259001
No. Area Who Items Description
We are working On the Quadski, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Blipper, bilge ) are all working
properly.
The Next tning we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? 'he machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Quadski Muffler Rubber mount s broken in Half -The Muffler is loose connecting
111 HM Equipment to exhaust pipe - seal s damaged
RH side - Upper Sprocket seal/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week — If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
makirg contact for approval
112 HM Equipment Fuel Truck I ;lathed Turn Fuel truck into Flatbed
113 HM Equipment Mules Kawasaki does not manufacture electric vehicles yet.
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will bo
114 HM Equipment Electric Carts sent for undercoating (Rust proofing process) 5/31.
John Deere does not manufacture electric progators, only electric
115 HM Equipment ProGator gators.
Arrived on SIT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
116 HM Equipment Roller MG will schedule barge to pick up directly 'rem Tropical Shipping STT.
117 Old Heavy Machinery Removal
118 GSJ Engineering Shed Berm Create Berm to block LSJ view across from the R/O Containers
119 GSJ Trenching Trenchirg Area 8 Description needed
120 LSJ Teti Hut Tiki Parking Create Parking & Driveway at LSJ Tiki HuL JE to advise 6/5
121 Wreckshop Office Clean office immediately 6/5
Might Barge & Watir Sports
Nautica delivered to Offshore Marne Su X bbaso C5/18/19. Offshore
Nautica Boat - NC, AJC Marine has scheduled Jesus the tube guy for 5/3i to remove tube and
122 Tubes, Structure ship out. F berglass repairs will start right after.
123 Sport's Boat NC
Exported on June 5.2019 5:40:29 PM BOT Page 13 of 18
EFTA00259002
Projected Arrival Tentative Completion
Initration Date Order Date Start Date
Date Completion Date Date
4/212019
5/10/2019 6/11/2019
6/5/2019
5/17/2019
6/4/2019
5/17/2019 05/18/19 06/20/19
Exported on June 5. 2O19 5:40:29 PM BOT Page 14 01 18
EFTA00259003
124 GSJ Water Front Sail Boat Rornove damaged sail boat
125 Christmas Cove Boat debris Remove boat debris
126 New Crew Boat Crew Boat
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
127 AYH / Big N Fenders 5/24. Production lead time is 10 weeks. EDA to production completion
8/2.
128 AYH / Blg N Cleats Install Cleats at AYH Barge slip
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
129 AYH/Big N Blankets
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Morday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to suppot the new Flanders and pipe that was found to be necessary.
130 PR / Big N PR Repairs Corrosion ate ones. Paint is being applied in the favorable
weather. Per 6/5 " I'm sony, I don't have an answer as yet" He's
waiting tractor to give him answers on the
hydraulic. He will continue to call Barge arrival home could be
between June 10th-15th
131 PR / Big N Nana Take Nana to Offshore to get the Engines Checked
Cleaning, Organizing & DEMO
132 GYM GYM Demo Flooring in the GYM
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
133 JE Denali M & Caribbean
uto Mart NC
Hose orcered 5/29; EDA on STY 5 business days (6/5). A complete
was performed on the Denali and the rear brake pads changed.
nill schedule the hose install once the part arrives.
Insurance Coverage & Repa rs to be made.IE. waiting estimate
134 LSJ Suburban Mz & Cliffs Auto
epairs
Accident from Cliffs Auto Repair - by 5/31.allik.1 to e t e vehicle to
Guardian 5/30 for adjusters inspection.
Pools & Power Washing
Exported on June 5, 2019 5:40:29 PM BOT Page 15 of 18
EFTA00259004
X41late Tentative ; Completion
Completion Date / Date
8/2/2019
6/102019
6/10/2019
Yr Page 16 of 18
EFTA00259005
Little Saint James
EFTA00259006
Rough Notes/Punch List from January 6, 2019 meeting on LSJ
JE, nd attending
1. Confirm turbo charger for lull was on plane — confirmed. sent picture.
2. order new lull
3. order new dump truck
4. order new fuel truck
5. order new flat bed
6. order new tractor
7. order new hydro seeder
8. order new man lift
9. order new push lawn mower
10. order new roller
11. order new trencher
12. order new larger fertilizer sprayer
13. order hydraulic hose machine
14. order tire changer for commercial vehicles
15. order new jet ski
16. Confirm condition of most recently purchased tractor and what needs to be done to it
to make it fully operable.
17. Nautica and Sportis are both to be ready by January 30, 2019
18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica
and Sportis are back up and running — est. to start by Feb 1.
19. new barge that is wider to accommodate two concrete trucks
EFTA00259007
20. barge and "Bubblerisp?]
