CAMP Amnia/mop r4e von'n' 737-72UB3 REVISION 21 S/N 29273 (YG006) VP-BBJ
OWNER: PICTON II LTD. OPERATOR: PICTON II LTD.
ADDRESS: C/O JET AVIATION ADDRESS: C/O JET AVIATION
GENEVA AIRPORT CH-1215 GENEVA AIRPORT CH-1215
PHONE: PHONE:
FAX: FAX:
ANALYST: DENNIS RUFFINI lr) PLEASE RECORD CHANGES TO ADDRESS, LAST
EMAIL: ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO
WWW.CANIPSYSTEMS.COM CAMP.
AIRCRAFT SERIAL/REGNO: 29273 (YG006)/VP-BBJ MODEL: 737-72UB3 REVISION 21 MANUFACTURER: BOEING COMPANY
DATES LAST ACTUALS CURRENT ACTUAL
INSERVICE DATE: 08-OCT-1999 3753:19 NC HRS as of 30-JUN-2014 NC HRS as of _i_ii
922 AFL as of 30-JUN-2014 AFL as of _i_t
3455:18 APH as of 30-JUN-2014 APH as of _/_/
APU SERIAL/PART: P-5180/3800702-1 MODEL: 131-9B MANUFACTURER: HONEYWELL
INSTALLED ON 25-1UN-2010 LAST ACTUALS CURRENT ACTUAL
3001 AR! HRS 3455:18 APU HRS as of 30-JUN-2014 APU HRS as of _/_/
2487 APUS 2961 APUS as of 30-JUN-2014 APUS as of _/_/
ENGINE NO. 1 SERIAL/PART: 874437/CFM56-7827/53 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 05-MAY-2011 LAST ACTUALS CURRENT ACTUAL
3556:48 ENG. HRS 3525:36 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. HRS as of _/_/
821 ENC 886 ENC as of 30-JUN-2014 ENC as of _/_/
ENGINE NO. 2 SERIAL/PART: 874438/CFM56-7827/B3 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 08-OCT-1999 LAST ACTUALS CURRENT ACTUAL
44 ENG. HRS 44 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. HRS as of _/_/
15 ENC 886 ENC as of 30-JUN-2014 ENC as of _i_t
BOEING AND BM ME TRADEMARKS OF THE BOEING COMPANY
05-AUG-2014 AD/Service Information Report CAMP SYSTEMS 1 Of 748
EFTA00618292
AD/SI Status Report AIRCRAFT
CAMP 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
COM M-7200-02-01189 EROS CREW OXYGEN MASK. COMMUNIQUE
MOS
- Is)
COM M-7200-02-01290 INSPECT ENGINE STRUT AFT FAIRING FOR WATER ACCUMULATION. COMMUNIQUE
MOS
AFL 4000 (s)
COM M-7200-03-00936 VISUAL INSPECTION FORWARD GRAY WATER DRAIN MAST FOR POSSIBLE FATIGUE CRACKS. COMMUNIQUE
MOS
500 (s)
MC 737-21-1149 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 SUPERSEDED
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R01 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R02 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R03 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R04 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R05 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 2 Of 748
@ Camp Systems
EFTA00618293
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
MC 737-21-1149 R06 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R07 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 ROB AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R09 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 RIO AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R11 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R12 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R13 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R14 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 3 Of 748
@ Camp Systems
EFTA00618294
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
MC 737-21-1149 R15 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 RI6 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 RI8 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R19 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R20 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R21 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R22 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-21-1149 R23 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500
FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE
MOS
MC 737-24-1196 RI ELECTRICAL POWER- STANDBY POWER SYSTEM - CHANGE THE ELECTRICAL POWER SYSTEM TO PROVIDE 60 SUPERSEDED
MINUTES OF STANDBY POWER FOR THE AIRPLANE BASIC STANDBY LOADS IN UEU OF THE 30 MINUTES
(SUPERSEDED BY MC 737-24-1196 R2). MASTER CHANGE
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 4 Of 748
@ Camp Systems
EFTA00618295
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
MC 737-32-1478 LANDING GEAR - MAIN LANDING GEAR BRAKE - REPLACEMENT OF HONEYWELL STANDARD STEEL BRAKES WITH SUPERSEDED
HONEYWELL HIGH CAPACITY STEEL BRAKES (SUPERSEDED BY MC 737-32-1478 RI ). MASTER CHANGE
MOS
SB -AP737-34-01 . SERVICE BULLETIN
MOS 19-DEC-2000
- Is)
SB 01930-38-1 . SERVICE BULLETIN
MOS
- (s)
SB 1153154-47-06 R1 ENVIRONMENTAL CONTROL - NITROGEN GENERATION SYSTEM CONTROLLER (NGSC)- OXYGEN SENSOR
INTERFACE CHANGE. MODIFICATION OF PN 1153154-4. PN 1153154-5. AND PN 1153154-6. SERVICE BULLETIN
MOS
03-FEB-2014
SB 233A3202-28-01 P5-2 FUEL CONTROL MODULE ASSEMBLY MODIFICATION. SERVICE BULLETIN
MOS
03-MAY-2001 - (s)
SB 233A3202-28-01 R1 P5-2 FUEL CONTROL MODULE ASSEMBLY MODIFICATION. SERVICE BULLETIN
MOS
- Is)
SB 233A3202-28-02 DISTRIBUTION - P5-2 FUEL SYSTEM MODULE - PW ASSEMBLY CIRCUIT BOARD REPLACEMENT. SERVICE BULLETIN
MOS
SB 233A3202-28-02R1 DISTRIBUTION - P5-2 FUEL SYSTEM MODULE - PW ASSEMBLY CIRCUIT BOARD REPLACEMENT. SERVICE BULLETIN
MOS
28-FEB-2002
SB 233A3202-28-03 FUEL - DISTRIBUTION - P5-2 CONTROL SYSTEM MODULE ASSEMBLY- CENTER FUEL TANK BOOST PUMP AUTO
SHOTOFF MODIFICATION.. SERVICE BULLETIN
MOS
I2-JAN-2006
SB 233A3205-24-01 GENERATOR DRIVE AND STANDBY POWER MODULE ASSEMBLY CHANGE. SERVICE BULLETIN
MOS
26-JUL-2001
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 5 Of 748
@ Camp Systems
EFTA00618296
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 233A3209-31-01 MODIFICATION OF THE P5-3 FLIGHT CONTROLS MODULE. SERVICE BULLETIN COMPLIED WITH
MOS
14-NOV-2CO2
SB 2344-5320-100 SERVICE BULLETIN
MOS
(s)
SB 28-01 x-RAY INSPECTION CRANE HYDRO-AIRE. SERVICE BULLETIN
MOS
(s)
SB 28-01 R2 x-RAY INSPECTION CRANE HYDRO-AIRE. SERVICE BULLETIN
MOS
AFL
SB 285A1010-27.04 ELEVATOR AND TAB STALL MANAGEMENT YAW DAMPER SOFTWARE CHANGE - COMPONENT. SERVICE BULLETIN
MOS
28-JUN-2001
SB 285A1600-32-01 PROXIMITY SENSOR ELECTRONIC UNIT - UPGRADE FROM -2 TO -3 CONFIGURATION. SERVICE BULLETIN
MOS
11-MAY-2CCO
SB 285A1600-32-02 PROXIMITY SWITCH ELECTRONICS UNIT CHANGE - COMPONENT. SERVICE BULLETIN
MOS
25-JUL-2001
SB 285A1840-24-02 MODIFICATION OF THE P5-13 ELECTRIC METERS. BATTERY AND GALLEY POWER MODULE ASSEMBLY. SERVICE
BULLETIN
MOS
28-AUG-2CO3
SB 285W0024-23-03 Fti CABIN ATTENDANT HANDSET I FLIGHT DECK HANDSET SHELL REPLACEMENT. SERVICE BULLETIN
MOS
25-JUL-2001 .
SB 321444636.1904 PNEUMATIC - HIGH STAGE VALVE - REWORK THE HIGH STAGE VALVE. PN 3214446-4. SERIES 6 OR PN 3214146-4. CUSTOMER
SERIES 7 TO PN 3214446-4. SERIES 8 (CHANGE MOD 9). SERVICE BULLETIN CONVENIENCE
MOS
25-JUL-2013
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 6 Of 748
Camp Systems
EFTA00618297
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 3214552-36-1899 R1 PNEUMATIC - PRESSURE REGULATOR AND SHUTOFF VALVE- REWORK PRESSURE REGULATOR AND SHUTOFF RECOMMENDED
VALVE. PN 32145524. SERIES 1 TO PN 3214552-6. MOD 1. SERVICE BULLETIN
MOS
05-AUG-2013
SB 3214552-36-1905 PNEUMATIC - PRESSURE REGULATOR AND SHUTOFF VALVE- REWORK THE PRESSURE REGULATOR AND SHUTOFF CUSTOMER
VALVE. PN 3214552-5. SERIES 5 TO PN 3214552-5. SERIES 6 (CHANGE MOD 5) AND PN 3214552-6. SERIES 1 AND CONVENIENCE
SERIES 2 TO PN 3214552-6. SERIES 3 (CHANGE MOD 2). SERVICE BULLETIN
MOS
26-JUL-2013
SB 3215618-30-1895 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE PN 3215618-4 SUPERSEDED
TO PN 3215618-5 (SUPERSEDED BY SB 3215618-30-1895 R1). SERVICE BULLETIN
MOS
SB 3215618-30-1895 R1 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE. PN SUPERSEDED
3215618-4 TO PN 3215618-5 (SUPERSEDED BY SB 3215618-30-1895 R2). SERVICE BULLETIN
MOS
SB 3215618-30-1895 R2 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE. PN OPTIONAL
3215618-4 TO PN 3215618-5. SERVICE BULLETIN
MOS
24-JAN-2014
SB 417A6110-23-01 ATTENDANT PANEL INTEGRATED HANDSET CONTROLLER REPLACEMENT. SERVICE BULLETIN
MOS
31-MAY-2001
SB 504443-25-01R3 AF1SAFE - INSPECTION OF RESTRAINT SYSTEM END RELEASE BUCKLE. SERVICE BULLETIN NOT APPLICABLE - TO PN NOT INSTALLED ON
AIRCRAFT.
MOS 18-AUG-2006
2633:50
AFL 633
SB 65-52801-49-08 AUXILIARY POWER CONTROL UNIT ASSEMBLY MODIFICATION, SERVICE BULLETIN
MOS
- (s)
SB 65C16237-32-02 LANDING GEAR, SERVICE BULLETIN
MOS
28-MAR-2002 - Is)
SB 72-000 COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN
MOS
- Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 7 Of 748
@ Camp Systems
EFTA00618298
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 734-16100-52-2 RI DOORS - AIRSTAIR DOOR LATCH LINEAR ACTUATOR - MODIFY ACTUATOR FROM PM 734-16100-01 TO PIN COMPUED WITH
734-16103-02. SERVICE BULLETIN
MOS 12-N0V-2010
18-MAR-2005 3477:55
AFL 848
SB 737-00-1009 ADMINISTRATIVE - GENERAL - AIRCRAFT GENERAL- DAMAGE TOLERANCE INSPECTION DATA - MASTER CHANGE RECOMMENDED
MODIFICATIONS. SERVICE BULLETIN
MOS
I4-APR-20 I
SB 737-11-1076 PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - NACELLE AND POWER PLANT - THRUST RECOMMENDED
REVERSER MAINTENANCE WARNING PLACARD INSTALLATION. SERVICE BULLETIN
MOS
06-MAY-1999 - (s)
SB 737-11-1077 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 RI). SERVICE BULLETIN
MOS
SB 737-11-1077 RI PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R2). SERVICE BULLETIN
MOS
SB 737-11-1077 RIO PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R11), SERVICE BULLETIN
MOS
SB 737-11-1077 R11 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R12). SERVICE BULLETIN
MOS
SB 737-11-1077 R12 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R13). SERVICE BULLETIN
MOS
SB 737-11-1077 R13 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R14). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 8 Of 748
@ Camp Systems
EFTA00618299
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R14 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R15). SERVICE BULLETIN
MOS
SB 737-11-1077 R15 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R16). SERVICE BULLETIN
MOS
SB 737-11-1077 R16 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R17). SERVICE BULLETIN
MOS
SB 737-11-1077 R17 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R18). SERVICE BULLETIN
MOS
58 737-11-1077 R18 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R19). SERVICE BULLETIN
MOS
58 737-11-1077 R19 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R20). SERVICE BULLETIN
MOS
58 737-11-1077 R2 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R3). SERVICE BULLETIN
MOS
SB 737-11-1077 R20 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R21). SERVICE BULLETIN
MOS
SB 737-11-1077 R21 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R22). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 9 Of 748
@ Camp Systems
EFTA00618300
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R22 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R23). SERVICE BULLETIN
MOS
SB 737-11-1077 R23 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R24). SERVICE BULLETIN
MOS
SB 737-11-1077 R24 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R25). SERVICE BULLETIN
MOS
SB 737-11-1077 R25 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R26). SERVICE BULLETIN
MOS
58 737-11-1077 R26 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R27). SERVICE BULLETIN
MOS
58 737-11-1077 R27 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R28). SERVICE BULLETIN
MOS
58 737-11-1077 R28 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R29). SERVICE BULLETIN
MOS
SB 737-11-1077 R29 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R30). SERVICE BULLETIN
MOS
SB 737-11-1077 R3 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R4). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 10 Of 748
@ Camp Systems
EFTA00618301
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R30 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R31). SERVICE BULLETIN
MOS
SB 737-11-1077 R31 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R32). SERVICE BULLETIN
MOS
SB 737-11-1077 R32 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R33). SERVICE BULLETIN
MOS
SB 737-11-1077 R33 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R34). SERVICE BULLETIN
MOS
58 737-11-1077 R34 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R35). SERVICE BULLETIN
MOS
58 737-11-1077 R35 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R36). SERVICE BULLETIN
MOS
58 737-11-1077 R36 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R37). SERVICE BULLETIN
MOS
SB 737-11-1077 R37 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R38). SERVICE BULLETIN
MOS
SB 737-11-1077 R38 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R39). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 11 Of 748
@ Camp Systems
EFTA00618302
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R39 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R40). SERVICE BULLETIN
MOS
SB 737-11-1077 R4 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 RS). SERVICE BULLETIN
MOS
SB 737-11-1077 R40 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R41). SERVICE BULLETIN
MOS
SB 737-11-1077 R41 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R42). SERVICE BULLETIN
MOS
58 737-11-1077 R42 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R43). SERVICE BULLETIN
MOS
58 737-11-1077 R43 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R44). SERVICE BULLETIN
MOS
58 737-11-1077 R44 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R45). SERVICE BULLETIN
MOS
SB 737-11-1077 R45 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R46). SERVICE BULLETIN
MOS
SB 737-11-1077 R46 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R47), SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 12 Of 748
@ Camp Systems
EFTA00618303
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R47 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R48). SERVICE BULLETIN
MOS
SB 737-11-1077 R48 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R49). SERVICE BULLETIN
MOS
SB 737-11-1077 R49 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R50). SERVICE BULLETIN
MOS
SB 737-11-1077 RS PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R6). SERVICE BULLETIN
MOS
58 737-11-1077 R50 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R51). SERVICE BULLETIN
MOS
58 737-11-1077 R51 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R52). SERVICE BULLETIN
MOS
58 737-11-1077 R52 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R53). SERVICE BULLETIN
MOS
SB 737-11-1077 R53 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R54). SERVICE BULLETIN
MOS
SB 737-11-1077 R54 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R55), SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 13 Of 748
@ Camp Systems
EFTA00618304
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R55 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R56). SERVICE BULLETIN
MOS
SB 737-11-1077 R56 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R57), SERVICE BULLETIN
MOS
SB 737-11-1077 R57 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R58). SERVICE BULLETIN
MOS
SB 737-11-1077 R58 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R59). SERVICE BULLETIN
MOS
58 737-11-1077 R59 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R60). SERVICE BULLETIN
MOS
58 737-11-1077 R6 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R7). SERVICE BULLETIN
MOS
58 737-11-1077 R60 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R61). SERVICE BULLETIN
MOS
SB 737-11-1077 R61 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R62). SERVICE BULLETIN
MOS
SB 737-11-1077 R62 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R63), SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 14 Of 748
@ Camp Systems
EFTA00618305
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R63 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SI3 737-11-1077 R64). SERVICE BULLETIN
MOS
SB 737-11-1077 R64 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R65). SERVICE BULLETIN
MOS
SB 737-11-1077 R65 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R66). SERVICE BULLETIN
MOS
SB 737-11-1077 R66 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R67). SERVICE BULLETIN
MOS
58 737-11-1077 R67 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R68). SERVICE BULLETIN
MOS
58 737-11-1077 R68 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY S8 737-11-1077 R69). SERVICE BULLETIN
MOS
58 737-11-1077 R69 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R70). SERVICE BULLETIN
MOS
SB 737-11-1077 R7 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R8). SERVICE BULLETIN
MOS
SB 737-11-1077 R8 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 R9). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 15 Of 748
@ Camp Systems
EFTA00618306
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1077 R9 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED
WEIGHT (SUPERSEDED BY SB 737-11-1077 RIO). SERVICE BULLETIN
MOS
SB 737-11-1125 PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - APPLICATION OF EXTERIOR DECORATIVE PAINT RECOMMENDED
SYSTEM ON LEFT SIDE AND RIGHT SIDE WINGS. SERVICE BULLETIN
MOS
23-SEP-2004
SB 737-11-1129 PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - FORWARD AIRSTAIRDECAL INSTALLATION.
SERVICE BULLETIN
MOS CO (5)
11-NOV-2CO1
SB 737-11-1129 RI PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - FORWARD AIRSTAIR DECAL INSTALLATION.
SERVICE BULLETIN
MOS CO (5)
11-NOV-2C04
SB 737-11-1156 PLACARD AND MARKINGS - FLIGHT DECK - CHANGE CONTROL COLUMN CHECKLIST PLACARDS. SERVICE BULLETIN
MOS
22-MAR-2007 •
SB 737-11-1156R1 PLACARD AND MARKINGS - FLIGHT DECK - CHANGE CONTROL COLUMN CHECKLIST PLACARDS. SERVICE BULLETIN COMPLIED WITH - lAw THE AD
MOS 22-AUG-2C08
I6-APR-2008 3260:48
AFL 782
SB 737-11-1179 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD SUPERSEDED
INSTALLATION (SUPERSEDED BY SB 737-11-1179 RI ). SERVICE BULLETIN
MOS
SB 737-11-1179 R1 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD SUPERSEDED
INSTALLATION (SUPERSEDED BY SB 737-11-1179 R2). SERVICE BULLETIN
MOS
SB 737-11-1179 R2 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS
21-DEC-2010
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 16 Of 748
LI Camp Systems
EFTA00618307
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-11-1201 PLACARDS AND MARKINGS - CARGO COMPARTMENT PLACARDS - FORWARD AND AFT CARGO COMPARTMENTS - RECOMMENDED
REPLACEMENT OF LOAD LIMIT PLACARDS. SERVICE BULLETIN
MOS
13-JUL-2010
SB 737-11-1202 PLACARDS AND MARKINGS - CARGO COMPARTMENT PI WARDS - FORWARD AND AFT CARGO COMPARTMENTS - RECOMMENDED
REPLACEMENT OF LOAD LIMIT PLACARDS. SERVICE BULLETIN
MOS
13-JUL-2010
SB 737-11-1207 PLACARDS AND MARKINGS - INTERIOR PLACARDS- REMOVAL OF AIRCRAFT FROM ALTERNATE WEIGHT PROGRAM SUPERSEDED
AND CHANGE MAXIMUM TAKEOFF WEIGHT FROM 143.000 POUNDS! 60.863 KILOGRAMS TO 134.000 POUNDS! 60.781
KILOGRAMS (SUPERSEDED BY S/3 737-11-1207 R1). SERVICE BULLETIN
MOS
58 737-11-1208 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF ALTERNATE MAXIMUM TAKEOFF WEIGHT RECOMMENDED
PLACARD AND INCREASE OF MAXIMUM TAKEOFF WEIGHT. SERVICE BULLETIN
MOS
14-JAN-2011
58 737-11AI109 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF IN-FLIGHT SPEEDBRAKE USAGE LIMITATION SUPERSEDED NOT APPLICABLE - NO ACTION REQUIRED
MARKER. SERVICE BULLETIN
MOS 22-AUG-2003
28-MAR-2002 - (s) 1342
AFL 351
SB 737-11A1109 R1 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF IN-FLIGHT SPEEDBRAKE USAGE LIMITATION RECOMMENDED
MARKER. SERVICE BULLETIN
MOS
16-JAN-2004
58 737-21-1125 AIR CONDITIONING - DISTRIBUTION - FLIGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - REPLACE DUCT RECOMMENDED
TAPE JOINTS WITH SLEEVES AND CLAMPS. SERVICE BULLETIN
MOS
12-APR-2001 - (6)
58 737-21-1125 RI AIR CONDITIONING - DISTRIBUTION - FLIGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - REPLACE DUCT RECOMMENDED
TAPE JOINTS WITH SLEEVES AND CLAMPS. SERVICE BULLETIN
MOS
07-MAY-2009
58 737-21-1127 AIR CONDITIONING - MAIN AIR DISTRIBUTION - REPLACEMENT OF BULKHEAD FLEX SEAL CLAMP ON ENVIROMENTAL RECOMMENDED
CONTROL SYSTEMS SUPPLY DUCTS. SERVICE BULLETIN
MOS
23-AUG-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 17 Of 748
@ Camp Systems
EFTA00618308
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-21-1127 RI AIR CONDITIONING - MAIN AIR DISTRIBUTION - REPLACEMENT OF BULKHEAD FLEX SEAL CLAMP ON ENVIROMENTAL RECOMMENDED
CONTROL SYSTEMS SUPPLY DUCTS. SERVICE BULLETIN
MOS
27-JUN-2002 - (s)
SB 737-21-1135 AIR CONDITIONING - PRESSURIZATION CONTROL - PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN
PRESSURE CONTROL SYSTEM FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT
SMOKE EVENT SERVICE BULLETIN. SERVICE BULLETIN
MOS 72 (s)
12-DEC-2007
58 737-21-1135 RI AIR CONDITIONING - PRESSURIZATION CONTROL- PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN
PRESSURE CONTROL SYSTEM FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT
SMOKE EVENT. SERVICE BULLETIN
MOS 72 (5)
I3-NOV-2008
SB 737-21-1144 AIR CONDITIONING - PASSENGER CABIN CONDITIONED AIR DUSTRIBUTION SYSTEM - TRANSITION DUCT RECOMMENDED
ASSEMBLIES AND SIDEWALL RISER DUCTS REPLACEMENT. SERVICE BULLETIN
MOS
I4-APR-2005
SB 737-21-1148 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS RECOMMENDED
INSPECTIION AND REPLACEMENT. SERVICE BULLETIN
MOS
28-JUL-2005
SB 737-21-1148 RI AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS
INSPECTIION AND REPLACEMENT. SERVICE BULLETIN
MOS
26-JAN-2006
SB 737-21-1148 R2 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS
INSPECTION AND REPLACEMENT.. SERVICE BULLETIN
MOS
27-JUL-2006
SB 737-21-1148 R3 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS
INSPECTION AND REPLACEMENT.. SERVICE BULLETIN
MOS
02-NOV-2006
58 737-21-1148 R4 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET
SYSTEM COMPONENTS INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
22-AUG-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 18 Of 748
@ Camp Systems
EFTA00618309
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-21-1148 R5 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM MR INLET
SYSTEM COMPONENTS INSPECTION AND REPLACEMENT.. SERVICE BULLETIN
MOS
06-MAY-2008
SB 737-21-1148 R6 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS
INSPECTION AND REPLACEMENT.
. SERVICE BULLETIN
MOS
I I -SEP-2008
SB 737-21-1148 R7 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS RECOMMENDED
INSPECTION AND REPLACEMENT.. SERVICE BULLETIN
MOS
21-JAN-2010
SB 737-21-1155 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE
INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN
MOS
I0-NOV-2005
SB 737-21-1155 R1 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE
INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN
MOS
22-DEC-2005
SB 737-21-1155 R2 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE
INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN
MOS
20-JUL-2006
SB 737-21-1155 R3 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION
AND TAPE INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN
MOS
25-MAR-2008
SB 737-21-1155 R4 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTIONAND TAPE RECOMMENDED
INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN
MOS
24-SEP-2009
SB 737-21-1163 AIR CONDITIONING - PRESSURIZATION CONTROL - PRESSURIZATION CONTROL SYSTEM -
CHANGE OF THE CABIN PRESSURE CONTROLLERS FOR 750 FEET PER MINUTE RATE OF DESCENT
DURING A CARGO COMPARTMENT SMOKE EVENT. SERVICE BULLETIN
MOS 72 (s)
2-DEC-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 19 Of 748
@ Camp Systems
EFTA00618310
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-21-1163 RI AIR CONDITIONING - PRESSURIZATION CONTROL- PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN RECOMMENDED
PRESSURE CONTROLLERS FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT SMOKE
EVENT. SERVICE BULLETIN
MOS 72 (0)
17-DEC-2009
SB 737-21-1165 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM- REDUNDANT PRESSURE SWITCH SUPERSEDED
INSTALLATION (SUPERSEDED BY S8 737-21-1165 RI). SERVICE BULLETIN
MOS
SB 737-21-1165 RI AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH SUPERSEDED
INSTALLATION (SUPERSEDED BY S8 737-21-1165 R2). SERVICE BULLETIN
MOS
- Is)
SB 737-21-1165 R2 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH SUPERSEDED
INSTALLATION (SUPERSEDED BY S8 737-21-1165 R3). SERVICE BULLETIN
MOS
SB 737-21-1165 R3 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS 72 (5)
07-NOV-2012
SB 737-21-1170 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM- REPLACEMENT OF SHAFT ASSEMBLIES RECOMMENDED
AND LINK ARM ASSEMBLIES TO INCREASE THE CLEARANCE FOR THE RAM AIR INLET ACTUATORS. SERVICE
BULLETIN
MOS
23-SEP-2010
SB 737-21-1177 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE POWER SOURCE TO THE RECOMMENDED
PRESSURIZATION SYSTEM CIRCUIT BREAKER. SERVICE BULLETIN
MOS
06-JAN-2011
SB 737-21-1178 AIR CONDITIONING - FUGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - CHANGE OF THE DUCTS AND RECOMMENDED
PLENUMS TO REDUCE NOISE. SERVICE BULLETIN
MOS
I9-AUG-2013
SB 737-21A1139 AIR CONDITIONING - DISTRIBUTION - INSTALLATION OF THE INSULATION AND TAPE ON THE OVERHEAD DUCTS AND SUPERSEDED
PLENUMS (SUPERSEDED BY 737-21A1139 R1). SERVICE BULLETIN
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 20 Of 748
@ Camp Systems
EFTA00618311
AD/SI Status Report AIRCRAFT
COMP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-21A1I39 RI AIR CONDITIONING - DISTRIBUTION - INSTALLATION OF THE INSULATION AND TAPE ON THE OVERHEAD DUCTS AND RECOMMENDED
PLENUMS. SERVICE BULLETIN
MOS
28-AUG-2003
SB 737-22-1137 AUTOFLIGHT - AUTOTHROTTLE SYSTEM- ACTIVATION OF FLIGHT MANAGEMENT COMPUTER TRANSITION ALTITUDE RECOMMENDED
SELECTION. SERVICE BULLETIN
MOS
25-MAY-2000 - (s)
SB 737-22-1140 AUTO FLIGHT - AUTOPILOT - AUTOPILOT OPERATION WITH ONE IRU INOPERATIVE RETROFIT, SERVICE BULLETIN RECOMMENDED
MOS
I5-JUN-2060 - (s)
SB 737-22-1153 AUTO FLIGHT - AUTOPILOT - INSTALLATION OF RED NON-DIMMABLE 'AUTOLAND* WARNING LIGHTS. SERVICE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY -
BULLETIN
MOS
01-NOV-2001
SB 737-22-1154 AUTO FLIGHT - AUTOPILOT - OPTION/PROGRAM PIN CHANGES TO ACTIVATE FLIGHT CONTROL COMPUTER RECOMMENDED
IMPROVEMENTS, SERVICE BULLETIN
MOS
24-JAN-2002 - (s)
SB 737-22-1154 RI AUTO FLIGHT - AUTOPILOT - OPTION/PROGRAM PIN CHANGES TO ACTIVATE FLIGHT CONTROL COMPUTER RECOMMENDED
IMPROVEMENTS. SERVICE BULLETIN
MOS
I2-SEP-2002
SB 737-22-1213 AUTOFLIGHT - YAW DAMPER SYSTEM - DELETION OF A YAW DAMPER INDICATOR (SUPERSEDED BY S8737-22-1213 SUPERSEDED
Ft1). SERVICE BULLETIN
MOS
SB 737-22-1213 RI AUTOFLIGHT - YAW DAMPER SYSTEM - DELETION OF A YAW DAMPER INDICATOR. SERVICE BULLETIN RECOMMENDED
MOS
I2-APR-20 I I
SB 737-22-1216 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM- FLIGHT CONTROL COMPUTER DIP SWITCH CHANGE. SERVICE RECOMMENDED
BULLETIN
MOS
I6-AUG-2010
SB 737-22-1223 AUTOFLIGHT - AUTOPILOT - INSTALLATION OF LATERAL NAVIGATION MODE AS THE DEFAULT ROLL MODE FOR RECOMMENDED
GO-AROUND IN LIEU OF TRACK HOLD FOR A MISSED APPROACH. SERVICE BULLETIN
MOS
25-JAN-2011
7-Insufficient Information +-Task exists in Inspection Manual (0 -Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 21 Of 748
@ Camp Systems
EFTA00618312
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-22A1164 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - FLIGHT CONTROL COMPUTER OPERATIONAL PROGRAM NOT APPLICABLE
SOFTWARE INSTALLATION - P2.0. SERVICE BULLETIN
MOS 28-APR-2006
20-MAY-2004 - (s) 2606:18
AFL 626
SB 737-22A1211 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - RIGHT CONTROL COMPUTER SOFTWARE CHANGE. SERVICE RECOMMENDED NOT APPLICABLE - BY AIRCRAFT SERIAL
BULLETIN NUMBER
DAYS 09-AUG-2010
13-APR-2010 3448:31
AFL 841
SB 737-22A1215 AUTOFLIGHT - AUTOTHROTTLE SYSTEM - AUTOTHROTTLE COMPUTER REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS 36 (EFF) 22-NOV-2016
22-NOV-20I3
SB 737-22A1224 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - RIGHT CONTROL COMPUTER SOFTWARE CHANGE. SERVICE RECOMMENDED NOT APPLICABLE - N/A BY PN INSTALLED.
BULLETIN REFER AD 2012-21-08.
MOS I6-NOV-2012
I8-MAY-2012 3670:04
AFL 890
SB 737-23-1135 PASSENGER ADDRESS AND ENTERTAINMENT - ATTENDANT PANEL REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
31-MAY-2001 - (s)
SB 737-23-1139 COMMUNICATIONS - PASSENGER ADDRESS AND ENTERTAINMENT. SERVICE BULLETIN RECOMMENDED
MOS
08-FEB-2001 - (s)
SB 737-23-1139 RI INSTALATION OF THE PASSENGER ADDRESS AMPLIFIER AND IN-FLIGHT ENTERTAINMENT AUDIO CIRCUT BREAKERS. RECOMMENDED
SERVICE BULLETIN
MOS
03-JUL-2002 - (s)
SB 737-23-1172 HF FERRY FLIGHT KIT INSTALLATION/REMOVAL (SUPERSEDED BY SB 737-23-1172 R1). SERVICE BULLETIN
MOS
SB 737-23-1172 RI HIGH FREQUENCY (HF) COMMUNICATIONS SYSTEM - HF SUPERSEDED
FERRY FLIGHT KIT INSTALLATION/REMOVAL (SUPERSEDED BY SB 737-23-1172 R2). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 22 Of 748
@ Camp Systems
EFTA00618313
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-23-1172 R2 COMMUNICATIONS - HIGH FREQUENCY (HF) COMMUNICATIONS SYSTEM - HF FERRY FLIGHT KIT RECOMMENDED
INSTALLATION:REMOVAL. SERVICE BULLETIN
MOS
01-MAY-2012
SB 737-23-1200 AUDIO SELECTOR PANEL RELOCATION. SERVICE BULLETIN RECOMMENDED
MOS
01-NOV-2001 • 1.51
SB 737-23-1208 COMMUNICATIONS AIRCRAFT COMMUNICATIONS ADDRESSING AND REPORTING SYSTEM (ACARS) - DATA BUS RECOMMENDED
WIRE CHANGES. SERVICE BULLETIN
MOS
29-SEP-2005
SB 737-23-1266 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R1). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-23-1266 RI COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R2) SUPERSEDED
. SERVICE BULLETIN
MOS
SB 737-23-1266 R2 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R3). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-23-1266 R3 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
C6-JAN-2011 •
SB 737-23-1336 COMMUNICATIONS - EMERGENCY LOCATOR TRANSMITTER - INSTALLATION OF A GROUND WIRE. SERVICE BULLETIN
MOS
1341AY-2010 •
SB 737-23-1337 COMMUNICATIONS - AUDIO VISUAL MONITORING - COCKPIT DOOR SURVEILLANCE SYSTEM WIRE BUNDLE CHANGE. RECOMMENDED
SERVICE BULLETIN
MOS
C6-AUG-2010
SB 737-23-1342 COMMUNICATIONS - LAV Al CONNECTOR MATE-WITH TAPE - CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
30-NOV-2010
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 23 Of 748
Camp Systems
EFTA00618314
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-23-1343 COMMUNICATION - HIGH FREQUENCY COMMUNICATION SYSTEM - INSTALL WIRES BETWEEN THE VERY HIGH RECOMMENDED
FREQUENCY TRANSCEIVER 3 AND THE COMMUNICATION MANAGEMENT UNIT OF THE AIRCRAFT COMMUNICATIONS
ADDRESSING AND REPORTING SYSTEM. SERVICE BULLETIN
MOS
10-JAN-2011
SB 737-23-1397 COMMUNICATIONS - CABIN INTERPHONE SYSTEM - IN-LINE FILTER INSTALLATION, SERVICE BULLETIN RECOMMENDED
MOS
06-DEC-2013
SB 737-23-1403 COMMUNICATIONS - SATELLITE COMMUNICATIONS SYSTEM- SATELLITE DATA UNIT REPLACEMENT AND AIR DATA RECOMMENDED
INERTIAL REFERENCE UNIT OUTPUT BUS WIRING CHANGES. SERVICE BULLETIN
MOS
07-FEB-2013 - Is)
SB 737-23-1410 COMMUNICATIONS - EMERGENCY EVACUATION SYSTEM - ERRONEOUS ACTIVATION OF CABIN CALL LIGHT IN FLIGHT RECOMMENDED
COMPARTMENT CORRECTIVE WIRING CHANGES. SERVICE BULLETIN
MOS
04-APR-2013
58 737-23-1419 COMMUNICATIONS - AIRCRAFT COMMUNICATIONS ADDRESSING AND REPORTING SYSTEM (AGARS) - RECOMMENDED
COMMUNICATIONS MANAGEMENT UNIT (CMU) WIRING CHANGE - INSTALL WIRING BETWEEN AGARS CMU AND
ENGINE RUNNING SWITCHES. SERVICE BULLETIN
MOS
18-OCT-2013
SB 737-23-1423 COMMUNICATIONS - VOICE RECORDER SYSTEM - INSTALLATION OF THE NEW L-3 COCKPIT VOICE RECORDER (CVR) RECOMMENDED
CONTROL PANEL. SERVICE BULLETIN
MOS
04-FEB-2014
SB 737-23-1429 COMMUNICATIONS - VOICE RECORDER SYSTEM - INSTALLATION OF THE COCKPIT VOICE RECORDER INDEPENDENT RECOMMENDED
POWER SUPPLY (RIPS) AND THE RIPS-COMPATIBLE MANUAL ON/AUTO OFF SWITCH OPTION. SERVICE BULLETIN
MOS
13-MAR-2014
SB 737-23A1170 COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE (SUPERSEDED BY SB 737-23A1170 R1). SERVICE SUPERSEDED COMPUED WITH
BULLETIN
MOS 10-AUG-2000
27-APR-2000
SB 737-23A1170 R1 COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE (SUPERSEDED BY SB 737-23A1170 R2). SERVICE SUPERSEDED
BULLETIN
MOS
27-JUL-2000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 24 Of 748
@ Camp Systems
EFTA00618315
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-23AI170 RI PART VHF-1 AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN RECOMMENDED
MOS
27-JUL-2000
SB 737-23A1170 RI PART COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN RECOMMENDED
MOS
27-JUL-2000
SB 737-23A1170 R2 COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE, SERVICE BULLETIN RECOMMENDED COMPLIED WITH - REF: PART I
PART II DUE 4000 HRS
MOS 02-MAR-2006
I4-SEP-2000 2509:38
AFL 609
SB 737-23A1170 R2 PART COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
DAYS 10 (s) 02-MAR-2006
I4-SEP-2000 2509:38
AFL 609
SB 737-23A1170 R2 PART COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE, SERVICE BULLETIN RECOMMENDED
II
MOS
I4-SEP-2000 4000 4000 4000
SB 737-24-1126 AILERON CONTROL SYSTEM - WIRING BUNDLE SHIELD OVERBRAID INSTALLATION FOR EMI PROTECTION, SERVICE RECOMMENDED
BULLETIN
MOS
0I -AUG-2002 - (s)
SB 737-24-1126 RI AILERON CONTROL SYSTEM - WIRING BUNDLE SHIELD OVERBRAID INSTALLATION FOR EMI PROTECTION. SERVICE RECOMMENDED
BULLETIN
MOS
I4-NOV-2002 - (s)
SB 737-24-1128 POWER DISTRIBUTION PANEL. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE- TERMINATED PCW
MOS 18-AUG-2006
28-APR-1999 2633:50
AFL 633
SB 737-24-1132 ELECTRICAL POWER- DC GENERATION. SERVICE BULLETIN RECOMMENDED
MOS
08-JUN-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 25 Of 748
@ Camp Systems
EFTA00618316
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24-1134 STANDBY POWER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
22-JUN-2000 - (s)
SB 737-24-1135 NO.1 AIR TRAFFIC CONTROL SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
27-APR-2000 -
SB 737-24-1147 INSTALLATION OF THE INFLIGHT ENTERTAINMENT SYSTEM CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE
BULLETIN
MOS 60 (s)
20-NOV-2003
58 737-24-1147 RI ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF THE INFLIGHT ENTERTAINMENT SYSTEM
CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE BULLETIN
MOS 60 (s)
01-MAR-2007
SB 737-24-1147 R2 ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF THE INFLIGHT RECOMMENDED
ENTERTAINMENT SYSTEM CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE BULLETIN
MOS 60 (s)
30-JUL-2009
SB 737-24-1149 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS (SUPERSEDED BY 737-24-1149 RI), SERVICE SUPERSEDED
BULLETIN
DAYS
01-JAN-2000
SB 737-24-1109 RI CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED
737-24-1149 R2). SERVICE BULLETIN
MOS
01-JAN-2000
SB 737-24-1149 R2 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED
737-24-1149 R3)
. SERVICE BULLETIN
MOS
01-JAN-2000
SB 737-24-1149 R3 ELECTRICAL POWER - GENERAL - CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN SUPERSEDED
WHEEL WELL (SUPERSEDED BY 737-24-1149 R4)
. SERVICE BULLETIN
MOS
01-JAN-2000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 26 Of 748
@ Camp Systems
EFTA00618317
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24-1149 R4 ELECTRICAL POWER - GENERAL - CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS
IN THE MAIN WHEEL WELL SERVICE BULLETIN
MOS 24 (s)
07-AUG-2007
SB 737-24-1154 GUARD INSTALLATION FOR THE CIRCUIT BREAKERS FOR THE OVERWING DOOR FLIGHT LOCKS. SERVICE BULLETIN RECOMMENDED
MOS
01-MAY-2003
SB 737-24-1155 STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION.. SERVICE RECOMMENDED
BULLETIN
MOS
26-FEB-2004
SB 737-24-1155 RI STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION. SERVICE RECOMMENDED
BULLETIN
MOS
16-DEC-2004
SB 737-24-1155 R2 ELECTRICAL POWER- STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY
INSTALLATION. SERVICE BULLETIN
MOS
08-SEP-2005
SB 737-24-1155 R3 ELECTRICAL POWER - STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY
INSTALLATION. SERVICE BULLETIN
MOS
23-MAR-2006
SB 737-24-1157 INSTALLATION OF CLAMPS BETWEEN THE WIRE BUNDLES AND THE HYDRAULIC TUBES IN THE LEFT MAIN LANDING RECOMMENDED
GEAR WHEEL WELL SERVICE BULLETIN
MOS
I4-AUG-2003
SB 737-24-1161 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS ON THE P6 AND RECOMMENDED
P18 LOAD CONTROL PANELS. SERVICE BULLETIN
MOS
24-MAR-2005
SB 737-24-1161 RI ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS ON THE P6 AND
P18 LOAD CONTROL PANELS. SERVICE BULLETIN
MOS
17-NOV-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 27 Of 748
@ Camp Systems
EFTA00618318
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24-1161 R2 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS
ON THE P6 AND P18 LOAD CONTROL PANELS. SERVICE BULLETIN
MOS
24-JAN-2008
SB 737-24-1162 ELECTRICAL POWER - AC GENERATION SYSTEM - STA 1088 BULKHEAD CATERPILLAR GROMMET. INSPECTION AND NOT APPLICABLE
INSTALLATION. SERVICE BULLETIN
MOS
02-JUN-2005
SB 737-24-1165 ELECTRICAL POWER - STANDBY POWER SYSTEM - REMOVAL AND REPLACEMENT OF THE STATIC INVERTER
MODULE. SERVICE BULLETIN
MOS 42 (s)
28-APR-2005
SB 737-24-1165 RI ELECTRICAL POWER - STANDBY POWER SYSTEM - REMOVAL AND REPLACEMENT OF THE STATIC INVERTER COMPLIED WITH
MODULE. SERVICE BULLETIN
MOS 29-AUG-2011
20-OCT-2005 (s) 3533:32
AFL 863
SB 737-24-1167 ELECTRICAL POWER - GENERAL - REPLACEMENT OF ANTISKID SYSTEM ELECTRICAL CONNECTORS IN THE MAIN
WHEEL WELLS. SERVICE BULLETIN
MOS
CE-APR-2006
SB 737-24-1167 RI ELECTRICAL POWER - GENERAL - REPLACEMENT OF ANTISKID SYSTEM ELECTRICAL CONNECTORS IN THE MAIN
WHEEL WELLS. SERVICE BULLETIN
MOS
13-NOv-2608
SB 737-24-1169 ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN RECOMMENDED
LANDING GEAR WHEEL WELLS. SERVICE BULLETIN
MOS 24 (s)
15-DEC-2006
SB 737-24-1169 R1 ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN
LANDING GEAR WHEEL WELLS. SERVICE BULLETIN
MOS 24 (s)
CE-AUG-2007
SB 737-24-1169 R2 ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN COMPLIED WITH
LANDING GEAR WHEEL WELLS. SERVICE BULLETIN
MOS 22-AUG-2608
09-APR-2008 -(s) 3260:48
AFL 782
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 28 Of 748
1' Camp System s
EFTA00618319
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-24-1171 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE
SLEEVE ON WIRE BUNDLE W0018 IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN
MOS 24 (s)
26-MAR-2007
SB 737-24-1171 RI ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE
SLEEVE ON WIRE BUNDLE W0018 IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN
MOS 24 (s)
02-JUL-2007
SB 737-24-1171 R2 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION
OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN
MOS 24 (s)
I8-SEP-2007
SB 737-24-1171 R3 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION
OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN
MOS 24 (s)
08-MAY-2008
SB 737-24-1171 R4 ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION
OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN
MOS 24 (s)
30-OCT-2008
SB 737-24-1172 ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE
AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN
MOS
I6-MAY-2008
SB 737-24-1172 RI INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED THROUGH RECOMMENDED
RECEPTACLES. SERVICE BULLETIN
MOS
18-NOV-2009
SB 737-24-1172 RI TABLE REPAIR INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED THROUGH RECOMMENDED
1 (A) RECEPTACLES. SERVICE BULLETIN AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS OPTION 1
MOS 72 (s)
18-NOV-2009
SB 737-24-1172 RI TABLE INSPECTION INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED RECOMMENDED
1 (B) THROUGH RECEPTACLES. SERVICE BULLETIN OF ELECTRICAL BONDING AS GIVEN IN ACCOMPLISHMENT
INSTRUCTIONS OPTION 2
MOS 24 (s)
18-NOV-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 29 Of 748
@ Camp Systems
EFTA00618320
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24-1172 TABLE 1 REPAIR ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE
(A) AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN AS GIVEN IN ACCOMPLISHMENT
INSTRUCTIONS OPTION 1
MOS 72 (s)
16-MAY-2008
58 737-24-1172 TABLE 1 INSPECTION ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE
(8) AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN OF ELECTRICAL BONDING AS GIVEN IN
ACCOMPLISHMENT INSTRUCTIONS OPTION 2
MOS 24 (s)
16-MAY-2008
SB 737-24-1173 ELECTRICAL - ELECTRICAL POWER - REPLACEMENT OF WIRE SUPPORT BRACKET AND
INSPECTION OF THE ROD END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN
MOS 72 (s)
07-NOV-2007
SB 737-24-1173 RI ELECTRICAL - ELECTRICAL POWER - REPLACEMENT OF WIRE SUPPORT BRACKET AND INSPECTION OF THE ROD
END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN
MOS 72 (s)
27-MAR-2008
SB 737-24-1173 R2 REPLACEMENT OF WIRE SUPPORT BRACKET AND INSPECTION RECOMMENDED
OF THE ROD END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN
MOS 72 (s)
23-APR-2009
SB 737-24-1176 ELECTRICAL POWER- AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT
ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN
MOS
21-FEB-2008
SB 737-24-1176 RI ELECTRICAL POWER - AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT
ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN
MOS
22-APR-2008
SB 737-24-1176 R2 AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT
ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN
MOS
06-NOV-2008
SB 737-24-1176 R3 AC GENERATION SYSTEM - INSPECTION AND RE-PIN WIRES AT TWO
WING-TO-STRUT ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN
MOS
18-DEC-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 30 Of 748
@ Camp Systems
EFTA00618321
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24-1182 INSPECTION AND CHANGE WIRE BUNDLE ROUTING TO PREVENT
CONTACT WITH MAIN BATTERY CHARGER. SERVICE BULLETIN
MOS
20-JAN-2009
SB 737-24-1194 ELECTRICAL POWER - MEDICAL OUTLET SYSTEM- MEDICAL FREQUENCY CONVERTER SUB-TRAY CHANGE. SERVICE RECOMMENDED
BULLETIN
MOS
14-SEP-2011
SB 737-24-1203 ELECTRICAL POWER- AC EXTERNAL POWER- CHANGE OF THE EXTERNAL POWER RECEPTACLE CONTACTS. RECOMMENDED
SERVICE BULLETIN
MOS
02-DEC-2013
SB 737-24-1205 ELECTRICAL POWER- STANDBY POWER SYSTEM - REPLACEMENT OF THE M9 STATIC INVERTER TERMINAL LUGS.. RECOMMENDED
SERVICE BULLETIN
MOS
25-MAR-2014
SB 737-24-1206 ELECTRICAL POWER - GENERAL - E8-1 SHELF ASSEMBLY - VINYL MARKER REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
03-APR-2014
SB 737-24A1141 R1 PS OVERHEAD PANEL - BRACKET REPLACEMENT AND WIRE INSTALLATION. SERVICE BULLETIN - REF: R2
MOS 24 (s)
23-DEC-2004
SB 737-24A1141 R2 ELECTRICAL POWER - GENERAL - PS OVERHEAD PANEL - BRACKET REPLACEMENT AND WIRE INSTALLATION. COMPUED WITH
SERVICE BULLETIN
MOS 18-AUG-2006
01-DEC-2005 -Is) 2633:50
AFL 633
SB 737-24A1141 R3 ELECTRICAL POWER - GENERAL - PS OVERHEAD PANEL - BRACKET REPLACEMENT AND COMPUED WITH - IAW THE AD R2 ALREADY CM
WIRE INSTALLATION REVISION. SERVICE BULLETIN GVBBJ122. AUG 18. 2006.
MOS 02-DEC-2009
20-FEB-2008 -Is) 3402:19
AFL 824
SB 737-24A1148 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED COMPUED WITH - INSPECTED AND CLEANED
737-24A1148 R1). SERVICE BULLETIN CONNECTORS
MOS 13-AUG-2004
06-DEC-2001 -(s) 1785:06
AFL 446
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 31 Of 748
@ Camp Systems
EFTA00618322
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-24A1148 RI CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. SERVICE BULLETIN COMPUED WITH - LAW. AD 2005-18-23
MOS 12 (s) 03-JUL-2013
1O-JUL-2003 3723:21
AFL 908
SB 737-24A1150 INSPECTION OF THE POWER SUPPLY VOLTAGE TO THE CAPTAINS PITOT HEATER. SERVICE BULLETIN RECOMMENDED
DAYS 60 (s) 27-AUG-2002
I I -DEC-2002 1057:48
AFL 271
SB 737-24M193 ELECTRICAL POWER-AC GENERATOR DRIVE SYSTEM- INCORRECT ELECTRICAL BOND ON GROUND BRACKET FOR NOT APPLICABLE - BY EFFECTIVITY
LEFT ENGINE GENERATOR. SERVICE BULLETIN
MOS
SB 737-25-1373 OVERHEAD STOWAGE BIN DOOR. SERVICE BULLETIN RECOMMENDED
MOS
24-JUL-I 999 - (s)
SB 737-25-1376 LAVATORY COMPARTMENT - CHANGE TO AFT CLEVIS SYSTEM RECOMMENDED
AND AFT WALL ON LAVATORY A. SERVICE BULLETIN
MOS
30-JUL-2009
SB 737-25-1378 CHANGE ESCAPE SLIDE INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
08-APR-1999 - (s)
SB 737-25-1378 RI . SERVICE BULLETIN RECOMMENDED
MOS
I2-JAN-2001 -
SB 737-25-1403 DOOR-MOUNTED ESCAPE SYSTEM, SERVICE BULLETIN RECOMMENDED
MOS
04-MAY-2000 - (s)
SB 737-25-1403 RI DOOR MOUNTED ESCAPE SYSTEM - INFLATION CYLINDER TRIGGER HOUSING COVER INSTALLATION. SERVICE RECOMMENDED
BULLETIN
MOS
29-NOV-2001
SB 737-25-1404 ESCAPE SLIDE LATCH ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
25-MAY-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 32 Of 748
@ Camp Systems
EFTA00618323
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1404 RI EMERGENCY - DOOR-MOUNTED ESCAPE SYSTEM - LATCH ASSEMBLY MODIFICATION (SUPERSEDED BY SB SUPERSEDED
737-25-1404 R2). SERVICE BULLETIN
MOS
- (s)
SB 737-25-1404 R2 EQUIPMENT/FURNISHINGS - EMERGENCY - DOOR-MOUNTED ESCAPE SYSTEM - LATCH ASSEMBLY MODIFICATION. RECOMMENDED
SERVICE BULLETIN
MOS 36 (s)
25-MAY-2000
SB 737-25-1439 R3 EQUIPMENT/FURNISHINGS-BUFFET/,ALLEY- GALLEY WIRE BUNDLE PROTECTIVE WRAP REPLACEMENT. SERVICE
BULLETIN
MOS
II -NOV-2004
SB 737-25-1440 REPLACEMENT OF SPARE BULB STOWAGE ASSEMBLY, SERVICE BULLETIN RECOMMENDED
MOS
06-DEC-2001 - (s)
SB 737-25-1447 INSTALL SECOND OBSERVERS STATION, SERVICE BULLETIN RECOMMENDED
MOS
I8-OCT-2001 - (s)
SB 737-25-1449 AFT CARGO COMPARTMENT - REPLACE INSULATION SUPPORT TRAYS. SERVICE BULLETIN RECOMMENDED
MOS
08-NOV-2001 - (s)
SB 737-25-1449 RI REPLACE INSLUATION SUPPORT TRAYS. SERVICE BULLETIN RECOMMENDED
MOS
0I-AUG-2002
SB 737-25-1475 REPLACE TRIGGER HOUSING ON SLIDE REGULATOR VALVE. SERVICE BULLETIN RECOMMENDED
MOS
26-NOV-2002
SB 737-25-1477 WINDOW NUMBER FOUR SUNSHADE INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
I4-NOV-2002 - (s)
SB 737-25-1477 RI WINDOW NUMBER FOUR SUNSHADE INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
28-AUG-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 33 Of 748
@ Camp Systems
EFTA00618324
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1491 EQUIPMENT/FURNISHINGS - EMERGENCY - DOOR MOUNTED ESCAPE SYSTEM - CHANGE EVACUATION SLIDE COMPLIED WITH - PREVIOUSLY
INFLATION VALVE REGULATOR. SERVICE BULLETIN
MOS 09-AUG-2010
23-APR-2007 3148:31
AFL PA
SB 737-25-1491 RI EMERGENCY - DOOR MOUNTED ESCAPE SYSTEM - CHANGE EVACUATION SLIDE INFLATION VALVE REGULATOR. RECOMMENDED COMPLIED WITH - PREVIOUSLY 737-25-1491
SERVICE BULLETIN SLIDE PN INSTALLED: 5A3086-301
MOS C9-AUG-2010
23-APR-2007 3448:31
AFL 841
SB 737-25-1493 EQUIPMENT/FURNISHINGS- INSULATION BLANKET - MOISTURE REDUCTION OF INSULATION BLANKETS AT THE
AUTOMATIC OVERWING EXIT DOORS. SERVICE BULLETIN
MOS
02-MAY-2007
SB 737-25-1493 RI INSULATION BLANKET - MOISTURE REDUCTION OF INSULATION RECOMMENDED
BLANKETS AT THE AUTOMATIC OVERWING EXIT DOORS. SERVICE BULLETIN
MOS
28-JUL-2009
SB 737-25-1523 EQUIPMENT/FURNISHINGS- FORWARD GALLEY DOOR DOORWAY HEADER PANEL - INSTALLATION OF ATTENDANT SUPERSEDED
SERVICE UNIT (SUPERSEDED BY SB 737-25.1523 RI ). SERVICE BULLETIN
MOS
SB 737-25-1523 RI EQUIPMENT/FURNISHINGS- FORWARD GALLEY DOOR DOORWAY HEADER PANEL - INSTALLATION OF ATTENDANT RECOMMENDED
SERVICE UNIT. SERVICE BULLETIN
MOS
27-JAN-2011
SB 737-25-1543 EQUIPMENT l FURNISHINGS - FLIGHT COMPARTMENT AND FORWARD CARGO COMPARTMENT - FLIGHT DECK NOISE RECOMMENDED
REDUCTION CHANGE. SERVICE BULLETIN
MOS
09-N0v-2012
SB 737-25-1544 PASSENGER CABIN PARTITIONS AND COMPARTMENTS -
SUPPORT FITTING ASSEMBLY AIR CONDITIONING EXTRUSIONS REPLACEMENT. SERVICE BULLETIN
MOS 72 (s)
04-OCT-2000
AFL 36000
SB 737-25-1544 RI EQUIPMENT/FURNISHING - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - SUPPORT FITTING ASSEMBLY SUPERSEDED
AIR CONDITIONING EXTRUSIONS REPLACEMENT (SUPERSEDED BY SB SB 737-25-1544 R2). SERVICE BULLETIN
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 34 Of 748
'2 Camp Systems
EFTA00618325
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1544 R2 EQUIPMENT/FURNISHING - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - SUPPORT FITTING ASSEMBLY RECOMMENDED
AIR CONDITIONING EXTRUSIONS REPLACEMENT. SERVICE BULLETIN
MOS 72 (s)
23-MAR-2011
SB 737-25-1545 EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION SUPERSEDED NOT APPLICABLE - PER PN NOT INSTALLED
MECHANISM WITHIN THE PASSENGER SERVICE UNITS (SUPERSEDED BY SB 737-25-1545 R1). SERVICE BULLETIN
MOS 24-AUG-2007
- (s) 2968:28
AFL 699
SB 737-25-1545 RI EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION SUPERSEDED NOT APPLICABLE - PER PN NOT INSTALLED
MECHANISM WITHIN THE PASSENGER SERVICE UNITS (SUPERSEDED BY SB 737-25-1545 R2). SERVICE BULLETIN
MOS 24-AUG-2007
- (s) 2968:28
AFL 699
SB 737-25-1545 R2 EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION RECOMMENDED
MECHANISM WITHIN THE PASSENGER SERVICE UNITS. SERVICE BULLETIN
MOS 60 (s)
02-MAY-2007
SB 737-25-1593 EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - INSTALL
OVERHEAD STOWAGE BIN DURABILITY PATCH. SERVICE BULLETIN
MOS
I2-MAR-2008
SB 737-25-1602 AUTOMATIC OVERWING EXIT DOOR SURROUND STRUCTURE - SUPERSEDED
CHANGE UPPER AND LOWER DOOR SILLS (SUPERSEDED BY SB 737-25-1602 RI). SERVICE BULLETIN
MOS
SB 737-25-1602 RI EQUIPMENT/FURNISHINGS - AUTOMATIC OVERWING EXIT DOOR SURROUND STRUCTURE - CHANGE UPPER AND RECOMMENDED
LOWER DOOR SILLS. SERVICE BULLETIN
MOS
I0-DEC-2010
SB 737-25-1617 CUP HOLDERS INSTALLATION CHANGE. SERVICE BULLETIN
MOS
I I -JUN-2009
SB 737-25-1617 RI FLIGHT COMPARTMENT - CUP HOLDERS INSTALLATION CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
09-NOV-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 35 Of 748
@ Camp Systems
EFTA00618326
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1636 EQUIPMENT/FURNISHINGS - PASSENGER SEATS - EMERGENCY EXIT DOOR - ARMREST INSTALLATION. SERVICE
BULLETIN
MOS
21-MAY-2010
SB 737-25-1639 EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - INTERIOR RECONFIGURATION - CHANGE FROM 167 RECOMMENDED
PASSENGER DUAL CLASS CONFIGURATION TO 176 PASSENGER SINGLE CLASS CONFIGURATION WITH PANASONIC
IN-FLIGHT ENTERTAINMENT (SUPERSEDED BY SB 737-25-1639 R1). SERVICE BULLETIN
MOS
09-DEC-2010
SB 737-25-1601 EQUIPMENT / FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD SUPERSEDED NOT APPLICABLE - BY EFFECTIVITY
STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE (SUPERSEDED BY S8 737-25-1611
R1). SERVICE BULLETIN
MOS
SB 737-25-1601 RI EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD SUPERSEDED
STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE (SUPERSEDED BY SB 737-25-1601
R2). SERVICE BULLETIN
MOS
SB 737-25-1601 R2 EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD RECOMMENDED
STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE. SERVICE BULLETIN
MOS 60 (s)
I3-MAY-2011
SB 737-25-1602 EQUIPMENT FURNISHINGS - PASSENGER AND CABIN ATTENDANT ACCOMMODATIONS SAM250 SLIDE COVER RECOMMENDED
ASSEMBLY FOR HBL3330 ELECTRICAL OUTLET - CHANGE. SERVICE BULLETIN
MOS
22-FEB-20II
SB 737-25-1603 EQUIPMENT/FURNISHINGS - ESCAPE SLIDES. SNAPS AND LANYARDS - CARGO DOOR. PERSONNEL SAFETY NET
REPLACEMENT. SERVICE BULLETIN
MOS
SB 737-25-1605 EQUIPMENT/FURNISHINGS - PASSENGER CABIN FLOORS - SECTIONS 44 - CHANGE SOUND DAMPING MATERIALS OF RECOMMENDED
FLOOR PANELS. SERVICE BULLETIN
MOS 12 (s)
I I -MAY-2012
SB 737-25-1606 EQUIPMENT FURNISHINGS - POWER DISTRIBUTION PANEL P92- CIRCUIT BREAKER C0912. INOP COLLAR AND LABEL RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS
02-AUG-20I2
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 36 Of 748
@ Camp Systems
EFTA00618327
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1647 EQUIPMENT FURNISHINGS - PASSENGER SEATS - PALLETIZED SEAT PALLET LATCH REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
12-OCT-201I
SB 737-25-1648 EQUIPMENTIFURNISHINGS-BUFFETIGALLEY. GALLEY NUMBER 2. FOLDING TROLLEY INSTALLATION. SERVICE RECOMMENDED
BULLETIN
MOS
13-MAY-2011
SB 737-25-1651 EOUIPMENTIFURNISHINGS - PASSENGER CABIN LININGS AND PANELS - RIGHT SIDE SIDEWALL AND LITERATURE RECOMMENDED
POCKET REPLACEMENT. SERVICE BULLETIN
MOS
15-AUG-2011
SB 737-25-1654 EQUIPMENTIFURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR RECOMMENDED
OVERHEAD STOWAGE BINS. INSTALLATION OF FASTER DEPLOYING BIN RATE CONTROLS FOR THE FORWARD AND
AFT. LEFT AND RIGHT TERMINATION BINS (SUPERSEDED BY SB 737-25-1654 R1). SERVICE BULLETIN
MOS
24-JUL-2012
SB 737-25-1654 RI EOUIPMENTIFURNiSHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR RECOMMENDED
OVERHEAD STOWAGE BINS. INSTALLATION OF FASTER DEPLOYING BIN RATE CONTROLS FOR THE FORWARD AND
AFT. LEFT AND RIGHT TERMINATION BINS. SERVICE BULLETIN
MOS
07-MAR-2013
SB 737-25-1660 EOUIPMENTIFURNISHINGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - CHANGE (SUPERSEDED BY SB SUPERSEDED
737-25-1660 RI). SERVICE BULLETIN
MOS
SB 737-25-1660 RI EQUIPNIENTIFURNIS11INGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
26-SEP-2012
SB 737-25-1661 EQUIPMENT r FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - OUTBOARD STOWAGE RECOMMENDED
CLOSET - REPLACEMENT OF FORWARD LEFT FULL HEIGHT CLOSET DOOR ASSEMBLIES. SERVICE BULLETIN
MOS
16-OCT-2012
SB 737-25-1663 EQUIPMENTFURNiSHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC SUPERSEDED
OVERWING EXIT DOOR WINDOW SHADE AND REVEAL ASSEMBLY REPLACEMENT (SUPERSEDED BY SB 737-25-1663
R1). SERVICE BULLETIN
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 37 Of 748
Camp Systems
EFTA00618328
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1663 RI EQUIPMENT/FURNISHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC SUPERSEDED
OVERWING EXIT DOOR WINDOW SHADE. REVEAL ASSEMBLY. AND INSULATION BLANKET REPLACEMENT
(SUPERSEDED BY SB 737-25-1663 R2). SERVICE BULLETIN
MOS
SB 737-25-1663 R2 EQUIPMENT/FURNISHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC RECOMMENDED
OVERWING EXIT DOOR WINDOW SHADE. REVEAL ASSEMBLY. AND INSULATION BLANKET REPLACEMENT. SERVICE
BULLETIN
MOS
02-DEC-2013
SB 737-25-1665 EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT RECOMMENDED
DOOR MOUNTED ARMREST PADS (SUPERSEDED BY SB 737-25-1665 R1). SERVICE BULLETIN
MOS
24-APR-20I2
SB 737-25-1665 RI EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT SUPERSEDED
DOOR MOUNTED ARMREST PADS (SUPERSEDED BY SB 737-25-1665 R2). SERVICE BULLETIN
MOS
SB 737-25-1665 R2 EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT NOT APPLICABLE
DOOR MOUNTED ARMREST PADS (REPLACED BY SB 737-25-1663 R2). SERVICE BULLETIN
MOS
03-DEC-2013
SB 737-25-1667 EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - PARTITIONS - PLACARD RECOMMENDED
REMOVAL NO CHILDREN THIS ROW. SERVICE BULLETIN
MOS
I5-AUG-2012
SB 737-25-1668 EQUIPMENT/FURNISHINGS - CABIN ATTENDANT STATIONS- REPLACEMENT OF FORWARD ATTENDANT CONTROL RECOMMENDED
PANEL AND SHROUD FOR IMPROVED RELIABILITY - BOEING SKY INTERIOR AIRPLANES. SERVICE BULLETIN
MOS
02-AUG-20I2
SB 737-25-1671 EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - SIDEWALL PANEL ASSEMBLY - RECOMMENDED
REPLACEMENT OF SIDEWALL PANEL ASSEMBLY AT GALLEY 2 INTERFACE. SERVICE BULLETIN
MOS
23-MAR-2012
SB 737-25-1672 EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - INSTALL MEGAPHONES IN THE RECOMMENDED
BOEING SKY INTERIOR LEFT FORWARD AND AFT TERMINATION OVERHEAD STOWAGE BINS. SERVICE BULLETIN
MOS
29-MAR-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 38 Of 748
@ Camp Systems
EFTA00618329
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1677 EQUIPMENT FURNISHINGS - ATTENDANT SEATS AND PANELS - ATTENDANT PANEL ASSEMBLY -REPLACEMENT, RECOMMENDED
SERVICE BULLETIN
MOS
04-DEC-2012
SB 737-25-1678 EQUIPMENT! FURNISHINGS - AFT. LEFT SIDE PRIVACY CURTAIN - ENCLOSURE INSTALLATION (SUPERSEDED BY SB SUPERSEDED
737-25-1678 RI), SERVICE BULLETIN
MOS
SB 737-25-1678 RI EQUIPMENT FURNISHINGS - AFT. LEFT SIDE PRIVACY CURTAIN- ENCLOSURE INSTALLATION. SERVICE BULLETIN OPERATORS
DISCRETION
MOS
26-AUG-20I3
SB 737-25-1679 EQUIPMENT/FURNISHINGS - PASSENGER SEAT - MOVE THE PASSENGER SEATS. CHANGE CARPETS. SERVICE RECOMMENDED
BULLETIN
MOS
IS-MAR-2013
SB 737-25-1680 EQUIPMENT FURNISHINGS - PASSENGER CABIN LININGS AND PANELS- WINDOW SHADE AND REVEAL ASSEMBLY - RECOMMENDED
CHANGE THE WINDOW SHADES. SERVICE BULLETIN
MOS
08-MAR-2013
SB 737-25-1681 EQUIPMENT/FURNISHING- PASSENGER CABIN UNING AND PANELS - SIDEWALL PANEL ASSEMBLY - CHANGE RECOMMENDED
MEDICAL OUTLET PLACARD. SERVICE BULLETIN
MOS
21-SEP-2012
SB 737-25-1682 EQUIPMENT FURNISHINGS - PASSENGER CABIN LININGS AND PANELS- WINDOW SHADE AND REVEAL ASSEMBLY - RECOMMENDED
CHANGE THE WINDOW SHADES. SERVICE BULLETIN
MOS
25-MAR-2013
SB 737-25-1680 EQUIPMENT/FURNISHINGS- PASSENGER COMPARTMENT - BOEING SKY INTERIOR OVERWING EXIT DOOR LINER RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
14-MAY-2013
SB 737-25-1685 EQUIPMENT/FURNISHINGS- PASSENGER CABIN LININGS AND PANELS - INSTALLATION OF ALUMINUM FOIL TAPE ON RECOMMENDED
BACK SIDE OF SIDEWALL PANELS. SERVICE BULLETIN
MOS
Of -MAR-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 39 Of 748
@ Camp Systems
EFTA00618330
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-25-1689 EQUIPMENT / FURNISHINGS - LAVATORIES - MODULAR LAVATORY A- REPLACE LAVATORY A THRESHOLD LIGHT SUPERSEDED
WITH STRIKE PLATE (SUPERSEDED BY SB 737-25-1689 R1). SERVICE BULLETIN
MOS
SB 737-25-1689 RI EQUIPMENT! FURNISHINGS - LAVATORIES - MODULAR LAVATORY A- REPLACE LAVATORY A THRESHOLD LIGHT RECOMMENDED
WITH STRIKE PLATE. SERVICE BULLETIN
MOS
09-JUL-2014 - (s)
SB 737-25-1691 EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR OPERATORS
OVERHEAD STOWAGE BINS - INSPECTION AND CHANGE OF THE THRESHOLD TRIM ASSEMBLY. SERVICE BULLETIN DISCRETION
MOS
04-SEP-2013
SB 737-25-1693 EQUIPMENT / FURNISHINGS - PARTITIONS - REPLACEMENT OF JOGGLED CLASS DWIDERS. SERVICE BULLETIN RECOMMENDED
MOS
28-JUN-20I3
SB 737-25-1702 EQUIPMENT/FURNISHINGS - DETACHABLE EMERGENCY EQUIPMENT - AFT RIGHT SIDE TERMINATION STOWAGE BIN RECOMMENDED
CHANGE PORTABLE OXYGEN BOTTLES INSTALLATION. SERVICE BULLETIN
MOS
23-JUN-20I4 - (s)
SB 737-25-1703 EQUIPMENT! FURNISHINGS- PASSENGER COMPARTMENT- PASSENGER SERVICE UNIT - REPLACE 12 MINUTE RECOMMENDED
OXYGEN GENERATORS WITH 22 MINUTE OXYGEN GENERATORS. SERVICE BULLETIN
MOS
06-DEC-2013
SB 737-25-1706 EQUIPMENT/FURNISHINGS- PASSENGER COMPARTMENT - SIDEWALL - AFT EMERGENCY EXIT. AUTOMATIC RECOMMENDED
OVERWING (AOE) EXIT DOOR - LEFT AND RIGHT SIDE. SEAT INTRUSION CONTROL BLOCK INSTALLATION. SERVICE
BULLETIN
MOS
I3-JUN-2014
SB 737-25A1372 FLIGHT COMPUTER FWD INSTRUMENT PANEL ACCESS PANEL FASTENER INTERFERENCE. SERVICE BULLETIN
MOS
20-MAY-1999 - (s)
SB 737-25A1383 RI RUDDER PEDAL COVER FASTENER INTERFERENCE. SERVICE BULLETIN RECOMMENDED COMPUED WITH
MOS 13-SEP-1999
02-DEC-1999 -(s)
SB 737-25A1626 EQUIPMENT/FURNISHINGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - LIQUID CONTAMINATION RECOMMENDED
PROTECTION IMPROVEMENTS ON THE E5 ELECTRONIC RACK DRIPSHIELD EQUIPMENT. SERVICE BULLETIN
MOS 60 (EFF) 25-MAR-2015 25-MAR-2015
25-MAR-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 40 Of 748
@ Camp Systems
EFTA00618331
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-26-1112 CORROSION PROTECTION OF THE FENWAL CONNECTORS. SERVICE BULLETIN
MOS 6(s) (EFF)
06-DEC-2001
SB 737-26-1112 RI CORROSION PROTECTION OF THE FENWAL CONNECTORS. SERVICE BULLETIN
MOS 6 (s)
06-FEB-2003
SB 737-26-1121 FIRE PROTECTION - LOWER CARGO COMPARTMENT SMOKE DETECTION - INSTALLATION OF FORWARD CARGO SUPERSEDED
COMPARTMENT SMOKE PENETRATION SEALING PROVISIONS (SUPERSEDED BY 737-26-1121 R1). SERVICE BULLETIN
MOS
13-DEC-2007 - Is)
+ SB 737-26-1121 RI FIRE PROTECTION - LOWER CARGO COMPARTMENT SMOKE DETECTION - INSTALLATION OF FORWARD CARGO RECOMMENDED
COMPARTMENT SMOKE PENETRATION SEALING PROVISIONS. SERVICE BULLETIN
MOS 72 (s)
I3-DEC-2007
SB 737-26-1122 FIRE PROTECTION- LOWER CARGO COMPARTMENT SMOKE DETECTION- FORWARD CARGO COMPARTMENT SMOKE SUPERSEDED
PENETRATION ELECTRICAL CHANGES (SUPERSEDED BY 737-26-1122 R1). SERVICE BULLETIN
MOS
I3-DEC-2007 - (s)
SB 737-26-1122 RI LOWER CARGO COMPARTMENT SMOKE DETECTION- FORWARD CARGO RECOMMENDED
COMPARTMENT SMOKE PENETRATION ELECTRICAL CHANGES. SERVICE BULLETIN
MOS 72 (s)
I3-AUG-2009
SB 737-26-1123 REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN RECOMMENDED
MOS
I8-JAN-2005
SB 737-26-1123 RI FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE
DETECTION HARNESSES. SERVICE BULLETIN
MOS
21-MAR-2005
SB 737-26-1123 R2 FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT
ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN
MOS
I6-AUG-2007
SB 737-26-1123 R3 FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT
ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN
MOS
28-FEB-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 41 Of 748
@ Camp Systems
EFTA00618332
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-26-1123 R4 ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT
ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN
MOS
20-AUG-2008
SB 737-26-1123 RS ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES SUPERSEDED
(SUPERSEDED BY 737-26-1123 R6), SERVICE BULLETIN
MOS
27-APR-2009
SB 737-26-1123 Re FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE SUPERSEDED
DETECTION HARNESSES (SUPERSEDED BY SB 737-26-1123 R7). SERVICE BULLETIN
MOS
SB 737-26-1124 FIRE PROTECTION- WHEEL WELL. WING AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM- MAIN WHEEL
WELL CONNECTOR CORROSION PREVENTION. SERVICE BULLETIN
MOS
72-JAN-2006
SB 737-26-1131 FIRE PROTECTION- WHEEL WELL. WING. AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM- DUCT LEAK SUPERSEDED
OVERHEAT DETECTOR SUPPORT INSTALLATION (SUPERSEDED BY SB 737-26-1131 R1). SERVICE BULLETIN
MOS
58 737-26-1131 RI FIRE PROTECTION - WHEEL WELL. WING. AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM - DUCT LEAK RECOMMENDED
OVERHEAT DETECTOR SUPPORT INSTALLATION. SERVICE BULLETIN
MOS
14-OCT-2011
58 737-26-1133 FIRE PROTECTION -CARGO FIRE EXTINGUISHING SYSTEM - INSTALLATION OF SECOND FIRE BOTTLE FOR SUPERSEDED
EXTENDED RANGE TWIN ENGINE OPERATIONS (SUPERSEDED BY SB 737-26-1133 R1). SERVICE BULLETIN
MOS
SB 737-26A1099 ENGINE FIRE EXTINGUISHING BOTTLES. SERVICE BULLETIN RECOMMENDED
DAYS 90 (s) 17-JAN-2001
01-NOV-2000 634
AFL 175
SB 737-26A1108 RI ENGINES AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES INSPECTION AND REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS 12 (s)
27-JUN-2002
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 42 Of 748
@ Camp Systems
EFTA00618333
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-26A1109 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY
FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
15-NOV-2001 - (s)
SB 737-26A1109 R1 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY
FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS 18 (s)
07-NOV-2002
SB 737-26A1109 R2 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE NOT APPLICABLE - BY SERIAL NUMBER
FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS 30-NOV-2005
15-NOV-2001 -(s) 2338:24
AFL 573
SB 737-26A1109 R3 ENTINGUISHING - ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND COMPUED WITH - NO REWORK REQUIRED
WING-TO-STRUT ENGINE FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN FOUND S8 737-26A1109 R2 ALREADY COMPUED
WITH AS NOT APPLICABLE 30-NOV-2005
(2338:24 HRS. 573 CYC) REF WO GUBBJ111-0202
MOS 05-APR-2007
29-SEP-2005 2871:09
AFL 676
SB 737-26A1118 FIRE PROTECTION-ENGINE FIRE EXTINGUISHING BOTTLES-GROUNDS INSPECTION/CHECK. SERVICE BULLETIN RECOMMENDED
DAYS 90 (5)
I7-OCT-2002
SB 737-26A1118 R1 FIRE PROTECTION-ENGINE FIRE EXTINGUISHING BOTTLES-GROUNDS INSPECTION/CHECK. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY VARIABLE NUMBER.
MOS 22-DEC-2004
08-APR-2004 1951:36
AFL 476
SB 737-26A1137 FIRE PROTECTION -CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE CLEARANCE MODE RECOMMENDED
OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN
MOS
22-MAY-2014 - (s)
SB 737-26A1137 TABLE PERFORM FIRE PROTECTION- CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE RECOMMENDED
1.1 CNF 1 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SMOKE
CLEARANCE MODE - OPERATIONAL TEST (GROUP I. CONFIGURATION I AIRPLANES)
MOS SI (s)
22-MAY-20I4
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 43 Of 748
@ Camp Systems
EFTA00618334
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-26A1137 TABLE PERFORM FIRE PROTECTION - CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE
1.2 CNF 2 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SMOKE
CLEARANCE MODE - OPERATIONAL TEST (GROUP 1. CONFIGURATION 2. GROUP 2 AND GROUP 3 AIRPLANES)
MOS
- (s)
SB 737-26A1137 TABLE PERFORM FIRE PROTECTION - CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE RECOMMENDED
1.3 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SYSTEM FAULT
ISOLATION (IF THE SMOKE CLEARANCE MODE - OPERATIONAL TEST RESULT IS NOT SATISFACTORY)
MOS
22-MAY-2014 BF/F (s)
SB 737-27-1210 HORIZ STAB-REPLACEMENT OF STAB TRIM ACTUATOR. SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2008
28-OCT-1999 - (s) 3260:48
AFL 782
SB 737-27-1210 RI HORIZONTAL STABILIZER REPLACEMENT OF STABILIZER TRIM ACTUATOR. SERVICE BULLETIN COMPUED WITH - IAW THE 58
MOS 22-AUG-2008
01-JUN-2000 4500 (s) 3260:48
AFL 782
SB 737-27-1215 FLIGHT CONTROLS- ELEVATOR AND TAB- INSTALLATION OF A 10-SECOND DELAY FOR THE RIGHT ELEVATOR RECOMMENDED
ANTI-BALANCE TAB, SERVICE BULLETIN
MOS
01-APR-1999 -(s)
SB 737-27-1215 RI FLIGHT CONTROLS - ELEVATOR TAB - INSTALLATION OF A 10-SECOND DELAY.RIGHT ELEVATOR ANTI-BALANCE RECOMMENDED
TAB. SERVICE BULLETIN
MOS
07-DEC-2000 - (s)
SB 737-27-1224 AILERON 8 AILERON TRIM CONTROL SYSTEM. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -Cm
MOS 19-JAN-2000
21-OCT-1999 3200 (s)
S8 737-27-1232 ELEVATOR AND TAB CONTROL SYSTEM TEST, SERVICE BULLETIN
MOS
28-FEB-2002 - (s)
S8 737-27-1240 MAIN WHEEL WELL AFT BULKHEAD STANDBY SHUT-OFF VALVE GROUND WIRE INSTALLATION MODIFICATION. RECOMMENDED
SERVICE BULLETIN
MOS 18 (s)
10-MAY-2001 6000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 44 Of 748
@ Camp Systems
EFTA00618335
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27-1242 FLIGHT CONTROLS - LIFT AUGMENTING - LEADING EDGE - CRUISE DEPRESSURIZATION VALVE MODIFICATION. RECOMMENDED
SERVICE BULLETIN
MOS
29-MAR-2001 - (s)
SB 737-27-1242 RI UFT AUGMENTING - LEADING EDGE - CRUISE DEPRESSURIZATION. SERVICE BULLETIN RECOMMENDED
MOS
28-SEP-2002 - (s)
SB 737-27-1244 ELEVATOR FEEL COMPUTER. SERVICE BULLETIN RECOMMENDED
MOS
I4-JUN-2001 - (s)
SB 737-27-1247 RI WIRE PROVISIONS FOR RUDDEER SYSTEM ENHANCEMENT. SERVICE BULLETIN RECOMMENDED COMPUED WITH - IAW THE 58 REV.1 N/A FOR
AIRCRAFT REV 00 ALREADY CAN.
