Guiestream Maintenance Due List
Sort By ATA Code
Include only mandatory service Information not yet accomplished
Projected Through •
3346.6 Hours TT
N62MS
2846.6
MYCMP Log Date — 24 Jan 2016
1640 Landings
05 Feb 2017 Date
Current TT
Current 1390
Phone:IM or FAX: ■
Analyst: Ralph Moose 2262.5 APU Hours Current Hr Mtr 2428.8
Aircra Make Gulfstream Phone: 300 APU Cycles
Aircraft Model G550
Aircraft Serial No. 5017
COMPONENT TIMES
Airworthiness Date 14 Aug 2003 Position Logbook Description Serial Number Total Time Total Cycles TSO CSO
Regulation 91.40913 1 Engine Rolls Royce BR700-710C4-11 15137 2846.6 1390
(G550)
2 Engine Rolls Royce BR700-710C4-11 15136 2846.6 1390
(G550)
1 APU Honeywell RE220 (G550) P-327 1862.5 0
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CiW
Frequency (*=Adj) Airframe Remains Price Manhrs
Logbook TAG MOD H/W SiW TSOHR TSOLD TSOMO
Position MM Ref Event Category Pr. Adjustments Date Type Ops Number(s)
1A CH 500 Hrs 2828.7 3328.7Hrs 482.1 Hrs
200074 1379
12 MOS 29 Jun 30 Jun 4 Mos
Airframe 2015 2016'
Operation (R)
2A CHECK 1000 Hrs 1974.4 2974.4Hrs 127.8 Hrs
200075 946
11 Apr
Airframe 2011
Operation (R)
1C CHECK 2828.7
200084 1379
12 MOS 23 Jun 30 Jun 4 Mos
Airframe 2015 20W
Operation (R)
N62MS G550 5017 Maintenance Due List Page 1 of 14 05 Feb 2016
@2016 Gulfskeam Aerospace Corporation. MI Rights Reserved. A General Dynamics Company
EFTA00591668
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW S.M TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
2C CHECK 2676.5
200085 1312
24 MOS 18 Jun 30 Jun 4 Mos
Airframe 2014 2016
Operation (R)
3C CHECK 2545.0
200086 1248
36 MOS 14 Jun 30 Jun 4 Mos
Airframe 2013 2016
Operation (R)
4C CHECK 2381.4
200087 1159
48 MOS 20 Jul 2012 30 Jun 4 Mos
Airframe 2016'
Operation (R)
6C CHECK 1761.4
200089 847
72 MOS 04 Jun 30 Jun 4 Mos
Airframe 2010 2016
Operation (R)
Fwd Emergency Battery Pack - Discard 2381.4
240113 102.110301 101011.3 0 1159 $1.842.67 4.0
Yes 13 48 MOS 03 Jul 2012 31 Jul 2016 5 Mos
Airframe
G550 AMM Replacement (X)
Standby Electrical Power System Operational Test 2676.5
242O05 1312 1.0
24 MOS 18 Jun 30 Jun 4 Mos
Airframe 2014 2016'
G550 AMM Functionat(Ops Test (O) 85
L Main Battery Capacity Check 2773.4
243011 1159SCAV519.l 114388 1356 4.0
12 MOS 18 Mar 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM Special Inspection (R)
R Main Battery Capacity Check 2773.4
243012 1356 4.0
12 MOS 18 Mar 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM Special Inspection (R)
Crew Seats Inertia Reel (Pilot) - Operational Test 2676.5
251006 1312 1.0
24 MOS 18 Jun 30 Jun 4 Mos
Airframe 2014 2016'
G550 AMM Functionat(Ops Test (O) 85
N62MS G550 5017 Maintenance Due List Page 2 of 14 05 Feb 2016
© 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591669
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW S.M TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
First Aid Kit (No. 1) - Detailed Inspection 2828.7
256043 1379 1.0
12 MOS 20 Jun 30 Jun 4 Mos
Airframe 2015 2016
G550 AMM Special Inspection (R)
First Aid Kit (No. I) Time Limits Supplies - Discard 2828.7
256045 AFAK 0120040418 1379 $1.019.70 1.0
No 12 MOS 20 Jun 30 Jun 4 Mos
Airframe 2015 2016
G550 AMM Replacement (X)
Life Vest(s) - Detailed Inspection 2773.4
256201 1356 2.0
12 MOS 18 Mar 31 Mar 55 Days
Airframe 2015 2016'
G550 AMM Special Inspection (R)
Life Raft(s) (No. 1) - Detailed Inspection 2845.9
256202 1389 1.0
12 MOS 20 Jan 31 Jan II Mos
Airframe 2016 2017.