21. Omega Electric —no handle demand letter after getting backup from
22. Pro Solar — follow up with Erika
23. Generator Bunker —Architect and Engineer
24. Cottage — addition and main — by February 15, 2019
25. Gym — Replace Equipment
26. Fiber to be installed for RO by Feb 20, 2019
27. RO for GSJ — work to be done; and by whom
28. Step Up Transformer for Cable
29. Step down transformer for Cable
30. Need to engineer a switch for when Cable from LSJ to GSJ fails
31. Engineering doors (28) — confirm arrival dates
32. Chillax Bath A/C — Reefco — when will it be finished
33. Roof Materials — No new EFIS — check with
34. Septic Tanks — hole dug — dates from
35. WIFI — Review ABL bids by Friday — to send bids tolao review.
36. [Dock?) pebble beach — Friday
37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019
38. Wooden Nursery Steps —JE to review
39. Service Doors and Service Gates — Bamboo Coverings
40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or
January 10, 2019
EFTA00259008
41. Planter by Pool wall
42. Christmas Cove Dock
43. Tiki Hut Kitchen —JE to choose color
44. Nursery Steps —JE to review
45. Waterfall layout — JE to review
46. Grotto —JE to review
47. Five Palms Electrical —Answer by January 9, 2019
48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019
49. Maids and crew— Decision regarding to serve as point person for supervision
50. Debris and materials on top of RO to be cleaned up immediately
51. Cost You Less to sort out by January 10, 2019
52. LS1 — =doing Roads — DKI to speak to RK
53. Dock Lights --to follow up with the person hired for this work
54. Staff Bathrooms
55. Under Cabana 2 — storage and piping
56. Island Oxygen bottles
57. First Aid Kits for all locations on both Islands
58. Pool Heater
59. Cistern Drains for Main Compound
60. Hurricane Prep Materials organized and accounted for
61. Solar System for Flagpole on GSJ
62. Reefco Library Issues— larger intake filter, intake pump, 3-day valve, etc.
EFTA00259009
63. Staff Cottage Dryer— Purchase one appropriate for propane use
64. Pool Rooms electrical panels replacement
65. Power to beach for Captains below staff cottage.
66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift
67. Blue Beach office — electric transformer
68. Staff Cottage water heater issues — dugout underneath Staff Cottage.
69. Refurbish water distribution manifold
70. Furniture package — Karen to complete by January 11, 2019
71. Pebble Beach house — 2 additional crew members requested
72. Security — including power & internet to docks so motion detecting Ring devices can be
installed
73. Mo review household supplies and cleaning equipment and materials needed
74. Water flowing up hillside on GSJ [location not clear from notes]
75. New kitchen fridge for Mottage
76. Countertops and Vanities everywhere on GSJ and LSJ
77. Pinto's people —June 17
EFTA00259010
V
Rough Notes/Punch List from January 6, 2019 meeting on LSJ
JEt ind attending
1. Confirm turbo charger for lull was on plane — confirmed. -sent picture.
2. order new lull
3. order new dump truck
4. order new fuel truck
5. order new flat bed
6. order new tractor
7. order new hydro seeder
8. order new man lift
9. order new push lawn mower
10. order new roller
11. order new trencher
12. order new larger fertilizer sprayer
13. order hydraulic hose machine
14. order tire changer for commercial vehicles
15. order new jet ski
16. Confirm condition of most recently purchased tractor and what needs to be done to it
to make it fully operable.
17. Nautica and Sport's are both to be ready by January 30, 2019
18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica
and Sports are back up and running — est. to start by Feb 1.
19. new barge that is wider to accommodate two concrete trucks
EFTA00259011
20. barge and "Bubbler"isp?]
ega Electric — to handle demand letter after getting backup from
liSr
.
22. Pro Solar — follow up with Erika
23. Generator Bunker - Architect and Engineer
24. In ottage - addition and main - by February 15, 2019
25. Gym — Replace Equipment
26. Fiber to be installed for RO by Feb 20, 2019
27. RO for GSJ — work to be done; and by whom
28. Step Up Transformer for Cable
29. Step down transformer for Cable
30. Need to engineer a switch for when Cable from LSJ to GSJ fails
31. Engineering doors (28) — confirm arrival dates
32. Chillax Bath A/C — Reefco — when will it be finished
33. Roof Materials — No new EFIS — check with
34. Septic Tanks — hole dug — dates from
35. WIFI — Review ABL bids by Friday --to send bids to to review.
36. [Dock?] pebble beach — Friday
37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019
38. Wooden Nursery Steps —JE to review
39. Service Doors and Service Gates — Bamboo Coverings
40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or
January 10, 2019
EFTA00259012
41. Planter by Pool wall
42. Christmas Cove Dock
43. Tiki Hut Kitchen —JE to choose color
44. Nursery Steps — JE to review
45. Waterfall layout —JE to review
46. Grotto — JE to review
47. Five Palms Electrical — Answer by January 9, 2019
48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019
49. Maids and crew — Decision regarding o serve as point person for supervision
50. Debris and materials on top of RO to be cleaned up immediately
51. Cost You Less -Mto sort out by January 10, 2019
52. LSJ —going Roads — DKI to speak to RK
53. Dock Lights o follow up with the person hired for this work
54. Staff Bathrooms
55. Under Cabana 2 — storage and piping
56. Island Oxygen bottles
57. First Aid Kits for all locations on both Islands
58. Pool Heater
59. Cistern Drains for Main Compound
60. Hurricane Prep Materials organized and accounted for
61. Solar System for Flagpole on GSJ
62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc.
EFTA00259013
63. Staff Cottage Dryer — Purchase one appropriate for propane use
64. Pool Rooms electrical panels replacement
65. Power to beach for Captains below staff cottage.
66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift
67. Blue Beach office — electric transformer
68. Staff Cottage water heater issues — dugout underneath Staff Cottage.
69. Refurbish water distribution manifold
70. Furniture package So complete by January 11, 2019
71. Pebble Beach house — 2 additional crew members requested
72. Security — including power & internet to docks so motion detecting Ring devices can be
installed
73. review household supplies and cleaning equipment and materials needed
74. Water flowing up hillside on GSJ [location not clear from notes]
75. New kitchen fridge for=cottage
76. Countertops and Vanities everywhere on GSJ and LSJ
77. Pinto's people — June 17