From: 4
To: "Lesley Groff'
Subject: RE: Shade Structure/Engineering Doors Bid (LSJ/GSJ)
Date: Thu, 23 May 2019 00:41:47 +0000
HI Ms. Groff,
Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to
determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able
to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on
St. John in the morning and may not have phone service. If any thing please send a text.
Best Wishes
John
Original Message
Subject: Shade /Engineering Doors Bid (LSJ/GSJ)
From: Lesley Groff <!
Date: Tue, May 21, 2019 2:46 pm
To:
Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure
located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me
as soon as possible with this bid?
Also wondering about the bid for the engineer doors?
Please let me know!
Thank you,
Lesley
LSJ/GSJ
Sent from my iPhone
EFTA00495638