G550 AMM Special Inspection (R)
Life Raft(s) (No. 2) Detailed Inspection 2845.9
256203 1389 1.0
12 MOS 20 Jan 31 Jan II Mos
Airframe 2016 2017*
G550 AMM Special Inspection (R)
Bator lectrode a sDiscard (Set o. 1 2628.2
256406 FR2 LO130913.1804 0.0 0 0 1283 $0.00 0.5
Yes 12 Dec 31 Mar 55 Days
Airframe 2013 2016
Replacement (X) Expiration
Defibrillator Electrode Pads - Discard (Set No. 2) 2628.2
256415 DP2 LO130913.1804 0.0 0 0 1283 $80.34 0.5
Yes 12 Dec 31 Mar 55 Days
Airframe 2013 2016
Replacement (X) Expiration
Engine Fire Bottle Cartridge (Left Bottle. APU / Spare Squib, Service Life) - Discard 2061.5
262118 30903852 1608FJ 66 988 $882.96 2.0
Yes 120 MOS 042 Aug 29 Feb 24 Days
Airframe 2011 2016
G550 AMM Replacement (X) 66
Trash Receptacle Fire Extinguisher Nozzles (Aft Lavatory) - Detailed Inspection 2828.7
262583 1379 0.0
12 MOS 09 Jun 30 Jun 4 Mos
Airframe 2015 2016'
G550 AMM Special Inspection (R)
N62MS G550 5017 Maintenance Due List Page 3 of 14 05 Feb 2016
CO 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591670
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD RN SNV TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
Trash Receptacle Fire Extinguisher Nozzles (Forward Lavatory) Details Inspection 2828.7
262584 1379 0.0
12 MOS 10 Jun 30 Jun 4 Mos
Airframe 2015 2016'
G550 AMM Special Inspection (R)
Trash Receptacle Fire Extinguisher Nozzles (Aft Galley / Annex) - Detailed Inspection 2828.7
262585 1379 0.0
12 MOS 09 Jun 30 Jun 4 Mos
Airframe 2015 2016'
G550 AMM Special Inspection (R)
Main Fuel Boost Pump (Left) - Fuel Leak Check 500 Hrs 2828.7 3328.7Hrs 482.1 His
282651 1379
08 Jun
Airframe 2015
G550 AMM Special Inspection (R)
Main Fuel Boost Pump (Right) - Fuel Leak Check 500 Hrs 2828.7 3328.7Hrs 482.1 Hrs
282652 1379
09 Jun
Airframe 2015
G550 AMM Special Inspection (R)
Alternate Fuel Boost Pump (Left) - Fuel Leak Check 500 Hrs 2828.7 3328.7Hrs 482.1 Hrs
282653 1379
08 Jun
Airframe 2015
G550 AMM Special Inspection (R)
Alternate Fuel Boost Pump (Right) - Fuel Leak Check 500 Hrs 2828.7 3328.7Hrs 482.1 Hrs
282654 1379
08 Jun
Airframe 2015
G550 AMM Special Inspection (R)
DFDR Functional Test 2689.1
313002 1320 4.0
24 MOS 30 Jul 2014 31 Jul 5 Mos
Airframe 2016'
G550 AMM Functional!Ops Test (F)
Main Landing Gear Components (Left) - Detailed Corrosion Inspection 2381.4
321003 1159 25.0
48 MOS 17 Jul 2012 31 Jul 2016 5 Mos
Airframe
G550 AMM Special Inspection (M)
Main Landing Gear Components (Right) Detailed Corrosion Inspection 2381.4
321004 1159 25.0
48 MOS 17 Jul 2012 31 Jul 2016 5 Mos
Airframe
G550 AMM Special Inspection (M)
N62MS G550 5017 Maintenance Due List Page 4 of 14 05 Feb 2016
O2016 Gulfsfream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591671
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
Main Landing Gear (Left) • Lubrication 2835.5
321005 1382 2.0
4 MOS 18 Sep 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM Lubrication/Servicing (L)
Main Landing Gear (Right) - Lubrication 2835.5
321006 1382 2.0
4 MOS 18 Sep 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM Lubrication/Servicing (L)
Main Landing Gear and Attachments (Left) General Visual Inspection 500 Hrs 0.0 3026.7 Hrs* 180.1 Hrs
321045 0
14 Aug
Airframe 2003
G550 AMM Special Inspection (R)
Main Landing Gear and Attachments (Right) General Visual Inspection 500 Hrs 0.0 3026.7 Hrs* 180.1 Hrs
321046 0 0.0
14 Aug
Airframe 2003
G550 AMM Special Inspection (R)
Main Landing Gear Corrosion Inhibiting Compound Reapplication (Left) 2689.1