MOS 13-AUG-2007
25-JUL-2002 - (s) 1785:05
AFL 446
SB 737-27-1247 R2 RUDDER AND RUDDER TRIM CONTROL SYSTEM - WIRE PROVISIONS FOR RECOMMENDED
RUDDER SYSTEM ENHANCEMENT. SERVICE BULLETIN
MOS
26-NOV-2008 -
SB 737-27-1248 FLIGHT CONTROLS - ELEVATOR PITOT-STATIC SYSTEM - TURN THE PITOT PROBE DOWN. SERVICE BULLETIN
MOS
24-JAN-2002 - (s)
SB 737-27-1251 STALL MANAGEMENT YAW DAMPER (SMYD)-REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
II-JUL-2002 - (s)
SB 737-27-1251 RI STALL MANAGEMENT YAW DAMPERS(SMYD) REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
27-FEB-2003
SB 737-27-1253 INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
02-JAN-2003
SB 737-27-1253 RI INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
27-MAR-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 45 Of 748
@ Camp Systems
EFTA00618336
AD/SI Status Report AIRCRAFT
flP Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27-1253 R2 INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM (RSEP). SERVICE BULLETIN RECOMMENDED
MOS
07-OCT-2004
SB 737-27-1253 R3 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - INSTALLATION OF AN ENHANCED RUDDER COMPLIED WITH - IAW THE SB
CONTROL SYSTEM (RSEP). SERVICE BULLETIN
MOS 22-AUG-2008
12-MAY-2086 - (s) 3260:48
AFL 782
SB 737-27-1253 R4 RUDDER AND RUDDER TRIM CONTROL SYSTEM - INSTALLATION OF AN RECOMMENDED
ENHANCED RUDDER CONTROL SYSTEM (RSEP) - TEST. SERVICE BULLETIN
MOS
07-MAY-2009
SB 737-27-1254 FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH "LOW ZINC' COATING (SUPERSEDED BY 737-27-1254 RI ). SUPERSEDED
SERVICE BULLETIN
MOS
31-OCT-2002 - (s)
SB 737-27-1254 E. 1 INSPECT FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING (SUPERSEDED BY RECOMMENDED
737-27-1254 RI). SERVICE BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING
MOS RECURRING
31-OCT-2002
SB 737-27-1254 E. 2 INSPECT FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING (SUPERSEDED BY RECOMMENDED
737-27-1254 RI). SERVICE BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING
MOS RECURRING
31-OCT-2002
SB 737-27-1254 RI CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED BY SUPERSEDED
737-27-1254 R2). SERVICE BULLETIN
MOS
14-APR-2003
SB 737-27-1254 RI E.1 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED RECOMMENDED
BY 737-27-1254 R2), SERVICE BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING
MOS RECURRING
14-APR-2003
S8 737-27-1254 RI E. 2 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED RECOMMENDED
BY 737-27-1254 R2), SERVICE BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING
MOS RECURRING
14-APR-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 46 Of 748
@Camp Systems
EFTA00618337
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27-1254 RI E 3 REPLACE CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED
BY 737-27-1254 R2). SERVICE BULLETIN CONTROL CABLE ASSEMBLIES
MOS 24 (5)
I 7-APR-2003
SB 737-27-1254 R2 CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING - INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
02-JUL-2008
SB 737-27-1254 R2 El INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING- INSPECTION AND REPLACEMENT. SERVICE
BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC COATING
MOS 9 (s)
02-JUL-2008
S8 737-27-1254 R2 E2 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING- INSPECTION AND REPLACEMENT. SERVICE
BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING
MOS 12 (s)
02-JUL-2008
SB 737-27-1254 R2 E3 REPLACE CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING - INSPECTION AND REPLACEMENT. SERVICE
BULLETIN CONTROL CABLE ASSEMBLIES
MOS 24 (s)
02-JUL-2008
SB 737-27-1262 RUDDER AND RUDDER TRIM CONTROL SYSTEM-REPLACEMENT OF THE P5-3 PANEL (RSEP).. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - PREVIOUSLY
MOS 22-AUG-2008
19-DEC-2002 - Is) 3260:48
AFL 782
SB 737-27-1262 RI RUDDER AND RUDDER TRIM CONTROL SYSTEM- REPLACEMENT OF THE RECOMMENDED
P5-3 PANEL (RSEP). SERVICE BULLETIN
MOS
07-MAY-2009
SB 737-27-1268 FLIGHT CONTROLS - HORIZONTAL STABLIZER TRIM CONTROL SYSTEM - STABLIZER TRIM AND LIMIT SWITCHES WIRE - INFORMATION REF TO RI
BUNDLE PROTECTION. SERVICE BULLETIN
MOS
12-OCT-2006
SB 737-27-1268 RI HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - STABILIZER TRIM AND RECOMMENDED COMPUED WITH - GROUP I A/C WIRE BUNDLES
UNIT SWITCHES WIRE BUNDLE PROTECTION. SERVICE BULLETIN INSPECTED. IAW S8737-27-1268 RI FIGURE 1.
GROUP 2 NC WIRE BUNDLES INSPECTED IAW
SB 737-27-1268 RI FIGURE 2.. IAW S8
737-27-1268 RI FIGURE 3
MOS 29-AUG-2011
26-MAR-2009 3533:32
AFL 863
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 47 Of 748
@ Camp Systems
EFTA00618338
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-27-1270 RUDDER FEEL AND CENTERING UNIT-CAM ROLLER BOLT TO FLANGE CLEARANCE-INSPECTION AND REWORK. RECOMMENDED
SERVICE BULLETIN
MOS
02-OCT-2003
SB 737-27-1273 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
AND LUBRICATION. SERVICE BULLETIN
MOS 24-AUG-2007
29-SEP-2005 2968:28
AFL 699
SB 737-27-1273 PART 1 FLIGHT CONTROLS -AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
AND LUBRICATION. SERVICE BULLETIN
MOS 24 (5) 24-AUG-2007
29-SEP-2005 8000 2968:28
AFL 699
SB 737-27-1273 PART 2 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
AND LUBRICATION. SERVICE BULLETIN
MOS 12 (s) 24-AUG-2007
29-SEP-2005 4000 2968:28
AFL 699
SB 737-27-1273 RI FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
AND LUBRICATION. SERVICE BULLETIN
MOS 24-AUG-2007
79-DEC-2006 2968:28
AFL 699
SB 737-27-1273 RI PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
1 AND LUBRICATION. SERVICE BULLETIN
MOS 24 (5) 24-AUG-2007
19-DEC-2006 8000 2968:28
AFL 699
SB 737-27-1273 RI PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH
2 AND LUBRICATION. SERVICE BULLETIN
MOS 12 (5) 24-AUG-2007
19-DEC-2006 4000 2968:28
AFL 699
SB 737-27-1273 R2 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH - IA.W. AD 2006-21-01 PART 1
AND LUBRICATION. SERVICE BULLETIN AND PART 2
MOS 03-JUL-2013
23-APR-2007 3723:21
AFL 908
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time ,i6 Of 748
@ Camp Systems
EFTA00618339
AD/SI Status Report AIRCRAFT
COMP
Astant.frar• Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27-1273 R2 PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPUED WITH - LAW. AD 2006-21-01 PART I
1 AND LUBRICATION. SERVICE BULLETIN
MOS 24 (5) 03-JUL-2013
23-APR-2007 8000 3723:21
AFL 908
SB 737-27-1273 R2 PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPUED WITH - IA.W. AD 2006-21-01 PART 2
2 AND LUBRICATION. SERVICE BULLETIN
MOS 12 (s) 03-JUL-2013
23-APR-2007 4000 3723:21
AFL 908
SB 737-27-1282 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - WIRE BUNDLE W443 AND LEFT FORWARD SUPERSEDED
RUDDER QUADRANT CLEARANCE INSPECTION (SUPERSEDED BY 737-27-1282 R1). SERVICE BULLETIN
MOS
15-MAR-2007 - (s)
SB 737-27-1282 RI FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM- WIRE BUNDLE W443 AND LEFT FORWARD RECOMMENDED
RUDDER QUADRANT CLEARANCE INSPECTION. SERVICE BULLETIN
MOS 60 (s)
14-JUN-2010
SB 737-27-1284 FLIGHT CONTROLS - ELEVATOR AND TAB - LEFT AND RIGHT ELEVATOR TAB PUSHRODS
REPLACEMENT. SERVICE BULLETIN
MOS 48 (s)
28-NOV-2007
SB 737-27-1284 RI ELEVATOR AND TAB- LEFT AND RIGHT ELEVATOR TAB PUSHRODS COMPUED WITH
REPLACEMENT. SERVICE BULLETIN
MOS 29-AUG-2011
28-NOV-2007 - (s) 3533:32
AFL 863
SB 737-27-1289 737 STABILIZER TAKEOFF WARNING SWITCHES - TEST OF THE TAKEOFF WARNING INDICATION. SERVICE BULLETIN RECOMMENDED COMPUED WITH
DAYS 29-AUG-2011 RECURRING
07-APR-2010 750 3533:32 4283:32
AFL 863
SB 737-27-1290 TRAILING EDGE FLAP SYSTEM - FLAP UMIT SWITCH AND FLAP LANDING WARNING SWITCH REPLACEMENT SUPERSEDED
(SUPERSEDED BY SB 737-27-1290 RI), SERVICE BULLETIN
MOS
SB 737-27-1290 RI FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP LIMIT SWITCH AND FLAP LANDING WARNING LIMIT SUPERSEDED
SWITCH REPLACEMENT (SUPERSEDED BY SB 737-27-1290 RZ. SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 49 Of 748
@ Camp Systems
EFTA00618340
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27-1290 R2 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
14-OCT-2011
SB 737-27-1290 R3 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
10-APR-2012
SB 737-27-1290 R4 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
28-NOV-2012
SB 737-27-1291 LEADING EDGE FLAP AND SLAT CONTROL SYSTEM - LEADING EDGE SLATS- TITANIUM PROXIMITY SENSOR SUPERSEDED
PROVISIONAL INSTALLATION (SUPERSEDED BY SB 737-27-1291 R1). SERVICE BULLETIN
MOS
SB 737-27-1291 RI LEADING EDGE FLAP AND SLAT CONTROL SYSTEM - LEADING EDGE SLATS- TITANIUM PROXIMITY SENSOR RECOMMENDED
PROVISIONAL INSTALLATION. SERVICE BULLETIN
MOS
18-N0V-2010
SB 737-27-1298 FLIGHT CONTROLS - CENTRAL WARNING SYSTEM - SPEEDBRAKE TAKEOFF WARNING SWITCH. 5651 - INSPECTION RECOMMENDED
AND REPLACEMENT. SERVICE BULLETIN
MOS
18-AUG-2010
SB 737-27-1300 FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR TAB CONTROL MECHANISM - AFT ATTACH LUG MODIFICATION SUPERSEDED
(SUPERSEDED BY S8 737-27-1300 RI). SERVICE BULLETIN
MOS
- (s)
SB 737-27-1300 RI FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR TAB CONTROL MECHANISM - AFT ATTACH LUG MODIFICATION.
SERVICE BULLETIN
MOS
SB 737-27-1303 FLIGHT CONTROLS- FLIGHT SPOILER CONTROL SYSTEM- LEFT AND RIGHT WING FLIGHT SPOILERS SHORT FIELD RECOMMENDED
PERFORMANCE POWER CONTROL UNIT REPLACEMENT. SERVICE BULLETIN
MOS
21-JUN-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 50 Of 748
@ Camp Systems
EFTA00618341
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1219 FLAP/SLAT ELECTRONICS UNIT. SERVICE BULLETIN RECOMMENDED
MOS
11-SEP-I998 - (s)
SB 737-27A1222 MAIN RUDDER POWER CONTROL UNIT (SUPERSEDED BY SB 737-27A1222 RI). SERVICE BULLETIN SUPERSEDED COMPUED WITH -CM
MOS 13-SEP-1999
- (s)
SB 737-27A1222 RI MAIN RUDDER POWER CONTROL UNIT. SERVICE BULLETIN RECOMMENDED COMPUED WITH
MOS 13-SEP-1999
28-JAN-I999 - (s)
SB 737-27A1228 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SB 737-27A1228 R1). SERVICE SUPERSEDED COMPUED WITH
BULLETIN
MOS 13-SEP-1999
- (s)
SB 737-27A1228 RI TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SI3 737-27A1228 R2). SERVICE SUPERSEDED COMPUED WITH - CM
BULLETIN
MOS 13-SEP-1999
- (s)
SB 737-27A1228 R2 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SI3 737-27A1228 R3). SERVICE SUPERSEDED
BULLETIN
MOS
- (s)
SB 737-27A1228 R3 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS. SERVICE BULLETIN RECOMMENDED COMPUED WITH
MOS 13-SEP-1999
18-NOV-1999 300(s) 23:30
AFL 21
SB 737-27A1234 ELEVATOR-PCU RETENTION BRACKET AND BOLT (SUPERSEDED BY SB 737-27A1234 R1). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
SB 737-27A1234 RI ELEVATOR-PCU RETENTION BRACKET AND BOLT. SERVICE BULLETIN RECOMMENDED
DAYS 7 (s) 22-NOV-2001
10-AUG-2000 854:54
AFL 225
SB 737-27A1239 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - RELOCATION OF WIRE BUNDLES AWAY FROM RECOMMENDED COMPUED WITH - IAW THE SB
THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN
MOS 22-AUG-2008
11-JAN-2001 -(s) 3260:48
AFL 782
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 51 Of 748
@ Camp Systems
EFTA00618342
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1245 EXCESSIVE FREEPLAY IN THE TAB CONTROL (SUPERSEDED BY SB 737-27A1245 R1). SERVICE BULLETIN SUPERSEDED COMPUED WITH - CM
MOS 26-APR-2001
- Is)
SB 737-27AI245 RI EXCESSIVE FREEPLAY IN THE TAB CONTROL (SUPERSEDED BY SB 737-27A1245 R2) SUPERSEDED
. SERVICE BULLETIN
MOS
- Is)
SB 737-27A1245 R2 EXCESSIVE FREEPLAY IN THE TAB CONTROL. SERVICE BULLETIN RECOMMENDED
MOS
02-AUG-2002 - Is)
SB 737-27A1259 RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
30-MAY-2002 - Is)
SB 737-27A1259 PART A INSPECT/REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. RECOMMENDED
SERVICE BULLETIN SPRING ASEMBLY
DAYS 10 (s)
30-MAY-2002
SB 737-27A1259 PART 8 INSPECT/REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. RECOMMENDED
SERVICE BULLETIN SPRING ASSEMBLY
DAYS 90 (s)
30-MAY-2002
SB 737-27A1259 RI RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
19-DEC-2002
SB 737-27A1259 RI PART INSPECT RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE RECOMMENDED
A BULLETIN
DAYS 10 (s)
19-DEC-2002
SB 737-27A1259 RI PART REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE RECOMMENDED
8 BULLETIN
DAYS 90 (s)
19-DEC-2002
SB 737-27A1260 REPLACEMENT OF COMPENSATORS. SERVICE BULLETIN
DAYS 180(s)
07-OCT-2002
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 52 Of 748
@ Camp Systems
EFTA00618343
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1271 ELEVATOR INPUT TORQUE TUBE MODIFICATION (SUPERSEDED BY SB 737-27A1271 R1). SERVICE BULLETIN SUPERSEDED COMPUED WITH - IAW THE SB
MOS 22-AUG-2008
3260:48
AFL 782
SB 737-27A1271 R1 FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR INPUT TORQUE TUBE - MODIFICATION. SERVICE BULLETIN COMPUED WITH - PREVIOUSLY 737-27A1271
MOS
SB 737-27A1277 FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION. COMPUED WITH - PAC 1(1) INSPECTION - NEX
LUBRICATION AND REPAIR/OVEFtHAUL. SERVICE BULLETIN DUE 151AUG/2099 - 9368HRS / PAC 1(2)
LUBRICATION NEXT DUE 15/AUG/2008 - 4568
HRS / HSTA REPLACEMENT DUE 25.0000
AFUCYC TO BE ACCOMPLISHED IN REV 1 OF
THIS SB
MOS 24-AUG-2007
2968:28
AFL 699
SB 737-27A1277 PAC 1(1) DETAILED INSPECTION FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND COMPUED WITH - PAC 1(1) INSPECTION - NEX
BALL NUT INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN DUE 15/AUG/2C09 - 9368HRS IN REV.1
MOS 24 (s) 24-AUG-2007
27 -JUL-2005 2000 2968:28
AFL 699
SB 737-27A1277 PAC 1(2) LUBRICATE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM- BALLSCREW AND BALL NUT COMPUED WITH - NEXT DUE 15/AUG/2008 - 4568
INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN HRS IN REV 1 OF THIS SB
MOS 12 (s) 24-AUG-2007
27 -JUL-2005 1600 2968:28
AFL 699
SB 737-27A1277 PAC 2 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT - REF: REV.1
INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS
MOS
27 -JUL-2005 25000 (s)
SB 737-27A1277 PAC 3 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT - REF: REV.1
INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM ACTUATOR
MOS
27 -JUL-2005 25000 (s)
SB 737-27A1277 RI FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL COMPLIED WITH - PAC 1 (1) INSPECTION AND
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN PAC 1 (2) LUBERICATION
REFER NEXT TO REV.2
MOS 28-SEP-2009
25-JUL-2007 3378:04
AFL 812
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 53 Of 748
@Camp Systems
EFTA00618344
AD/SI Status Report AIRCRAFT
COMP
Astant.frar• Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1277 RI PAC 1 DETAIL INSPECTION FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL COMPLIED WITH - REFER NEXT COMPLIANCE IN
(1) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN REV.2
MOS 24 (s) 28-SEP-2009
27-JUL-2007 6400 3378:04
AFL 812
SB 737-27A1277 RI PAC 1 LUBRICATE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM- BALLSCREW AND BALL COMPLIED WITH - REFER NEXT COMPLIANCE IN
(2) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN REV.2
MOS 12 (s) 28-SEP-2009
25-JUL-2007 1600 3378:04
AFL 812
SB 737-27A1277 RI PAC 2 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - R0i I cd-REW AND BALL - INFORMATION REFER TO REV2
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS
MOS
25-JUL-2007 25000 (s)
SB 737-27A1277 RI PAC 3 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL COMPLIED WITH - REPLACEMENT PER
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM 737-27-1210/RI PN 251A4510-6 TSO .O'.
ACTUATOR UPDATED COMPONENT TASK 27-108-00 WITH
THE COMPLETION DATE OF THIS SB. FURTURE
TRACKING OF THIS SB WILL BE
ACCOMPLISHED PER 27-108-00
MOS 22-AUG-2008
25-JUL-2007 3260:48
AFL 782
SB 737-27A1277 R2 HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL RECOMMENDED COMPLIED WITH - INSPECTION AND
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN LUBRICATION LA.W. AD 2011-27-03
MOS 03-JUL-2013
08-JAN-2010 3723:21
AFL 908
SB 737-27A1277 R2 PAC 1 DETAIL INSPECTION HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL RECOMMENDED COMPLIED WITH - IA.W. AD 2011-27-03
(I) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN
MOS 24 (s) 03-JUL-2013
08-JAN-2010 6400 3723:21
AFL 908
SB 737-27A1277 R2 PAC 1 LUBRICATE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL RECOMMENDED COMPLIED WITH - IA.W. AD 2011-27-03
(2) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN
MOS 12 (s) 03-JUL-2013
08-JAN-2010 1600 3723:21
AFL 908
SB 737-27A1277 R2 PAC 2 REPLACE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL RECOMMENDED - INFO REFERENCE TO AD 2011-27-03
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS
MOS
19-DEC-2002 25000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 54 Of 748
@ Camp Systems
EFTA00618345
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1277 R2 PAC 3 REPLACE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL RECOMMENDED - INFORMATION REFERENCE REV.I
NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM PREVIOUSLY CW 22-AUG-2008
ACTUATOR REPLACEMENT PER 737-27-1210411 PN
251A4510-6 TSO "0'. UPDATED COMPONENT
TASK 27-108-00 WITH THE COMPLETION DATE
OF THIS Se. FURTURE TRACKING OF THIS SIB
WILL BE ACCOMPLISHED PER 27-108-00
MOS
19-DEC-2002
SB 737-27A1279 RUDDER - RUDDER AND RUDDER TRIM CONTROL SYSTEM - MAIN RUDDER POWER CONTROL NOT APPLICABLE - BY EFFECTIVITY N/A BY LINE
UNIT INPUT CONTROL RODS AND STANDBY RUDDER POWER CONTROL UNIT INPUT CONTROL ROD - NO.
REPLACEMENT. SERVICE BULLETIN
MOS 28-OCT-2007
SB 737-27A1279 RI MAIN RUDDER POWER CONTROL UNIT INPUT CONTROL RODS AND STANDBY RUDDER POWER CONTROL UNIT INPUT RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY
CONTROL ROD - REPLACEMENT. SERVICE BULLETIN YG091-YG096 EFFECTED AIRCRAFT
MOS
I I -JAN-2010
SB 737-27A1280 RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION NOT APPLICABLE - NO PCU CONTROL RODS
SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. PREVIOUSLY CHANGED.
SERVICE BULLETIN
MOS 08-DEC-2006
25-MAY-2006 2785:43
AFL 661
S8 737-27A1280 RI RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST Of THE STANDBY HYDRAULIC ACTUATION COMPUED WITH - IAW THE SB
SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE.
SERVICE BULLETIN
MOS 22-AUG-2008
24-MAY-2007 3260:48
AFL 782
SB 737-27A1280 RI MONITOR TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC
TABLE 1 ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY
CHANGE. SERVICE BULLETIN RUDDER MAIN POWER CONTROL UNIT (PCU) FORCE FLIGHT
DAYS 90 (s)
24-MAY-2007
SB 737-27A1280 RI OPERATIONAL TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY
TABLE 2 HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST
FREQUENCY CHANGE. SERVICE BULLETIN OF THE STANDBY HYDRAULIC ACTUATION SYSTEM
DAYS 60 (s)
16-FEB-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 55 Of 748
@ Camp Systems
EFTA00618346
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1280 TABLE 1 MONITOR TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC NOT APPLICABLE - NO PCU CONTROL RODS
ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY PREVIOUSLY CHANGED.
CHANGE. SERVICE BULLETIN RUDDER MAIN POWER CONTROL UNIT (PCU) FORCE FLIGHT
DAYS 08-DEC-2006
25-MAY-2006 6000 (s) 2785:43
AFL 661
SB 737-27A1280 TABLE 2 OPERATIONAL TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY NOT APPLICABLE - NO PCU CONTROL RODS
HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST PREVIOUSLY CHANGED.
FREQUENCY CHANGE. SERVICE BULLETIN OF THE STANDBY HYDRAULIC ACTUATION SYSTEM
DAYS 08-DEC-2006
25-MAY-2006 500(s) 2785:43
AFL 661
SB 737-27A1283 FLIGHT CONTROLS - SPOILER. DRAG DEVICES. AND VARIABLE AERODYNAMIC FAIRINGS - LEFT AND RIGHT WING NOT APPLICABLE - BY EFFECTIVITY
FLIGHT SPOILERS SHORT FIELD PERFORMANCE ACTUATOR REPLACEMENT. SERVICE BULLETIN APPLICABLE TO 737-800 SERIES AIRCRFAT
ONLY.
MOS 18-OCT-2007
03-APR-2007
SB 737-27A1287 RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT - N/A BY LINE NO.
OF SPRING ASSEMBLY. SERVICE BULLETIN
MOS 03-NOV-2009
16-APR-2008 3391
AFL 817
SB 737-27A1296 ELAVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB 737-27A1297 R1). SERVICE SUPERSEDED COMPUED WITH - IAW THE AD
BULLETIN
MOS I9-MAY-2010
3438:54
AFL 835
SB 737-27A1296 R1 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED
737-27A1297 R1), SERVICE BULLETIN
MOS
SB 737-27A1297 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED
737-27A1297 R1), SERVICE BULLETIN
MOS
SB 737-27A1297 RI FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED
737-27A1297 R2). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 56 Of 748
@ Camp Systems
EFTA00618347
AD/SI Status Report AIRCRAFT
COMP
Astant.fran 'Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1297 RI DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION RECOMMENDED COMPLIED WITH
TABLE 1.03 (SUPERSEDED BY S8 737-27AI297 R2). SERVICE BULLETIN OF THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM
(GROUP 3)
DAYS 180(s) 28-FEB-2011
02-AUG-2010 1800 3525:36
AFL 857
SB 737-27A1297 RI REPLACE FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB RECOMMENDED
TABLE 1.04 737-27A1297 R2). SERVICE BULLETIN THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM AND DO DETAILED
INSPECTION BEFORE AND AFTER INSTALLING IT ( IF ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE
DISCREPANT OR
REPLACEMENT ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT)
MOS
BF(F
SB 737-27A1297 RI DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION RECOMMENDED COMPLIED WITH
TABLE 2.03 (SUPERSEDED BY 58 737-27A1297 R2). SERVICE BULLETIN OF THE RIGHT SIDE ELEVATOR TAB CONTROL
MECHANISM (GROUP 3)
DAYS 180 (5) 28-FEB-2011
02-AUG-2010 1800 3525:36
AFL 857
SB 737-27A1297 RI REPLACE FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED 8Y SB RECOMMENDED
TABLE 2.04 737-27A1297 R2). SERVICE BULLETIN THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM AND DO DETAILED
INSPECTION BEFORE AND AFTER INSTALLING IT ( IF ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE
DISCREPANT OR REPLACEMENT ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT)
MOS
BF(F
SB 737-27A1297 R2 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. SERVICE BULLETIN RECOMMENDED
MOS
16-APR-2012
SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. RECOMMENDED
TABLE (1) SERVICE BULLETIN OF THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM
MOS RECURRING
1800 (EFF) 5325:36 M
SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. RECOMMENDED
TABLE (2) SERVICE BULLETIN OF THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM
MOS RECURRING
1800 (EFF) 5325:36 M
SB 737-27A1299 FLIGHT CONTROLS- ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RETAINER SUPERSEDED
INSTALLATION (SUPERSEDED BY SI3 737-27A1299 R1). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 57 Of 748
@ Camp Systems
EFTA00618348
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-27A1299 RI FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RETAINER RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS (EFF)
16-APR-20I2
SB 737-27A1299 RI DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND RECOMMENDED
TABLE 1 BEARING RETAINER INSTALLATION. SERVICE BULLETIN THE ELEVATOR TAB CONTROL MECHANISM ALL AIRPLANES
AND REPORT ALL INITIAL INSPECTION RESULTS AND DATE OF BEARING RETAINER INSTALLATION
TO BOEING
DAYS 30 (s)
SB 737-27A1299 RI DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND RECOMMENDED
TABLE 2 INSP BEARING RETAINER INSTALLATION. SERVICE BULLETIN OF THE BEARING RETAINERS AND THE ELEVATOR TAB
CONTROL MECHANISM WITH
BEARING RETAINERS INSTALLED.
MOS
890 (s)
AFL 40O
SB 737-27A1299 RI REPORT FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RECOMMENDED
TABLE 2 REPORT RETAINER INSTALLATION. SERVICE BULLETIN ALL DISCREPANT MECHANISM FINDINGS FROM REPEAT INSPECTIONS
TO BOEING INCLUDING WHICH REPEAT THE FAILED INSPECTION OCCURRED FOR ALL AIRPLANES:
AFTER THE DETAILED INSPECTION
DAYS 30 (s)
SB 737-28-1152 P5-2 FUEL CONTROL MODULE REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
03-MAY-2001 - (s)
SB 737-28-1155 CENTER FUEL TANK SCAVENGE SYSTEM, SERVICE BULLETIN
MOS
19-OCT-2000
SB 737-28-1160 SPARE VALVE DUAL WIRE VERIFICATION TEST. SERVICE BULLETIN RECOMMENDED
MOS
05-JUN-2000 - (s)
SB 737-28-1160 RI ENGINE FUEL FEED SYSTEM, SERVICE BULLETIN RECOMMENDED
MOS 6(s) 31-AUG-2001
26-OCT-2000 793:18
AFL 212
SB 737-28-1172 INTEGRAL FUEL TANKS - ALIGNMENT OF CENTER TANK BOOST PUMP INLETS AND FUEL PUMP ALIGNMENT RECOMMENDED
BRACKETRY. SERVICE BULLETIN
MOS
18-APR-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 58 Of 748
@ Camp Systems
EFTA00618349
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28-1172 RI FUEL - STORAGE - INTEGRAL FUEL TANKS - ALIGNMENT OF CENTER TANK BOOST PUMP INLETS AND FUEL PUMP
ALIGNMENT BRACKETRY. SERVICE BULLETIN
MOS
04-JUN-2007
SB 737-28-1173 APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND REPAIR. SERVICE BULLETIN
MOS
17-JAN-2002 -
SB 737-28-1173 RI APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND REPAIR. SERVICE BULLETIN RECOMMENDED
MOS
04-NOV-2004
SB 737-28-1173 R2 FUEL SYSTEM - DISTRIBUTION - APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND
REPAIR. SERVICE BULLETIN
MOS
23-FEB-2006
SB 737-28-1179 P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS 27-AUG-2002
31-JAN-2002 1057:50
AFL 271
SB 737-28-1179 RI P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN
MOS
28-FEB-2002 - (s)
SB 737-28-1179 R2 P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
02-DEC-2004
SB 737-28-1190 FUEL-FUEL QUANTITY INDICATING SYSTEM (FQIS)-CENTER FUEL TANK WIRE SUPPORT BRACKET REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS 18(s)
16-JAN-2003
SB 737-28-1190 RI FUEL-FUEL QUANTITY INDICATING SYSTEM (FQIS)-CENTER FUEL TANK WIRE SUPPORT BRACKET REPLACEMENT. COMPLIED WITH
SERVICE BULLETIN
MOS 18-AUG-2006
27-MAR-2003 - (s) 2633:50
AFL 633
SB 737-28-1194 RELOCATION OF CONNECTOR PINS. SERVICE BULLETIN RECOMMENDED
MOS
20-FEB-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 59 Of 748
@ Camp Systems
EFTA00618350
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28-1194 RI RELOCATION OF CONNECTOR PINS AT WING(BODY CONNECTORS. SERVICE BULLETIN RECOMMENDED
MOS
37 -JUL-2003
SB 737-28-1194 R2 RELOCATION OF CONNECTOR PINS AT VYING/BODY CONNECTORS. SERVICE BULLETIN RECOMMENDED
MOS
08-JAN-2004
SB 737-28-1194 R3 FUEL - FUEL BOOST PUMP - RELOCATION OF CONNECTOR PINS AT VYING/BODY CONNECTORS. SERVICE BULLETIN
MOS
I8-SEP-2007
SB 737-28-1199 ENGINE FUEL SHUTOFF VALVE WIRE AND CONDUIT ASSEMBLY REPLACEMENT. SERVICE BULLETIN COMPUED WITH
MOS I8-AUG-2006
09-SEP-2004 - (s) 2633:50
AFL 633
SB 737-28-1199 RI FUEL - ENGINE FUEL FEED SYSTEM - ENGINE FUEL SHOUTOFF VALVE WIRE AND CONDUIT ASSEMBLY COMPUED WITH
REPLACEMENT. SERVICE BULLETIN
MOS 18-AUG-2086
15-DEC-2005 - (s) 2633:50
AFL 633
SB 737-28-1199 R2 FUEL - ENGINE FUEL FEED SYSTEM - ENGINE FUEL SHUTOFF VALVE WIRE AND CONDUIT ASSEMBLY REPLACEMENT.
SERVICE BULLETIN
MOS 36 (s)
I 7-JUL-2006
SB 737-28-1200 INSPECTION FOR WIRE CHAFING BEHIND P15 REFUEL PANEL. SERVICE BULLETIN COMPUED WITH - NO CHAFING FOUND
MOS 24(s) 0I -JUN-2007
I0JUL-2003 2955:24
AFL 691
SB 737-28-1200 RI FUEL - PRESSURE FUELING SYSTEM - INSPECTION FOR WIRE CHAFING BEHIND P15 REFUEL PANEL. SERVICE COMPUED WITH - NO CHAFING FOUND
BULLETIN
MOS 01-JUN-2007
28-JUL-2005 - (s) 2955:24
AFL 691
SB 737-28-1209 FUEL - INDICATING - WING CENTER TANK WIRE BUNDLES INSTALLATION CHANGE (SUPERSEDED BY SB 737-28-1209 SUPERSEDED COMPLIED WITH
R1). SERVICE BULLETIN
MOS I8-AUG-2006
-(s) 2633:50
AFL 633
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 60 Of 7,18
@ Camp Systems
EFTA00618351
AD/SI Status Report AIRCRAFT
COMP
Moan Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28-1209 RI FUEL - INDICATING - WING CENTER TANK WIRE BUNDLES INSTALLATION CHANGE. SERVICE BULLETIN RECOMMENDED
MOS 60 (s)
21-DEC-2005
58 737-28-1225 FUEL - DISTRIBUTION - ENGINE FUEL FEED SYSTEM - INSPECTION/REPA1R OF THE ELECTRICAL BOND BETWEEN THE NOT APPLICABLE - REF: TO R1
BULKHEAD FITTING AND THE WING FRONT SPAR. SERVICE BULLETIN
MOS 22-AUG-2008
I2-JAN-2006 - (s) 3260:48
AFL 782
SB 737-28-1225 RI FUEL - DISTRIBUTION - ENGINE FUEL FEED SYSTEM -INSPECTION/REPAIR OF THE ELECTRICAL BOND BETWEEN THE COMPUED WITH - IAW THE SB
BULKHEAD FITTING AND THE WING FRONT SPAR. SERVICE BULLETIN
MOS 22-AUG-2008
30-OCT-2006 -(s) 3260:48
AFL 782
SB 737-28-1251 FUEL - BOOST PUMP CONTROL RELAY - GROUND MODULE INSPECTION AND REPLACEMENT IF NECESSARY. - INFORMATION REF COMPLIANCE OF
SERVICE BULLETIN 737-28-1257
DAYS 90 (s)
20-OCT-2005
SB 737-28-1251 RI FUEL - ENGINE FUEL FEED SYSTEM - GROUND MODULE INSPECTION AND REPLACEMENT. SERVICE BULLETIN - INFORMATION REF COMPLIANCE OF
737-28-1257
DAYS 90 (s)
27-APR-2006
SB 737-28-1251 R2 FUEL - ENGINE FUEL FEED SYSTEM - GROUND MODULE INSPECTION AND REPLACEMENT. SERVICE BULLETIN - INFORMATION REF COMPLIANCE OF
737-28-1257
DAYS 90 (s)
26-OCT-2006
SB 737-28-1257 FUEL - ENGINE FUEL FEED SYSTEM - BOOST PUMP CONTROL RELAY GROUND LOCATION CHANGE. SERVICE COMPLIED WITH
BULLETIN
MOS I4-FEB-2008
26-FEB-2007 -(s) 3151:22
AFL 746
58 737-28-1257 RI FUEL - ENGINE FUEL FEED SYSTEM - BOOST PUMP CONTROL RELAY GROUND LOCATION CHANGE. SERVICE COMPUED WITH
BULLETIN
MOS 14-FEB-2008
28-NOV-2007 - (s) 3151:22
AFL 746
SB 737-28-1272 ENGINE FUEL FEED SYSTEM - MAIN TANKS ENGINE FUEL SPAR VALVE BODY REPLACEMENT (SUPERSEDED BY SB SUPERSEDED
737-28-1272 RI), SERVICE BULLETIN
MOS 29-AUG-2011
3533:32
AFL 863
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 61 Of 748
@ Camp Systems
EFTA00618352
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28-1272 RI FUEL - ENGINE FUEL FEED SYSTEM - MAIN TANKS ENGINE FUEL SPAR VALVE BODY REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS 60 (s)
18-FEB-2010
SB 737-28-1283 FUEL QUANTITY INDICATING SYSTEM - FUEL QUANTITY PROCESSOR UNIT REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
11-FEB-2009
SB 737-28-1303 FUEL - GENERAL - LEFT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS 60 (s)
26-APR-2012
SB 737-28-1312 FUEL - GENERAL - LEFT AND RIGHT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND SUPERSEDED
REPLACEMENT (SUPERSEDED BY SB 737-28-1312 R1). SERVICE BULLETIN
MOS (EFF)
SB 737-28-1312 RI FUEL - GENERAL - LEFT AND RIGHT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
19-APR-2013
58 737-28-1318 FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS
03-APR-2014
SB 737-28-1318 TABLE 1.1 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
REPLACEMENT. SERVICE BULLETIN A MAINTENANCE RECORDS CHECK TO SEE IF ANY OF THE FOUR
FUEL VALVE ADAPTER SHAFT ASSEMBLIES HAVE A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A (ALL
AIRPLANES)
MOS
SB 737-28-1318 TABLE 12 FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. RECOMMENDED
SERVICE BULLETIN NO MORE WORK IS NECESSARY IF CONDITION 1: ALL FUEL VALVE
ADAPTER SHAFT ASSEMBLIES THAT DO NOT HAVE A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A.
MOS
03-APR-2014
58 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.3.1 REPLACEMENT. SERVICE BULLETIN PART 1: FUEL VALVE ADAPTER SHAFT ASSEMBLY - OPEN ACCESS (IF
CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN
APPENDIX A)
MOS
- Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 62 Of 748
@ Camp Systems
EFTA00618353
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.3.2 REPLACEMENT. SERVICE BULLETIN PART 3: FUEL VALVE ADAPTER SHAFT ASSEMBLY - REPLACEMENT (IF
CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN
APPENDIX A)
MOS
- (s)
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.3.3 REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF
CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN
APPENDIX A)
MOS
- (s)
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.4.1 REPLACEMENT. SERVICE BULLETIN PART 1: FUEL VALVE ADAPTER SHAFT ASSEMBLY - OPEN ACCESS (IF
CONDITION 3: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY WHERE THE SERIAL NUMBER CANNOT BE IDENTIFIED
IN THE MAINTENANCE RECORDS)
MOS
- (s)
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.4.2 REPLACEMENT. SERVICE BULLETIN PART 2: FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION - TO SEE IF THE
SERIAL NUMBER IS SPECIFIED IN APPENDIX A (IF CONDITION 3: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY
WHERE THE SERIAL NUMBER CANNOT BE IDENTIFIED IN THE MAINTENANCE RECORDS)
MOS
- (s)
SB 737-28-1318 TABLE 1.5 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND RECOMMENDED
REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF
CONDITION 4: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT DOES NOT HAVE A SERIAL NUMBER THAT IS
SPECIFIED IN APPENDIX A)
MOS
03-APR-2014
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.6.1 REPLACEMENT. SERVICE BULLETIN PART 3: FUEL VALVE ADAPTER SHAFT ASSEMBLY - REPLACEMENT (IF
CONDITION 5: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN
APPENDIX A. OR THAT CANNOT BE DETERMINED)
MOS
- (s)
SB 737-28-1318 TABLE DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND
1.6.2 REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF
CONDITION 5: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN
APPENDIX A OR THAT CANNOT BE DETERMINED)
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 63 Of 748
@ Camp Systems
EFTA00618354
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-28-1323 FUEL - DISTRIBUTION - LEFT WING TANK WATER SCAVENGE SYSTEM - PERFORMANCE IMPROVEMENT EVALUATION. RECOMMENDED
SERVICE BULLETIN
MOS
10-JUL-2014
SB 737-28M142 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN RECOMMENDED
MOS 24 (s)
07-FEB-2002
SB 737-28A1142 RI IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN
MOS 24 (s)
1 7-JUN-2002
SB 737-28A1142 R2 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION. SERVICE BULLETIN
MOS 24 (s) 21-AUG-2002
07-FEB-2002 1057:48
AFL 271
SB 737-28A1142 R3 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN
MOS 24 (s) 21-AUG-2002
21-AUG-2003 1057:48
AFL 271
SB 737-28A1142 R4 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN
MOS 24 (s) 21-AUG-2002
15-JUL-200d 1057:48
AFL 271
SB 737-28A1148 TANK FUEL BOOST PUMP. SERVICE BULLETIN COMPUED WITH - PREVIOUSLY REV 2 DOESN7
AFFECT A/C
MOS 6 (s) 09-JAN-200d
Id-SEP-2000 1547:30
AFL 391
SB 737-28A1148 RI AFT BOOST PUMP WIRING SUPPORT BRACKET INSTALLATION. SERVICE BULLETIN
MOS 6 (s)
22-AUG-2002
SB 737-28A1148 R2 AFT BOOST PUMP WIRING SUPPORT BRACKET INSTALLATION (SUPERSEDED BY SB 737-28A1148 R3). SERVICE SUPERSEDED COMPUED WITH - PREVIOUSLY DONE WITH SB
BULLETIN 737-28A1148 IN AUG 14.8.01
MOS 16-DEC-2004
- Is) 1951:36
AFL 476
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 64 Of 748
@ Camp Systems
EFTA00618355
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28A1148 R3 ENGINE FUEL FEED SYSTEM - TANK FUEL BOOST PUMP - AFT BOOST PUMP WIRING SUPPORT BRACKET RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS 6 (s)
13-JUL-2004
SB 737-28A1184 FUEL BOOST AND OVERRIDE PUMP MOTOR-IMPELLAR REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
14-SEP-2000
SB 737-28A1188 AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE, SERVICE BULLETIN COMPLIED WITH
MOS 18 (s) 13-AUG-2004
06-MAR-2003 1785:06
AFL 446
SB 737-28A1188 IN 01 FUEL BOOST PUMP -AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE. SERVICE BULLETIN
MOS
12-JUN-2096
SB 737-28A1188 R1 AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE.. SERVICE BULLETIN COMPLIED WITH - PREVIOUSLY
MOS 30-NOV-2005
18-MAR-2004 2338:24
AFL 573
SB 737-28A1197 FUEL PUMP MOTOR-IMPELLER INSPECTION (SUPERSEDED BY 737-28A1197 R1), SERVICE BULLETIN SUPERSEDED
MOS
23-SEP-2002 - (s)
SB 737-28A1197 RI FUEL PUMP MOTOR-IMPELLER INSPECTION (SUPERSEDED BY 737-28A1197 R2), SERVICE BULLETIN SUPERSEDED
MOS
01-MAY-2003
SB 737-28A1197 R2 FUEL - DISTRIBUTION - FUEL PUMP MOTOR-IMPELLER INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
25-AUG-2005
SB 737-28Al201 FUEL - ENGINE FUEL FEED SYSTEM - FUEL PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) RELAY SUPERSEDED
INSTALLATION (SUPERSEDED BY 737-28Al201 R1). SERVICE BULLETIN
MOS
SB 737-28Al201 RI FUEL - ENGINE FUEL FEED SYSTEM - FUEL PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) RELAY RECOMMENDED COMPLIED WITH
INSTALLATION. SERVICE BULLETIN
MOS 29-AUG-201I
28-MAY-2009 3533:32
AFL 863
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 65 Of 748
@ Camp Systems
EFTA00618356
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28A1206 FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE.
SERVICE BULLETIN
MOS
II -JAN-2006
SB 737-28A1206 RI FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION
LOGIC CHANGE, SERVICE BULLETIN
MOS
I I -JAN-2006
SB 737-28A1206 R2 CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE (SUPERSEDED BY SB SUPERSEDED COMPLIED WITH
737-28A1206 R3), SERVICE BULLETIN
MOS 29-AUG-2011
3533:32
AFL 863
SB 737-28A1206 R3 FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE. RECOMMENDED
SERVICE BULLETIN
MOS 36 (EFF) 30-SEP-2014 30-SEP-2014
30-SEP-2011
SB 737-28A1207 FUEL - ENGINE FUEL FEED SYSTEM - MOTOR OPERATED VALVE - ACTUATOR REPLACEMENT (SUPERSEDED BY SUPERSEDED
737-28A1207 RI). SERVICE BULLETIN
MOS
I5-FEB-2007
SB 737-28A1207 RI FUEL - ENGINE FUEL FEED SYSTEM -MOTOR OPERATED VALVE - ACTUATOR REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 29-AUG-201I
I9-APR-2010 - (s) 3533:32
AFL 863
SB 737-28A1221 FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR MIS FUEL DENSITOMETER. SERVICE BULLETIN
MOS 60 (s)
I4-JAN-2007
SB 737-28A1221 RI FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR FOIS FUEL DENSITOMETER (SUPERSEDED BY SB NOT APPLICABLE - N/A BY EFFECTIVITY
737-28A1221 R2), SERVICE BULLETIN
MOS 29-AUG-201I
09-NOV-2007 -(s) 3533:32
AFL 863
SB 737-28A1221 R2 FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR FOIS FUEL DENSITOMETER. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - N/A BY EFFECTIVITY
MOS 29-AUG-2011
I4-JAN-2007 - (s) 3533:32
AFL 863
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 66 Of 7,18
@ Camp Systems
EFTA00618357
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-28A1248 FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM SUPERSEDED
(UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY 737-28A1248 R1). SERVICE BULLETIN
MOS
SB 737-28A1248 RI FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM SUPERSEDED
(UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY 737-28A1248 R2). SERVICE BULLETIN
MOS
SB 737-28A1248 R2 ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM SUPERSEDED COMPLIED WITH- WO BVBBJ006
(UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY SB 737-28A1248 R3). SERVICE BULLETIN
MOS 29-AUG-2011
3533:32
AFL 863
SB 737-28A1248 R3 FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS -POWER FAILED ON PROTECTION SYSTEM RECOMMENDED
(UN-COMMANDED PUMP ON)- RELAYS INSTALLATION. SERVICE BULLETIN
MOS 60 (s)
30-SEP-2011
SB 737-29-1077 . SERVICE BULLETIN COMPLIED WITH - CM
MOS 23-SEP-1999
- (s)
SB 737-29-1083 HYDRAULIC POWER - PARKING BRAKE SHUTOFF VALVE (NON-SENSITIVE LOCATIONS) REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
25-JAN-2001 - (s)
SB 737-29-1084 HYDRAULIC POWER TRANSFER UNIT SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
01-JUN-2000 - (s)
SB 737-29-1090 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE (ALL LOCATIONS) REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
25-JAN-2001 -
SB 737-29-1094 MODIFICATION OF THE RESERVOIR PRESSURIZATION MODULE. SERVICE BULLETIN RECOMMENDED
MOS
I5-MAR-2001 - (s)
SB 737-29-1094 RI MODIFICATION OF THE HYDRAULIC RESERVOIR PRESSURIZATION MODULE. SERVICE BULLETIN RECOMMENDED
MOS
29-MAR-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 67 Of 748
@ Camp Systems
EFTA00618358
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-29-1106 HYDRAULIC POWER-HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM-REMOVAL OF THE RESERVOIR - REF:REV.4
PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN
MOS
23-DEC-2002 (s)
SB 737-29-1106 RI HYDRAULIC POWER-HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM-REMOVAL OF THE RESERVOIR - REF:REV.4
PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN
MOS
15-MAY-2603 -(s)
SB 737-29-1106 R2 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN - REF: REV.4
MOS
05-FEB-2004
SB 737-29-1106 R3 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN RECOMMENDED - REF:REV.4
MOS
28-JUL-200.5
SB 737-29-1106 R4 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN COMPLIED WITH
MOS 24-AUG-2C07
23-JUN-2066 (s) 29618:28
AFL 699
SB 737-29-1106 RS HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE - INFORMATION REFER TO. REv.6
RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN
MOS
16-JAN-2008 Is)
SB 737-29-1106 R6 HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND SUPERSEDED COMPLIED WITH
DEPRESSURIZATION VALVES (SUPERSEDED BY SB 737-29-1106 R7). SERVICE BULLETIN
MOS 28-SEP-2009
- 3378.04
AFL 812
SB 737-29-1106 R7 HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR SUPERSEDED
PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES (SUPERSEDED BY SB 737-29-1166 R8). SERVICE
BULLETIN
MOS
SB 737-29-1106 R8 HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR
PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 68 Of 748
LI Camp Systems
EFTA00618359
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-29-1110 HYDRAULIC POWER - HYDRAULIC RESERVOIR - OVERFILL WARNING MARKER INSTALLATION. SERVICE BULLETIN COMPLIED WITH
MOS 22-AUG-2008
28-NOV-2007 - (s) 3260:48
AFL 782
SB 737-29-1110 RI HYDRAULIC RESERVOIR - OVERFILL WARNING MARKER INSTALLATION. SERVICE BULLETIN
MOS 60 (s)
30-OCT-2008
SB 737-29-1111 HYDRAULIC SYSTEMS A AND B ENGINE DRIVEN PUMP - SUPPORT RECOMMENDED
BRACKET CHANGE FOR THE HYDRAULIC PRESSURE HOSE. SERVICE BULLETIN
MOS
30-JUL-2009
SB 737-29-1113 HYDRAULIC POWER - RIGHT MAIN LANDING GEAR WHEEL WELL - WIRE BUNDLE AND HYDRAULIC TUBING - RECOMMENDED
INSPECTION. REPAIR AND NEW CLAMPS INSTALLATION (SUPERSEDED BY SB 737-29-1113 R1). SERVICE BULLETIN
MOS 24 (s)
23-MAR-2011
SB 737-29-1113 RI HYDRAULIC POWER - RIGHT MAIN LANDING GEAR WHEEL WELL - WIRE BUNDLE AND HYDRAULIC TUBING -
INSPECTION. REPAIR AND NEW CLAMPS INSTALLATION. SERVICE BULLETIN
MOS
SB 737-29-1114 HYDRAULIC POWER - MAIN - HYDRAULIC SYSTEMS A AND B PRESSURE MODULE CHECK VALVE INSPECTION AND
REPLACEMENT. SERVICE BULLETIN
MOS
- (s)
SB 737-29-1114 RI HYDRAULIC POWER - MAIN - HYDRAULIC SYSTEMS A AND B PRESSURE MODULE CHECK VALVE INSPECTION AND RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS 24 (s) (EFF)
10-SEP-2012
SB 737-29A1073 HYD POWER - DC MOTOR OPERATED 5/0 INSP.. SERVICE BULLETIN RECOMMENDED
MOS
01-MAY-1997 -(s)
SB 737-29A1073 R2 DC MOTOR OPERATED SHUTOFF VALVE. SERVICE BULLETIN RECOMMENDED
MOS 6 (s) 08-OCT-1999
OI -JUL-1999
SB 737-29A1073 R3 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE INSPECTION. SERVICE BULLETIN
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 69 Of 748
@ Camp Systems
EFTA00618360
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-29A1077 HYDRAULIC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE AND WIRE BUNDLE CLAMP SUPERSEDED
INSTALLATION (SUPERSEDED BY SB 737-29A1077 R1). SERVICE BULLETIN
MOS
- (s)
SB 737-29A1077 RI MAIN - HYDRAULIC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP (SUPERSEDED BY SB 737-29A1077 R2). SERVICE SUPERSEDED COMPLIED WITH
BULLETIN
MOS 09-SEP-1999
- (s)
SB 737-29A1077 R2 HYDRAULIC POWER -MAIN - HYDRAUUC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE. PRESSURE SUPERSEDED
HOSE AND WIRE BUNDLE INSPECTION AND CLAMP INSTALLATION (SUPERSEDED BY SB 737-29A1077 R3). SERVICE
BULLETIN
MOS
SB 737-29A1077 R3 HYDRAULIC POWER - MAIN - HYDRAUUC SYSTEM 8 ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE. PRESSURE RECOMMENDED
HOSE AND WIRE BUNDLE INSPECTION AND CLAMP INSTALLATION. SERVICE BULLETIN
MOS
07-APR-2010
SB 737-29A1078 DC MOTOR OPERATED SHUTOFF VALVE (SENSITIVE LOCATIONS) REPLACEMENT. SERVICE BULLETIN
MOS
- (s)
SB 737-29A1081 DC MOTOR OPERATED SHUTOFF VALVE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 6 (s) 01-NOV-2001
02-DEC-1999 822:06
AFL 220
SB 737-29A1081 RI HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE INSPECTION. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 6(s) 01-NOV-2001
11-OCT-2001 822:06
AFL 220
SB 737-29A1082 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE (SENSITIVE LOCATIONS) REPLACEMENT. SERVICE RECOMMENDED COMPLIED WITH
BULLETIN
MOS 01-NOV-2001
07-DEC-2000 - (s) 822:06
AFL 220
SB 737-30-1050 WINDSHIELD WIPER MOTOR REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 18-AUG-2006
09-MAY-2002 - (s) 2633:50
AFL 633
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 70 Of 748
@ Camp Systems
EFTA00618361
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-30-1054 RI WINDSHIELD WIPER MOTOR REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 18-AUG-2006
C6-MAR-2003 2633:50
AFL 633
SB 737-30-1056 ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST
BONDING JUMPER INSTALLATION. SERVICE BULLETIN
MOS CO (5)
28-FEB-2007
SB 737-30-1056 RI ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPLIED WITH
COMPOSITE DRAIN MAST BONDING JUMPER INSTALLATION. SERVICE BULLETIN
MOS 22-AUG-2C08
25-OCT-2007 (s) 3260:48
AFL 782
SB 737-30-1056 R2 ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST RECOMMENDED
BONDING JUMPER INSTALLATION. SERVICE BULLETIN
MOS CO (s)
27-MAY-2008
SB 737-30-1056 R3 WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER RECOMMENDED
COMPOSITE DRAIN MAST BONDING JUMPER INSTALLATION. SERVICE BULLETIN
MOS CO (5)
27-MAY-2008
SB 737-30-1058 ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT
ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN
MOS
27-JUL-2000
SB 737-30-1058 RI ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT
ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN
MOS
18-JUN-2007
SB 737-30-1058 R2 CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD SUPERSEDED
ASSEMBLY REPLACEMENT ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT 9SUPERSEDED BY
737-30-1058 R3). SERVICE BULLETIN
MOS
13-FEB-2009
SB 737-30-1058 R3 ICE AND RAIN PROTECTION - CONTROL CABIN' INDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT SUPERSEDED
ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT (SUPERSEDED BY SB 737-30-1058 R4). SERVICE
BULLETIN
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 71 Of 748
Camp Systems
EFTA00618362
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-30-1058 R4 ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT SUPERSEDED
ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT (SUPERSEDED BY SB 737-30-1058 R5). SERVICE
BULLETIN
MOS
- Is)
SB 737-30-1058 RS ICE AND RAIN PROTECTION- CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT RECOMMENDED
ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN
MOS
24-APR-20I3 - Is)
SB 737-30-1070 ICE AND RAIN PROTECTION - PITOT AND STATIC - POLARITY STANDARDIZATION TO ADDRESS UN-ANNUNCIATED SUPERSEDED
FAILURE OF PITOT PROBE HEATERS (SUPERSEDED BY SB 737-30-1070 R1). SERVICE BULLETIN
MOS
58 737-30-1070 RI ICE AND RAIN PROTECTION - PITOT AND STATIC - POLARITY STANDARDIZATION TO ADDRESS UN-ANNUNCIATED RECOMMENDED
FAILURE OF PITOT PROBE HEATERS. SERVICE BULLETIN
MOS
04-JUN-2014 - (6)
SB 737-30A1049 WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. WIRING CHANGE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -CM
MOS 10-AUG-2000
01-JUN-2000 - (s)
SB 737-30A1049 RI WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
12-OCT-2000 - (s)
SB 737-30A1049 RI LEFT CHANGE WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN WIRING RECOMMENDED
SIDE
DAYS 90 (s)
12-OCT-2000
SB 737-30A1049 RI CHANGE WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN WIRING RECOMMENDED
RIGHT SIDE
MOS
12-OCT-2000 5000 (s)
SB 737-30A1057 ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINSHIELD WIPER MOTOR (SUPERSEDED SUPERSEDED - INFORMATION REFER TO REV.1 IA.W. AD
BY 737-30A1057 RI. SERVICE BULLETIN 2008-24-05
MOS
06-OCT-2006 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 72 Of 748
@ Camp Systems
EFTA00618363
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-30A1057 RI ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR SUPERSEDED
(SUPERSEDED BY 88 737-30A1057 R2). SERVICE BULLETIN
MOS
- (s)
SB 737-30A1057 R2 ICE AND RAIN PROTECTION- WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR SUPERSEDED
(SUPERSEDED BY 737-30A1057 R3), SERVICE BULLETIN
MOS
- (0
SB 737-30A1057 R3 ICE AND RAIN PROTECTION- WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. SERVICE COMPLIED WITH- IAW. AD 2008-24-05
BULLETIN
MOS I I -SEP-2013
31-OCT-2011
SB 737-30A1057 R3 VERIFY ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. RECOMMENDED COMPUED WITH -CHANGE LH: PN 10-61329-39
TABLE 1 (001.1) SERVICE BULLETIN THE LH WINDSHIELD WIPER MOTOR PART NUMBER AND SERIAL NUMBER (REFERRED TO TO P/N 10-1329-41
AS'MODEL NUMBER' IN THE GOODRICH SERVICE BULLETIN 2313M-347/2313M-348-30-01) OF THE WINDSHIELD WIPER
MOTORS AS GIVEN IN WORK PACKAGE 1 OF THE ACCOMPLISHMENT INSTRUCTIONS FOR ALL AIRPLANES! REPLACE
OR CHANGE GOODRICH PART NUMBER AS NEEDED.
MOS If -SEP-2013
30-DEC-2008
SB 737-30A1057 R3 VERIFY ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. RECOMMENDED COMPLIED WITH - CHANGE PN TO 231351348-4 /
TABLE 1 (001.2) SERVICE BULLETIN THE RH WINDSHIELD WIPER MOTOR PART NUMBER AND SERIAL NUMBER (REFERRED TO SN 00338
AS'MODEL NUMBER' IN THE GOODRICH SERVICE BULLETIN 2313M-347/2313M-348-30-01) OF THE WINDSHIELD WIPER
MOTORS AS GIVEN IN WORK PACKAGE 1 OF THE ACCOMPLISHMENT INSTRUCTIONS FOR ALL AIRPLANES! REPLACE
OR CHANGE GOODRICH PART NUMBER AS NEEDED.
MOS f f -SEP-2013
30-DEC-2008
SB 737-30A1063 ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT SUPERSEDED
AUTOMATION INSTALLATION (SUPERSEDED BY SB 737-30A1063 R1). SERVICE BULLETIN
MOS (EFF)
SB 737-30A1063 RI ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT SUPERSEDED
AUTOMATION INSTALLATION (SUPERSEDED BY SB 737-30A1063 R2). SERVICE BULLETIN
MOS (EFF)
SB 737-30A1063 R2 ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT MANDATORY
AUTOMATION INSTALLATION. SERVICE BULLETIN
MOS 24 (EFF) 14-JAN-2015
14-JAN-2013
SB 737-31-1124 ADDITION OF THE RUDDER PEDAL FORCE TRANSDUCER. SERVICE BULLETIN RECOMMENDED
MOS
20-MAY-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (0 -Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 73 Of 748
@ Camp Systems
EFTA00618364
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-31-1124 RI ADDITION OF THE RUDDER PEDAL FORCE TRANSDUCER. SERVICE BULLETIN RECOMMENDED
MOS
22-JUN-2000 - Is)
SB 737-31-1150 INDICATING/RECORDING SYSTEMS - CENTRAL DISPLAY SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
06-APR-2000 - Is)
SB 737-31-1153 OPERATIONAL PROGRAM CONFIGURATION (OPC) SOFTWARE UPGRADE REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
I3-JAN-2000 - (s)
SB 737-31-1153 RI . SERVICE BULLETIN RECOMMENDED
MOS
OI -JUN-2000 - (s)
SB 737-31-1153 R2 INDICATING AND RECORDING SYSTEM - COMMON DISPLAY SYSTEMS. SERVICE BULLETIN RECOMMENDED
MOS
I0-AUG-2000 - (s)
SB 737-31-1169 SOFTWARE CHANGE TO DISPLAY THE FLIGHT DIRECTOR COMMAND AS SPLIT AXIS COMMAND BARS. SERVICE RECOMMENDED
BULLETIN
MOS
08-JUN-2000
SB 737-31-1169 R3 SOFTWARE CHANGE TO DISPLAY THE FLIGHT DIRECTOR COMMAND AS SPLIT AXIS COMMAND BARS. SERVICE RECOMMENDED
BULLETIN
MOS
02-MAY-2002
SB 737-31-1170 INDICATING/RECORDING - RIGHT DATA RECORDER SYSTEM - PARAMETER ADDITION TO RECORD STANDBY
RUDDER SYSTEM ENGAGED (ON-OFF) STATUS. SERVICE BULLETIN
MOS
21-MAR-2002 - (s)
SB 737-31-1170 RI INDICATING/RECORDING - RIGHT DATA RECORDER SYSTEM - PARAMETER ADDITION TO
RECORD STANDBY RUDDER SYSTEM ENGAGED (ON-OFF) STATUS. SERVICE BULLETIN
MOS
I8-SEP-2007
SB 737-31-1205 OPERATIONAL PROGRAM SOFTWARE (OPS) UPGRADE. SERVICE BULLETIN RECOMMENDED
MOS
20-FEB-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 74 Of 748
@ Camp Systems
EFTA00618365
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-31-1246 INDICATING AND RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - DISPLAY ELECTRONIC UNIT OPERATIONAL
PROGRAM SOFTWARE CHANGE. SERVICE BULLETIN
MOS
05-MAY-2005
SB 737-31-1284 INDICATING/RECORDING SYSTEMS - MASTER CAUTION - ADDITION OF QUICK DISCONNECTS TO THE MASTER
CAUTION AND FIRE WARNING SWITCHLIGHT WIRES. SERVICE BULLETIN
MOS
23-FEB-2006
SB 737-31-1284 RI INDICATING/RECORDING SYSTEMS - MASTER CAUTION - ADDITION OF QUICK DISCONNECTS TO THE MASTER
CAUTION AND FIRE WARNING SWITCHLIGHT WIRES. SERVICE BULLETIN
MOS
01-MAR-2007
SB 737-31-1293 COMMON DISPLAY SYSTEM - UPDATED PHASE RECOMMENDED
3 DISPLAY UNIT DATABASE INSTALLATION. SERVICE BULLETIN
MOS
06-AUG-2009
SB 737-31-1295 INDICATING AND RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - DISPLAY ELECTRONIC UNIT OPERATIONAL
PROGRAM SOFTWARE CHANGE. SERVICE BULLETIN
MOS
27-OCT-2005
SB 737-31-1327 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM (CDS)- CHANGE THE OPERATIONAL PROGRAM
SOFTWARE (OPS) FOR THE CDS DISPLAY ELECTRONIC UNIT (DEU). SERVICE BULLETIN
MOS
14-DEC-2006
SB 737-31-1327 RI INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM (CDS) - CHANGE THE OPERATIONAL PROGRAM COMPLIED WITH - IAW THE 58
SOFTWARE (OPS) FOR THE CDS DISPLAY ELECTRONIC UNIT (DEU). SERVICE BULLETIN
MOS 22-AUG-2008
I0-OCT-2007 3260:48
AFL 782
SB 737-31-1449 INDICATING/RECORDING SYSTEMS- FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED
SB 737-31-1449 RI), SERVICE BULLETIN
MOS
SB 737-31-1449 RI INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED
SB 737-31-1449 R3). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 75 Of 748
@ Camp Systems
EFTA00618366
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnsind
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-31-1449 R2 INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM - GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED
SB 737-31-1449 R3). SERVICE BULLETIN
MOS
SB 737-31-1449 R3 INDICATING/RECORDING SYSTEMS- FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE. SERVICE RECOMMENDED
BULLETIN
MOS
23-JUL-2013
SB 737-31-1471 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF PHASE 3A DISPLAY UNIT AND SUPERSEDED
DATABASE SOFTWARE (SUPERSEDED BY SB 737-31-1471 R1). SERVICE BULLETIN
MOS
-
SB 737-31-1471 RI INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF PHASE 3A DISPLAY UNIT AND RECOMMENDED
DATABASE SOFTWARE. SERVICE BULLETIN
MOS 60 (s)
29-NOV-2012
SB 737-31-1472 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF FLIGHT DIRECTOR COMMAND RECOMMENDED
DISPLAY AS A SPLIT AXIS COMMAND BAR. SERVICE BULLETIN
MOS
12-JAN-2011
SB 737-31-1475 INDICATING / RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - REMOVAL OF OPTIONS. SERVICE BULLETIN RECOMMENDED
MOS
21-JAN-2011
SB 737-31-1506 INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM- DIGITAL FLIGHT DATA ACQUISITION UNIT RECOMMENDED
LOADABLE SOFTWARE CHANGE. SERVICE BULLETIN
MOS
04-OCT-2011
SB 737-31-1552 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - SOFTWARE CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
08-MAR-2013
SB 737-31A1332 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R1). SERVICE
BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 76 Of 748
@ Camp Systems
EFTA00618367
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnundop'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-31A1332 R1 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R2). SERVICE
BULLETIN
MOS (EFF)
SB 737-31A1332 R2 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R3). SERVICE
BULLETIN
MOS (EFF)
SB 737-31A1332 R3 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R4). SERVICE
BULLETIN
MOS (EFF)
SB 737-31A1332 R4 INDICATING / RECORDING SYSTEMS -AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING RECOMMENDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS. SERVICE BULLETIN
MOS 36 (EFF) 06-MAR-2016 06-MAR-2016
06-MAR-2013
SB 737-32-1305 NOSE LANDING GEAR AFT LOCK LINK REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
- (s)
SB 737-32-1305 RI NOSE LANDING GEAR AFT LOCK LINK REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
I3-MAR-2003
SB 737-32-1311 LANDING GEAR- WHEELS AND BRAKES - HYDRAULIC BRAKE SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
I9-AUG-1999 - (s)
SB 737-32-1312 SHIMMY DAMPER ADDITION. SERVICE BULLETIN RECOMMENDED
MOS
24-FEB-1999 - Is/
SB 737-32-1312 RI SHIMMY DAMPER ADDITION. SERVICE BULLETIN RECOMMENDED
MOS
0I-APR-1999 - Is/
SB 737-32-1312 R2 MLG SHIMMY DAMPER ADDITION. SERVICE BULLETIN RECOMMENDED
MOS
IS-JUL-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 77 Of 748
@ Camp Systems
EFTA00618368
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1312 R3 SHIMMY DAMPER ADDITION. SERVICE BULLETIN RECOMMENDED
MOS
27 -SEP-2000 - (s)
SB 737-32-1317 LANDING GEAR - POSITION AND WARNING. SERVICE BULLETIN RECOMMENDED
MOS
09-SEP-I999 - (s)
SB 737-32-1317 RI LANDING GEAR- POSITION AND WARNING. SERVICE BULLETIN RECOMMENDED
MOS
I8-JAN-2001 - (s)
SB 737-32-1330 MAIN LANDING GEAR (STRUCTURE). SERVICE BULLETIN RECOMMENDED
MOS
08-JUN-2000 - (s)
SB 737-32-1332 NOSE GEAR EXTENSION AND RETRACTION. SERVICE BULLETIN RECOMMENDED COMPUED WITH - PREVIOUSLY NO WORK
NECCESSARY REF: GVBBJ039-0220 -2 KIT USED
FOR ORIGINAL COMPLIANCE
MOS 24-AUG-2007
07-FEB-2000 - (s) 2968:28
AFL 699
SB 737-32-1332 RI LANDING GEAR. NOSE GEAR EXTENSION 8 RETRACTION. RELOCATION OF THE NOSE GEAR EXTEND FUSE. SERVICE RECOMMENDED - REF: RO
BULLETIN
MOS
08-JUN-2000 - (s)
SB 737-32-1332 R2 RELOCATION OF THE NOSE GEAR EXTEND FUSE, SERVICE BULLETIN - REF: RO
MOS
28-FEB-2002 - (s)
SB 737-32-1342 LANDING GEAR-STEERING-INSPECTION AND MODIFICATION TO THE NOSE LANDING GEAR STEERING COLLAR AND RECOMMENDED
STEERING PLATE. SERVICE BULLETIN
MOS
I I -MAY-2000 - Is)
SB 737-32-1342 RI LANDING GEAR - STEERING - INSPECTION AND MODIFICATION TO THE NOSE LANDING GEAR STEERING COLLAR AND RECOMMENDED
STEERING PLATE. SERVICE BULLETIN
MOS
01-MAY-2001
SB 737-32-1362 CHANGE THE LOWER BEARING SEAL RETAINER, SERVICE BULLETIN RECOMMENDED
MOS
07-FEB-2000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 78 Of 748
@ Camp Systems
EFTA00618369
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1362 RI LANDING GEAR - NOSE LANDING GEAR - CHANGE THE LOWER BEARING SEAL RETAINER.. SERVICE BULLETIN
MOS
26-JAN-2006
SB 737-32-1368 LEFT AND RIGHT MAIN LANDING GEAR SHIMMY DAMPER ASSEMBLY REPAIRS AND SEALS REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
09-SEP-2004
SB 737-32-1368 RI LEFT AND RIGHT MAIN LANDING GEAR SHIMMY DAMPER ASSEMBLY REPAIRS AND SEALS REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUN-2009
SB 737-32-1369 RETRACT ACTUATOR CYLINDER ASSEMBLY MODIFICATION OR REPLACEMENT. SERVICE BULLETIN
MOS
01-APR-2004
AFL 3000(s)
SB 737-32-1369 RI LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR CYLINDER ASSEMBLY
MODIFICATION OR REPLACEMENT. SERVICE BULLETIN
MOS
09-AUG-20C6
AFL 3000 (s)
SB 737-32-1369 R2 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR
CYLINDER ASSEMBLY MODIFICATION OR REPLACEMENT. SERVICE BULLETIN
MOS
I6-AUG-2007
AFL 3000 (s)
SB 737-32-1369 R3 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR CYLINDER ASSEMBLY SUPERSEDED
MODIFICATION OR REPLACEMENT (SUPERSEDED BY SB 737-32-1369 R4). SERVICE BULLETIN
MOS
- (s)
SB 737-32-1369 R4 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION- RETRACT ACTUATOR CYLINDER ASSEMBLY RECOMMENDED
MODIFICATION OR REPLACEMENT. SERVICE BULLETIN
MOS
AFL 1000 (s)
SB 737-32-1376 INSPECT. LUBRICATE. REPAIR OR REPLACE MAIN LANDING GEAR-FORWARD TRUNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY
REPLACEMENT. SERVICE BULLETIN
MOS
I2-MAY-2005 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 79 Of 748
@ Camp Systems
EFTA00618370
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1376 RI INSPECT. LUBRICATE. REPAIR OR REPLACE MAIN LANDING GEAR- FORWARD TRUNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY
REPLACEMENT.. SERVICE BULLETIN
MOS
- (s)
SB 737-32-1376 R2 MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY
REPLACEMENT. SERVICE BULLETIN
MOS I6-FEB-2010
06-AUG-2008 3417:51
AFL 829
58 737-32-1393 LANDING GEAR - MAIN GEAR AND DOORS - OUTER CYLINDER WALKING BEAM CLEVIS BUSHING AND RETRACT
ACTUATOR CLEVIS BUSHING REPLACEMENT. SERVICE BULLETIN
MOS
02-JUL-2007
58 737-32-1393 RI MAIN GEAR AND DOORS - OUTER CYLINDER WALKING BEAM CLEVIS BUSHING RECOMMENDED
AND RETRACT ACTUATOR CLEVIS BUSHING REPLACEMENT. SERVICE BULLETIN
MOS
05-JAN-2010
SB 737-32-1394 LANDING GEAR - NOSE LANDING GEAR EXTENSION AND RETRACTION - GEAR LOCK ACTUATOR TRUNNION SEALS
REPLACEMENT. SERVICE BULLETIN
MOS
I6-NOV-2006
SB 737-32-1402 MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY
REPLACEMENT (SUPERSEDED BY SB 737-32-1402 R1). SERVICE BULLETIN
MOS 02-FEB-2010
06-AUG-2008 3411:56
AFL 827
SB 737-32-1402 RI LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
07-FEB-20I3 - (s)
SB 737-32-1402 RI TABLE LUBRICATE LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. RECOMMENDED
1.1 & 1.2 SERVICE BULLETIN THE MLG FORWARD TRUNNION PIN
DAYS 30 (s)
07-FEB-20I3
SB 737-32-1402 RI TABLE DETAILED INSPECTION LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND RECOMMENDED
1.3 81.4 REPLACEMENT. SERVICE BULLETIN OF THE TRANSITION RADIUS LOCATION (IN-SITU)
MOS 6 (s)
07-FEB-20I3
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 80 Of 748
@ Camp Systems
EFTA00618371
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1402 RI TABLE REPAIR LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. RECOMMENDED
1.5 SERVICE BULLETIN THE FINISH FOR AIRPLANES WITH FINISH DAMAGE (SCRAPES OR SCRATCHES
THROUGH THE FULL THICKNESS OF THE PRIMER OR AREAS OF MISSING PRIMER) FOUND IN THE TRANSITION
RADIUS LOCATION. AND NO CORROSION. NO PITTING. AND NO B SF METAL SCRATCHES 8 DO A DETAILED
INSPECTION OF THE TRANSITION RADIUS LOCATION (IN-SITU)
MOS
BFIF (s)
SB 737-32-1402 RI TABLE LUBRICATE LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. RECOMMENDED
2.1 & 2.2 SERVICE BULLETIN LUBRICATE THE MLG FOR WARD TRUNNION PIN
DAYS 30 (s)
07-FEB-2013
SB 737-32-1402 RI TABLE DETAILED INSPECTION LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND RECOMMENDED
2.3 & 2.4 REPLACEMENT. SERVICE BULLETIN OF THE TRANSITION RADIUS LOCATION (IN-SITU)
MOS 6 (s)
07-FEB-2013
SB 737-32-1402 RI TABLE REPAIR LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. RECOMMENDED
2.5 SERVICE BULLETIN THE FINISH FOR AIRPLANES WITH FINISH DAMAGE (SCRAPES OR SCRATCHES THROUGH THE
FULL THICKNESS OF THE PRIMER OR AREAS OF MISSING PRIMER) FOUND IN THE TRANSITION RADIUS LOCATION
AND NO CORROSION. NO PITTING. AND NO BASE METAL SCRATCHES 8 DO DETAILED INSPECTION OF THE
TRANSITION RADIUS LOCATION (IN-SITU)
MOS
BFIF (s)
SB 737-32-1408 WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON BRAKES AND SUPERSEDED
WHEELS (SUPERSEDED BY 737-32-1408 RI). SERVICE BULLETIN
MOS
09-SEP-2009
SB 737-32-1408 RI LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON SUPERSEDED
BRAKES AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1408 R2). SERVICE BULLETIN
MOS
SB 737-32-1408 R2 LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON RECOMMENDED
BRAKES AND WHEELS FOR 737-700 AIRPLANES. SERVICE BULLETIN
MOS
24-JUN-2011
SB 737-32-1410 LANDING GEAR - MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY COMPLIED WITH
INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN
MOS 22-AUG-2008
20-FEB-2008 3260:48
AFL 782
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 81 Of 748
@ Camp Systems
EFTA00618372
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1410 RI MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY
INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN
MOS
20-NOV-2008
SB 737-32-1410 R2 MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY RECOMMENDED
INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN
MOS
29-SEP-2009
SB 737-32-1418 LANDING GEAR - EXTENSION AND RETRACTION- MAIN LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED
REPLACEMENT (SUPERSEDED BY SB 737-32-1418 RI). SERVICE BULLETIN
MOS
I3-JUL-2010
SB 737-32-1418 RI LANDING GEAR - EXTENSION AND RETRACTION- MAIN LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
05-APR-20I3
SB 737-32-1422 LANDING GEAR- EXTENSION AND RETRACTION- CONTROL SYSTEM AFT CONTROL QUADRANT CLEARANCE RECOMMENDED
MEASUREMENT AND REPLACEMENT. SERVICE BULLETIN
MOS
29-JAN-2010
SB 737-32-1429 REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON BRAKES AND WHEELS FOR 737-800 SUPERSEDED
AIRPLANES (SUPERSEDED BY SB 737-32-1429 RI). SERVICE BULLETIN
MOS
SB 737-32-1429 RI LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON SUPERSEDED
BRAKES AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1429 R2). SERVICE BULLETIN
MOS
SB 737-32-1429 R2 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI-DOWTY SUPERSEDED
CARBON BRAKES AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1429 R3). SERVICE BULLETIN
MOS
SB 737-32-1429 R3 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI-DOWTY RECOMMENDED
CARBON BRAKES AND WHEELS FOR 737-803 AIRPLANES. SERVICE BULLETIN
MOS
09-AUG-20I2
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 82 Of 748
@ Camp Systems
EFTA00618373
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1430 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO SUPERSEDED
MESSIER-SUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES
(SUPERSEDED BY SS 737-32-1430 R1). SERVICE BULLETIN
MOS
58 737-32-1430 RI LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO SUPERSEDED
MESSIER-BUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES
(SUPERSEDED BY S8 737-32-1430 R2). SERVICE BULLETIN
MOS
SB 737-32-1430 R2 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO RECOMMENDED
MESSIER-BUGATTI-DOWTY CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES.
SERVICE BULLETIN
MOS
09-JAN-2012
SB 737-32-1433 LANDING GEAR - WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED
AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1433 R1). SERVICE BULLETIN
MOS
SB 737-32-1433 RI LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED
AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1433 R2). SERVICE BULLETIN
MOS
SB 737-32-1433 R2 LANDING GEAR- WHEELS AND BRAKES -REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED
AND WHEELS FOR 737-700 AIRPLANES. SERVICE BULLETIN
MOS
I9-APR-2012
58 737-32-1440 LANDING GEAR- EXTENSION AND RETRACTION- NOSE LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
14-JUL-2011
SB 737-32-1441 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED
AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1441 R1). SERVICE BULLETIN
MOS
SB 737-32-1441 RI LANDING GEAR - WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED
AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY S8 737-32-1441 R2). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 83 Of 748
@ Camp Systems
EFTA00618374
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1441 R2 LANDING GEAR - WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED
AND WHEELS FOR 737400 AIRPLANES. SERVICE BULLETIN
MOS
06-AUG-2012
SB 737-32-1442 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED SUPERSEDED
BY SB SB 737-32-1442 RI), SERVICE BULLETIN
MOS
SB 737-32-1442 RI LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED SUPERSEDED
BY SB 737-32-1442 R2). SERVICE BULLETIN
MOS
SB 737-32-1442 R2 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED RECOMMENDED
BY SB 737-32-1442 R3). SERVICE BULLETIN
MOS
15-AUG-2011
SB 737-32-1442 R3 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE. SERVICE RECOMMENDED
BULLETIN
MOS
11-MAR-2013
58 737-32-1442 R4 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE. SERVICE RECOMMENDED
BULLETIN
MOS
29-JUL-2013
58 737-32-1443 LANDING GEAR- EXTENSION AND RETRACTION - MANUAL EXTENSION CONTROL MECHANISM ACCESS DOOR RECOMMENDED
SWITCH REPLACEMENT. SERVICE BULLETIN
MOS
18-N0V-2011
SB 737-32-1443 RI LANDING GEAR- EXTENSION AND RETRACTION - MANUAL EXTENSION CONTROL MECHANISM ACCESS DOOR RECOMMENDED
SWITCH REPLACEMENT. SERVICE BULLETIN
MOS
16-AUG-2013
SB 737-32-1444 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR INBOARD WHEEL HALF INSPECTION. SERVICE BULLETIN RECOMMENDED
MOS
08-APR-2010
SB 737-32-1445 LANDING GEAR - MAIN LANDING GEAR GLAND NUT INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 84 Of 748
@ Camp Systems
EFTA00618375
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1448 LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION AND CHANGE.