321221 1320 20.0
24 MOS 26 Jul 2014 31 Jul 5 Mos
Airframe 2016'
G550 AMM Lubrication/Servicing (S)
Main Landing Gear Corrosion Inhibiting Compound Reapplication (Right) 2689.1
321222 1320 20.0
24 MOS 26 Jul 2014 31 Jul 5 Mos
Airframe 2016'
G550 AMM Lubrication/Servicing (S)
Nose Landing Gear Components - Detailed Corrosion Inspection 2381.4
322003 1159 20.5
48 MOS 07 Jul 2012 31 Jul 2016 5 Mos
Airframe
G550 AMM Special Inspection (M)
Nose Landing Gear - Lubrication 2835.5
322004 1382 2.0
4 MOS 18 Sep 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM Lubrication/Servicing (L)
Nose Landing Gear and Attachments - General Visual Inspection 500 Hrs 0.0 3026.7 Hrs* 180.1 Hrs
322006 0
14 Aug
Airframe 2003
G550 AMM Special Inspection (R)
N62MS G550 5017 Maintenance Due List Page 5 of 14 05 Feb 2016
€12016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591672
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CMI
Frequency (*=.AdJ) Airframe Remains Price Manhrs
Logbook TAG MOD KW SAW TSOHR TSOLD TSOMO
Position MM Ref Event Category P.: Adjustments Date Type Ops Number(s)
Nose Landing Gear Corrosion Inhibiting Compound Reapplication 2689.1
322220 1320 18.0
24 MOS 26 Jul 2014 31 Jul 5 Mos
Airframe 20W
G550 AMM Lubrication/Servicing (S)
Landing Gear Emergency Extension Nitrogen Blow-down Bottle (Left) • (Hydrostatic) Functional 2525.3
323002 Test
3.0
1159SCH233.5 29118C1 1234
Airframe 36 MOS 15 May 31 May 116 Days
2013 2016
G550 AMM Functional/Ops Test (F) Hydrostatic
Landing Gear Emergency Extension • Operational Test 2545.0
323901 1248 16.0
36 MOS 14 Jun 30 Jun 4 Mos
Airframe 2013 2016
G550 AMM FunctionaUOps Test (O) 86
Emergency Floorpath Lighting Battery Pack (Deep Cycle) No. 1 - Functional Test 2828.7
335006 ABS•2013•IA 24300 1379 8.0
18 MOS 15 Jun 31 Jan 11 Mos
Airframe 2015 2017'
G550 AMM Lubrication/Servicing (5)
Emergency Floorpath Lighting Battery Pack (Deep Cycle) No. 2 • Functional Test 2828.7
335007 24301 1379 8.0
18 MOS 15 Jun 31 Jan 11 Mos
Airframe 2015 2017'
G550 AMM LubricatioNServicing (S)
Emergency Floorpath Lighting Battery Pack (Deep Cycle) No. 3 • Functional Test 2828.7
335008 ABS-2013.1A 24299 1379 8.0
18 MOS 15 Jun 31 Jan 11 Mos
Airframe 2015 2017'
G550 AMM Lubrication/Servicing (S)
Air Data Module No. 1 - Certification 2761.6
341023 hg1153ca02 03020372 1352 4.0
12 MOS 01 Mar 31 Mar 55 Days
Airframe 2015 2016
G550 AMM Lubrication/Servicing (Z) Calibration
Air Data Module No. 2 - Certification 2761.6
341024 HG1153CA02 03030401 1352 4.0
12 MOS 20M
01 ia
5r 32
10i
Ma6r 55 Days
Airframe
G550 AMM Lubrication/Servicing (Z) Calibration
N62MS G550 5017 Maintenance Due List Page 6 of 14 05 Feb 2016
@2016 Gulfstream Aerospace Corporation. MI Rights Reserved. A General Dynamics Company
EFTA00591673
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
Air Data Module No. 3 - Certification 2761.6
341025 HG1153CA02 07022079 1352 4.0
12 MOS 01 Mar 31 Mar 55 Days
Airframe 2015 2016
G550 AMM Lubrication(Servicing (Z) Calibration
Air Data System No. I - Functional / Leak Test 2761.6
341304 1352 4.0
12 MOS 01 Mar 29 Feb 24 Days
Airframe 2015 2016'
G550 AMM FunctionatlOps Test (F)
Air Data System No. 2 Functional / Leak Test 2761.6
341305 1352 4.0
12 MOS 01 Mar 29 Feb 24 Days
Airframe 2015 2016*
G550 AMM Functionat(Ops Test (F)
Air Data System No. 3 - Functional / Leak Test 2761.6
341306 1352 4.0
12 MOS 01 Mar 29 Feb 24 Days
Airframe 2015 2016*
G550 AMM Functionat(Ops Test (F)
VOR IFR Check 2846.6
345004 1390 2.0
30 DAY 31 Jan 01 Mar 25 Days
Airframe 2016 2016
FunctionayOps Test (O)
FMS NAV Database Update 2834.2
346025 1381
28 DAY 19 Aug 16 Sep -5 Mos
Airframe 2015 2015
G550 AMM Lubrication/Servicing Expiration
Crew Oxygen Bottle (No. 1) - (Hydrostatic) Functional Test 2070.8
351211 895180.15 ALTB42.046 993 8.0
60 MOS 14 Sep 30 Sep 7 Mos
Airframe 2011 2016
G550 AMM FunctionallOgs Test (F) Hydrostatic
Passenger Oxygen Bottle (No. 2) (Hydrostatic) Functional Test 2070.8
351212 805983.15 ALT842-065 993 8.0
60 MOS 14 Sep 30 Sep 7 Mos
Airframe 2011 2016
G550 AMM Functionati09ps Test (F) Hydrostatic
Portable Oxygen Bottle (No. 1) (Hydrostatic) Functional Test 2006.5
353003 56009M6A-F30AN ST77661 968 1.0
60 MOS 20 May 31 May 116 Days
Airframe 2011 2016
G550 AMM FunctionattOps Test (F) Hydrostatic
N62MS G550 5017 Maintenance Due List Page 7 of 14 05 Feb 2016
© 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591674
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category @r. Adjustments Date Type Ops Number(s)
Water Sterilizer Quartz Glass Sheath - Restore 3000 Hrs 12.0 3012.0Hrs 165.4 Hrs
381027 0.0 0 8 2.0
No 20 Nov
Airframe 2003
G550 AMM Overhaul (T)
Germicidal Lamp Discard 3000 Hrs 12.0 3012.0Hrs 165.4 Hrs
381028 2.60001.01 NSN 0.0 0 0 8 $284.64 2.0
No 20 Nov
Airframe 2003
G550 AMM Replacement (X)
APU Compartment Drain Collectors General Visual Inspection 2689.1
491300 1320
24 MOS 24 Jul 2014 30 Jun 4 Mos
Airframe 2016'
G550 AMM Special Inspection (R)
Auxiliary Power Unit Turbine Plenum Drains - Operational Test 1761.5
491301 0 3.0
24 MOS 28 Jul 2014 30 Jun 4 Mos
APU 2016'
G550 AMM Functional/Ops Test (O)
Main Entrance Door Cables - Tension Check 1761.4
521016 847 8.0
72 MOS 04 Jun 30 Jun 4 Mos
Airframe 2010 2016*
G550 AMM Special Inspection (R) 89
Baggage Compartment Door Internal Structure Detailed Inspection 0.0
523201 0 8.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Tail Compartment Door - Zonal Inspection 0.0
524001 0 2.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (R)
Auxiliary Pressure Bulkhead Door Zonal Inspection 0.0
525002 0 2.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (R)
Radome to Structure Perimeter Steps - Detailed Inspection 2689.1
530201 1320 3.0
24 MOS 30 Jul 2014 31 Jul 5 Mos
Airframe 2016'
G550 AMM Special Inspection (R)
N62MS G550 5017 Maintenance Due List Page 8 of 14 05 Feb 2016
CO 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591675
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P.: Adjustments Date Type Ops Number(s)
Electronic Equipment Rack FS 147 - FS 181 (Enhanced) Zonal Inspection 2676.5
531082 1312 3.0
24 MOS 18 Jun 30 Jun 4 Mos
Airframe 2014 2016'
G550 AMM Special Inspection (M) 85
Longeron Installation L / R BL 12 FS 119 - 145 (Left) - Detailed Inspection 0.0
531300 0 8.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Longeron Installation L / R BL 12 FS 119 - 145 (Right) - Detailed Inspection 0.0
531305 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Cabin Internal Structure Headliner Removed All Penetrations - Detailed Inspection 0.0
532105 0 45.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Below Emergency Exits Detailed Inspection 0.0
532110 0 35.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Baggage Door Surround Structure - Detailed Inspection 0.0
532115 0 6.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Traffic Alert and Collision Avoidance System Antenna Spacer - Detailed Inspection 0.0
532610 0 0.0
144 MOS 23 Jun 30 Jun 4 Mos