SERVICE BULLETIN
MOS
SB 737-32-1448 TABLE 1.1 LUBRICATE LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION RECOMMENDED COMPUED WITH
AND CHANGE. SERVICE BULLETIN THE MLG FORWARD AND AFT TRUNNION PIN ASSEMBLIES FOR ALL AIRPLANES
DAYS 30 (s) 13-JUN-2014
19-MAY-2011 3749:42
AFL 920
SB 737-32-1448 TABLE INSTALL LANDING GEAR- MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION AND RECOMMENDED
1.10 CHANGE. SERVICE BULLETIN IMPROVED MLG OUTER CYLINDER TRUNNION BUSHINGS. IMPROVED AFT TRUNNION
BEARING ASSEMBLY. NEW FORWARD TRUNNION PIN CROSS BOLT BUSHINGS (GROUP 1 ONLY) AND AFT TRUNNION
PIN CROSS BOLT BUSHINGS FOR ALL AIRPLANES
MOS 120(s)
19-MAY-2011
SB 737-32-1448 TABLE 1.2 PERFORM LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION RECOMMENDED COMPUED WITH
AND CHANGE. SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE MLG FORWARD AND AFT TRUNNION PIN
ASSEMBLIES WITH THE MLG NOT REMOVED FOR SIGNS OF CORROSION AND/OR CHROME PLATING DAMAGE FOR
ALL AIRPLANES
MOS 18 09-AUG-2011 09-FEB-2013 RECURRING
19-MAY-2011 3533:32
AFL 863
SB 737-32-1449 LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED
AND WHEELS FOR 737-900ER AIRPLANES (SUPERSEDED BY SB 737-32-1449 RI). SERVICE BULLETIN
MOS
SB 737-32-1449 RI LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED
AND WHEELS FOR 737-900ER AIRPLANES. SERVICE BULLETIN
MOS
15-SEP-2011
SB 737-32-1449 R2 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED
AND WHEELS FOR 737-900ER AIRPLANES. SERVICE BULLETIN
MOS
08-AUG-2012
SB 737-32-1456 LANDING GEAR- WHEELS AND BRAKES- MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO RECOMMENDED
MESSIER-BUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES. SERVICE
BULLETIN
MOS
13-JUN-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 85 Of 748
@ Camp Systems
EFTA00618376
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32-1457 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO GOODRICH RECOMMENDED
CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES (SUPERSEDED BY SB 737-32-1457
R1). SERVICE BULLETIN
MOS
03-OCT-2011
SB 737-32-1457 RI LANDING GEAR- WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO GOODRICH RECOMMENDED
CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES. SERVICE BULLETIN
MOS
01-FEB-2013
SB 737-32-1458 LANDING GEAR- TIRES AND WHEELS - REPLACEMENT OF WHEEL WELL BLADE SEALS. LOWER FAIRING SUPERSEDED
ASSEMBLIES. AND 43.5 INCH DIAMETER TIRES WITH 44.5 INCH DIAMETER TIRES (SUPERSEDED BY SB 737-32-1458
R1). SERVICE BULLETIN
MOS
SB 737-32-1470 LANDING GEAR - TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED
AIRPLANES WITH GOODRICH CARBON BRAKES (SUPERSEDED BY SB 737-32-1470 R1), SERVICE BULLETIN
MOS
SB 737-32-1470 RI LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR RECOMMENDED
AIRPLANES WITH GOODRICH CARBON BRAKES. SERVICE BULLETIN
MOS
13-AUG-2013
SB 737-32-1471 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED
AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES (SUPERSEDED BY SB 737-32-1471 R1). SERVICE
BULLETIN
MOS
SB 737-32-1471 RI LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED
AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES (SUPERSEDED BY SB 737-32-1471 R2). SERVICE
BULLETIN
MOS
SB 737-32-1471 R2 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR RECOMMENDED
AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES. SERVICE BULLETIN
MOS
15-JUL-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 86 Of 748
@ Camp Systems
EFTA00618377
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-32A1343 REPLACEMENT OF THE PROXIMITY SWITCH ELECTRONICS. SERVICE BULLETIN RECOMMENDED COMPUED WITH - PREVIOUSLY UNK - PART
INSTALLED: P/N 285A1600-4 SN 001197
REF: COMPONENT CODE 311051
MOS 09-NOV-2005
26-JUL-2001 2281
AFL 563
SB 737-33-1116 PASSENGER SERVICE UNIT NO-SMOKING FASTEN SEAT BELT SIGN-WIRING CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
I6-DEC-1999
SB 737-33-1121 R2 LIGHTS - FLIGHT COMPARTMENTS- AUDIO CONTROL PANEL LAMP TEST WIRING INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
30-MAR-2011
SB 737-33-1128 LIGHTS - EXTERIOR - REPLACE POSITION LIGHT TRANSFORMERS. SERVICE BULLETIN RECOMMENDED
MOS
I8-JAN-2001 -
SB 737-33-1130 PASSENGER COMPARTMENT LIGHTS - REPLACE THE 115VAC ATM CONNECTORS. SERVICE BULLETIN RECOMMENDED
MOS
24-JAN-2002 -
SB 737-33-1130 RI LIGHTS - PASSENGER COMPARTMENT LIGHTS - REPLACE THE 115VAC ATM CONNECTORS. SERVICE BULLETIN
MOS
02-MAR-2006
SB 737-33-1133 MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN
MOS 12 (s)
I9-DEC-2002
SB 737-33-1133 RI MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN
MOS 12 (s)
17-APR-2003
SB 737-33-1133 R2 MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN
MOS 30 (s)
04-DEC-2003
SB 737-33-1133 R3 LIGHTS - MASTER DIM AND TEST - SUPPLY TEST GROUND SIGNAL WIRING SEPARATION. SERVICE BULLETIN COMPUED WITH - IAW THE AD AD 2006-15-18
MOS 09-AUG-2010
08-SEP-2005 - (s) 3448:31
AFL 841
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 87 Of 748
@ Camp Systems
EFTA00618378
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-33-1133 R0 MASTER DIM AND TEST - SUPPLY TEST GROUND SIGNAL WIRING SEPARATION (SUPERSEDED BY SB 737-33-1133 R5). SUPERSEDED - INFORMATION NO MORE WORK IS
SERVICE BULLETIN NECESSARY ON AIRPLANES CHANGED AS
SHOWN IN THE REVISION 3 OF THIS SERVICE
BULLETIN
MOS
- Is)
SB 737-33-1133 RS UGHTS - MASTER DIM AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPARATION. SERVICE BULLETIN RECOMMENDED
MOS 48 (s)
05-SEP-2006
SB 737-33-1146 UGHTS - STROBE POSITION UGHTS - LIGHTNING PROTECTION OF THE TAIL STROBE UGHT SYSTEM WIRING SUPERSEDED
(SUPERSEDED BY SB 737-33-1146 RI). SERVICE BULLETIN
MOS
- (s)
SB 737-33-1146 RI UGHTS - STROBE POSITION UGHTS - LIGHTNING PROTECTION OF THE TAIL STROBE UGHT AND SYSTEM WIRING. RECOMMENDED
SERVICE BULLETIN
MOS 72 (s)
02-NOV-2011
S8 737-33-1151 LIGHTS - EMERGENCY LIGHTING - MID-CABIN CENTER-AISLE EXIT SIGN INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
27-JAN-2011
SB 737-33-1152 UGHTS - RETRACTABLE LANDING LIGHT - REPLACEMENT OF RETRACTABLE LANDING LIGHTS AND WIRE RECOMMENDED
CONNECTORS. SERVICE BULLETIN
MOS
29-AUG-201I
SB 737-33-1153 UGHTS - FLIGHT CREW LIGHTS - CAPTAINS AND FIRST OFFICERS UTILITY LIGHT LOCATION CHANGES. SERVICE RECOMMENDED
BULLETIN
MOS
13-OCT-2011
SB 737-34-1496 NAVIGATION-HEAD UP DISPLAY SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
01-JUL-1999 - (s)
SB 737-34-1496 RI NAVIGATION-HEAD UP DISPLAY SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
30-SEP-1999 - Is)
SB 737-34-1503 FLIGHT MANAGEMENT COMPUTER SYSTEM SOFTWARE VERSION U10.3 UPDATE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -CM
MOS 08-NOV-2000
27-JUL-2000 - (s)
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 88 Of 748
@ Camp Systems
EFTA00618379
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34-1503 RI FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
I8-JAN-2001 - (s)
SB 737-34-1522 FLIGHT MANAGEMENT COMPUTING - UPDATE SOFTWARE. SERVICE BULLETIN RECOMMENDED COMPUED WITH - CM
MOS I3-SEP-1999
03-JUN-1999 - (s)
SB 737-34-1538 FLIGHT MANAGEMENT COMPUTING-DUST COVER. SERVICE BULLETIN RECOMMENDED
MOS
II -NOV-1999 -
SB 737-34-1539 COLLISION AVOIDANCE-TCAS WIRING CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
27-JUL-2000 - (s)
SB 737-34-1540 ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
27-JUL-I 999 - (s)
SB 737-34-1540 RI ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
23-SEP-I999 - (s)
SB 737-34-1540 R2 ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
07-DEC-2000 - (s)
SB 737-34-1545 R7 REPLACEMENT OF THE ROCKWELUCOLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED
MOS
08-NOV-2001 - (s)
SB 737-34-1545 R8 REPLACEMENT OF THE ROCKWELUCOLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED
MOS
I4-FEB-2002
SB 737-34-1545 R9 REPLACEMENT OF ROCKWELL/COLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED
MOS
06-MAY-2004
SB 737-34-1551 UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
10-AUG-200O - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 89 Of 748
@ Camp Systems
EFTA00618380
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34-1551 RI UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
05-OCT-2000 - Is)
SB 737-34-1551 R2 UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
07-DEC-2000 - (s)
SB 737-34-1562 FLIGHT MANAGEMENT COMPUTING - UPGRADE SOFTWARE. SERVICE BULLETIN RECOMMENDED
MOS
21-OCT-1999 - (s)
SB 737-34-1566 FLIGHT MANAGEMENT COMPUTER-SOFTWARE CHANGE. SERVICE BULLETIN RECOMMENDED COMPUED WITH -Cm
MOS 08-NOV-2000
03-AUG-2000 - (s)
SB 737-34-1567 GROUND PROXIMITY WARNING SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
20-APR-2000 - (s)
SB 737-34-1572 FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
09-NOV-2000 - (s)
SB 737-34-1572 RI FLIGHT MANAGEMENT COMPUTER SYSTEM INSTALLATION OF HEADING REFERENCE SWITCH FOR POLAR RECOMMENDED
NAVIGATION. SERVICE BULLETIN
MOS
25-JAN-2001 - Is)
SB 737-34-1607 UPDATE FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
20-SEP-2001 - Is)
SB 737-34-1616 NAVIGATION - INDEPENDENT POSITION DETERMINING - ENHANCED GROUND PROXIMITY WARNING COMPUTER RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
I8-JAN-2001 - (s)
SB 737-34-1634 RI INSTALLATION OF AN ALTERNATE NAVIGATION SYSTEM AND DATA LINK SERVICE BULLETIN RECOMMENDED
MOS
15-NOV-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 90 Of 748
@ Camp Systems
EFTA00618381
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34-1650 NAVIGATION-FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM- UPDATE THE FMC SOFTWARE TO VERSION 10.5. RECOMMENDED
SERVICE BULLETIN
MOS
06-FEB-2003
SB 737-34-1650 RI UPDATE THE FMC SOFTWARE TO VERSION 10.5. SERVICE BULLETIN RECOMMENDED
MOS
27-FEB-2003
SB 737-34-1652 SOFTWARE CHANGE TO ACTWATE FMCS AND DEU FEATURES.. SERVICE BULLETIN RECOMMENDED
MOS
18-OCT-2001 - (s)
SB 737-34-1656 FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
23-MAY-2002 - (s)
SB 737-34-1666 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.4A. RECOMMENDED
SERVICE BULLETIN
MOS
I I -APR-2002 - (s)
SB 737-34-1672 INSTALL FMC OPC SOFTWARE FOR THE 'MISSED APPROACH ON MAP IN CYAN' OPTION. SERVICE BULLETIN RECOMMENDED
MOS
I9-DEC-2002
SB 737-34-1720 INTEGRATED STANDBY FLIGHT DISPLAY (ISFD) REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
I 7-APR-2003
SB 737-34-1721 AIR DATA INERTIAL REFERENCE SYSTEM (ADIRS)-WIRING CHANGE TO ACTIVATE 2005 MAGVAR TABLE. SERVICE RECOMMENDED
BULLETIN
MOS
03-APR-2003
SB 737-34-1762 R3 REPLACEMENT OF ATC TRANSPONDERS. AND ACTWATION OF ELEMENTARY SURVEILLANCE (ELS). ENHANCED RECOMMENDED
SURVEILLANCE (EHS) AND EXTENDED SOUITTER (ES) PARAMETERS. SERVICE BULLETIN
MOS
27-JAN-2005
SB 737-34-1768 NAVIGATION - FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.6. COMPLIED WITH
SERVICE BULLETIN
MOS I I -MAY-2006
I I -AUG-2005 2619:10
AFL 629
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 91 Of 748
@ Camp Systems
EFTA00618382
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34-1811 NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE
INSTALLATION. SERVICE BULLETIN
MOS 24 (5)
SB 737-34-1811 RI NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE
INSTALLATION. SERVICE BULLETIN
MOS
05-OCT-2006
SB 737-34-1811 RI El INSTALL NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING
PLATE INSTALLATION. SERVICE BULLETIN GROUND PLATE. STUD. AND JUMPER AS SHOWN IN WORK PACKAGE 1 OF
THIS SERVICE BULLETIN.
MOS 30 (5)
05-OC-1-2006
SB 737-34-1811 RI E3 REPLACE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING
PLATE INSTALLATION. SERVICE BULLETIN THE NUTPLATES WITH CRES NUTPLATES AND SOLID ALUMINUM RIVETS
AS SHOWN IN WORK PACKAGE 2 OF THIS SERVICE BULLETIN.
MOS 60 (5)
OS-OCT-200G
SB 737-34-1811EI MEASURE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING
PLATE INSTALLATION. SERVICE BULLETIN PITOT PROBE RESISTANCE AS SHOWN IN WORK PACKAGE 1
MOS 18 (s)
25-AUG-2005
SB 737-34-1811E2 GENERAL VISUAL INSPECTION NAVIGATION - FLIGHT ENVIRONMENT DATA- PITOT STATIC PROBE BOND
INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN OF THE PITOT PROBE MOUNTING PLATE
NUTPLATES FOR PULL-TYPEA-IOLLOW RIVETS AND CORROSION ON THE FASTNER THREADS MD IN THE
NUTPLATES.
MOS 30 (5)
25-AUG-2005
SB 737-34-1811E3 INSTALL NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING
PLATE INSTALLATION. SERVICE BULLETIN GROUND PLATE. STUD AND JUMPER AS SHOWN IN WORK PACKAGE 3
MOS 30 (s)
25-AUG-2005
SB 737-34-1811E4 REPLACE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING
PLATE INSTALLATION. SERVICE BULLETIN THE NUTPLATES WITH CRES NUTPLATES AND SOLID ALUMINUM RIVETS
AS SHOWN IN WORK PACKAGE 4
MOS 72 (5)
25-AUG-2005
SB 737-34-1844 WIRING PROVISIONS FOR FUTURE ACTIVATION OF ELEMENTARY SURVEILLANCE. ENHANCED SURVEILLANCE AND RECOMMENDED
EXTENDED SOUITTER PARAMETERS. SERVICE BULLETIN
MOS
29-NOv-200.1
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAV
(EBT)-Estimated Base Time 92 Of 748
Camp Systems
EFTA00618383
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34-1875 NAVIGATION - INDEPENDENT POSITION DETERMINING - ENHANCED GROUND PROXIMITY WARNING SYSTEM RECOMMENDED
COMPUTER CHANGE. SERVICE BULLETIN
MOS
22-SEP-2005
SB 737-34-1885 ANTENNA WATER WICKING. SERVICE BULLETIN
MOS
09-JUN-2005
SB 737-34-1918 FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.7. SERVICE
BULLETIN
MOS
27-MAR-2007
SB 737-34-1918 RI NAVIGATION- FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE
TO VERSION 10.7. SERVICE BULLETIN
MOS
14-MAR-2008
SB 737-34-2138 AIR DATA INERTIAL REFERENCE UNIT - STATIC SOURCE ERROR CORRECTION TABLE WIRING CHANGE SUPERSEDED
(SUPERSEDED BY SB 737-34-2138 RI), SERVICE BULLETIN
MOS
SB 737-34-2138 RI NAVIGATION -AIR DATA INERTIAL REFERENCE UNIT - STATIC SOURCE ERROR CORRECTION TABLE WIRING CHANGE. RECOMMENDED
SERVICE BULLETIN
MOS
06-FEB-2014
SB 737-34-2155 NAVIGATION - HEAD-UP DISPLAY (HUD) SYSTEM - COMBINER MOUNTING BRACKET CHANGE (SUPERSEDED BY SB SUPERSEDED
737-34-2155 R1). SERVICE BULLETIN
MOS
SB 737-34-2155 RI NAVIGATION - HEAD-UP DISPLAY (HUD) SYSTEM - COMBINER MOUNTING BRACKET CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
08-AUG-2011
SB 737-34-2284 NAVIGATION- GROUND PROXIMITY WARNING SYSTEM - ENHANCED GROUND PROXIMITY WARNING SYSTEM SUPERSEDED
ALTITUDE CALLOUTS MENU ID 23. SMART 500 CALLOUT. LOW VOLUME FOR ALTITUDE CALLOUTS. AND PEAKS AND
OBSTACLES SELECTION CHANGE (SUPERSEDED BY SB 737-34-2284 R1). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 93 Of 748
@ Camp Systems
EFTA00618384
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 737-34-2284 RI NAVIGATION - GROUND PROXIMITY WARNING SYSTEM - ENHANCED GROUND PROXIMITY WARNING SYSTEM SUPERSEDED
ALTITUDE CALLOUTS MENU ID 23. SMART 500 CALLOUT. LOW VOLUME FOR ALTITUDE CALLOUTS. AND PEAKS AND
OBSTACLES SELECTION CHANGE (SUPERSEDED BY SB 737-34-2284 R2). SERVICE BULLETIN
MOS
SB 737-34-2286 NAVIGATION - GLOBAL POSITIONING SYSTEM - CHANGE AND DEACTIVATION OF CATEGORY I APPROACH CAPABILITY RECOMMENDED
OF THE GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM. SERVICE BULLETIN
MOS
21-JAN-2011
58 737-34-2287 RI NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM- AUTOFLIGHT. RIGHT MANAGEMENT COMPUTER RECOMMENDED
SYSTEM. COMMON DISPLAY SYSTEM. FUEL QUANTITY INDICATION SYSTEM - CHANGE OPTIONS. SERVICE BULLETIN
MOS
27-JAN-2011
SB 737-34-2290 NAVIGATION - AUTOMATIC DIRECTION FINDER SYSTEM - INSTALLATION OF SECOND AUTOMATIC DIRECTION FINDER RECOMMENDED
INTO EXISTING PROVISIONS. SERVICE BULLETIN
MOS
7-DEC-2010
SB 737-34-2293 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FAA TO JAPJEASA FLIGHT RECOMMENDED
RULES. SERVICE BULLETIN
MOS
10-DEC-2010
SB 737-34-2294 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FAA TO JAA/EASA FLIGHT SUPERSEDED
RULES (SUPERSEDED BY SB 737-34-2294 R1). SERVICE BULLETIN
MOS
SB 737-34-2296 NAVIGATION - AUTOMATIC DIRECTION FINDER SYSTEM - INSTALLATION OF SECOND AUTOMATIC DIRECTION FINDER RECOMMENDED
INTO EXISTING PROVISIONS. SERVICE BULLETIN
MOS
28-JAN-2011
SB 737-34-2297 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FEDERAL AVIATION RECOMMENDED
ADMINISTRATION TO JOINT AVIATION AUTHORITIES/EUROPEAN AVIATION SAFETY AGENCY FLIGHT RULES. SERVICE
BULLETIN
MOS
20-JAN-2011
SB 737-34-2298 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE FROM JOINT AVIATION AUTHORITIES TO RECOMMENDED
FEDERAL AVIATION ADMINISTRATION FLIGHT RULES AND DUAL AIRPLANE FLIGHT MANUAL FORMAT SERVICE
BULLETIN. SERVICE BULLETIN
MOS
04-JAN-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 94 Of 748
@ Camp Systems
EFTA00618385
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 737-34-2300 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM JOINT AVIATION RECOMMENDED
AUTHORITIES/EUROPEAN AVIATION SAFETY AGENCY TO FEDERAL AVIATION ADMINISTRATION FLIGHT RULES
(SUPERSEDED BY SB 737-34-2300 RI). SERVICE BULLETIN
MOS
27-JAN-2011
SS 737-34-2327 NAVIGATION - FLIGHT MANAGEMENT COMPUTING - DIP SWITCH POSITION CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
05-DEC-2011
SS 737-34-2384 NAVIGATION - WEATHER RADAR SYSTEM - INSPECTION AND REPLACEMENT OF WEATHER RADAR ANTENNA WIRE RECOMMENDED
BUNDLE W8489. SERVICE BULLETIN
MOS
27-NOV-2012
SS 737-34-2395 NAVIGATION- LOW RANGE RADIO ALTIMETER - INSTALLATION OF THE ANTENNA GASKETS (SUPERSEDED BY SB SUPERSEDED
737-34-2395 RI). SERVICE BULLETIN
MOS
SS 737-34-2395 RI NAVIGATION- LOW RANGE RADIO ALTIMETER - INSTALLATION OF THE ANTENNA GASKETS. SERVICE BULLETIN RECOMMENDED
MOS
17-OCT-2013
SS 737-34-2413 NAVIGATION- STANDBY ATTITUDE REFERENCE SYSTEM - INTEGRATED STANDBY FLIGHT DISPLAY BACK COURSE RECOMMENDED
PROGRAM PIN CHANGE. SERVICE BULLETIN
MOS
I0-OCT-2012
SS 737-34-2432 NAVIGATION- GROUND PROXIMITY WARNING SYSTEM - INTEGRATED AREA NAVIGATION TURNED OFF BY WIRING RECOMMENDED
CHANGE. SERVICE BULLETIN
MOS
28-NOV-20I2
SB 737-34-2454 NAVIGATION- AIR DATA SYSTEM - ALTIMETRY SYSTEM TEST. SERVICE BULLETIN
MOS
SS 737-34-2461 NAVIGATION- ATC SYSTEM- ROCKWELL COLLINS AIR TRAFFIC CONTROL TRANSPONDER REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
17-MAY-2013
SS 737-34A1502 FLIGHT MANAGEMENT COMPUTER SYSTEM (SUPERSEDED BY SB 737-34A1502 RI). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 95 Of 748
@ Camp Systems
EFTA00618386
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-34A1502 RI FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
20-MAY-1999 - (s)
SB 737-34A1801 CHANGE THE OPERATIONAL PROGRAM SOFTWARE TO VERSION 10.5A. SERVICE BULLETIN COMPUED WITH
DAYS 1 1-MAY-2006
15-JUL-2004 2619:10
AFL 629
SB 737-34A2104 FLIGHT MANAGEMENT COMPUTER SYSTEM - RIGHT MANAGEMENT COMPUTER OPERATIONAL PROGRAM SUPERSEDED - INFO: THIS SOFTWARE WAS SUPERSEDED BY
SOFTWARE U10.8 INSTALLATION (SUSPENDED BY 737-34A2104 N1). SERVICE BULLETIN U10.8A SOFTWARE WHICH WAS RECENTLY
INSTALLED.
MOS
SB 737-34A2216 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - FLIGHT MANAGEMENT COMPUTER OPERATIONAL SUPERSEDED
PROGRAM SOFTWARE U10.8A SOFTWARE INSTALLATION (SUPERSEDED BY SB 737-34A2216 R1). SERVICE BULLETIN
MOS
SB 737-34A2216 RI NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - FLIGHT MANAGEMENT COMPUTER OPERATIONAL RECOMMENDED COMPUED WITH
PROGRAM SOFTWARE U10.8A SOFTWARE INSTALLATION
. SERVICE BULLETIN
MOS 16-MAY-2012
09-JUN-2010 3634:25
AFL 882
SB 737-34A2292 NAVIGATION - ENHANCED GROUND PROXIMITY WARNING SYSTEM - AIR SPEED LOW ALERT CHANGES. SERVICE RECOMMENDED
BULLETIN
MOS 12 (s)
27-APR-20I2
SB 737-35-1049 PURITAN-BENETT OXYGEN MASKS. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY
MOS 06-JAN-2007
- (s)
SB 737-35-1077 OXYGEN GENERATOR FIRING PIN LOCATION. SERVICE BULLETIN RECOMMENDED
DAYS 90 (s)
01-MAR-2001
SB 737-35-1080 OXYGEN - FLIGHT CREW OXYGEN SYSTEM - INSTALLATION OF HOSE SEPARATION SUPPORT FOR REMOTE FILL RECOMMENDED NOT APPLICABLE
TUBING. SERVICE BULLETIN
MOS
07-JUL-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 96 Of 748
@ Camp Systems
EFTA00618387
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-35-1107 OXYGEN - PASSENGER OXYGEN SYSTEM - CHANGE 22 MINUTE OXYGEN GENERATOR RETENTION IN THE
PASSENGER SERVICE UNITS. SERVICE BULLETIN
MOS 60 (s)
04-JAN-2008
SB 737-35A1058 CREW OXYGEN - HOSE REPLACEMENT (SUPERSEDED BY SB 737-35A1058 RI ). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
SB 737-35A1058 RI CREW OXYGEN - HOSE REPLACEMENT (SUPERSEDED BY SB 737-35A1058 R2). SERVICE BULLETIN SUPERSEDED COMPUED WITH - AND REPLACED PARTS I.A.W.
AD 2010-16-06
MOS 27-AUG-2010
- (s) 3448:31
AFL 841
SB 737-35A1058 R2 OXYGEN - CREW OXYGEN - CREW OXYGEN SYSTEM LOW PRESSURE FLEX HOSE REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPUED WITH - DURING COMPLIED WITH
737-35A1058 RI REPLACED PILOT a CO PILOT
FLEX HOSES BY PM 60850059-618. REPLACED
FIRST OBSERVER FLEX HOSE BY P/N
60850056-614 NO MORE ACTION REQUIRED
MOS 21-FEB-2013
09-SEP-2010 3702:13
AFL 897
SB 737-35A1121 CREW OXYGEN MASK STOWAGE BOX UNIT -INSPECT/REPLACE (SUPERSEDED BY SB 737-35A1121 R1). SERVICE SUPERSEDED
BULLETIN
MOS (EFF)
SB 737-35A1121 Ft1 OXYGEN - CREW OXYGEN SYSTEM - CREW OXYGEN MASK STOWAGE BOX UNIT - INSPECT/REPLACE. SERVICE RECOMMENDED NOT APPLICABLE - DUE TO VARIABLE NUMBER
BULLETIN OF THE A/C YG006
MOS 19-JAN-2012
I4-DEC-2009 3609:52
AFL 879
SB 737-35A1126 CREW AND PASSENGER GASEOUS OXYGEN SYSTEMS - OXYGEN CYLINDER RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER
INSPECTION/REPLACEMENT. SERVICE BULLETIN INSTALLED
DAYS I6-FEB-2010
29-OCT-2009 3417:51
AFL 829
SB 737-36-1019 ENGINE BLEED AIR DISTRIBUTION SYSTEM - CLAMP INSTALLATION ON ENGINE RECOMMENDED
SENSE TUBES FOR THE PNEUMATIC SYSTEM FLEX LINES. SERVICE BULLETIN
MOS
14-SEP-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 97 Of 748
@ Camp Systems
EFTA00618388
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-36-1019 RI CLAMP INSTALLATION ON ENGINE SENSE TUBES FOR THE PNEUMATIC SYSTEM FLEX LINES. SERVICE BULLETIN RECOMMENDED
MOS
16-FEB-2010
SB 737-36-1020 DISTRIBUTION- PNEUMATIC MANIFOLD SYSTEM - REPLACEMENT OF AUXILIARY POWER UNIT PNEUMATIC DUCTS. RECOMMENDED
SERVICE BULLETIN
MOS
27-JAN-2011
SB 737-36-1021 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM- CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED
GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL
SYSTEM TROUBLESHOOTING (SUPERSEDED BY S8 737-36-1021 R1). SERVICE BULLETIN
MOS
SB 737-36-1021 RI PNEUMATIC - BLEED AIR PRECOOLER SYSTEM- CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED
GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL
SYSTEM TROUBLESHOOTING (SUPERSEDED BY SB 737-36-1021 R2). SERVICE BULLETIN
MOS
SB 737-36-1021 R2 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM - CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED
GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL
SYSTEM TROUBLESHOOTING (SUPERSEDED BY SEI 737-36-1021 R3). SERVICE BULLETIN
MOS
SB 737-36-1021 R3 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM - CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO RECOMMENDED
GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL
SYSTEM TROUBLESHOOTING. SERVICE BULLETIN
MOS
03-OCT-2013
SB 737-38-1046 POTABLE WATER - ADDITION OF INSULATION TO THE WATER SUPPLY LINES. SERVICE BULLETIN
MOS
07-MAR-2002 - (s)
SB 737-38-1048 WATERAMASTE-WASTE DISPOSAL-DRAIN MAST-INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A CRACKED RECOMMENDED - SUPERSEDED BY S/B 737-38-1053
FORWARD DRAIN MAST ASSEMBLY (REPLACED BY 737-38-1053). SERVICE BULLETIN
MOS
I6-JAN-2003 SOO (s)
SB 737-38-1048 RI WATER/WASTE - WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A SUPERSEDED
CRACKED FORWARD DRAIN MAST ASSEMBLY (SUPERSEDED BY 737-38-1053). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 98 Of 748
@ Camp Systems
EFTA00618389
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-38-1053 WATERIWASTE - WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A
CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN
MOS
15-SEP-2005 560 (s)
SB 737-38-1053 RI WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE RECOMMENDED
CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN
MOS
14-SEP-2009
SB 737-38-1053 R1.1 GENERAL VISUAL INSPECTION WASTE DISPOSAL- DRAIN MAST - INSPECTION FOR FATIGUE RECOMMENDED
CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN OF THE FORWARD
DRAIN MAST ASSEMBLY
MOS
14-SEP-2009 500 (s)
SB 737-38-1053 RI .2 REPLACE WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE RECOMMENDED
CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN WITH ALUMINUM
DRAIN MAST ASSEMBLY
MOS 60 (s)
14-SEP-2009
SB 737-38-1057 POTABLE WATER - PASSENGER WATER SYSTEM - HOSE AND FITTING REPLACEMENT. FITTING HEATER AND RECOMMENDED
SHROUD INSTALLATION. SERVICE BULLETIN
MOS
19-FEB-2010
SB 737-44-1001 CABIN SYSTEMS - INFLIGHT ENTERTAINMENT SYSTEM - INSTALLATION OF LATCH PLATES ON THE AFT AUDIO
DISTRIBUTION BOX. SERVICE BULLETIN
MOS
07-JUN-2010
SB 737-44-1006 CABIN SYSTEMS - PASSENGER AUDIONIDEO ENTERTAINMENT SYSTEM - IN-FLIGHT ENTERTAINMENT SYSTEM AUDIO RECOMMENDED
HUM NOISE CORRECTIVE WIRING CHANGES. SERVICE BULLETIN
MOS
03-JUL-2013
SB 737-04-1007 CABIN SYSTEMS- CREW PANELS - GROMMET INSTALLATION FOR IN-FLIGHT ENTERTAINMENT SYSTEM CONTROL RECOMMENDED
PANEL STOWAGE BOX. SERVICE BULLETIN
MOS
03-DEC-2013
SB 737-06-1009 CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG HARDWARE
AND SOFTWARE REPLACEMENT. SERVICE BULLETIN
MOS
08-JAN-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 99 Of 748
@ Camp Systems
EFTA00618390
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73746-1011 INFORMATION SYSTEMS - CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG HARDWARE AND SOFTWARE RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
20-OCT-2010
SB 737-46-1013 INFORMATION SYSTEMS - CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG SOFTWARE REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS
29-NOv-2012
SB 73747-1002 INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM (SUPERSEDED BY SUPERSEDED
SB 73747-1002 RI). SERVICE BULLETIN
MOS
SB 73747-1002 RI INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM (SUPERSEDED BY SUPERSEDED
SB 73747-1002 R2). SERVICE BULLETIN
MOS
SB 73747-1002 R2 INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
14-NOv-2013
SB 73747-1003 INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM (SUPERSEDED BY SB 73747-1003 RN. SUPERSEDED
SERVICE BULLETIN
MOS
SB 73747-1003 RI INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM (SUPERSEDED BY SB 73747-1003 R2). SUPERSEDED
SERVICE BULLETIN
MOS
SB 73747-1003 R2 INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
27-SEP-2013
SB 73747-10as NITROGEN GENERATION SYSTEM - INSTALLATION OF OXYGEN SENSOR. REPLACEMENT OF EQUIPMENT AND WIRE RECOMMENDED
BUNDLES. SERVICE BULLETIN
MOS
02-FEB-2010
SB 73747-1011 INERT GAS SYSTEM - AIR SEPARATION UNIT - AIR SEPARATION MODULE HIGH FLOW VALVE CONNECTOR RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
14-OCT.20 1 u
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 100 Of 748
Camp Systems
EFTA00618391
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-07-1012 INERT GAS SYSTEM - AIR SEPARATION UNIT - INSPECTION OF TUBES AND CLAMP INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
12-APR-2012
SB 737-09-1119 APU - ELECTRONIC CONTROL UNIT. SERVICE BULLETIN RECOMMENDED
MOS
10-JUN-1999 - (s)
SB 737-09-1133 AIRBORNE AUXILIARY POWER- AUXILARY POWER UNIT AIR INLET - AUXILARY POWER UNIT FLAP AND VORTEX
GENERATOR ASSEMBLY MOSIFICATION. SERVICE BULLETIN
MOS
22-SEP-2005
SB 737-09-1133 RI AIRBORNE AUXILIARY POWER - AUXILIARY POWER UNIT AIR INLET - AUXILIARY POWER UNIT FLAP AND VORTEX
GENERATOR ASSEMBLY MODIFICATION. SERVICE BULLETIN
MOS
21-SEP-2007
SB 737-09-1133 R2 AUXILIARY POWER UNIT FLAP AND VORTEX GENERATOR ASSEMBLY MODIFICATION. SERVICE BULLETIN
MOS
26-JAN-2009
SB 737-09-1130 AIRBORNE AUXILIARY POWER - APU AIR INLET - INLET PLENUM REPLACEMENT. SERVICE BULLETIN
MOS
16-OCT-2007
SB 737-09-1139 AIRBORNE AUXILIARY POWER - COWL DOOR INSULATION PANEL AND AFT BULKHEAD SEAL REPLACEMENT SUPERSEDED
(SUPERSEDED BY S8 737-09-1139 RI). SERVICE BULLETIN
MOS
SB 737-09-1139 RI AIRBORNE AUXILIARY POWER -COWL DOOR INSULATION PANEL AND AFT BULKHEAD SEAL REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS
04-OCT-2012
SB 737-51-1017 RI EVES MOISTURE SHROUD SEAL INSTALLATION, SERVICE BULLETIN RECOMMENDED
MOS
28-MAR-2002
SB 737-51-1018 CARGO DOORWAY STOP PAD REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
I I -APR-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 101 Of 748
@ Camp Systems
EFTA00618392
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-51-1019 STRUCTURES - WIRE SHIELD ASSEMBLY INSTALLATION UNDER THE E5-2 SHELF. SERVICE BULLETIN RECOMMENDED
MOS
25-APR-2002
SB 737-51-1019 RI STRUCTURES - WIRE SHIELD ASSEMBLY INSTALLATION UNDER THE E5-2 SHELF. SERVICE BULLETIN RECOMMENDED
MOS
18-DEC-2003
SB 737-52-1136 EMERGENCY EXIT. SERVICE BULLETIN RECOMMENDED
MOS
22-JUN-2000 - (s)
SB 737-52-1137 DOORS - CONTROL CABIN EMERGENCY EXIT PANEL. SERVICE BULLETIN
MOS
- (s)
SB 737-52-1138 ELECTRONIC EQUIPMENT ACCESS DOOR, SERVICE BULLETIN RECOMMENDED
MOS
29-JUL-1999 - (s)
SB 737-52-1140 FORWARD ENTRY - UPPER AFT CORNER DOOR STOP REPLACEMENT. SERVICE BULLETIN
MOS
20-AUG-2001
AFL 18000 (s)
SB 737-52-1142 AFT GALLEY SERVICE DOOR, SERVICE BULLETIN RECOMMENDED
MOS 4 (s)
22-FEB-2001
SB 737-52-1148 HORIZONTAL AIRSTAIRS MOISTURE SHROUD INSTALATION SUPPORT RAIL REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
12-DEC-2002
SB 737-52-1148 RI FUSELAGE - HORIZONTAL AIRSTAIRS MOISTURE SHROUD INSTALLATION - SUPPORT RAIL REPLACEMENT. SERVICE
BULLETIN
MOS
11-MAY-2006
SB 737-52-1152 DOORS - FORWARD AIRSTAIR DOOR RELIABILITY IMPROVEMENT - REPLACE DOOR LOCKPIN ACTUATORS. OPEN
UMITAMARNING SWITCH BRACKETS. AND RACEWAY COVER ASSEMBLY. SERVICE BULLETIN
MOS
08-SEP-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 102 Of 748
@ Camp Systems
EFTA00618393
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-52-1156 DOORS - FORWARD AIRSTAIR AND DOOR - FORWARD AIRSTAIR SPEEDUP AND SLOWDOWN SYSTEM DELETION.
SERVICE BULLETIN
MOS
01-DEC-2005
SB 737-52-1157 ENTRANCE STAIRS - FORWARD AIRSTAIR - AIRSTAIR HANDRAIL SAFETY IMPROVEMENTS (SUPERSEDED BY SB SUPERSEDED
737-52-1157 RI). SERVICE BULLETIN
MOS
SB 737-52-1157 RI DOORS - ENTRANCE STAIRS - FORWARD AIRSTAIR AIRSTAIR HANDRAIL SAFETY IMPROVEMENTS. SERVICE
BULLETIN
MOS
SB 737-52-1159 DOORS - DOOR WARNING SYSTEM - FORWARD ENTRY DOOR LATCH SWITCH AND WIRING
INSTALLATION AND MODIFICATION. SERVICE BULLETIN
MOS
26-NOV-2C07
SB 737-52-1159 RI DOOR WARNING SYSTEM - FORWARD ENTRY DOOR LATCH SWITCH AND WIRING RECOMMENDED
INSTALLATION AND MODIFICATION. SERVICE BULLETIN
MOS
21-SEP-2009
SB 737-52-1164 FORWARD AND AFT CARGO DOORS - LANYARD ASSEMBLY REPLACEMENT. SERVICE BULLETIN
MOS
20-JAN-2009
SB 737-52-1165 AFT ENTRY AND AFT GALLEY SERVICE DOOR - DOOR SNUBBER STOP LINK ASSEMBLY CHANGE. SERVICE BULLETIN
MOS
29-JUL-2008
SB 737-52-1165 RI AFT ENTRY AND AFT GALLEY SERVICE DOOR - DOOR SNUBBER STOP LINK ASSEMBLY CHANGE. SERVICE BULLETIN
MOS
15-JAN-2009
SB 737-52-1169 DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. SERVICE
BULLETIN
MOS
13-DEC-201I
SB 737-52-1169 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE INBOARD MLG DOOR FOR IDENTIFICATION
MOS
13-DEC-2011
AFL 51)03(s1
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 103 Of 748
Camp Systems
EFTA00618394
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.1L SERVICE BULLETIN A DETAILED INSPECTION OF THE LEFT INBOARD MLG DOOR FOR ANY CRACKS
MOS
13-DEC-2011
AFL 5500(s)
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.1R SERVICE BULLETIN A DETAILED INSPECTION OF THE RIGHT INBOARD MLG DOOR FOR ANY CRACKS
MOS
13-DEC-2011
AFL 5500 (5)
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.2L SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS ( ANY PART-THROUGH
CRACK IS FOUND.) LEFT MLG INBOARD DOOR
MOS
BF,'F (5)
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.2R SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE I LIMITS ( ANY PART-THROUGH
CRACK IS FOUND.) RIGHT MLG INBOARD DOOR
MOS
BF,F (so
SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.3L SERVICE BULLETIN THE LEFT INBOARD MLG DOOR AND PREFORM A DETAILED INSPECTION OF THE INBOARD MLG
DOOR FOR ANY CRACKS
MOS
BF,F (so
SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
2.3R SERVICE BULLETIN THE RIGHT INBOARD MLG DOOR AND PREFORM A DETAILED INSPECTION OF THE INBOARD MLG
DOOR FOR ANY CRACKS
MOS
BF,F (so
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.1L SERVICE BULLETIN A DETAILED INSPECTION OF THE LEFT INBOARD MLG DOOR FOR ANY CRACKS
MOS
13-DEC-2011
AFL 5503 (5)
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.1R SERVICE BULLETIN A DETAILED INSPECTION OF THE RIGHT INBOARD MLG DOOR FOR ANY CRACKS
MOS
31-DEC-2011
AFL 5503 (5)
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 104 Of 748
Camp Systems
EFTA00618395
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.2L SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS AND DETAILED
INSPECTION OF THE LEFT INBOARD MLG DOOR
MOS
BFIF (s)
SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.2R SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS AND DETAILED
INSPECTION OF THE RIGHT INBOARD MLG DOOR
MOS
BF/F (s)
SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.3L SERVICE BULLETIN THE LEFT INBOARD MLG DOOR DOOR WITH INBOARD MLG DOOR MADE FROM MACHINED
ALUMINUM. 113A8335-( ). OR INBOARD MLG DOOR MADE FROM CAST ALUMINUM. 113A8331-( ). AND DETAILED
INSPECTION
MOS
BFIF (s)
SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED
3.3R SERVICE BULLETIN THE RIGHT INBOARD MLG DOOR DOOR WITH INBOARD MLG DOOR MADE FROM MACHINED
ALUMINUM. 113A8335-( ). OR INBOARD MLG DOOR MADE FROM CAST ALUMINUM. 113A8331- ). AND DETAILED
INSPECTION
MOS
BFIF (s)
SB 737-52-1170 DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED
SERVICE BULLETIN
MOS
29-JUL-2014
SB 737-52-1170 T84. 1.1 DETAILED INSPECTION DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR RECOMMENDED
AND MODIFICATION. SERVICE BULLETIN OF MLG CENTER DOOR ASSEMBLY ATTACHMENTS (PART 2) FOR ANY
LOOSE. MISSING. DAMAGED OR BOTTOMED OUT BOLTS. OR ANY WEAR TO THE RETENTION CLIP ASSEMBLIES. OR IF
RETENTION CLIP ASSEMBLIES ARE NOT INSTALLED. FOR ANY LOOSE. MISSING OR DAMAGED BOLTS (ALL
AIRPLANES)
MOS
AFL 12000 (s)
SB 737-52-1170 TB11.2 DO DOORS -LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED
SERVICE BULLETIN PART 4: MLG CENTER DOOR ASSEMBLY ATTACHMENTS - REMOVAL! PART 5: MLG CENTER
DOOR ASSEMBLY RETENTION CLIP ASSEMBLIES - MODIFICATION f REPEAT PART -2 (IF CONDITION 1: NO LOOSE.
MISSING. DAMAGED OR BOTTOMED OUT BOLTS AND NO WEAR TO THE RETENTION CLIP ASSEMBLIES)
MOS
29-JUL-2014 BFIF
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 105 Of 748
@ Camp Systems
EFTA00618396
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-52-1170 TBL 1.3 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED
SERVICE BULLETIN PART 3 MLG CENTER DOOR ASSEMBLY ATTACHMENTS - REMOVAL AND BUSHING DETAILED
INSPECTION MEASUREMENT FOR EXCESSIVE WEAR. GALLING AND CRACKS (IF CONDITION 2: ANY LOOSE. MISSING.
DAMAGED OR BOTTOMED OUT BOLTS. OR ANY WEAR TO THE RETENTION CLIP ASSEMBLIES)
MOS
29-JUL-2014 BPIF
SB 737-52-1170 TBL 1.4 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED
SERVICE BULLETIN PART 7: BUSHING REMOVAL/ REPAIR. LUG MAGNETIC PARTICLE INSPECTION' REPAIR PART 5:
MLG CENTER DOOR ASSEMBLY RETENTION CLIP ASSEMBLIES - MODIFICATION PART 7: BUSHING REMOVAL]
REPAIR. LUG MAGNETIC PARTICLE INSPECTION' REPAIR PART 6: MLG CENTER DOOR ASSEMBLY BOLTS AND
RETENTION CLIP ASSEMBLIES - REPLACEMENT REPEAT PART 2 (IF CONDITION 3: ANY EXCESSIVE WEAR FOUND IN
THE INTERNAL DIAMETER OF THE BUSHING OR ANY GALLING FOUND OR ANY CRACK FOUND)
MOS
29-JUL-2014 BPIF
SB 737-52-1170 TBL 1.5 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED
SERVICE BULLETIN PART 5 MLG CENTER DOOR RETENTION CLIP ASSEMBLIES - MODIFICATION / PART 6: MLG
CENTER DOOR ASSEMBLY BOLTS AND RETENTION CLIP ASSEMBLIES - REPLACEMENT I REPEAT PART 2 (IF
CONDITION 4: NO EXCESSIVE WEAR FOUND IN THE INTERNAL DIAMETER OF THE BUSHING AND NO GALLING AND NO
CRACKS FOUND)
MOS
29-JUL-2014 BF.'F
SB 737-52-1173 FORWARD AIRSTAIR - STAIR TREAD - ANTI-SLIP MATERIAL EDGE SEAL MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
24-JUN-201•I • (s)
SB 737-52A1167 DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS - INSPECTION AND
REPLACEMENT. SERVICE BULLETIN
MOS (EFF)
01-DEC-201I
SB 737-52A1167 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS - INSPECTION RECOMMENDED
LMLG AND REPLACEMENT. SERVICE BULLETIN DETAILED INSPECTION OR HFEC INSPECTION OF THE LEFT INBOARD MLG
DOOR HINGE FITTINGS FOR CRACKS FOR AIRPLANES
MOS
AFL 1C000 10000
SB 737-52A1167 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS INSPECTION RECOMMENDED
RMLG AND REPLACEMENT. SERVICE BULLETIN DETAILED INSPECTION OR SURFACE HFEC INSPECTION OF THE RIGHT
INBOARD MLG DOOR HINGE FITTINGS FOR CRACKS
MOS
AFL 1C000 10000
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 106 Of 748
Camp Systems
EFTA00618397
AD/SI Status Report AIRCRAFT
CAMP
MionistAlmthermumlitli 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1217 SECTION 43 AND SECTION 47 - STIR 17 SKIN CRACKS AT STA 364-371 AND STA 890-900. SERVICE BULLETIN RECOMMENDED
MOS
09-AUG-2001
AFL 36000 (s)
SS 737-53-1219 FUSELAGE SECTION 44- S18A WEB FITTING FLANGE CRACKS. INSPECTION AND REPAIR, SERVICE BULLETIN RECOMMENDED
MOS
I6-AUG-2001
AFL 30000 30000
SS 737-53-1222 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R1). SERVICE SUPERSEDED
BULLETIN
MOS
06-JUN-2002
SS 737-53-1223 MAIN LANDING GEAR FAIRING REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
29-NOV-2001 - Is)
SS 737-53-1227 NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN RECERTIFY - INFORMATION REF TO R2
MOS
03-OCT-2002 - (s)
SS 737-53-1227 RI NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN - INFORMATION REF TO R2
MOS
26-AUG-2006
SS 737-53-1227 R2 FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING COMPUED WITH - TERMINATED
REPLACEMENT. SERVICE BULLETIN
MOS 22-AUG-2008
Id-NOV-2007 3260:48
AFL 782
SB 737-53-1227 R2 PARA REPLACE FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACE COMPUED WITH - REPLACEMENT
0 REPLACEMENT. SERVICE BULLETIN BUSHINGS
MOS 22-AUG-2008
Id-NOV-2007 3260:48
AFL 782
SS 737-53-1227 R2 PARA INSPECT FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING COMPUED WITH - MIGRATION FOUND /
E REPLACEMENT. SERVICE BULLETIN REPLACEMENT PERFORMED TERMINATING
ACTION
MOS 22-AUG-2008
3260:48
AFL 782
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 107 Of 748
@ Camp Systems
EFTA00618398
AD/SI Status Report AIRCRAFT
CAMP
Mianistfrn• thermiewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1227 R3 NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
18-NOV-2009
SB 737-53-1227 R3 PARA DETAILED INSPECTION NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN
E (DT INS) FOR CORROSION OF THE FITTINGS
MOS 3 (s)
SB 737-53-1227 R3 PARA INITIAL INSPECTION NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN RECOMMENDED
E (I INSP)
MOS
18-NOV-2009
AFL 2000(s)
SB 737-53-1227 R3 PARA REPLACE NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN BUSHING REPLACE
E (RPL)
MOS 12 (s)
18-NOV-2009
SB 737-53-1232 FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTATIVE MODIFICATION SUPERSEDED
(SUPERSEDED BY 737-53-1232 R1). SERVICE BULLETIN
MOS
SB 737-53-1232 RI FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTATIVE MODIFICATION SUPERSEDED
(SUPERSEDED BY SB 737-53-1232 R2). SERVICE BULLETIN
MOS
SB 737-53-1232 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS- INSPECTION. REPAIR AND PREVENTATIVE RECOMMENDED
MODIFICATION (SUPERSEDED BY SB 737-53-1232 R2). SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE
INSPECTION (NDI) FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT SPECIFIED LOCATIONS
MOS
AFL 35000 35000
SB 737-53-1232 R2 FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE RECOMMENDED
BULLETIN
MOS
26-JUL-2013
SB 737-53-1232 R2 TABLE EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND
1.01 PREVENTIVE MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NDI (EXT.MFECMCWC-SCAN/EXT.UTPA) FOR
CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT SPECIFIED LOCATIONS (FOR AIRPLANES WITHOUT
THE PREVENTATIVE MODIFICATION. TIME-LIMITED REPAIR OR PERMANENT REPAIR INSTALLED IN ACCORDANCE
WITH THIS SB)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 108 Of 748
@ Camp Systems
EFTA00618399
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
1.02 SERVICE BULLETIN ANY CRACK THAT IS FOUND IN THE SKIN
MOS
SB 737-53-1232 R2 TABLE INSPECT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
1A.01 SERVICE BULLETIN FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT THE SPECIFIED
LOCATIONS (FOR AIRPLANES WITH PREVENTATIVE MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SB AT OR BEFORE 30.000 TOTAL FC)
MOS
AFL
SB 737-53-1232 R2 TABLE INSPECT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
1A.02 SERVICE BULLETIN FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT THE SPECIFIED
LOCATIONS (FOR AIRPLANES WITH PREVENTATIVE MODIFICATION THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SB AFTER 30.000 TOTAL FC)
MOS
AFL
58 737-53-1232 R2 TABLE CONTACT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
1A.03 SERVICE BULLETIN BOEING AND ACCOMPLISH THE WORK INSTRUCTED (IF ANY CRACK IS FOUND IN THE SKIN)
MOS
58 737-53-1232 R2 TABLE HFEC FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
18.01.1 SERVICE BULLETIN INSPECTION FOR CRACKS (IF PREVENTATIVE MODIFICATION INSTALLED IN ACCORDANCE WITH
THIS SB)
MOS
AFL
58 737-53-1232 R2 TABLE DEATILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS- INSPECTION. REPAIR AND PREVENTIVE
18.01.2 MODIFICATION. SERVICE BULLETIN FOR CRACKS AND ANY LOOSE OR MISSING FASTENERS (IF PREVENTATIVE
MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS 58)
MOS
AFL
SB 737-53-1232 R2 TABLE CONTACT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
18.02 SERVICE BULLETIN BOEING AND ACCOMPLISH THE WORK INSTRUCTED (IF ANY CRACK FOUND IN THE SKIN)
MOS
SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
18.03 SERVICE BULLETIN THE LOOSE OR MISSING FASTENER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 109 Of 748
@ Camp Systems
EFTA00618400
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE
2.01.1.1 BULLETIN SKIN INSPECTION OPTION 1 - EXTERNAL LFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT
REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE
2.01.1.2 BULLETIN SKIN INSPECTION OPTION 1 - DOUBLER INSPECTION: EXTERNAL LFEC FOR CRACKS AND AN EXTERNAL
DETAILED INSPECTION FOR CRACKS AND LOOSE/MISSING FASTENERS (FOR AIRPLANES WITH THE PERMANENT
REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION, SERVICE
2.01.2.1 BULLETIN SKIN INSPECTION OPTION 2 - EXTERNAL LFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT
REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE
2.01.2.2 BULLETIN SKIN INSPECTION OPTION 2 - INTERNAL MFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT
REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE
2.01.2.3 BULLETIN SKIN INSPECTION OPTION 2 - DOUBLER INSPECTION: EXTERNAL LFEC FOR CRACKS AND AN EXTERNAL
DETAILED INSPECTION FOR CRACKS AND LOOSE/MISSING FASTENERS (FOR AIRPLANES WITH THE PERMANENT
REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
2.02 SERVICE BULLETIN ANY CRACK FOUND (IF ANY CRACK IS FOUND IN THE SKIN)
MOS
SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
2.03 SERVICE BULLETIN LOOSE AND MISSING FASTENERS (IF ANY LOOSE OR MISSING FASTENER)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 110 Of 748
@ Camp Systems
EFTA00618401
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 737-53-1232 R2 TABLE INTERNAL FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
3.01.1 SERVICE BULLETIN / EXTERNAL DETAILED INSPECTION OF A TIME-LIMITED REPAIR FOR CRACKS AND LOOSE OR
MISSING FASTENERS (FOR AIRPLANES WITH THE TIME-LIMITED REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
3.01.2 SERVICE BULLETIN THE TIME-LIMITED REPAIR WITH THE PERMANENT REPAIR (FOR AIRPLANES WITH THE
TIME-LIMITED REPAIR INSTALLED IN ACCORDANCE WITH THIS SB)
MOS
AFL
SB 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
3.02 SERVICE BULLETIN ANY CRACK FOUND IN THE SKIN
MOS
SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION.
3.03 SERVICE BULLETIN LOOSE AND MISSING FASTENERS
MOS
SB 737-53-1232 TABLE 1 AIRPLANES WITHMJTHOUT THE PREVENTATIVE MODIFICATION INSTALLED. (SUPERSEDED BY 737-53-1232 RI). SUPERSEDED
SERVICE BULLETIN
MOS
- (s)
SB 737-53-1232 TABLE 2 AIRPLANES WITH THE PERMANENT REPAIR INSTALLED. (SUPERSEDED BY 737-53-1232 RI). SERVICE BULLETIN SUPERSEDED NOT APPLICABLE
MOS
- (s)
SB 737-53-1232 TABLE 3 AIRPLANES WITH THE TIME-LIMITED REPAIR INSTALLED. INTERNAUEXTEFtNAL DETAILED INSPECTION OF A NOT APPLICABLE
TIME-LIMITED REPAIR FOR CRACKS AND LOOSE OR MISSING FASTENERS AS GIVEN IN -PART IV - TIME-LIMITED
REPAIR'.. SERVICE BULLETIN
MOS
02-APR-2007
AFL 2500 (s)
SB 737-53-1233 INSPECTION AND REPLACEMENT OF KEEL BEAM LOWER CHORD FORWARD SPLICE AT STATION 535. SERVICE
BULLETIN
DAYS 30 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 111 Of 748
@ Camp Systems
EFTA00618402
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1233 RI INSPECTION AND REPLACEMENT OF KEEL BEAM LOWER CHORD FORWARD SPLICE AT STATION 535. SERVICE COMPUED WITH - REPLACEMENT
BULLETIN
MOS 18 (s) 25-JUL-2002
28-FEB-2002 1057:48
AFL 271
SB 737-53-1236 AIRSTAIR DOORSTOP INTERCOSTAL - INSPECTION AND FASTENER REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
I I -JUL-2002
AFL 24000 (0
SB 737-53-1236 RI FUSELAGE - AIRSTAIR DOORSTOP INTERCOSTAL - INSPECTION AND FASTENER REPLACEMENT. SERVICE BULLETIN COMPUED WITH
MOS 29-AUG-2011
10-NOV-2005 -(s) 3533:32
AFL 863
SB 737-53-1237 FASTENER REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
04-DEC-2003
SB 737-53-1237 RI FUSELAGE - WING TO BODY FAIRING - WHEEL WELL - BONDED PANEL (BOW-TIE PANEL) - FASTENER REPLACEMENT.
SERVICE BULLETIN
MOS
07-DEC-2006
SB 737-53-1239 KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN
MOS
22-AUG-2002
SB 737-53-1239 RI KEEL CHORD SPLICE WASHERS. BOLTS. AND NUTS REPLACEMENT. SERVICE BULLETIN
MOS 6 (s)
I4-AUG-2003
SB 737-53-1239 R2 FUSELAGE - KEEL BEAM LOWER CHORDS - FORWARD AND AFT SPLICES AT STATIONS 540 AND 727 - KEEL CHORD
SPLICE WASHERS. BOLTS. AND NUTS REPLACEMENT. SERVICE BULLETIN
MOS 6 (s)
28-APR-2005
SB 737-53-1239(A) INSPECT KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN
MOS 6 (s)
22-AUG-2002
SB 737-53-1239(E) REPLACE KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN
MOS 6 (s)
22-AUG-2002
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 112 Of 748
@ Camp Systems
EFTA00618403
AD/SI Status Report AIRCRAFT
COMP up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1243 AUTOMATIC OVERWING EXIT DOUBLERS (BEARSTRAPS) INSPECTION INTERVAL CHANGE. SERVICE BULLETIN RECOMMENDED
MOS
26-SEP-2002
AFL 75000 (s)
SB 737-53-1244 PIVOT LINK ASSEMBLY REPAIR/REPLACE, SERVICE BULLETIN
MOS
SB 737-53-1244 RI PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN
MOS
SB 737-53-1244 RI (8)2 REPLACE PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTENERS
MOS
AFL 10000 (s)
SB 737-53-1244 R2 PIVOT LINK ASSEMBLY REPAIRIREPLACE. SERVICE BULLETIN
MOS 12 (s)
15-MAR-2007
SB 737-53-1244 R2 (8)1 INSPECT PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTNERS
MOS
15-MAR-2007
AFL WOO (s)
SB 737-53-1244 R2 (8)2 REPLACE PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTNERS
MOS
15-MAR-2007
AFL 10000 (s)
SB 737-53-1244 R4 FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540 - PIVOT LINK ASSEMBLY REPAIR/REPLACE SUPERSEDED
(SUPERSEDED BY S8 737-53-1244 R5), SERVICE BULLETIN
MOS
SB 737-53-1244 RS FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540 - PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE
BULLETIN
MOS
27-JUL-2011
SB 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED
1.1 SERVICE BULLETIN NEW PIVOT LINK - NO CHANGES TO PIVOT LINK STRUCTURE AND PASSENGER SEATS HAVE NOT
BEEN MOVED AFTER AIRPLANE DELIVERY
MOS 12(s)
I 7-APR-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 113 Of 748
@ Camp Systems
EFTA00618404
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1244 R5 TABLE ACCOMPLISH FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY RECOMMENDED
1.2 REPAIR/REPLACE. SERVICE BULLETIN MOVE THE SEATS - NO CHANGES TO PIVOT LINK STRUCTURE AND
PASSENGER SEATS HAVE NOT BEEN MOVED AFTER AIRPLANE DELIVERY
MOS 12 (s)
I 7-APR-2003
58 737-53-1244 RS TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY FtEPAIRJREPLACE. RECOMMENDED
1.3 SERVICE BULLETIN BLIND CENTERLINE FASTNERS IN THE SEAT TRACK
MOS 12 (s)
17-APR-2003
SB 737-53-1244 R5 TABLE INSPECT FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540 - PIVOT UNK ASSEMBLY REPAIR/REPLACE. RECOMMENDED
1.3.1 SERVICE BULLETIN BLIND FASTENERS
MOS
AFL 3800 (s)
SB 737-53-1244 RS TABLE REPLACE FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED
1.3.2 SERVICE BULLETIN BLIND FASTENERS WITH SOLID FASTENERS
MOS
AFL 10000 (s)
58 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED
1.4 SERVICE BULLETIN SOLID CENTERLINE FASTNERS IN THE SEAT TRACK
MOS 12 (s)
17-APR-2003
58 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED
1.5 SERVICE BULLETIN NEW PIVOT LINK
MOS 60 (s)
27-JUL-2011
SB 737-53-1245 HIGH PRESSURE DOOR AND DOUBLER-REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
05-AUG-2004
SB 737-53-1249 FUSELAGE - FRAMES AND BULKHEADS - BODY STATION 1016 AFT PRESSURE BULKHEAD - VERTICAL FIN
ATTACHMENT FITTINGS -BOLT HOLE INSPECTION AND REPAIR. SERVICE BULLETIN
MOS
16-NOV-2006
AFL 36000 (s)
SB 737-53-1251 AFT PRESSURE BULKHEAD APEX INSPECTION. SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2008
03-JUN-2004 3260:48
AFL 4000 (s) 782
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 114 Of 748
@ Camp Systems
EFTA00618405
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1252 FUSELAGE - STABILIZER CENTER SECTION FRONT SPAR - SLIDING SEAL AND TRACK MODIFICATION. SERVICE
BULLETIN
MOS
13-OCT-2005
SB 737-53-1252 RI FUSELAGE - STABILIZER CENTER SECTION FRONT SPAR - SLIDING SEAL AND TRACK MODIFICATION.. SERVICE
BULLETIN
MOS
15-FEB-2007
SB 737-53-1256 CHEMICAL MILL PITTING AT S-4 LAP SPLICE. SERVICE BULLETIN RECOMMENDED
MOS
18-SEP-2003
SB 737-53-1264 FUSELAGE - FILLET FAIRINGS - AFT WING-TO-BODY FAIRING - INBOARD FLAP PRIMARY TORQUE TUBE
INSPECTION/REPAIR AND AFT WING-TO-BODY FAIRING MODIFICATION. SERVICE BULLETIN
MOS
04-MAY-2006
SB 737-53-1264 RI FUSELAGE - FILLET FAIRINGS - AFT WING-TO-BODY FAIRING - INBOARD FLAP PRIMARY TORQUE
TUBE INSPECTION/REPAIR AND AFT WING-TO-BODY FAIRING MODIFICATION, SERVICE BULLETIN
MOS
24-JAN-2008
SB 737-53-1276 FUSELAGE - FORWARD AND AFT CARGO COMPARTMENT- CORROSION PREVENTION MODIFICATION (SUPERSEDED SUPERSEDED
BY SB 737-53-1276 RI), SERVICE BULLETIN
MOS
SB 737-53-1276 RI FUSELAGE - FORWARD AND AFT CARGO COMPARTMENT - CORROSION PREVENTION MODIFICATION. SERVICE RECOMMENDED
BULLETIN
MOS
01-AUG-2014 -
SB 737-53-1277 FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - NOSE WHEEL WELL RETRACT ACTUATOR SUPPORT FITTING SUPERSEDED
INSPECTION AND MODIFICATION (SUPERSEDED BY 737-53-1277 R1). SERVICE BULLETIN
MOS
14-NOV-2007
SB 737-53-1277 RI FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - NOSE WHEEL WELL RETRACT ACTUATOR SUPPORT FITTING
INSPECTION AND MODIFICATION. SERVICE BULLETIN
MOS
14-MAY-2010
SB 737-53-1280 FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN
MOS
22-MAY-2008
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 115 Of 748
@ Camp Systems
EFTA00618406
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1280 OPTION 1 INSTALL FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN
MODIFICATION AS GIVEN IN PARAGRAPH 3.8.. WORK INSTRUCTIONS
MOS 24 (s)
22-MAY-2008
SB 737-53-1280 OPTION 2 INSPECT FUSELAGE- FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE
(A) BULLETIN AS GWEN IN PARAGRAPH 3.8.. WORK INSTRUCTIONS
MOS 24 (5)
22-MAY-2008
SB 737-53-1280 OPTION 2 INSTALL FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN
(3) MODIFICATION AS GIVEN IN PARAGRAPH 3.8., WORK INSTRUCTIONS
MOS 72 (s)
22-MAY-2008
SB 737-53-1282 FUSELAGE - WHEEL WELL - NOSE WHEEL UPPER DRAG BRACE AND TRUNNION BUSHING
REPLACEMENT. SERVICE BULLETIN
MOS
14-NOV-2007
SB 737-53-1282 RI FUSELAGE - WHEEL WELL - NOSE WHEEL UPPER DRAG BRACE AND TRUNNION BUSHING COMPLIED WITH
REPLACEMENT. SERVICE BULLETIN
61OS 22-AUG-2008
14-MAR-2008 3260:48
AFL 782
SB 737-53-1285 FUSELAGE - PASSENGER CABIN FLOORS - SECTIONS 41 AND 47 - ADDITION OF GEL TAPE TO PREVENT CORROSION SUPERSEDED
OF PASSENGER CABIN FLOOR PANEL SUPPORT STRUCTURE (SUPERSEDED BY SB 737-53-1285 RI ). SERVICE
BULLETIN
MOS
58 737-53-1285 RI FUSELAGE - PASSENGER CABIN FLOORS - SECTIONS 41 AND 47 - ADDITION OF GEL TAPE TO PREVENT CORROSION RECOMMENDED
OF PASSENGER CABIN FLOOR PANEL SUPPORT STRUCTURE. SERVICE BULLETIN
MOS
23-JUL-2014
58 737-53-1294 FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE SUPERSEDED
INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SI3 737-53-1294 RI ). SERVICE BULLETIN
MOS
58 737-53-1294 RI FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE RECOMMENDED
INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN
MOS (EFF)
12-JUN-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 116 Of 748
@ Camp Systems
EFTA00618407
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION.
1.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN AND A HIGH FREQUENCY EDDY CURRENT
(HFEC) INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA
540 BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 (AIRPLANES WITH LESS THAN 27.500 TOTAL FLIGHT
CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN)
MOS
SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION.
1.2 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN AND A HFEC INSPECTION OF THE SKIN FOR
CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540 BULKHEAD CHORDS BETWEEN
STRINGER S-22 AND S-23 (AIRPLANES WITH 27.500 OR MORE TOTAL FLIGHT CYCLES AS OF THE ORIGINAL ISSUE
DATE OF THIS SERVICE BULLETIN)
MOS
58 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE
1.3 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKING ON LEFT SIDE (AND) DO THE PREVENTIVE
MODIFICATION ON THE RIGHT SIDE (IF ANY CRACK IS FOUND IN THE SKIN ON THE LEFT SIDE OF THE AIRPLANE AND
NO CRACK IS FOUND ON THE RIGHT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE
1.4 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKING ON RIGHT SIDE (AND) DO THE PREVENTIVE
MODIFICATION ON THE LEFT SIDE (IF ANY CRACK IS FOUND IN THE SKIN ON THE RIGHT SIDE OF THE AIRPLANE AND
NO CRACK IS FOUND ON THE LEFT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE
1.5 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKS (IF ANY CRACK IS FOUND IN THE SKIN ON BOTH
SIDES OF THE AIRPLANE)
MOS
58 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION.
2.1.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER
UNDER THE DRAG LINK ASSEMBLY FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE
LEFT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD
2.1.2 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN EXTERNAL LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTION OF THE SKIN AND DOUBLER AND AN EXTERNAL HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION
OF THE TRIPLER FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE
AIRPLANE)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 117 Of 748
@ Camp Systems
EFTA00618408
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD
2.1.3 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SKIN FOR
CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD
2.1.4 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SPLICE PLATE
AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON
THE LEFT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION.
2.2.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER
UNDER THE DRAG LINK ASSEMBLY FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE
RIGHT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD
2.2.2 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN EXTERNAL LFEC INSPECTION OF THE SKIN AND
DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIPLER FOR CRACKING (ALL AIRPLANES THAT HAVE DONE
THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD
2.2.3 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SKIN FOR
CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD
2.2.4 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SPLICE PLATE
AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON
THE RIGHT SIDE OF THE AIRPLANE)
MOS
SB 737-53-1294 RI TABLE CONTACT FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPUCE
2.3 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN BOEING FOR INSTRUCTIONS AND DO THE WORK (ANY CRACK
IS FOUND)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 118 Of 748
@ Camp Systems
EFTA00618409
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1294 TABLE 1.1 DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. RECOMMENDED
CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN AND A
HFEC INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540
BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 FOR AIRPLANES WITH LESS THAN 27.500 TOTAL FLIGHT
CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN
MOS
31-MAR-2011
AFL 2000 (s)
SB 737-53-1294 TABLE 1.2 DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. RECOMMENDED
CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN AND A
HFEC INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540
BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 FOR AIRPLANES WITH 27.500 OR MORE TOTAL FLIGHT
CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN.
MOS
31-MAR-2011
AFL 750(s)
SB 737-53-1294 TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. RECOMMENDED
2.1.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN OF THE
SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING FOR ALL AIRPLANES THAT
HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE
MOS
AFL 2500 (s)
SB 737-53-1294 TABLE HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.1.2 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN EXTERNAL INSPECTION
OF THE SKIN AND DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIFLER FOR CRACKING FOR ALL
AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE
MOS
AFL SCO0 (s)
SB 737-53-1294 TABLE HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.1.3 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN INTERNAL INSPECTION
OF THE SKIN FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE
AIRPLANE
MOS
AFL 5000 (s)
SB 737-53-1294 TABLE HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.1.4 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN INTERNAL INSPECTION
OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING FOR ALL AIRPLANES THAT HAVE
DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE
MOS
AFL 5000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 119 Of 748
@ Camp Systems
EFTA00618410
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1294 TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. RECOMMENDED
2.2.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN OF THE
SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING FOR ALL AIRPLANES THAT
HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE
MOS
AFL 2500 (5)
SB 737-53-1294 TABLE LFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.2.2 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN EXTERNAL INSPECTION
OF THE SKIN AND DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIPLER FOR CRACKING FOR ALL
AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE
MOS
AFL 5000 (s)
SB 737-53-1294 TABLE HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.2.3 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN INTERNAL INSPECTION
OF THE SKIN FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE
AIRPLANE
MOS
AFL 5000 (s)
SB 737-53-1294 TABLE HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE RECOMMENDED
2.2.4 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN INTERNAL INSPECTION
OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING FOR ALL AIRPLANES THAT HAVE
DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE
MOS
AFL 5000(s)
SB 737-53-1295 RI FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT SUPERSEDED
(SUPERSEDED BY 93 737-53-1295 R2). SERVICE BULLETIN
MOS
SB 737-53-1295 R2 FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT. RECOMMENDED
SERVICE BULLETIN
MOS
18-JUN-20I3
SB 737-53-1295 R2 TABLE EXTERNAL - DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER I WINDOW FRAME AND
1.1.1 WINDSHIELD ASSEMBLY REPLACEMENT. SERVICE BULLETIN OF THE CROWN SKIN FOR CORROSION (GROUP 1.
CONFIGURATION 6: GROUP 2. CONFIGURATION 4) (ALL AIRPLANES)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 120 Of 748
@ Camp Systems
EFTA00618411
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1295 R2 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD
1.1.2 ASSEMBLY REPLACEMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS (GROUP 1.
CONFIGURATION 6: GROUP 2. CONFIGURATION 4) (ALL AIRPLANES)
MOS
- (s)
SB 737-53-1295 R2 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY
1.2 REPLACEMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED (IF
CORROSION IS FOUND)
MOS
SB 737-53-1295 R2 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD
2.1 ASSEMBLY REPLACEMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS (ALL AIRPLANES)
MOS
- Is)
SB 737-53-1295 R2 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY
2.2 REPLACEMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED (IF
CORROSION IS FOUND)
MOS
SB 737-53-1296 FUSELAGE - PASSENGER CABIN FLOORS - STATION 7278 SPLICE STRAP INSTALLATION. SERVICE BULLETIN
MOS
11-JAN-2011
SB 737-53-1296 TABLE 1.1 REPLACE FUSELAGE - PASSENGER CABIN FLOORS - STATION 727B SPLICE STRAP INSTALLATION. SERVICE RECOMMENDED
BULLETIN SEAT TRACK BOLTS FOR ALL AIRPLANES
MOS 24 (s)
11-JAN-2011
SB 737-53-1296 TABLE 1.2 DETAILED INSPECTION FUSELAGE - PASSENGER CABIN FLOORS - STATION 7278 SPLICE STRAP INSTALLATION. RECOMMENDED
SERVICE BULLETIN AND HFEC INSPECTION OF SPLICE STRAP AND FORWARD SEAT TRACK FOR ALL AIRPLANES
MOS 24 (s)
11-JAN-2011
SB 737-53-1297 FUSELAGE - EQUIPMENT ATTACHMENT FITTINGS- AFT CARGO WASTE TANK ENCLOSURE - STANCHION RECOMMENDED
MODIFICATION. SERVICE BULLETIN
MOS
03-SEP-2010
SB 737-53-1298 FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007- INSPECTION. SERVICE
BULLETIN
MOS
27-AUG-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 121 Of 748
@ Camp Systems
EFTA00618412
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1298 TABLE INSPECTION FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007- RECOMMENDED
1.1/2 INSPECTION. SERVICE BULLETIN OF THE DORSAL FIN LOWER SEAL RETAINERS FOR CONTACT WITH THE FUSELAGE
SKIN BETWEEN STA 847 AND STA 1007 IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 1 FOR
ALL AIRPLANES
MOS 24 (s)
27-AUG-2010
AFL 4000
SB 737-53-1298 TABLE 1.6 MODIFY FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007 - INSPECTION. RECOMMENDED
SERVICE BULLETIN THE LOWER AND VERTICAL SEALS IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK
INSTRUCTIONS. PART 5 FOR AIRPLANES THAT HAVE NOT MODIFIED THE LOWER AND VERTICAL SEALS OR.
REPLACED THE LOWER SEAL IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4.
MOS 24 (s)
27-AUG-20I0
AFL 4000
SB 737-53-1303 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED
INSTALLATION (SUPERSEDED BY SB 737-53-1303 RI). SERVICE BULLETIN
MOS
513 737-53-1303 RI FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG RECOMMENDED
INSTALLATION. SERVICE BULLETIN
MOS
06-MAY-2014
513 737-53-1303 RI TBL HIGH FREQUENCY EDDY CURRENT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME -
1.1 INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN (HFEC) INSPECTION OF THE AFFECTED NUMBER
3 WINDOW FRAME FASTENER HOLES FOR CRACKS. COLD WORK AND INSTALL FREEZE PLUGS IN AFFECTED
NUMBER 3 WINDOW FRAME HOLES
MOS
AFL
513 737-53-1303 RI TBL INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE RECOMMENDED
1.2 PLUG INSTALLATION. SERVICE BULLETIN TEMPORARY REPAIR STRAP OR INSTALL THE NUMBER 3 WINDOW FRAME
PERMANENT REPAIR (ANY CRACK INDICATION FOUND)
MOS
06-MAY-2014 BFIF
SB 737-53-1303 RI TBL REPLACE FUSELAGE- STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME- INSPECTION AND FREEZE RECOMMENDED
1.3 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME OR INSTALL THE NUMBER 3 WINDOW
FRAME PERMANENT REPAIR (IF ANY CRACK FOUND BEYOND THE TEMPORARY REPAIR STRAP INSTALLATION
UMITS)
MOS
06-MAY-2014 BF/F
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 122 Of 748
@ Camp Systems
EFTA00618413
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1303 RI TBL EXTERNAL - DETAILED INSPECTION FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME -
INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN OF THE TEMPORARY REPAIR STRAP FOR
CORROSION AND ANY OTHER NICKS. GAPS. LOOSE FASTENERS OR MISSING SEALANT (IF TEMPORARY REPAIR
STRAP INSTALLED)
MOS
- (s)
SB 737-53-1303 RI TBL REPLACE FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE
1.4.2 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME (IF TEMPORARY REPAIR STRAP
INSTALLED)
MOS
- Is)
SB 737-53-1303 RI TBL EXTERNAL - DETAILED INSPECTION FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME -
1.5.1 INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN OF THE TEMPORARY REPAIR STRAP FOR
CORROSION AND ANY OTHER NICKS. GAPS. LOOSE FASTENERS OR MISSING SEALANT (IF TEMPORARY REPAIR
STRAP OPTION 2 WITH STRAIGHT LINE FASTENER PATTERN INSTALLED)
MOS
- (s)
SB 737-53-1303 RI TBL INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE
1.5.2 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINOW FRAME PERMANENT REPAIR OR REPLACE THE
NUMBER 3 WINDOW FRAME (IF TEMPORARY REPAIR STRAP OPTION 2 WITH STRAIGHT LINE FASTENER PATTERN
INSTALLED)
MOS
- (s)
SB 737-53-1303 RI TBL REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE RECOMMENDED
1.6 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME OR INSTALL THE NUMBER 3 WINDOW
FRAME PERMANENT REPAIR (IF ANY CRACK FOUND AROUND THE NUMBER 3 WINDOW FRAME REPAIR FASTENERS
COMMON TO THE TEMPORARY REPAIR STRAP)
MOS
OS-MAY-20M BF/F
SB 737-53-1303 TABLE 1.1 HFEC FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED
INSTALLATION (SUPERSEDED BY SB 737-53-1303 R1). SERVICE BULLETIN INSPECTION OF THE AFFECTED NUMBER 3
WINDOW FRAME FASTENER HOLES FOR CRACKS. COLD WORK AND INSTALL FREEZE PLUGS IN AFFECTED NUMBER
3 WINDOW FRAME HOLES FOR ALL AIRPLANES
MOS
- Is)
SB 737-53-1303 TABLE HFEC FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED
1.4.1 INSTALLATION (SUPERSEDED BY SB 737-53-1303 R1). SERVICE BULLETIN - INTERNAL INSPECTION OF THE NUMBER 3
WINDOW FRAME MOUND THE REPAIR FASTENERS COMMON TO THE TEMPORARY REPAIR STRAP FOR CRACKS AND
DO A GENERAL VISUAL INSPECTION OF THE TEMPORARY REPAIR STRAP FOR TEMPORARY REPAIR STRAP
INSTALLED AIRPLANES
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 123 Of 748
@ Camp Systems
EFTA00618414
AD/SI Status Report AIRCRAFT
COMP
Mien winin Mernund 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1303 TABLE REPLACE FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE SUPERSEDED
1.4.2 PLUG INSTALLATION (SUPERSEDED BY SB 737-53-1303 RI). SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME
MOS
-
S8 737-53-1307 FUSELAGE - FILLET FAIRINGS - AFT WING TO BODY FAIRING - PANEL 194E AND AFT CENTER WHEEL WELL PANEL RECOMMENDED
193D - INSPECTION AND REWORK. SERVICE BULLETIN
MOS
12-JAN-2012
SB 737-53-1307 TABLE 1.1 PERFORM FUSELAGE - FILLET FAIRINGS - AFT WING TO BODY FAIRING - PANEL 194E AND AFT CENTER WHEEL WELL RECOMMENDED
PANEL 193D - INSPECTION AND REWORK. SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE LOWER AFT
WING TO BODY FAIRING PANEL AND SUPPORT STRUCTURE
MOS 24 (s)
12-JAN-2012
SB 737-53-1307 TABLE 1.4 PERFORM FUSELAGE - FILLET FAIRINGS -AFT WING TO BODY FAIRING -PANEL 194E AND AFT CENTER WHEEL WELL RECOMMENDED
PANEL 193D - INSPECTION AND REWORK. SERVICE BULLETIN THE PANEL AND SUPPORT STRUCTURE REWORK
MOS 72 (s)
12-JAN-2012
SB 737-53-1310 FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION RECOMMENDED
. SERVICE BULLETIN
MOS
20-OCT-2011
SB 737-53-1310 TABLE 1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL DETAILED INSPECTION AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI)
FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS OPTION 1 OR OPTION 2
FOR ALL AIRPLANES
MOS
20-OCT-2011
AFL 1500(s)
SB 737-53-1310 TABLE 2.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS
COMMON TO THE MODIFICATION DOUBLER OPTION 1 OR OPTION 2 FOR AU. EXTERNAL MODIFICATIONS INSTALLED
IN ACCORDANCE WITH THIS SERVICE BULLETIN
MOS
AFL 50000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 124 Of 748
@ Camp Systems
EFTA00618415
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1310 TABLE 2.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF
FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS
INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN
MOS
AFL 50000 (s)
SB 737-53-1310 TABLE 3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF
FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS
INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN
MOS
AFL 50000 (s)
SB 737-53-1310 TABLE 4 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF
FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS
INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN
MOS
AFL 50000 (s)
58 737-53-1310 TABLE 5.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT
THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN
ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES
MOS
AFL 50000 (s)
SB 737-53-1310 TABLE 5.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES
MOS
AFL 43000 (s)
SB 737-53-1310 TABLE 5.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NDI - FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES
MOS
AFL 5500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 125 Of 748
@ Camp Systems
EFTA00618416
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1310 TABLE 6.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT
THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN
ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES
MOS
AFL 50000 (s)
513 737-53-1310 TABLE 6.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES
MOS
AFL 5500 (s)
SB 737-53-1310 TABLE 6.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN DO AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES
MOS
AFL 5500(s)
513 737-53-1310 TABLE 7.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT
THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN
ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES
MOS
AFL 50000 (s)
SB 737-53-1310 TABLE 7.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES
MOS
AFL 5500(s)
SB 737-53-1310 TABLE 7.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED
MODIFICATION
. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE
SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS
SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES
MOS
AFL 5500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 126 Of 748
@ Camp Systems
EFTA00618417
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1311 FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION. NOT APPLICABLE - N/A BY AIRCRAFT MODEL
SERVICE BULLETIN
MOS 28-MAY-20I3
21-OCT-201I 3714:04
AFL 900
SB 737-53-1311 TABLE 1 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEK1-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE
INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS FOR
ALL AIRPLANES
MOS 28-MAY-20I3
21-OCT-2011 - (s) 3714:04
AFL 900
SB 737-53-1311 TABLE 2 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE
INSPECTION (NDI) OF THE FUSELAGE SKIN FOR CRACKING AT THE CHEM-MILL STEPS COMMON TO SHEAR WRINKLE
AREAS FOR ALL AIRPLANES. GROUP 2.5-6
MOS 28-MAY-2013
21-OCT-2011 -(s) 3714:04
AFL 900
SB 737-53-1311 TABLE 3.1 NON DESTRUCTIVE FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
AND MODIFICATION. SERVICE BULLETIN INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW
OF FASTENERS COMMON TO THE MODIFICATION DOUBLER FOR ALL EXTERNAL MODIFICATIONS INSTALLED IN
ACCORDANCE WITH THIS SERVICE BULLETIN
MOS 28-MAY-2013
- (s) 3714:04
AFL 900
SB 737-53-1311 TABLE 3.2 EXTERNAL INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW
OF FASTENERS COMMON TO THE MODIFICATION FILLER FOR ALL INTERNAL MODIFICATIONS INSTALLED IN
ACCORDANCE WITH THIS SERVICE BULLETIN
MOS 28-MAY-2013
- (s) 3714:04
AFL 900
SB 737-53-1311 TABLE 4.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE
FUSELAGE
SKIN AT THE CHEM-MILL STEP FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 127 Of 748
@ Camp Systems
EFTA00618418
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1311 TABLE 4.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL
STEP
AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43,000 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
SB 737-53-1311 TABLE 4.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL
STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE
WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
SB 737-53-1312 FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION. NOT APPLICABLE - N/A BY AIRCRAFT MODEL
SERVICE BULLETIN
MOS 28-MAY-2013
21-OCT-2011 3714:04
AFL 900
SB 737-53-1312 RI FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS- INSPECTION AND MODIFICATION. RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
SERVICE BULLETIN
MOS 28-MAY-2013
I4-MAR-2012 3714:04
AFL 900
SB 737-53-1312 TABLE 1 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE
INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS AND
OPTION 1(OR) OPTION 2 FOR ALL AIRPLANES
MOS 28-MAY-2013
21-OCT-2011 -(s) 3714:04
AFL 900
SB 737-53-1312 TABLE 2 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE
INSPECTION (NDI) OF THE FUSELAGE SKIN FOR CRACKING AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS AND
OPTION 1(OR) OPTION 2 FOR ALL AIRPLANES
MOS 28-MAY-2013
21-OCT-2011 -(s) 3714:04
AFL 900
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 128 Of 748
@ Camp Systems
EFTA00618419
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1312 TABLE 3 EXTERNAL INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW
OF FASTENERS COMMON TO THE MODIFICATION FILLER AND OPTION 1 (OR) OPTION 2 FOR ALL INTERNAL
MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN
MOS 28-MAY-2013
- (s) 3714:04
AFL 900
SB 737-53-1312 TABLE 4.1 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE
FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT
WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN
BEFORE 32.000 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
SB 737-53-1312 TABLE 4.2 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP
AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
SB 737-53-1312 TABLE 4.3 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL
MODIFICATION. SERVICE BULLETIN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP
AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH
THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES
MOS 28-MAY-2013
3714:04
AFL 5500 (s) 900
SB 737-53-1316 FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT SUPERSEDED
AND HEAD UP DISPLAY REALIGNMENT (SUPERSEDED BY SB 737-53-1316 R1). SERVICE BULLETIN
MOS
SB 737-53-1316 RI FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT RECOMMENDED
AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN
MOS
03-JUL-2013
SB 737-53-1316 RI TABLE EXTERNAL - DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND
1.1.1 WINDSHIELD ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN OF THE CROWN
SKIN FOR CORROSION FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 6)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 129 Of 748
@ Camp Systems
EFTA00618420
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1316 R1 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD
1.1.2 ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN FOR CORROSION AND
INSTALL NEW FASTENERS FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 6)
MOS
SB 737-53-1316 RI TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY
1.2 REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND
DO THE WORK INSTRUCTED BY BOEING IF CORROSION IS FOUND (GROUP 1. CONFIGURATION 6)
MOS
SB 737-53-1316 RI TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD
2.1 ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN FOR CORROSION AND
INSTALL NEW FASTENERS FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 5)
MOS
SB 737-53-1316 RI TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY
2.2 REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND
DO THE WORK INSTRUCTED BY BOEING IF CORROSION IS FOUND (GROUP 1. CONFIGURATION 5)
MOS
SB 737-53-1326 FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN RECOMMENDED
MOS
26-OCT-2012
SB 737-53-1326 TABLE 1.1 INSPECTION FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN RECOMMENDED
OF THE FORWARD AND AFT CARGO COMPARTMENTS SIDEWALL PANELS FOR ALL AIRPLANES
MOS 24 (5)
26-OCT-2012
SB 737-53-1326 TABLE 1.2 REMOVE FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN RECOMMENDED
AND REPLACE ALUMINUM SIDEWALL LININGS
MOS 60 (s)
26-OCT-2012
SB 737-53-1330 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
SERVICE BULLETIN
MOS
26-FEB-2013
SB 737-53-1330 RI FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
SERVICE BULLETIN
MOS
10-JUN-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 130 Of 748
@ Camp Systems
EFTA00618421
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1330 TABLE 1 DO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
(1.1.1) SERVICE BULLETIN A HFEC INSPECTION OF THE CRACK IN THE NUMBER 1 WINDOW FRAME TO DETERMINE IF THE
CRACK HAS GROWN BEYOND THE ALLOWABLE STOP DRILL REGION AND STOP DRILL THE CRACK IF WITHIN THE
ALLOWABLE STOP DRILL REGION
MOS
BF/F
SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
(1.1.2) SERVICE BULLETIN A HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION ABOVE AND BELOW THE CRACKED
NUMBER 1 WINDOW FRAME AROUND THE FASTENERS THAT HOLD THE NUMBER 1 AND NUMBER 2 WINDOW FRAMES
TOGETHER
MOS
BF/F
SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
(1.1.3) SERVICE BULLETIN A DETAILED INSPECTION OF THE AREA TWO INCHES ABOVE AND BELOW THE CRACK
MOS
BF/F
SB 737-53-1330 TABLE 1 INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED
(1.1.4) REPAIR. SERVICE BULLETIN THE TEMPORARY REPAIR DOUBLER ON THE NUMBER 1 WINDOW FRAME
MOS
BF/F
SB 737-53-1330 TABLE 1 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED
(1.2) REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING. FOR
CRACK FOUND OUTSIDE OF THE UPPER AFT CORNER AREA OF THE NUMBER 1 WINDOW FRAME
MOS
BF1F
SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED
(1.3.1) SERVICE BULLETIN AN EXTERNAL DETAILED INSPECTION FOR CORROSION AND ANY OTHER NICKS. GAPS. LOOSE
FASTENERS OR MISSING SF41 ANT FOR TEMPORARY REPAIR DOUBLER INSTALLED
MOS 6 (s)
SB 737-53-1330 TABLE 1 REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER I WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED
(1.3.2) REPAIR. SERVICE BULLETIN THE NUMBER 1 WINDOW FRAME FOR TEMPORARY REPAIR DOUBLER INSTALLED
MOS 24 (s)
AFL 6000
SB 737-53-1330 TABLE 1 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED
(1.4) REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING FOR
ANY CRACK FOUND AROUND THE NUMBER 1 WINDOW FRAME FASTENERS COMMON TO THE TEMPORARY REPAIR
DOUBLER
MOS
BF/F
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 131 Of 748
@ Camp Systems
EFTA00618422
AD/SI Status Report AIRCRAFT
CAMP
Mianistfrn• thermiewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1334 FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN RECOMMENDED
MOS
04-AUG-2014 - (s)
SB 737-53-1334 TBL 1.1.1 OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 2: CROWN RECOMMENDED
SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS
LOCATIONS (ALL AIRPLANES) (GROUP 1-5)
MOS
AFL 7500 (s)
SB 737-53-1334 TBL 1.1.2 OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 3: CROWN RECOMMENDED
SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS
LOCATIONS (ALL AIRPLANES) (GROUP 1-5)
MOS
AFL 10000 (s)
SB 737-53-1334 TBL 1.3 CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED
COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR! REPEAT PART 2: CROWN SKIN PANEL ASSEMBLY -
EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS LOCATIONS (IF CONDITION
2: ANY CRACK FOUND (DURING PART 2 MFEC INSPECTION OF HIGHER STRESS LOCATIONS)) (GROUP 1-5)
MOS
04-AUG-2014 BFIF (s)
SB 737-53-1334 TBL 1.5 CONTACT FUSELAGE -CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED
COMPANY FOR REPAIR INSTRUCTIONS AND OO THE REPAIR! REPEAT PART 3: CROWN SKIN PANEL ASSEMBLY -
EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (IF CONDITION
2 ANY CRACK FOUND (DURING PART 3 MFEC INSPECTION OF LOWER STRESS LOCATIONS)) (GROUP 1-5)
MOS
04-AUG-2014 BFIF (s)
SB 737-53-1334 TBL 2.1.1 OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 2: CROWN RECOMMENDED
SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS
LOCATIONS (ALL AIRPLANES) (GROUP 6)
MOS
AFL 7500 (s)
SB 737-53-1334 T/31. 2.12 OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 3: CROWN RECOMMENDED
SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS
LOCATIONS (ALL AIRPLANES) (GROUP 6)
MOS
AFL 20O00 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 132 Of 748
@ Camp Systems
EFTA00618423
AD/SI Status Report AIRCRAFT
CAMP
Aiont.inn• 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1334 TBL 2.3 CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED
COMPANY REPAIR INSTRUCTIONS AND DO THE REPAIR/REPEAT PART 2: CROWN SKIN PANEL ASSEMBLY -
EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC)INSPECTION - HIGHER STRESS LOCATIONS (B)
MOS
04-AUG-2014 BF/F (s)
SB 737-53-1334 TBL 2.5 CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED
COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR/ REPEAT PART 3: CROWN SKIN PANEL ASSEMBLY -
EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (IF CONDITION
3: ANY CRACK FOUND (DURING PART 3 MFEC INSPECTION OF LOWER STRESS LOCATIONS)) (GROUP 6)
MOS
04-AUG-2014 BF/F (s)
SB 737-53-1335 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
31-JUL-2013
SB 737-53-1335 TABLE 11 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN NUMBER 1 WINDOW FRAME DETAILED AND HFEC INSPECTION FOR ANY CRACK INDICATION (FOR ALL
AIRPLANES) (GROUP 1. CONFIGURATION 1-3)
MOS
AFL
SB 737-53-1335 TABLE 1.2 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN NUMBER 1 WINDOW FRAME PREVENTIVE MODIFICATION DOUBLER INSTALLATION (IF NO CRACK
INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3)
MOS
AFL
SB 737-53-1335 TABLE 1.3 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN NUMBER 1 WINDOW FRAME TEMPORARY REPAIR INSTALLATION OR REPLACEMENT (IF ANY CRACK
INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3)
MOS
SB 737-53-1335 TABLE 2.1 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN POST PREVENTIVE MODIFICATION DOUBLER INSTALLATION SEALANT INSPECTION (FOR AIRPLANES WITH
THE PREVENTIVE MODIFICATION DOUBLER INSTALLED) (GROUP 1. CONFIGURATION 1-3)
MOS
AFL
SB 737-53-1335 TABLE 2.3 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN SEALANT APPLICATION (IF SEALANT CRACKS. EROSION. SPLITS. LOOSE BEADS OR MISSING SECTIONS
FOUND) (GROUP I. CONFIGURATION 1-3)
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 133 Of 748
'2 Camp Systems
EFTA00618424
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1335 TABLE 3.1 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER I WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN POST PREVENTIVE MODIFICATION DOUBLER INSTALLATION WINDOW FRAME DETAILED AND HFEC
INSPECTION (FOR AIRPLANES WITH THE PREVENTIVE MODIFICATION DOUBLER INSTALLED) (GROUP 1.
CONFIGURATION 1-3)
MOS
AFL
SB 737-53-1335 TABLE 3.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE
BULLETIN BOEING (IF ANY CRACK INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3)
MOS
SB 737-53-1336 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 11MNDOW FRAME - PERMANENT REPAIR. SERVICE RECOMMENDED
BULLETIN
MOS
23-OCT-2013
SB 737-53-1336 TABLE 1.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN PART 12: POST PERMANENT REPAIR INSTALLATION NUMBER 1 WINDOW FRAME AND
PERMANENT REPAIR TRIPLER HFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND
TRIPLER INSTALLED)
MOS
AFL
SB 737-53-1336 TABLE 1.2 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN PART 12: POST PERMANENT REPAIR INSTALLATION NUMBER 1 WINDOW FRAME AND
PERMANENT REPAIR TRIPLER HFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND)
MOS
AFL
SB 737-53-1336 TABLE 1.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY
CRACK INDICATION FOUND)
MOS
SB 737-53-1336 TABLE 2.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN PART 13: POST PERMANENT REPAIR INSTALLATION FUSELAGE SKIN LFEC INSPECTION
(AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED)
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 134 Of 748
@ Camp Systems
EFTA00618425
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1336 TABLE 2.2 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN PART 13: POST PERMANENT REPAIR INSTALLATION FUSELAGE SKIN LFEC INSPECTION
(CONDITION 1: NO CRACK INDICATION FOUND)
MOS
AFL
SB 737-53-1336 TABLE 2.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR.
SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY
CRACK INDICATION FOUND)
MOS
SB 737-53-1341 FUSELAGE - MISCELLANEOUS EXTERIOR SERVICE DOORS - EXTERNAL POWER RECEPTACLE DOOR - BONDING SUPERSEDED
JUMPER INSPECTION AND REPLACEMENT (SUPERSEDED BY SB 737-53-1341 R1). SERVICE BULLETIN
MOS
SB 737-53-1341 RI FUSELAGE - MISCELLANEOUS EXTERIOR SERVICE DOORS - EXTERNAL POWER RECEPTACLE DOOR - BONDING RECOMMENDED
JUMPER INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
11-APR-2014
SB 737-53-1345 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR RECOMMENDED
. SERVICE BULLETIN
MOS
05-NOV-2013
SB 737-53-1345 TABLE 1.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN PART 1 NUMBER 3 WINDOW FRAME INSPECTION. COLD WORKING AND FREEZE PLUG
INSTALLATION (AIRPLANES THAT COULD NOT BE REPAIRED WITH THE MAXIMUM FREEZE PLUG DIAMETER ALLOWED
IN ACCORDANCE WITH BOEING SERVICE BULLETIN 737-53.1303)
MOS
AFL
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
1.2.1 . SERVICE BULLETIN PART 2: NUMBER 3 WINDOW FRAME SEPARATION (CONDITION 1: CRACK IN SECOND LOWER
CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG)
MOS
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
1.2 .2 . SERVICE BULLETIN PART 3: NUMBER 3 WINDOW FRAME CUTTING (CONDITION 1 CRACK IN SECOND LOWER
CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG)
MOS
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 135 Of 748
Camp Systems
EFTA00618426
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
1.2.3 . SERVICE BULLETIN PART 4: NUMBER 3 WINDOW FRAME PERMANENT REPAIR INSTALLATION (CONDITION 1: CRACK
IN SECOND LOWER CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE
PLUG)
MOS
SB 737-53-1345 TABLE REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
1.2.4 . SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME (CONDITION 1: CRACK IN SECOND LOWER CORNER FASTENER
HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG)
MOS
SB 737-53-1345 TABLE 1.3 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN PART 4: NUMBER 3 WINDOW FRAME PERMANENT REPAIR INSTALLATION (CONDITION 2: CRACK
IN SECOND LOWER CORNER FASTENER HOLE THAT CAN BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG)
MOS
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
2.1.1 . SERVICE BULLETIN PART 5: POST PERMANENT REPAIR INSTALLATION PERMANENT REPAIR TRIPLER HFEC
INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED)
MOS
AFL
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
2.1.2 . SERVICE BULLETIN PART 6: POST PERMANENT REPAIR INSTALLATION NUMBER 3 WINDOW FRAME HFEC
INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED)
MOS
AFL
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
2.2.1 . SERVICE BULLETIN PART 5: POST PERMANENT REPAIR INSTALLATION PERMANENT REPAIR TRIPLER HFEC
INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND)
MOS
AFL
SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
2.2.2 . SERVICE BULLETIN PART 6: POST PERMANENT REPAIR INSTALLATION NUMBER 3 WINDOW FRAME HFEC
INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND)
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 136 Of 748
@ Camp Systems
EFTA00618427
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53-1345 TABLE 2.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY
CRACK INDICATION FOUND)
MOS
SB 737-53-1345 TABLE 3.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN PART 7: POST PERMANENT REPAIR INSTALLATION REPAIR DOUBLER LFEC INSPECTION
(AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED)
MOS
AFL
SB 737-53-1345 TABLE 3.2 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN PART 7: POST PERMANENT REPAIR INSTALLATION REPAIR DOUBLER LFEC INSPECTION
(CONDITION 1: NO CRACK INDICATION FOUND)
MOS
AFL
SB 737-53-1345 TABLE 3.3 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR
. SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY
CRACK INDICATION FOUND)
MOS
SB 737-53A1222 R1 POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R2). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-53A1222 R2 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R3). SERVICE SUPERSEDED
BULLETIN
MOS
SB 737-53A1222 R3 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R4). SERVICE SUPERSEDED
BULLETIN
MOS
SB 737-53A1222 R4 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
20-OCT-2005
AFL 13500 (s)
SB 737-53A1238 FUSELAGE - SECTION 08 - STRUCTURE - INSPECTION (SUPERSEDED BY SS 737-53A1238 R1). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 137 Of 748
@ Camp Systems
EFTA00618428
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1238 RI FUSELAGE - SECTION 48 - STRUCTURE - INSPECTION. SERVICE BULLETIN RECOMMENDED
DAYS 30 (s)
10-OCT-2002
SB 737-53A1242 SEALING AROUND VERTICAL FIN LUGS. SERVICE BULLETIN
MOS 18 (s)
I 7-OCT-2002
AFL 2500
SB 737-53A1242 RI FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - INADEQUATE SEALING AROUND VERTICAL FIN LUGS. SERVICE COMPUED WITH - PREVIOUSLY
BULLETIN
MOS )8 (s) 13-OCT-2006
28-APR-2005 2686:29
AFL 2500 644
SB 737-53A1242 R2 FUSELAGE - STRUCTURE ATTACHMENT FITTINGS-INADEQUATE SEALING AROUND VERTICAL FIN LUGS. SERVICE COMPUED WITH - IAW THE AD
BULLETIN
MOS 22-AUG-2008
23-APR-2007 -(s) 3260:48
AFL 782
SB 737-53A1248 NDT INSPECTION OF WEB AT "r CHORD-ABOVE STR 15L AND ISR (STR SL TO 7L AND STR SR TO 9R). SERVICE RECOMMENDED
BULLETIN
MOS
09-SEP-2004
S8 737-53A1248 E(A)1 INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT 'r CHORD-ABOVE STR ISL AND 15R (STR 5L TO 7L RECOMMENDED
AND STR 5R TO 9R). SERVICE BULLETIN (STR SL TO 7L AND STR SR TO 9R)
MOS
09-SEP-2004
AFL 25000 (s)
SB 737-53A1248 E(A)2 INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT 'r CHORD-ABOVE STR 15L AND 15R (STR 5L TO 7L RECOMMENDED
AND STR 5R TO 9R). SERVICE BULLETIN (ABOVE STR 15L AND 15R EXCEPT 5L TO 7L AND 5R TO BR)
MOS
09-SEP-2004
AFL 25000 (s)
SB 737-53A1248 E(B) INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT -NT CHORD-ABOVE STR 15L AND 15R (STR 5L TO 7L RECOMMENDED
AND STR 5R TO 9R). SERVICE BULLETIN 'Y-CHORD
BELOW S-15UR
MOS
09-SEP-2004
AFL 66000 (s)
SB 737-53A1248 RI FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB
CRACKS AT THE Y-CHORD. SERVICE BULLETIN
MOS
10-SEP-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 138 Of 748
@ Camp Systems
EFTA00618429
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1248 R1 E (A) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB
1 CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB AT 1Y" CHORD STR 15L AND 15R (STR 5L TO 7L AND
STR 5R TO 9R)
MOS
10-SEP-2007
AFL 25000 (s)
SB 737-53A1248 RI E (A) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB- INSPECTION FOR WEB
2 CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB AT'Y" CHORD (ABOVE STR 15L AND 15R EXCEPT 5L
TO 7L
AND 5R TO 9R)
MOS
10-SEP-2007
AFL 25000 (s)
SB 737-53A1248 RI E (B) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB
CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB ATI"' CHORD -BELOW S-15UR
MOS
10-SEP-2007
AFL 66000 (s)
SB 737-53A1253 FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING SUPERSEDED COMPUED WITH - TABLE 1 I.A.W. AD 2007-25-03 /
(SUPERSEDED BY SB 737-53A1253 R1). SERVICE BULLETIN TABLE 2 8 3 ARE N/A TO At
MOS 22-AUG-2008
3260:48
AFL 782
SB 737-53A1253 RI FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. SERVICE
BULLETIN
MOS (EFF)
13-MAY-2011
SB 737-53A1253 RI GENERAL VISUAL INSPECTION FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR MANDATORY
TABLE 1.1 WEB OIL CANNING. SERVICE BULLETIN FOR OIL CAN CONDITIONS OR BULGES FOR ALL AIRPLANES
MOS RECURRING
AFL 15000 15000
SB 737-53A1253 RI PERFORM FUSELAGE - GENERAL - STATION 1016 AfT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. MANDATORY
TABLE 1.2 SERVICE BULLETIN OPTION A: STEP 1 OF 2 OR STEP 2 OF 2 OR OPTION B
MOS
BF/F (s)
SB 737-53A1253 RI GENERAL VISUAL INSPECTION FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR MANDATORY
TABLE 2.1 WEB OIL CANNING. SERVICE BULLETIN TO IDENTIFY REPAIRS TO THE GORE WEB 8 VERIFY THAT THEY HAVE
FOLLOW-ON INSPECTIONS (SRM SECTION 53-80-08-2R) FOR ALL AIRPLANES
MOS
AFL 15000 15000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 139 Of 748
@ Camp Systems
EFTA00618430
AD/SI Status Report AIRCRAFT
COMP
Astant.fran 'Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1253 RI DETERMINE FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL MANDATORY
TABLE 2.2 CANNING. SERVICE BULLETIN FAA APPROVED FOLLOW-ON INSPECTION PROCEDURES. THRESHOLDS. AND REPEAT
INTERVALS AND INCORPORATE INTO MAINTENANCE PROGRAM IF A REPAIR IS FOUND THAT DOES NOT HAVE
FOLLOW-ON SUPPLEMENTAL INSPECTIONS
MOS 12(s)
SB 737-53A1253 RI FM FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. MANDATORY
TABLE 3 SERVICE BULLETIN APPROVED REPAIR INSPECTION PROCEDURES
MOS
AFL 36000 (s)
SB 737-53A1253 TABLE 1 PERFORM A GENERAL VISUAL INSPECTION FOR OIL CAN CONDITIONS OR BULGES AS GIVEN IN ACCOMPLISHMENT COMPLIED WITH
INSTRUCTIONS. 3.8.2 OR 3.8.3. SERVICE BULLETIN
MOS 22-AUG-2008
I8-MAY-2007 3260:48
AFL 10000 (s) 782
SB 737-53A1253 TABLE 2 GENERAL VISUAL INSPECTION TO IDENTIFY REPAIRS TO THE GORE WEB 8 VERIFY THAT THEY HAVE FOLLOW-ON NOT APPLICABLE
INSPECTIONS (SRM SECTION 53-80-08-2R). SERVICE BULLETIN
MOS 22-AUG-2008
I8-MAY-2007 - (s) 3260:48
AFL 782
SB 737-53A1253 TABLE 3 FM APPROVED REPAIR INSPECTION PROCEDURES. SERVICE BULLETIN NOT APPLICABLE
MOS 22-AUG-2008
I8-MAY-2007 3260:48
AFL 24000 (s) 782
SB 737-53A1289 INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN SUPERSEDED
MOS
AFL
SB 737-53A1289 R1 INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN RECOMMENDED
MOS
I8-NOV-2009
SB 737-53A1289R1 EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (1.1) SCRIBE LINE FOR ANY SCRIBE LINE AT THE LOCATIONS IN
ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.1. PART 1 -SKIN LAP JOINT - ZONE 1
INSPECTION (GROUP 1-5)
MOS
I8-NOV-2009
AFL 4000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 140 Of 748
@ Camp Systems
EFTA00618431
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN . HFEC RECOMMENDED
TABLE (1.10) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10.A. PART 10 - LRTS PROGRAM
INSPECTION.IN ZONE 17 (GROUP 1-5)
MOS
AFL 40O00 (s)
SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (1.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10.8. PART 10 -LRTS PROGRAM
INSPECTION. IN ZONE 18 (GROUP 1-5)
MOS
AFL 50000 (s)
S8 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (1.12) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10.C. PART 10 -LRTS PROGRAM
INSPECTION. IN ZONE 19 (GROUP 1-5)
MOS
AFL 50000 (s)
SB 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL RECOMMENDED
TABLE (1.14) INSPECTIONS OR REPAIR (GROUP 1-5)
MOS
AFL 75000 (s)
S8 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (1.2) SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.2.
PART 2 -SKIN LAP JOINT - ZONE 2 INSPECTION (GROUP 1-5)
MOS
I8-NOV-2009
AFL 40O0 (s)
SS 737-53A1289 RI PERFORM INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTIONS AS NEEDED IF ANY RECOMMENDED
TABLE (1.4) SCRIBE LINE IS FOUND (GROUP 1-5)
MOS
BF/F (s)
S8 737-53AI289 RI HFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND UT INSPECTION OF THE SCRIBE LINE RECOMMENDED
TABLE (1.7) FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.9. PART 9 - SCRIBE
UNE INSPECTION. IN ZONE 1
(GROUP 1-5)
MOS
AFL 40000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 141 Of 748
@ Camp Systems
EFTA00618432
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-53A1289 RI HFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTION AND UT INSPECTION OF THE RECOMMENDED
TABLE (1.8) SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.9.
PART 9 - SCRIBE LINE IN ZONE 2 (GROUP 1-5)
INSPECTION.
MOS
AFL 50000 (s)
SS 737-53A1289 Ft1 DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED
TABLE (10.1) SKIN IN THE AREA OF THE EXTERNAL APPROVED REPAIR BETWEEN STA 360 AND STA 1016 AND BELOW S-10L AND
5-10R WHICH IS 20 INCHES OR LONGER IN THE FORE AND AFT DIRECTION WITH NO CIRCUMFERENTIAL LIMITATIONS
MOS
AFL 40O0 (s)
SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (10.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL
APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR
WITH PARENT SKIN THICKNESS 0.040 - 0.044 INCH
AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION
MOS
AFL 1500 (s)
SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (10.12) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL
APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR
WITH PARENT SKIN THICKNESS 0.045 - 0.049 INCH
AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION
61OS
AFL 2000 (s)
SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (10.13) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL
APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR
WITH PARENT SKIN THICKNESS 0.050 - 0.055 INCH
AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION.
MOS
AFL 3000(s)
S8 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL RECOMMENDED
TABLE (10.15) INSPECTIONS OR REPAIR ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION
MOS
AFL 75000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 142 Of 748
@ Camp Systems
EFTA00618433
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1289 RI DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED
TABLE (10.2) SKIN IN THE AREA OF THE EXTERNAL APPROVED REPAIR EXISTING EXTERNAL APPROVED REPAIR LOCATED
BETWEEN STA 360 AND STA 1016 AND ABOVE S-10L AND S-10R WHICH IS 20 INCHES OR LONGER IN
THE FORE AND AFT DIRECTION OR WIDER THAN 12 INCHES CIRCUMFERENTIALLY. (B)
MOS
AFL 4000 (s)
SB 737-53AI289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (10.3) SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE
WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.5. PART 5 - EXTERNAL
APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.040 - 0.044 INCH IN
THE AREA OF THE EXTERNAL APPROVED
REPAIR
MOS
AFL 4000 (s)
SB 737-53A1289 R1 EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (10.4) SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 3.8.5. PART 5 - EXTERNAL APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.045 - 0.049
INCH IN THE AREA OF THE EXTERNAL APPROVED REPAIR.
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53AI289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (10.5) SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 32.5. PART 5 - EXTERNAL
APPROVED REPAIR - INSPECTION (AXB) PARENT SKIN THICKNESS 0.050 - 0.055 INCH IN THE AREA OF THE EXTERNAL
APPROVED REPAIR
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1289 RI DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED
TABLE (11.1) SKIN IN THE AREA OF THE INTERNAL APPROVED
REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.6. PART 6- INTERNAL APPROVED
REPAIR - INSPECTION.EXISTING INTERNAL APPROVED REPAIR LOCATED BETWEEN STA 360 AND STA 1016 AND
BELOW 5-10L AND 5-10R AND THE SKIN CUTOUT IS GREATER THAN 20 INCHES LONG IN THE FORE AND AFT
DIRECTION WITH NO CIRCUMFERENTIAL LIMITATIONS.
MOS
18-N0V-2809
AFL 4000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 143 Of 748
@ Camp Systems
EFTA00618434
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-53A1289 R1 EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (11.10) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM INTERNAL
APPROVED REPAIR REPEAT INSPECTION SCRIBE LINE IS FOUND COMMON TO
INTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.040 - 0.044 INCH
AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION
MOS
AFL 2600 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED
TABLE (11.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN
ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM INTERNAL
APPROVED REPAIR REPEAT INSPECTION SCRIBE LINE IS FOUND COMMON TO
INTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.045 - 0.049 INCH
AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION
MOS
AFL 2500 (s)
SB 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL RECOMMENDED
TABLE (11.12) INSPECTIONS OR REPAIR. ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION
MOS
AFL 75000 (s)
SB 737-53A1289 RI DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED
TABLE (11.2) SKIN IN THE AREA OF THE INTERNAL APPROVED
REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.6. PART 6- INTERNAL APPROVED
REPAIR - INSPECTION EXISTING INTERNAL APPROVED REPAIR LOCATED BETWEEN STA 360 AND STA 1016 AND
ABOVE S-10L AND S-10R AND THE SKIN CUTOUT IS GREATER THAN 20 INCHES LONG IN THE FORE AND AFT
DIRECTION OR WIDER THAN 12 INCHES CIRCUMFERENTIALLY
MOS
I8-NOV-2009
AFL 4000 (s)
S8 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN ANY SCRIBE RECOMMENDED
TABLE (11.3) UNE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH
ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.6. PART 6 - INTERNAL
APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.040 - 0.044 INCH INCHES IN THE AREA OF THE
INTERNAL APPROVED REPAIR.
MOS
I8-NOV-2009
AFL 4000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 144 Of 748
@ Camp Systems
EFTA00618435
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (11.4) SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH
ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.6. PART 6 - INTERNAL
APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.045 - 0.049 INCH IN THE AREA OF THE INTERNAL
APPROVED REPAIR
MOS
I8-NOV-20D9
AFL 4000 (s)
SB 737-53AI289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN OF RECOMMENDED
TABLE (3.1) CIRCUMFERENTIAL BUTT JOINT STA 887 BETWEEN S-10L AND 5-10R FOR ANY
SCRIBE LINE IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 3.8.3. PART 3-CIRCUMFERENTIAL BUTT JOINT -INSPECTION. (GROUP 1-3.5-8.10)
MOS
AFL 40000 (s)
SB 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL RECOMMENDED
TABLE (3.11) INSPECTIONS OR REPAIR FOR ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION. (GROUP
1-3.5-8. 10)
MOS
AFL 75000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN OF RECOMMENDED
TABLE (3.2) CIRCUMFERENTIAL BUTT JOINT STA 360 BETWEEN S-10L AND S-10R FOR ANY
SCRIBE LINE IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 3.8.3. PART 3 -CIRCUMFERENTIAL BUTT JOINT -INSPECTION. (GROUP 1-3.5-8.10)
MOS
AFL 45000 (s)
SB 737-53A1289 RI ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTIONS AS NEED FOR ANY RECOMMENDED
TABLE (3.4) SCRIBE LINE FOUND
MOS
BF/F (s)
SB 737-53A1289 RI LFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN - EXTERNAL - SLIDING PROBE INSPECTION RECOMMENDED
TABLE (3.8) OR AN INTERNAL MFEC INSPECTION OR AN EXTERNAL HFEC PENCIL PROBE INSPECTION OR AN INTERNAL HFEC
INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
(GROUP 1-3.5-8. 10) PARAGRAPH 3.6.10.D. PART 10 - LRTS PROGRAM CIRCUMFERENTIAL BUTT JOINT -
REPEAT INSPECTION STATION 360 (GROUP 1-3.5-8.10)
MOS
AFL 45000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 145 Of 748
@ Camp Systems
EFTA00618436
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1289 RI LFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN - EXTERNAL - SLIDING PROBE INSPECTION RECOMMENDED
TABLE (3.9) OR AN INTERNAL MFEC INSPECTION OR AN EXTERNAL HFEC PENCIL PROBE INSPECTION OR AN INTERNAL HFEC
INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 3.8.10.D. PART 10 - LRTS
PROGRAM CIRCUMFERENTIAL BUTT JOINT -REPEAT INSPECTION. STATION 887 (GROUP 1-3.5-8. 10)
MOS
AFL 40000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (6.1) SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 32.4.
PART 4 -DECAL - INSPECTION. IN ZONE 6 (GROUP 2.7)
MOS
18-NOV-2009
AFL 4000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED
TABLE (6.12) INSPECTION OF THE
SCRIBE LINES FOR ANY CRACK IN
ACCORDANCE WITH THE ACCOMPLISHMENT
INSTRUCTIONS PARAGRAPH 3.6.10. PART 10
- LRTS PROGRAM REPEAT INSPECTION. (A)IN ZONE 6 (GROUP 2. 7)
MOS
AFL 10000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED
TABLE (6.13) INSPECTION OF THE SCRIBE LINES FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 3.8.10. PART 10
- LRTS PROGRAM REPEAT INSPECTION. IN ZONE 7 (GROUP 2.7)
MOS
AFL WOO (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED
TABLE (6.14) INSPECTION OF THE
SCRIBE LINES FOR ANY CRACK IN
ACCORDANCE WITH THE ACCOMPLISHMENT
INSTRUCTIONS PARAGRAPH 3.6.10. PART 10
- LRTS PROGRAM REPEAT INSPECTION IN ZONE 8 (GROUP 2.7)
MOS
AFL 2500 (s)
SB 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR FOR ADDITIONAL RECOMMENDED
TABLE (6.16) INSPECTIONS OR REPAIRALL AIRPLANES WITH
SCRIBE LINE USING A LRTS PROGRAM INSPECTION (GROUP 2. 7)
MOS
AFL 75000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 146 Of 748
@ Camp Systems
EFTA00618437
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1289 RI ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN EXTERNAL GENERAL VISUAL RECOMMENDED
TABLE (6.2) INSPECTIONFOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT
INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 - DECAL -
INSPECTIONIN ZONE 6 (GROUP 2. 7)
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (6.3) SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4.
PART 4 - DECAL - INSPECTION. IN ZONE 7 (GROUP 2. 7)
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1289 RI PERFORM INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AN EXTERNAL GENERAL VISUAL RECOMMENDED
TABLE (6.4) INSPECTION FOR ANY SCRIBE LINE AT THE
LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS
PARAGRAPH 32.4. PART 4 - DECAL -INSPECTION. IN ZONE 7 (GROUP 2.7)
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED
TABLE (6.5) SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4.
PART 4 -DECAL - INSPECTION. IN ZONE 8 (GROUP 2.7)
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1289 Ft1 ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN EXTERNAL GENERAL VISUAL RECOMMENDED
TABLE (6.6) INSPECTION FOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT
INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 - DECAL -INSPECTION IN ZONE 8 (GROUP 2.7)
MOS
I8-NOV-2009
AFL 4000 (s)
SB 737-53A1325 FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER MANDATORY
CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN
MOS
03-DEC-2013
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
1.01 LH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE LEFT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE LEFT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1 (FOR ALL AIRPLANES)
(GROUP 1)
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 147 Of 748
@ Camp Systems
EFTA00618438
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
1.01 RH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1 (FOR ALL AIRPLANES)
(GROUP 1)
MOS
AFL
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
1.02 LH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE LEFT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE LEFT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.J. (IF NO CRACK FOUND
ON BOTH THE LEFT AND RIGHT SIDES) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
1.02 RH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.J. (IF NO CRACK FOUND
ON BOTH THE LEFT AND RIGHT SIDES) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP IA. (IF ANY CRACK FOUND. ON THE LEFT SIDE. LESS THAN
OR EQUAL TO 0.18 INCHES) (GROUP 1)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.8. (ANY CRACK FOUND. ON THE RIGHT SIDE. LESS THAN OR
EQUAL TO 0.18 INCHES) (GROUP 1)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.0 (IF ANY CRACK FOUND. ON THE LEFT SIDE. GREATER
THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE
FLANGE OF THE INNER CHORD) (GROUP 1)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 148 Of 748
@ Camp Systems
EFTA00618439
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.0. (IF ANY CRACK FOUND. ON THE RIGHT SIDE. GREATER
THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE
FLANGE OF THE INNER CHORD) (GROUP 1)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.07 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCOR DANCE
WITH PARAGRAPH 3.B..WORK INSTRUCTIONS. PART 2. STEP 1.E. (IF ANY CRACK FOUND. ON THE LEFT SIDE.
GREATER THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 1)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.08 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP IF. (IF ANY CRACK FOUND. ON THE RIGHT SIDE. GREATER
THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 1)
MOS
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
1.09 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING. (IF ANY CRACK FOUND GREATER THAN 1.50 INCHES IN
LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 1)
MOS
SB 737-53A1325 TABLE ACCOMPLISH FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB
1.10 AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN PREVENTIVE
MODIFICATION ON THE LEFT SIDE IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.H.
(IF NO CRACK FOUND ON THE LEFT
SIDE AND A REPAIR WAS ACCOMPLISHED ON THE RIGHT SIDE) (GROUP 1)
MOS
SB 737-53A1325 TABLE ACCOMPLISH FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB
1.11 AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN PREVENTIVE
MODIFICATION ON THE RIGHT SIDE IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP
1.1. (IF NO CRACK FOUND ON THE RIGHT
SIDE AND A REPAIR WAS ACCOMPLISHED ON THE LEFT SIDE) (GROUP 1)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 149 Of 748
@ Camp Systems
EFTA00618440
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
2.01 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2 (ALL AIRPLANES)
(GROUP 2)
MOS
AFL
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
2.02 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.E. (NO CRACK FOUND
ON THE RIGHT SIDE) (GROUP 2)
MOS
- Is)
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
2.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.A. (ANY CRACK FOUND LESS THAN OR EQUAL TO 0.18
INCHES) (GROUP 2)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
2.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.8. (ANY CRACK FOUND GREATER THAN 0.18 INCHES AND
LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER
CHORD) (GROUP 2)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
2.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.C. (ANY CRACK FOUND GREATER THAN 0.18 INCHES. THAT
EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 2)
MOS
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
2.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND GREATER THAN 1.50 INCHES IN
LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 2)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 150 Of 748
@ Camp Systems
EFTA00618441
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
2.07 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR LEFT SIDE
INSPECTION AND MODIFICATION INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ALL AIRPLANES)
(GROUP 2)
MOS
AFL
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
3.01 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2 (ALL AIRPLANES)
(GROUP 3)
MOS
AFL
SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME
3.02 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT
SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER
FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2. (NO CRACK FOUND)
(GROUP 3)
MOS
- (s)
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
3.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.A. (ANY CRACK FOUND LESS THAN OR EQUAL TO 0.18
INCHES) (GROUP 3)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
3.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.8. (ANY CRACK FOUND GREATER THAN 0.18 INCHES AND
LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER
CHORD) (GROUP 3)
MOS
SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
3.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH
PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.C. (ANY CRACK FOUND GREATER THAN 0.18 INCHES. THAT
EXTENDS INTO THE FLANGE OF INNER CHORD) (GROUP 3)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 151 Of 748
@ Camp Systems
EFTA00618442
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
3.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND GREATER THAN 1.50 INCHES IN
LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 3)
MOS
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.01.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 2.A.
(AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 2.8. (AIRPLANES WITH THE
REPAIR 1 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.02.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 5.A.
(AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS
SB) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.02.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 5.8. (AIRPLANES WITH THE
PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.03.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A.
(AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.03.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE
REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 152 Of 748
@ Camp Systems
EFTA00618443
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.04.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A.
(AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH
THIS S8) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.04.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE
PREVENTIVE MODIFICATION ACCOMPUSHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.05 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 3.
(AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.06 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3.
(AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.07 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 4.
(AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
4.08 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4.
(AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 1)
MOS
- (s)
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
4.09 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 1)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 153 Of 748
@ Camp Systems
EFTA00618444
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.01.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB
AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A.
(AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 2)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE
REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.02.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB
AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A.
(AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH
THIS S8) (GROUP 2)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.02.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE
PREVENTNE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2)
MOS
- Is)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.03 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3.
(AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
5.04 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4.
(AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 2)
MOS
- (s)
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
5.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 2)
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 154 Of 748
@ Camp Systems
EFTA00618445
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
6.01.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE LEFT SIDE
FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4.
STEP 6.A. (ALL AIRPLANES) (GROUP 3)
MOS
AFL
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
6.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE LEFT SIDE
INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 6.8. (ALL AIRPLANES)
(GROUP 3)
MOS
AFL
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
802.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB
AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A.
(AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 3)
MOS
-
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
802.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE
REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
803.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB
AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A.
(AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH
THIS SB) (GROUP 3)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
803.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER
CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE
PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3)
MOS
- (s)
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
6.04 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3.
(AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 3)
MOS
- Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 155 Of 748
@ Camp Systems
EFTA00618446
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER
6.05 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME
WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4.
(AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3)
MOS
- (s)
SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND
6.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR
INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 3)
MOS
SB 737-54-1039 STRUT -APPLICATION OF °saki ANT AT BULKHEAD/DIAGONAL BRACE INTERFACE. SERVICE BULLETIN
MOS 18 (5)
13-JUN-2002 800
SB 737-54-1039 RI APPLICATION OF SEALANT AT BULKHEAD/DIAGONAL BRACE INTERFACE, SERVICE BULLETIN COMPLIED WITH
MOS 18(s) 11-MAY-2006
IO-OCT-2002 2619:10
AFL 3500 629
SB 737-54-1040 GENERAL VISUAL INSPECTION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN
MOS 18 (s)
14-NOV-2002
AFL 3500
SB 737-54-1040 RI APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN COMPLIED WITH
MOS 18 (s) 18-AUG-2006
14-NOV-2002 2633:50
AFL 3500 633
SB 737-54-1040 R2 APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN
MOS 18 (5)
07-NOV-2006
AFL 3500
SB 737-54-1040 R3 APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN
MOS 18 (5)
14-NOV-2002
AFL 3500
SB 737-54-1041 ENGINE STRUT AFT FAIRING. SERVICE BULLETIN COMPLIED WITH
MOS 24-AUG-2007
22,JAN-2004 AR 2968:28
AFL 699
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 156 Of 748
@ Camp Systems
EFTA00618447
AD/SI Status Report AIRCRAFT
COMPAtant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-54-1041 PART 1811 INSPECT ENGINE STRUT AFT FAIRING. SERVICE BULLETIN FOR FLUID ACCUMULATION COMPUED WITH
MOS 30 (s) 24-AUG-2007
22-JAN-2004 2968:28
AFL 4000 699
SB 737-54-1041 PART MODIFY ENGINE STRUT AFT FAIRING. SERVICE BULLETIN SEALS COMPUED WITH
IIIBN
MOS 24-AUG-2007
22-JAN-2004 2968:28
AFL 9000 (s) 699
SB 737-54-1041 RI ENGINE STRUT AFT FAIRING. SERVICE BULLETIN RECOMMENDED COMPUED WITH - IAW THE AD AD 2006-07-04
/MARTS 1.11 AND III MOD SB 737-54-1041R1 REF
(R2) - IN 02)
MOS 24-AUG-2007
OI -DEC-2005 2968:28
AFL 699
SB 737-54-1041 RI PART INSPECT ENGINE STRUT AFT FAIRING. SERVICE BULLETIN FOR FLUID ACCUMULATION COMPUED WITH
18.11
MOS 30 (s) 24-AUG-2007
OI -DEC-2005 2968:28
AFL 4000 699
SB 737-54-1041 RI PART MODIFY ENGINE STRUT AFT FAIRING. SERVICE BULLETIN SEALS RECOMMENDED COMPUED WITH
IIIBN
MOS 24-AUG-2007
12-JAN-2005 - (s) 2968:28
AFL 699
SB 737-54-1041 R2 NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION OF NEW
ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN
MOS
03-OCT-2007
SB 737-54-1041 R2 PART INSPECT NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION
1811 OF NEW ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN FOR FLUID ACCUMULATION
MOS 30 (s)
03-OCT-2007
AFL 4000
SB 737-54-1041 R2 PART MODIFY NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION
III & IV OF NEW ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN SEALS
MOS
03-OCT-2007
AFL 9000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 157 Of 748
@ Camp Systems
EFTA00618448
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-54-1042 ENGINE STRUT UPPER LINK-INSPECTION MODIFICATION. SERVICE BULLETIN
MOS 30 (s)
I2-FEB-2004
SB 737-54-1042 RI ENGINE STRUT UPPER LINK - INSPECTION / MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS 30 (s)
30-JUL-2009
SB 737-54-1043 NACELLES/PYLONS - STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT.. SERVICE
BULLETIN
MOS 60 (s)
02-MAY-2007
SB 737-54-1043 RI STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY SUPERSEDED
REPLACEMENT.(SUPPERSEDED BY 737-54-1043 R2). SERVICE BULLETIN
MOS
- Is)
SB 737-54-1043 R2 NACELLES/PYLONS- STRUT DRAINS AND SEALS- AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT SUPERSEDED
(SUPERSEDED BY SB 737-54-1043 R3). SERVICE BULLETIN
MOS
- Is)
SB 737-54-1043 R3 NACELLES/PYLONS - STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT. SERVICE RECOMMENDED
BULLETIN
MOS 60 (s)
31-DEC-2012
SB 737-54-1045 NACELLES/PYLONS - HEAT INSULATION BLANKETS - REPLACEMENT. SERVICE BULLETIN COMPLIED WITH
MOS 29-AUG-2011
25-JUL-2007 - (s) 3533:32
AFL 863
SB 737-54-1046 NACELLES/PYLONS -STRUT TO WING FAIRINGS - THUMBNAIL FAIRING EDGE SEAL REPLACEMENT (SUPERSEDED BY SUPERSEDED
SB 737-54-1046 RI), SERVICE BULLETIN
MOS
- (s)
SB 737-54-1046 RI NACELLES/PYLONS - STRUT TO WING FAIRINGS - THUMBNAIL FAIRING EDGE SEAL REPLACEMENT. SERVICE
BULLETIN
MOS
SB 737-54-1047 NACELLES/PYLONS - STRUT AFT FAIRING HEAT SHIELD ASSEMBLY AND INSULATION BLANKET INSTALLATION. RECOMMENDED
SERVICE BULLETIN
MOS
14-SEP-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 158 Of 748
@ Camp Systems
EFTA00618449
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 737-54-1049 NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK INSPECTION. SERVICE RECOMMENDED
BULLETIN
MOS
13-SEP-2012
SB 737-54-1049 TABLE 1.1 DETAILED INSPECTION NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK RECOMMENDED
INSPECTION. SERVICE BULLETIN OF THE STRUT SEAL PLANE ACCESS PANELS FOR ANY LEAK (GROUP 1
AIRPLANES)
MOS 30 (s)
AFL 9000
SB 737-54-1049 TABLE 1.2 DETAILED INSPECTION NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK RECOMMENDED
INSPECTION. SERVICE BULLETIN OF THE STRUT SEAL PLANE ACCESS PANELS FOR ANY LEAK (GROUP 2
AIRPLANES)
MOS 36 (s)
SB 737-55-1062 LEADING EDGE RIB. SERVICE BULLETIN RECOMMENDED
MOS
10-AUG-2000 - (s)
SB 737-55-1063 TAB MAST FITTING. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - CM
MOS 13-SEP-1999
01-JUL-1999 -
SB 737-55-1063 RI TAB MAST FITTING. SERVICE BULLETIN RECOMMENDED
MOS 18 (s)
14-SEP-2000
AFL 4000
SB 737-55-1067 ELEVATOR HINGE PLATES. SERVICE BULLETIN NOT APPLICABLE - NO ACTION REQUIRED
MOS 22-AUG-2003
1342
AFL 351
SB 737-55-1069 LOWER CLOSURE RIB & RUDDER HINGE PLATE NUT. SERVICE BULLETIN RECOMMENDED
MOS
31-AUG-2000 - (s)
SB 737-55-1074 INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - PERMANENT REPAIR. PART 3
OF SB.
MOS 09-AUG-2010
15-AUG-2000 3448:31
AFL 841
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 159 Of 748
@ Camp Systems
EFTA00618450
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1074 PART 1 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN INSPECTION COMPLIED WITH - PERMANENT REPAIR. PART 3
OF SB.
MOS 18 (s) 09-AUG-20I0
IS-AUG-2002 3448:31
AFL 841
SB 737-55-1074 PART 2 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN INTERIM REPAIR COMPLIED WITH
MOS 18 (s) 22-AUG-2008
3260:48
AFL 782
SB 737-55-1074 PART 3 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN PERMANENT REPAIR COMPLIED WITH - PERMANENT REPAIR. PART 3
OF SB.
MOS 09-AUG-2010
- (s) 3448:31
AFL 841
SB 737-55-1074 RI INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS AND THE RECOMMENDED COMPLIED WITH - PERMANENT REPAIR
HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN
MOS 29-AUG-2011
18-DEC-2003 3533:32
AFL 863
SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS COMPLIED WITH
1 AND THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN INSPECTION
MOS 18 (5) 29-AUG-20I I
18-DEC-2003 3533:32
AFL 863
SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS RECOMMENDED
2 AND THE HORIZONTAL STABILIZER CENTER SECTION, SERVICE BULLETIN INTERIM REPAIR
MOS 18 (5)
12-DEC-2003
SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS RECOMMENDED COMPLIED WITH
3 AND THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN PERMANENT REPAIR
MOS 29-AUG-2011
09-SEP-2004 - (s) 3533:32
AFL 863
SB 737-55-1086 INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL STABILIZER TO THE HORIZONTAL STABLIZER - IAW THE SB
CENTER SECTION (SUPERSEDED BY SB 737-55-1086 RI). SERVICE BULLETIN
MOS 22-AUG-2008
II -DEC-2003 3260:48
AFL 782
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 160 Of 748
© Camp Systems
EFTA00618451
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1086 RI INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL STABILIZER TO THE HORIZONTAL STABLIZER - INFORMATION REF TO IR AND REV.2
CENTER SECTION (SUPERSEDED BY SB 737-55-1086 R2). SERVICE BULLETIN (REPLACEMENT)
MOS
16-DEC-2004
SB 737-55-1086 R2 STABILIZERS - HORIZONTAL STABILIER - INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL SUPERSEDED COMPLIED WITH
STABILIZER TO THE HORIZONTAL STABILIZER CENTER SECTION (SUPERSEDED BY SB 737-55-1086 R3). SERVICE
BULLETIN
MOS 29-AUG-20m
3533:32
AFL 863
SB 737-55-1086 R3 STABILIZERS - HORIZONTAL STABILIZER - INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL RECOMMENDED
STABILIZER TO THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN
DAYS 90 (5)
13-JUN-2012
SB 737-55-1089 HORIZONTAL STABILIZER - TRAILING EDGE PANEL. CONDUCTIVE STRIP AND TIP CAP ASSEMBLY - CHANGE SUPERSEDED
(SUPERSEDED BY SB 737-55-1089 R1). SERVICE BULLETIN
MOS
SB 737-55-1089 RI STABILIZERS - HORIZONTAL STABILIZER - TRAILING EDGE PANEL. CONDUCTIVE STRIP AND TIP CAP ASSEMBLY - RECOMMENDED
CHANGE. SERVICE BULLETIN
MOS
09-SEP-201
SB 737-55-1090 STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING- INSPECTION. SERVICE BULLETIN MANDATORY
MOS
30-MAR-201I
SB 737-55-1090 TABLE 1 INSPECTION STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. SERVICE MANDATORY
BULLETIN OF THE LEFT AND RIGHT SIDE HORIZONTAL STABILIZER IDENTIFICATION PLATE FOR A SERIAL NUMBER
THAT START WITH SAX FOR ALL AIRPLANES
MOS 12 (5)
30-MAR-201I
SB 737-55-1090 TABLE 1.2 DETAILED INSPECTION STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. MANDATORY
SERVICE BULLETIN OF THE HORIZONTAL STABILIZER TERMINATION FITTING FASTENERS FOR INCORRECT BOLT
PROTRUSION AND CHAMFER FOR HORIZONTAL STABILIZERS IDENTIFICATION PLATES WHICH HAVE A SERIAL
NUMBER STARTING WITH SAIC.
MOS 12 (5)
30-MAR-201I
SB 737-55-1090 TABLE 1.6 HFEC STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. SERVICE MANDATORY
BULLETIN AND UT INSPECTIONS OF THE TERMINATION FITTING FOR CRACKS FOR NEW BACB30US14K( ) BOLT IS
INSTALLED
MOS 12 (5)
3C-MAR-201I
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 161 Of 748
Camp Systems
EFTA00618452
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1093 STABILIZERS - HORIZONTAL STABILIZER - REPLACEMENT OF REAR SPAR ATTACH PINS WITH UNAPPROVED RECOMMENDED
SURFACE COATING. SERVICE BULLETIN
MOS
09-APR-2012
AFL 3000(s)
SB 737-55-1096 STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
22-MAR-2013
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN DO A
1(01.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR CRACKS FOR LEFT SIDE
HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN
1(01.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR
CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL
FLIGHT CYCLES
MOS
AFL
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(01.3) LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION OF THE FRONT SPAR UPPER CHORD AFT FLANGE. FROM
STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION
INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(01.4) HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE.
FROM STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN
MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(01.5) LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND
FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN
MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 162 Of 748
@ Camp Systems
EFTA00618453
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(01.6) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND
FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN
MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(01.7) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 175.5 TO STAB STA
258.28. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE
56.000 TOTAL RIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE
1(02.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IN ANY CRACK FOUND
IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE DOUBLERS OR SPAR LOWER CHORDS FOR LEFT SIDE
HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
SB 737-55-1096 TABLE REMOVE STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN
1(03.1) THE CRACK DAMAGE IF ANY CRACK FOUND IN THE FRONT SPAR UPPER CHORD FOR LEFT SIDE HORIZONTAL
STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(00.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL
FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN
1(00.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL
FLIGHT CYCLES
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 163 Of 748
@ Camp Systems
EFTA00618454
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(04.3) LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD AFT FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL
FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(04.4) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL
FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(04.5) LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND
FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN
MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(04.6) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND
FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN
MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(04.7) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 175.5 TO STAB STA
258.28. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE
56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE
1(05.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND
IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE
DOUBLERS OR SPAR LOWER CHORDS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION
INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 164 Of 748
@ Camp Systems
EFTA00618455
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1096 TABLE REMOVE STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN
1(06.1) THE CRACK DAMAGE IF ANY CRACK FOUND IN THE FRONT SPAR UPPER CHORD FOR RIGHT SIDE HORIZONTAL
STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES
MOS
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(07.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR
CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000
TOTAL FLIGHT CYCLES
MOS
AFL
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN
1(07.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR
CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000
TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE RECOMMENDED
1(07.3) BULLETIN BOEING FOR ADDITIONAL POST MODIFICATION INSPECTIONS FOR LEFT SIDE HORIZONTAL STABILIZER
LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES
MOS
SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE
1(08.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND
IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE
DOUBLERS OR SPAR LOWER CHORDS FOR LEFT SIDE HORIZONTAL
STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT
CYCLES
MOS
58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A
1(09.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000
TOTAL FLIGHT CYCLES
MOS
AFL
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 165 Of 748
@ Camp Systems
EFTA00618456
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN
1(09.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR
CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER
SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES
MOS
AFL
SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE RECOMMENDED
1(09.3) BULLETIN BOEING FOR ADDITIONAL POST MODIFICATION INSPECTIONS FOR RIGHT SIDE HORIZONTAL STABILIZER
LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES
MOS
58 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE
1(10.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND
IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE
DOUBLERS OR SPAR LOWER CHORDS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER
SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES
MOS
SB 737-55A1064 ELEVATOR BALANCE PANEL ASSEMBLIES. SERVICE BULLETIN RECOMMENDED
MOS
I5-OCT-1998 250(s) 44
SB 737-55A1064 R1 ELEVATOR BALANCE PANEL ASSEMBLIES. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER
MOS 20-APR-2001
07-DEC-2000 - (s) 697:54
AFL 188
SB 737-55A1066 FRONT SPAR HINGE FITTING REPLACEMENT-HINGE 3-8. SERVICE BULLETIN NOT APPLICABLE - NO ACTION REQUIRED
MOS 24 (s) 22-AUG-2003
19-SEP-2002 1342
AFL 18000 351
SB 737-55A1066 RI FRONT SPAR HINGE FITTING REPLACEMENT-HINGES 3-8. SERVICE BULLETIN - 737-55A1080R1
MOS 24 (s)
19-SEP-2002
AFL 18000
SB 737-55A1068 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -OW
MOS I3-SEP-1999
09-JUN-1999 - Is)
SB 737-55A1068 R1 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
11-JUN-1999
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 166 Of 748
@ Camp Systems
EFTA00618457
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55A1068 R2 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
DAYS 15 (s)
24-FEB-2000
AFL 100
SB 737-55A1072 PKG 1 STABILIZERS - ELEVATOR - TAB ASSEMBLY - INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL
MECHANISM. SERVICE BULLETIN
MOS
28-DEC-2000 - Is)
SB 737-55A1072 PKG 2 STABILIZERS - ELEVATOR - TAB ASSEMBLY- INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL RECOMMENDED
MECHANISM. SERVICE BULLETIN
MOS
28-DEC-2000
AFL 750(s)
SB 737-55A1072 PKG 3 STABILIZERS - ELEVATOR - TAB ASSEMBLY- INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL RECOMMENDED
MECHANISM. SERVICE BULLETIN
MOS
28-DEC-2000 1500 (s)
AFL 750
SB 737-55A1072 RI ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
11-JAN-2001 - (s)
SB 737-55A1072 RI PKG 1 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS 20-APR-2001
11-JAN-2001 702:24
AFL 250(s) 188
SB 737-55A1072 RI PKG 2 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
IWAN-2001
AFL 750(s)
SB 737-55A1072 RI PKG 3 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED
MOS
I I -JAN-2001 1500 (s)
AFL 750
SB 737-55A1076 ELEVATOR TAB HINGE FASTNER REPLACEMENT. SERVICE BULLETIN
MOS 24 (s)
AFL 4500
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 167 Of 748
@ Camp Systems
EFTA00618458
AD/SI Status Report AIRCRAFT
MP
Aseant.ftne tAernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-55A1079 ELEVATOR TAB. SPEEDBRAKE RESTRICTION. PLACARD INSTALLATION. SERVICE BULLETIN
MOS 1 (s)
19-JUL-2001
SB 737-55A1079 RI ELEVATOR TAB. SPEEDBREAK RESTRICTION, PLACARD INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS I (s)
16-MAY-2002
SB 737-55A1080 ELEVATOR AND ELEVATOR TAB REPLACEMENT. SERVICE BULLETIN COMPUED WITH - PREVIOUSLY REF. AD
2003-03-22 / 737-55A1080R1
MOS 24 (s) 18-AUG-2006
19-SEP-2002 2633:50
AFL 18000 633
SB 737-55A1080 RI ELEVATOR AND ELEVATOR TAB REPLACEMENT, SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2003
19-SEP-2002 1342
AFL 351
SB 737-55A1082 ELEVATOR MODIFICATION. SERVICE BULLETIN COMPLIED WITH - PREVIOUSLY
MOS 24 (s) 22-AUG-2003
19-SEP-2002 1342
AFL 18000 351
SB 737-55A1082 RI MODIFICATION TO IMPROVE THE STRUCTURAL DAMPING CHARACTERISTICS AND ENHANCE THE WEAR - 737-55A1080RI
CHARACTERISTICS OF THE ELEVATOR TAB. SERVICE BULLETIN
MOS 24 (s)
19-SEP-2002
AFL 18000
SB 737-55A1084 HORIZONTAL STABILIZER - TRAILING EDGE - ELEVATOR BALANCE BAY PANEL SEAL TRIM. SERVICE BULLETIN RECOMMENDED
MOS
07-MAR-2002 - (s)
SB 737-55A1084 RI HORIZONTAL STABILIZER - ELEVATOR BALANCE BAY PANEL SEAL TRIM. SERVICE BULLETIN RECOMMENDED
MOS
20-JUN-2002 - (s)
SB 737-56-1011 DRAIN OPENABLE WINDOWS INSTALLATIONS. SERVICE BULLETIN RECOMMENDED
MOS
19-NOV-1998 - (s)
SB 737-56-1011 RI DRAIN OPENABLE WINDOWS INSTALLATIONS. SERVICE BULLETIN RECOMMENDED
MOS
29-JUN-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 168 Of 748
@Camp Systems
EFTA00618459
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-56-1014 INSPECTION AND REPLACEMENT OF NO. 3 FLIGHT COMPARTMENT WINDOWS. SERVICE BULLETIN
MOS
26-APR-2001
AFL 2000 (s)
SB 737-56-1016 WINDOWS - CONTROL CABIN SLIDING WINDOWS - NUMBER 2 OPENABLE WINDOW - HOLD OPEN LATCH ASSEMBLY -
INSPECTION AND REPLACEMENT. SERVICE BULLETIN
MOS
-AUG-2005
SB 737-56-1017 WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELEATION OF NUMBER 4 AND NUMBER 5
WINDOWS (SUPERSEDED BY 737-56-1017 R1). SERVICE BULLETIN
MOS
I7-MAY-2006
SB 737-56-1017 RI WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELETION OF NUMBER 4 AND NUMBER 5 SUPERSEDED
WINDOWS. (SUPERSEDED BY SB 737-56-1017 R2). SERVICE BULLETIN
MOS
SB 737-56-1017 R2 WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELETION OF NUMBER 4 AND NUMBER 5 RECOMMENDED
WINDOWS.. SERVICE BULLETIN
MOS
28-JAN-2011
SB 737-56-1024 WINDOWS - CONTROL CABIN SLIDING WINDOWS - LEFT SIDE AND RIGHT SIDE NUMBER 2 WINDOW FRAME REPAIR
AND MODIFICATION. SERVICE BULLETIN
MOS
21-SEP-2007
SB 737-56-1025 FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE - REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
20-JAN-2010
SB 737-56-1025 (LH) REPLACE FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE- REPLACEMENT. SERVICE BULLETIN RECOMMENDED
LEFT FLIGHT DECK NUMBER 2 (SLIDING) WINDOW
MOS
SB 737-56-1025 (RH) REPLACE FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE - REPLACEMENT. SERVICE BULLETIN RECOMMENDED
RIGHT FLIGHT DECK NUMBER 2 (SLIDING) WINDOW
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 169 Of 748
@ Camp Systems
EFTA00618460
AD/SI Status Report AIRCRAFT
C O MP
&Wiwi's. Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-56A1022 WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION SUPERSEDED COMPUED WITH - INSPECTIONS TABLES 2 & 3
(SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN FOR THE 114 AND #5 WINDOWS ONLY LA.W. AD
2008-11-08 FOUND SATSFACTORY
MOS 16-FEB-20I0
18-JUL-2007 3417:51
AFL 829
SB 737-56A1022 RI WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION. RECOMMENDED COMPUED WITH - DETAIL INSPECTION I.A.W. AD
SERVICE BULLETIN 2008-11-08 (F) FLIGHT DECK NO2. NO.4 AND
NO.5 WINDOWS
MOS 12-FEB-2014
12-MAR-2010 3743:34
AFL 917
SB 737-56A1022 RI DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION
TABLE 1.01 WINDOWS - INSPECTION. SERVICE BULLETIN OF THE LEFT AND RIGHT FLIGHT DECK NUMBER 2 WINDOW (GROUP
1-2)
MOS 36 (s) 12-FEB-2014
12-MAR-2010 7500 3743:34
AFL 917
SB 737-56A1022 RI REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED
TABLE 1.02 INSPECTION. SERVICE BULLETIN THE LEFT AND RIGHT FLIGHT DECK NUMBER 2 WINDOW AND PERFORM A
DETAILED INSPECTION (GROUP 1-2)
MOS
12-MAR-2010
SB 737-56A1022 RI DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION
TABLE 2.01 WINDOWS - INSPECTION. SERVICE BULLETIN OF FLIGHT DECK NUMBER 4 WINDOW (GROUP 1. CONFIGURATION 1)
MOS 24 (s) I2-FEB-2014
12-MAR-2010 6000 3743:34
AFL 917
SB 737-56A1022 RI REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED
TABLE 2.02 INSPECTION. SERVICE BULLETIN THE FLIGHT DECK NUMBER 4 WINDOW AND PERFORM DETAILED INSPECTION
(GROUP 1. CONFIGURATION 1)
MOS
12-MAR-2010 BFIF (s)
SB 737-56A1022 RI DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION
TABLE 3.01 WINDOWS - INSPECTION. SERVICE BULLETIN OF THE FLIGHT DECK NUMBER 5 WINDOW (GROUP 1. CONFIGURATION
1)
MOS 24 (s) I2-FEB-2014
12-MAR-2010 6000 3743:34
AFL 917
SB 737-56A1022 RI REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED
TABLE 3.02 INSPECTION. SERVICE BULLETIN THE FLIGHT DECK NUMBER 5 WINDOW (GROUP 1. CONFIGURATION 1)
MOS
I2-MAR-2010 BFIF (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 170 Of 748
@ Camp Systems
EFTA00618461
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-56A1022 TABLE 1 DETAIL INSPECTION WINDOWS - FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 - INSPECTION
WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN OF FLIGHT DECK NUMBER 2
WINDOW FOR GROUP 1 AND 2
MOS 36 (5) 14-FEB-2008
18-JUL-2007 7500 3151:22
AFL 746
SB 737-56A1022 TABLE 2 DETAIL INSPECTION WINDOWS- FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5
WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 R1). SERVICE BULLETIN OF FLIGHT DECK NUMBER 4
WINDOW FOR GROUP 1 CONFIGURATION 1
MOS 24 (s) I6-FEB-2010
18-JUL-2007 6000 3417:51
AFL 829
SB 737-56A1022 TABLE 3 DETAIL INSPECTION WINDOWS - FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5
WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN OF FLIGHT DECK NUMBER 5
WINDOW FOR GROUP 1 CONFIGURATION 1
MOS 24 (5) I6-FEB-2010
18-JUL-2007 6000 3417:51
AFL 829
SB 737-57-1250 INSPECTION OF SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION. SERVICE
BULLETIN
MOS 48 (5)
07-FEB-2002
SB 737-57-1250 RI INSPECTION OF THE SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION TOP PANEL COMPUED WITH
AND FRONT SPAR. SERVICE BULLETIN
MOS 48 (5) 28-SEP-2009
04-SEP-2003 3378:04
AFL 812
SB 737-57-1250 R2 INSPECTION OF THE SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION TOP PANEL COMPUED WITH
AND FRONT SPAR. SERVICE BULLETIN
MOS 28-SEP-2009
28-NOV-2006 - (s) 3378:04
AFL 812
SB 737-57-1253 CENTER WING REAR SPAR - STIFFENER MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
16-DEC-1999
AFL 4500 (s)
SB 737-57-1253 RI CENTER WING REAR SPAR - STIFFENER MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
II -JAN-2001
AFL 4500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 171 Of 748
@ Camp Systems
EFTA00618462
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57-1255 WING - LEFT SIDE MIDSPAR LOWER PANEL REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
21-JUN-2001 - Is)
SB 737-57-1255 RI LEFT SIDE MIDSPAR LOWER PANEL REPLACEMENT. SERVICE BULLETIN
MOS
II -MAR-2004
SB 737-57-1264 FLAP CARRIAGE BUSHING REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
24-MAY-2001 - (s)
SB 737-57-1268 WINGS-LOWER WING SKIN PANELS-INSTALLATION OF THE RUB STRIPS. SERVICE BULLETIN RECOMMENDED
MOS
06-JUN-2002 - (s)
SB 737-57-1268 RI WING LOWER SKIN PANELS INSTALLATION OF THE RUB STRIPS. SERVICE BULLETIN RECOMMENDED
MOS
I7-OCT-2002 -
SB 737-57-1272 OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE BULLETIN
MOS
24-JUN-2004 - (s)
SB 737-57-1272 PART 1 INSPECT OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE BULLETIN
MOS
24-JUN-2004 3000 (s)
SB 737-57-1272 PART 2 MODIFICATION OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE
BULLETIN !REPLACEMENT
MOS
24-JUN-2004
SB 737-57-1275 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND RECOMMENDED
REPLACEMENT. SERVICE BULLETIN
MOS
04-SEP-2003 30000 Is)
AFL 30000
SB 737-57-1275 RI LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND - REF: REV.3
REPLACEMENT. SERVICE BULLETIN
MOS
I8-AUG-2005 30000 Is)
AFL 30000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 172 Of 748
@ Camp Systems
EFTA00618463
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57-1275 R2 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND - REF: REV.3
REPLACEMENT. SERVICE BULLETIN
MOS
12-JUL-2006 - (s)
SB 737-57-1275 R3 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND COMPLIED WITH - IAW THE AD 2005-24-03R1
REPLACEMENT. SERVICE BULLETIN
MOS 24-AUG-2007
I7-OCT-2006 - (5) 2968:28
AFL 699
SB 737-57-1278 OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
02-DEC-2004
SB 737-57-1278 RI WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND
MODIFICATION.. SERVICE BULLETIN
MOS
27 -SEP-2006
58 737-57-1278 R2 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND
MODIFICATION.. SERVICE BULLETIN
MOS
04-JUN-2007
SB 737-57-1281 REPAIR OF INBOARD MAIN FLAP UPPER SKIN AND MODIFICATION OF NUTPLATE STRIP ASSEMBLY. SERVICE RECOMMENDED
BULLETIN
MOS
I 5-JUL-2004
SB 737-57-1284 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - INSPECTION. REPAIR 7 MODIFICATION - WING BUTTOCK LINE
147 TO WING BUTTOCK LINE 201. SERVICE BULLETIN
MOS
09-APR-2007
SB 737-57-1285 WINGS - WING STRINGERS - INSTALL STRINGERS 7 AND 9 REINFORCEMENT. SERVICE BULLETIN
MOS
SB 737-57-1285 RI WINGS - WING STRINGERS - INSTALL STRINGERS 7 AND 9 REINFORCEMENT. SERVICE BULLETIN
MOS
SB 737-57-1286 WINGS - CENTER - REAR SPAR VAPOR BARRIER - INSPECTION. REPAIR AND MODIFICATION.. SERVICE BULLETIN - INFORMATION REFER TO REV.1
MOS
03-APR-2006
AFL 5500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 173 Of 748
@ Camp Systems
EFTA00618464
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57-1286 RI WINGS - CENTER WING - REAR SPAR VAPOR BARRIER - INSPECTION. REPAIR AND MODIFICATION. SERVICE COMPUED WITH - PARTIALLY GENERAL
BULLETIN
MOS 28-SEP-2009 RECURRING
26-JUL-2007 3378:04
AFL 5500 812 6312
SB 737-57-1288 TRAILING EDGE FLAP - NUMBER 3 AND NUMBER 6 TAILCONE ASSEMBLIES - INSPECTION AND REPAIR. SERVICE
BULLETIN
MOS
30-MAR-2007
AFL 5600 (s)
SB 737-57-1288 RI WINGS - TRAILING EDGE FLAP - NUMBER 3 AND NUMBER 6 TAILCONE ASSEMBLES - INSPECTION
AND REPAIR. SERVICE BULLETIN
MOS
03-JUN-2008
AFL 5000(s)
SB 737-57-1293 LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION. SERVICE BULLETIN
MOS 24 (5)
13-NOV-2008
SB 737-57-1293 RI LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION (SUPERSEDED BY SB 737-57-1293 SUPERSEDED
R2). SERVICE BULLETIN
MOS
SB 737-57-1293 R2 WINGS - LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION (SUPERSEDED BY SB SUPERSEDED
737-57-1293 R3). SERVICE BULLETIN
MOS
- Is)
SB 737-57-1293 R3 WINGS - LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS 24 (s)
28-SEP-2011
SB 737-57-1295 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - WING INBOARD FIXED TRAILING EDGE UPPER PANEL BULB
SEAL CHAFING ON WING-TO-BODY FAIRING PANEL - INSPECTION. REPAIR AND MODIFICATION.. SERVICE BULLETIN
MOS 12 (s)
04-JUN-2007 4500
SB 737-57-1300 WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS- INBOARD MAIN FLAP TRACKS. K4 AND #5- INSPECTION AND RECOMMENDED
EXCHANGE PROGRAM. SERVICE BULLETIN
MOS
04-JUN-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 174 Of 748
@ Camp Systems
EFTA00618465
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57-1300 NO 4 DETAILED INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. 84 AND 85 - RECOMMENDED
FLAP INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN
MOS 24 (5)
03-FEB-2010
AFL 5500
SB 737-57-1300 NO 5 DETAILED INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. #4 AND 85 - RECOMMENDED
FLAP INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN
MOS 24 (s)
03-FEB-2010
AFL 5500
SB 737-57-1306 INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. #4 AND
85 - SUPER 0-GUN COATING. DETAILED INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN
MOS 24 (s)
26-SEP-2008
AFL 5500
SB 737-57-1309 WINGS - CENTER WING BOX- FRONT SPAR SHEAR FITTING - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. RECOMMENDED
SERVICE BULLETIN
MOS
28-JAN-2011
SB 737-57-1310 WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION SUPERSEDED
FOR CORROSION (SUPERSEDED BY SB 737-57-1310 RN. SERVICE BULLETIN
MOS
- Is)
SB 737-57-1310 RI WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION SUPERSEDED
FOR CORROSION (SUPERSEDED BY SB 737-57-1310 R2). SERVICE BULLETIN
MOS
- Is)
SB 737-57-1310 R2 WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION RECOMMENDED
FOR CORROSION. SERVICE BULLETIN
MOS 120(s)
SB 737-57-1312 WINGS - OUTER WING - WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION. REPLACE TFE-4X WITH TFE-2X RECOMMENDED
SLEEVE. SERVICE BULLETIN
MOS 60 (s)
07-SEP-2010
SB 737-57-1316 WINGS - SPOILERS - INSTALLATION OF POLYURETHANE PROTECTIVE TAPE ON LOWER SKIN SURFACE OF INBOARD RECOMMENDED
GROUND SPOILER NUMBER 6 AND 7. SERVICE BULLETIN
MOS
05-SEP-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 175 Of 748
@ Camp Systems
EFTA00618466
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1279 WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL SUPERSEDED
INSPECTION (SUPERSEDED BY 737-57A1279 R1). SERVICE BULLETIN
MOS
24-JAN-2007
S8 737-57A1279 RI CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION SUPERSEDED
(SUPERSEDED BY 737-57A1279 R2), SERVICE BULLETIN
MOS (EFF)
S8 737-57A1279 R2 WINGS - CENTER AND OUTER WING- FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL SUPERSEDED
INSPECTION (SUPERSEDED BY SB 737-57A1279 R3). SERVICE BULLETIN
MOS
- (s)
S8 737-57A1279 R3 WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL
INSPECTION. SERVICE BULLETIN
MOS (EFF)
I5-FEB-20 I 1
SB 737-57A1279 R3 PERFORM WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL RECOMMENDED
TABLE 1 INSPECTION. SERVICE BULLETIN ACTIONS REQUIRED FOR FASTENER SEALEANT IN THE FUEL TANK AND WIRE
CLAMP FOR GROUP 1.4 AIRPLANES
MOS 60 (s)
24-JAN-2007
SB 737-57A1294 WINGS - WING CENTER SECTION - UPPER AND LOWER SWINGERS - DRILL START INSPECTION AND REPAIR. NOT APPLICABLE - BY EFFECTIVITY SB FOUND
SERVICE BULLETIN TO BE NA BY VARIABLE NUMBER (YG006)
MOS 16-FEB-2010
23-APR-2007 3417:51
AFL 829
SB 737-57A1294 TABLE 1 DETAILED INSPECTION WINGS - WING CENTER SECTION - UPPER AND LOWER STRINGERS - DRILL START
INSPECTION AND REPAIR. SERVICE BULLETIN OF THE WING CENTER SECTION LOWER AND UPPER STRINGERS TO
MINIMIZE CRACK SIZE.
MOS
23-APR-2007
AFL 9000 9000
SB 737-57A1294 TABLE2 DETAILED INSPECTION WINGS - WING CENTER SECTION - UPPER AND LOWER STRINGERS - DRILL START
INSPECTION AND REPAIR. SERVICE BULLETIN OF THE WING CENTER SECTION LOWER STRINGERS FOR SAFETY
MOS
23-APR-2007
AFL 18000 18000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 176 Of 748
@ Camp Systems
EFTA00618467
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1302 LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED
737-57A1302 R1). SERVICE BULLETIN
MOS
SB 737-57A1302 RI WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION, SERVICE COMPUED WITH - IAW. AD 2011-06-05 PARA (I)
BULLETIN DETAILED INSPECTION AND MODIFICATION
REPLACED ALL DOWN STOP ASSEMBLY
HARDWARE-
MOS 12-FEB-2014
78-OCT-2010 3743:34
AFL 917
SB 737-57A1302 RI REPLACE WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION. RECOMMENDED COMPUED WITH - DETAILED INSPECTION AND
TABLE 1 A SERVICE BULLETIN DOWN STOP ASSEMBLY HARDWARE WITH NEW DOWN STOP ASSEMBLY HARDWARE AND DOA MODIFICATION REPLACED ALL DOWN STOP
DETAILED INSPECTION OF THE SLAT CANS AND SLAT MAIN TRACKS FOR DEBRIS IN ACCORDANCE WITH ASSEMBLY HARDWARE
PARAGRAPH 3.8.. WORK INSTRUCTIONS. STEP 2. AT ALL 16 SLAT MAIN TRACK LOCATIONS.(A) FOR ALL AIRPLANES
MOS 12-FEB-2014
15-DEC-2008 - (s) 3743:34
AFL 917
SB 737-57A1302 RI REPLACE WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION. RECOMMENDED COMPUED WITH - DETAILED INSPECTION AND
TABLE 1 SERVICE BULLETIN AFT SIDE GUIDE BOLTS WITH NEW AFT SIDE GUIDE BOLTS IN ACCORDANCE WITH PARAGRAPH MODIFICATION REPLACED ALL DOWN STOP
3.8.. WORK INSTRUCTIONS. STEP 2. AT ALL 16 SLAT MAIN TRACK LOCATIONS.(A) FOR ALL AIRPLANES ASSEMBLY HARDWARE
MOS 12-FEB-2014
15-DEC-2008 -(s) 3743:34
AFL 917
SB 737-57A1308 RI OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT RECOMMENDED
KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN
MOS
01-OCT-2009
SB 737-57A1308 RI PERFORM OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT RECOMMENDED
TABLE 1.1 KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN A ONE TIME INSPECTION FOR A KEYWAY IN THE FUEL
TANK ACCESS DOOR 53188 AND 631BB CUTOUTS
MOS
01-OCT-2009
AFL 7500 (s)
SB 737-57A1308 RI PERFORM OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT RECOMMENDED
TABLE 1.2 KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN A ONE TIME HIGH FREQUENCY EDDY CURRENT (HFEC)
INSPECTION OF THE FUEL TANK ACCESS DOOR 531BB CUTOUT KEYWAY AND FUEL TANK ACCESS DOOR 631BB
CUTOUT KEYWAY ON THE LEFT AND RIGHT WING
MOS
01-OCT-2009
AFL 7500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 177 Of 748
@ Camp Systems
EFTA00618468
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1314 WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - SUPERSEDED
INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RD. SERVICE BULLETIN
MOS
- (s)
SB 737-57A1314 RI WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED
INSPECTION AND MODIFICATION. SERVICE BULLETIN
MOS
I5-JUL-2014 - (s)
SB 737-57A1314 Ftt TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED
1.1 LH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES)
MOS
AFL 32000 (s)
SB 737-57A1314 Rt TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY- INBOARD CARRIAGE TO TORQUE RECOMMENDED
1.1 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES)
MOS
AFL 32000 (s)
SB 737-57A1314 RI TBL RETOROUE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.2 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD FOUR FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT 7 ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER
FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY)
MOS
15-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL RETOROUE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.3 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD FOUR FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT / ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER
FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP
ASSEMBLY)
MOS
IS-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.4 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION
1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO
TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY)
MOS
I5-JUL-2014 BFIF (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 178 Of 748
@ Camp Systems
EFTA00618469
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1314 R1 TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.5 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION
1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO
TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY)
MOS
15-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.6 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN EACH PART THAT HAS A CRACK OR WEAR OR
CONTACT BOEING FOR A REPAIR AND DO THE REPAIR (IF ANY CRACK OR WEAR FOUND DURING ACCOMPLISHMENT
OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING -
MODIFICATION THAT CANNOT BE REMOVED BY OVERSIZING THE TORQUE TUBE ATTACHMENT HOLE TO SECOND
OVERSIZE)
MOS
5-JUL-2014 BF/F (s)
SB 737-57A1314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
1.8 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD CARRIAGE OR CONTACT
BOEING FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (IF ANY CHAFING OR FRETTING FOUND DURING
ACCOMPLISHMENT OF PARAGRAPH 38.. WORK INSTRUCTIONS. PART 6- LEFT WING - MODIFICATION OR PART 7 -
RIGHT WING - MODIFICATION THAT IS DEEPER THAN 0.020 INCH)
MOS
15-JUL-2014 BF/F (s)
SB 737-57AI314 RI TBL WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED
1.9 INSPECTION AND MODIFICATION. SERVICE BULLETIN BLEND THE INBOARD CARRIAGE TO REMOVE THE CHAFING
AND FRETTING (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.B.. WORK
INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION UP TO A MAXIMUM
DEPTH OF 0.020 INCH)
MOS
15-JUL-2014 BF/F (s)
SB 737-57AI314 RI TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED
2.01 LH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES)
MOS
AFL 11000(s)
SB 737-57A1314 RI TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED
2.01 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE
INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES)
MOS
AFL 11000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 179 Of 748
@ Camp Systems
EFTA00618470
AD/SI Status Report AIRCRAFT
CAMP 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1314 RI TBL DETAIL INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED
2.02 LH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE INBOARD CARRIAGE FOR
CHAFING AND FRETTING / RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE
TUBE ATTACHMENT /ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY)
MOS
I5-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY- INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.03 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE MODIFICATION (IF ANY CHAFING OR
FRETTING FOUND BY DETAILED INSPECTION OF INBOARD CARRIAGE OF THE LEFT WING INBOARD FLAP ASSEMBLY)
MOS
15-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL DETAIL INSPECTION WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED
2.05 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE INBOARD CARRIAGE FOR
CHAFING AND FRETTING / RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE
TUBE ATTACHMENT 1ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY)
MOS
I5-JUL-2014 BFIF (s)
SB 737-57A1314 RI TBL ACCOMPLISH WINGS - TRAILING EDGE FLAPS- INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.06 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE MODIFICATION (IF ANY CHAFING OR
FRETTING FOUND BY DETAILED INSPECTION OF INBOARD CARRIAGE OF THE RIGHT WING INBOARD FLAP
ASSEMBLY)
MOS
15-JUL-2014 BF/F (s)
SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.08 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION
1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO
TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY)
MOS
5-JUL-2014 BF/F (s)
SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.09 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION
1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD
CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO
TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY)
MOS
5-JUL-2014 BF/F (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 180 Of 748
@ Camp Systems
EFTA00618471
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1314 R1 TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.10 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN EACH PART THAT HAS A CRACK OR WEAR OR
CONTACT BOEING FOR A REPAIR AND DO THE REPAIR (IF ANY CRACK OR WEAR FOUND DURING ACCOMPLISHMENT
OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING -
MODIFICATION THAT CANNOT BE REMOVED BY OVERSIZING THE TORQUE TUBE ATTACHMENT HOLE TO SECOND
OVERSIZE)
MOS
5-JUL-2014 BF/F (s)
SB 737-57AI314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED
2.12 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD CARRIAGE OR CONTACT
BOEING FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (IF ANY CHAFING OR FRETTING FOUND DURING
ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6- LEFT WING - MODIFICATION OR PART 7 -
RIGHT WING - MODIFICATION THAT IS DEEPER THAN 0.020 INCH)
MOS
5-JUL-2014 BF/F (s)
SB 737-57AI314 RI TBL WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED
2.13 INSPECTION AND MODIFICATION. SERVICE BULLETIN BLEND THE INBOARD CARRIAGE TO REMOVE THE CHAFING
AND FRETTING (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK
INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION UP TO A MAXIMUM
DEPTH OF 0.020 INCH)
MOS
I5-JUL-2014 BF/F (s)
SB 737-57A1314 TABLE TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE SUPERSEDED
1.1 TUBE ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN
(REQUIRED MINIMUM FOR SAFETY)
MOS
- (s)
SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED
1.2 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RH. SERVICE BULLETIN THE
MODIFICATION FOR LEFT WING (REQUIRED MINIMUM FOR SAFETY)
MOS
- (s)
SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED
1.3 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RH. SERVICE BULLETIN THE
MODIFICATION FOR RIGHT WING (REQUIRED MINIMUM FOR SAFETY)
MOS
- (s)
SB 737-57A1314 TABLE TORQUE CHECK WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE SUPERSEDED
2.1 TUBE ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RI). SERVICE BULLETIN
(RECOMMENDED ECONOMIC INSPECTION)
MOS
- Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 181 Of 748
@ Camp Systems
EFTA00618472
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED
2.2 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN THE
MODIFICATION FOR LEFT WING (RECOMMENDED ECONOMIC INSPECTION)
MOS
- Is)
SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED
2.4 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN THE
MODIFICATION FOR RIGHT WING (RECOMMENDED ECONOMIC INSPECTION)
MOS
- (s)
SB 737-71-1422 CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN RECOMMENDED COMPUED WITH - CM
MOS 7-OCT-2000
21-JUN-I999 - (s)
SB 737-71-1422 RI CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN RECOMMENDED
MOS
02-NOV-2000 - (s)
SB 737-71-1422 R2 CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN RECOMMENDED
MOS
IS-FEB-2001 - (s)
SB 737-71-1422 R3 CONVERSION OF CFM56-76 TO 7827/83. SERVICE BULLETIN
MOS
12-FEB-2002 - (s)
SB 737-71-1464 DRAIN TUBE REPLACEMENT. ENGINE FUEL PUMP PAD. SERVICE BULLETIN RECOMMENDED
MOS
02-OCT-2003
SB 737-71-1551 RI POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76 SINGLE ANNULAR SUPERSEDED
COMBUSTOR (SACy3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR
AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE
ENGINES (SUPERSEDED BY SB 737-71-1551 R2). SERVICE BULLETIN
MOS
SB 737-71-1582 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR SUPERSEDED
COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE
TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SAC/3 TECHNOLOGY INSERTION PROGRAM BASE
ENGINES (SUPERSEDED BY SB 737-71-1582 R1). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 182 Of 748
@ Camp Systems
EFTA00618473
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnsind
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71-1582 RI POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78 SINGLE ANNULAR SUPERSEDED
COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE
TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SAC/3 TECHNOLOGY INSERTION PROGRAM BASE
ENGINES (SUPERSEDED BY SB 737-71-1582 R2). SERVICE BULLETIN
MOS
58 737-71-1582 R2 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR RECOMMENDED
COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE
TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SACf3 TECHNOLOGY INSERTION PROGRAM BASE
ENGINES. SERVICE BULLETIN
MOS
13-JAN-2012
58 737-71-1588 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B
SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-
78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT
ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN
MOS
02-AUG-2007
SB 737-71-1588 RI POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78
SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-
78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT
ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN
MOS
I5-AUG-2007
SB 737-71-1588 R2 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76
SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78
HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT
ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN
MOS
I 7-DEC-2007
SB 737-71-1588 R3 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76
SINGLE ANNULAR COMBUSTOR (SACO TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78
HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT
ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN
MOS
24-DEC-2007
58 737-71-1588 R4 INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78
SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78
HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT
ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN
MOS
18-JUL-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 183 Of 748
@ Camp Systems
EFTA00618474
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnundop'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71-1588 RS INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFMS6-78 SINGLE ANNULAR COMBUSTOR (SAC)/3 SUPERSEDED
TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH
PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES
(SUPERSEDED BY S8 737-71-1588 R6). SERVICE BULLETIN
MOS
58 737-71-1588 R6 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR RECOMMENDED
COMBUSTOR (SACy3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR
AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFMS6-78 SAC BASE
ENGINES. SERVICE BULLETIN
MOS
07-DEC-2011
58 737-71-1603 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFMS6-78 SAC/3 (TECH SUPERSEDED
INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 RI).