Airframe 2003 2016'
G550 AMM Special Inspection (R)
Torque Box Installation /Connections Detailed Inspection 0.0
533410 0 6.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Forward Engine Mounts Installation FS 758 - Detailed Inspection 0.0
533610 0 2.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
N62MS G550 5017 Maintenance Due List Page 9 of 14 05 Feb 2016
2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591676
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category Pr. Adjustments Date Type Ops Number(s)
Pressure Bulkhead FS 758 Composite Panels - Detailed Inspection 1761.4
533620 847 24.0
72 MOS 02 Jun 30 Jun 4 Mos
Airframe 2010 2016
G550 AMM Special Inspection (M)
Tail Compartment Above Floor Electrical Junction Boxes Detailed Inspection 2381.4
535028 1159 4.0
48 MOS 07 Jul 2012 31 Jul 2016 5 Mos
Airframe
G550 AMM Special Inspection (R) 87
Horizontal Stabilizer Hinge and Actuator Fitting Detailed Inspection 0.0
551014 0 10.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Horizontal Stabilizer Rub Blocks General Visual Inspection 3000 Hrs 0.0 3000.0Hrs 153.4 Hrs
551109 0
14 Aug
Airframe 2003
G550 AMM Special Inspection (R)
Horizontal Stabilizer Rub Blocks Functional Test 3000 Hrs 0.0 3000.0Hrs 153.4 Hrs
551110 0
14 Aug
Airframe 2003
G550 AMM FunctionatlOps Test (F)
Elevator External for Delamination (Left) Detailed Inspection 0.0
552001 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Elevator External for Delamination (Right) - Detailed Inspection 0.0
552002 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Elevator Hinge (Left) - Detailed Inspection 0.0
552005 0 26.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Elevator Hinge (Right) - Detailed Inspection 0.0
552006 0 26.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
N62MS G550 5017 Maintenance Due List Page 10 of 14 05 Feb 2016
© 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591677
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
Rudder External for Delamination Detailed Inspection 0.0
554005 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Rudder Assembly Front Beam Internal - Detailed Inspection 0.0
554010 0 12.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Wing Rear Beam (Left Enhanced) Zonal Inspection 2689.1
575021 1320 3.5
24 MOS 25Jul 2014 30 Jun 4 Mos
Airframe 2016'
G550 AMM Special Inspection (M) 85
Wing Rear Beam (Right Enhanced) Zonal Inspection 2689.1
575022 1320 3.5
24 MOS 25 Jul 2014 30 Jun 4 Mos
Airframe 2016'
G550 AMM Special Inspection (M) 85
Trailing Edge Flight Control Attach Hinge / Support Fittings (Left) Detailed Inspection 0.0
575601 0 12.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Trailing Edge Flight Control Attach Hinge / Support Fittings (Right) - Detailed Inspection 0.0
575602 0 12.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Aileron Ballast Weights (Left) Details Inspection 0.0
576005 0 10.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Aileron Ballast Weights (Right) Detailed Inspection 0.0
576006 0 10.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
Aileron Tab r Spoilers External for Delamination Detailed Inspection 0.0
576010 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (M)
N62MS G550 5017 Maintenance Due List Page 11 of 14 05 Feb 2016
CO 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591678
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
Powerplant Nose Cowls Internal (Left) Zonal Inspection 0.0