SERVICE BULLETIN
MOS
S8 737-71-1603 RI POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED
INSERTION) ENGINES FROM 7826/3 TO 7827/3 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 R2).
SERVICE BULLETIN
MOS
SB 737-71-1603 R2 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFMS6-78 SAM (TECH SUPERSEDED
INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 R3).
SERVICE BULLETIN
MOS
S8 737-71-1603 R3 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED
INSERTION) ENGINES FROM 7826/3 TO 7827/3 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY S8 737-71-1603 R4).
SERVICE BULLETIN
MOS
S8 737-71-1603 R4 POWER PLANT -POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED
INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY S8 737-71-1603 RS).
SERVICE BULLETIN
MOS
58 737-71-1608 INSPECTION AND REPAIR OF THE ENGINE BUILD UP BRACKETS RECOMMENDED
TO PREVENT DAMAGE TO THE ENGINE FAN CASE. SERVICE BULLETIN
MOS
02-OCT-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 184 Of 748
@ Camp Systems
EFTA00618475
AD/SI Status Report AIRCRAFT
C O A.m."
MPvgnie• Megnund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71-1625 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 ENGINES FROM RECOMMENDED
CFM56-7824 TO CFM56-7826/B2 THRUST RATING OR FROM CFM56-7824/3 TO CFM56-7826/382 OR CFM56-7826/382F
THRUST RATING. SERVICE BULLETIN
MOS
28-JUL-2010
SB 737-71-1634 POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SACJ3 (TECH INSERTION) SUPERSEDED
ENGINES FROM 7827/3 TO 7B24/3 OR 7826/3. OR FROM 7826/3 TO 7824/3 (SUPERSEDED BY SB 737-71-1634 RI).
SERVICE BULLETIN
MOS
S8 737-71-1634 RI POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SACJ3 (TECH INSERTION) SUPERSEDED
ENGINES FROM 7827/3 TO 7824/3 OR 7826/3. OR FROM 7826/3 TO 7824/3 (SUPERSEDED BY S8 737-71-1634 R2).
SERVICE BULLETIN
MOS
SB 737-71-1634 R2 POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SAC/3 (TECH INSERTION) RECOMMENDED
ENGINES FROM 7827/3 TO 7824/3 OR 7826/3. OR FROM 7626/3 TO 7824/3, SERVICE BULLETIN
MOS
15-DEC-2010
SB 737-71-1658 POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 SUPERSEDED
SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES (SUPERSEDED BY S8 737-71-1658 RI).
SERVICE BULLETIN
MOS
SB 737-71-1658 RI POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 SUPERSEDED
SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES (SUPERSEDED BY S8 737-71-1658 R2).
SERVICE BULLETIN
MOS
SB 737-71-1658 R2 POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 RECOMMENDED
SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES. SERVICE BULLETIN
MOS
08-DEC-2011
SB 737-71-1673 POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) SUPERSEDED
ENGINES OR CFM56-78/3 SAC ENGINES FOR ONE OR TWO CFM56-78E ENGINES (SUPERSEDED BY SB 737-71-1673
R1). SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 185 Of 748
@ Camp Systems
EFTA00618476
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71-1673 RI POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) RECOMMENDED
ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES. SERVICE BULLETIN
MOS
08-DEC-2011
SB 737-71-1674 POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFP.I56-78 SINGLE ANNULAR COMBUSTOR (SAC) SUPERSEDED
ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES (SUPERSEDED BY SB 737-71-1674
RI). SERVICE BULLETIN
MOS
SB 737-71-1674 RI POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) SUPERSEDED
ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES (SUPERSEDED BY SB 737-71-1674
R2). SERVICE BULLETIN
MOS
SB 737-71-1674 R2 POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) RECOMMENDED
ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES. SERVICE BULLETIN
MOS
08-DEC-2011
SB 737-71-1675 POWER PLANT - CHANGE TWO CFM56-78x2 DUAL ANNULAR COMBUSTOR (DAC) ENGINES FOR TWO CFM56-7BE SUPERSEDED
ENGINES (SUPERSEDED BY S8 737-71-1675 RI). SERVICE BULLETIN
MOS
SB 737-71-1675 RI POWER PLANT - CHANGE TWO CFM56-78x2 DUAL ANNULAR COMBUSTOR (DAC) ENGINES FOR TWO CFM56-7BE RECOMMENDED
ENGINES. SERVICE BULLETIN
MOS
16-DEC-201I
SB 737-71-1682 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R1). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-71-1682 RI POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R2). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-71-1682 R2 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R3). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-71-1682 R3 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION. SERVICE BULLETIN RECOMMENDED
MOS
07-MAR-2014
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 186 Of 748
Camp Systems
EFTA00618477
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71-1705 POWER PLANT - POWER PLANT - CHANGE OPERATIONAL THRUST RATING OF CFM5G-7B ENGINES FROM 7822 TO RECOMMENDED
7824 AND RETURN TO 7822. SERVICE BULLETIN
MOS
21-DEC-2010
SB 737-71-1709 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF TWO CFM56-78 ENGINES FROM RECOMMENDED
7826 TO 7827 AND RETURN TO 7826. SERVICE BULLETIN
MOS
12-JAN-2011 •
SB 737-71-1717 POWER PLANT - ENGINE COWLING - HEAT RESISTANT ALUMINIZED PRIMER INSTALLATION TO THE LIPSKIN OF THE RECOMMENDED
ENGINE INLET COWL. SERVICE BULLETIN
MOS
12-SEP-2013
SB 737-71-1725 POWER PLANT - POWER PLANT - INSTALLATION OF ENGINE OWNERSHIP PLACARD. SERVICE BULLETIN RECOMMENDED
MOS
23-NOV-2011 •
SB 737-71A1462 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION. SERVICE BULLETIN
DAYS CO (5)
29-AUG-2C02
SB 737-71A1462 Fti POWER PLANT-ENGINE MOUNTS-AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION.
SERVICE BULLETIN
DAYS 90 (5)
29-AUG-2C02
SB 737-71A1462 R2 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. SERVICE RECOMMENDED
BULLETIN
MOS
29-MAY-2C03
SB 737-71A1462 R2 PART INSPECT AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. RECOMMENDED
SERVICE BULLETIN FOR CORRECT INSTALLATION
MOS
29-MAY-2C03
SB 737-71A1462 R2 PART APPLY AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. RECOMMENDED
2 SERVICE BULLETIN PERMANENT MARKINGS
MOS
29-MAY-2C03 (51
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 187 Of 748
1, Camp Systems
EFTA00618478
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-71A1462 R3 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. SERVICE COMPUED WITH - PERFORMED UNDER WO
BULLETIN GVBBJ206
MOS 26-OCT-2011
20-MAY-2004 3573:06
AFL 872
SB 737-71A1462 R3 PART INSPECT AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. COMPUED WITH - PERFORMED UNDER WO
1 SERVICE BULLETIN FOR CORRECT INSTALLATION GVBBJ206
MOS 26-OCT-2011
20-MAY-2004 3573:06
AFL 872
SB 737-71A1462 R3 PART INSTALL AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. COMPUED WITH - PERFORMED UNDER WO
2 SERVICE BULLETIN PERMANENTLY MARKED MOUNT GVBBJ206
MOS 26-OCT-2011
20-MAY-2004 3573:06
AFL 872
SB 737-73-1014 ELECTRONIC ENGINE CONTROL. SERVICE BULLETIN RECOMMENDED COMPUED WITH -CM
MOS I3-SEP-1999
Of -JUL-7999 - (s)
SB 737-73-1014 RI ELECTRONIC ENGINE CONTROL. SERVICE BULLETIN RECOMMENDED
MOS
27-JUL-2000 - (s)
SB 737-73A-026 . SERVICE BULLETIN
MOS I3-SEP-1999
- (s)
SB 737-73A1011 ENGINE FUEL SUPPLY HOSE (SUPERSEDED BY SB 737-73A1011 R1). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
SB 737-73A1011 RI ENGINE FUEL SUPPLY HOSE (SUPERSEDED BY SB 737-73A1011 R2). SERVICE BULLETIN SUPERSEDED
MOS
- (s)
SB 737-73A1011 R2 ENGINE FUEL SUPPLY HOSE. SERVICE BULLETIN RECOMMENDED
MOS I9-APR-2002
73-JUL-2000 988:36
AFL 250
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 188 Of 748
@ Camp Systems
EFTA00618479
AD/SI Status Report AIRCRAFT
COMP
Moan Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-73A1016 ELECTRONIC ENGINE CONTROL SOFTWARE CHANGE. SERVICE BULLETIN COMPUED WITH
MOS 6 (s) 22-AUG-2003
20-FEB-2003 1342
AFL 351
SB 737-73A1016 RI ELECTRONIC ENGINE CONTROL-SOFTWARE CHANGE. SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2003
08-MAY-2003 1342
AFL 351
SB 737-77-1056 AIRBORNE VIBRATION MONITORING SYSTEM UNIVERSAL SIGNAL CONDITIONER INSTALLATION, SERVICE BULLETIN RECOMMENDED
MOS
I6-AUG-2001 - (s)
SB 737-77-1069 R2 AIRBORNE VIBRATION MONITORING (AVM) SYSTEM - REPLACE
CONDITIONER UNIT FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
10-DEC-2008
SB 737-78-1063 R2 EXHAUST- THRUST REVERSER - INNER WALL BLANKET INSULATION CHANGE. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY
MOS 28-MAR-2014
07-OCT-1999
SB 737-78-1067 THRUST REVERSER, SERVICE BULLETIN RECOMMENDED
MOS
10-AUG-2000 3000 (s) 44
AFL 2100 38
SB 737-78-1069 EXHAUST- THRUST REVERSER- INSULATION BLANKET MODIFICATION. SERVICE BULLETIN
MOS
28-FEB-2002 - (s)
SB 737-78-1069 RI EXHAUST - THRUST REVERSER - INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
I3-JUN-2002
SB 737-78-1069 R2 INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
06-FEB-2003
SB 737-78-1069 R3 INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
05-AUG-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 189 Of 748
@ Camp Systems
EFTA00618480
AD/SI Status Report AIRCRAFT
COMP
Moan Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1069 R4 EXHAUST - THRUST REVERSER - INSULATION BLANKET MODIFICATION. SERVICE BULLETIN
MOS
16-JUN-2005
SB 737-78-1071 REPLACE THRUST REVERSER EXHAUST FASTNERS FOR TRACKING SEALS. SERVICE BULLETIN RECOMMENDED
MOS
06-DEC-2001 -
SB 737-78-1071 RI THRUST REVERSER - REPLACE FASTNERS FOR TRACK FAIRING SEALS. SERVICE BULLETIN RECOMMENDED
MOS
09-MAY-2002 - (s)
SB 737-78-1072 EXHAUST - THRUST REVERSER - INSPECT/CHANGE CASCADE SUPPORT RING TO CORRECTLY INSTALL BARREL RECOMMENDED
NUTS. SERVICE BULLETIN
MOS
28-MAR-2002 - (s)
SB 737-78-1073 INSPECTION AND MODIFICATION OR REPLACEMNT OF BUSHINGS IN THE ATTACH FITTING ASSEMBLIES FOR THE RECOMMENDED COMPLIED WITH
DRAG LINKS. SERVICE BULLETIN
MOS 07-SEP-2005
09-DEC-2004 2202:21
AFL 541
SB 737-78-1073 RI EXHAUST - THRUST REVERSER - BLOCKED DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF RECOMMENDED
BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN
MOS
21-APR-2005
SB 737-78-1073 R2 EXHAUST - THRUST REVERSER - BLOCKERS DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF
BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN
MOS
12-JAN-2006
SB 737-78-1073 R3 EXHAUST - THRUST REVERSER - BLOCKER DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF
BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN
MOS
20-JUL-2006
SB 737-78-1073 R4 EXHAUST - THRUST REVERSER - BLOCKER DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF
BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN
MOS
16-NOV-2006
SB 737-78-1074 EXHAUST - THRUST REVERSER - BLOCKER DOOR AERO/FIRE SEAL REPLACEMENT. SERVICE BULLETIN
MOS 24 (s)
07-APR-2005
AFL 4000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 190 Of 748
@ Camp Systems
EFTA00618481
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1074 RI EXHAUST - THRUST REVERSER - BLOCKER DOOR AEROIFIRE SEAL REPLACEMENT. SERVICE BULLETIN
MOS 60 (s)
15-SEP-2005
AFL 8200
SB 737-78-1075 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND REPLACEMENT OF THE FIRE SEAL ON EACH THRUST SUPERSEDED
REVERSER HALF (SUPERSEDED BY SB 737-78-1075 RI). SERVICE BULLETIN
MOS
SB 737-78-1075 RI EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND REPLACEMENT OF THE FIRE SEAL ON EACH THRUST SUPERSEDED
REVERSER HALF (REPLACED BY 737-78-1086 R2). SERVICE BULLETIN
MOS
SB 737-78-1076 RI EXHAUST - THRUST REVERSER SYSTEM - REPLACEMENT OF CASCADE ASSEMBLIES. SERVICE BULLETIN RECOMMENDED
MOS
12-MAR-2010
SB 737-78-1078 EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST REVERSER SYNC
LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN
MOS
17-AUG-2006
SB 737-78-1078 RI EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST REVERSER SYNC
LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN
MOS
30-MAY-2007
SB 737-78-1078 R2 EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST
REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN
MOS
19-FEB-2008
SB 737-78-1078 R3 THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST RECOMMENDED
REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN
MOS
16-OCT-2009
SB 737-78-1079 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND
COOLING HOLE MODIFICATION. SERVICE BULLETIN
MOS
06-AUG-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 191 Of 748
@ Camp Systems
EFTA00618482
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1079 RI EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE SUPERSEDED
MODIFICATION 9SUPERSEDED BY 737-78-1079 R2). SERVICE BULLETIN
MOS
17-DEC-2007
SB 737-78-1079 R2 EXHAUST - THRUST REVERSER- THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE SUPERSEDED
MODIFICATION (SUPERSEDED BY SB 737-78-1079 R3). SERVICE BULLETIN
MOS
SB 737-78-1079 R3 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE
MODIFICATION. SERVICE BULLETIN
MOS
SB 737-78-1082 EXHAUST - THRUST REVERSER - INSTALLATION OF A COOLING HOLE AND BUSHING. APPLY SEALANT AND INSTALL SUPERSEDED COMPLIED WITH - LAW. AD 2012-05-02 PARA (G)
FLANGE INSULATION ASSEMBLIES ON THE THRUST REVERSERS (SUPERSEDED BY SB 737-78-1082 R1). SERVICE - FOUND SATISFACTORY - TOP KIT RETROFIT
BULLETIN THR / 002A0004-16
MOS 12-FEB-2014
- (s) 3743:34
AFL 917
SB 737-78-1082 RI EXHAUST - THRUST REVERSER - INSTALLATION OF A COOLING HOLE AND BUSHING. APPLY SEALANT AND INSTALL RECOMMENDED DECLINED - NO MORE WORK IS NECESSARY ON
FLANGE INSULATION ASSEMBLIES ON THE THRUST REVERSERS. SERVICE BULLETIN THE AIRPLANE(S) CHANGED IN ACCORDANCE
WITH THE ORIGINAL ISSUE OF THIS SERVICE
BULLETIN.
MOS 12-FEB-2014
10-MAY-2012 - (s) 3743:34
AFL 917
SB 737-78-1083 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST SUPERSEDED
REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB 737-78-1083 R1). SERVICE
BULLETIN
MOS
- (s)
SB 737-78-1083 RI EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST SUPERSEDED
REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB 737-78-1083 R2). SERVICE
BULLETIN
MOS
SB 737-78-1083 RI TABLE DEATILED INSPECTION EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT SUPERSEDED
1 OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB
737-78-1083 R2). SERVICE BULLETIN OF THE THRUST REVERSER HYDRAULIC ACTUATOR ROD ENDS AND ACTUATOR
ATTACH FITTINGS
MOS
01-JAN-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 192 Of 748
@ Camp Systems
EFTA00618483
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1083 R2 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN
MOS
13-JUN-2014
SB 737-78-1083 R2 TBL DETAILED INSPECTION EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT RECOMMENDED
1.01 OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FOR
DAMAGE ON THE HYDRAULIC ACTUATOR ROD END ASSEMBLIES AND A DETAILED INSPECTION FOR DAMAGE ON THE
ACTUATOR ATTACH FITTINGS (FOR ALL AIRPLANES) (GROUP 1 - 2. CNF 2)
MOS
30-JUN-2010 7500 (s)
SB 737-78-1083 R2 TBL DO EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
1.03 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN DETAILED INSPECTIONS
FOR DAMAGE ON THE HYDRAULIC ACTUATOR ROD END ASSEMBLIES (IF ANY DAMAGE FOUND ON THE HYDRAULIC
ACTUATOR ROD END ASSEMBLIES) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-2014 BFIF
SB 737-78-1083 R2 TBL REPAIR EXHAUST - THRUST REVERSER SYSTEM- INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
1.04 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN OR REPLACE THE
HYDRAULIC ACTUATOR ROD END BODY (IF ANY DAMAGE FOUND ON HYDRAULIC ACTUATOR ROD END BODY AND
THE DAMAGE IS LESS THAN OR EQUAL TO THE REPAIR LIMITS) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-2014 BF/F
SB 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED
1.05 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN HYDRAULIC
ACTUATOR ROD END ASSEMBLY (IF ANY DAMAGE FOUND ON HYDRAULIC ACTUATOR ROD END BODY AND THE
DAMAGE IS GREATER THAN THE REPAIR LIMITS) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-2014 BFIF
SB 737-78-1083 R2 TBL EXHAUST- THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
1.06 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN RETURN SPHERICAL
BEARING TO SERVICE (IF WEAR LESS THAN OR EQUAL TO SERVICEABLE LIMITS FOUND ON SPHERICAL BEARING ON
THE HYDRAULIC ACTUATOR ROD END) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-2014 BFIF
SB 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED
1.07 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN THE SPHERICAL
BEARING (IF WEAR GREATER THAN SERVICEABLE LIMITS FOUND ON SPHERICAL BEARING ON THE HYDRAULIC
ACTUATOR ROD END) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-2014 BF/F
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 193 Of 748
@ Camp Systems
EFTA00618484
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1083 R2 TBL INSTALL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED
1.08 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN SPACER (IF NO
DAMAGE FOUND ON AN ACTUATOR ATTACH FITTING) (GROUP 1 - 2. CNF 2)
MOS
13-JUN-20I1 BFIF
58 737-78-1083 R2 TBL REPAIR EXHAUST - THRUST REVERSER SYSTEM- INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
1.09 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FITTING AND INSTALL
SPACER (IF ANY DAMAGE FOUND ON ACTUATOR ATTACH FITTING AND THE DAMAGE IS LESS THAN OR EQUAL TO
0.020 INCH IN DEPTH) (GROUP 1- 2. CNF 2)
MOS
13-JUN-2014 BFIF
58 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED
1.10 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FITTING (IF ANY
DAMAGE FOUND ON ACTUATOR ATTACH FITTING AND THE DAMAGE IS GREATER THAN 0.020 INCH IN DEPTH)
(GROUP 1 - 2. CNF 2)
MOS
I3-JUN-2014 BFIF
58 737-78-1083 R2 TBL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
1.11 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN CHANGE THE SCHEDULED
MAINTENANCE PROGRAM (FOR AIRPLANES WITH WEAR SPACERS INSTALLED ON THE ACTUATOR ATTACH FITTINGS)
(GROUP 1 - 2. CNF 2)
MOS
20000 (s)
58 737-78-1083 R2 TBL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED
2.1 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN CHANGE THE SCHEDULED
MAINTENANCE PROGRAM (FOR ALL AIRPLANES WITH WEAR SPACERS INSTALLED ON THE ACTUATOR ATTACH
FITTINGS) (GROUP 1 - 2. CNF 1)
MOS 12 (s)
13-JUN-2014
SS 737-78-1085 EXHAUST - THRUST REVERSER SYSTEM - CHANGE TO THE INSULATION BLANKETS ON THE THRUST REVERSERS SUPERSEDED
(SUPERSEDED BY SS 737-78-1085 RI). SERVICE BULLETIN
MOS
SS 737-78-1085 RI EXHAUST - THRUST REVERSER SYSTEM - CHANGE TO THE INSULATION BLANKETS ON THE THRUST REVERSERS. RECOMMENDED
SERVICE BULLETIN
MOS
16-DEC-2011
SS 737-78-1086 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL SUPERSEDED
BRACKET ON THE THRUST REVERSER (SUPERSEDED BY SB 737-78-1086 R1). SERVICE BULLETIN
1/10S
- Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 194 Of 748
@ Camp Systems
EFTA00618485
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 737-78-1086 RI EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL SUPERSEDED
BRACKET ON THE THRUST REVERSER (SUPERSEDED BY SB 737-78-1086 R2). SERVICE BULLETIN
MOS
- (s)
SB 737-78-1086 R2 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL
BRACKET ON THE THRUST REVERSER
. SERVICE BULLETIN
MOS
SB 737-78-1087 REPLACEMENT OF THE LOCKOUT HANDLE ASSEMBLY ON THE THRUST REVERSER ACTUATORS (SUPERSEDED BY SUPERSEDED
SB 737-78-1087 R1). SERVICE BULLETIN
MOS
SB 737-78-1087 RI EXHAUST - THRUST REVERSER SYSTEM - REPLACEMENT OF THE LOCKOUT HANDLE ASSEMBLY ON THE THRUST RECOMMENDED
REVERSER ACTUATORS. SERVICE BULLETIN
MOS
29-MAY-2013
SB 737-78-1088 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION AND REPAIR (SUPERSEDED BY SB SUPERSEDED
737-78-1088 R1). SERVICE BULLETIN
MOS
- (s)
SB 737-78-1088 RI EXHAUST- THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION AND REPAIR. SERVICE BULLETIN
MOS
SB 737-78-1089 EXHAUST - ENGINE PRIMARY EXHAUST NOZZLE AND PLUG ASSEMBLY INSTALLATION (SUPERSEDED BY SB SUPERSEDED
737-78-1089 R1). SERVICE BULLETIN
MOS
SB 737-78-1089 RI EXHAUST- ENGINE PRIMARY EXHAUST NOZZLE AND PLUG ASSEMBLY INSTALLATION. SERVICE BULLETIN RECOMMENDED
MOS
25-OCT-2013
SB 737-78-1090 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION FOR AND REMOVAL OF THE THRUST REVERSER INNER WALL
COOLING HOLE BLOCKAGE. SERVICE BULLETIN
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 195 Of 748
@ Camp Systems
EFTA00618486
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 737-78-1092 EXHAUST - TURBINE EXHAUST SYSTEM - REWORK OF INTERFERENCE CONDITION AT EXHAUST NOZZLE FORWARD RECOMMENDED
LABYRINTH. SERVICE BULLETIN
MOS
22-JAN-2013
SB 737-SL-21-056 RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE BULLETIN RECOMMENDED
MOS
25-OCT-2002 -(5)
SB 737-SL-28-044 AIRCRAFT USE OF DYED FUELS (SUPERSEDED BY SL 737-SL-28-044 REV. A). SERVICE BULLETIN SUPERSEDED
MOS
SB 737-SL-30-020 WINDOW HEAT CONTROL UNIT MODIFICATION TO CORRECT A4 CIRCUIT BOARD CORROSION. SERVICE BULLETIN
MOS
OI -MAR-2006
SB 737-SL-31-034 TAKEOFF CONFIGURATION WARNING- ALTERNATE METHOD OF COMPLIANCE A.D., SERVICE BULLETIN OPTIONAL
MOS
SB 737-SL-32-129 REV. A NOSE GEAR LOCK VALVE MANIFOLD DUPLICATE SERIAL NUMBERS. SERVICE BULLETIN
MOS
I0-JUL-2006
SB 737-SL-32-134 REV. A NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE BULLETIN
MOS
10-JUL-2006
SB 737-SL-32-154 MAIN LANDING GEAR ACTUATOR BARREL CRACKS RECOMMENDED
FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE BULLETIN
MOS
09-FEB-2009
AFL 500(s)
SB 737-SL-34-187 LOSS OF RELIABLE AIR DATA DUE TO ICING OF STATIC PORTS - SRP 34-0111. SERVICE BULLETIN
MOS
04-JUN-2007
SB 737-SL-52-046 AUXILIARY POWER UNIT (APU) ACCESS DOOR SKIN LATCH RECOMMENDED
CUTOUTS. SERVICE BULLETIN
MOS
I4-APR-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 196 Of 748
@ Camp Systems
EFTA00618487
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 920-34-25 ROCKWELL COLLINS - SB 25 - GLU-920 GLOBAL LANDING UNIT (CPN 822-1152-0011002/003) COMPLIED WITH
GNSS RECEIVER CIRCUIT CARD A8 (CPN 828-2940-302)
REDUCE OCCURRENCE OF INCORRECT GPS DATE. SERVICE BULLETIN
MOS 23-FEB-2009
03-OCT-2008 3353:18
AFL 804
SB 964-0452-23-39 COMMUNICATION - XK516D HF RADIO SYSTEM - UNIT MODIFICATION (MOD) 48 TO XK516D1 HF TRANSCEIVER (HF RECOMMENDED
TRANSCEIVER). PN 964-0452-012. -042. OR -052: INSPECTION AND REPLACEMENT OF HIGH FREOUENCY (HF) MODEM
NON-CONFORMING INTEGRATED CIRCUIT (VOICE BAND ANALOG INTERFACE). SERVICE BULLETIN
MOS
05-N0V-2013
SB 965-0976-0XXX-34-38 . SERVICE BULLETIN
R1
MOS
- (s)
SB A001-25-96 . SERVICE BULLETIN - IPECO SEATS
MOS 13-SEP-1999
- (s)
SB Bill 28-136 INSTALLATION OF COMPONENT IDENTIFICATIONS PLACARDS. SERVICE BULLETIN
MOS
- (s)
SB BBJ-25-34 REMOVAL OF CARGO COMPARTMENT LOWER BILGE INSULATION BLANKETS. SERVICE BULLETIN
MOS
- (s)
SB BB.J-28-001-K ST00936NY-D-28-SB-001- K SFAR 88 AFS INTERNAL FUEL CELL MODIFICATION AND VALVE PLATE ASSEMBLY. COMPLIED WITH
SERVICE BULLETIN
MOS 28-SEP-2009
3378:04
AFL 812
SB BBJ-28-02 MODIFICATION OF THE FORWARD HALF TANK, INBOARD SUPPORT RAIL. SERVICE BULLETIN RECOMMENDED
MOS
17-AUG-1999 - (s)
SB BBJ-28-021-K ST00936NY-D-28-SB-021-_K SFAR88 {AND FAR 25.981 (A) (8) (C1) (AMENDMENT 102)} AUXILIARY FUEL SYSTEM COMPLIED WITH
UPGRADE FOR PATS MODIFIED AIRCRAFT SERVICE BULLETIN, SERVICE BULLETIN
MOS 28-SEP-2009
3378:04
AFL 812
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 197 Of 748
@ Camp Systems
EFTA00618488
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-02A MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN RECOMMENDED
MOS
17-AUG-1999 - Is)
SB Bill-28-02B MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN RECOMMENDED
MOS
15-OCT-1999 - Is)
SB BBJ-28-02C MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN RECOMMENDED
MOS
28-NOV-1999 - (s)
SB BBJ-28-03 MODIFICATION OF THE AUXILIARY FUEL ELECTRICAL SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
10-JUN-1999 - (s)
SB BBJ-28-04 MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN
MOS
- Is)
SB BBJ-28-04A MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN RECOMMENDED
MOS
12-AUG-1999 - (s)
SB BBJ-28-048 MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN RECOMMENDED
MOS
14-APR-2000 - (s)
SB BEJ-28-05 INSTALLATIONOF AUXILIARY FUEL SHROUD DRAIN SYSTEM FLOW RESTRICTOR. SERVICE BULLETIN RECOMMENDED
MOS
10-JUN-1999 - Is)
SB BBJ-28-06 MODIFICATION TO ADDED ELECTRONICS RACK FOR INCREASED LOAD CAPACITY. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-09 CONVERSION FROM AN EXISTING NINE (4FWD. 5 AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. 5 AFT)
AFS. CONFIGURATION 2-F. SERVICE BULLETIN
MOS
SB BBJ-28-098 CONVERSION FROM AN EXISTING NINE (4FWD. 5 AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. 5 AFT) RECOMMENDED
AFS. CONFIGURATION 2-F. SERVICE BULLETIN
MOS
23-AUG-1999 -(s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 198 Of 748
@ Camp Systems
EFTA00618489
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-09F CONVERSION FROM AN EXISTING NINE (4FWD. S AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. S AFT) RECOMMENDED
AFS. CONFIGURATION 2-F. SERVICE BULLETIN
MOS
29-OCT-2001 - (s)
SB BB.J-28-10 RELOCATION OF HOSE SHROUD CHECK VALVES. SERVICE BULLETIN RECOMMENDED
MOS
10-JUN-1999 - (s)
SB BBJ-28-108-A AUXILIARY FUEL SYSTEM (AFS) CONVERSION FROM AN EXISTING (2M) 1FWD 5 AFT CELL CONFIGURATION TO A (3A) RECOMMENDED
0 FWD 3 AFT CELL CONFIGURATION, SERVICE BULLETIN
MOS
08-MAR-2004
SB BBJ-28-11 INSTALLATION OF CARGO NET ATTACH PROVISIONS (FORWARD). SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-13 INSTALLATION: COMPONENT IDENTIFICATION PLACARDS. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-13 . SERVICE BULLETIN - PATS SB
MOS I3-SEP-1999
- (s)
SB BBJ-28-13A INSTALLATION: COMPONENT IDENTIFICATION PLACARDS. SERVICE BULLETIN RECOMMENDED
MOS
09-AUG-1999 - (s)
SB BBJ-28-138 INSTALLATION OF COMPONENT IDENTIFICATIONS PLACARDS. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-16 MODIFICATION OF THE AUX FUEL HALF TAW INBOARD SUPPORT RAIL. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-16A MOUNTING OF THE AFT HALF FUEL CELL INBOARD SUPPORT RAIL AND THE ADDITION OF THE FASTENERS IN THE RECOMMENDED
FLOOR BEAM REINFORCEMENT STRAPS. SERVICE BULLETIN
MOS
31-AUG-1999
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 199 Of 748
@ Camp Systems
EFTA00618490
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-18 INSPECTION/MODIFICATION OF FASTENERS ON RAIL AND FLOOR. SERVICE BULLETIN RECOMMENDED
MOS
31-AUG-1999 - Is)
SB BBJ-28-19 MODIFICATION OF THE WIRING OF THE AUX FUEL PROCESSING UNIT. SERVICE BULLETIN
MOS
-
SB BBJ-28-19A MODIFICATION OF THE WIRING OF THE AUX FUEL PROCESSING UNIT. SERVICE BULLETIN RECOMMENDED
MOS
06-JUL-2001 - (s)
SB BBJ-28-21 FUEL MIGRATION PREVENTION. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-21A FUEL MIGRATION PREVENTION.. SERVICE BULLETIN
MOS
-
SB Bill-28-21B FUEL MIGRATION PREVENTION.. SERVICE BULLETIN
MOS
-
SB Bill-28-21C FUEL MIGRATION PREVENTION.. SERVICE BULLETIN
MOS
- Is)
SB BBJ-28-210 FUEL MIGRATION PREVENTION. SERVICE BULLETIN RECOMMENDED COMPLIED WITH
MOS 28-AUG-2009
07-SEP-2000 - (s) 3378:04
AFL 812
SB BBJ-28-23 MODIFICATION TO PREVENT BATTERY DRAINING. SERVICE BULLETIN
MOS
01-JAN-2000 - (s)
SB BBJ-28-23A MODIFICATION TO PREVENT BATTERY DRAIN. SERVICE BULLETIN RECOMMENDED
MOS
21-DEC-1999 - (s)
SB BBJ-28-24 THE INSTALLATION OF A CLIP ASSEMBLY IN THE FORWARD CARGO COMPARTMENT TO ALLOW FOR THE PROPER RECOMMENDED
REINSTALLATION OF THE FORWARD MOST CARGO NET AT THE CARGO BAY DOOR.. SERVICE BULLETIN
MOS
14-JAN-2000 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 200 Of 748
@ Camp Systems
EFTA00618491
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-25 INSTALLATION OF A PLATE & CHANNEL IN THE FORWARD CARGO COMPARTMENT TO ALLOW FOR THE PROPER RECOMMENDED
REINSTALLATION OF THE AFT MOST CARGO NET AT THE CARGO BAY DOOR. SERVICE BULLETIN
MOS
I9-JAN-2000 - (s)
SB BBJ-28-26A CONVERSION: FROM (2 WD 5 Fl) TO elFWD 5 AFT) 6 TANK.. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-268 CONVERSION: FROM (2 WD 5 Fl) TO elFWD 5 AFT) 6 TANK.. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-26C CONVERSION: FROM A 7 TANK (2 WD 5 FT) TO A 6 TANK. ( FWD 5 AFT). SERVICE BULLETIN RECOMMENDED
MOS
30-JUN-2060 - (s)
SB BBJ-28-30 CONVERSION OF A SEVEN TANK FUEL SYSTEM TO A SIXTANK FUEL SYSTEM. SERVICE BULLETIN
MOS
- (s)
SB BBJ-28-39E EIGHT CELL TO SEVEN CELL CONVERSION. SERVICE BULLETIN RECOMMENDED
MOS
77-JUL-2001 - (s)
SB BBJ-28-39F CONVERSION FROM AN EXISTING 8 TANK (3 FWD. 5 AFT) TO A 7 TANK (2 FWD. 5 AFT) AFS. CONFIGURATION. RECOMMENDED
SERVICE BULLETIN
MOS
04-OCT-2001
SB BBJ-28-00A MODIFICATION TO FWD BLEED AIR.. SERVICE BULLETIN
MOS
- (s)
SB BB-I-28-00B MODIFICATION TO FORWARD BLEED AIR. SERVICE BULLETIN RECOMMENDED
MOS
29-SEP-2000 - (s)
SB Bal-28-038 FUEL LINE BRACKET MODIFICATION. SERVICE BULLETIN RECOMMENDED
MOS
29-SEP-2000 - (s)
SB BBJ-28-45A RELOCATION OF CHECK VALVE IN MIX BAY. SERVICE BULLETIN RECOMMENDED
MOS
I8-SEP-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 201 Of 748
@ Camp Systems
EFTA00618492
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-458 RELOCATION OF CHECK VALVE IN MIX BAY. SERVICE BULLETIN RECOMMENDED
MOS
I2-JUL-2001 - Is)
SB BBJ-28-47F CONVERSION FROM 5 TANK(1 FWD 4 AFT) TO A4 TANK (0 FWD 4AFT) CONFIGURATION. SERVICE BULLETIN RECOMMENDED
MOS
I6-AUG-2001 - (s)
SB BBJ-28-56 REPLACEMENT OF THE BBJ FUELING PLACARDS. SERVICE BULLETIN
MOS
- Is)
SB BBJ-28-58 REPLACEMENT OF THE BBJ CARGO LOADING PLACARDS. SERVICE BULLETIN RECOMMENDED
MOS
05-JUL-2001 - (s)
SB BBJ-28-61 CONVERSION FROM AN EXISTING EIGHT CELL (3 FWD 5AFT) AFS. CONFIGURATION 2-F TO A SIX CELL (1 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 24.1. SERVICE BULLETIN
MOS
I7-APR-2001 -Is)
SB BBJ-28-63C CONVERSION FROM AN EXISTING SIX CELL (2 FWD. 4 AFT) AFS. CONFIGURATION 2-D TO A EIGHT CELL (3 FWD. 5 AFT) RECOMMENDED
AFS. CONFIGURATION 2-F WITH AFT STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED. SERVICE BULLETIN
MOS
09-NOV-2001
SB BBJ-28-67 CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 2-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 2-E.. SERVICE BULLETIN
MOS
05-DEC-2001 - Is)
SB BBJ-28-6A MODIFICATION TO ADDED ELECTRONICS RACK FOR INCREASED LOAD CAPACITY. SERVICE BULLETIN RECOMMENDED
MOS
02-SEP-1999 - (s)
SB BBJ-28-70 MODIFICATION OF THE EQUIPMENT EQUIPMENT RACK INSTALLED IN THE FORWARD CARGO COMPARTMENT. RECOMMENDED
SERVICE BULLETIN
MOS
16-JAN-2002
SB BBJ-28-73A RELOCATION OF THE ATOP INSTALLED ON THE ELECTRICAL EQUIPMENT RACK IN THE FORWARD CARGO RECOMMENDED
COMPARTMENT. SERVICE BULLETIN
MOS
28-MAY-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 202 Of 748
@ Camp Systems
EFTA00618493
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ-28-78-D CONVERSION UPDATE TO SOFTWARE 2.1. SERVICE BULLETIN COMPLIED WITH
MOS 28-SEP-2009
3378:04
AFL 812
SB BBJ-28-78A AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (STC: ST00936NY). SERVICE BULLETIN RECOMMENDED
MOS
05-JUN-2002 - (s)
SB BBJ-28-788 AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (AFCU/AFDU). SERVICE BULLETIN RECOMMENDED
MOS
13-NOV-2002 - (s)
SB BBJ-28-84A INSTALLATION OF PRESSURE EQUALIZATION PANELS INTO EXISTING AUXILIARY FUEL SYSTEM (AFS) RECOMMENDED
CONFIGURATIONS WITH ONE TANK FORWARD AND/OR TWO. THREE AND FOUR TANKS AFT.. SERVICE BULLETIN
MOS
08-OCT-2002 - (s)
SB BBJ-28-84B INSTALLATION OF PRESSURE EQUALIZATION PANELS. SERVICE BULLETIN
MOS
31-DEC-2003 - (s)
SB BBJ-28-84C INSTALLATION OF PRESSURE EQUALIZATION PANELS INTO EXISTING AUXILIARY FUEL SYSTEM (AFS) RECOMMENDED
CONFIGURATION WITH ONE TANK FORWARD AN/OR TWO. THREE. AND FOUR TANKS AFT. SERVICE BULLETIN
MOS
27-FEB-2003
SB BBJ-28-86 CONVERSION FROM AN EXISTING SIX CELL (1FWD 5 AFT). CONFIGURATION 244 TO A NINE CELL (4 FWD 5 AFT) AFS. RECOMMENDED
CONFIGURATION 2-G WITH STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED. (STC: ST00936NY AMENDED JUNE
17. 2002). SERVICE BULLETIN
MOS
28-AUG-2002 - (s)
SB BBJ-28-86A CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT), CONFIGURATION 3-M TO A NINE CELL (4 FWD 5 AFT) AFS. RECOMMENDED
CONFIGURATION 3-G WITH STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED.. SERVICE BULLETIN
MOS
30-SEP-2002 - (s)
SB BRJ-28-890 ADDING ADDITIONAL PROVISIONS ONLY TO AN EXISITING THREE CELL (0 FWD 3 AFT) AFS. CONFIGURATION 3-A. FOR RECOMMENDED
FUTURE INSTALLATION OF 2 FWD TANKS FOR A FIVE CELL (2 FWD 3 AFT) AFS. CPNFIGURATION 3-C. SERVICE
BULLETIN
MOS
15-JAN-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 203 Of 748
@ Camp Systems
EFTA00618494
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 88J-28-89E ADDING ADDITIONAL PROVISIONS ONLY TO AN EXISITING THREE CELL (0 FWD 3 AFT) AFS. CONFIGURATION 3-A. FOR RECOMMENDED
FUTURE INSTALLATION OF 2 FWD TANKS FOR A FIVE CELL (2 FWD 3 AFT) AFS. CPNFIGURATION 3-C. SERVICE
BULLETIN
MOS
14-FEB-2003
SB 88J-28-89F CONVERSION OF EXISTING CONFIGURATION 3-A A THREE CELL (0 FWD 3 AFT) AFS PER STC ST00936NY TO A RECOMMENDED
CONFIGURATION 3-C A FIVE CELL (2 FWD 3 AFT) AFS ALSO PER STC ST00936NY.. SERVICE BULLETIN
MOS
I7-APR-2003
SB 88J-28-90 CONVERSION TO CONFIGURATION TO A FIVE CELL. SERVICE BULLETIN RECOMMENDED
MOS
07-NOV-2002
SB 88J-28-90A CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD. 5 AFT) AFS. CONFIGURATION 2-E TO A FIVE CELL (1FWD. 4 RECOMMENDED
AFT) AFS. CONFIGURATION 3-K. SERVICE BULLETIN
MOS
05-DEC-2002
SB 88J-28-92 CONVERSION FROM AN EXISTING SIX CELL (1 FWD. 5 AFT) AFS. CONFIGURATION 2-M TO A SEVEN CELL (2 FWD. 5 RECOMMENDED
AFT) AFS. CONFIGURATION 3-E. SERVICE BULLETIN
MOS
22-NOV-2002
SB 88J-28-928 CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 3-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 3-E.. SERVICE BULLETIN
MOS
20-NOV-2003
SB 88J-28-92C CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 3-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 3-E.. SERVICE BULLETIN
MOS
02-DEC-2003
SB 88J-28-93 IN AUX FUEL MODIFIED AIRPLANES. TO RELOCATE EXPOSED TEST PLUG IN THE AFT CARGO COMPARTMENT 8. RECOMMENDED
STOW THE FUEL CONNECTOR PLUG IN THE FWD CARGO TO A PROTECTED AREA. SERVICE BULLETIN
MOS
1S-JAN-2003
SB 88J-28-94A CONVERSION OF PREVIOUS CONFIGURATION: FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION RECOMMENDED
2-M TO A EIGHT CELL (3 FWD 5 AFT) AFS. CONFIGURATION 3-F. SERVICE BULLETIN
MOS
17-APR-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 204 Of 748
@ Camp Systems
EFTA00618495
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 88J-28-95 CHANGE THE FUEL QUANTITY INDICATING SYSTEM FROM KILOGRAMS TO POUNDS STC: ST00936NY AMENDED JUNE RECOMMENDED
17. 2002. SERVICE BULLETIN
MOS
I0-MAR-2003
SB 88J-33-37A DE-ACTIVATIONIREACTIVATION OF CARGO LIGHTING ABOVE AUX FUEL TANKS. SERVICE BULLETIN
MOS
- (s)
SB 88J-33-37B DE-ACTIVATION! REACTIVATION OF CARGO LIGHTING ABOVE AUX FUEL TANKS.. SERVICE BULLETIN RECOMMENDED
MOS
I3-NOV-2000 - (s)
SB 88J-34-79 REMOVAL OF EXISTING ARINC 740 MILTOPE COCKPIT PRINTER AND AND REPLACE WITH ALLIED SIGNAL PRIMER. RECOMMENDED
SERVICE BULLETIN
MOS
I4-MAR-2003
SB 88J-53-38A IMPROVED MIX BAY ACCESS.. SERVICE BULLETIN RECOMMENDED
MOS
06-JUL-2001 - (s)
SB BB-Q-28-08A AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (STC SA01384NY). SERVICE BULLETIN RECOMMENDED
MOS
05-JUN-2002 - (s)
SB 88J2-28-11A CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD 5 AFT) AFS. CONFIGURATION 1-G TOA SIX CELL (1 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 1-0. SERVICE BULLETIN
MOS
08-JAN-2003
SB 88J2-28-118 CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD 5 AFT) AFS. CONFIGURATION 1-G TOA SIX CELL (1 FWD 5 AFT) RECOMMENDED
AFS. CONFIGURATION 1-D. SERVICE BULLETIN
MOS
15-APR-2003
SB 88J2-28-15 CONVERSION FROM AN EXISITNG SIX CELL (2 FWD 4 AFT) AFS. CONFIGURATION 1-F TO A FIVE CELL (1 FWD 4 AFT) RECOMMENDED
AFS. CONFIGURATION 1-C. SERVICE BULLETIN
MOS
12-FEB-2003
SB 88J2-28-17A CHANGE FUEL OUANITY INDICATING SYSTEM. SERVICE BULLETIN RECOMMENDED
MOS
21-FEB-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 205 Of 748
@ Camp Systems
EFTA00618496
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB BBJ2-28-9 IA CHANGE FUEL OUANITY INDICATING SYSTEM. SERVICE BULLETIN
MOS
SB CFM56-78S880-005 . SERVICE BULLETIN COMPUED WITH -CM
MOS 10-AUG-2000
- (s)
SB CFMI-S872-168 . SERVICE BULLETIN
MOS 17-OCT-2000
- (s)
SB S-0380-34-02 . SERVICE BULLETIN
MOS
- (s)
SB S-0380-34-03 . SERVICE BULLETIN
MOS
- (s)
SB S8-17 . SERVICE BULLETIN
MOS
- (s)
SB TPR-901-34-10R2 ROCKWELL COLLINS- ELIMINATE OCCURANCE OF ERRANT MODE A CODE (0607) AND IMPROVE DESENDE COMPUED WITH
RECOVERY TIMING. SERVICE BULLETIN
MOS 20-DEC-2006
2785:43
AFL 661
SIL 920-08-1 ROCKWELL COLLINS - GLU-920 GLOBAL LANDING UNIT COMPUED WITH
(CPN 822-1152-001/002=31220)
GPS DATE CODE - 08-1. SERVICE INFORMATION LETTER
MOS 23-FEB-2009
26-AUG-2008 3353:18
AFL 804
SIL D200808000008 R5 HONEYWELL HAS ISSUED A SPECIAL PRICE FOR THE PARTS NECESSARY FOR THE ATA 36 UPGRADES FOR 737.
SERVICE INFORMATION LETTER
MOS
07-AUG-20I3
SIL D201103000023 R1 INTRODUCTION OF WHEEL HUB ULTRASONIC INSPECTION KIT. PN 7416886. SERVICE INFORMATION LETTER RECOMMENDED
MOS
27-NOV-20I3
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 206 Of 748
@ Camp Systems
EFTA00618497
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SIL D201104000050 R2 RE-INTRODUCTION OF VACUUM BLOWER. PN 606802-2. IN PLACE OF VACUUM BLOWER. PN 645172-1. -2. SERVICE OPERATORS
INFORMATION LETTER DISCRETION
MOS
28-JUN-2013
SIL D201311000043 POSSIBLE INCORRECT PACK DISCHARGE OVERHEAT SWITCH INSTALLED ON CERTAIN BOEING MODEL SUPERSEDED
737-800/-900/-900ER AIRCRAFT (SUPERSEDED BY SIL D201311000043 R1), SERVICE INFORMATION LETTER
MOS
SIL D201311000043 RI POSSIBLE INCORRECT PACK DISCHARGE OVERHEAT SWITCH INSTALLED ON CERTAIN BOEING MODEL RECOMMENDED
737-800/-900/-900ER AIRCRAFT. SERVICE INFORMATION LETTER
MOS
15-JAN-2011
SIL D201312000067 MK V ENHANCED GROUND PROXIMITY WARNING SYSTEM (EGPWS). PN 965-0976-003-XXX-XXX. PN RECOMMENDED
965-0976-020-XXX-XXX. PN 965-0976-040-XXX-XXX. PN 965-0976-060-XXX-XXX. PN 965-1676-00X. AND PN 965-1690-05X:
END OF PRODUCTION ANNOUNCEMENT DUE TO PARTS OBSOLESCENCE. SERVICE INFORMATION LETTER
MOS
20-DEC-2013
SIL D201401000052 BOEING 737 UGHT EMITTING DIODE (LED) WINGLET AND COLLISION LIGHT SYSTEM - WINGLET STROBE NOT RECOMMENDED
FLASHING. SERVICE INFORMATION LETTER
MOS
13-MAR-2011
SIL D201402000030 INSPECTION OF THE LEVER. PN 3177656-1 OR PN 63000974-1. AND ADAPTER ASSEMBLY. PN 3177635-2 OR -3. ON THE RECOMMENDED
PRECOOLER CONTROL VALVE (PCCV). PN 3289562-6.-7. SERVICE INFORMATION LETTER
MOS
26-FEB-2014
SL 737-SL-00-014 REV. A LOADABLE SOFTWARE MEDIA BINDERS. SERVICE LETTER INFORMATIONAL
MOS
19-SEP-2001 - (s)
SL 737-SL-00-015 FLIGHT DECK FAULT INDICATIONS AND NUISANCES MESSAGES. SERVICE LETTER INFORMATIONAL
MOS
29-JUN-1999 - (s)
SL 737-SL-00-016 SOFTWARE STORAGE ON DISKETTE SET. OTHER MEDIA SET. AND MASS STORAGE DEVICES. SERVICE LETTER INFORMATIONAL
MOS
20-SEP-1999 - (s)
SI. 737-SL-00-017 AVAILABILITY OF BOEING DISKETTE COPY PROCESS AND TOOL SET. (SUPERSEDED BY SL 737-SL-00-017 REV. A). SUPERSEDED
SERVICE LETTER
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 207 Of 748
@ Camp Systems
EFTA00618498
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-00-017 REV. A AVAILABILITY OF BOEING DISKETTE COPY PROCESS AND TOOL SET. SERVICE LETTER RECOMMENDED
MOS
17-OCT-2012
SL 737-SL-00-019 SUSPECT DISCREPANCY REPORT PROCESS (SUPERSEDED BY SL 737-SL-00-019 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-00-019 REV. A SUSPECT DISCREPANCY REPORT PROCESS. SERVICE LETTER RECOMMENDED
MOS
I3-NOV-2012
SL 737-SL-00-020 PROCEDURES FOR SEEKING ALTERNATE METHOD OF COMPLIANCE APPROVAL. SERVICE LETTER INFORMATIONAL
MOS
24-JAN-2007
SL 737-SL-00-022 BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE INFORMATIONAL
SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL
OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9)
DATA. SERVICE LETTER
MOS
10-JAN-2008
SL 737-SL-00-022 REV. A BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE INFORMATIONAL
SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL
OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9)
DATA. SERVICE LETTER
MOS
12-MAR-2008
SI. 737-SL-00-022 REV. 8 BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SUPERSEDED
SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL
OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9)
DATA (SUPERSEDED BY SL 737-SL-00-022 REV. C). SERVICE LETTER
MOS
SL 737-SL-00-022 REV. C BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL SUPERSEDED
OBJECTIONS. FAA 8100-9 FORMS. AND REPAIR AND DEVIATION RECORDS (SUPERSEDED BY SL 737-SL-00-022 REV.
D), SERVICE LETTER
MOS
SL 737-SL-00-022 REV. D BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL RECOMMENDED
OBJECTIONS. FAA 8100-9 FORMS. AND REPAIR AND DEVIATION RECORDS. SERVICE LETTER
MOS
I6-JUL-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 208 Of 748
@ Camp Systems
EFTA00618499
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-00-023 SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL
MOS
22-FEB-2008 •
SL 737-SL-00-023 REV. A SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL
MOS
24-NOv-2008
SL 737-SL-00-023 REV. B SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL
MOS
17-DEC-2009
SL 737-SL-00-024 BOEING TECHNICAL COMMUNICATIONS (SUPERSEDED BY SL 737-SL-00-024 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-00-024 REV. A BOEING TECHNICAL COMMUNICATIONS. SERVICE LETTER RECOMMENDED
MOS
11-APR-2011
SL 737-SL-00-025 DISCONTINUED USE OF 3.5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRLI'S (SUPERSEDED BY SL SUPERSEDED
737-SL-00-025 REV. A). SERVICE LETTER
MOS
SL 737-SL-00-025 REV. A DISCONTINUED USE OF 3 5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRUS (SUPERSEDED BY SL SUPERSEDED
737-SL-00-025 REV B). SERVICE LETTER
MOS
SL 737-SL-00-025 REV. B DISCONTINUED USE OF 3.5 INCH FLOPPY DISKETTES FOR ON BOARD LOADABLE LRUS (SUPERSEDED BY SL SUPERSEDED
737-SL-00-025 REV. C). SERVICE LETTER
MOS
SL 737-SL-00-025 REV. C DISCONTINUED USE OF 3 5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRU.S. SERVICE LETTER RECOMMENDED
MOS
23-JUL-2014
SL 737-SL-00-026 OPERATOR CORRECTION OF ERRORS IN THE LIFE LIMITED PART LIST AND AIRCRAFT READINESS LOG. SERVICE RECOMMENDED
LETTER
MOS
17-JAN.2014
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 209 Of 748
11 Camp Systems
EFTA00618500
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-02-002 IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL
MOS
28-JUL-1987 - Is)
St 737-SL-02-002 REV. A IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL
MOS
09-AUG-1995 - (s)
St 737-SL-02-002 REV. B IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL
MOS
I I -SEP-1996 - Is)
St 737-SL-02-002 REV. C IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL
MOS
28-APR-1999 - Is)
St 737-SL-02-002 REV. D IN FLIGHT AIRFRAME VIBRATION.. SERVICE LETTER INFORMATIONAL
MOS
03-JUL-2001 - (s)
St 737-SL-02-008 PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. A). SERVICE LETTER SUPERSEDED
MOS
04-JUL-I 993 - (s)
St 737-SL-02-008 REV. A PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. B). SERVICE LETTER SUPERSEDED
MOS
- (s)
St 737-SL-02-008 REV. B PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. C), SERVICE LETTER SUPERSEDED
MOS
-
St 737-SL-02-008 REV. C PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. D), SERVICE LETTER SUPERSEDED
MOS
- Is)
St 737-SL-02-008 REV. D PASSENGER CARRY-ON ELECTRONIC DEVICES (SUPERSEDED BY 51 737-SL-02-008 REV. E), SERVICE LETTER SUPERSEDED
MOS
St 737-SL-02-008 REV. E PASSENGER CARRY-ON ELECTRONIC DEVICES (SUPERSEDED BY St 737-SL-02-008 REV. F). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 210 Of 748
@ Camp Systems
EFTA00618501
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-02-008 REV. F PASSENGER CARRY-ON ELECTRONIC DEVICES. SERVICE LETTER RECOMMENDED
MOS
31-JUL-2014
SL 737-SL-02-017 REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL
MOS
10-FEB-1998 - (s)
SL 737-SL-02-017 REV. A REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL
MOS
25-SEP-1998 - Is)
SL 737-SL-02-017 REV. B REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL
MOS
23-SEP-1998 - (s)
SL 737-SL-02-017 REV. C REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL - INFORMATION COMPLIED WITH RVSM
QUALIFICATION RENEWAL. CONTINUE IN REV.G
MOS 27-JAN-2006
21-MAR-2001 2484:18
AFL 596
SL 737-SL-02-017 REV. 0 REDUCED VERTICAL SEPARATION MINIMUM (RVSM) QUALIFICATION. SERVICE LETTER INFORMATIONAL
MOS
06-OCT-2003
SL 737-SL-02-017 REV. G REDUCED VERTICAL SEPARATION MINIMUM (RVSM) QUALIFICATION. SERVICE LETTER INFORMATIONAL COMPLIED WITH - FOUND NC ALREADY RVSM
CERTIFIED
MOS 24-AUG-2007
02-JUL-2004 2968:28
AFL 699
SL 737-SL-02-018 COMPLIANCE GUIDANCE TO EUROPEAN JOINT AVIATION AUTHORITY REQUIREMENTS FOR OPERATIONS. (JAR-OPS INFORMATIONAL
I EUROPEAN). SERVICE LETTER
MOS
26-MAR-1998 - Is)
SL 737-SL-02-019 EXTENDED RANGE OPERATIONS WITH ETOPS NP CONFIGURATION CMP DOC, SERVICE LETTER INFORMATIONAL
MOS
20-JAN-1999 - (s)
SL 737-SL-02-020 BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER INFORMATIONAL
MOS
04-JUN-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 211 Of 748
@ Camp Systems
EFTA00618502
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-02-020 REV. A BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER
MOS
03-NOV-2005
SL 737-SL-02-020 REV. 8 BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER
MOS
I I -SEP-2006
SL 737-SL-02-020 REV. C BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER
MOS
I2-FEB-2007
SL 737-SL-02-021 UPDATE 10.5 INCORPORATION OF 2005 MAGNETIC VARIATION DATA. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-2004
SL 737-SL-02-022 STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO INFORMATIONAL
TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED
STATES NATIONAL AIRSPACE. SERVICE LETTER
MOS
31-AUG-2005
SI. 737-SL-02-022 REV. A STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE NAVIGATION IN UNITED STATES
NATIONAL AIRSPACE. SERVICE LETTER
MOS
22-SEP-2005
SI. 737-SL-02-022 REV. 8 STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED
STATES NATIONAL AIRSPACE SERVICE LETTER
MOS
29-JUN-2006
SL 737-SL-02-022 REV. C STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED SUPERSEDED
STATES NATIONAL AIRSPACE (SUPERSEDED BY 737-SL-02-022 REV.D). SERVICE LETTER
MOS
7-JUL-2007
SL 737-SL-02-022 REV. D STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED RECOMMENDED
STATES NATIONAL AIRSPACE SERVICE LETTER
MOS
08-FEB-20I2
SL 737-SL-02-023 TRANSPORT OF LIQUID CARGO. SERVICE LETTER RECOMMENDED
MOS
15-DEC-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 212 Of 748
@ Camp Systems
EFTA00618503
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-02-024 LITHIUM BATTERY FIRE FIGHTING RECOMMENDATIONS (SUPERSEDED BY SL 737-SL-02-024 REV. A). SERVICE SUPERSEDED
LETTER
MOS
51 737-SL-02-024 REV. A LITHIUM BATTERY FIRE FIGHTING RECOMMENDATIONS. SERVICE LETTER RECOMMENDED
MOS
28-APR-20I4
51 737-SL-03-004 AVIOD USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES. SERVICE LETTER
MOS
16-AUG-2005
St 737-SL-03-004 REV. A AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON SUPERSEDED
AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. 8). SERVICE LETTER
MOS
SL 737-SL-03-004 REV. 8 AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
13-JUL-2011
SL 737-SL-03-004 REV. C AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. 0). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-03-004 REV. 0 AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. E). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-03-004 REV. E AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON RECOMMENDED
AIRPLANES. SERVICE LETTER
MOS
I8-FEB-2014
SL 737-SL-05-011 REPORTING PARTS DEPARTING AIRPLANE. SERVICE LETTER RECOMMENDED
MOS
31-JUL-2009
SL 737-SL-05-012 CONTROL AND ELIMINATION OF CIMICIDAE (BED BUGS) ON AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
24-MAY-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 213 Of 748
@ Camp Systems
EFTA00618504
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-05-013 REPORTING FUEL IMBALANCE EXCEEDANCES TO BOEING. SERVICE LETTER RECOMMENDED
MOS
I3-MAR-2014
SL 737-SL-05-014 CONTROL AND ELIMINATION OF RODENTS ON AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
20-JAN-2014
St 737-SL-09-002 TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. A). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-09-002 REV. A TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. B). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-09-002 REV. B TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. C), SERVICE LETTER SUPERSEDED
MOS
St 737-SL-09-002 REV. C TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. 0). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-09-002 REV. 0 TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. E). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-09-002 REV. E TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. F). SERVICE LETTER RECOMMENDED
MOS
I6-OCT-2009
St 737-SL-09-002 REV. F TOWBARLESS TOWING, SERVICE LETTER RECOMMENDED
MOS
I8-DEC-2013
St 737-SL-09-003 737 NOSE GEAR COLLAPSE POTENTIAL DURING
TOWING4PUSHBACK SERVICE LETTER
MOS
I2-JUL-2007
St 737-SL-09-003 REV. A 737 NOSE GEAR COLLAPSE POTENTIAL DURING
TOWING/PUSHBACK SERVICE LETTER
MOS
17-JAN-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 214 Of 748
@ Camp Systems
EFTA00618505
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-11-005 RED CROSS PLACARDS. SERVICE LETTER INFORMATIONAL
MOS
II -MAR-1998 -(s)
51 737-SL-11-005 REV. A RED CROSS PLACARDS. SERVICE LETTER INFORMATIONAL
MOS
06-MAY-1998 -(s)
51 737-SL-11-005 REV. 8 RED CROSS PLACARDS. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-1998 - (s)
SL 737-SL-11-007 PASSENGER ENTRY DOOR HANDLE ARROW PLACARD MODIFICATION.. SERVICE LETTER INFORMATIONAL
MOS
08-OCT-1999 - (s)
51 737-SL-11-009 EXTERNAL POWER PANEL-INCORRECT VOLTAGE MARKING. SERVICE LETTER INFORMATIONAL
MOS
31-MAY-2000 -(s)
51 737-SL-11-010 LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER INFORMATIONAL
MOS
OI -JUN-2001 - (s)
51 737-SL-11-010 REV. A EXTERIOR PLACARDS PEELING FROM AIRPLANE. SERVICE LETTER INFORMATIONAL
MOS
I5-APR-2003
51 737-SL-11-011 REV. A OWNER NAMEPLATE-INSPECTION AND REWORK. SERVICE LETTER INFORMATIONAL
MOS
10-FEB-2004
51 737-SL-11-013 P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT
NOMENCLATURE. SERVICE LETTER
MOS
26-SEP-2008
SI. 737-SL-11-013 REV. A P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT RECOMMENDED
NOMENCLATURE. SERVICE LETTER
MOS
I5-JUL-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 215 Of 748
@ Camp Systems
EFTA00618506
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-11-013 REV. 8 P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT
NOMENCLATURE. SERVICE LETTER
MOS
21-AUG-2009
51 737-SL-11-014 E/E BAY ACCESS DOOR STENCILS. SERVICE LETTER RECOMMENDED
MOS
23-AUG-2013
51 737-SL-11-015 FORWARD AND AFT DOOR SILL DRAIN SYSTEM STENCIL REPLACEMENTS (SUPERSEDED BY SL 737-SL-11-015 REV. SUPERSEDED
A). SERVICE LETTER
MOS
51 737-SL-11-015 REV. A FORWARD AND AFT DOOR SILL DRAIN SYSTEM STENCIL REPLACEMENTS. SERVICE LETTER RECOMMENDED
MOS
02-JUN-2014 - (s)
51 737-SL-12-011 AIRPLANE HIGH PRESSURE WASHING VIDEO. SERVICE LETTER INFORMATIONAL
MOS
25-JUN-1993 - (s)
51 737-SL-12-011 REV. A AIRPLANE HIGH PRESSURE WASHING VIDEO. SERVICE LETTER INFORMATIONAL
MOS
02-APR-1999 -
51 737-SL-12-011 REV. 8 AIRPLANE HIGH PRESSURE WASHING VIDEO (SUPERSEDED BY 737-SL-12-011 REV. C). SERVICE LETTER SUPERSEDED
MOS
18-MAY-1999 -(s)
SL 737-SL-12-011 REV. C AIRPLANE HIGH PRESSURE WASHING VIDEO, SERVICE LETTER RECOMMENDED
MOS
08-JUL-2010
51 737-SL-12-014 DEICING/ANTI-ICING FLUID RESIDUE REHYDRATION AND FREEZING.. SERVICE LETTER INFORMATIONAL
MOS
11-JAN-2000 - (s)
51 737-SL-12-015 RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER INFORMATIONAL
MOS
13-JUL-2001 - (s)
51 737-SL-12-015 REV. A RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER
MOS
17-JUL-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 216 Of 748
@ Camp Systems
EFTA00618507
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-12-01S REV. B RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER
MOS
26-SEP-2007
SL 737-SL-12-016 INTRODUCTION OF RE-BRANDED NAMES FOR APPROVED OILS. SERVICE LETTER INFORMATIONAL
MOS
09-OCT-2001 - Is)
SI. 737-SL-12-017 CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE FROM ELEVATOR BALANCE PANEL CAVITY AREA. SERVICE INFORMATIONAL
LETTER
MOS
10-APR-2002 - (s)
SI. 737-SL-12-017 REV. A CLEANING OF DEICING/ANIT-ICING FLUID RESIDUE FROM ELEVATOR BALANCE PANEL CAVITY AREA. SERVICE INFORMATIONAL
LETTER
MOS
23-MAY-2002 - (s)
SI. 737-SL-12-018 LANDING GEAR MAINTENANCE DURING COLD WEATHER
OPERATION. SERVICE LETTER
MOS
73-OCT-2006
SL 737-SL-12-018 REV. A LANDING GEAR MAINTENANCE DURING COLD WEATHER OPERATION. SERVICE LETTER RECOMMENDED
MOS
18-MAR-2013
SL 737-SL-12-019 DEICING/ANTI-ICING FLUID RESIDUES CAUSING FLIGHT CONTROL RESTRICTIONS. SERVICE LETTER
MOS
14-NOV-2006
SL 737-SL-12-019 REV. A DEICING/ANTI-ICING FLUID RESIDUES CAUSING FLIGHT
CONTROL RESTRICTIONS. SERVICE LETTER
MOS
28-AUG-2007
SL 737-SL-12-020 LANDING GEAR WASHING AND CLEANING PRACTICES (SUPERSEDED BY SL 737-SL-12-020 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-12-020 REV. A LANDING GEAR WASHING AND CLEANING PRACTICES. SERVICE LETTER RECOMMENDED
MOS
C6-JUN-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 217 Of 748
@ Camp Systems
EFTA00618508
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-12-022 IATA GUIDANCE MATERIAL ON STANDARD INTO-PLANE FUEUNG PROCEDURES. SERVICE LETTER RECOMMENDED
MOS
20-JAN-2011
SL 737-SL-12-022 REV. A IATA GUIDANCE MATERIAL ON STANDARD INTO-PLANE FUEUNG PROCEDURES. SERVICE LETTER RECOMMENDED
MOS
27-JAN-2011
SL 737-SL-156-A UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER
MOS
- (s)
SL 737-SL-20-005 APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St SUPERSEDED
737-SL-20-005 REV. A). SERVICE LETTER
MOS
SL 737-SL-20-005 REV. A APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St SUPERSEDED
737-SL-20-005 REV. 8). SERVICE LETTER
MOS
St 737-SL-20-005 REV. 8 APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St SUPERSEDED
737-SL-20-005 REV. C). SERVICE LETTER
MOS
SL 737-SL-20-005 REV. C APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL SUPERSEDED
AIRCRAFT MAINTENANCE (SUPERSEDED BY SL 737-SL-20-005 REV. D). SERVICE LETTER
MOS
SL 737-SL-20-005 REV. D APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE. SERVICE LETTER RECOMMENDED
MOS
I4-JAN-2014
SL 737-SL-20-012 QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER INFORMATIONAL
MOS
I -MAR-1987 - (s)
SL 737-SL-20-012 REV. A QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER INFORMATIONAL
MOS
04-MAY-1987
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 218 Of 748
@ Camp Systems
EFTA00618509
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-012 REV. 8 QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER INFORMATIONAL
MOS
31-MAR-1992 - Is)
SL 737-SL-20-012 REV. C QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER INFORMATIONAL
MOS
05-FEB-2001
SL 737-SL-20-014 REV. 8 CONTROL CABLE CHANGE TO IMPROVE TENSION STABILITY. SERVICE LETTER
MOS
20-OCT-2008
SL 737-SL-20-025 REV. A EVALUATION OF GENERAL PURPOSE GREASES FOR ROUTINE RECOMMENDED
RELUBRICATION DURING AIRPLANE MAINTENANCE. SERVICE LETTER
MOS
26-K1AR-2009
SL 737-SL-20-027 REV. C SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRCRAFT. SERVICE LETTER
MOS
I6-NOV-2001 - (4)
SL 737-SL-20-027 REV. D SUMMARY OF MOST COMMONLY USED GREASES ON BOEING
AIRPLANES (SUPERSEDED BY SL 737-SL-20-027 REV. E). SERVICE LETTER
MOS
C6-AUG-2008
SI. 737-SL-20-027 REV. E SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRPLANES (SUPERSEDED BY 737-SL-20-027 REV. F). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-20-027 REV. F SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
26-JUN-20I3
SL 737-SL-20-029 REV. A AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER INFORMATIONAL
MOS
20-MAY-2003
SL 737-SL-20-029 REV. B AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER INFORMATIONAL
MOS
24-JUL-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 219 Of 748
@ Camp Systems
EFTA00618510
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-029 REV. C AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER
MOS
O1-MAR-2005
SL 737-SL-20-032 REV. A BMS 3-33 GENERAL PURPOSE AIRCRAFT GREASE. SERVICE LETTER INFORMATIONAL
MOS
I4-AUG-2001 - (s)
SL 737-SL-20-032 REV. 8 BMS 3-33 GENERAL PURPOSE AIRCRAFT GREASE. SERVICE LETTER RECOMMENDED
MOS
26-MAR-2009
SL 737-SL-20-034 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
03-MAY-1991 -144
SL 737-SL-20-034 REV. A WIRE BUNDLE/COAXIAL CABLE ORDERING/FABRICATING PROCEDURE SERVICE LETTER INFORMATIONAL
MOS
I6-JUN-1997 - (s)
SL 737-SL-20-034 REV. 8 WIRE BUNDLE/COAXIAL CABLE ORDERING/FABRICATING PROCEDURE SERVICE LETTER INFORMATIONAL
MOS
I6-JUL-1999 - (s)
SL 737-SL-20-035 AS HOSE INTERCHANGEABILIN FOR POTABLE AND GREY WATER. SERVICE LETTER INFORMATIONAL
MOS
20-JUL-1998 - (s)
SL 737-SL-20-036 NAS1611. NAS1612. NAS1613SEAL AND SEAL MATERIAL CHANGES. SERVICE LETTER
MOS
04-JUN-1999 - (s)
SL 737-SL-20-037 LOW BREAKAWAY TORQUE ON KAYNAR NAS 1805-5L.. SERVICE LETTER INFORMATIONAL
MOS
30-MAY-2000 -(s)
SL 737-SL-20-038 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
31-OCT-2000 -
SL 737-SL-20-038 REV. A CONTROL CABLE TENSION INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
22-OCT-2002
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 220 Of 748
@ Camp Systems
EFTA00618511
AD/SI Status Report AIRCRAFT
C 4 11 Megnand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-038 REV. 8 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
I 7-JUL-2003
SL 737-SL-20-040 PART MARKING., SERVICE LETTER INFORMATIONAL
MOS
30-MAY-2001
SL 737-SL-20-041 OVERHAUL OF HIGH STRENGTH STEEL COMPONENTS - CADMIUM STRIP REQUIRED. SERVICE LETTER INFORMATIONAL
MOS
22-MAR-2002 - (s)
SL 737-SL-20-042 REV. A MATERIAL REVIEW BOARD ACTION ON TILEFLEX STANDARD HOSES SHIPPED AS SPARES. SERVICE LETTER INFORMATIONAL
MOS
28-JAN-2003
SL 737-SL-20-043 DEFERRED APPLICATION OF AERO-SEALANT, SERVICE LETTER INFORMATIONAL
MOS
16-AUG-2002
SL 737-SL-20-043 REV. A DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER INFORMATIONAL
MOS
02-MAY-2003
SL 737-SL-20-043 REV. 8 DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER INFORMATIONAL
MOS
13-NOV-2003
SL 737-SL-20-043 REV. C DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER
MOS
I I -JUN-2007
SL 737-SL-20-044 ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5 (SUPERSEDED BY SL SUPERSEDED
737-SL-20-044 REV. A). SERVICE LETTER
MOS
St 737-SL-20-044 REV. A ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5 (SUPERSEDED BY SUPERSEDED
737-SL-20-044 REV. 8). SERVICE LETTER
MOS
SL 737-SL-20-044 REV. 8 ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5. SERVICE LETTER RECOMMENDED
MOS
I4-JUN-20 I 1
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 221 Of 748
@Camp Systems
EFTA00618512
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-045 GASKET IN LIEU OF SEALANT FOR ANTENNA INSTALLATIONS. SERVICE LETTER INFORMATIONAL
MOS
07-AUG-2003
SI. 737-SL-20-045 REV. A USE OF GASKET IN LIEU OF SEALANT FOR THE FOLLOWING ANTENNA INSTALLATION (SUPERSEDED BY SL SUPERSEDED
737-SL-20-045 REV. 8). SERVICE LETTER
MOS
SL 737-SL-20-045 REV. 8 USE OF GASKET IN LIEU OF SEALANT FOR THE FOLLOWING ANTENNA INSTALLATIONS: AIR TRAFFIC CONTROL (ATC). RECOMMENDED
DISTANCE MEASURING EQUIPMENT (DME). LOW RANGE RADIO ALTIMETER (LRRA). MARKER BEACON (MB). TRAFFIC
ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS). AND VERY HIGH FREQUENCY (VHF) COMMUNICATION
ANTENNAS. SERVICE LETTER
MOS
19-NOV-20I3
SL 737-SL-20-047 CIRCUIT BREAKER RELIABILITY. SERVICE LETTER
MOS
07-JAN-2005
SL 737-SL-20-048 NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRULIC FLUID EXTERNAL LEAKAGE LOW TEMPERATURES. SERVICE
LETTER
MOS
19-DEC-2005
SL 737-SL-20-048 REV. A NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES.
SERVICE LETTER
MOS
21-MAR-2006
SL 737-SL-20-048 REV. 8 NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES.
SERVICE LETTER
MOS
22-SEP-2006
SL 737-SL-20-048 REV. C NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES.
SERVICE LETTER
MOS
29-JUN-2007
SL 737-SL-20-048 REV. D NAS16114COCA CODE O-RING STATIC SEALS - HYDRAULIC
FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES. SERVICE LETTER
MOS
09-APR-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 222 Of 748
@ Camp Systems
EFTA00618513
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-049 BACC1OKB( ) CONNECTOR BACKSHELL CHAFE. SERVICE LETTER
MOS
I4-NOV-2006
SL 737-SL-20-049 REV. A BACC1OKB( ) CONNECTOR BACKSHELL CHAFE. SERVICE LETTER
MOS
21-NOV-2007
SI. 737-SL-20-050 REPAINTING AIRPLANES THAT EXHIBIT FUSELAGE DECORATIVE PAINT PEELING FROM RIVET HEADS - -RIVET RASH'.
SERVICE LETTER
MOS
IS-FEB-2007
SL 737-SL-20-05I POSSIBLE INCORRECT WIRING BRACKET LOCATION. SERVICE LETTER RECOMMENDED
MOS
IS-JUL-2009
SL 737-SL-20-05I REV. A POSSIBLE INCORRECT WIRING BRACKET LOCATION (SUPERSEDED BY SL 737-SL-20-051 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-20-051 REV. B POSSIBLE INCORRECT WIRING BRACKET LOCATION. SERVICE LETTER
MOS
IS-JUL-2010
SL 737-SL-20-052 WIRE BUNDLE SUPPORT BRACKETS IN NOSE GEAR E/E BAY RECOMMENDED
INCORRECTLY INSTALLED. SERVICE LETTER
MOS
13-AUG-2009
SL 737-SL-20-052 REV. A WIRE BUNDLE SUPPORT BRACKETS IN NOSE GEAR E/E BAY RECOMMENDED
INCORRECTLY INSTALLED. SERVICE LETTER
MOS
02-OCT-2009
SL 737-SL-20-053 ELECTRICAL CONNECTOR CORROSION IN UNPRESSURIZED RECOMMENDED
AREAS. SERVICE LETTER
MOS
04-N0V-2009
SL 737-SL-20-054 SEVEN CONNECTORS WITH POTENTIALLY INCORRECT PLATING (SUPERSEDED BY SL 737-SL-20-054 REV. A). SUPERSEDED
SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 223 Of 748
@ Camp Systems
EFTA00618514
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-20-054 REV. A SEVEN CONNECTORS WITH POTENTIALLY INCORRECT PLATING. SERVICE LETTER RECOMMENDED
MOS
30-SEP-2010
SL 737-SL-20-055 GROUND BLOCK CORROSION. SERVICE LETTER RECOMMENDED
MOS
10-JAN-2012
SL 737-SL-20-056 INSPECTION FOR CORRECT LABELING OF THE TERMINAL BLOCKS IN THE .138 JUNCTION BOX. SERVICE LETTER RECOMMENDED
MOS
28-MAR-2011
SL 737-SL-20-057 SAFETY WIRE (LOCKWIRE) MATERIAL SELECTION AND USAGE INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED
MOS
04-SEP-2013
SL 737-SL-21-033 REV. D RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER
MOS
28-MAY-2008
SL 737-SL-21-033 REV. E RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER
MOS
0I-AUG-2008
SL 737-SL-21-033 REV. F RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. G). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-21-033 REV. G RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. H). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-21-033 REV. H RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. I). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-21-033 REV. I RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. J). SERVICE SUPERSEDED
LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 224 Of 748
@ Camp Systems
EFTA00618515
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-033 REV. J RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER RECOMMENDED
MOS
28-MAY-20I4
SL 737-SL-21-044 DIGITAL CABIN PRESSURE SYSTEM - CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED
REV. A). SERVICE LETTER
MOS
SL 737-SL-21-044 REV. A DIGITAL CABIN PRESSURE SYSTEM - CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED
REV. B). SERVICE LETTER
MOS
SL 737-SL-21-044 REV. 8 DIGITAL CABIN PRESSURE SYSTEM -CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED
REV. C). SERVICE LETTER
MOS
SL 737-SL-21-044 REV. C DIGITAL CABIN PRESSURE SYSTEM-CABIN PRESSURE EXCURSIONS DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED
REV. D). SERVICE LETTER
MOS
SL 737-SL-21-044 REV. D DIGITAL CABIN PRESSURE SYSTEM -CABIN PRESSURE EXCURSION DUE TO EMI. SERVICE LETTER RECOMMENDED
MOS
78-JUL-2011
SL 737-SL-21-045 SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER INFORMATIONAL
MOS
-SEP-1998 - (s)
SL 737-SL-21-045 REV. A SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER INFORMATIONAL
MOS
19-APR-1999 - (s)
SL 737-SL-21-045 REV. 8 SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER INFORMATIONAL
MOS
04-OCT-1999 - (s)
SL 737-SL-21-045 REV. C SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER INFORMATIONAL
MOS
03-JUN-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 225 Of 748
@ Camp Systems
EFTA00618516
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-045 REV. D SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-2CO3
SL 737-SL-21-045 REV. E SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO)
CHECK. SERVICE LETTER
MOS
22-AUG-2007
SL 737-SL-21-045 REV. F SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO)
CHECK. SERVICE LETTER
MOS
02-JUN-2008
SL 737-SL-21-045 REV. G SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) RECOMMENDED
CHECK. SERVICE LETTER
MOS
27-OCT-2009
SL 737-SL-21-046 PASSENGER CABIN TEMPERATURE SENSOR INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
20-OCT-1998 - Is)
SL 737-SL-21-050 MODIFICATION OF THE AFT CABIN ZONE TEMPERATURE INDICATION SYSTEM WIRING.. SERVICE LETTER INFORMATIONAL
MOS
29-OCT-1999 - Is)
SL 737-SL-21-051 DIGITAL CABIN PRESSURE CONTROLLER-SOFTWARE UPGRADE. SERVICE LETTER INFORMATIONAL
MOS
29-OCT-1999 - (s)
SL 737-SL-21-052 AIR CYCLE MACHINE FAN DESIGN IMPROVEMENT.. SERVICE LETTER INFORMATIONAL
MOS
02-FEB-2000 - Is)
SL 737-SL-21-053 USE OF GROUND SOURCE CONDITIONED MR IN LIEU OF AIRPLANES ECS AIR CONDITIONING PACKS (SUPERSEDED SUPERSEDED
BY SL 737-SL-21-053 REV. A). SERVICE LETTER
MOS
- (s)
SL 737-SL-21-053 REV. A USE OF GROUND SOURCE CONDITIONED MR IN LIEU OF AIRPLANE ECS AIR CONDITIONING PACKS. SERVICE LETTER RECOMMENDED
MOS
I 7-OCT-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 226 Of 748
@ Camp Systems
EFTA00618517
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-055 NEW RECIRCULATION AIR FILTER. SERVICE LETTER INFORMATIONAL
MOS
02-JAN-2003
SL 737-SL-21-056 REV. A RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
11-MAY-2004 •
SL 737-SL-21-056 REV. C RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER
MOS
02-DEC-2005 •
SL 737-SL-21-056 REV. D RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER
MOS
30-MAR-2006 •
SL 737-SL-21-056 REV. E RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER
MOS
23-MAR-2007 •
SL 737-SL-21-056 REV. F RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER
MOS
10-JUL-2007
SL 737-SL-21-058 SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER INFORMATIONAL
MOS
21-JUL-2003
SL 737-SL-21-058 REV. B SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER INFORMATIONAL
MOS
09-JUN-200,1
SL 737-SL-21-058 REV. C SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER
MOS
03-APR-2007
SL 737-SL-21-059 AIR-CONDITIONING HIGH PRESSURE WATER SEPERATOR DRAM MANIFOLD INSPECTION. SERVICE LETTER
MOS
18-JUL-2003 •
SL 737-SL-21-060 RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM INFORMATIONAL
COMPONENTS. SERVICE LETTER
MOS
25-SEP-2003
9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 227 Of 748
1' Camp Systems
EFTA00618518
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-060 REV. A CLEAN RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM RECOMMENDED
COMPONENTS. SERVICE LETTER COOLING SYSTEM
MOS
25-SEP-2003
SL 737-SL-21-060 REV. B INSPECT RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM RECOMMENDED
COMPONENTS. SERVICE LETTER IFE EQUIPMENT
MOS
25-SEP-2003 800 (s)
SL 737-SL-21-062 REV. B OPTIONAL PART FOR RIGHT AIR CYCLE MACHINE (ACM) SENSE LINE. SERVICE LETTER
MOS
I6-APR-2007
SL 737-SL-21-062 REV. C AIR CYCLE MACHINE (ACM) SENSE LINES. SERVICE LETTER
MOS
I6-JAN-2009
SI. 737-SL-21-063 NUISANCE PACK/ZONE TEMP LIGHT ILLUMINATION ON RECALL THAT RESETS - CONTROLLER INPROVEMENT. NOT APPLICABLE - BY EFFECTIVITY -
SERVICE LETTER
MOS
30-SEP-2004
SL 737-SL-21-064 OUTFLOW VALVE SOFTWARE UPGRADE AND EMI ENHANCEMENT. SERVICE LETTER
MOS
04-NOV-2004
SL 737-SL-21-065 AIR CONDITIONING FLEX HOSE SEPARATION AT THE OVERHEAD DISTRIBUTION TAPED JOINTS. SERVICE LETTER
MOS
15-K4AR-2005
SL 737-SL-21-065 REV. A AIR CONDITIONING FLEX HOSE SEPARATION AT THE
OVERHEAD DISTRIBUTION TAPED JOINTS. SERVICE LETTER
MOS
23-AUG-2007
SL 737-SL-21-066 COOLING PACK MR CYCLE MACHINE TURBINE TORUS EROSION. SERVICE LETTER
MOS
I9-JUL-2005
SL 737-SL-21-067 FLIGHT DECK MUFFLER REPLACEMENT. SERVICE LETTER
MOS
07-DEC-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 228 Of 748
@ Camp Systems
EFTA00618519
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-068 AIRPLANE PRESSURIZATION - GUIDANCE TO UNDERSTANDING. SERVICE LETTER
MOS
20-MAR-2006
51 737-SL-21-070 OUTFLOW VALVE MODIFICATION. SERVICE LETTER
MOS
I3-DEC-2006
51 737-SL-21-071 MISSING BOND JUMPER CABLE ON NC PACK. SERVICE LETTER
MOS
30-NOV-2006
51 737-SL-21-071 REV. A MISSING BOND JUMPER CABLE ON NC PACK, SERVICE LETTER
MOS
08-FEB-2007
51 737-SL-21-071 REV. B MISSING BOND JUMPER CABLE ON NC PACK, SERVICE LETTER
MOS
09-APR-2007
51 737-SL-21-072 DIGITAL CABIN PRESSURE CONTROL SYSTEM - CONTROLLER SOFTWARE UPDATE. SERVICE LETTER
MOS
23-FEB-2007
51 737-SL-21-072 REV. A DIGITAL CABIN PRESSURE CONTROL SYSTEM - CONTROLLER SOFTWARE UPDATE. SERVICE LETTER
MOS
02-MAR-2007
51 737-SL-21-073 PRESSURIZATION TROUBLESHOOTING GUIDANCE. SERVICE LETTER
MOS
24-JAN-2007
51 737-SL-21-074 COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074
REV. A). SERVICE LETTER
MOS
20-APR-2007
SL 737-SL-21-074 REV. A COMPONENT INTERCHANGEABILITY - DIGITAL CABIN
PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 REV. B). SERVICE LETTER
MOS
23-DEC-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 229 Of 748
@ Camp Systems
EFTA00618520
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-074 REV. 8 COMPONENT INTERCHANGEABILITY - DIGITAL CABIN SUPERSEDED
PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 REV. C). SERVICE LETTER
MOS
SL 737-SL-21-074 REV. C COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 SUPERSEDED
REV. 0). SERVICE LETTER
MOS
SL 737-SL-21-074 REV. D COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM. SERVICE LETTER RECOMMENDED
MOS
24-JAN-2014
SL 737-SL-21-075 DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER
MOS
01-MAY-2007
SL 737-SL-21-075 REV. A DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER
MOS
09-NOV-2007
SL 737-SL-21-075 REV. B DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER
MOS
30-APR-2008
SL 737-SL-21-077 AIR-CONDITIONING HIGH PRESSURE WATER SEPARATOR SUPERSEDED
DRAIN MANIFOLD PLUG (SUPERSEDED BY SL 737-SL-21-077 REV. A). SERVICE LETTER
MOS
SL 737-SL-21-077 REV. A AIR-CONDITIONING HIGH PRESSURE WATER SEPARATOR RECOMMENDED
DRAIN MANIFOLD PLUG. SERVICE LETTER
MOS
24-JUN-20I4
SL 737-SL-21-078 FORWARD DOOR HEAT SYSTEM DUCT KINKING. SERVICE LETTER
MOS
20-FEB-2008
SL 737-SL-21-078 REV. A FORWARD DOOR HEAT SYSTEM FLEXIBLE DUCT KINKING, SERVICE LETTER
MOS
37 -JUL-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 230 Of 748
@ Camp Systems
EFTA00618521
AD/SI Status Report AIRCRAFT
C 4 11 Megnand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-078 REV. B FORWARD DOOR HEAT SYSTEM FLEXIBLE DUCT KINKING. SERVICE LETTER RECOMMENDED
MOS
02-APR-2009
SI. 737-SL-21-079 EÆ COOLING IN PS PANEL - POTENTIAL WIRE CHAFING RECOMMENDED
AGAINST HOSE CLAMP. SERVICE LETTER
MOS
I2-MAY-2009
SL 737-SL-21-080 AIR-CONDITIONING DUCT CLAMP ASSEMBLY TORQUE. SERVICE LETTER RECOMMENDED
MOS
23-JAN-2009
SL 737-SL-21-080 REV. A AIR-CONDITIONING DUCT CLAMP ASSEMBLY TORQUE. SERVICE LETTER RECOMMENDED
MOS
31-MAR-2009
SL 737-SL-21-081 CABIN ALTITUDE AND DIFFERENTIAL PRESSURE INDICATOR RECOMMENDED
INSPECTION. SERVICE LETTER
DAYS 90 (s)
24-APR-2009
SL 737-SL-21-082 CABIN ALTITUDE AND DIFFERENTIAL PRESSURE INDICATOR RECOMMENDED
REPLACEMENT. SERVICE LETTER
MOS
I2-MAY-2009
SL 737-SL-21-083 PROTECTIVE CAPS NOT REMOVED FROM MIX MANIFOLD RECOMMENDED
TEMPERATURE SENSORS. SERVICE LETTER
MOS
08-OCT-2009
SL 737-SL-21-084 TRANSPORTATION OF CRYOGENIC LIQUIDS (SUPERSEDED BY SL 737-SL-21-084 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-21-084 REV. A TRANSPORTATION OF CRYOGENIC LIQUIDS (SUPERSEDED BY SL 737-SL-21-084 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-21-084 REV. B TRANSPORTATION OF CRYOGENIC LIQUIDS. SERVICE LETTER RECOMMENDED
MOS
I8-JUL-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 231 Of 748
@Camp Systems
EFTA00618522
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-086 DIGITAL CABIN SELECTOR PANEL - VALVE POSITION RECOMMENDED
INDICATION REPLACEMENT. SERVICE LETTER
MOS
23-DEC-2009
SL 737-SL-21-087 DIGITAL CABIN PRESSURE CONTROLLER - P/N 7121-19971-01XX ON-WING SERVICE LIFE. SERVICE LETTER RECOMMENDED
MOS
15-FEB-2010
SL 737-SL-21-088 DIGITAL CABIN PRESSURE CONTROLLER - SOFTWARE FOR DOWNLOAD AND ANALYSIS OF NON-VOLATILE MEMORY. RECOMMENDED
SERVICE LETTER
MOS
20-JUL-2010
SL 737-SL-21-089 OUTFLOW VALVE: ATTACHMENT CLAMP:BOLT-INTERFERENCE CONDITION (SUPERSEDED BY SL 737-SL-21-089 REV. RECOMMENDED
A). SERVICE LETTER
MOS
26-JUL-2011
SL 737-SL-21-089 REV. A OUTFLOW VALVE: ATTACHMENT CLAMP:BOLT-INTERFERENCE CONDITION. SERVICE LETTER RECOMMENDED
MOS
19-MAR-2013
SL 737-SL-21-091 AIR CONDITIONING TEMPERATURE CONTROL VALVE IMPROVEMENT (SUPERSEDED BY SL 737-SL-21-091 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-21-091 REV. A AIR CONDITIONING TEMPERATURE CONTROL VALVE IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
04-SEP-2013
SL 737-SL-21-092 CABIN ENVIRONMENTAL QUALITY - INFECTION CONTROL GUIDELINES. SERVICE LETTER RECOMMENDED
MOS
10-DEC-2012
SI. 737-SL-21-094 CABIN PRESSURE CONTROLLER. ADDITIONAL LAYER OF TAPE (ALOP) FOR COPPER TAPE PROTECTION. SERVICE RECOMMENDED
LETTER
MOS
30-MAY-2013
SI. 737-SL-21-095 ACMS 'USER GUIDE FOR ENHANCED PRESSURIZATION SYSTEM TROUBLESHOOTING AND HEALTH MANAGEMENT. RECOMMENDED
SERVICE LETTER
MOS
02-APR-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 232 Of 748
@ Camp Systems
EFTA00618523
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-21-096 PACK DISCHARGE OVERHEAT SWITCH - POSSIBLE WRONG PART NUMBER INSTALLED. SERVICE LETTER RECOMMENDED
MOS
17-OCT-2013
SL 737-SL-21-097 POSSIBLE UNDER-TORQUE OF THE GROUNDING JUMPER TO THE RAM AIR INLET ACTUATOR. SERVICE LETTER RECOMMENDED
MOS
03-MAR-2014
SI. 737-SL-21-099 SMART RAM AIR DOOR ACTUATOR (SRADA) - RAM AIR DOOR STATUS LIGHT ILLUMINATION - SUSPECT CONNECTOR SUPERSEDED
BUILD (SUPERSEDED 8Y SI. 737-SL-21-099 REV. A). SERVICE LETTER
MOS
SI. 737-SL-21-099 REV. A SMART RAM AIR DOOR ACTUATOR (SRADA) - RAM AIR DOOR STATUS LIGHT ILLUMINATION - SUSPECT CONNECTOR RECOMMENDED
BUILD. SERVICE LETTER
MOS
I4-JUL-2014
SL 737-SL-22-040 AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
21-JAN-1999 - (s)
SL 737-SL-22-040 REV. A AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
I8-FEB-1999 - (s)
SL 737-SL-22-040 REV. B AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS.. SERVICE LETTER INFORMATIONAL
MOS
I0-FEB-2000 - (s)
SL 737-SL-22-043 737 AUTO THROTTLE COMPUTER. SERVICE LETTER INFORMATIONAL
MOS
08-MAR-2000 - (s)
SL 737-SL-22-044 FCC SOFTWARE UPDATE (-705), SERVICE LETTER INFORMATIONAL
MOS
31-MAY-2000 -(s)
SL 737-SL-22-045 AUTOTHROTTLE COMPUTER MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
08-SEP-2000 - (s)
SL 737-SL-22-046 FCC HARDWARE UPDATE (PM 10-62038-8).. SERVICE LETTER INFORMATIONAL
MOS
I3-NOV-2000 - (s)
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 233 Of 748
@ Camp Systems
EFTA00618524
AD/SI Status Report AIRCRAFT
flP Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-22-046 REV. A FCC HARDWARE UPDATE (PM 10-62038-8) (SUPERSEDED BY SL 737-SL-22-046 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-22-046 REV. 8 FCC HARDWARE UPDATE (P/N 10-62038-8). SERVICE LETTER RECOMMENDED
MOS
21-OCT-2011
SL 737-SL-22-047 FCC SOFTWARE UPDATE (-708). SERVICE LETTER INFORMATIONAL
MOS
I3-JUL-2001 - (s)
SL 737-SL-22-048 AUTO THROTTLE COMPUTER MODIFICATION (-54), SERVICE LETTER INFORMATIONAL
MOS
06-MAR-2002 -
SL 737-SL-22-051 FCC SOFTWARE UPDATE(-709). SERVICE LETTER INFORMATIONAL
MOS
I I -JUN-2002
SL 737-SL-22-052 REV. 8 COLLINS ENHANCED DIGITAL FLIGHT CONTROL SYSTEM (SUPERSEDED BY 51737-SL-22-052 REV. C). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-22-052 REV. C COLLINS ENHANCED DIGITAL FLIGHT CONTROL SYSTEM, SERVICE LETTER RECOMMENDED
MOS
29-JUL-2010
SL 737-SL-22-053 COLLINS FCC SOFTWARE UPDATE (-120). SERVICE LETTER INFORMATIONAL
MOS
09-FEB-2004
SL 737-SL-22-054 POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL'. SERVICE LETTER INFORMATIONAL
MOS
I 7-JUN-2004
SL 737-SL-22-054 REV. A POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL'. SERVICE LETTER INFORMATIONAL
MOS
02-JUL-2004
SL 737-SL-22-054 REV. B POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL 'A", SERVICE LETTER INFORMATIONAL
MOS
03-NOV-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 234 Of 748
@Camp Systems
EFTA00618525
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-22-056 REV. A COLLINS FCC SOFTWARE UPDATE (-130). SERVICE LETTER
MOS
I8-APR-2005
51 737-SL-22-056 REV. 8 COLLINS FCC SOFTWARE UPDATE (-130). SERVICE LETTER INFORMATIONAL
MOS
21-SEP-2005
SL 737-SL-22-057 COLLINS FCC SOFTWARE UPDATE (-100). SERVICE LETTER
MOS
04-AUG-2006
SL 737-SL-22-058 HONEYWELL FCC SOFTWARE UPDATE (-710), SERVICE LETTER COMPUED WITH
MOS 22-AUG-2008
09-AUG-2007 3260:48
AFL 782
SL 737-SL-22-059 COLLINS FCC SOFTWARE UPDATE (P5.0), SERVICE LETTER
MOS
29-JUN-2007
SL 737-SL-22-060 CAT IIIB AUTOPILOT ROLLOUT RUDDER POSITION
TRANSMITTER - MISSING LOCKWIRE. SERVICE LETTER
MOS
I9-FEB-2008
SL 737-SL-22-061 FIRST OFFICERS PITCH CONTROL WHEEL STEERING FORCE TRANSDUCER WIRE CONTACTING NEARBY WIRE RECOMMENDED
BUNDLE CLAMP HARDWARE. SERVICE LETTER
MOS
04-MAY-2011
SL 737-SL-22-062 COLLINS FCC SOFTWARE UPDATE (P7.0) (SUPERSEDED BY SL 737-SL-22-062 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-22-062 REV. A COLLINS FCC SOFTWARE UPDATE (P7.0), SERVICE LETTER RECOMMENDED
MOS
17-OCT-2012
SL 737-SL-22-063 ROCKWELL COLLINS FCC HARDWARE UPDATE- PIN'S 822-1600-102 AND -152. SERVICE LETTER RECOMMENDED
MOS
05-FEB-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 235 Of 748
@ Camp Systems
EFTA00618526
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-22-064 AUTOTHROTTLE COMPUTER MODIFICATION (P/N 10-62017-55) (SUPERSEDED BY 737-SL-22-064 REV. A). SERVICE SUPERSEDED
LETTER
MOS
51 737-SL-22-064 REV. A AUTOTHROTTLE COMPUTER MODIFICATION (P/N 10-62017-55). SERVICE LETTER
MOS
51 737-SL-23-01 PASSENGER ADDRESS AMPLIFIER MODIFICATION
. SERVICE LETTER
MOS
I6-MAY-1990
51 737-SL-23-020 VHF 8.33 I0-IZ CHANNEL SPACING, SERVICE LETTER INFORMATIONAL
MOS
16-SEP-1997 -(s)
51 737-SL-23-020 REV. A VHF 8.33 I0-IZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL
MOS
16-DEC-1997 -(s)
51 737-SL-23-020 REV. 8 VHF 8.33 KHZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL
MOS
28-MAY-1998 -(s)
51 737-SL-23-020 REV. C VHF 8.33 I0-IZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL
MOS
28-MAY-1998 -(s)
51 737-SL-23-021 HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL
MOS
18-MAR-1998 - (s)
51 737-SL-23-021 REV. A HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL
MOS
09-APR-1998 -(s)
51 737-SL-23-021 REV. 8 HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL
MOS
02-NOV-1998 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 236 Of 748
@ Camp Systems
EFTA00618527
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-23-023 RADIO COMMUNICATION COMPLIANT PINS. SERVICE LETTER INFORMATIONAL
MOS
22-DEC-1998 - Is)
51 737-SL-23-024 COMMUNICATIONS-HF AUDIO DISTORTION ON OPPOSITE HF. SERVICE LETTER INFORMATIONAL
MOS
08-MAR-1999 - (s)
51 737-SL-23-024 REV. A COMMUNICATIONS-HF AUDIO DISTORTION ON OPPOSITE HF. SERVICE LETTER INFORMATIONAL
51OS
27-MAY-1999 - (s)
51 737-SL-23-025 COMMANDED FREQUENCY CHANGE. SERVICE LETTER INFORMATIONAL
MOS
23-APR-200O - Is)
51 737-SL-23-025 REV. A COMMANDED FREQUENCY CHANGE.. SERVICE LETTER INFORMATIONAL
MOS
23-JAN-2001 - (s)
51 737-SL-23-026 LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL
MOS
23-APR-1999 - (s)
51 737-SL-23-026 REV. A LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL
MOS
27-MAY-1999 - Is)
51 737-SL-23-026 REV. 8 LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL
MOS
26-AUG-1999 - (s)
51 737-SL-23-027 SEAT ELECTRONICS BOX (SEB) MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
C6-AUG-1999 -
SL 737-SL-23-028 VHF ANTENNA CONNECTION CHANGE. SERVICE LETTER INFORMATIONAL
MOS
13-JUL-2001 -
51 737-SL-23-028 REV. A VHF ANTENNA CONNECTION CHANGE. SERVICE LETTER INFORMATIONAL
MOS
13-JUL-2001 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 237 Of 748
@ Camp Systems
EFTA00618528
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-23-029 INTERPHONE SYSTEM - REMOTE ELECTRONICS UNIT MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
15-AUG-2000 - Is)
St 737-SL-23-030 BOEING RADIO COMMUNICATIONS PANEL UPGRADE TO P/N 285U0037-61X. SERVICE LETTER INFORMATIONAL
MOS
27 -SEP-2000 -(s)
SL 737-SL-23-030 REV. 8 COMMUNICATIONS - BOEING RADIO COMMUNICATIONS PANEL (RCP) UPGRADE TO P/N 2850003761X. SERVICE INFORMATIONAL
LETTER
MOS
IO-AUG-2001 - Is)
St 737-SL-23-031 CABIN ATTENDANT HANDSET/FLIGHT DECK HANDSET, P/14 285W0024. SHELL REPLACEMENT.. SERVICE LETTER INFORMATIONAL
MOS
04-DEC-2000 - (s)
St 737-SL-23-031 REV. A CABIN ATTENDANT HANDSET/FLIGHT DECK HANDSET, PIN 285W0024. SHELL REPLACEMENT.. SERVICE LETTER INFORMATIONAL
MOS
04-APR-2001 - Is)
St 737-SL-23-032 REV. A AUDIO - REMOTE ELECTRONICS UNIT (REU) PIN 10-62090-121 (AVTECH PM 5340-1-1). SERVICE LETTER INFORMATIONAL
MOS
I9-OCT-2001 -(s)
St 737-SL-23-032 REV. 8 AUDIO-REMOTE ELECTRONICS UNIT PM 10-62090-121 (AVTECH PIN 5340-1-1). SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2002
St 737-SL-23-032 REV. C AUDIO-REMOTE ELECTRONICS UNIT PM 10-62090-121 (AVTECH FIN 5340-1-1). SERVICE LETTER INFORMATIONAL
MOS
I5-OCT-2003
St 737-SL-23-033 AUDIO CONTROL PANEL. P5-15. INTERFERENCE WITH SCREW. SERVICE LETTER INFORMATIONAL
MOS
OI -APR-2002 - (s)
St 737-SL-23-033 REV. A AUDIO CONTROL PANEL. P5-15. INTERFERENCE WITH SCREW. SERVICE LETTER INFORMATIONAL
MOS
26-NOV-2002
St 737-SL-23-035 HIGH FREQUENCY TRANSCEIVER. SERVICE LETTER INFORMATIONAL
MOS
I6-JUL-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (0 -Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 238 Of 748
@ Camp Systems
EFTA00618529
AD/SI Status Report AIRCRAFT
C 4 11 Megnand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-23-036 MULTI-INPUT INTERACTIVE DISPLAY UNIT (MIDU) PIN 964-0443-002/-003 MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
19-SEP-2003
SL 737-SL-23-037 GABLES NEW RADIO TUNING PANEL (RTP) PM G7404-12X. SERVICE LETTER INFORMATIONAL
MOS
15-OCT-2003
SL 737-SL-23-037 REV. B GABLES NEW RADIO TUNING PANEL (RTP) PM G7404-12X. SERVICE LETTER
MOS
09-JAN-2009
SL 737-SL-23-038 ARINC EUROPEAN VHF REOUENCY CHANGE. SERVICE LETTER INFORMATIONAL
MOS
10-SEP-2004
SL 737-SL-23-038 REV. A ARINC EUROPEAN VHF FREQUENCY CHANGE. SERVICE LETTER COMPLIED WITH
MOS 28-APR-2006
10-MAY-2005 2606:18
AFL 626
SL 737-SL-23-038 REV. B ARINC EUROPEAN VHF FREQUENCY CHANGE. SERVICE LETTER RECOMMENDED
MOS
13-AUG-2009
SL 737-SL-23-039 UNCOMMANDED CHANGE OF VHF COMMUNICATIONS FREQUENCY, SERVICE LETTER INFORMATIONAL
MOS
03-NOV-2004
SL 737-SL-23-040 PASSENGER ADDRESS (PA) POPPING/CRACKLING SOUND. SERVICE LETTER
MOS
28-FEB-2005
SL 737-SL-23-041 VHF NUMBER TWO ANTENNA CONNECTORS DISCONNECTING. SERVICE LETTER
MOS
II -OCT-2006
SI. 737-SL-23-042 VHF-2100 COM TRANSCEIVER - KEY EVENT SIGNAL LEVEL
CORRECTION. SERVICE LETTER
MOS
27 -SEP-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 239 Of 748
@Camp Systems
EFTA00618530
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-23-043 VHF-920 DATA RADIO (822-1250-002) - MODE LOCK-UP
CONDITION. SERVICE LETTER
MOS
12-JAN-2009
SL 737-SL-23-043 REV. A VHF-920 DATA RADIO (822-1250-002) - MODE LOCK-UP RECOMMENDED
CONDITION. SERVICE LETTER
MOS
09-JUL-2009
SL 737-SL-23-044 NOISE ON SERVICE INTERPHONE. SERVICE LETTER RECOMMENDED
MOS
I9-JAN-2010
SL 737-SL-23-044 REV. A NOISE ON SERVICE INTERPHONE (SUPERSEDED BY 737-SL-23-044-B). SERVICE LETTER SUPERSEDED
MOS
26-JAN-2010
SL 737-SL-23-044 REV. B NOISE ON SERVICE INTERPHONE. SERVICE LETTER
MOS
I3-MAY-2010
SL 737-SL-23-045 MISWIRING OF TERMINAL BLOCKS IN CVR SELF-TEST WIRING. SERVICE LETTER RECOMMENDED
MOS
22-DEC-2010
SI. 737-SL-23-046 BOEING SKY INTERIOR ATTENDANT CONTROL PANEL SOFTWARE IMPROVEMENTS-LOCK UPS AND UN-COMMANDED SUPERSEDED
UGHT CHANGES (SUPERSEDED BY SL 737-SL-23-046 REV. A). SERVICE LETTER
MOS
SI. 737-SL-23-046 REV. A BOEING SKY INTERIOR ATTENDANT CONTROL PANEL SOFTWARE IMPROVEMENTS-LOCK UPS AND UN-COMMANDED RECOMMENDED
UGHT CHANGES. SERVICE LETTER
MOS
18-OCT-2011
SL 737-SL-23-047 INTERPHONE (INT) SYSTEM NOISE. SERVICE LETTER RECOMMENDED
MOS
I7-JUL-2013
SL 737-SL-23-048 POSSIBLE INCORRECT ORIENTATION OF GROUND CREW CALL HORN. SERVICE LETTER RECOMMENDED
MOS
28-MAY-20I4
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 240 Of 748
@ Camp Systems
EFTA00618531
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-111 REV. A MAIN WHEEL WELL JUNCTION BOX. SERVICE LETTER INFORMATIONAL
MOS
08-SEP-2000 - (s)
51 737-SL-24-111 REV. B MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL
MOS
I6-JAN-2001 - (s)
51 737-SL-24-111 REV. C MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL
MOS
22-AUG-2001 - (s)
51 737-SL-24-111 REV. D MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL
MOS
28-NOV-2001 - (s)
51 737-SL-24-111 REV. E MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING (SUPERSEDED BY SI. 737-SL-24-111 REV. F). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-24-111 REV. F MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING. SERVICE LETTER RECOMMENDED
MOS
21-AUG-20I 2
SL 737-SL-24-125 CHECK SCREWS ATTACHING FEEDER TERMINALS TO RIGID BUS IN POWER DISTRIBUTION PANELS. SERVICE LETTER INFORMATIONAL
MOS
05-NOV-1998 - (s)
SL 737-SL-24-125 REV. A CHECK SCREWS ATTACHING FEEDER TERMINALS TO RIGID BUS IN POWER DISTRIBUTION PANELS. SERVICE LETTER INFORMATIONAL
MOS
C6-JAN-1999 - (s)
SL 737-SL-24-133 FUELING VALVE WIRE CHAFING, SERVICE LETTER INFORMATIONAL
MOS
23-FEB-1999 - (s)
SL 737-SL-24-136 REV. A INSPECTION FOR WIRE CHAFING CONDITION IN P5 PANEL, SERVICE LETTER INFORMATIONAL
MOS
30-AUG-1999 -(s)
SL 737-SL-24-136 REV. B P-5 PANEL WIRE CHAFING INSPECTION/PROTECTION. SERVICE LETTER INFORMATIONAL
MOS
17-NOV-2000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 241 Of 748
@ Camp Systems
EFTA00618532
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-136 REV. C INSPECTION FOR WIRE CHAFING CONDITION IN PS PANEL. SERVICE LETTER INFORMATIONAL
MOS
I9-JUN-2001 - (s)
51 737-SL-24-137 WIRE BUNDLE RIDING FLAP CONTROL CABLE.. SERVICE LETTER INFORMATIONAL
MOS
26-APR-1999 - (s)
51 737-SL-24-139 BATTERY CHARGER MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
24-MAY-1999 - Is)
SL 737-SL-24-140 SPARE CONNECTOR CAVITIES NOT SEALED. SERVICE LETTER INFORMATIONAL
MOS
Of -JUN-1999 - (s)
SL 737-SL-24-141 POWER FEEDER WIRE BUNDLE CHAFED AGAINST FILTER ON ENGINE. SERVICE LETTER INFORMATIONAL
MOS
Of -JUN-1999 -
SL 737-SL-24-141 REV. A POWER FEEDER WIRE BUNDLE CHAFED AGAINST FILTER ON ENGINE. SERVICE LETTER INFORMATIONAL
MOS
20-OCT-1999 - (s)
SL 737-SL-24-142 STANDOFF NOT INSTALLED IN MAIN WHEEL WELL. SERVICE LETTER INFORMATIONAL
MOS
II -JUN-1999 - (s)
SL 737-SL-24-143 . SERVICE LETTER INFORMATIONAL
MOS
II -JUN-1999 -
51 737-SL-24-143 REV. A .SERVICE LETTER INFORMATIONAL
MOS
03-SEP-1999 -
51 737-SL-24-143 REV. B WIRE BUNDLE RIDING IN LEFT WING STINT. SERVICE LETTER INFORMATIONAL
MOS
IO-DEC-1999 -(s)
SL 737-SL-24-144 DUAL BATTERY AND STATIC INVERTER REMOTE CONTROLLED CIRCUIT BREAKER INSTALLATION ERRORS. SERVICE INFORMATIONAL
LETTER
MOS
29-JUN-1999 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 242 Of 748
@ Camp Systems
EFTA00618533
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Attn./whip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-145 WIRE BUNDLE RIDESACOUSTIC FIBER. SERVICE LETTER INFORMATIONAL
MOS
27-AUG-1999 - (s)
SL 737-SL-24-146 POWER DISTRIBUTION PANEL. P92. INSPECTION & MODIFICATION OF RIGID BUS ASSEMBLY. SERVICE LETTER INFORMATIONAL
MOS
07-SEP-1999 - (s)
SL 737-SL-24-146 REV. A POWER DISTRIBUTION PANEL. P92. INSPECTION & MODIFICATION OF RIGID BUS ASSEMBLY. SERVICE LETTER INFORMATIONAL
MOS
23-SEP-1999 - (s)
SI. 737-SL-24-147 BPCU MODIFICATION TO PREVENT POTENTIAL LOSS OF POWER TO A TRANSFER BUS WHEN CONNECTING GROUND INFORMATIONAL
POWER. SERVICE LETTER
MOS
23-SEP-1999 - (s)
SI. 737-SL-24-147 REV. A BUS POWER CONTROL UNIT (3PCLI) MODIFICATION TO PREVENT POTENTIAL LOSS OF POWER TO A TRANSFER BUS INFORMATIONAL
WHEN CONNECTING GROUND POWER. SERVICE LETTER
MOS
Of -JUL-2002 - (s)
SL 737-SL-24-149 DUAL BATTERY ('API F LENGTH. SERVICE LETTER INFORMATIONAL
MOS
08-OCT-1999 - (s)
SL 737-SL-24-150 WIRE BUNDLES RIDING P15 REFUELING PANEL. SERVICE LETTER INFORMATIONAL
MOS
08-OCT-1999 - (8)
SL 737-SL-24-152 RIDING CONDITION OF THE COAXIAL CABLE ON THE KEEL BEAM STRUCTURE. SERVICE LETTER INFORMATIONAL
MOS
15-NOV-1999 - (s)
SL 737-SL-24-153 FUEL SHUTOFF VALVE WIRE CHAFING AGAINST THE RIGHT HYDRAULIC ACOUSTIC FILTER BRACKET BOLT IN THE INFORMATIONAL
WHEEL WELL.. SERVICE LETTER
MOS
16-NOV-1999 - (s)
SL 737-SL-24-153 REV. A FUEL SHUTOFF VALVE WIRE CHAFING AGAINST THE RIGHT HYDRAULIC ACOUSTIC FILTER BRACKET BOLT IN THE INFORMATIONAL
WHEEL WELL.. SERVICE LETTER
MOS
29-JAN-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 243 Of 748
@ Camp Systems
EFTA00618534
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-154 REV. 8 BATTERY CHARGER INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
09-SEP-2002
SL 737-SL-24-156 UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER INFORMATIONAL
MOS
13-DEC-1999 - (s)
SL 737-SL-24-156 REV. A UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER INFORMATIONAL
MOS
I7-APR-2000 - (s)
SL 737-SL-24-157 REV. A WIRE BUNDLES RIDING HYDRAULIC TUBE IN WHEEL WELL. SERVICE LETTER INFORMATIONAL
MOS
13-OCT-2000 - (s)
SL 737-SL-24-158 LANDING GEAR DOWN LOCK SENSOR- POTENTIAL WIRE CHAFING, SERVICE LETTER INFORMATIONAL
MOS
31-JAN-2000 - (s)
SL 737-SL-24-162 POTENTIAL WIRE INTERFERENCE WITH HYDRAULIC LINE IN THE REFUELING PANEL. SERVICE LETTER INFORMATIONAL
MOS
31-JUL-2000 - (s)
SL 737-SL-24-163 POTENTIAL WIRE RIDING CONDITION IN NOSE GEAR WHEEL WELL AREA, SERVICE LETTER INFORMATIONAL
MOS
14-AUG-2000 - (s)
SL 737-SL-24-164 EXTERNAL POWER RECEPTACLE - IMPROVED RETENTION. SERVICE LETTER INFORMATIONAL
MOS
31-OCT-2001 -(s)
SL 737-SL-24-165 STATIC INVERTER MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
03-OCT-2000 - (s)
SL 737-SL-24-165 REV. A STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER INFORMATIONAL
MOS
20-MAY-2003
SL 737-SL-24-165 REV. B STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING (SUPERSEDED BY THE LATEST SUPERSEDED
REVISION OF 737-SL-24-183). SERVICE LETTER
MOS
03-APR-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 244 Of 748
@ Camp Systems
EFTA00618535
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-167 STANDBY POWER CONTROL UNIT (SPCU) IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
09-APR-2001 - Is)
SL 737-SL-24-168 GROUND SERVICE BUS 28VAC TRANSFORMER WIRES-POTENTAL CHAFING ON FRAME. SERVICE LETTER INFORMATIONAL
MOS
I4-MAY-2001 - (s)
SL 737-SL-24-168 REV. A GROUND SERVICE BUS 28VAC TRANSFORMER WIRES- POTENTIAL CHAFING ON FRAME. SERVICE LETTER INFORMATIONAL
MOS
II -DEC-2001 - (s)
SI. 737-SL-24-169 INTEGRATED DRIVE GENERATOR (IDG) RETENTION LANYARDS CHAFING (SUPERSEDED BY SL 737-SL-24-169 REV. A). SUPERSEDED
SERVICE LETTER
MOS
- (s)
SL 737-SL-24-169 REV. A INTEGRATED DRIVE GENERATOR (IDG) RETENTION LANYARDS CHAFING. SERVICE LETTER
MOS
SL 737-SL-24-170 WIRE BUNDLE RIDING AIRSTAIR RAIL. SERVICE LETTER INFORMATIONAL
MOS
24-SEP-2001 - Is)
SL 737-SL-24-171 CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. (SUPERSEDED BY SUPERSEDED
737-SL-24-171 REV. A). SERVICE LETTER
MOS
31-OCT-2001 - (s)
SL 737-SL-24-171 REV. A CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED
737-SL-24-171 REV.B). SERVICE LETTER
MOS
21-AUG-2003 - (s)
SL 737-SL-24-171 REV. 8 CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. SERVICE LETTER
MOS 24 (s)
24-JUN-2005
SL 737-SL-24-175 INTERGRATED DRIVE GENERATOR-MAIN ROTOR. EXCITER ROTOR. CHARGE RELIEF VALVE. AND INPUT SHAFT SEAL INFORMATIONAL
IMPROVEMENTS. SERVICE LETTER
MOS
04-N0V-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 245 Of 748
@ Camp Systems
EFTA00618536
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-176 WINGTIP WIRING CHAFING-INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2002
SL 737-SL-24-176 REV. B WINGTIP WIRING CHAFING - INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
I 7-DEC-2003
SL 737-SL-24-177 BATTERY RESTORATION REQUIREMENTS. SERVICE LETTER INFORMATIONAL
MOS
I3-MAY-2003
SL 737-SL-24-178 INSTALLATION MODIFICATION TO PREVENT LANYARD CHAFING. SERVICE LETTER INFORMATIONAL
MOS
07-JUL-2003
SL 737-SL-24-178 REV. A INTEGRATED DRIVE GENERATOR - INSTALLATION MODIFICATION TO PREVENT LANYARD CHAFING. SERVICE LETTER INFORMATIONAL
MOS
22-JAN-2004
SL 737-SL-24-179 FLIGHT DECK P5 OVERHEAD RUBBER SWITCH TIP P/NS, SERVICE LETTER INFORMATIONAL
MOS
08-AUG-2003
SL 737-SL-24-180 INTEGRATED DRIVE GENERATOR-MAIN STATOR SHORT CIRCUIT. SERVICE LETTER INFORMATIONAL
MOS
24-OCT-2003
SL 737-SL-24-181 WIRE BUNDLE CHAFING AT STATION 671 AILERON CONTROL QUADRANT. SERVICE LETTER
MOS
23-FEB-2004
SL 737-SL-24-181 REV. A WIRE BUNDLE CHAFING AT STATION 671 SPOILER CONTROL QUADRANT. SERVICE LETTER
MOS
I3-SEP-2004
SL 737-SL-24-182 STANDBY POWER CONTROL UNIT (SPCU) l(1 8 K8 RELAY IMPROVEMENTS. SERVICE LETTER
MOS
I2-JAN-2006
SL 737-SL-24-183 STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER
MOS
09-DEC-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 246 Of 748
@ Camp Systems
EFTA00618537
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-183 REV. A STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER
MOS
03-APR-2007
51 737-SL-24-184 STATIC INVERTER TRANSISTOR REPLACEMENT. SERVICE LETTER
MOS
09-FEB-2006
51 737-SL-24-185 UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER
MOS
27-MAR-2006
51 737-SL-24-185 REV. A UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER
MOS
22-MAY-2006
51 737-SL-24-185 REV. B UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER
MOS
I I -SEP-2006
51 737-SL-24-186 LEACH TIME DELAY RELAY DISCLOSURE. SERVICE LETTER RECOMMENDED
MOS
09-MAR-2012
51 737-SL-24-187 CIC NOT APPLIED TO CONNECTOR O46038P. SERVICE LETTER
MOS
09-JAN-2007
51 737-SL-24-188 DRAIN MAST HEATER WIRE CHAFING. SERVICE LETTER
MOS
09-APR-2007
51 737-SL-24-188 REV. A DRAIN MAST HEATER WIRE CHAFING. SERVICE LETTER COMPLIED WITH
MOS 29-AUG-2011
I8-MAY-2007 3533:32
AFL 863
SL 737-SL-24-189 INTEGRATED DRIVE GENERATOR - DIFFERENTIAL PRESSURE
INDICATOR CHECK - ALTERNATE PROCEDURE. SERVICE LETTER
MOS
03-DEC-2007
51 737-SL-24-190 NON-CONFORMING KINGS COAX CONNECTORS. SERVICE LETTER
MOS
77-JAN-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 247 Of 748
@ Camp Systems
EFTA00618538
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-190 REV. A NON-CONFORMING KINGS COAX CONNECTORS. SERVICE LETTER
MOS
I 5-JUL -2008
SI. 737-SL-24-192 W10'22A/V1032 WIRE BUNDLE CHAFING NEAR FLAP TRACK
BEAM. SERVICE LETTER
MOS
24-JAN-2008
SL 737-SL-24-192 REV. A W10'22AN1032 WIRE BUNDLE CHAFING NEAR FLAP TRACK RECOMMENDED
BEAM. SERVICE LETTER
MOS
12-MAY-2009
SL 737-SL-24-193 ELECTRICAL BRACKET ASSEMBLY INSTALLED
INCORRECTLY. SERVICE LETTER
MOS
28-JAN-2009
SL 737-SL-24-194 BACC6513L EXTERNAL POWER RECEPTACLE - CONTACTS SUPERSEDED
BREAKING (SUPERSEDED BY SL 737-SL-24-194 REV. A). SERVICE LETTER
MOS
SL 737-SL-24-194 REV. A BACC8513L EXTERNAL POWER RECEPTACLE - CONTACTS BREAKING. SERVICE LETTER RECOMMENDED
MOS
I3-SEP-2011
SL 737-SL-24-195 CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT (SUPERSEDED BY 737-SL-24-195-A). SUPERSEDED
SERVICE LETTER
MOS
I5-FEB-2010
SL 737-SL-24-195 REV. A CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT (SUPERSEDED BY SL 737-SL-24-195 REV. B), SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-24-195 REV. B CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT. SERVICE LETTER
MOS
I5-JUL-2010
SL 737-SL-24-196 EXTERNAL POWER RECEPTACLE CRACKING (SUPERSEDED BY SL 737-SL-24-196 REV. A). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 248 Of 748
@ Camp Systems
EFTA00618539
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-196 REV. A EXTERNAL POWER RECEPTACLE CRACKING. SERVICE LETTER RECOMMENDED
MOS
OS-OCT-201I
SL 737-SL-24-197 ELECTRIC MOTOR DRIVEN HYDRAULIC CIRCUIT BREAKER TRIPPING (SUPERSEDED BY SL 737-SL-24-197 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-24-197 REV. A ELECTRIC MOTOR DRIVEN HYDRAULIC CIRCUIT BREAKER TRIPPING. SERVICE LETTER RECOMMENDED
MOS
20-MAR-2012
SI. 737-SL-24-198 POTENTIALLY INCORRECT CIRCUIT BREAKERS INSTALLED FOR STICK SHAKER AND MACH WARNING SYSTEM. RECOMMENDED
SERVICE LETTER
MOS
28-JAN-2011
SL 737-SL-24-200 FIRE PANEL WIRE INSTALLATION (SUPERSEDED BY SL 737-SL-24-200 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-24-200 REV. A FIRE PANEL WIRE INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
I3-SEP-2011
SL 737-SL-24-201 POWER DISTRIBUTION PANEL - P91. UNUSED WIRE TERMINAL SLEEVES. SERVICE LETTER RECOMMENDED
MOS
08-DEC-2011
SL 737-SL-24-202 GEN DRIVE STANDBY POWER TOGGLE SWITCH GUARD IS FOUND NOT FULLY ENGAGED TO AUTO POSITION. RECOMMENDED
SERVICE LETTER
MOS
28-MAR-2012
SL 737-SL-24-204 POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL (SUPERSEDED BY SL 737-SL-24-204 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SI. 737-SL-24-204 REV. A POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL (SUPERSEDED BY SL 737-SL-24-204 REV. B). SUPERSEDED
SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 249 Of 748
@ Camp Systems
EFTA00618540
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-24-204 REV. 8 POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL. SERVICE LETTER RECOMMENDED
MOS
27-AUG-2013
51 737-SL-24-205 IDG LANYARD ADJUSTMENT TO PREVENT CHAFING ON IDG SERVICING ACCESS DOOR. SERVICE LETTER RECOMMENDED
MOS
16-NOV-2012
51 737-SL-24-206 STANDBY POWER CONTROL UNIT - K1 AND K8 RELAY IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
26-JUN-2013
SL 737-SL-24-207 ENVIRONMENTAL PROTECTION OF ELECTRICAL COMPONENTS IN WHEEL WELL AND WING. SERVICE LETTER RECOMMENDED
MOS
08-JUL-2013
51 737-SL-24-208 IDG BARE BORE BLOCKS. SERVICE LETTER RECOMMENDED
MOS
19-AUG-2013
51 737-SL-24-209 STATIC INVERTER INSTALLATION - TERMINAL TORQUE, SERVICE LETTER RECOMMENDED
MOS
17-MAR-2014
51 737-SL-25-051 REV. D LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER INFORMATIONAL
MOS
07-DEC-2001 -(s)
51 737-SL-25-051 REV. E LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER INFORMATIONAL
MOS
28-MAR-2002 - (s)
51 737-SL-25-051 REV. F LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER
MOS
05-NOV-2004
51 737-SL-25-073 OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL
MOS
12-MAR-1997 -(s)
51 737-SL-25-073 REV. A OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL
MOS
23-JUN-1997 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 250 Of 748
@ Camp Systems
EFTA00618541
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-073 REV. 8 OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL
MOS
26-MAR-1999 - Is)
SL 737-SL-25-076 INSTALLATION OF FELT TO PREVENT WATER DRIPPAGE INTO THE PASSENGER CABIN. SERVICE LETTER INFORMATIONAL
MOS
I6-JAN-I998 - (s)
SL 737-SL-25-077 PREVENTING CONTAMINATION THAT AFFECTS FLAMMABILITY Of INSULATION BLANKETS. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-1998 - (s)
SL 737-SL-25-078 REV. A RESCU 406 EMERGENCY LOCATOR TRANSMITTER (ELT)
INSTALLATION. SERVICE LETTER
MOS
03-JUN-2008
SL 737-SL-25-079 GALLEY OVEN MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
I4-JUL-I998 - (4)
SL 737-SL-25-082 EMI FILTER REPLACEMENT WE AEROSPACE AIR CHILLERS. SERVICE LETTER INFORMATIONAL
MOS
21-DEC-1998 - (4)
SL 737-SL-25-082 REV. A EMI FILTER REPLACEMENT B/E AEROSPACE AIR CHILLERS. SERVICE LETTER INFORMATIONAL
MOS
I8-JAN-1999 - (s)
SL 737-SL-25-082 REV. B EMI FILTER REPLACEMENT WE AEROSPACE AIR CHILLERS. SERVICE LETTER INFORMATIONAL
MOS
06-AUG-1999 - (s)
SL 737-SL-25-084 JAMCO GALLEY ELECTRICAL WIRE TERMINAL FASTENERS INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
05-MAR-1999 - (s)
SL 737-SL-25-085 IMPROVED OVERHEAD STOW BIN LATCH. SERVICE LETTER INFORMATIONAL
MOS
27-APR-1999 - (s)
SL 737-SL-25-087 FLIGHT CREW SEAT ADJUSTMENT HANDLE. SERVICE LETTER INFORMATIONAL
MOS
14-JUL-I 999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 251 Of 748
@ Camp Systems
EFTA00618542
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-088 LAV BI-FOLD DOOR IMPROVEMENTS TO EASE EMERGENCY REMOVAL. SERVICE LETTER INFORMATIONAL
MOS
29-JUL-I999 - Is)
St 737-SL-25-089 AVIO INTERIORS PASSENGER SEAT TRAC REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
22-MAR-1999 - Is)
St 737-SL-25-089 REV. A AVIO INTERIORS PASSENGER SEAT TRAC REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
10-AUG-1999 - Is)
St 737-SL-25-092 REV. A OVERHEAD STOWAGE BIN DOOR STRIKE ASSEMBLY MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
I4-JUL-2000 - (s)
St 737-SL-25-093 REV. B LAVATORY DOOR LATCH IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
28-AUG-2000 - (s)
St 737-SL-25-094 REV. B CARGO NET USE - LOWER LOBE. SERVICE LETTER
MOS
27-OCT-2006
St 737-SL-25-094 REV. C CARGO NET USE - LOWER LOBE. SERVICE LETTER
MOS
24-JUL-2007
St 737-SL-25-096 LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER INFORMATIONAL
MOS
26-APR-2001 - (s)
St 737-SL-25-096 REV. A LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER INFORMATIONAL
MOS
C6-JUN-2001 - Is)
SL 737-SL-25-096 REV. B LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL SUPERSEDED
REPLACEMENT (SUPERSEDED BY SL 737-SL-25-096 REV. C), SERVICE LETTER
MOS
SL 737-SL-25-096 REV. C LOWER LOBE CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
10-MAR-201I
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 252 Of 748
@ Camp Systems
EFTA00618543
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-097 REMOVAL OF FUSELAGE CARGO COMPARTMENT INSULATION BLANKETS. SERVICE LETTER INFORMATIONAL
MOS
22-AUG-2001 - Is)
SL 737-SL-25-098 FLIGHT DECK SUITCASE RESTRAINT STRAP CLIP INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
27-JUL-2001 -
St 737-SL-25-099 FLIGHT DECK NO.2 SLIDING WINDOW UNING ASSEMBLY INTERFERENCE WITH CIRCUIT BREAKER PANEL. SERVICE INFORMATIONAL
LETTER
MOS
24-AUG-2001 - (s)
SL 737-SL-25-100 FORWARD CARGO LOADINGAJNLOADING PRECAUTIONS. SERVICE LETTER INFORMATIONAL
MOS
24-SEP-2001 - Is)
SL 737-SL-25-100 REV. A FORWARD CARGO LOADINGAJNLOADING PERCAUTIONS. SERVICE LETTER INFORMATIONAL
MOS
I3-OCT-2003
SL 737-SL-25-100 REV. B FORWARD CARGO LOADINGAJNLOADING PRECAUTIONS. SERVICE LETTER INFORMATIONAL
MOS
I7-OCT-2003
SL 737-SL-25-100 REV. 0 CARGO LOADING/UNLOADING PRECAUTIONS. SERVICE LETTER
MOS
25-SEP-2007
SL 737-SL-25-101 ESCAPE ROPE "SHELLING'. SERVICE LETTER INFORMATIONAL
MOS
24-SEP-2001 - (s)
SL 737-SL-25-103 SLIDING CARPET LOADING SYSTEM (SCLS) RAMP SEALING. SERVICE LETTER INFORMATIONAL
MOS
03-JUN-2002 -
SL 737-SL-25-104 ATTENDANT SEAT MOUNTING BOLT MATERIAL. SERVICE LETTER INFORMATIONAL
MOS
29-MAY-2002 -
SL 737-SL-25-104 REV. A ATTENDANT SEAT MOUNTING BOLT MATERIAL. SERVICE LETTER INFORMATIONAL
MOS
Of -JUL-2002 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 253 Of 748
@ Camp Systems
EFTA00618544
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-106 OUTBOARD GLARESHIELD LIGHTSHADE ASSEMBLY BREAKAGE.. SERVICE LETTER INFORMATIONAL
MOS
03-OCT-2002 - Is)
SL 737-SL-25-107 CLOSE OUT SEAL RETAINER. SERVICE LETTER INFORMATIONAL
MOS
I0-SEP-2002
SL 737-SL-25-107 REV. A CLOSE OUT SEAL RETAINER REPLACEMENT ON INTERIOR MONUMENTS. SERVICE LETTER INFORMATIONAL
MOS
21-OCT-2002
SL 737-SL-25-108 CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BIN AND FULL HEIGHT MONUMENTS. SERVICE INFORMATIONAL
LETTER
MOS
I7-DEC-2002
SL 737-SL-25-108 REV. A CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BIN AND FULL HEIGHT MONUMENTS. SERVICE INFORMATIONAL
LETTER
MOS
08-APR-2003
SL 737-SL-25-109 CABIN SIDEWALL AIR RETURN GRILLE INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
I5-MAY-2003
SL 737-SL-25-109 REV. A CABIN SIDEWALL AIR RETURN GRILLE INSTALLATION, SERVICE LETTER INFORMATIONAL
MOS
02-JUL-2003
SL 737-SL-25-111 FLIGHT DECK DRIP-SHIELD DRAIN TUBE INTERFERENCE WITH THE NUMBER 2 WINDOW. SERVICE LETTER INFORMATIONAL
MOS
27-OCT-2003
SL 737-SL-25-111 REV. A FLIGHT DECK DRIP-SHIELD DRAIN TUBE INTERFERENCE
WITH THE NUMBER 2 WINDOW. SERVICE LETTER
MOS
0I-FEB-2008
SL 737-SL-25-112 AFT CARGO COMPARTMENT BLOWOUT PANEL REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
30-MAR-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 254 Of 748
@ Camp Systems
EFTA00618545
AD/SI Status Report AIRCRAFT
flP Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-114 REV. A ATTENDANT SEAT RUBSTRIPS. SERVICE LETTER INFORMATIONAL
MOS
31-MAR-2004
51 737-SL-25-115 REV. 8 CARGO COMPARTMENT LINER TAPE AND FASTENERS. SERVICE LETTER
MOS
-JUL-2007
51 737-SL-25-116 REV. A CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BINS. SERVICE LETTER
MOS
76-DEC-2005
51 737-SL-25-116 REV. 8 CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BINS. SERVICE LETTER
MOS
30-MAR-2006
51 737-SL-25-117 REV. A FORWARD CARGO CEILING PANEL PERMANENT REPAIR OPTIONS. SERVICE LETTER
MOS
04-JAN-2005
51 737-SL-25-118 AVAILABILITY OF IMPROVED OXYGEN GENERATOR RELEASE PIN. SERVICE LETTER INFORMATIONAL
MOS
30-NOV-2004
51 737-SL-25-119 REV. A OVERHEAD STOWAGE BIN LATCH BEZEL CRACKING. SERVICE LETTER INFORMATIONAL NOT APPLICABLE - -
MOS
23-MAR-2005
51 737-SL-25-120 IMPROVED CROWN INSULATION BLANKETS AT ANTENNAJLIGHT PENETRATIONS. SERVICE LETTER
MOS
29-MAR-2005
51 737-SL-25-120 REV. B IMPROVED CROWN INSULATION BLANKETS AT ANTENNAJLIGHT PENETRATIONS. SERVICE LETTER
MOS
07-DEC-2005
51 737-SL-25-121 OUST CONTAMINATION - LRU CLEANING PROCEDURES. SERVICE LETTER
MOS
72-JUL-2005
51 737-SL-25-122 ATTENDANT SEAT FASTENERS. SERVICE LETTER NOT APPLICABLE
MOS
23-AUG-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 255 Of 748
@Camp Systems
EFTA00618546
AD/SI Status Report AIRCRAFT
1y taM1pM„ Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-123 REV. B AIR STAIRS HANDRAIL FITTING ATTACHMENT TO YRC FWD
LAVATORY. SERVICE LETTER
MOS 24 (s)
13-DEC-2005
SL 737-SL-25-124 NEW FLAMMABILITY REQUIREMENT FOR THERMAUACOUS11C INSULATION MATERIALS. SERVICE LETTER
MOS
06-JAN-2006
SL 737-SL-25-124 REV. A NEW FLAMMABILITY REQUIREMENT FOR THERMAUACOUSTIC INSULATION MATERIALS. SERVICE LETTER
MOS
I3-APR-2006
SL 737-SL-25-125 GALLEY AIR CHILLER RELIABILITY IMPROVEMENTS, SERVICE LETTER
MOS
28-APR-2006
SL 737-SL-25-125 REV. A GALLEY AIR CHILLER RELIABILITY IMPROVEMENTS, SERVICE LETTER
MOS
30-AUG-2006
SL 737-SL-25-126 IMPROVING GALLEY REFRIGERATION PERFORMANCE AND RELIABILITY BEST PRACTICES. SERVICE LETTER
MOS
15-MAR-2007
SL 737-SL-25-127 OVERHEAD STOWAGE BIN DOOR IMPROVEMENTS, SERVICE LETTER
MOS
Of-OCT-2007
SL 737-SL-25-128 CARGO COMPARTMENT BILGE TFUM, - FUSELAGE SKIN
DAMAGE. SERVICE LETTER
MOS
27-MAR-2008
SL 737-SL-25-130 CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD
STOWAGE AND FULL HEIGHT MONUMENTS. SERVICE LETTER
MOS
08-DEC-2008
SL 737-SL-25-130 REV. A CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD RECOMMENDED
STOWAGE AND FULL HEIGHT MONUMENTS. SERVICE LETTER
MOS
27-FEB-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 256 Of 748
@Camp Systems
EFTA00618547
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-131 POSSIBLE DAMAGE TO E4-1 RACK SHROUD DRAIN TUBE. SERVICE LETTER
MOS
24-OCT-2008
SL 737-SL-25-132 GALLEY OVEN MODIFICATION. SERVICE LETTER
MOS
I9-DEC-2008
SL 737-SL-25-132 REV. A GALLEY OVEN MODIFICATION. SERVICE LETTER
MOS
I7-FEB-2009
SI. 737-SL-25-133 IMPROVED OXYGEN GENERATOR FITTING FOR 417N3011- SUPERSEDED
SERIES PASSENGER SERVICE UNITS (SUPERSEDED BY SL 737-SL-25-133 REV. A). SERVICE LETTER
MOS
SL 737-SL-25-133 REV. A IMPROVED OXYGEN GENERATOR FITTING FOR 417N3011-SERIES PASSENGER SERVICE UNITS. SERVICE LETTER RECOMMENDED
MOS
I0-SEP-2010
SL 737-SL-25-134 GOODRICH 2110-SERIES FLIGHT ATTENDANT SEATBACK
CRACKING. SERVICE LETTER
MOS
21-AUG-2009
SL 737-SL-25-135 INSULATION BLANKET REPAIR PROCEDURES - NEW RECOMMENDED
THERMAL-ACOUSTIC INSULATION BLANKETS FOR FUSELAGE
BURNTHROUGH STANDARDS. SERVICE LETTER
MOS
31-AUG-2009
SL 737-SL-25-135 REV. A INSULATION BLANKET REPAIR PROCEDURES -NEW RECOMMENDED
THERMAL-ACOUSTIC INSULATION BLANKETS FOR FUSELAGE
BURNTHROUGH STANDARDS. SERVICE LETTER
MOS
06-OCT-2009
SL 737-SL-25-136 SELL OVEN INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED
MOS
23-SEP-2009
SL 737-SL-25-137 FLIGHT DECK SIDE GRILLE MODIFICATION. SERVICE LETTER RECOMMENDED
MOS
23-SEP-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 257 Of 748
@ Camp Systems
EFTA00618548
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-137 REV. A FLIGHT DECK SIDE GRILLE MODIFICATION. SERVICE LETTER RECOMMENDED
MOS
29-SEP-2009
SL 737-SL-25-138 RESTRAINT SYSTEM WITH INERTIA REEL - MANUAL LOCK RECOMMENDED
MAY BE INOPERABLE. SERVICE LETTER
MOS
19-OCT-2009
SL 737-SL-25-138 REV. A RESTRAINT SYSTEM WITH INERTIA REEL - MANUAL LOCK RECOMMENDED
MAY BE INOPERABLE. SERVICE LETTER
MOS
I I -NOV-2009
SL 737-SL-25-139 DRIESSEN 61 GALLEY SHROUD COVER MODIFICATION. SERVICE LETTER RECOMMENDED
MOS
27-OCT-2009
SL 737-SL-25-140 RESCU 406(5) ELT ANTENNA RADIATION ISSUE. SERVICE LETTER INFORMATIONAL
MOS
23-DEC-2009
SL 737-SL-25-141 FOLD DOWN TABLE ASSEMBLY MECHANICAL LINKAGE. SERVICE LETTER RECOMMENDED
MOS
30-JUL-2010
SL 737-SL-25-142 737NG ESCAPE SLIDE VALISE RELEASE CABLE AND ASPIRATOR (SUPERSEDED BY SL 737-SL-25-142 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-25-142 REV. A 737NG ESCAPE SLIDE VALISE RELEASE CABLE AND ASPIRATOR. SERVICE LETTER RECOMMENDED
MOS
22-DEC-2010
SL 737-SL-25-143 LRU EQUIPMENT DECALS SWAPPED ON E1-5 SHELF FOR VHF NO.2 TRANSCEIVER AND DME NO.2 INTERROGATOR. RECOMMENDED
SERVICE LETTER
MOS
23-DEC-2010
SL 737-SL-25-144 ATTENDANT SERVICE UNIT - OXYGEN DOOR PANEL ASSEMBLY DESIGN IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
03-DEC-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 258 Of 748
@ Camp Systems
EFTA00618549
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-145 737 BSI OVERHEAD STOWAGE BIN BUCKET LATCH END ASSEMBLY FASTENERS. SERVICE LETTER RECOMMENDED
MOS
12-MAY-2011
SL 737-SL-25-146 RETENTION OF OXYGEN DOOR LATCH ACTUATOR FOR 417N3011-SERIES PASSENGER SERVICE UNITS. SERVICE RECOMMENDED
LETTER
MOS
08-FEB-2012
SL 737-SL-25-148 EUROPEAN UNION (EU) RESTRICTION ON IMPORT OF CADMIUM IN PLASTICS. SERVICE LETTER RECOMMENDED
MOS
19-DEC-2011
SL 737-SL-25-149 BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS (SUPERSEDED BY SL 5L737-SL-25-149 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SI. 737-SL-25-149 REV. A BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS (SUPERSEDED BY SL 737-SL-25-149 REV. B). SERVICE RECOMMENDED
LETTER
MOS
18-DEC-2012
SL 737-SL-25-149 REV. B BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS. SERVICE LETTER RECOMMENDED
MOS
28-MAR-2013
SL 737-SL-25-150 HORIZONTAL BATWING TRIM DIS-BONDING BSI STOW BINS. SERVICE LETTER RECOMMENDED
MOS
06-AUG-2012
SL 737-SL-25-152 FLIGHT DECK DRIP-SHIELD DRAIN TUBE INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
12-MAR-2013
SL 737-SL-25-153 BOEING SKY INTERIOR (BSI) - SEAT ROW MARKER (SUPERSEDED BY SL 737-SL-25-153 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-25-153 REV. A BOEING SKY INTERIOR (BSI) - SEAT ROW MARKER. SERVICE LETTER RECOMMENDED
MOS
22-MAY-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 259 Of 748
@ Camp Systems
EFTA00618550
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-25-155 YRC (YOKOHAMA RUBBER COMPANY) TOILET DOOR HANDLE MISSING LOCTITE. SERVICE LETTER RECOMMENDED
MOS
06-JUN-2013
SL 737-SL-25-156 2ND OBSERVERS SEAT: REPLACEMENT OF THE FWD ATTACH BOLTS AND THE ATTACHMENT SCREWS IN THE FLT SUPERSEDED
DECK CLOSET (SUPERSEDED BY 737-SL-25-156 REV. A). SERVICE LETTER
MOS
SL 737-SL-25-156 REV. A 2ND OBSERVERS SEAT: REPLACEMENT OF THE FWD ATTACH BOLTS AND THE ATTACHMENT SCREWS IN THE FLT RECOMMENDED
DECK CLOSET. SERVICE LETTER
MOS
30-JAN-2014
SL 737-SL-25-157 CONNECTOR BACKSHELL POTENTIALLY RIDING BSI CEILING PANEL. SERVICE LETTER RECOMMENDED
81OS
02-JUN-2014 - (s)
SL 737-SL-25-159 INTRODUCTION OF IMPROVED SIDEWALL WINDOW SHADES (SUPERSEDED BY SL 737-SL-25-159 REV. A). SERVICE SUPERSEDED
LETTER
81OS
SL 737-SL-25-159 REV. A INTRODUCTION OF IMPROVED SIDEWALL WINDOW SHADES. SERVICE LETTER RECOMMENDED
MOS
16-MAY-2014
SL 737-SL-25-160 BOEING SKY INTERIOR (BSI) - PASSENGER WINDOW REVEAL SHARP EDGE. SERVICE LETTER RECOMMENDED
MOS
03-MAR-2014
SL 737-SL-26-037 FORWARD ATTENDANT PANEL - LAVATORY SMOKE DETECTOR MODULE IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
09-AUG-2000 - (s)
SL 737-SL-26-037 REV. A FORWARD ATTENDANT PANEL- LAVATORY SMOKE DETECTOR MODULE IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
07-DEC-2000 - (s)
SL 737-SL-26-038 CFM56-78 FIRE DETECTION HARNESS IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
14-MAR-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 260 Of 748
@ Camp Systems
EFTA00618551
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-26-040 PORTABLE WATER FIRE EXTINGUISHERS. SERVICE LETTER INFORMATIONAL
MOS
22-APR-2002 - Is)
SL 737-SL-26-042 PORTABLE WATER FIRE EXTINGUISHERS MISSING PIERCER. SERVICE LETTER INFORMATIONAL
MOS
13-JUN-2002 - (s)
SL 737-SL-26-043 RECALL OF KIDDE AEROSPACE PORTABLE HALON 1211 FIRE EXTINGUISHERS-P/N 898052. SERVICE LETTER INFORMATIONAL COMPUED WITH
MOS 15-FEB-2004
05-NOV-2002 -Is) 1579:18
AFL 398
SL 737-SL-26-044 INCORRECT INSTALLATION OF ENGINE FIRE EXTINGUISHING HOSE MAY PREVENT AGENT FLOW TO ENGINE. INFORMATIONAL COMPUED WITH
SERVICE LETTER
MOS 15-FEB-2004
17-DEC-2003 1579:18
AFL 398
SL 737-SL-26-045 CARGO COMPARTMENT FIRE SUPPRESSION BOTTLE REQUIREMENTS. SERVICE LETTER INFORMATIONAL
MOS
18-AUG-2004
SL 737-SL-26-046 LAVATORY FIRE EXTINGUISHER EXTINGUISHING AGENT REPLACEMENT. SERVICE LETTER
MOS
20-SEP-2006
SL 737-SL-26-046 REV. A LAVATORY FIRE EXTINGUISHER EXTINGUISHING AGENT REPLACEMENT. SERVICE LETTER
MOS
27-FEB-2007
SL 737-SL-26-047 ENGINE FIRE LIGHT ILLUMINATION. SERVICE LETTER
MOS
27-NOV-2006
SL 737-SL-26-048 CARGO FIRE EXTINGUISHER -METERING ASSEMBLY/DRIER
DISC RUPTURE. SERVICE LETTER
MOS
09-NOV-2007
SL 737-SL-26-049 IMPROPERLY TORQUED APU LOWER FIRE DETECTOR SENSOR, SERVICE LETTER
MOS
14-NOV-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 261 Of 748
@ Camp Systems
EFTA00618552
AD/SI Status Report AIRCRAFT
CAMP
Asiant.fran Atna:up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-26-049 REV. A IMPROPERLY TORQUED APU LOWER FIRE DETECTOR SENSOR. SERVICE LETTER
MOS
24-JAN-2008
51 737-SL-26-050 CARD CONTAMINATION IN FIRE DETECTION MODULES. SERVICE LETTER
MOS
03-DEC-2008
51 737-SL-26-051 CONTAMINATED HALON 1211 FIRE EXTINGUISHERS. SERVICE LETTER INFORMATIONAL
MOS
23-DEC-2009
51 737-SL-26-051 REV. A CONTAMINATED HALON 1211 FIRE EXTINGUISHERS. SERVICE LETTER INFORMATIONAL
MOS
08-FEB-2010
51 737-SL-26-052 WASHERS ON APU FIRE DETECTOR CLAMPS INADVERTENTLY OMITTED (SUPERSEDED BY SL SL 737-SL-26-052 REV. SUPERSEDED
A). SERVICE LETTER
MOS
51 737-SL-26-052 REV. A WASHERS ON APU FIRE DETECTOR CLAMPS INADVERTENTLY OMITTED. SERVICE LETTER RECOMMENDED
MOS
10-JAN-2011
51 737-SL-26-054 POSSIBLE OVERHEAT SENSOR BRACKET DISCREPANCY. SERVICE LETTER RECOMMENDED
MOS
14-MAY-2012
51 737-SL-26-055 WING(BODY OVERHEAT FAULTS DUE TO FENWAL CONNECTORS. SERVICE LETTER RECOMMENDED
MOS
I9-JUN-2012
51 737-SL-26-056 APU FIRE DETECTOR PART MARK INCORRECT. SERVICE LETTER RECOMMENDED
MOS
23-MAY-20I3
51 737-SL-27-079 REV. A MACH TRIM FLAPS UP. AND LANDING WARNING SWITCH IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
10-APR-2003
51 737-SL-27-079 REV. F NEW S138 LAND WARNING. S245 FLAP POSITION. S290 MACH TRIM WARNING. AND S1051 FLAPS UP SWITCHES.
SERVICE LETTER
MOS
08-FEB-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 262 Of 748
@ Camp Systems
EFTA00618553
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-124 STALL MANAGEMENT/ YAW DAMPER MODULE ASSY MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
23-FEB-1999 - Is)
SL 737-SL-27-126 REV. A PERIODIC OPERATIONAL VERIFICATION OF THE ELEVATOR TAB CONTROL SYSTEM. SERVICE LETTER RECOMMENDED
MOS
I3-NOV-2000 - (s)
SL 737-SL-27-130 REV. A STABILIZER TRIM ACTUATOR CMR RETROFIT PROCEDURE. SERVICE LETTER INFORMATIONAL
MOS
06-AUG-1999 - Is)
SL 737-SL-27-131 ELEVATOR TAB ROD HI-LOK INTERFERENCE WITH STRUCTURE. SERVICE LETTER INFORMATIONAL
MOS
I8-DEC-1998 -
SL 737-SL-27-131 REV. A ELEVATOR TAB ROD HI-LOK INTERFERENCE WITH STRUCTURE. SERVICE LETTER INFORMATIONAL
MOS
I 7-JUN-1999 -
51 737-SL-27-132 INSPECTION OF FLEXIBLE HOSES BETWEEN ELEVATOR FEEL PITOT PROBES AND RIGID METAL TUBING. SERVICE INFORMATIONAL
LETTER
MOS
I8-DEC-1998 - (s)
SL 737-SL-27-133 ELEVATOR TAB CONTROL ROD NUT REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
I8-JAN-1999 - (s)
SL 737-SL-27-134 REV. A TRAILING EDGE FLAP ALTERNATE DRIVE MOTOR DESIGN IMPROVEMENTS. SERVICE LETTER
MOS
27-MAR-2007
SL 737-SL-27-136 ELEVATOR CONTROL CABLE CLEARANCE INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
31-MAR-1999 - (s)
SL 737-SL-27-137 REV. B ELEVATOR TAB PIVOT BOLT WASHER OMISSION. SERVICE LETTER INFORMATIONAL
MOS
03-NOV-2000 - (s)
SL 737-SL-27-138 AILERON TAB CONTROL ROD CONNECTING BARREL. SERVICE LETTER INFORMATIONAL
MOS
31-MAR-1999 -(s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 263 Of 748
@ Camp Systems
EFTA00618554
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-139 ELEVATOR CONTROLS-FORWARD QUADRANT INTERFERENCE. SERVICE LETTER INFORMATIONAL
MOS
I6-APR-1999 - Is)
SL 737-SL-27-140 FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER INFORMATIONAL COMPLIED WITH - CM
MOS 13-SEP-1999
23-APR-1999 -
SL 737-SL-27-140 REV. A FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER INFORMATIONAL
MOS
I7-MAY-1999 - (s)
SL 737-SL-27-140 REV. B FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER INFORMATIONAL
MOS
I6-JUN-1999 -
SL 737-SL-27-141 AILERON WING CONTROL CABLE ROUTING INSPECTION. SERVICE LETTER INFORMATIONAL COMPLIED WITH - CM
MOS 18 (s) 13-SEP-1999
I3-JUL-I 999
AFL 4000
SL 737-SL-27-142 ELEVATOR FEEL COMPUTER DISCREPANT O RINGS, SERVICE LETTER RECOMMENDED
MOS
14-JUL-I 999 - (s)
SL 737-SL-27-143 AILERON SPRING CARTRIDGE BOLTINTERFERENCE. SERVICE LETTER RECOMMENDED
MOS
07-SEP-1999 - (s)
SL 737-SL-27-147 REV. A RUDDER CONTROL AFT QUADRANT ATTACHMENT FASTENERS UNDERTOROUED.. SERVICE LETTER RECOMMENDED
MOS
08-DEC-1999 - (s)
SL 737-SL-27-148 INABILITY TO MOVE WING LEADING EDGE DEVICE. SERVICE LETTER RECOMMENDED
MOS
21-DEC-1999 - (s)
SL 737-SL-27-148 REV. A INABILITY TO MOVE WING LEADING EDGE DEVICES, SERVICE LETTER INFORMATIONAL
MOS
01-MAR-2005
SL 737-SL-27-149 RUDDER CONTROL AFT QUADRANT ATTACHMENT FASTENERS UNDERTOROUED.. SERVICE LETTER RECOMMENDED
MOS
11-JUN-2000 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 264 Of 748
@ Camp Systems
EFTA00618555
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-149 REV. A CONTROLS-AILERON CABLE PULLEY INSTALLATION-INTERFERNCE. SERVICE LETTER RECOMMENDED
MOS
21-FEB-2000 - Is)
St 737-SL-27-150 ELEVATOR POWER CONTROL UNIT LINKAGE INSPECTION, SERVICE LETTER RECOMMENDED COMPUED WITH - CM
MOS I 7-APR-2000
I4-FEB-2000 - (s)
St 737-SL-27-150 REV. A ELEVATOR POWER CONTROL UNIT LINKAGE INSPECTION. SERVICE LETTER
MOS
I4-FEB-2001 - (s)
St 737-SL-27-150 REV. B ELEVATOR POWER CONTROL UNIT LINKAGE- INSPECTION.. SERVICE LETTER INFORMATIONAL
MOS
I2-MAY-2000 -(s)
St 737-SL-27-152 STABILIZER TRIM MOTOR IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
27-JUL-2000 -
St 737-SL-27-153 TRAILING EDGE FLAP TORQUE TUBE COUPLING AND U-JOINT LUBRICATION. SERVICE LETTER INFORMATIONAL
MOS
03-OCT-2000 - (s)
St 737-SL-27-154 REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER INFORMATIONAL
MOS
I3-OCT-2000 - (s)
St 737-SL-27-154 REV. A REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER INFORMATIONAL
MOS
I 7-NOV-2000 - (s)
St 737-SL-27-154 REV. B REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER INFORMATIONAL
MOS
I8-APR-2001 - (s)
St 737-SL-27-154 REV. C REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING, SERVICE LETTER INFORMATIONAL
MOS
27-APR-2001 - Is)
St 737-SL-27-154 REV. D ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER
MOS
I6-NOV-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 265 Of 748
@ Camp Systems
EFTA00618556
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-154 REV. E ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TOROUE
TUBE CONTROL CRANK BEARING. SERVICE LETTER
MOS
I5-OCT-2007
SL 737-SL-27-154 REV. F ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE RECOMMENDED
TUBE CONTROL CRANK BEARING. SERVICE LETTER
MOS
27-OCT-2009
SL 737-SL-27-154 REV. G ELEVATOR CONTROL SYSTEM- ELEVATOR OUTPUT TORQUE SUPERSEDED
TUBE CONTROL CRANK BEARING (SUPERSEDED BY SL 737-SL-27-154 REV. H). SERVICE LETTER
MOS
SL 737-SL-27-154 REV. H ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING, SERVICE LETTER RECOMMENDED
MOS
I3-JUL-2011
SL 737-SL-27-155 ELEVATOR TAB SOLENOID VALVE REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
I 7-NOV-2000 - (s)
SL 737-SL-27-155 REV. A ELEVATOR TAB SOLENOID VALVE REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
I3-APR-2001 - (s)
SI. 737-SL-27-156 STABILIZER TRIM CABLE GUARD INTERFERENCE WITH AUTOTHROTTLE MECHANISMMOUNTING FLANGE. SERVICE INFORMATIONAL
LETTER
MOS
79-DEC-2000 - (s)
SL 737-SL-27-159 STANDBY RUDDER PCU REACTION BEARING INCORRECTLY SWAGED. SERVICE LETTER INFORMATIONAL
MOS
I6-JAN-2001 - (s)
SL 737-SL-27-160 AILERON POWER CONTROL SUPPORT ARM INTERFERENCE WITH HYDRAULIC HOSE. SERVICE LETTER INFORMATIONAL
MOS
07-MAY-2001 - (s)
SL 737-SL-27-162 STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. 1,401748 NO.2. P/N 285A1010. INFORMATIONAL
SERVICE LETTER
MOS
I9-OCT-2001 -(s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 266 Of 748
@ Camp Systems
EFTA00618557
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-162 REV. A STALL MANAGEMENT/ YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. M01748 NO.2. PIN 285A1010. INFORMATIONAL
SERVICE LETTER
MOS
12-APR-2002 - Is)
SL 737-SL-27-162 REV. B STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. M01748 NO.2. PIN 285A1010. INACTIVE
SERVICE LETTER
MOS
08-MAR-2004
SL 737-SL-27-164 INSPECTION FOR BENT CLEVIS ON ELEVATOR FEEL AND CENTERING BRACKET SUPPORT. SERVICE LETTER INFORMATIONAL
MOS
02-MAY-2002 - (s)
SL 737-SL-27-164 REV. A INSPECTION FOR BENT CLEVIS ON ELEVATOR FEEL AND CENTERING BRACKET SUPPORT. SERVICE LETTER INFORMATIONAL
MOS
16-DEC-2004
SL 737-SL-27-165 P2-3 LANDING GEAR PANEL ASSEMBLIES - DISCREPANT FLAP PLACARD SPEEDS. SERVICE LETTER INFORMATIONAL
MOS
I2-APR-2002 - (s)
SL 737-SL-27-167 CONTROL COLUMN NEEDLE BEARING CORROSION. SERVICE LETTER INFORMATIONAL
MOS
I I -DEC-2002
SL 737-SL-27-169 LUBRICATION OMITTED FROM THE ROD END ASSEMBLY FOR THE FLIGHT SPOILER ACTUATOR. SERVICE LETTER INFORMATIONAL
MOS
I I -DEC-2002
SL 737-SL-27-169 REV. A LUBRICATION OMITTED FROM THE ROD END ASSEMBLY FOR THE FLIGHT SPOILER ACTUATOR. SERVICE LETTER INFORMATIONAL
MOS
29-OCT-2003
SL 737-SL-27-170 TRAILING EDGE FLAP AND SPOILER HANDLE-LUBRICATION. SERVICE LETTER INFORMATIONAL
MOS
I8-DEC-2002
SL 737-SL-27-171 ELEVATOR CONTROL CABLE INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
21-JAN-2003
SL 737-SL-27-171 REV. A ELEVATOR CONTROL CABLE INSPECTION-INSUFFICIENT CLEARANCE. SERVICE LETTER INFORMATIONAL
MOS
29-SEP-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 267 Of 748
@ Camp Systems
EFTA00618558
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-172 MOUNTING BRACKET FASTENERS INCORRECTLY INSTALLED. SERVICE LETTER INFORMATIONAL
MOS
02-JAN-2003
SL 737-SL-27-173 ELEVATOR CABLE PULLEY NUT AND BOLT INSTALLATION-POTENTIAL FOR LOW TORQUE VALUE. SERVICE LETTER INFORMATIONAL
MOS
01-AUG-2003
SL 737-SL-27-174 AILERON AND SPEED BRAKE CONTROL CABLE LOW TENSION. SERVICE LETTER INFORMATIONAL
MOS
18-AUG-2003
SL 737-SL-27-175 AUTOPILOT ACTUATOR MOUNTING BOLTS-TORQUE INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
07-JUL-2003
SL 737-SL-27-175 REV. A AUTOPILOT ACTUATOR MOUNTING BOLTS-TORQUE INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
23-DEC-2003
SL 737-SL-27-176 AILERON CONTROL CABLE HIGH TENSION. SERVICE LETTER INFORMATIONAL
MOS
13-JAN-2004
SL 737-SL-27-177 REV. A AILERON SPRING CARTRIDGE ANOMALIES. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-2004
SL 737-SL-27-178 REV. B TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX-NEW RETAINER WITH EXCLUDER SEAL. SERVICE LETTER INFORMATIONAL
MOS
30-SEP-2004
SL 737-SL-27-178 REV. C TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX - NEW RETAINER WITH EXCLUDER SEAL (SUPERSEDED SUPERSEDED
BY St 737-SL-27-178 REV. O). SERVICE LETTER
51OS
SL 737-SL-27-178 REV. D TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX-NEW EXCLUDER SEAL. SERVICE LETTER RECOMMENDED
MOS
30-NOV-2012
SL 737-SL-27-179 REV. A LEADING EDGE SLAT POSITION SENSOR INSTALLATION-POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE INFORMATIONAL
CHAFING. SERVICE LETTER
MOS
15-JUL-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 268 Of 748
@ Camp Systems
EFTA00618559
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-179 REV. B LEADING EDGE SLAT POSITION SENSOR INSTALLATION-POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE RECOMMENDED
CHAFING. SERVICE LETTER
MOS
20-JUL-2004
51 737-SL-27-179 REV. C LEADING EDGE SLAT POSITION SENSOR INSTALLATION - POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE
CHAFING.. SERVICE LETTER
MOS
26-APR-2005
51 737-SL-27-180 FLIGHT SPOILER PCU LEAKAGE DUE TO INCORRECT PISTON ROD SEAL. SERVICE LETTER
MOS
04-AUG-2004
51 737-SL-27-181 RUDDER SYSTEM ENHANCEMENT PROGRAM SERVICE BULLETIN-INCORRECT WIRE IN KIT. SERVICE LETTER INFORMATIONAL
MOS
I3-JUL-2004
51 737-SL-27-181 REV. A RUDDER SYSTEM ENHANCEMENT PROGRAM SERVICE BULLETIN - INCORRECT WIRE IN KIT. SERVICE LETTER
MOS
25-MAY-2006
51 737-SL-27-182 ELEVATOR FEEL SHIFT MODULE FILLET SEAL INSPECTION. SERVICE LETTER INFORMATIONAL
MOS
II -OCT-2004
51 737-SL-27-183 ELEVATOR FEEL COMPUTER DISCLOSURE - OVERTOROUED FASTENERS. SERVICE LETTER INFORMATIONAL
MOS
I4-DEC-2004
51 737-SL-27-184 FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO THE FINISH OF CADMIUM PLATED COMPONENTS.. SERVICE
LETTER
MOS
27-MAY-2005
SL 737-SL-27-184 REV. A FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO
THE FINISH OF CADMIUM PLATED COMPONENTS. SERVICE LETTER
MOS
I 3-DEC-2007
SL 737-SL-27-184 REV. 8 FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO RECOMMENDED
THE FINISH OF CADMIUM PLATED COMPONENTS. SERVICE LETTER
MOS
19-JAN-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 269 Of 748
@ Camp Systems
EFTA00618560
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-185 RUDDER PEDAL ADJUSTMENT SHAFT. SERVICE LETTER
MOS
07-DEC-2005
51 737-SL-27-185 REV. A RUDDER PEDAL ADJUSTMENT SHAFT. SERVICE LETTER
MOS
07-AUG-2066
SL 737-SL-27-186 TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY INFORMATIONAL
AND CABLE CHECK. SERVICE LETTER
MOS
29-AUG-2005
SL 737-SL-27-186 REV. A TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER
MOS
09-APR-2007
SL 737-SL-27-186 REV. B TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER COMPLIED WITH
MOS 22-AUG-2008
I9-JUN-2007 3260:48
AFL 782
SL 737-SL-27-186 REV. C TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY RECOMMENDED
AND CABLE CHECK. SERVICE LETTER
MOS
0I-APR-2009
SL 737-SL-27-188 AILERON CONTROL CABLE TENSION INSPECTION (SUPERSEDED BY 737-SL-27-188 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-27-188 REV. A AILERON CONTROL CABLE TENSION INSPECTION. SERVICE LETTER
MOS
SL 737-SL-27-189 TRAILING EDGE FLAP BALLSCREW - MIXED GREASE. SERVICE LETTER
MOS
09-JAN-2006
SL 737-SL-27-190 STABILIZER TRIM MOTOR - EMI FILTER SUPPLIER CHANGE. SERVICE LETTER
MOS
09-FEB-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 270 Of 748
@ Camp Systems
EFTA00618561
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-191 SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER
MOS
09-MAR-2006
SL 737-SL-27-191 REV. A SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER
MOS
06-JUN-2006
SL 737-SL-27-191 REV. 8 SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER
MOS
22-MAR-2007
SL 737-SL-27-191 REV. C SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER
MOS
27-AUG-2007
51 737-SL-27-192 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE
LETTER
MOS
17-JUL-2006
51 737-SL-27-192 REV. A INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE
LETTER
MOS
01-SEP-2006
SI. 737-SL-27-192 REV. 8 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE
LETTER
MOS
22-MAR-2007
SI. 737-SL-27-192 REV. C INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE
LETTER
MOS
10-APR-2007
SI. 737-SL-27-192 REV. 0 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE
LETTER
MOS
24-JUL-2007
SI. 737-SL-27-19a STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO. 1. M01748 NO. 2. PM 285A1010.