711310 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (R)
Powerplant Nose Cowls Internal (Right) Zonal Inspection 0.0
711311 0 4.0
144 MOS 02 Jun 30 Jun 4 Mos
Airframe 2004 2016
G550 AMM Special Inspection (R)
Low-pressure Compressor (Fan) Annulus Fillers - Detailed Inspection 500 Hrs 2828.7 3328.7Hrs 3328.7 482.1 Hrs
723103 1379 4.0
14 Jun
Engine 1 2015
G550 AMM Special Inspection (R) 74
Low-pressure Compressor (Fan) Annulus Fillers - Detailed Inspection 500 Hrs 2828.7 3328.7Hrs 3328.7 482.1 Hrs
723103
(723104) 1379 4.0
12 Jun
Engine 2 2015
G550 AMM Special Inspection (R) 74
Variable Stator Vane Mechanism - Lubrication 1000 Hrs 1974.4 2974.4Hrs 2974.4 127.8 Hrs
753025 946 16.0
30 Mar
Engine 1 2011
RR 8R710-C4 EMM Lubrication/Servicing (L)
Variable Stator Vane Mechanism - Lubrication 1000 Hrs 1974.4 2974.4Hrs 2974.4 127.8 Hrs
753025
(753026) 946 16.0
30 Mar
Engine 2 2011
RR BR710-C4 EMM Lubrication/Servicing (L)
Thrust Reverser Ground Relay (Left) Operational Test 2545.0
783013 1248 1.0
36 MOS 14 Jun 30 Jun 4 Mos
Airframe 2013 2016'
G550 AMM Functionat(Ops Test (O) 86
Thrust Reverser Ground Relay (Right) Operational Test 2545.0
783014 1248 1.0
36 MOS 14 Jun 30 Jun 4 Mos
Airframe 2013 2016'
G550 AMM Functionat(Ops Test (p) 86
SB BR700-72-A101523 (Revision 3) - Pawl Carrier Pivot Pins - Replace 0.0
880128 (R) 0 3.0
31 Jan -5 Days
Engine 1 2016
Required Bulletin
N62MS G550 5017 Maintenance Due List Page 12 of 14 05 Feb 2016
© 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591679
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SIW TSOHR TSOLD TSOMO
Position MM Ref Event Category P= Adjustments Date Type Ops Number(s)
SB BR700-72-A101523 (Revision 3) - Pawl Carrier Pivot Pins Replace 0.0
880128
(890128) (R) 0 3.0
31 Jan -5 Days
Engine 2 2016
Required Bulletin
CB 122A Replacement - Fuel Boost Pumps. P/N 1159SCP500-5 0.0
981221 (R) 0 23.5
31 Oct 8 Mos
Airframe 2016
Required Bulletin
CB 150A Modification Aircraft Main Battery Chargers 0.0
981501 0
15 Aug 6 Mos
Airframe 2016
Required Bulletin
CB 159 Replacement - Main Landing Gear Door Actuator End Cap - Life Limit 0.0
981590 (R) 0 31.0
12 MOS 01 Jul 2016 5 Mos
Airframe
Required Bulletin
AD 7408.09 R3 Lavatory Paper and Linen Waste Receptacle Enclosure Access Dow and 1000 Hrs 0.0 2996.1 Hrs 149.5 Hrs
994002 Disposal Door Inspection
1.0
0
Airframe
AD 74-0809 Airworthiness Directive (R)
AD 2013.22-19 Fuel Boost Pump 0.0
994013 0
36 MOS 07 Jan 11 Mos
Airframe 2017
Airworthiness Directive
AD 2014.18-01 Rockwell Collins Mode S Transponders TDR-94/TDR-94D 0.0
994015 0
24 MOS 14 Oct 8 Mos
Airframe 2016
Airworthiness Directive
AD 2015.16-04 Kidde Graviner 0.0
994019 (R) 0
6 MOS 15 Mar 39 Days
Airframe 2016
Airworthiness Directive
AD 2012.26-15 RI Honeywell International 0.0
998001 0
Airframe
Service Information
N62MS G550 5017 Maintenance Due List Page 13 of 14 05 Feb 2016
© 2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591680
Description
Code Required Next Due Next Due Time Approx Code
Part Number Serial Number TSNHR TSNLD TSNMO Last CM
Frequency ('a.Adj) Airframe Remains Price Manhrs
Logbook TAG MOD tVW SAN TSOHR TSOLD TSOMO
Position MM Ref Event Category p= Adjustments Date Type Ops Number(s)
TOTAL APPROXIMATE PRICE AND CODE MANHOURS FOR ATAs 05-96 $4.110.31 611.50
TOTAL APPROXIMATE PRICE AND CODE MANHOURS FOR ATAs 97-99 $0.00 55.50
N62MS G550 5017 Maintenance Due List Page 14 of 14 05 Feb 2016
O2016 Gulfstream Aerospace Corporation. All Rights Reserved. A General Dynamics Company
EFTA00591681