SERVICE LETTER
MOS
10-AUG-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 271 Of 748
@ Camp Systems
EFTA00618562
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-193 REV. A STALL MANAGEMENT/ YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO. 1. MOI 748 NO. 2. PIN 285A1010.
SERVICE LETTER
MOS
27-JUL-2007
51 737-SL-27-195 ELEVATOR FEEL COMPUTER INPUT ROD WASHER INSTALLATION DISCREPANCY. SERVICE LETTER
MOS
I6-NOV-2006
SL 737-SL-27-195 REV. A ELEVATOR FEEL COMPUTER INPUT ROD WASHER INSTALLATION DISCREPANCY. SERVICE LETTER COMPUED WITH - IAW THE 58
MOS 22-AUG-2008
24-JUL-2007 3260:48
AFL 782
SL 737-SL-27-196 TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW SENSOR CONNECTOR - WATER INGRESS. SERVICE
LETTER
MOS
22-FEB-2007
51 737-SL-27-196 REV. A TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW SENSOR CONNECTOR - WATER INGRESS. SERVICE
LETTER
MOS
09-APR-2007
SL 737-SL-27-196 REV. 8 TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW
SENSOR CONNECTOR - WATER INGRESS. SERVICE LETTER
MOS
I5-FEB-2008
SL 737-SL-27-198 NOSE DOWN STAB TAKE-OFF WARNING SWITCH (S-546) PLACARD AND STAB NOSE DOWN LIMIT SWITCH (S-145)
PLACARD INSTALLED INCORRECTLY. SERVICE LETTER
MOS
10-APR-2007
51 737-SL-27-199 RUDDER TRIM INDICATOR - ERRATIC OR STUCK NEEDLE. SERVICE LETTER
MOS
05-NOV-2007
SL 737-SL-27-200 WSA1 SPOILER CABLE MAY HAVE A MINIMAL RIDING
CONDITION ON THE UPPER SIDE OF THE LOWER PULLEY OF
THE 251A1411.6 SPOILER TURNAROUND PULLEY BRACKET. SERVICE LETTER
MOS
19-OCT-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 272 Of 748
@ Camp Systems
EFTA00618563
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-201 LATERAL TRIM - AIRPLANE CONFIGURATION HISTORY AND
CORRECTION. SERVICE LETTER
MOS
24-JAN-2008
SL 737-SL-27-202 ELEVATOR FEEL COMPUTER - INSPECTION FOR FEEL
COMPUTER RETURN SPRING. SERVICE LETTER
MOS
24-JAN-2008
SL 737-SL-27-203 TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND
COLUMN FORCES. SERVICE LETTER
MOS
24-JAN-2008
SL 737-SL-27-203 REV. A TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND SUPERSEDED
COLUMN FORCES (SUPERSEDED BY SL 737-SL-27-203 REV. B). SERVICE LETTER
MOS
SL 737-SL-27-203 REV. B TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND COLUMN FORCES, SERVICE LETTER RECOMMENDED
MOS
16-NOV-2012
SL 737-SL-27-204 SPEEDBRAKE GROUND PROXIMITY SENSOR ADJUSTMENT, SERVICE LETTER
MOS
27-MAR-2008
SL 737-SL-27-205 ELEVATOR FEEL COMPUTER INPUT ROD FASTENER
INSTALLATION DISCREPANCY. SERVICE LETTER
MOS
18-JUL-2008
SL 737-SL-27-206 POSSIBLE CONTAMINATION OF STANDBY RUDDER PCU. SERVICE LETTER RECOMMENDED
MOS
18-AUG-2009
SL 737-SL-27-207 SPEED BRAKE BRACKET ASSEMBLY -CABLE RETAINER
BOLTS - TORQUE INSPECTION. SERVICE LETTER
MOS
20-OCT-2008
SL 737-SL-27-208 SPOILER BRACKET MOUNTING BOLTS - TORQUE INSPECTION. SERVICE LETTER
MOS
20-OCT-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 273 Of 748
@ Camp Systems
EFTA00618564
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-209 ELEVATOR POSITION SENSOR INSTALLATION - IMPROPER SUPERSEDED
FASTENER TORQUE (SUPERSEDED BY SL 737-SL-27-209 REV. A). SERVICE LETTER
MOS
SL 737-SL-27-209 REV. A ELEVATOR POSITION SENSOR INSTALLATION - IMPROPER FASTENER TORQUE, SERVICE LETTER RECOMMENDED
MOS
22-MAR-2011
SL 737-SL-27-210 POSSIBLE CONTAMINATION OF AILERON/ELEVATOR PCU, SERVICE LETTER RECOMMENDED
MOS
19-AUG-2009
SI. 737-SL-27-211 AIRPLANE PITCH UPSETS DURING MANUAL REVERSION TEST RECOMMENDED
FLIGHTS DUE TO INCORRECT ADJUSTMENT OF ELEVATOR
TAB PUSHRODS. SERVICE LETTER
MOS
OS-MAY-2009
a 737-SL-27-212 HORIZONTAL STABILIZER LIMIT AND WARNING SWITCH SUPERSEDED
INSTALLATION (SUPERSEDED BY SL 737-SL-27-212 REV. A). SERVICE LETTER
MOS
a 737-SL-27-212 REV. A HORIZONTAL STABILIZER LIMIT AND WARNING SWITCH INSTALLATION (SUPERSEDED 8Y SL 737-SL-27-230 AND SL SUPERSEDED
737-SL-31-057). SERVICE LETTER
MOS
SL 737-SL-27-214 HORIZONTAL STABILIZER TRIM ACTUATOR- LOWER PLUG RECOMMENDED
ASSEMBLY - OVER-SIZED 0 -RING GROOVE. SERVICE LETTER
MOS
30-JUN-2009
SL 737-SL-27-215 LEAKAGE OF ELEVATOR TAB LOCK ACTUATORS ON SUPERSEDED
RECENTLY DELIVERED AIRPLANES (SUPERSEDED BY SL 737-SL-27-215 REV. A). SERVICE LETTER
MOS
SL 737-SL-27-215 REV. A LEAKAGE OF ELEVATOR TAB LOCK ACTUATORS ON RECENTLY DELIVERED AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
04-DEC-2013
SL 737-SL-27-216 STABILIZER POSITION SENSOR INPUT ROD WASHER RECOMMENDED
INSTALLATION DISCREPANCY. SERVICE LETTER
MOS
OS-NOV-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 274 Of 748
@ Camp Systems
EFTA00618565
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-217 ELEVATOR SYSTEM COMPONENTS FASTENERS UNDERTOROUED. SERVICE LETTER RECOMMENDED
MOS
08-DEC-2009
SL 737-SL-27-218 GROUND SPOILER INTERLOCK VALVE END PLATE ASSEMBLY RECOMMENDED
INSTALLED UPSIDE DOWN. SERVICE LETTER
MOS
07-JAN-2010
SL 737-SL-27-219 737NG FLAP/SLAT ELECTRONICS UNIT (FSEU) (M01746) - HISTORY. APPLICABILITY AND INTERCHANGEABILITY.
SERVICE LETTER
MOS
07-MAY-2010
SL 737-SL-27-220 AILERON CENTERING MECHANISM PIN DELIVERED WITHOUT REQUIRED SURFACE COATING. SERVICE LETTER RECOMMENDED
MOS
26-JUL-2010
SL 737-SL-27-221 INCORRECT USE OF CAD PLATED SCREWS WITH TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING RECOMMENDED
EDGE. SERVICE LETTER
MOS
20-AUG-2010
SL 737-SL-27-222 AILERON CENTERING MECHANISM LEVER DELIVERED WITH MINOR ASSEMBLY DAMAGE, SERVICE LETTER RECOMMENDED
MOS
20-SEP-2010
SL 737-SL-27-223 GROUND SPOILER INTERLOCK VALVE IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
14-OCT-2010
SL 737-SL-27-224 RUDER PCU - DAMAGE SUMMING LEVER BOLTS. SERVICE LETTER RECOMMENDED
MOS
05-NOV-2010
SL 737-SL-27-225 6355C0001-01 STABILIZER TRIM MOTOR - MODIFICATION HISTORY (SUPERSEDED 8Y 737-SL-27-225 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-27-225 REV. A 6355C0001-01 STABILIZER TRIM MOTOR- MODIFICATION HISTORY, SERVICE LETTER RECOMMENDED
MOS
30-JAN-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 275 Of 748
@ Camp Systems
EFTA00618566
AD/SI Status Report AIRCRAFT
COMP
Astant.frar• Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-226 STICK SHAKER MOTOR GROUND TERMINAL INSPECTION (SUPERSEDED BY SL 737-SL-27-226 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-27-226 REV. A STICK SHAKER MOTOR GROUND TERMINAL INSPECTION (SUPERSEDED BY SL 737-SL-27-226 REV. B). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-27-226 REV. B STICK SHAKER MOTOR GROUND TERMINAL INSPECTION. SERVICE LETTER RECOMMENDED
MOS
08-JUN-2012
SL 737-SL-27-227 RUDDER FEEL AND CENTERING INSTALLATION - FASTENERS UNDERTOROUED. SERVICE LETTER RECOMMENDED
MOS
17-NOV-2010
SL 737-SL-27-228 TRAILING EDGE FLAP BALLSCREWS-IN-SERVICE WEAR. SERVICE LETTER RECOMMENDED
MOS
15-NOV-2010
SI. 737-SL-27-229 737NG LEADING EDGE CRUISE DEPRESSURIZATION VALVE N00163). INCORRECTLY APPLIED INSTALLATION RECOMMENDED
SEALANT. SERVICE LETTER
MOS
16-DEC-2010
SL 737-SL-27-230 HORIZONTAL STABILIZER LIMIT SWITCH INSTALLATION (SUPERSEDED BY SL 737-SL-27-230 REV. A). SERVICE LETTER RECOMMENDED
MOS
31-MAR-2011
SL 737-SL-27-230 REV. A HORIZONTAL STABILIZER LIMIT SWITCH INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
08-FEB-20IS
SL 737-SL-27-231 GROUND STUD DECAL GD1086ST INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-27-231 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-27-231 REV. A GROUND STUD DECAL GD1086ST INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-27-231 REV. 8). SERVICE SUPERSEDED
LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 276 Of 748
@ Camp Systems
EFTA00618567
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-231 REV. 8 GROUND STUD DECAL GD1086ST INCORRECTLY LABELED. SERVICE LETTER RECOMMENDED
MOS
09-DEC-2011
SL 737-SL-27-232 AUTO SPEEDBRAKE ACTUATOR IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
24-AUG-2011
SL 737-SL-27-233 WIRE BUNDLE W1032 POSSIBLE CHAFING. SERVICE LETTER RECOMMENDED
MOS
09-DEC-2011
SL 737-SL-27-234 REV. A CORROSION PROTECTION FOR S138. S245. AND 51051 FLAP POSITION SWITCH CONNECTORS. SERVICE LETTER RECOMMENDED
MOS
13-AUG-2013
SL 737-SL-27-235 GROUND STUD DECAL GD236ST POTENTIALLY LOCATED INCORRECTLY. SERVICE LETTER RECOMMENDED
MOS
18-SEP-2012
SL 737-SL-27-236 S245 FLAP SWITCH CONNECTOR - POSSIBLE IMPROPER ASSEMBLY OF BACKSHELL CLAMP (SUPERSEDED BY SL SUPERSEDED
737-SL-27-236 REV. A). SERVICE LETTER
MOS
SL 737-SL-27-236 REV. A 5245 FLAP SWITCH CONNECTOR - POSSIBLE IMPROPER ASSEMBLY OF BACKSHELL CLAMP. SERVICE LETTER RECOMMENDED
MOS
27-SEP-2012
SL 737-SL-27-238 INADVERTENT ACTIVATION OF RUDDER TRIM. SERVICE LETTER RECOMMENDED
MOS
19-SEP-2012
SL 737-SL-27-239 RUDDER CENTERING UNIT SPRING ASSEMBLY - INCORRECT SPRING SEAT MATERIAL. SERVICE LETTER RECOMMENDED
MOS
C5-FEB-20I3
SL 737-SL-27-240 TRAILING EDGE FLAP - ALTERNATE ELECTIC MOTOR - POSSIBILITY OF NO LUBRICATION FLUID. SERVICE LETTER RECOMMENDED
MOS
16-NOV-2012
SL 737-SL-27-241 FLIGHT CONTROL DAMAGE CAUSED BY EXTREME WINDS. SERVICE LETTER RECOMMENDED
MOS
19-DEC-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 277 Of 748
@ Camp Systems
EFTA00618568
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-27-242 POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES (SUPERSEDED BY SL 737-SL-27-242 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-27-242 REV. A POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES (SUPERSEDED BY SL 737-SL-27-242 REV. B), SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-27-242 REV. B POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES. SERVICE LETTER RECOMMENDED
MOS
05-AUG-20I3
SL 737-SL-27-243 POSSIBLE ELECTRO-HYDRAULIC SERVO VALVE (EHSV) GASKET PLATE LEAKAGE ON PARKER AEROSPACE RUDDER RECOMMENDED
POWER CONTROL UNITS (PCU), SERVICE LETTER
MOS
21-JUN-2073
SL 737-SL-27-244 POSSIBLE DISCREPANT FLOW LIMITER ASSEMBLIES. SERVICE LETTER RECOMMENDED
MOS
06-SEP-2013
SL 737-SL-27-245 SHOULDER BOLT AND SLAT TORSION ROD CLEARANCE. SERVICE LETTER RECOMMENDED
MOS
30-SEP-2013
SI. 737-SL-27-246 POSSIBLE EXTERNAL LEAKAGE FROM AILERON/ELEVATOR POWER CONTROL UNIT (PCU) CRANK ASSEMBLY SUPERSEDED
(SUPERSEDED BY SL 737-SL-27-246 REV. A). SERVICE LETTER
MOS
SL 737-SL-27-246 REV. A POSSIBLE EXTERNAL LEAKAGE FROM AILERON/ELEVATOR POWER CONTROL UNIT (PCU) CRANK ASSEMBLY. RECOMMENDED
SERVICE LETTER
MOS
02-JUN-20I4
SL 737-SL-27-247 HORIZONTAL STABILIZER TRIM ACTUATOR- INPUT CAM ASSEMBLY- IMPROPERLY CARBURIZED. SERVICE LETTER RECOMMENDED
MOS
21-APR-2014
SL 737-SL-27-248 FLIGHT SPOILER PCU RELIABILITY IMPROVEMENTS ON SHORT FIELD PERFORMANCE AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
I I -JUN-20I4
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 278 Of 748
@ Camp Systems
EFTA00618569
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-015 REV. D FUEL TANKS OPEN AND PURGED. ELECTRICAL POWER APPUCATION (SUPERSEDED 737-SL-28-082). SERVICE SUPERSEDED
LETTER
MOS
I3-APR-2010
SL 737-SL-28-039 REV. B FUEL LEAK DETECTION AND REPAIR OVERVIEW VIDEO. SERVICE LETTER INFORMATIONAL
MOS
1O-JAN-2002 - (s)
SL 737-SL-28-044 REV. A AIRCRAFT USE OF DYED FUELS (SUPERSEDED BY SL 737-SL-28-044 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-28-044 REV. B AIRCRAFT USE OF DYED FUELS. SERVICE LETTER RECOMMENDED
MOS
02-APR-20I2
SL 737-SL-28-053 AIRCRAFT USE OF FUELS CONTAMINATED WITH DYE (SUPERSEDED BY SL 737-SL-28-053 REV. A). SERVICE LETTER SUPERSEDED
MOS
-
SL 737-SL-28-053 REV. A AIRCRAFT USE OF FUELS CONTAMINATED WITH DYE. SERVICE LETTER RECOMMENDED
MOS
I6-APR-2012
SL 737-SL-28-055 DESIGN IMPROVEMENT FOR PITCH AND ROLL INCLINOMETERS TO PREVENT CRACKING OF GLASS TUBE, SERVICE INFORMATIONAL
LETTER
MOS
I8-JUN-1999 - (s)
SL 737-SL-28-055 REV. A DESIGN IMPROVEMENT FOR PITCH AND ROLL INCLINOMETERS TO PREVENT CRACKING OF GLASS TUBE. SERVICE INFORMATIONAL
LETTER
MOS
22-JAN-2003
SL 737-SL-28-056 FUEL QUANITITY PROCESSOR UNIT (FOPU) SOFTWARE IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
15-DEC-1999 - (s)
SL 737-SL-28-057 NEW SCAVENGE PUMP INLET AND SCREEN.. SERVICE LETTER INFORMATIONAL
MOS
15-AUG-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 279 Of 748
@ Camp Systems
EFTA00618570
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-060 SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE RECOMMENDED
LETTER
MOS
I9-OCT-2001
SL 737-SL-28-060 REV. A SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE INFORMATIONAL
LETTER
MOS
28-NOV-2001 - (s)
SL 737-SL-28-060 REV. 8 SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF
VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE LETTER
MOS
I5-OCT-2007
SL 737-SL-28-061 ESTIMATION OF FREEZING POINTS OF JET AMET A-I FUEL BLENDS(SUPERSEDEO BY SL 737-SL-28-061 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-28-061 REV. A ESTIMATION OF FREEZING POINTS OF JET AMET A-I FUEL BLENDS(SUPERSEDEO BY SL 737-SL-28-061 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SI. 737-SL-28-061 REV. 8 ESTIMATION OF FREEZING POINTS OF JET A/JET A-I FUEL BLENDS (SUPERSEDED 8Y SL 737-SL-28-06I REV. C). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-28-061 REV. C ESTIMATION OF FREEZING POINTS OF JET AMET A-1 FUEL BLENDS. SERVICE LETTER RECOMMENDED
MOS
28-NOV-2011
SL 737-SL-28-062 POSSIBLE MISS-LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER INFORMATIONAL
MOS
I8-JUN-2003
SL 737-SL-28-062 REV. A POSSIBLE MISS-LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER INFORMATIONAL
MOS
I5-SEP-2003
SL 737-SL-28-062 REV.B POSSIBLE MISS - LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER RECOMMENDED
MOS
20-JUN-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 280 Of 748
@ Camp Systems
EFTA00618571
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-063 APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER INFORMATIONAL
MOS
I9-NOV-2003
SL 737-SL-28-063 REV. A APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER
MOS
I8-MAR-2005
SL 737-SL-28-063 REV. B APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER
MOS
07-AUG-2006
SL 737-SL-28-065 POTENTIAL FUEL LEAKS IN THE OUTBOARD ORYBAY ON 737NG AIRPLANE RETROFITTED WITH BLENDED WINGLETS.
SERVICE LETTER
MOS
28-JUN-2004
SL 737-SL-28-065 REV. A POTENTIAL FUEL LEAKS IN THE OUTBOARD ORYBAY ON INFORMATIONAL
737NG AIRPLANE RETROFITTED WITH BLENDED WINGLETS. SERVICE LETTER
MOS
01-AUG-2005
SL 737-SL-28-066 SPECIAL FEDERAL AVIATION REGULATION (SFAR) 88 DESIGN. OPERATION. AND MAINTENANCE TRAINING
INFORMATION. SERVICE LETTER
MOS
13-FEB-2007
SL 737-SL-28-066 REV. A SPECIAL FEDERAL AVIATION REGULATION (SFAR) 88 DESIGN.
OPERATION. AND MAINTENANCE TRAINING INFORMATION. SERVICE LETTER
MOS
I 7-JUN-2008
SL 737-SL-28-067 SUSPECT FUELING FLOAT SWITCHES. SERVICE LETTER
MOS
05-APR-2007
SL 737-SL-28-067 REV. A SUSPECT FUELING FLOAT SWITCHES. SERVICE LETTER
MOS
I3-DEC-2007
SL 737-SL-28-069 FUEL SYSTEM MOTOR OPERATED VALVE ACTUATORS, SERVICE LETTER
MOS
21-MAY-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 281 Of 748
@ Camp Systems
EFTA00618572
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-069 REV. A FUEL SYSTEM MOTOR OPERATED VALVE ACTUATORS. SERVICE LETTER
MOS
05-DEC-2008
SL 737-SL-28-070 GROUND FAULT INTERRUPT (GA) RELAYS FOR THE FUEL BOOST PUMP. SERVICE LETTER
MOS
24-JUL-2007
SL 737-SL-28-070 REV. A GROUND FAULT INTERRUPT (GFI) RELAYS FOR THE FUEL
BOOST PUMP. SERVICE LETTER
MOS
27-MAR-2008
SL 737-SL-28-07I AVIATION FUELS SPECIFICATION. SERVICE LETTER
MOS
I8-JAN-2008
SL 737-SL-28-07I REV. A AVIATION FUELS SPECIFICATION. SERVICE LETTER
MOS
I9-FEB-2008
SL 737-SL-28-071 REV. B AVIATION FUELS SPECIFICATION. SERVICE LETTER
MOS
31-JUL-2008
SL 737-SL-28-071 REV. C AVIATION FUELS SPECIFICATION (SUPERSEDED BY SL 737-SL-28-071 REV. D). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-28-07I REV. D AVIATION FUELS SPECIFICATION (SUPERSEDED BY SL 737-SL-28-071 REV. E). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-28-07I REV. E AVIATION FUELS SPECIFICATION. SERVICE LETTER RECOMMENDED
MOS
27-JUN-20I2
SL 737-SL-28-072 WIRE BUNDLE W1126 POSSIBLE CHAFING. SERVICE LETTER
MOS
I8-JUL-2008
SL 737-SL-28-072 REV. A WIRE BUNDLE W1126 POSSIBLE CHAFING. SERVICE LETTER
MOS
24-OCT-2008
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 282 Of 748
@ Camp Systems
EFTA00618573
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-073 INTRODUCTION OF IMPROVED SPAR. DEFUEL AND COMPUEO WITH
CROSSFEED VALVE DISK. SERVICE LETTER
MOS 29-AUG-2011
18-FEB-2009 - (s) 3533:32
AFL 863
SI. 737-SL-28-073 REV. A INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK (SUPERSEDED BY SL 737-SL-28-073 REV. SUPERSEDED
8). SERVICE LETTER
MOS
SL 737-SL-28-073 REV. 8 INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK (SUPERSEDED BY SL 737-SL-28-073 REV. SUPERSEDED COMPUEO WITH
C). SERVICE LETTER
MOS 29-AUG-2011
3533:32
AFL 863
SL 737-SL-28-073 REV. C INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK SERVICE LETTER RECOMMENDED
MOS
25-JUL-2012
SL 737-SL-28-074 CENTER TANK REFUEL TUBE LOCATED IN THE RIGHT WING RECOMMENDED
PM 344A2202-8 MAY BE INSTALLED BACKWARDS. SERVICE LETTER
MOS
I4-MAY-2009
SL 737-SL-28-075 POTENTIAL FOR FOREIGN OBJECTS LEFT IN THE FUEL TANK RECOMMENDED
AFTER REWORK PRIOR TO AIRPLANE DELIVERY. SERVICE LETTER
MOS
I3-AUG-2009
SL 737-SL-28-076 POSSIBLE OVER-TWISTED LOCKWIRE ON THE MAIN TANK RECOMMENDED
FUEL BOOST PUMPS. SERVICE LETTER
MOS
24-NOV-2009
SL 737-SL-28-077 POSSIBLE OVER-TWISTED LOCKWIRE ON THE CENTER TANK RECOMMENDED
FUEL BOOST PUMP DRAIN PLUG. SERVICE LETTER
MOS
24-NOV-2009
SL 737-SL-28-078 POSSIBLE LACK OF SEALANT ON THE FUEL PUMP PRESSURE INFORMATIONAL
SWITCH SPAR PENETRATIONS FOR THE LEFT AND RIGHT
FORWARD MAIN-TANK PUMPS. SERVICE LETTER
MOS
22-DEC-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 283 Of 748
@ Camp Systems
EFTA00618574
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-079 POSSIBLE LACK OF SEALANT ON THE FUEL PUMP PRESSURE INFORMATIONAL
SWITCH SPAR PENETRATIONS FOR THE LEFT AND RIGHT
CENTER-TANK OVERRIDE-PUMPS. SERVICE LETTER
MOS
22-DEC-2009
SL 737-SL-28-080 POTENTIAL UNDER-TORQUED FUEL SUMP DRAIN AND AN UNDER-TORQUED BULKHEAD FITTING NUT (SUPERSEDED SUPERSEDED
BY 737-SL-28-080-A). SERVICE LETTER
MOS
15-FEB-2010
SL 737-SL-28-080 REV. A POTENTIAL UNDER-TORQUED FUEL SUMP DRAIN AND AN UNDER-TORQUED BULKHEAD FITTING NUT. SERVICE
LETTER
MOS
09-JUN-20I0
SL 737-SL-28-081 CONNECTOR D01828 HAS INCORRECT PLATING. SERVICE LETTER RECOMMENDED
MOS
25-MAR-2010
SL 737-SL-28-082 AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN. SERVICE LETTER INFORMATIONAL
MOS
I3-APR-2010
SL 737-SL-28-082 REV. A AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN (SUPERSEDED BY 737-SL-28-082 REV. B). SERVICE LETTER SUPERSEDED
MOS
22-APR-20I0
SL 737-SL-28-082 REV. B AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN (SUPERSEDED BY SL 737-SL-28-082 REV. C), SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-28-082 REV. C AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN. SERVICE LETTER RECOMMENDED
MOS
27-JUN-20 I I
SL 737-SL-28-083 POTENTIALLY MIS-INSTALLED LOCKWIRE FOR THE RH MAIN TANK FUEL QUANTITY INDICATING SYSTEM(FOIS)
BULKHEAD CONNECTOR. SERVICE LETTER
MOS
I7-JUN-2010
SL 737-SL-28-085 WIRE BUNDLE CONTACTS P-15 REFUELING PANEL (SUPERSEDED BY SL 737-SL-28-085 REV. A). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 284 Of 748
@ Camp Systems
EFTA00618575
AD/SI Status Report AIRCRAFT
CAMP
Asiant.fran Atna:up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-085 REV. A WIRE BUNDLE CONTACTS P-15 REFUELING PANEL. SERVICE LETTER RECOMMENDED
MOS
31-JAN-2012
SI. 737-SL-28-086 PM 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SI. 737-SL-28-086 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-28-086 REV. A PM 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. B). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-28-086 REV. B P/N 343A2212-3/-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. C). SERVICE RECOMMENDED
LETTER
MOS
I8-APR-2012
SL 737-SL-28-086 REV. C PM 343A2212-3/-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. 0). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-28-086 REV. D PIN 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE. SERVICE LETTER RECOMMENDED
MOS
25-MAR-2014
SL 737-SL-28-087 FUEL QUANTITY INDICATION SYSTEM (FOIS) FUEL TANK UNITS WITH PLASTIC CLAMPS. SERVICE LETTER RECOMMENDED
MOS
05-MAY-2011
SL 737-SL-28-088 SHIELD GROUND WIRES NOT CONNECTED TO GROUND STUD (SUPERSEDED BY SL 737-SL-28-088 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-28-088 REV. A SHIELD GROUND WIRES NOT CONNECTED TO GROUND STUD. SERVICE LETTER RECOMMENDED
MOS
14-NOV-2011
SL 737-SL-28-089 MOTOR OPERATED VALVE (54OV) ACTUATOR IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
I9-DEC-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 285 Of 748
@ Camp Systems
EFTA00618576
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-28-090 REFUELING PANEL LAMP MOD. SERVICE LETTER RECOMMENDED
MOS
20-JUL-2012 •
SL 737-SL-28-09I MISSING GROMMET FOR THE CENTER FUEL TANK SUMP DRAIN VALVE (SUPERSEDED BY SL 737-SL-28-091 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-28-09I REV. A MISSING GROMMET FOR THE CENTER FUEL TANK SUMP DRAIN VALVE. SERVICE LETTER RECOMMENDED
MOS
13-JUN-2012
SL 737-SL-28-092 POTENTIAL MISSING WASHER AT FUEL TANK VENT TUBE DRAIN. SERVICE LETTER RECOMMENDED
MOS
20-JUL-2012
SL 737-SL-28-093 MAIN TANK REFUEL TUBE ASSEMBLY. 344A2201-12. MAY BE INSTALLED INCORRECTLY. SERVICE LETTER RECOMMENDED
MOS
06-MAR-2013
SL 737-SL-28-094 FUEL TEMPERATURE SENSOR WIRE CHAFING. SERVICE LETTER RECOMMENDED
MOS
I9-JUN-2013
SL 737-SL-28-095 ENGINE FUEL SUCTION FEED TEST - ENGINE PARAMETER CHANGES RECOMMENDED
. SERVICE LETTER
MOS
I3-AUG-2013
SL 737-SL-28-096 ENGINE FUEL SHUTOFF VALVE WIRE CHAFING. SERVICE LETTER RECOMMENDED
MOS
10-DEC-2013
SL 737-SL-28-098 FUEL BOOST PUMP BACKSHELL CHAFING WIRES. SERVICE LETTER RECOMMENDED
MOS
24-JUN-2014
SL 737-SL-28-099 POSSIBLE MISSING FINISH ON APU DRAIN MAST TUBE. SERVICE LETTER RECOMMENDED
MOS
SL 737-SL-29-069 HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
26-AUG-1996 - Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 286 Of 748
@ Camp Systems
EFTA00618577
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-069 REV. A HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
30-JAN-1997 - Is)
51 737-SL-29-069 REV. 8 HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
09-APR-1999 - (s)
51 737-SL-29-069 REV. C HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
24-MAY-2010
SL 737-SL-29-074 HYDRAULIC PRESSURE TRANSDUCER IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
27-JUN-1998 - (s)
SL 737-SL-29-075 IMPROVED HYDRAULIC STANDBY SYSTEM MODULAR PACKAGE HOUSING. SERVICE LETTER INFORMATIONAL
MOS
18-AUG-1998 - (s)
SL 737-SL-29-076 CHAFING OF HYDRAULIC SYSTEM A ELECTRIC MOTOR-DRIVEN PUMP PRESSURE HOSE ON RETURN FILTER V-BAND INFORMATIONAL
CLAMP. SERVICE LETTER
MOS
20-NOV-1998 - Is)
SL 737-SL-29-076 REV. A CHAFING OF HYDRAULIC SYSTEM A ELECTRIC MOTOR-DRIVEN PUMP PRESSURE HOSE ON RETURN FILTER V-BAND INFORMATIONAL
CLAMP. SERVICE LETTER
MOS
29-JUN-1999 - (s)
SL 737-SL-29-078 HYDRAULIC FLUID NEW FORMULATION. SERVICE LETTER INFORMATIONAL
MOS
29-JUL-1999 -
SL 737-SL-29-079 INSUFFICIENT SWAGE ON THRUST REVERSER HYDRAULIC HOSES. PM AS115-06H0152. SERVICE LETTER INFORMATIONAL
MOS
13-DEC-1999 - (s)
SL 737-SL-29-080 CROSS CONNECTION OF LANDING GEAR HYDRAULIC LINES. SERVICE LETTER INFORMATIONAL
MOS
05-JUL-2000 - Is)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 287 Of 748
@ Camp Systems
EFTA00618578
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-081 IMPROVED ENGINE DRIVEN HYDRAULIC PUMP HOSE QUICK-DISCONNECTS. SERVICE LETTER INFORMATIONAL COMPUED WITH - -ACCOMPLISHED ON AAC WO
1828 AVV040 CLOSED 06/1561. CONSTITUTES
TERMINATING ACTION.
MOS 23-JUL-2001
03-NOV-2000 500 (s) 320
AFL 127
St 737-SL-29-082 NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER INFORMATIONAL
MOS
17-NOV-2000 - (s)
St 737-SL-29-082 REV. A NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER INFORMATIONAL
MOS
21-DEC-2000 - (s)
St 737-SL-29-082 REV. B NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-2004
St 737-SL-29-083 REV. A POSSIBLE IMPROPERLY TORQUED JAM NUTS ON BULKHEAD HYDRAULIC FITTINGS. SERVICE LETTER INFORMATIONAL
MOS
12-OCT-2001 - (s)
St 737-SL-29-084 POSSIBLE THIN-WALL CONDITION ON PARKER ABEX ELECRTIC MOTOR-DRIVEN PUMPS. SERVICE LETTER
MOS 24 (s)
08-OCT-2001
St 737-SL-29-084 REV. A POSSIBLE THIN-WALL CONDITION ON PARKER ABEX ELECRTIC MOTOR-DRIVEN PUMPS. SERVICE LETTER
MOS 24 (s)
08-OCT-2001
St 737-SL-29-085 LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER
MOS
21-AUG-2002
AFL
St 737-SL-29-085 REV. A LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER INFORMATIONAL
MOS
03-JUN-2003
St 737-SL-29-085 REV. B LOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING (SUPERSEDED BY SL 737-SL-29-085 REV. C). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 288 Of 748
@ Camp Systems
EFTA00618579
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-085 REV. C LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER RECOMMENDED
MOS
10-JUN-2011
SL 737-SL-29-086 ELECTRIC MOTOR OPERATED HYDRAULIC SHUTOFF VALVE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2002
SL 737-SL-29-087 TITEFLEX DISCLOSURE.IMPROPER HEAT TREATMENT ON HOSE B-NUTS. SERVICE LETTER INFORMATIONAL
MOS
I4-APR-2003
SL 737-SL-29-088 DRUCK HYDRAULIC PRESSURE TRANSDUCER DISCREPANCY. SERVICE LETTER INFORMATIONAL
MOS
I7-JAN-2003
SL 737-SL-29-089 ENGINE DRIVEN PUMP(EDP) AND AIR DRIVEN PUMP (ADP)- REPLACEMENT OF DISCREPANT WEAR PLATE. SERVICE INFORMATIONAL
LETTER
MOS
26-MAR-2003
SL 737-SL-29-090 FLIGHT CONTROLS HYDRAULIC MODULAR PACKAGE REPLACEMENT - INTERCHANGEABILITY (SUPERSEDED BY SL SUPERSEDED
737-SL-29-090 REV. A). SERVICE LETTER
MOS
SL 737-SL-29-090 REV. A FLIGHT CONTROLS HYDRAULIC MODULAR PACKAGE REPLACEMENT-INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED
MOS
23-NOV-2011
SL 737-SL-29-091 METHODS TO HELP REDUCE OR ELIMINATE PRELOAD WHEN REPLACING FRACTURED HYDRAULIC PRESSURE TUBE
PfN 312A2110-2 IN 737NG STRUTS. SERVICE LETTER
MOS
24-MAR-2005
St 737-SL-29-092 REV. A RECOMMENDED ACTION TO RESOLVE CORROSION OF HYDRAULIC TUBES IN THE WHEEL WELLS CAUSED BY
EXPOSURE TO POTASSIUM-CONTAINING RUNWAY DEICING FLUIDS. SERVICE LETTER
MOS
22-AUG-2005
St 737-SL-29-092 REV. 8 RECOMMENDED ACTION TO RESOLVE CORROSION OF HYDRAULIC TUBES IN THE WHEEL WELLS CAUSED BY
EXPOSURE TO POTASSIUM-CONTAINING RUNWAY DEICING FLUIDS. SERVICE LETTER
MOS
21-MAR-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 289 Of 748
@ Camp Systems
EFTA00618580
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-095 HYDRAULIC FLUID EXTERNAL LEAKAGE - RELIABILITY IMPROVEMENTS (SUPERSEDED BY SL 737-SL-29-095 REV. A), SUPERSEDED
SERVICE LETTER
MOS
51 737-SL-29-095 REV. A HYDRAULIC FLUID EXTERNAL LEAKAGE - RELIABILITY IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
22-DEC-2010
51 737-SL-29-096 INCORRECT SEALS IN HYDRAULIC SYSTEM A HEAT EXCHANGER FITTINGS. SERVICE LETTER
MOS
12-APR-2007
51 737-SL-29-097 INCORRECT SADDLE-TYPE TUBE CLAMPS INSTALLED. SERVICE LETTER
MOS
24-JUL-2007
51 737-SL-29-099 CORROSION-RESISTANT HYDRAULIC FUSES (SUPERSEDED BY 737-SL-29-099-A). SERVICE LETTER SUPERSEDED
MOS
28-AUG-2007
51 737-SL-29-099 REV. A CORROSION-RESISTANT HYDRAULIC FUSES. SERVICE LETTER
MOS
07-JUN-20I0
51 737-SL-29-100 TROUBLESHOOTING OF REPEATED ENGINE-DRIVEN PUMP
FAILURES. SERVICE LETTER
MOS
10-OCT-2007
SL 737-SL-29-100 REV. A TROUBLESHOOTING OF REPEATED ENGINE-DRIVEN PUMP
FAILURES. SERVICE LETTER
MOS
I7-OCT-2007
51 737-SL-29-101 FILTER ELEMENTS WITH INCORRECT EPDXY OR
INCORRECTLY MACHINED 0 -RING GROOVES. SERVICE LETTER
MOS
17-DEC-2007
SL 737-SL-29-101 REV. A FILTER ELEMENTS WITH INCORRECT EPDXY OR
INCORRECTLY MACHINED 0-RING GROOVES. SERVICE LETTER
MOS
20-FEB-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 290 Of 748
@ Camp Systems
EFTA00618581
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-102 STANDBY HYDRAULIC SYSTEM CASE DRAIN FILTER I CHECK
VALVE INSTALLED REVERSED. SERVICE LETTER
MOS
20-JUN-2008
SL 737-SL-29-102 REV. A STANDBY HYDRAULIC SYSTEM CASE DRAIN FILTER / CHECK COMPLIED WITH
VALVE INSTALLED REVERSED. SERVICE LETTER
MOS 28-SEP-2009
23-JAN-2009 3378:04
AFL 812
SL 737-SL-29-103 HYDRAULIC FLUID - NEW FORMULATION. SERVICE LETTER
MOS
26-JUN-2008
SL 737-SL-29-103 REV. A HYDRAULIC FLUID - NEW FORMULATION. SERVICE LETTER RECOMMENDED
MOS
07-MAY-2012 •
SL 737-SL-29-104 EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST
FAIRING PANEL. SERVICE LETTER
MOS
29-AUG-2C08
SL 737-SL-29-104 REV. A EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST SUPERSEDED
FAIRING PANEL (SUPERSEDE BY SL 737-SL-29-104 REV. B). SERVICE LETTER
MOS
SL 737-SL-29-104 REV. B EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST FAIRING PANEL. SERVICE LETTER RECOMMENDED
MOS
18-MAY-2011
SL 737-SL-29-105 HYDRAULIC RESERVOIR DRAIN VALVE LEAKAGE. SERVICE LETTER
MOS
11-AUG-2C08
SL 737-SL-29-106 RECOMMENDED HANDLING AND STORAGE PRACTICES FOR
HYDRAULIC COMPONENTS USING BMS 3-11. SERVICE LETTER
MOS
17-FEB-2009
SL 737-SL-29-107 CRACKING OF HYDRAULIC STANDBY SYSTEM RESERVOIR RECOMMENDED
BOSS—AVAILABILITY OF NEW TUBE. SERVICE LETTER
MOS
18-MAY-20O9
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 291 Of 748
'2 Camp Systems
EFTA00618582
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-108 HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE RECOMMENDED
FRACTURES. SERVICE LETTER
MOS
07-JUL-2009
SL 737-SL-29-108 REV. 8 HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES. SERVICE LETTER INFORMATIONAL
MOS
IS-MAR-2010
SL 737-SL-29-108 REV. C HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES (SUPERSEDED BY SL 737-SL-29-108 REV. SUPERSEDED
0). SERVICE LETTER
MOS
SL 737-SL-29-108 REV. D POTENTIAL PERSONAL HAZARD - HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES SUPERSEDED
(SUPERSEDED BY SB 737-SL-29-108 REV. E). SERVICE LETTER
MOS
SL 737-SL-29-108 REV. E POTENTIAL PERSONAL HAZARD - HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES. SERVICE RECOMMENDED
LETTER
MOS
I2-JUL-2013
SL 737-SL-29-109 INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN SUPERSEDED
LANDING GEAR (MLG) WHEEL WELL (SUPERSEDED BY SL 737-SL-29-109 REV. A). SERVICE LETTER
MOS
SI. 737-SL-29-109 REV. A INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN SUPERSEDED
LANDING GEAR (MLG) WHEEL WELL (SUPERSEDED BY SL 737-SL-29-109 REV. B). SERVICE LETTER
MOS
SI. 737-SL-29-109 REV. 8 INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN RECOMMENDED
LANDING GEAR (MLG) WHEEL WELL. SERVICE LETTER
MOS
-JAN-2012
SL 737-SL-29-110 HYDRAULIC FLUID - NEW FORMULATION-SKYDROL-PE-5. SERVICE LETTER
MOS
I8-JUN-2010
SL 737-SL-29-111 POSSIBLE HYDRAULIC TUBE INSUFFICIENT CLEARANCE. MAIN WHEEL WELL (SUPERSEDED 8Y SL 737-SL-29-111 REV. SUPERSEDED
A). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 292 Of 748
@ Camp Systems
EFTA00618583
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-111 REV. A POSSIBLE HYDRAULIC TUBE INSUFFICIENT CLEARANCE. MAIN WHEEL WELL. SERVICE LETTER RECOMMENDED
MOS
28-SEP-2011
SL 737-SL-29-112 RETURN FILTER MODULE IMPROVEMENTS - SYSTEM-A AND SYSTEM-B HYDRAULIC POWER (SUPERSEDED BY SL SUPERSEDED
737-SL-29-112 REV. A). SERVICE LETTER
MOS
SL 737-SL-29-112 REV. A RETURN FILTER MODULE IMPROVEMENTS - SYSTEM-A AND SYSTEM-B HYDRAULIC POWER (SUPERSEDED BY SL SUPERSEDED
737-SL-29-112 REV. 8). SERVICE LETTER
MOS
SL 737-SL-29-112 REV. 8 RETURM FILTER MODULE IMPROVEMENTS - SYSTEN-A AND SYSTEM-B HYDRAULIC POWER. SERVICE LETTER RECOMMENDED
MOS
I9-JUL-2012
SL 737-SL-29-113 POTENTIAL INSUFFICIENT CLEARANCE BETWEEN HYDRAULIC TUBE AND FILTER MODULE. SERVICE LETTER RECOMMENDED
MOS
I6-SEP-2011
SL 737-SL-29-114 MISSING PACKING IN FUSE ASSEMBLY PIN 2-7680-2 (SUPERSEDED BY SL 737-SL-29-114 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-29-114 REV. A MISSING PACKING IN FUSE ASSEMBLY PIN 2-7680-2. SERVICE LETTER RECOMMENDED
MOS
I8-APR-2012
SL 737-SL-29-115 GROUND STUD DECALS GO304DC 8 GD304ST (SUPERSEDED BY SL 737-SL-29-115 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-29-115 REV. A GROUND STUD DECALS GO304DC 8 GD304ST (SUPERSEDED BY 737-SL-29-115 REV. B). SERVICE LETTER RECOMMENDED
MOS
08-AUG-20I2
SL 737-SL-29-115 REV. 8 GROUND STUD DECALS GO304DC 8 GD304ST. SERVICE LETTER RECOMMENDED
MOS
06-MAR-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 293 Of 748
@ Camp Systems
EFTA00618584
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-29-116 POSSIBLE INSUFFICIENTLY TIGHTENED HYDRAULIC TUBE CONNECTIONS - LEFT AND RIGHT INBOARD WING REAR SUPERSEDED
SPAR INSTALLATIONS (SUPERSEDED BY SL 737-SL-29-116 REV. A). SERVICE LETTER
MOS
SL 737-SL-29-116 REV. A POSSIBLE INSUFFICIENTLY TIGHTENED HYDRAULIC TUBE CONNECTIONS? LEFT AND RIGHT INBOARD WING REAR RECOMMENDED
SPAR INSTALLATIONS. SERVICE LETTER
MOS
I3-APR-2012
SL 737-SL-29-117 IMPROVED EDP PRESSURE HOSE QUICK-DISCONNECTS. SERVICE LETTER RECOMMENDED
MOS
30-JUL-2012
SL 737-SL-29-118 DETERMINE INSTALLATION TORQUE FOR TUBES/FITTINGSMOSES. SERVICE LETTER RECOMMENDED
MOS
30-NOV-2012
SL 737-SL-29-119 TROUBLESHOOTING HYDRAULIC TUBE/FITTING/HOSE LEAKAGE. SERVICE LETTER RECOMMENDED
MOS
02-APR-20I3
SL 737-SL-29-120 PREMATURE LEAKAGE OF SHAFT SEAL ON PARKER HYDRAULIC EDP AND PTU. SERVICE LETTER RECOMMENDED
MOS
10-DEC-2013
SI. 737-SL-29-121 INCORRECT ORIENTATION OF POWER TRANSFER UNIT (PTU) RECOMMENDED
PRESSURE FILTER ASSEMBLY. SERVICE LETTER
MOS
03-APR-20I4
SL 737-SL-30-017 COWL THERMAL ANT-ICE VALVE IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
13-OCT-2000 - (s)
SL 737-SL-30-019 INTRODUCTION OF IMPROVED NOSE COWL THERMAL ANTI-ICE VALVE (SUPERSEDED BY SL 737-SL-30-019 REV. A). SUPERSEDED
SERVICE LETTER
MOS
28-JUL-2003
SL 737-SL-30-019 REV. A INTRODUCTION OF IMPROVED NOSE COWL THERMAL ANTI-ICE VALVES. SERVICE LETTER
MOS
20-SEP-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 294 Of 748
@ Camp Systems
EFTA00618585
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-30-021 WINDOW HEAT CONTROL UNIT - DUST CONTAMINATION CLEANING PROCEDURES. SERVICE LETTER COMPUED WITH
MOS 28-SEP-2009
29-AUG-2006 3378:04
AFL 812
SL 737-SL-30-024 IDENTIFICATION OF DRAIN MAST MATERIAL. SERVICE LETTER INFORMATIONAL
MOS
28-APR-2010
SL 737-SL-30-025 POTENTIAL IMPROPERLY TORQUED NUTS ON THE WING ANTI-ICE DUCT SUPPORT CLAMP (SUPERSEDED BY SL SUPERSEDED
737-SL-30-025 REV. A), SERVICE LETTER
MOS
SL 737-SL-30-025 REV. A POTENTIAL IMPROPERLY TORQUED NUTS ON THE WING ANTI-ICE DUCT SUPPORT CLAMP. SERVICE LETTER RECOMMENDED
MOS
12-AUG-2013
SL 737-SL-31-038 COMMON DISPLAY SYSTEM (CDS) SOFTWARE UPDATE. SERVICE LETTER INFORMATIONAL
MOS
08-DEC-1998 - (s)
SI. 737-SL-31-039 COMMON DISPLAY SYSTEM (CDS) AND AIRPLANE INFORMATION MANAGEMENT SYSTEM (AIMS) NORMALLY WHITE INFORMATIONAL
(NW) DISPLAY UNIT (DU) INCORPORATION. SERVICE LETTER
MOS
10-MAR-1999 - (s)
SI. 737-SL-31-039 REV. A COMMON DISPLAY SYSTEM (CDS) AND AIRPLANE INFORMATION MANAGEMENT SYSTEM (AIMS) NORMALLY WHITE INFORMATIONAL
(NW) DISPLAY UNIT (DU) INCORPORATION. SERVICE LETTER
MOS
18-DEC-2000 - (s)
SL 737-SL-31-040 STICK SHAKEN SPEED DIFFERENCES INFORMATION. SERVICE LETTER INFORMATIONAL
MOS
05-APR-1999 - (s)
SL 737-SL-31-041 COMMON DISPLAY SYSTEM(CDS) BLOCK POINT 99 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
24-DEC-1999 -(s)
SL 737-SL-31-042 DISPLAYS: INCORPORATION OF PHASE II NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER INFORMATIONAL
MOS
17-SEP-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 295 Of 748
@ Camp Systems
EFTA00618586
AD/SI Status Report AIRCRAFT
C4INI
Asitant.P
Inne Ad-gnu...14C 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-31-042 REV. A DISPLAYS: INCORPORATION OF PHASE II NORMALLY WHITE
DISPLAY UNITS. SERVICE LETTER
MOS
07-NOV-2C07
SL 737-SL-31-043 RUDDER PEDAL POSITION SENSOR COTTER PIN INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
21-NOV-2C01 • (s)
SL 737-SL-31-044 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
11-FEB-2003 •
SL 737-SL-31-044 REV. A COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
07-MAR-2003
SL 737-SL-31-044 REV. B COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
04-JUN-2003
SL 737-SL-31-044 REV. C COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
07-JUL-2003
SL 737-SL-31-044 REV. D COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-2C03 •
SL 737-SL-31-044 REV. E COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
24-OCT-2003
SL 737-SL-31-044 REV. F COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
02-DEC-2003
SL 737-SL-31-045 OPTICAL QUICK ACCESS RECORDER (OOAR) P/N D52C00 SERIES MODIFICATION. SERVICE LETTER
MOS
02-FEB-2005
SL 737-SL-31-046 COMMON DISPLAY SYSTEM (COS) BLOCK POINT 04 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL
MOS
03-MAR-2005
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 296 Of 748
.2 Camp Systems
EFTA00618587
AD/SI Status Report AIRCRAFT
CORP
As man wire„veland up 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-31-046 REV. A COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 04 SOFTWARE RELEASE. SERVICE LETTER
MOS
28-JUN-2005
SL 737-SL-31-046 REV. 8 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 04A SOFTWARE RELEASE. SERVICE LETTER
MOS
16-NOV-2005
51 737-SL-31-047 GPS CLOCK REPLACEMENT. P/N 9010-14, SERVICE LETTER
MOS
I6-JAN-2006
51 737-SL-31-048 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 06
SOFTWARE RELEASE. SERVICE LETTER
MOS
19-SEP-2006
SI. 737-SL-31-048 REV. A COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 06 COMPLIED WITH
SOFTWARE RELEASE. SERVICE LETTER
MOS 22-AUG-2008
18-SEP-2007 3260:48
AFL 782
SL 737-SL-31-049 CDS INHIBITION OF PFD TIME CRITICAL ALERTS, SERVICE LETTER
MOS
15-MAR-2007
SL 737-SL-31-050 COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC
UNIT (DEU-II). SERVICE LETTER
MOS
12-SEP-2007
SL 737-SL-31-050 REV. A COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC
UNIT (DEU-II), SERVICE LETTER
MOS
05-MAY-2008
SL 737-SL-31-051 DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE
DISPLAY UNITS. SERVICE LETTER
MOS
09-JAN-2009
SL 737-SL-31-051 REV. A DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE RECOMMENDED
DISPLAY UNITS. SERVICE LETTER
MOS
26-MAR-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 297 Of 748
@Camp Systems
EFTA00618588
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-31-051 REV. B DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE RECOMMENDED
DISPLAY UNITS. SERVICE LETTER
MOS
26-JUN-2009
SL 737-SL-31-051 REV. C DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE RECOMMENDED
DISPLAY UNITS. SERVICE LETTER
MOS
10-SEP-2009
SL 737-SL-31-052 AURAL WARNING MODULE PIN 69-78214-4. SERVICE LETTER RECOMMENDED
MOS
01-MAY-2009
SL 737-SL-31-052 REV. A AURAL WARNING MODULE P/N 69-78214-4. SERVICE LETTER RECOMMENDED
MOS
16-SEP-2009
SL 737-SL-31-052 REV. B AURAL WARNING MODULE P/N 69-78214-4. SERVICE LETTER RECOMMENDED
MOS
14-DEC-2009
SI. 737-SL-31-053 COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC RECOMMENDED
UNIT (DEU-II) MOD A. SERVICE LETTER
MOS
I I -SEP-2009
SI. 737-SL-31-055 P8 AISLE STAND STAB TRIM LIGHTPLATE WITH INCORRECT NOMENCLATURE RECOMMENDED
. SERVICE LETTER
MOS
22-FEB-2010
SL 737-SL-31-056 NEW S651 SPEEDBRAKE LEVER TAKEOFF WARNING SWITCH ANOMALIES (SUPERSEDED BY SL 737-SL-31-056 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-31-056 REV. A NEW S651 SPEEDBRAKE LEVER TAKEOFF WARNING SWITCH ANOMALIES. SERVICE LETTER RECOMMENDED
MOS
I9-MAY-2011
SL 737-SL-31-057 HORIZONTAL STABILIZER TAKEOFF WARNING SWITCH INSTALLATION (SUPERSEDED BY SL 737-SL-31-057 REV. A). RECOMMENDED
SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 298 Of 748
@ Camp Systems
EFTA00618589
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-31-057 REV. A HORIZONTAL STABILIZER TAKEOFF WARNING SWITCH INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
08-FEB-2013
SL 737-SL-31-058 P1-3 AND P3-1 PANEL MODIFICATION: VENDOR SERVICE BULLETINS FOR THE CABIN ALTITUDE AND TAKE-OFF SUPERSEDED
WARNING LIGHTS (SUPERSEDED BY SL 737-SL-31-058 REV. A). SERVICE LETTER
MOS
SL 737-SL-31-058 REV. A P1-3 AND P3-1 PANEL MODIFICATION: VENDOR SERVICE BULLETINS FOR THE CABIN ALTITUDE AND TAKE-OFF RECOMMENDED
WARNING LIGHTS. SERVICE LETTER
MOS
06-AUG-20I2
SL 737-SL-31-059 DISPLAYS: INCORPORATION OF PHASE 3A NORMALLY WHITE RECOMMENDED
DISPLAY UNITS. SERVICE LETTER
MOS
77-SEP-2012
SL 737-SL-32-074 PROXIMITY SWITCH ELECTRONIC UNIT, P/N Z85A1600. BITE MODULE CASKET MODIFICATION. SERVICE LETTER INFORMATIONAL
MOS
01-JAN-2000 - (s)
SL 737-SL-32-075 IMPROPERLY TORQUED NOSE WHEEL STEERING TILLER NUT. SERVICE LETTER INFORMATIONAL
MOS
19-MAR-I999 - (s)
SL 737-SL-32-075 REV. A IMPROPERLY TORQUED NOSE WHEEL STEERING TILLER NUT. SERVICE LETTER INFORMATIONAL
MOS
17-NOV-2000 - (s)
SL 737-SL-32-076 MLG BRAKE HOUSING CORROSION AT HYDRAULIC DISCONNECT. SERVICE LETTER RECOMMENDED
MOS
17-SEP-2001 - (s)
SL 737-SL-32-076 REV. B MAIN LANDING GEAR BRAKE HOUSING CORROSION AT THE HYDRAULIC DISCONNECT COUPLING. SERVICE LETTER INFORMATIONAL
MOS
17-SEP-2001 - (s)
SL 737-SL-32-077 MLG TIRE SHOULDER WEAR. SERVICE LETTER RECOMMENDED
MOS
05-MAY-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 299 Of 748
@ Camp Systems
EFTA00618590
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-078 ANTISKID/AUTOBRAKE CONTROL UNIT UPGRADE. SERVICE LETTER RECOMMENDED
MOS
02-JUL-1999 - Is)
SL 737-SL-32-079 APPROVED LG TIRE SUPPLIER P/NS (SUPERSEDED BY SL 737-SL-32-079 REV. A). SERVICE LETTER SUPERSEDED
MOS
- Is)
SL 737-SL-32-079 REV. A APPROVED LG TIRE SUPPLIER P/NS (SUPERSEDED BY SL 737-SL-32-079 REV. B). SERVICE LETTER SUPERSEDED
MOS
- Is)
SI. 737-SL-32-079 REV. B APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR (SUPERSEDED BY SL 737-SL-32-079 REV. C). SERVICE SUPERSEDED
LETTER
MOS
- (s)
SI. 737-SL-32-079 REV. C APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SI. 737-SL-32-079 REV. O). SUPERSEDED
SERVICE LETTER
MOS
SI. 737-SL-32-079 REV. F APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. G). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-32-079 REV. G APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. H). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-32-079 REV. H APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR SUPERSEDED
TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. I). SERVICE LETTER
MOS
SL 737-SL-32-079 REV. I APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. J). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-32-079 REV. J APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-M-079 REV. K), SUPERSEDED
SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 300 Of 748
@ Camp Systems
EFTA00618591
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-079 REV. K APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES. SERVICE LETTER RECOMMENDED
MOS
26-AUG-2013
SL 737-SL-32-080 INVESTIGATING TIRE TREAD LOSSES. SERVICE LETTER RECOMMENDED
MOS
06-AUG-1999 (s)
SL 737-SL-32-081 REV. A NOSE GEAR STEERING METERING VALVE HYDRAULIC FLUID LEAKAGE. SERVICE LETTER RECOMMENDED
MOS
26-APR-2000 (s)
SL 737-SL-32-082 MLG DOWN LOCK PROXIMITY SENSOR GROUND JUMPER INSTALLATION.. SERVICE LETTER RECOMMENDED
MOS
17-N0v-1999 (s)
SL 737-SL-32-085 MLG FLEX CONDUIT CHAFING ON TORSION LINK APEX NUT.. SERVICE LETTER RECOMMENDED
MOS
22-DEC-1999 -c.$)
SL 737-SL-32-086 LANDING GEAR RETRACTION DIFFICULITIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER RECOMMENDED
MOS
17-JAN-2000 (51
SL 737-SL-32-086 REV. A LANDING GEAR RETRACTION DIFFICULITIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL
MOS
07-AUG-2000 (51
SL 737-SL-32-086 REV. B LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENTION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL
MOS
29-OCT-2002
SL 737-SL-32-086 REV. D LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL
MOS
04-JUN-2003
SL 737-SL-32-086 REV. F LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENTION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL
MOS
09-MAR-2004
SL 737-SL-32-087 REV. A NOSE GEAR TORSIN LINK APEX PIN REPLACEMENT. 162A1310-1. SERVICE LETTER INFORMATIONAL
MOS
07-FEB-2000 is)
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 301 Of 748
Camp Systems
EFTA00618592
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-088 PROXIMITY SWITCH ELECTRONIC UNIT UPGRADE TO PIN 285A1600-3. SERVICE LETTER INFORMATIONAL
MOS
02-FEB-2000 - (s)
51 737-SL-32-088 REV. A PROXIMITY SWITCH ELECTRONIC UNIT UPGRADE TO P/N 285A1600-3. SERVICE LETTER RECOMMENDED
MOS
I6-MAY-2000 - (s)
51 737-SL-32-089 REV. A INABILITY TO EXTEND NOSE GEAR ON THE FIRST ATTEMPT. SERVICE LETTER INFORMATIONAL
MOS
31-AUG-2000 - Is)
51 737-SL-32-090 USE 737 STEERING LOCKOUT PINS.. SERVICE LETTER RECOMMENDED
MOS
I 7-APR-2000 - (s)
51 737-SL-32-090 REV. A USE 737 STEERING LOCKOUT PINS.. SERVICE LETTER RECOMMENDED
MOS
31-JUL-2000 - (s)
51 737-SL-32-091 NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21 DAMAGED. SERVICE LETTER RECOMMENDED
MOS
I2-MAY-2000 - (s)
51 737-5L-32-091 REV. A NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21 DAMAGED. SERVICE LETTER RECOMMENDED
MOS
20-JUN-2000 - (s)
51 737-SL-32-091 REV. 8 NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21/-26 DAMAGE. SERVICE LETTER
MOS
04-MAY-2006
51 737-SL-32-092 LEFT ALTERNATE BRAKE PRESSURE TRANSMITTER SEALANT MISSING. SERVICE LETTER RECOMMENDED
MOS
03-MAY-2000 - (s)
SL 737-SL-32-094 COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM. SERVICE LETTER RECOMMENDED
MOS
I5-MAY-2000 - (s)
SL 737-SL-32-094 REV. A COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM SERVICE LETTER, SERVICE RECOMMENDED
LETTER
MOS
28-JUL-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 302 Of 748
@ Camp Systems
EFTA00618593
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-094 REV. 8 COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM, SERVICE LETTER RECOMMENDED
MOS
I6-AUG-2000 - Is)
St 737-SL-32-095 PROXIMITY SENSOR 10-61226-29 IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
20-JUL-2000 -(s)
St 737-SL-32-096 NOSE LANDING GEAR STEERING ACTUATOR. SERVICE LETTER INFORMATIONAL
MOS
23-AUG-2000 - Is)
St 737-SL-32-096 REV. A NOSE LANDING GEAR STEERING ACTUATOR, SERVICE LETTER RECOMMENDED
MOS
22-SEP-2000 - Is)
St 737-SL-32-097 REV. B PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER INFORMATIONAL
MOS
72-OCT-2001 - (s)
St 737-SL-32-097 REV. C PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER INFORMATIONAL
MOS
06-MAR-2002 - (s)
St 737-SL-32-097 REV. 0 PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER SUPERSEDED
MOS
I7-MAR-2003
St 737-SL-32-098 LANDING GEAR BRAKE METERING VALVE CONTROL CRANK BOLT INSPECTION. SERVICE LETTER INFORMATIONAL COMPUED WITH
MOS I9-DEC-2000
03-OCT-2000 - (s)
St 737-SL-32-100 MAIN LANDING GEAR SHIMMY DAMPER INSTALLATION AND SHIMMY INSPECTIONS, SERVICE LETTER INFORMATIONAL
MOS
I2-APR-2002 - (s)
St 737-SL-32-101 LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER INFORMATIONAL
MOS
I5-JUN-2001 - (s)
St 737-SL-32-101 REV. A LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER
MOS
I3-MAY-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 303 Of 748
@ Camp Systems
EFTA00618594
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-101 REV. 8 WHEEL BRAKE AND TIRE INTERCHANGEABILITY
INFORMATION. SERVICE LETTER
MOS
16-AUG-2007
SL 737-SL-32-101 REV. C LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED
REV. D). SERVICE LETTER
MOS
SL 737-SL-32-101 REV. D LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED
REV. E), SERVICE LETTER
MOS
SL 737-SL-32-101 REV. E LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED
REV. F). SERVICE LETTER
MOS
SI. 737-SL-32-101 REV. F LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SI. 737-SL-32-101 RECOMMENDED
REV. G). SERVICE LETTER
MOS
I3-APR-2012
SI. 737-SL-32-101 REV. G LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SS 737-SL-32-101 SUPERSEDED
REV. H). SERVICE LETTER
MOS
SI. 737-SL-32-101 REV. H LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED
REV. I). SERVICE LETTER
MOS
SL 737-SL-32-101 REV. I LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER RECOMMENDED
MOS
19-MAR-2014
SL 737-SL-32-103 ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER RECOMMENDED
MOS
17-SEP-2001 - (s)
SL 737-SL-32-103 REV. A ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER
MOS
19-MAR-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 304 Of 748
@ Camp Systems
EFTA00618595
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-103 REV. 8 ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER
MOS
05-NOV-2002
AFL
51 737-SL-32-101 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) UPGRADE TO PIN 285A1600-4, SERVICE LETTER INFORMATIONAL
MOS
I I -SEP-2001 - (s)
51 737-SL-32-105 REV. A LANDING GEAR COMPONENT INTERCHANGEABILITY AND
SAFE LIFE COMPONENT INFORMATION, SERVICE LETTER
MOS
10-MAY-2005
51 737-SL-32-105 REV. 8 LANDING GEAR COMPONENT INTERCHANGEABILITY AND
SAFE LIFE COMPONENT INFORMATION, SERVICE LETTER
MOS
28-AUG-2007
51 737-SL-32-105 REV. C LANDING GEAR COMPONENT INTERCHANGEABILITY AND SAFE LIFE COMPONENT INFORMATION (SUPERSEDED BY SUPERSEDED
51737-SL-32-105 REV. O). SERVICE LETTER
MOS
51 737-SL-32-105 REV. D LANDING GEAR COMPONANT INTERCHANGEABILITY AND SAFE LIFE COMPONENT INFORMATION. SERVICE LETTER RECOMMENDED
MOS
27 -SEP-2010
51 737-SL-32-106 REWORK OF MLG SIDE STRUT PIN FIN 161A2331 PROTECTIVE EPDXY PRIMER. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2001 - (s)
51 737-SL-32-107 TIE BOLT NUTS FOUND CRACKED ON HONEYWELL (BENDIX) NOSE WHEELS SERVICE LETTER. SERVICE LETTER RECOMMENDED
MOS
23-OCT-2001
51 737-SL-32-107 REV. A TIE BOLT NUTS FOUND CRACKED ON HONEYWELL (BENDIX) NOSE WHEELS, SERVICE LETTER INFORMATIONAL
MOS
28-NOV-2001 - (s)
51 737-SL-32-108 MAIN GEAR TORSION UNK APEX NUT FOUND LOOSE. SERVICE LETTER INFORMATIONAL
MOS
I6-NOV-2001 - (4)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 305 Of 748
@ Camp Systems
EFTA00618596
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-110 NLG STEERING - INTERCONNECT - EXCESSIVE GAP BETWEEN CABLE QUADRANT AND CABLE KEEPER PIN. SERVICE
LETTER
MOS
22-FEB-2002 - Is)
St 737-SL-32-111 REV. A ESTABLISHING A LIFE LIMIT FOR WHEEL TIE BOLTS ON SUPERSEDED
BENDIX (HONEYWELL) 737 WHEELS (SUPERSEDED BY SL 737-SL-32-111 REV. B). SERVICE LETTER
MOS
St 737-SL-32-111 REV. B ESTABLISHING A LIFE LIMIT FOR WHEEL TIE BOLTS ON BENDIX (HONEYWELL) 737 WHEELS. SERVICE LETTER RECOMMENDED
MOS
27-SEP-2012
St 737-SL-32-112 REV. A OVERHAUL OF STEEL COMPONENTS - CADMIUM STRIP REQUIRED. SERVICE LETTER INFORMATIONAL
MOS
24-JAN-2002 - (s)
St 737-SL-32-113 MAIN GEAR EXTENSION PROBLEMS CAUSED BY DOWNLOCK ACTUATOR MANUFACTURING DISCREPANCY. SERVICE INFORMATIONAL
LETTER
MOS
09-APR-2002 - (s)
St 737-SL-32-113 REV. A MAIN GEAR EXTENTION PROBLEMS CAUSED BY DOWNLOCK ACUTATOR MANUFACTURING DISCREPANCY. SERVICE INFORMATIONAL
LETTER
MOS
I6-JUN-2003
St 737-SL-32-116 CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. A). RECOMMENDED
SERVICE LETTER
MOS
30-OCT-2002 - (s)
St 737-SL-32-116 REV. A CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. B). INFORMATIONAL
SERVICE LETTER
MOS
27-MAY-2003
St 737-SL-32-116 REV. B CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. C). SUPERSEDED
SERVICE LETTER
MOS
St 737-SL-32-116 REV. C CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS. SERVICE LETTER RECOMMENDED
MOS
08-JUN-20I2
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 306 Of 748
@ Camp Systems
EFTA00618597
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-119 MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER RECOMMENDED
MOS
03-FEB-2003
AFL 3000 (s)
SL 737-SL-32-119 REV. A MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK, SERVICE LETTER INFORMATIONAL
MOS RECURRING
21-JAN-2004 AIR
SL 737-SL-32-119 REV. B MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER
MOS
27-OCT-2005
SL 737-SL-32-119 REV. D MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER RECOMMENDED
MOS
13-OG1.-2010
SL 737-SL-32-121 LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
07-APR-2003
SL 737-SL-32-121 REV. A LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER
MOS
06-OCT-2005
SL 737-SL-32-121 REV. B LANDING GEAR CONTROL LEVER IMPROVEMENTS (SUPERSEDED BY SL 737-SL-32-121 REV. C), SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-121 REV. C LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
04-OCT-2011
SL 737-SL-32-122 REV. A LANDING GEAR WHEEL INSTALLATION. SPACER AND RETENTION WASHER. SERVICE LETTER
MOS
04-MAY-2006
SL 737-SL-32-123 MAIN LANDING GEAR UPLOCK SPRING FRACTURES. SERVICE LETTER INFORMATIONAL
MOS
15-DEC-2003
SL 737-SL-32-124 IMPROVED STEERING METERING VALVE FOR NOSE LANDING GEAR. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 307 Of 748
@ Camp Systems
EFTA00618598
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-125 MLG OUTER CYUNDER RETRACT ACTUATOR AND WALKING BEAM ATTACH LUG BUSHING MIGRATION AND FILLET
SEAL CRACKS. SERVICE LETTER
MOS
27-APR-2006
SL 737-SL-32-126 NOSE LANDING GEAR FLEXIBLE CONDUIT P/N 287A6212-25 REPLACEMENT. SERVICE LETTER
MOS
03-FEB-2005
SL 737-SL-32-128 TIRE RETREADING RECOMMENDATIONS. SERVICE LETTER
MOS
I6-MAY-2005
SL 737-SL-32-129 NOSE GEAR LOCK VALVE MANIFOLD DUPLICATE SERIAL NUMBERS. SERVICE LETTER NOT APPLICABLE
MOS
30-AUG-2005
SL 737-SL-32-130 MAIN LANDING GEAR UPLOCK PINS MAY NOT HAVE BEEN PROPERLY PREPARED PRIOR TO CHROME PLATE
APPLICATION. SERVICE LETTER
MOS
09-DEC-2005
SL 737-SL-32-130 REV. A MAIN LANDING GEAR UPLOCK PINS MAY NOT HAVE BEEN PROPERLY PREPARED PRIOR TO CHROME PLATE
APPLICATION. SERVICE LETTER
MOS
21-MAR-2006
SL 737-SL-32-131 MAIN LANDING GEAR ACTUATOR - LOOSE LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER
MOS
O6-OCT-2005
SL 737-SL-32-131 REV. A MAIN LANDING GEAR RETRACT ACTUATOR - LOOSE LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER
MOS
I9-APR-2006
SL 737-SL-32-131 REV. B MAIN LANDING GEAR RETRACT ACTUATOR - LOOSE RECOMMENDED
LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER
MOS
26-MAY-2009
SL 737-SL-32-132 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) UPGRADE OF P/N 285A1600-4 TO MOD A. SERVICE LETTER
MOS
09-NOV-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 308 Of 748
@ Camp Systems
EFTA00618599
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-133 LANDING GEAR CONTROL CABLE HIGH TENSION. SERVICE LETTER
MOS
30-MAR-2006
SL 737-SL-32-134 NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER
MOS
03-APR-2006
SL 737-SL-32-134 REV. B NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER
MOS
I I -AUG-2008
SL 737-SL-32-135 SHIMMY DAMPER MOUNTING BOLTS- GRIP LENGTH. SERVICE LETTER INFORMATIONAL
MOS
I3-APR-2006
SL 737-SL-32-135 REV. A SHIMMY DAMPER MOUNTING BOLTS - GRIP LENGTH (SUPERSEDED BY SL 737-SL-32-135 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-135 REV. B SHIMMY DAMPER MOUNTING BOLTS- GRIP LENGTH. SERVICE LETTER RECOMMENDED
MOS
08-SEP-2011
SL 737-SL-32-137 STEERING METERING VALVE TOW LEVER STUCK IN TOW POSITION. SERVICE LETTER
MOS
I4-JUN-2006
SL 737-SL-32-137 REV. A STEERING METERING VALVE TOW LEVER STUCK IN TOW POSITION. SERVICE LETTER
MOS
30-OCT-2006
AFL 50 (s)
SL 737-SL-32-138 SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES (SUPERSEDED BY SL
737-SL-32-138 REV. A). SERVICE LETTER
MOS
10-JUL-2006
SL 737-SL-32-138 REV. A SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES (SUPERSEDED BY SL
737-SL-32-138 REV. B). SERVICE LETTER
MOS
06-DEC-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 309 Of 748
@ Camp Systems
EFTA00618600
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-138 REV. 8 SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES. SERVICE LETTER RECOMMENDED
MOS
29-APR-20I3
SL 737-SL-32-140 BRAKE METERING VALVE STATIC SEAL LEAKAGE. SERVICE LETTER
MOS
05-OCT-2006
SL 737-SL-32-141 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-5. SERVICE LETTER
MOS
17-NOV-2006
SL 737-SL-32-141 REV. A PROXIMITY SWITCH ELECTRONIC UNIT (PSEU)P!N 285A1600-5. SERVICE LETTER INFORMATIONAL
MOS
23-MAR-2010
SL 737-SL-32-143 FATALITY OF A MAINTENANCE WORKER DUE TO WHEEL/TIRE OVERPRESSURIZATION. SERVICE LETTER
MOS
09-JUL-2007
SL 737-SL-32-143 REV. A FATALITY OF A MAINTENANCE WORKER DUE TO WHEEL/TIRE OVERPRESSURIZATION. SERVICE LETTER RECOMMENDED
MOS
Of -MAY-2009
SI. 737-SL-32-144 REV. A LANDING GEAR LIFE LIMITED PART RECORDKEEPING
REQUIREMENTS. SERVICE LETTER
MOS
I9-FEB-2008
SL 737-SL-32-145 NOSE LANDING GEAR VIBRATION. SERVICE LETTER
MOS
I 7-JUL-2007
SL 737-SL-32-145 REV. A NOSE LANDING GEAR VIBRATION (SUPERSEDED BY SL 737-SL-32-105 REV. 8). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-145 REV. 8 NOSE LANDING GEAR VIBRATION (SUPERSEDED BY SL 737-SL-32-105 REV. C). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-145 REV. C NOSE LANDING GEAR VIBRATION. SERVICE LETTER RECOMMENDED
MOS
25-JUL-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 310 Of 748
@ Camp Systems
EFTA00618601
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-146 NOSE WHEEL STEERING INTERCONNECT MECHANISM -
LOOSE NUT FOUND. SERVICE LETTER
MOS
28-AUG-2007
St 737-SL-32-147 CLARIFICATION CONCERNING MOBIL AVIATION WHEEL
BEARING GREASE NAMES. SERVICE LETTER
MOS
26-SEP-2007
St 737-SL-32-149 POSSIBLE CAUSES OF LANDING GEAR WHEEL LOSSES AND SUPERSEDED
WHEEL BEARING FAILURES (SUPERSEDED BY SL 737-SL-32-149 REV. A). SERVICE LETTER
MOS
St 737-SL-32-149 REV. A POSSIBLE CAUSES OF LANDING GEAR WHEEL LOSSES AND WHEEL BEARING FAILURES. SERVICE LETTER RECOMMENDED
MOS
I2-SEP-2013
St 737-SL-32-150 NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER
MOS
27-NOV-2007
St 737-SL-32-150 REV. A NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER
MOS
28-FEB-2008
St 737-SL-32-150 REV. 8 NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER
MOS
25-JUL-2008
St 737-SL-32-151 NOSE LANDING GEAR MANUAL EXTENSION SPRING. SERVICE LETTER
MOS
08-FEB-2008
St 737-SL-32-152 IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH
CLAMP-UP BUSHING. SERVICE LETTER
MOS
30-APR-2008
SL 737-SL-32-152 REV. A IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH RECOMMENDED
CLAMP-UP BUSHING. SERVICE LETTER
MOS
21-AUG-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 311 Of 748
@ Camp Systems
EFTA00618602
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-152 REV. 8 IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH CLAMP-UP BUSHING. SERVICE LETTER RECOMMENDED
MOS
03-MAR-2010
SL 737-SL-32-153 ANTISKID VALVE CONNECTOR MISSING POTTING. SERVICE LETTER
MOS
04-APR-2008
SI. 737-SL-32-154 REV. A MAIN LANDING GEAR ACTUATOR BARREL CRACKS RECOMMENDED
FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER
MOS
I2-MAY-2009
SL 737-5L-32-154 REV. 8 MAIN LANDING GEAR ACTUATOR BARREL CRACKS RECOMMENDED
FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER
MOS
04-AUG-2009
SL 737-SL-32-154 REV. C MAIN LANDING GEAR ACTUATOR BARREL CRACKS RECOMMENDED
FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER
DAYS 7 (s)
02-OCT-2009
SL 737-SL-32-156 EFFECTS OF ALKALI METAL (ORGANIC SALT) RUNWAY
DEICERS ON CARBON BRAKES. SERVICE LETTER
MOS
26-JAN-2009
SL 737-SL-32-157 BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER RECOMMENDED
MOS
O5-FEB-2009
SL 737-SL-32-157 REV. A BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER RECOMMENDED
MOS
IO-JUN-2009
SL 737-SL-32-157 REV. 8 BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER INFORMATIONAL
MOS
IO-MAR-2010
SL 737-SL-32-158 INCORRECT PART NUMBER ON NOSE GEAR DOWN LINE RECOMMENDED
HYDRAULIC FUSE. SERVICE LETTER
MOS
31-MAR-2009
7-Insufficient Information +-Task exists in Inspection Manual (0 -Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 312 Of 748
@ Camp Systems
EFTA00618603
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-159 MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS (SUPERSEDED BY SL 737-SL-32-159 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-32-159 REV. A MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS (SUPERSEDED BY SL 737-SL-32-159 REV. B), SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-32-159 REV. B MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS. SERVICE LETTER RECOMMENDED
MOS
22-FEB-20I1
SL 737-SL-32-160 MAIN LANDING GEAR SIDE STRUT APEX PIN FINISH CHANGES. SERVICE LETTER RECOMMENDED
MOS
02-JUL-2009
SL 737-SL-32-161 RIDING CONDITION FOUND ON BRAKE PEDAL BUS. SERVICE LETTER RECOMMENDED
MOS
26-AUG-2009
SI. 737-SL-32-162 INBOARD HUB FRACTURES ON HONEYWELL MAIN GEAR RECOMMENDED
WHEELS. SERVICE LETTER
MOS
19-AUG-2009
SL 737-SL-32-162 REV. A INBOARD HUB FRACTURES ON HONEYWELL MAIN GEAR WHEELS. SERVICE LETTER INFORMATIONAL
MOS
04-MAY-2010
SL 737-SL-32-163 LANDING GEAR LEVER DOES NOT DROP INTO 'OFF DETENT. SERVICE LETTER RECOMMENDED
MOS
02-OCT-2009
SL 737-SL-32-164 LANDING GEAR ALTERNATE EXTENSION SYSTEM SWITCH SUPERSEDED
DAMAGED (SUPERSEDED BY 737-SL-32-164-A). SERVICE LETTER
MOS
12-OCT-2009
SL 737-SL-32-164 REV. A LANDING GEAR ALTERNATE EXTENSION SYSTEM SWITCH DAMAGE. SERVICE LETTER
MOS
07-JUN-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 313 Of 748
@ Camp Systems
EFTA00618604
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-165 737NG LANDING GEAR RESTORATION REQUIREMENTS (SUPERSEDED BY SL 737-SL-32-165 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-165 REV. A 737NG LANDING GEAR RESTORATION REQUIREMENTS. SERVICE LETTER RECOMMENDED
MOS
I5-JUL-2010
SL 737-SL-32-166 INSTALLATIONiREMOVAL OF THE MAIN LANDING GEAR. SERVICE LETTER INFORMATIONAL
MOS
09-MAR-2010
SI. 737-SL-32-167 INSTALLATION OF TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING EDGE AND LANDING GEAR INFORMATIONAL
(SUPERSEDED BY SL 737-SL-32-167 REV. A). SERVICE LETTER
MOS
31-MAR-2010
SI. 737-SL-32-167 REV. A INSTALLATION OF TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING EDGE AND LANDING GEAR. INFORMATIONAL
SERVICE LETTER
MOS
03-APR-20I3
a 737-SL-32-168 POTENTIALLY INCORRECT MAIN LANDING GEAR AXLE INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
I6-JUL-2010
a 737-SL-32-169 POTENTIALLY INCORRECT MAIN LANDING GEAR LOWER TORSION LINK INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
I5-JUL-2010
SL 737-SL-32-170 LANDING GEAR CONTROL CABLE LOW TENSION, SERVICE LETTER RECOMMENDED
MOS
I5-JUL-2010
a 737-SL-32-171 NOSE LANDING GEAR AXLE INSPECTIONS DUE TO POSSIBLE CHROME GRINDING DAMAGE DURING PRODUCTION SUPERSEDED
(SUPERSEDED BY SL 737-SL-32-171 REV. A). SERVICE LETTER
MOS
SL 737-SL-32-171 REV. A NOSE LANDING GEAR AXLE INSPECTIONS DUE TO POSSIBLE CHROME GRINDING DAMAGE DURING PRODUCTION. RECOMMENDED
SERVICE LETTER
MOS
07-APR-20 14
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 314 Of 748
@ Camp Systems
EFTA00618605
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-172 LANDING GEAR BEARING CARRIER REFINISH OPTION. SERVICE LETTER RECOMMENDED
MOS
25-MAY-2011
SL 737-SL-32-173 MAIN LANDING GEAR UPLOCK SPRING FRACTURES (SUPERSEDED BY SL 737-SL-32-173 REV. A). SERVICE LETTER SUPERSEDED
MOS
09-FEB-2011
SI. 737-SL-32-173 REV. A MAIN LANDING GEAR UPLOCK SPRING FRACTURES (SUPERSEDED BY SL 737-SL-32-173 REV. B) SUPERSEDED
. SERVICE LETTER
MOS
SL 737-SL-32-173 REV. B MAIN LANDING GEAR UPLOCK SPRING FRACTURES. SERVICE LETTER RECOMMENDED
MOS
I9-JUL-2011
SL 737-SL-32-174 LANDING GEAR SHOCK STRUT DYNAMIC SEAL INSTALLATION TOOLING. SERVICE LETTER RECOMMENDED
MOS
03-FEB-2011
SL 737-SL-32-175 LANDING GEAR LOWER BEARING CARRIER REFINISH OPTION. SERVICE LETTER RECOMMENDED
MOS
25-MAY-2011
SL 737-SL-32-176 POTENTIALLY INCORRECT MAIN LANDING GEAR UPPER TORSION LINK PIN INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
19-MAY-2011
SL 737-SL-32-178 DIGITAL LANDING GEAR SHOCK STRUT AND TIRE PRESSURE GAUGE (SUPERSEDED BY SL 737-SL-32-178 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-32-178 REV. A DIGITAL LANDING GEAR SHOCK STRUT AND TIRE PRESSURE GAUGE. SERVICE LETTER RECOMMENDED
MOS
17-OCT-2012
SL 737-SL-32-179 HYDRAULIC LINE RIDING W8224 WIRE BUNDLE 9SUPERSEDED BY SL 737-SL-32-179 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-179 REV. A HYDRAULIC LINE RIDING W8224 WIRE BUNDLE (SUPERSEDED BY SL 737-SL-32-179 REV. B). SERVICE LETTER RECOMMENDED
MOS
I4-FEB-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 315 Of 748
@ Camp Systems
EFTA00618606
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-179 REV. B HYDRAULIC LINE RIDING W8224 WIRE BUNDLE. SERVICE LETTER RECOMMENDED
MOS
27-APR-20I2
SI. 737-SL-32-180 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6 (SUPERSEDED BY SL 737-SL-32-180 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-32-180 REV. A PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6 (SUPERSEDED BY SL 737-SL-32-180 REV. 8). SERVICE RECOMMENDED
LETTER
MOS
I8-SEP-2012
SL 737-SL-32-180 REV. 8 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6. SERVICE LETTER RECOMMENDED
MOS
02-APR-20I3
SL 737-SL-32-181 -737NG NOSE LANDING GEAR NON-CONFORMING STEERING SUPERSEDED
SYSTEM STRUCTURAL COMPONENTS" (SUPERSEDED BY SL 737-SL-32-181 REV. A). SERVICE LETTER
MOS
SL 737-SL-32-181 REV. A 737NG NOSE LANDING GEAR NON-CONFORMING STEERING SYSTEM STRUCTURAL COMPONENTS. SERVICE LETTER RECOMMENDED
MOS
03-OCT-2012
SL 737-SL-32-182 COLD SPRAY REPAIR OF P/N 287A8115 MLG WIRE BUNDLE SUPPORT BRACKET. SERVICE LETTER RECOMMENDED
MOS
21-JUN-20I2
SL 737-SL-32-183 THERMAL SPRAY REPAIR OF TITANIUM LANDING GEAR BEARING CARRIERS. SERVICE LETTER RECOMMENDED
MOS
26-APR-20I2
SL 737-SL-32-184 REPAIR OF TITANIUM LANDING GEAR BEARING CARRIERS USING THE LASER DEPOSITION PROCESS. SERVICE RECOMMENDED
LETTER
MOS
I I -MAY-20I2
SL 737-SL-32-185 WIRE BUNDLE W8224 - POSSIBLE MISSING CLAMP IN MAIN GEAR WHEEL WELL. SERVICE LETTER RECOMMENDED
MOS
I4-JUN-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 316 Of 748
@ Camp Systems
EFTA00618607
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-186 MLG OUTER CYLINDER TRUNNIONS LUBRICATION SERVICING AND REMOVED DECALS. SERVICE LETTER RECOMMENDED
MOS
03-OCT-2012
SL 737-SL-32-187 MAIN LANDING GEAR OUTBOARD DOWNLOCK SPRING PIN. SERVICE LETTER RECOMMENDED
MOS
26-OCT-2012
SL 737-SL-32-188 SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS (SUPERSEDED BY SL 737-SL-32-188 REV. A). SERVICE LETTER SUPERSEDED
MOS
22-JUL-2013
SL 737-SL-32-188 REV. A SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS (SUPERSEDED BY SL 737-SL-32-188 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-188 REV. B SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS. SERVICE LETTER RECOMMENDED
MOS
09-MAY-2014
SL 737-SL-32-189 NOSE WHEEL STEERING CABLE - POTENTIAL CHAFING CONDITION WITH A WIRE BUNDLE. SERVICE LETTER RECOMMENDED
MOS
08-FEB-20I3
SL 737-SL-32-190 ANTISKID/AUTOBRAKE CONTROL UNIT (AACU) - REPLACEMENT OF UNAUTHORIZED TRANSISTORS. SERVICE LETTER RECOMMENDED
MOS
13-FEB-20I3
SL 737-SL-32-191 MLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER RECOMMENDED
MOS
16-APR-20I3
SL 737-SL-32-192 BRAKE CONTROL CABLE TENSION CHECK (SUPERSEDED BY SL 737-SL-32-192 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-32-192 REV. A BRAKE CONTROL CABLE TENSION CHECK. SERVICE LETTER RECOMMENDED
MOS
07-FEB-2014
SL 737-SL-32-193 NLG ALTERNATE EXTENSION MECHANISM BINDING. SERVICE LETTER RECOMMENDED
MOS
12-JUN-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 317 Of 748
@ Camp Systems
EFTA00618608
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-32-194 LANDING GEAR LIFE LIMITED PARTS IN THE AIRCRAFT READINESS LOG (SUPERSEDED BY SL 737-SL-32-194 REV. A), SUPERSEDED
SERVICE LETTER
MOS
51 737-SL-32-194 REV. A LANDING GEAR LIFE LIMITED PARTS IN THE AIRCRAFT READINESS LOG (REPLACED BY SL 737-SL-00-026). SERVICE SUPERSEDED
LETTER
MOS
51 737-SL-32-195 USE OF SMARTSTEM TIRE PRESSURE SENSOR ON DELIVERED AIRPLANES. SERVICE LETTER RECOMMENDED
MOS
10-OCT-2013
51 737-SL-32-196 PROXIMITY SENSOR MAINTENANCE/REMOVAL BEST PRACTICES AND SUPPLIER RELIABILITY IMPROVEMENTS. RECOMMENDED
SERVICE LETTER
MOS
31-MAR-2014
51 737-SL-33-029 PRESS-TO-TEST ANNUNCIATORSDISCREPANT PRINTED CIRCUIT ASSEMBLY. SERVICE LETTER RECOMMENDED
MOS
01-APR-1999 - (s)
51 737-SL-33-029 REV. A PRESS-TO-TEST ANNUNCIATORSDISCREPANT PRINTED CIRCUIT ASSEMBLY. SERVICE LETTER RECOMMENDED
MOS
14-MAY-2001 -(s)
51 737-SL-33-030 FLORESCENT LIGHT LAMP DAMPENERS. SERVICE LETTER RECOMMENDED
MOS
I2-JUL-1999 - (s)
51 737-SL-33.032 REV. A FORWARD POSITION LIGHT LENS CRACKING - INTERIM CORRECTION ACTION. SERVICE LETTER INFORMATIONAL
MOS
I2-JAN-2000 - (s)
SL 737-SL-33.033 LIGHTED PUSHBUTTON SWITCHES AND ANUNCIATORS - KOFtRY - EMITTING DIODE (LED) REPLACEMENTS FOR INFORMATIONAL
INCANDESCENT LIGHTS. SERVICE LETTER
MOS
08-OCT-1999 - (s)
51 737-SL-33-034 RETRACTABLE LANDING LIGHT (RLL) DRAIN HOLE.. SERVICE LETTER RECOMMENDED
MOS
16-JUL-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 318 Of 748
@ Camp Systems
EFTA00618609
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-33-035 EMERGENCY LIGHTING BATTERY PACK SCHEDULED MAINTENANCE. SERVICE LETTER INFORMATIONAL
MOS
I 7-JUL-2001 - Is)
SL 737-SL-33-037 RETRACTABLE LANDING LIGHT (RLL) WIRE HARNESS REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
OS-NOV-2001 - (s)
SL 737-SL-33-038 RETRACTABLE LANDING LIGHT (RLL) CURVED LENS. SERVICE LETTER INFORMATIONAL
MOS
OS-NOV-2001 - Is)
SL 737-SL-33-039 BOEING PHOTOLUMINESCENT EMERGENCY FLOOR PROXIMITY LIGHTING SYSTEMS OPERATIONL PROCEDURES.
SERVICE LETTER
MOS
31-JAN-2002 - (s)
SL 737-SL-33-041 WIRE CRIMP TOOL OUT OF CALIBRATION. SERVICE LETTER RECOMMENDED
MOS
23-JUL-2003
SL 737-SL-33-041 REV. A WIRE CRIMP TOOL OUT OF CALIBRATION. SERVICE LETTER INFORMATIONAL
MOS
23-JUL-2003 -
SL 737-SL-33-042 SIDEWALL UGHTING COMPONENTS-CASE GROUNDING. SERVICE LETTER INFORMATIONAL
MOS
I8-OCT-2002
SL 737-SL-33-042 REV. A SIDEWALL UGHTING COMPONENTS-CASE GROUNDING. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-2003
SL 737-SL-33-043 KOFtRY LIGHTED PUSHBUTTON SWITCHES-NEW PART NUMBER WITH 'CONFIGURATION 0' MASTER MODULE. INFORMATIONAL
SERVICE LETTER
MOS
27-MAR-2003
SL 737-SL-.33-044 BALLAST DAMAGE DUE TO AIRCRAFT VOLTAGE SPIKES. SERVICE LETTER INFORMATIONAL
MOS
I7-NOV-2003
SL 737-SL-33-045 AUXILIARY DIM AND TEST MODULE-DIODE OVERHEAT. SERVICE LETTER INFORMATIONAL
MOS
I I -MAY-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 319 Of 748
@ Camp Systems
EFTA00618610
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-33-046 OVERWING EMERGENCY LIGHT - DECAL MISSING. SERVICE LETTER INFORMATIONAL
MOS
I8-OCT-2004
SL 737-SL-33-047 RETRACTABLE LANDING LIGHT (RLL) -MOTOR CONNECTOR TIGHTENING. SERVICE LETTER INFORMATIONAL
MOS
08-SEP-2005
SL 737-SL-33-048 RETRACTABLE LANDING LIGHT (RLL) IMPROVEMENTS. SERVICE LETTER
MOS
I4-SEP-2006
SL 737-SL-33.048 REV. A RETRACTABLE LANDING LIGHT (RLL) IMPROVEMENTS. SERVICE LETTER
MOS
22-MAR-2007
SL 737-SL-33-049 ANTI-COLLISION LIGHT POWER SUPPLY BRACKET - FILLET SEAL APPLICATION (SUPERSEDED BY SL 737-SL-33-049 SUPERSEDED
REV. A). SERVICE LETTER
MOS
I I -MAY-2007
SL 737-SL-33.049 REV. A ANTI-COLLISION LIGHT POWER SUPPLY BRACKET- FILLET SEAL APPLICATION RECOMMENDED
. SERVICE LETTER
MOS
06-MAY-201I
SI. 737-SL-33-050 SEALING OF TAILCONE AND ANTI-COLLISION LIGHT COMPLIED WITH
INTERFACES. SERVICE LETTER
MOS 22-AUG-2008
I7-AUG-2007 3260:48
AFL 782
SL 737-SL-33-051 NEW CHART LIGHT BRACKET ASSEMBLY. SERVICE LETTER
MOS
28-AUG-2007
SL 737-SL-33-052 REFUELING PANEL FLOODLIGHT INSTALLATION. SERVICE LETTER
MOS
30-OCT-2007
SL 737-SL-33-052 REV. A REFUELING PANEL FLOODLIGHT INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
26-MAR-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 320 Of 748
@ Camp Systems
EFTA00618611
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-33-053 ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING
SEAL APPLICATION. SERVICE LETTER
MOS
20-OCT-2008
SL 737-SL-.33-053 REV. A ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING
SEAL APPLICATION. SERVICE LETTER
MOS
11-DEC-2008
SL 737-SL-33-053 REV. B ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET-FAYING RECOMMENDED
SEAL APPLICATION. SERVICE LETTER
MOS
01-MAY-2009
51 737-SL-33-053 REV. C ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING RECOMMENDED
SEAL APPLICATION. SERVICE LETTER
MOS
26-JUN-2009
51 737-SL-.33-055 RETRACTABLE LANDING LIGHT CONNECTORS BURNED. SERVICE LETTER RECOMMENDED
MOS
I7-SEP-2010
51 737-SL-.33-056 RETRACTABLE LANDING LIGHT IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
31-AUG-2011
51 737-SL-33-057 LOWER ANTI-COLLISION LIGHT - SEALANT POSSIBLY OMITTED BETWEEN SKIN PANELS. SERVICE LETTER RECOMMENDED
MOS
04-SEP-2013
51 737-SL-33-058 POSSIBLE WIRE RIDING CONDITION IN EMERGENCY WING LIGHTS. SERVICE LETTER RECOMMENDED
MOS
I8-MAY-2012
SI. 737-SL-33-059 WINGLET FORWARD POSITION LIGHT LENS REPLACEMENT GUIDEUNES (SUPERSEDED BY SL 737-SL-33-059 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-33-059 REV. A WINGLET FORWARD POSITION LIGHT LENS REPLACEMENT GUIDEUNES. SERVICE LETTER RECOMMENDED
MOS
30-MAY-20I2
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 321 Of 748
@ Camp Systems
EFTA00618612
AD/SI Status Report AIRCRAFT
CAMP
Miatioafra ihrenninthur 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-33-060 R427 SIDEWALL LIGHT RELAY IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
24-AUG-2012
SL 737-SL-33-061 CONFIGURATION DATABASE TOOL - CHANGING AVAILABLE SCENES ON THE BOEING SKY INTERIOR (BSI) LIGHTING SUPERSEDED
SYSTEM (SUPERSEDED BY SL 737-SL-33-061 REV. A). SERVICE LETTER
MOS
SL 737-SL-33.061 REV. A CONFIGURATION DATABASE TOOL - CHANGING AVAILABLE SCENES ON THE BOEING SKY INTERIOR (BSI) LIGHTING RECOMMENDED
SYSTEM. SERVICE LETTER
MOS
12-N0V-2012
SL 737-SL-33-062 IMPROVED WIRE ATTACHMENT FOR BSI CENTER OVERHEAD STOWAGE (COS) AREA EMERGENCY LIGHTING. RECOMMENDED
SERVICE LETTER
MOS
12-DEC-2012
SL 737-SL-33.063 FAIRED ANTICOLLISION LENS - SEALANT BLOCKING SKIN PANEL DRAIN HOLE. SERVICE LETTER RECOMMENDED
MOS
29-APR-2073
SL 737-SL-33-064 LOWER ANTI-COLLISION LIGHT CABLE CHAFING. SERVICE LETTER RECOMMENDED
MOS
22-MAY-20I3
SL 737-SL-33.065 WINGLET LED (LIGHT EMITTING DIODE) POSITION LIGHTS AND ANTI-COLLISION LIGHTS. SERVICE LETTER RECOMMENDED
MOS
27-JAN-2014
SL 737-SL-33-066 BOEING SKY INTERIOR (BSI) LED LIGHTING IMPROVEMENTS (REFERRED TO AS GENERATION 2 LED LIGHTS). RECOMMENDED
SERVICE LETTER
MOS
25-OCT-2013
SL 737-SL-33.067 MEMORY DEVICE DESIGN IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
20-FEB-20I4
SL 737-SL-33-068 EMERGENCY LIGHTS WIRE BUNDLE CHAFING. SERVICE LETTER RECOMMENDED
MOS
28-JAN-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks - -Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 322 Of 748
Camp Systems
EFTA00618613
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-33-069 BOEING SKY INTERIOR LIGHTING - DARK SHADOW EFFECT. SERVICE LETTER RECOMMENDED
MOS
27-MAR-2014
SL 737-SL-33-070 EMERGENCY LIGHTING - WIRE W3142-0522-20 POSSIBLE CHAFING. SERVICE LETTER RECOMMENDED
MOS
25-MAR-2014
SL 737-SL-33-071 WINGLET ANTICOLLISION LIGHT STEP DOWN CONVERTER BOX- R11 AND INDUCTOR IMPROVEMENT. SERVICE RECOMMENDED
LETTER
MOS
25-APR-20I4
SL 737-SL-34-131 DATA LOADER INCOMPATIBILITY. SERVICE LETTER RECOMMENDED
MOS
28-MAR-1997 - (s)
SL 737-SL-34-131 REV. A DATA LOADER INCOMPATIBILITY. SERVICE LETTER RECOMMENDED
MOS
08-SEP-1998 - (s)
SL 737-SL-34-140 AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE. SERVICE LETTER RECOMMENDED
MOS
23-MAR-1998 - (s)
SL 737-SL-34-140 REV. A AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE. SERVICE LETTER RECOMMENDED
MOS
25-SEP-1998 - (s)
SL 737-SL-34-143 FLIGHT MANAGEMENT COMPUTER 0 UPDATE 10.1 AND 10.2. SERVICE LETTER RECOMMENDED
MOS
13-NOV-1998 - (s)
SL 737-SL-34-144 INTRODUCTION OF ENHANCED GROUND PROXIMITY WARNING SYSTEM AND PREDICTIVE WINDSHEAR SYSTEM. RECOMMENDED
SERVICE LETTER
MOS
15-DEC-1998 - (s)
SL 737-SL-34-144 REV. A INTRODUCTION OF ENHANCED GROUND PROXIMITY WARNING SYSTEM AND PREDICTIVE WINDSHEAR SYSTEM. RECOMMENDED
SERVICE LETTER
MOS
19-MAY-1999 -(s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 323 Of 748
@ Camp Systems
EFTA00618614
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-145 FLIGHT MANAGEMENT COMPUTER UPDATE 10.2A. SERVICE LETTER RECOMMENDED
MOS
18-DEC-1998 - Is)
51 737-SL-34-146 GABLES VHF NAV CONTROL PANEL UPGRADE. SERVICE LETTER RECOMMENDED
MOS
30-APR-1999 - (s)
51 737-SL-34-147 ROCKWELL COLLINS WEATHER RADAR TRANSCEIVER UPGRADE. SERVICE LETTER RECOMMENDED
MOS
25-MAY-1999 - Is)
51 737-SL-34-150 ALLIEDSIGNAL WEATHER RADAR TRANSCEIVER UPGRADE. SERVICE LETTER INFORMATIONAL
MOS
13-OCT-1999 - Is)
51 737-SL-34-152 AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED
MOS
19-MAY-2000 - Is)
51 737-SL-34-152 REV. A AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED
MOS
09-DEC-2000 - (s)
51 737-SL-34-152 REV. B AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED
MOS
30-APR-2001 - (s)
51 737-SL-34-152 REV. C AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED
MOS
29-JUN-2001 - (s)
51 737-SL-34-152 REV. 0 AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER INFORMATIONAL
DAYS 180(s)
06-OCT-2003
SL 737-SL-34-153 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.3. SERVICE LETTER INFORMATIONAL
MOS
14-AUG-2000 - Is)
51 737-SL-34-154 AIR DATA INTERIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.004. SERVICE LETTER RECOMMENDED
MOS
10-NOV-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 324 Of 748
@ Camp Systems
EFTA00618615
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-154 REV. A AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.004. SERVICE LETTER INFORMATIONAL
MOS
03-NOV-2003
SL 737-SL-34-155 MISSING '2500 FEET ALTITUDE CALLOUT DUE TO SUDDEN ANOMALOUS DROP IN RADIO ALTITUDE. SERVICE LETTER INFORMATIONAL
MOS
I7-AUG-2000 - (s)
SL 737-SL-34-156 ENHANCED GROUND PROXIMITY WARNING SYSTEM TERRAIN ALERTS AREA DISPLAY SHIFT. SERVICE LETTER INFORMATIONAL
MOS
I 7-AUG-2000 - (s)
SL 737-SL-34-159 MARKER BEACON ANTENNA ENHANCEMENT. SERVICE LETTER RECOMMENDED
MOS
02-MAR-2001 - (s)
SL 737-SL-34-160 AIR DATA INTERIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.005. SERVICE LETTER RECOMMENDED
MOS
Of -JUN-2001 - (s)
SL 737-SL-34-161 PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL
MOS
27-AUG-2001 - (s)
SL 737-SL-34-161 REV. B PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL
MOS
I8-APR-2002 - (s)
SL 737-SL-34-161 REV. C PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL
MOS
21-FEB-2003
SL 737-SL-34-162 FLIGHT MANAGEMENT COMPUTER - 4 MODULAR CONCEPT UNIT PIN 10-62225-004. SERVICE LETTER INFORMATIONAL
MOS
I4-SEP-2001 - (s)
SL 737-SL-34-163 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.4. SERVICE LETTER INFORMATIONAL
MOS
I4-SEP-2001 - (s)
SL 737-SL-34-164 ACTIVATION OF 'PEAKS' AND 'OBSTACLES' IN HONEYWELL'S ENHANCED GROUND PROXIMITY WARNING INFORMATIONAL
COMPUTER (EGWPS). SERVICE LETTER
MOS
26-MAR-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 325 Of 748
@ Camp Systems
EFTA00618616
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-165 ANGLE OF ATTACK INSTALLATION CALIBRATION PROCEDURES. SERVICE LETTER
MOS
15-FEB-2002 - Is)
SL 737-SL-34-166 FLIGHT MANAGEMENT COMPUTER - UPDATE 10AA, SERVICE LETTER INFORMATIONAL
MOS
I7-MAY-2002 - (s)
SL 737-SL-34-168 ENHANCED GROUND PROXIMITY WARNING COMPUTER UPGRADE. SERVICE LETTER INFORMATIONAL
MOS
22-OCT-2002
SL 737-SL-34-169 HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS.. INFORMATIONAL
SERVICE LETTER
MOS
14-OCT-2002 - (s)
St 737-SL-34-169 REV. A HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS. INFORMATIONAL
SERVICE LETTER
MOS
30-OCT-2002 - (s)
St 737-SL-34-169 REV. 8 HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS. INFORMATIONAL
SERVICE LETTER
MOS
27-OCT-2003
SL 737-SL-34-170 REPLACEMENT OF PITOT PROBE. SERVICE LETTER INFORMATIONAL
MOS
20-FEB-2003
SL 737-SL-34-170 REV. A REPLACEMENT OF PITOT PROBE. SERVICE LETTER INFORMATIONAL COMPUED WITH
MOS 11-JAN-2005
10-APR-2003 1965:18
AFL 482
SL 737-SL-34-171 PITOT STATIC PROBE HOSE FIRE. SERVICE LETTER
MOS 18 (s)
29-MAY-2001
SL 737-SL-34-171 REV. A PITOT STATIC PROBE HOSE FIRE. SERVICE LETTER
MOS
22-JUL-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 326 Of 748
@ Camp Systems
EFTA00618617
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-172 FLIGHT MANAGEMENT COMPUTER-UPDATE 10.5. SERVICE LETTER INFORMATIONAL
MOS
10-FE8-2003
51 737-SL-34-174 NEW STANDBY MAGNETIC COMPASS. SERVICE LETTER INFORMATIONAL
MOS
02-JUL-2003
SI. 737-SL-34-175 AIR TRAFFIC CONTROL (ATC) SYSTEM ELEMENTARY SURVEILLANCE . ENHANCED SURVEILLANCE . AND EXTENDED INFORMATIONAL
SOUITTER UPGRADE. SERVICE LETTER
MOS
18-DEC-2003
SI. 737-SL-34-178 ROCKWELL COLLINS TCAS COMPUTER CHANGE-ELIMINATION POTENTIAL NUISANCE RESOLUTION AND TRAFFIC INFORMATIONAL
ADVISORIES ON THE GROUND OR AT LOW ALTITUDE. SERVICE LETTER
MOS
I9-JUL-2004
SL 737-SL-34-180 REV. A NEW HONEYWELL MULTI-MODE RECEIVER -PiN 066-50029-1201. SERVICE LETTER INFORMATIONAL
MOS
0I-FEB-2005
SL 737-SL-34-180 REV. 8 NEW HONEYWELL MULTI-MODE RECEIVER - 066-50029-1201. SERVICE LETTER
MOS
10-MAY-2005
SL 737-SL-34-181 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.6. SERVICE LETTER INFORMATIONAL
MOS
09-MAR-2005
SL 737-SL-34-181 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.6. SERVICE LETTER COMPUED WITH
MOS 11-MAY-2006
I3-JUL-2005 2619:10
AFL 629
SL 737-SL-34-182 NEW MASTER CAUTION UNIT - PIN 69-37399-13. SERVICE LETTER INFORMATIONAL
MOS
10-MAR-2005
SL 737-SL-34-184 AIR TRAFFIC CONTROL ANTENNA CONNECTOR CHANGE - INSTALLATION INSTRUCTIONS. SERVICE LETTER
MOS
26-APR-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 327 Of 748
@ Camp Systems
EFTA00618618
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-185 STANDBY ALTIMETER/AIRSPEED INDICATOR IMPROVEMENTS (WL102AMS SERIES). SERVICE LETTER
MOS
29-AUG-2006
SL 737-SL-34-186 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.7. SERVICE LETTER
MOS
I0-APR-2007
SL 737-SL-34-187 REV. A LOSS OF RELIABLE AIR DATA DUE TO ICING OF STATIC PORTS - SRP 34-0111. SERVICE LETTER
MOS
20-JUL-2007
SI. 737-SL-34-188 HONEYWELL WEATHER RADAR TRANSCEIVER SUPERSEDED
MODIFICATION FOR PIN 066-50008-0406 (SUPERSEDED BY SL 737-SL-34-188 REV. A). SERVICE LETTER
MOS
SL 737-SL-34-188 REV. A HONEYWELL WEATHER RADAR TRANSCEIVER MODIFICATION FOR P/N 066-50008-0406. SERVICE LETTER RECOMMENDED
MOS
14-JUN-2012
SL 737-SL-34-189 HONEYWELL WEATHER RADAR TRANSCEIVER SUPERSEDED
MODIFICATION FOR PIN 066-50008-0408 (SUPERSEDED BY SL 737-SL-34-189 REV. A). SERVICE LETTER
MOS
SL 737-SL-34-189 REV. A HONEYWELL WEATHER RADAR TRANSCEIVER MODIFICATION FOR PIN 066-50008-0408. SERVICE LETTER RECOMMENDED
MOS
14-JUN-2012
SL 737-SL-34-191 MASTER CAUTION UNIT P/N 69-37399-13 ANOMALY, SERVICE LETTER
MOS
09-JUL-2008
SL 737-SL-34-192 HEAD-UP GUIDANCE SYSTEM - DESIGN ENHANCEMENTS TO SUPERSEDED
ADDRESS DISPLAY SYMBOLOGY JITTER (SUPERSEDED BY SL 737-SL-34-192 REV. A). SERVICE LETTER
MOS
SL 737-SL-34-192 REV. A HEAD-UP GUIDANCE SYSTEM - DESIGN ENHANCEMENT TO ADDRESS DISPLAY SYMBOLOGY JITTER. SERVICE RECOMMENDED
LETTER
MOS
17-N0V-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 328 Of 748
@ Camp Systems
EFTA00618619
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-193 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8. SERVICE LETTER
MOS
30-JAN-2009
SL 737-SL-34-193 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8. SERVICE LETTER
MOS
18-FEB-2009
St 737-SL-34-194 AIR DATA INERTIAL REFERENCE SYSTEM (ADIRS) FAULT
ISOLATION MANUAL IMPROVEMENTS. SERVICE LETTER
MOS
04-NOV-2008
St 737-SL-34-195 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADSB) RECOMMENDED
OUT IMPLEMENTATION AND EUROPEAN AVIATION
SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER
MOS
23-MAR-2009
SL 737-SL-34-195 REV. A AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADSB) RECOMMENDED
OUT IMPLEMENTATION AND EUROPEAN AVIATION
SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER
MOS
06-JUL-2009
SL 737-SL-34-195 REV. 8 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-8) OUT IMPLEMENTATION AND EUROPEAN AVIATION INFORMATIONAL
SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER
MOS
24-MAR-2010
SL 737-SL-34-196 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A (SUPERSEDED BY SL 737-SL-34-196 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-34-196 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A (SUPERSEDED BY SL 737-SL-34-196 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-34-196 REV. B FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A, SERVICE LETTER RECOMMENDED
MOS
I7-JAN-2012
SL 737-SL-34-198 NEW ENHANCED GROUND PROXIMITY WARNING COMPUTER (EGPWC) UPGRADE TO SUPPORT RAAS AND ADD RECOMMENDED
AIRSPEED LOW CALLOUT, SERVICE LETTER
MOS
27-OCT-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 329 Of 748
@ Camp Systems
EFTA00618620
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-199 NEW FLIGHT MANAGEMENT COMPUTER DISPLAY UNIT. SERVICE LETTER RECOMMENDED
MOS
04-N0V-2010
SL 737-SL-34-201 INTEGRATED STANDBY FLIGHT DISPLAY (ISFD) - NEW INSTRUMENT CLAMP. SERVICE LETTER RECOMMENDED
MOS
06-APR-20 I 1
SI. 737-SL-34-202 FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT? AVAILABILITY OF AN ALTERNATE KEYBOARD WITH KEY SUPERSEDED
GUARDS AND WIDE HOLD HANDLE (SUPERSEDED BY SL 737-SL-34-202 REV. A). SERVICE LETTER
MOS
SL 737-SL-34-202 REV. A FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT - AVAILABILITY OF AN ALTERNATE KEYBOARD WITH KEY RECOMMENDED
GUARDS AND WIDE HOLD HANDLE. SERVICE LETTER
MOS
06-JUL-2011
SL 737-SL-34-203 LOW RANGE RADIO ALTIMETER (LRRA) REPLACEMENT - THALES ERT-550 TRANSCEIVER P/N 9599-607 19996. RECOMMENDED
SERVICE LETTER
MOS
20-SEP-2011
SL 737-SL-34-204 LOW RANGE RADIO ALTIMETER REPLACEMENT - HONEYWELL ALA-528 TRANSCEIVER P/N 066-50007-0531 RECOMMENDED
. SERVICE LETTER
MOS
28-NOV-2011
SL 737-SL-34-205 NEW FLIGHT MANAGEMENT COMPUTER CONTROL DISPLAY UNIT OPERATIONAL SOFTWARE- U3.1 (SUPERSEDED BY SUPERSEDED
SL 737-SL-34-205 REV. A). SERVICE LETTER
MOS
SL 737-SL-34-205 REV. A NEW FLIGHT MANAGEMENT COMPUTER CONTROL DISPLAY UNIT OPERATIONAL SOFTWARE - U3.1, SERVICE LETTER RECOMMENDED
MOS
09-APR-20I2
SL 737-SL-34-206 PITOT PROBE FLEXIBLE HOSE CONFIGURATIONS. SERVICE LETTER RECOMMENDED
MOS
23-NOV-2011
SL 737-SL-34-207 DEFERRED APPLICATION OF AERO-SEALANT IN AIR DATA SENSOR INSTALLATIONS. SERVICE LETTER RECOMMENDED
MOS
10-NOV-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 330 Of 748
@ Camp Systems
EFTA00618621
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-34-208 NEW FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT PART NUMBERS (P/N) RECOMMENDED
5242A600-1003.S242A600-2003.5242A600-3003. SERVICE LETTER
MOS
23-MAR-2012
SL 737-SL-34-210 LOW RANGE RADIO ALTIMETER (LRRA) ANTENNA GEL rasKET INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
25-JAN-2013
SL 737-SL-34-211 NEW SUPPLIER AND PART NUMBER OF STANDBY MAGNETIC COMPASS. SERVICE LETTER RECOMMENDED
MOS
18-DEC-2012
SL 737-SL-34-212 P5 PANEL BONDING JUMPER - FASTENER NUT NOT PROPERLY TORQUED. SERVICE LETTER RECOMMENDED
MOS
22-FEB-2013
SL 737-SL-34-213 NEW SENSOR SYSTEMS LOW RANGE RADIO ALTIMETER (LRRA) ANTENNA PART NUMBER. SERVICE LETTER RECOMMENDED
MOS
27-FEB-20I3
SL 737-SL-34-215 P/N 5242A101-009 AIR DATA INERTIAL REFERENCE UNIT (ADIRU) (HONEYWELL P/N HG2050AC11) MAG VAR UPDATE. RECOMMENDED
SERVICE LETTER
MOS
28-MAY-2014
SL 737-SL-34-216 ENHANCED GROUND PROXIMITY WARNING COMPUTER (EGPWC) UPGRADE FROM MK V TO MK V-A. SERVICE LETTER RECOMMENDED
MOS
30-APR-2014
SL 737-SL-34-217 NEW ENHANCED GROUND PROXIMITY WARNING COMPUTER RECOMMENDED
(EGPWC) - P/N 69000940-102. SERVICE LETTER
MOS
25-JUN-2014
SL 737-SL-35-003 REV. C PASSENGER OXYGEN MASK ASSEMBLY. TUBE DETERIORATION.. SERVICE LETTER RECOMMENDED
MOS
30-MAR-2000 - (s)
SL 737-SL-35-003 REV. D PASSENGER OXYGEN MASK ASSEMBLY. TUBE DETERIORATION, SERVICE LETTER
MOS
22-AUG-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 331 Of 748
@ Camp Systems
EFTA00618622
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-35-015 MODIFICATION OF THE MXPHI0 CREW OXYGEN MASK STOWAGE BOX. SERVICE LETTER RECOMMENDED
MOS
29-JUN-1999 - Is)
51 737-SL-35-016 POTENTIALLY OVERSIZED 115 SCF STEEL OXYGEN CYLINDERS. SERVICE LETTER RECOMMENDED
MOS
16-SEP-1999 - (s)
51 737-SL-35-016 REV. A POTENTIALLY OVERSIZED 115 SCF STEEL OXYGEN CYLINDERS. SERVICE LETTER RECOMMENDED
MOS
C6-NOV-1999 - (s)
51 737-SL-35-018 B/E AEROSPACE PROTECTIVE BREATHING EQUIPMENT USEFUL LIFE CHANGE AND NECK SEAL IMPROVEMENT.
SERVICE LETTER
MOS
01-FEB-2002 - (s)
51 737-SL-35-019 MAINTAINING OXYGEN SYSTEM CLEANLINESS. SERVICE LETTER INFORMATIONAL
MOS
I7-OCT-2003
SL 737-SL-35-019 REV. A MAINTAINING OXYGEN SYSTEM CLEANLINESS. SERVICE LETTER INFORMATIONAL
MOS
10-MAR-2004
51 737-SL-35-020 OXYGEN CYLINDER SERVICING. SERVICE LETTER RECOMMENDED
MOS
23-JUN-2009
51 737-SL-35-021 B/E AEROSPACE PROTECTIVE BREATHING EQUIPMENT (PBE) REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
26-MAY-2011
51 737-SL-35-022 CREW OXYGEN MASK INFLATABLE HARNESS LEAKAGE. SERVICE LETTER RECOMMENDED
MOS
I3-JUN-2011
51 737-SL-35-023 CREW OXYGEN SYSTEM- TOTAL LOSS OF OXYGEN. SERVICE LETTER RECOMMENDED
MOS
30-APR-2012
51 737-SL-35-026 CREW OXYGEN MASK REGULATORS SET INCORRECTLY BY RECOMMENDED
SUPPLIER REPAIR STATION. SERVICE LETTER
MOS
09-JAN-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 332 Of 748
@ Camp Systems
EFTA00618623
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-35-027 CREW OXYGEN - FLEX HOSE AND WIRE BUNDLE INSTALLATION RECOMMENDED
. SERVICE LETTER
MOS
31-OCT-2013
51 737-SL-35-028 SMOKE HOOD USE. DISPOSAL AND IMPROVEMENT (SUPERSEDED BY SL 737-SL-35-028 REV. A). SERVICE LETTER SUPERSEDED
MOS
51 737-SL-35-028 REV. A SMOKE HOOD USE. DISPOSAL AND IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
16-JUN-2014
51 737-SL-36-010 APU DUCT BOOT CLAMP T-BOLT NUT TORQUE INSPECTION. SERVICE LETTER RECOMMENDED
MOS
29-JUL-I 999 - (s)
51 737-SL-36-010 REV. A APU DUCT BOOT CLAMP T-BOLT NUT TOROUE INSPECTION. SERVICE LETTER RECOMMENDED
MOS
13-OCT-1999 - (s)
SL 737-SL-36-010 REV. B APU DUCT BOOT CLAMP T-BOLT NUT TORQUE INSPECTION. SERVICE LETTER RECOMMENDED
MOS
20-OCT-2000 - (s)
51 737-SL-36-011 SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A PNEUMATIC SENSE LINE. SERVICE LETTER INFORMATIONAL
MOS
12-MAR-2004
51 737-SL-36-011 REV. A SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A INFORMATIONAL
PNEUMATIC SENSE LINE. SERVICE LETTER
MOS
08-JUN-2004
51 737-SL-36-011 REV. B SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A
PNEUMATIC SENSE LINE. SERVICE LETTER
MOS
05-JUL-2005
51 737-SL-36-012 IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU DUCT ASSEMBLY. SERVICE LETTER
MOS
15-MAR-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 333 Of 748
@ Camp Systems
EFTA00618624
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-36-012 REV. A IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU DUCT ASSEMBLY. SERVICE LETTER
MOS
31-AUG-2005
SI. 737-SL-36-012 REV. B IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU
DUCT ASSEMBLY. SERVICE LETTER
MOS
08-OCT-2007
SL 737-SL-36-013 MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER
MOS
20-APR-2007
SL 737-SL-36-013 REV. A MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER
MOS
21-MAY-2007
SL 737-SL-36-013 REV. B MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER
MOS
04-FEB-2008
SL 737-SL-36-014 BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER
MOS
31-AUG-2006
SL 737-SL-36-014 REV. A BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER
MOS
79-DEC-2006
SL 737-SL-36-014 REV. B BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER
MOS
I0-JUL-2007
SL 737-SL-36-014 REV. C BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER
MOS
I9-SEP-2007
SL 737-SL-36-014 REV. D BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER
MOS
09-JAN-2008
SL 737-SL-36-016 HIGH STAGE REGULATOR MODIFICATION. SERVICE LETTER
MOS
I0-APR-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 334 Of 748
@ Camp Systems
EFTA00618625
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-36-017 HIGH STAGE BLEED AIR VALVE. SERVICE LETTER
MOS
21-FEB-2008 •
SI. 737-SL-36-018 BLEED AIR SYSTEM 390 AND 450 TEMPERATURE SENSOR RECOMMENDED
IMPROVEMENTS. SERVICE LETTER
MOS
13-MAR-2009
SL 737-SL-36-019 PRESSURE REGULATOR SHUTOFF VALVE (PRSOV) RECOMMENDED
IMPROVEMENTS, SERVICE LETTER
MOS
18-MAR-2009
51 737-SL-36-020 NEW PRSOV FLEX LINE. SERVICE LETTER RECOMMENDED
MOS
07-OCT-2009
SL 737-SL-36-021 FIFTH STAGE BLEED AIR CHECK VALVE INSPECTION (SUPERSEDED BY SL 737-SL-36-021 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-36-021 REV. A FIFTH STAGE BLEED AIR CHECK VALVE INSPECTION. SERVICE LETTER RECOMMENDED
MOS
21-JAN-2011
SI. 737-SL-36-022 FIFTH STAGE BLEED AIR CHECK VALVE- BUSHING BRAZING (SUPERSEDED BY SL 737-SL-36-022 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-36-022 REV. A FIFTH STAGE BLEED AIR CHECK VALVE - BUSHING BRAZING. SERVICE LETTER RECOMMENDED
MOS
22-MAY-20I2
SL 737-SL-36-023 BLEED AIR PRECOOLER CONTROL VALVE(PCCV) IMPROVEMENTS. SERVICE LETTER
MOS
27 -JUL-2010
SL 737-SL-36-024 ACMS 'USER GUIDE FOR ENHANCED ECS TROUBLESHOOTING AND HEALTH MANAGEMENT (SUPERSEDED BY SL SUPERSEDED
737-SL-36-024 REV. A). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 335 Of 748
@ Camp Systems
EFTA00618626
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-36-024 REV. A ACMS 'USER GUIDE' FOR ENHANCED ECS TROUBLESHOOTING AND HEALTH MANAGEMENT (SUPERSEDED BY SL RECOMMENDED
737-SL-36-024 REV. 8). SERVICE LETTER
MOS
I3-SEP-2011
SL 737-SL-36-024 REV. 8 ACMS 'USER GUIDE FOR ENHANCED PNEUMATIC SYSTEM TROUBLESHOOTING AND HEALTH MANAGEMENT. RECOMMENDED
SERVICE LETTER
MOS
18-MAR-2013
SL 737-SL-36-025 PRECOOLER CONTROL VALVE KISS SEAL IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
29-OCT-2010
SL 737-SL-36-026 ENGINE BLEED SYSTEM MAINTENANCE PROCEDURES DESCRIPTION TABLES. SERVICE LETTER RECOMMENDED
MOS
06-DEC-2010
SI. 737-SL-36-029 CIRCUIT BREAKERS LABEL-INCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-36-029 REV. A CIRCUIT BREAKERS LABEL-INCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. B). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-36-029 REV. 8 CIRCUIT BREAKERS LABEL4NCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. C). SERVICE RECOMMENDED
LETTER
MOS
72-APR-2073
SL 737-SL-36-029 REV. C CIRCUIT BREAKERS LABEL4NCORRECT NOMENCLATURE. SERVICE LETTER RECOMMENDED
MOS
22-MAY-20I3
SL 737-SL-36-030 PRE-COOLER INSTALLATION. INCORRECT SAFETY WIRE INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
03-MAY-20I3
SL 737-SL-36-031 PRSOV AND HIGH STAGE VALVE IMPROVMENTS. SERVICE LETTER RECOMMENDED
MOS
10-DEC-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 336 Of 748
@ Camp Systems
EFTA00618627
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-38-009 WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-SL-38-009 REV. A). SERVICE SUPERSEDED
LETTER
MOS
St 737-SL-38-009 REV. A WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-S1-38-009 REV. B). SERVICE SUPERSEDED
LETTER
MOS
St 737-SL-38-009 REV. B WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-S1-38-009 REV. C). SERVICE SUPERSEDED
LETTER
MOS
St 737-SL-38-009 REV. C WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION. SERVICE LETTER RECOMMENDED
MOS
29-NOV-2012
St 737-SL-38-015 REV. 8 GREY WATER DRAIN CLEANING INFORMATION AND FREQUENCY. SERVICE LETTER RECOMMENDED
MOS
19-NOV-2012
St 737-SL-38-016 IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL
MOS
10-APR-2007 - (s)
St 737-SL-38-016 REV. A IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL
MOS
31-MAR-2006 - (s)
St 737-SL-38-016 REV. 8 IN SITU CHEMICAL CLEANING PROCEDURES FOR VACUUM
WASTE TUBES. SERVICE LETTER
MOS
31-MAR-2006
St 737-SL-38-018 IN SITU CHEMICAL rl PANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER RECOMMENDED
MOS
26-NOV-1996 - (s)
St 737-SL-38-018 REV. A IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER RECOMMENDED
MOS
25-NOV-1997 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 337 Of 748
@ Camp Systems
EFTA00618628
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-38-018 REV. 8 IN SITU CHEMICAL CLEANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL
MOS
28-MAY-1999 - Is)
SL 737-SL-38-018 REV. C IN-SITU PRESSURE CLEANING PROCEDURE OF VACUUM WASTE TUBES (SUPERSEDED BY SL 737-SL-38-018 REV. D). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-38-018 REV. 0 IN SITU PRESSURE CLEANING PROCEDURE OF VACUUM WASTE TUBES (S1REPORTED AS ATA 3832-90). SERVICE RECOMMENDED
LETTER
MOS
15-OCT-2012
SL 737-SL-38-019 VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS. SERVICE LETTER RECOMMENDED
MOS
ZS-JUL-1997 - (s)
SL 737-SL-38-019 REV. A VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS (SUPERSEDED BY SL 737-SL-38-019 REV. B). SERVICE SUPERSEDED
LETTER
MOS
- (s)
SL 737-SL-38-019 REV. 8 VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS. SERVICE LETTER RECOMMENDED
MOS
OS-NOV-2012
SL 737-SL-38-020 VACUUM WASTE TANK IMPROVE AIR/WATER SEPARATOR. SERVICE LETTER INFORMATIONAL
MOS
-JAN-1999 - (s)
SL 737-SL-38-022 LAVATORY POTABLE WATER SELECTOR VALVE ADAPTER REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
27-MAY-1999 - (s)
SL 737-SL-38-023 INSPECT FOR POTENTIAL MISSING CLAMPS FROM FORWARD GRAY WATER DRAIN LINE TUBE INSTIL. SERVICE RECOMMENDED
LETTER
MOS
16-AUG-1999 - (s)
SL 737-SL-38-020 WASTE SERVICE PANEL COVER FASTENER INSPECTION AND POTENTIAL REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
28-SEP-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 338 Of 748
@ Camp Systems
EFTA00618629
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-38-026 POTABLE WATER CABLE ASSEMBLY IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
02-NOV-1999 - (s)
SL 737-SL-38-026 REV. A POTABLE WATER CABLE ASSEMBLY IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
I4-JUL-2000 - (s)
SL 737-SL-38-028 REV. A AVAILABILITY OF POTABLE WATER TANK WITH IMPROVED LINER AND WINDING MATERIAL. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-2000 - Is)
SL 737-SL-38-031 REV. B VACUUM WASTE LINE BLOCKAGE -KINETIC WATER RAM' REMOVAL TOOL AND USAGE (SUPERSEDED BY SL SUPERSEDED
737-SL-38-031 REV. C). SERVICE LETTER
MOS
SL 737-SL-38-031 REV. C VACUUM WASTE LINE BLOCKAGE KINETIC WATER RAM' REMOVAL TOOL AND USAGE, SERVICE LETTER RECOMMENDED
MOS
29-OCT-2012
SL 737-SL-38-032 VACUUM WASTE CLEANING METHODS, SERVICE LETTER
MOS
22-JUN-2007
SL 737-SL-38-032 REV. A VACUUM WASTE CLEANING METHODS. SERVICE LETTER
MOS
II -MAR-2008
SL 737-SL-38-032 REV. B VACUUM WASTE CLEANING METHODS (SUPERSEDED BY 737-SL-38-019-C). SERVICE LETTER SUPERSEDED
MOS
I0-SEP-2009
SL 737-SL-38-032 REV. C VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. D). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-38-032 REV. 0 VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. E), SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-38-032 REV. E VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. F). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 339 Of 748
@ Camp Systems
EFTA00618630
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-38-032 REV. F VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. G). SERVICE LETTER SUPERSEDED
MOS
51 737-SL-38-032 REV. G VACUUM WASTE CLEANING METHODS. SERVICE LETTER RECOMMENDED
MOS
01-APR-2014
51 737-SL-38-033 FORWARD DOOR SILL DRAIN VALVE REPLACEMENT. SERVICE LETTER
MOS
10-FEB-2010
SL 737-SL-38-034 VACUUM WASTE SYSTEM BLOWER REPLACEMENT. SERVICE LETTER RECOMMENDED
MOS
10-JUN-2011
51 737-SL-38-035 VACUUM WASTE SYSTEM MAINTENANCE PRACTICES. SERVICE LETTER RECOMMENDED
MOS
25-NOV-20I3
51 737-SL-45-001 READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED
MOS
23-DEC-1998 - (s)
51 737-SL-45-001 REV. A READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED
MOS
28-APR-1999 - (s)
51 737-SL-45-001 REV. B READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED
MOS
03-JAN-2000 - (s)
51 737-SL-48-001 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0 (PHASE 1) AND EFB DISPLAY UNIT UPDATE. SERVICE LETTER
MOS
08-JUN-2007
51 737-SL-46-002 ELECTRONIC FLIGHT BAG DISPLAY UNIT PART NUMBER 1978O3-5/-51 BRIGHTNESS CONTROL CORRECTION. SERVICE
LETTER
MOS
08-JUN-2007
51 737-SL-46-003 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER
MOS
01-JUL-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 340 Of 748
@ Camp Systems
EFTA00618631
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-003 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER
MOS
1O-NOV-2008
St 737-SL-46-003 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER RECOMMENDED
MOS
24-MAR-2009
St 737-SL-46-003 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER RECOMMENDED
MOS
13-APR-2009
SL 737-SL-46-003 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER RECOMMENDED
MOS
I6-JUL-2009
SL 737-SL-46-003 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3, SERVICE LETTER
MOS
10-FEB-2010
St 737-SL-46-004 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER
MOS
05-NOV-2008
St 737-SL-46-004 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER
MOS
21-APR-2009
St 737-SL-46-004 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED
MOS
08-JUL-2009
St 737-SL-46-004 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED
MOS
23-NOV-2009
St 737-SL-46-004 REV. D ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4 (SUPERSEDED BY SL 737-SL-46-004 REV. E). SERVICE LETTER SUPERSEDED
MOS
a 737-SL-46-004 REV. E ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED
MOS
06-AUG-20I0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 341 Of 748
@ Camp Systems
EFTA00618632
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-004 REV. F ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED
MOS
14-FEB-2011
SL 737-SL-46-005 REV. A ELECTRONIC FLIGHT BAG (EFB) ELECTRONIC UNIT (EU)
HARDWARE UPGRADE. SERVICE LETTER
MOS
29-OCT-2008
SL 737-SL-46-006 REV. A BLOCKPOINT 4 ELECTRONIC FLIGHT BAG (EFB) HARDWARE SUPERSEDED
AND EFB BP 4.0 SOFTWARE (SUPERSEDED BY SL 737-SL-46-006 REV. B). SERVICE LETTER
MOS
SL 737-SL-46-006 REV. B BLOCKPOINT 4 ELECTRONIC FLIGHT BAG(EFB)HARDWARE AND EFB BP 4.0 SOFTWARE (SUPERSEDED BY SL SUPERSEDED
737-SL-46-006 REV. C). SERVICE LETTER
MOS
SL 737-SL-46-006 REV. C BLOCKPOINT 4 ELECTRONIC FLIGHT BAG(EFB)HARDWARE AND EFB BP 4.0 SOFTWARE. SERVICE LETTER RECOMMENDED
MOS
I7-JUN-20 I 1
SL 737-SL-46-007 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) RECOMMENDED
BLOCKPOINT (BP) 1. SERVICE LETTER
MOS
01-DEC-2009
SL 737-SL-46-007 REV. A BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) RECOMMENDED
BLOCKPOINT (BP) 1. SERVICE LETTER
MOS
I6-DEC-2009
SL 737-SL-46-008 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-008 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-008 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. C). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 342 Of 748
@ Camp Systems
EFTA00618633
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-008 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. D). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-008 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2. SERVICE LETTER RECOMMENDED
MOS
27-JUL-2012
St 737-SL-46-009 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. A) SUPERSEDED
. SERVICE LETTER
MOS
St 737-SL-46-009 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. B). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-009 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. C). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-009 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5. SERVICE LETTER RECOMMENDED
MOS
IO-NOV-2011
St 737-SL-46-010 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2 (SUPERSEDED BY St 737-SL-46-010 REV. A), SUPERSEDED
SERVICE LETTER
MOS
St 737-SL-46-010 REV. A BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2 (SUPERSEDED BY St 737-SL-46-010 REV. B). SUPERSEDED
SERVICE LETTER
MOS
St 737-SL-46-010 REV. B BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2. SERVICE LETTER RECOMMENDED
MOS
04-NOV-2011
St 737-SL-46-013 WIRE BUNDLE DISCONNECT BRACKET AB366 INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-46-013 REV. A), SUPERSEDED
SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 343 Of 748
@ Camp Systems
EFTA00618634
AD/SI Status Report AIRCRAFT
CAMP
Asiant.fran Atna:up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-013 REV. A WIRE BUNDLE DISCONNECT BRACKET A8366 INCORRECTLY LABELED. SERVICE LETTER RECOMMENDED
MOS
19-APR-2012
51 737-SL-46-014 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) (SUPERSEDED BY SL 737-51-46-014 REV. A). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-014 REV. A CLASS 2 ELECTRONIC FLIGHT BAG (EFB) (SUPERSEDED BY SL 737-SL-46-014 REV. B) SUPERSEDED
. SERVICE LETTER
MOS
St 737-SL-46-014 REV. 8 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 2.0 (SUPERSEDED BY SL 737-SL-46-014 REV. C). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-46-014 REV. C CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 2.0. SERVICE LETTER RECOMMENDED
MOS
21-NOV-2013
SL 737-SL-46-015 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3. SERVICE LETTER RECOMMENDED
MOS
12-DEC-2011
SL 737-SL-46-016 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-016 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. 8). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-016 REV. 8 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. C). SERVICE LETTER RECOMMENDED
MOS
20-AUG-2012
SL 737-SL-46-016 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. 0) RECOMMENDED
. SERVICE LETTER
MOS
18-FEB-20I3
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 344 Of 748
@ Camp Systems
EFTA00618635
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-016 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. E). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-016 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. F). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-016 REV. F ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7. SERVICE LETTER RECOMMENDED
MOS
10-MAR-2014
St 737-SL-46-017 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. A). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-017 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. B). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-017 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. C). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-017 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. D). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-017 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. E). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-46-017 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4. SERVICE LETTER RECOMMENDED
MOS
10-MAR-2014
SL 737-SL-46-018 GOODRICH SERVICE INFORMATION LETTER (SIL) - CAMERA INTERFACE UNIT (CIU) UPGRADE. SERVICE LETTER RECOMMENDED
MOS
22-AUG-20I2
St 737-SL-46-019 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 3.1. SERVICE LETTER RECOMMENDED
MOS
25-FEB-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 345 Of 748
@ Camp Systems
EFTA00618636
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-020 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.8 (SUPERSEDED 737-SL-46-020 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-020 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.8. SERVICE LETTER RECOMMENDED
MOS
21-NOV-2013
SL 737-SL-46-021 ELECTRONIC FLIGHT BAG (EFB) BLOCK POINT 4.5 (SUPERSEDED BY SL 737-S1-46-021 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-021 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.5. SERVICE LETTER RECOMMENDED
MOS
10-MAR-2014
SL 737-SL-46-022 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0 (SUPERSEDED BY SL 737-SL-46-022 REV. A). SERVICE RECOMMENDED
LETTER
MOS
13-DEC-2012
SL 737-SL-46-022 REV. A CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0. SERVICE LETTER RECOMMENDED
MOS
29-APR-2013
SL 737-SL-46-023 PORTABLE MAINTENANCE DEVICE MALWARE PREVENTION. DISCOVERY. AND OPERATOR GUIDANCE FOR EVENT RECOMMENDED
HANDLING. SERVICE LETTER
MOS
19-AUG-2013
SL 737-SL-46-024 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.0. SERVICE LETTER RECOMMENDED
MOS
13-MAR-2014
SL 737-SL-46-025 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 4.0. SERVICE LETTER RECOMMENDED
MOS
13-MAR-2014
SL 737-SL-46-026 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.614.6E (SUPERSEDED BY SL 737-SL-46-026 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-46-026 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.614.6E. SERVICE LETTER RECOMMENDED
MOS
09-MAY-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 346 Of 748
@ Camp Systems
EFTA00618637
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-46-027 REV. A AIRCRAFT NETWORK SECURITY PROGRAM (ANSP) REGULATORY REQUIREMENT. SERVICE LETTER RECOMMENDED
MOS
20-JUN-2014
51 737-SL-47-001 POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM. SERVICE LETTER RECOMMENDED
MOS 24 (s)
1 1-NOV-2009
SI. 737-SL-47-001 REV. A POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM (SUPERSEDED BY SL 737-SL-47-001 REV. B). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-47-001 REV. B POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM. SERVICE LETTER RECOMMENDED
MOS
23-SEP-2010
SL 737-SL-47-002 INCORRECT MATING TEETH ON NGS ELECTRICAL CONNECTIONS. SERVICE LETTER RECOMMENDED
MOS
I6-FEB-2010
SL 737-SL-47-002 REV. A INCORRECT MATING TEETH ON NGS ELECTRICAL CONNECTIONS. SERVICE LETTER INFORMATIONAL
MOS
18-MAR-2010
SL 737-SL-47-004 NGS NEADS TUBE CHAFING. SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-47-004 REV. A NGS NEADS TUBE CHAFING. SERVICE LETTER RECOMMENDED
MOS
16-DEC-2011
SL 737-SL-47-006 ENVIRONMENTAL CONTROL- NGS BITE DISPLAY UNIT (BDU)- CRACKED CAPACITORS ON BDU. SERVICE LETTER RECOMMENDED
MOS
17-DEC-2013
SL 737-SL-49-058 FALSE APU MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER RECOMMENDED
MOS
19-DEC-1997 - (s)
SL 737-SL-49-058 REV. A FALSE APU MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER RECOMMENDED
MOS
19-MAR-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 347 Of 748
@ Camp Systems
EFTA00618638
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-49-058 REV. 8 FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE UGHT ILLUMINATION. SERVICE LETTER RECOMMENDED
MOS
23-JUL-2001 - Is)
51 737-SL-49-058 REV. C FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2001 - (s)
51 737-SL-49-058 REV. 0 FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER INFORMATIONAL
MOS
07-APR-2004
51 737-SL-49-058 REV. E FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT RECOMMENDED
ILLUMINATION. SERVICE LETTER
MOS
28-MAY-2009
SI. 737-SL-49-059 START POWER UNIT (SPU) TRANSFORMER MOUNTING PLATE IMPROVEMENT ALLIED SIGNAL MODEL 131-98 RECOMMENDED
AUXILIARY POWER UNIT (APU). SERVICE LETTER
MOS
08-APR-1998 - (s)
SI. 737-SL-49-060 BENEFITS OF OPERATING TWO AIR CONDITIONING PACKS WITH 131-96 AUXILIARY POWER UNIT (APU). SERVICE RECOMMENDED
LETTER
MOS
03-JUN-1998 - (s)
SL 737-SL-49-061 131-98 APU START CONVERTER UNIT MODIFICATION. SERVICE LETTER RECOMMENDED
MOS
10-JUL-1998 - Is)
SL 737-SL-49-067 131-98 AUXILIARY POWER UNIT ELECTRONIC CONTROL UNIT (ECU). SERVICE LETTER RECOMMENDED
MOS
12-AUG-1999 -
SL 737-SL-49-067 REV. A 131-98 AUXILIARY POWER UNIT ELECTRONIC CONTROL UNIT (ECU). SERVICE LETTER RECOMMENDED
MOS
20-SEP-1999 - (s)
SL 737-SL-49-071 MISSING COMBUSTOR CASE DRAIN PLUG CAUSING HEAT DAMAGE TO THE APU DOOR. SERVICE LETTER INFORMATIONAL
MOS
15-JUN-2001 -
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 348 Of 748
@ Camp Systems
EFTA00618639
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-49-071 REV. A MISSING COMBUSTER CASE DRAIN PLUG CAUSING HEAT DAMAGE TO THE APU DOOR. SERVICE LETTER INFORMATIONAL
MOS
I4-APR-2003
SI. 737-SL-49-072 131-98 APU START SYSTEM IMPREOVEMENT - INTRODUCTION OF NEW START CONVERTER UNIT AND START POWER INFORMATIONAL
UNIT. SERVICE LETTER
MOS
73-JUL-2001 - (s)
SL 737-SL-49-074 PAINT PEELING OFF FROM APU EDUCTOR INLET DUCT. SERVICE LETTER INFORMATIONAL
MOS
02-APR-2003
SL 737-SL-49-075 HIGH RESISTANCE ACROSS APU EXHAUST GROUND STRAP. SERVICE LETTER INFORMATIONAL
MOS
09-FEB-2004
SL 737-SL-49-075 REV. A HIGH RESISTANCE ACROSS APU EXHAUST GROUND STRAP. SERVICE LETTER INFORMATIONAL
MOS
05-APR-2004
SL 737-SL-49-076 APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER
MOS
I5-AUG-2005
SL 737-SL-49-076 REV. A APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER RECOMMENDED
MOS
04-JUN-2009
SL 737-SL-49-076 REV. 8 APU AIR INLET DUCT BOX CORROSION (SUPERSEDED BY SL 737-SL-49-076 REV. C). SERVICE LETTER INFORMATIONAL
MOS
30-MAR-2010
SL 737-SL-49-076 REV. C APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER RECOMMENDED
MOS
26-MAR-2013
SL 737-SL-49-077 APU EXHAUST MUFFLER - INSULATION BLANKET REPAIR. SERVICE LETTER
MOS
22-SEP-2005
SL 737-SL-49-078 APU ECU SOFTWARE - VERSION 4. SERVICE LETTER
MOS
I4-AUG-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 349 Of 748
@ Camp Systems
EFTA00618640
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-49-078 REV. A APU ECU SOFTWARE - VERSION 4. SERVICE LETTER
MOS
31-OCT-2008
SL 737-SL-49-078 REV. B APU ECU SOFTWARE- VERSION 4. SERVICE LETTER RECOMMENDED
MOS
79-JAN-2010
SL 737-SL-49-079 GAP IN APU INSULATION BLANKET. SERVICE LETTER RECOMMENDED
MOS
11-MAY-2009
SL 737-SL-49-080 UNDERTOROUED FASTENERS IN APU MOUNT INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
12-MAY-2009
SL 737-SL-49-080 REV. A UNDERTOROUED FASTENERS IN APU MOUNT INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
21-JAN-2010
SL 737-SL-49-081 IMPROPER REMOVAL OF DRY FILM LUBRICANT FROM APU RECOMMENDED
MOUNT STRUT ASSEMBLY. SERVICE LETTER
MOS
30-OCT-2009
SL 737-SL-49-081 REV. A IMPROPER REMOVAL OF DRY FILM LUBRICANT FROM APU RECOMMENDED
MOUNT STRUT ASSEMBLY. SERVICE LETTER
MOS
22-DEC-2000
SL 737-SL-49-082 VERSION 5- APU ECU OPERATION SOFTWARE. SERVICE LETTER RECOMMENDED
MOS
Id-MAY-2010
SL 737-SL-49-084 HYDRAULIC LOCK IN APU SOLENOID VALVE. SERVICE LETTER RECOMMENDED
MOS
06-APR-2012
SL 737-SL-49-085 LOW DUCT PRESSURE DUE TO APU INLET GUIDE VANE DISAGREES WITH COMMAND FAULT, SERVICE LETTER RECOMMENDED
MOS
23-MAR-2012
SL 737-SL-49-086 APU OIL DRAIN TUBE MISALIGNMENT CAUSING EXTERNAL OIL STREAKING. SERVICE LETTER RECOMMENDED
MOS
22-MAR-2012
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 350 Of 748
@ Camp Systems
EFTA00618641
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-49-087 FIRST STAGE TURBINE WHEEL BLADE WALKING - 131-98 APU (SUPERSEDED BY SL 737-SL-49-087 REV. A). SERVICE SUPERSEDED
LETTER
MOS
SL 737-SL-49-087 REV. A FIRST STAGE TURBINE WHEEL BLADE WALKING -131-98 APU. SERVICE LETTER RECOMMENDED
MOS
28-JUL-2014
SL 737-SL-49-088 131-9B APU CERAMIC DUPLEX BALL BEARING ASSEMBLY. SERVICE LETTER RECOMMENDED
MOS
I2-JUL-2012
SL 737-SL-49-089 APU DATA MEMORY MODULE WITH NON-COMPLIANT COMPONENT. SERVICE LETTER RECOMMENDED
MOS
01-AUG-2012
SL 737-SL-49-090 COMMON COMMERCIAL CONTROL UNIT -131-98 APU (SUPERSEDED BY SL 737-SL-49-090 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-49-090 REV. A COMMON COMMERCIAL CONTROL UNIT -131-98 APU. SERVICE LETTER RECOMMENDED
MOS
I I -OCT-2012
SL 737-SL-49-091 STARTER- GENERATOR IMPROVEMENT - 9 STARTER GENERATOR, SERVICE LETTER RECOMMENDED
MOS
72-SEP-2012
SL 737-SL-49-092 MANUFACTURING ESCAPE - LOOSE COMBUSTOR DRAIN ADAPTOR -131-98 APU. SERVICE LETTER RECOMMENDED
MOS
25-JAN-2013
SL 737-SL-49-093 POSSIBLE GROUND JUMPER ASSEMBLY UNDER TORQUE - 131-98 APU (SUPERSEDED BY SL 737-SL-49-093 REV. A). SUPERSEDED
SERVICE LETTER
MOS
SL 737-SL-49-093 REV. A POSSIBLE GROUND JUMPER ASSEMBLY UNDER TORQUE -131-98 APU. SERVICE LETTER RECOMMENDED
MOS
I9-JUN-2013
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 351 Of 748
@ Camp Systems
EFTA00618642
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-49-094 INCORRECT INSTALLATION OF SEALING PLUGS IN APU WIRING HARNESS CONNECTORS - 131-98 APU (SUPERSEDED SUPERSEDED
BY SL 737-SL-49-094 REV. A). SERVICE LETTER
MOS
SL 737-SL-49-094 REV. A INCORRECT INSTALLATION OF SEALING PLUGS IN APU WIRING HARNESS CONNECTORS - 131-98 APU. SERVICE RECOMMENDED
LETTER
MOS
20-DEC-2013
SL 737-SL-51-022 WING AND HORIZONTAL STABILIZER INSPAR FINISHES (ORIGINALLY REPORTED AS ATA 5180-21) (SUPERSEDED BY SUPERSEDED
SL 737-SL-51-022 REv. A). SERVICE LETTER
MOS
SL 737-SL-51-022 REV. A WING AND HORIZONTAL STABILIZER INSPAR FINISHES (ORIGINALLY REPORTED AS ATA 5180-21). SERVICE LETTER RECOMMENDED
MOS
13-APR-2012
SL 737-SL-51-027 REV. B BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER INFORMATIONAL
MOS
10-JUL-2002 (s)
SL 737-SL-51-027 REV. D BOEING COMMERCIAL AIRPLANES REVIEW AND DELEGATED
APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER
MOS
12-MAY-2C05
SL 737-SL-51-027 REV. E BOEING COMMERCIAL AIRPLANES REVIEW AND DELEGATED APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND
MODIFICATION DATA. SERVICE LETTER
MOS
11-OCT-2000
SL 737-SL-51-027 REV. F BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER
MOS
24-MAY-2C07
SL 737-SL-51-027 REV O BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER
MOS
21-JAN-2008
SL 737-SL-51-027 REV. H BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER
MOS
19-JUN-2008
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 352 Of 748
Camp Systems
EFTA00618643
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-51-027 REV. I BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER INFORMATIONAL
MOS
09-APR-2010
SL 737-SL-51-027 REV. J BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA (SUPERSEDED BY SL SUPERSEDED
737-SL-51-027 REV. K). SERVICE LETTER
MOS
SL 737-SL-51-027 REV. K BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA (SUPERSEDED BY SL SUPERSEDED
737-SL-51-027 REV. L). SERVICE LETTER
MOS
SL 737-SL-51-027 REV. L BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER RECOMMENDED
MOS
1 1-APR-20I4
SL 737-SL-51-029 REV. B DAMAGE TOLERANT MAINTENANCE REQUIREMENTS. SERVICE LETTER INFORMATIONAL
MOS
03-DEC-2002
SL 737-SL-51-035 DESIGN IMPROVEMENT TO PREVENT DIFFICULTY IN THE OPERATION OF THE FORWARD ENTRY DOOR. SERVICE
LETTER
MOS
26-NOV-2002
SL 737-SL-51-036 'METALBOND•-STRUCTURAL ALUMINUM BONDING PRECAUTIONS AND PROCEDURES. SERVICE LETTER INFORMATIONAL
MOS
01-AUG-2003
SL 737-SL-51-037 INACTIVATION OF BACB30MY6p•X AND Y FASTENERS. SERVICE LETTER INFORMATIONAL
MOS
15-APR-2003
SL 737-SL-51-037 REV. A INACTIVATION OF BACB3LIMY6()0X ANDY FASTENERS. SERVICE LETTER INFORMATIONAL
MOS
11-JUL-2003
SL 737-SL-51-038 REV. A DAMAGE IDENTIFICATION AND REMOVAL DURING STRUCTURAL REPAIRS, SERVICE LETTER
MOS
I4-JUL-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 353 Of 748
@ Camp Systems
EFTA00618644
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-51-039 MAJOR REVISIONS TO STRUCTURAL REPAIR MANUAL METALBOND SECTIONS. SERVICE LETTER
MOS
IS-SEP-2005
SI. 737-SL-51-039 REV. A MAJOR REVISIONS TO STRUCTURAL REPAIR MANUAL
METALBOND SECTIONS. SERVICE LETTER
MOS
I7-OCT-2007
SL 737-SL-51-040 POSSIBLE CORROSION ON THE EMERGENCY ESCAPE HATCH UPPER SILLS. BS616 8 639 (-600 8 -700) BS578 8 BS639 NOT APPLICABLE
(-800 & -900). SERVICE LETTER
MOS 22-AUG-2008
17-DEC-2006 3260:48
AFL 782
SL 737-SL-51-040 REV. A POSSIBLE CORROSION ON THE EMERGENCY ESCAPE HATCH UPPER SILLS. BS616 8 639 (-600 8 -700) BS578 8 BS639
(-800 & -900). SERVICE LETTER
MOS
I0-JUL-2007
SL 737-SL-51-041 MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-51-041 REV. A MAJOR/MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-51-041 REV. B MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. C). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-51-041 REV. C MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. D). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-51-041 REV. D MAJOR/MINOR REPAIR CLASSIFICATION. SERVICE LETTER RECOMMENDED
MOS
22-NOV-20I3
SL 737-SL-51-042 REV. B DAMAGE REPORTING AND REPAIR PLAN/DESIGN GUIDELINES. SERVICE LETTER RECOMMENDED
MOS
09-DEC-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 354 Of 748
@ Camp Systems
EFTA00618645
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-51-042 REV. C DAMAGE REPORTING AND REPAIR PLANIDESIGN GUIDELINES (SUPERSEDED BY SL 737-SL-51-042 REV. DJ, SERVICE SUPERSEDED
LETTER
MOS
51 737-SL-51-042 REV. D DAMAGE REPORTING AND REPAIR PLAN/DESIGN GUIDELINES. SERVICE LETTER RECOMMENDED
MOS
I6-MAR-2011
51 737-SL-51-043 BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE (SUPERSEDED BY SL SUPERSEDED
737-SL-51-043 REV. A). SERVICE LETTER
MOS
51 737-SL-51-043 REV. A BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE (SUPERSEDED BY SL SUPERSEDED
737-SL-51-043 REV. B). SERVICE LETTER
MOS
51 737-SL-51-043 REV. B BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE. SERVICE LETTER RECOMMENDED
MOS
27-OCT-2010
51 737-SL-51-044 PINHOLES IN THE FINISH OF CARBON FIBER REINFORCED RECOMMENDED
PLASTIC (CFRP) PARTS, SERVICE LETTER
MOS
21-OCT-2011
51 737-SL-51-045 CORROSION PREVENTION AND CONTROL PROGRAMS. SERVICE LETTER RECOMMENDED
MOS
02-FEB-20I2
51 737-SL-51-047 ESCAPEMENT OF SPS TECHNOLOGIES BACN10JR3CFD NUTPLATES WITH MISSING CADMIUM PLATING. SERVICE RECOMMENDED
LETTER
MOS
25-JAN-2013
51 737-SL-52-023 WING REFUEL ACCESS DOOR HOLD OPEN STRUT ASSY LOCK MODIFICATION TO PREVENT OVER EXTENSION. RECOMMENDED
SERVICE LETTER
MOS
I8-JAN-1999 - (s)
51 737-SL-52-024 AFT LEFT ENTRY DOOR HANDLE SEPARATION. SERVICE LETTER RECOMMENDED
MOS
29-OCT-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 355 Of 748
@ Camp Systems
EFTA00618646
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-52-024 REV. A AFT LEFT ENTRY DOOR HANDLE SEPARATION. SERVICE LETTER INFORMATIONAL
MOS
I4-FEB-2002 - Is)
SL 737-SL-52-025 AUTOMATIC OVERWING EXIT FLIGHT LOCK- SOLENOID IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
05-OCT-2000 - (s)
SL 737-SL-52-026 FORWARD AIRSTAIR TOP STEP CONTROL ACTUATOR AND ROLLER ENGAGEMENT. SERVICE LETTER INFORMATIONAL
MOS
24-SEP-2001 - (s)
SL 737-SL-52-026 REV. A FORWARD AIRSTAIR TO STEP CONTROL ACTUATOR AND ROLLER ENGAGEMENT. SERVICE LETTER INFORMATIONAL
MOS
20-MAY-2003
SL 737-SL-52-027 FORWARD AIRSTAIR TOP STEP INTERFFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL
MOS
07-NOV-2001 - (s)
SL 737-SL-52-027 REV. A FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL
MOS
I3-SEP-2005
SL 737-SL-52-027 REV. 8 FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR RECOMMENDED
BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER
MOS
05-MAR-2009
SL 737-SL-52-027 REV. C FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL
MOS
I9-MAR-2010
SL 737-SL-52-028 FORWARD AIRSTAIR DOOR LOCK PIN ACTUATOR - NEW POTTING MATERIAL. SERVICE LETTER INFORMATIONAL
MOS
29-MAY-2002 - Is)
SL 737-SL-52-029 CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
I I -APR-2002 - (s)
SL 737-SL-52-029 REV. A AFT CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
21-OCT-2002
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 356 Of 748
@ Camp Systems
EFTA00618647
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-52-029 REV. 8 AFT CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER
MOS
I3-NOV-2006
51 737-SL-52-030 ENHANCED SECURITY FLIGHT DECK DOOR PRESSURE RELIEF LATCH REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
37 -JAN-2003 - Is)
51 737-SL-52-03I SECURE FLIGHT DECK DOOR LOCK CONTROL MODULE ROTARY SWITCH. SERVICE LETTER INFORMATIONAL
MOS
04-APR-2003
51 737-SL-52-032 REV. A ENHANCED FLIGHT DECK ACCESS DOOR. NEW BEZEL FOR ACCESS SYSTEM KEYPAD MODULE. SERVICE LETTER INFORMATIONAL
MOS
09-MAY-2003
51 737-SL-52-034 AIRSTAIR DOOR INDICATION TARGET AND BRACKET-REPLACEMENT. SERVICE LETTER INFORMATIONAL
MOS
20-MAY-2003
51 737-SL-52-034 REV. A AIRSTAIR DOOR INDICATION TARGET AND BRACKET-REPLACEMENT. SERVICE LETTER COMPLIED WITH - COMPONENT REPLACEMENT
COMPLIED WITH
MOS 02-MAR-2006
I3-SEP-2005 2509:38
AFL 609
51 737-SL-52-036 REV. A DEADBOLT ARMOR PLATE INSTALLATION, SERVICE LETTER
MOS
I6-NOV-2006
51 737-SL-52-037 REV. A C8D AEROSPACE ENHANCED SECURITY FLIGHT DECK DOOR DIFFICULT TO OPEN. SERVICE LETTER
MOS
I6-APR-2004
51 737-SL-52-038 FORWARD AIRSTAIR RELIABILITY IMPROVEMENTS - PRR 38582, SERVICE LETTER
MOS
I 7-NOV-2005
51 737-SL-52-039 AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT - INOP PLACARD CHECK. SERVICE LETTER
MOS
09-APR-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 357 Of 748
@ Camp Systems
EFTA00618648
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-52-039 REV. A AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT -
!NOP PLACARD CHECK. SERVICE LETTER
MOS
28-AUG-2007
SL 737-SL-52-039 REV. B AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT -
INOP PLACARD CHECK, SERVICE LETTER
MOS
23-JUL-2008
SL 737-SL-52-040 AFT FAIRING BRAKE ACCUMULATOR DOOR HOLD OPEN STRUT ASSEMBLY, SERVICE LETTER
MOS
21-MAY-2007
51 737-SL-52-040 REV. A AFT FAIRING BRAKE ACCUMULATOR DOOR HOLD OPEN STRUT ASSEMBLY. SERVICE LETTER
MOS
22-JUN-2007
51 737-SL-52-041 CARGO DOOR HANDLE IMPROVEMENTS. SERVICE LETTER
MOS
24-JUL-2007
51 737-SL-52-042 MAIN LANDING GEAR DOOR. BULB SEAL ATTACHMENT. SERVICE LETTER
MOS
23-JUL-2007
SL 737-SL-52-043 STAB TRIM AND FLIGHT DECK DOOR CONTROL P8-47 PANEL -
ANNUNCIATOR. SERVICE LETTER
MOS
24-JAN-2008
SI. 737-SL-52-044 AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR
SNUBBER. SERVICE LETTER
MOS
22-DEC-2008
SL 737-SL-52-044 REV. A AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR
SNUBBER. SERVICE LETTER
MOS
19-JAN-2009
SL 737-SL-52-044 REV. 8 AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR RECOMMENDED
SNUBBER. SERVICE LETTER
11.10S
13-MAY-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 358 Of 748
@ Camp Systems
EFTA00618649
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-52-045 FORWARD ENTRY DOOR GUIDE ARM RADIUS LINKS PIN
SCREW. SERVICE LETTER
MOS
22-DEC-2008
51 737-SL-52-047 AVAILABILITY Of IMPROVEMENTS FOR AFT ENTRY. AFT SUPERSEDED
SERVICE AND FORWARD GALLEY DOOR SNUBBERS (SUPERSEDED BY SL 737-SL-52-047 REV. A). SERVICE LETTER
MOS
51 737-SL-52-047 REV. A AVAILABILITY OF IMPROVEMENTS FOR AFT ENTRY. AFT SERVICE AND FORWARD GALLEY DOOR SNUBBERS. RECOMMENDED
SERVICE LETTER
MOS
I8-AUG-2010
51 737-SL-52-048 AVAILABILITY OF IMPROVED FORWARD AND AFT CARGO RECOMMENDED
DOOR LATCH ASSEMBLIES. SERVICE LETTER
MOS
13-AUG-2009
51 737-SL-52-048 REV. A AVAILABILITY Of IMPROVED FORWARD AND AFT CARGO DOOR LATCH ASSEMBLIES. SERVICE LETTER INFORMATIONAL
MOS
25-MAR-2010
51 737-SL-52-049 AVAILABILITY Of IMPROVED EE BAY DOOR LATCH ASSEMBLY. SERVICE LETTER RECOMMENDED
MOS
08-DEC-2009
51 737-SL-52-049 REV. A AVAILABILITY OF IMPROVED EE BAY DOOR LATCH ASSEMBLY. SERVICE LETTER INFORMATIONAL
MOS
15-MAR-2010
51 737-SL-52-050 POTENTIAL DAMAGE TO THE FORWARD ENTRY DOOR SEAL AND SEAL RETAINER. SERVICE LETTER RECOMMENDED
MOS
08-FEB-2010
51 737-SL-52-051 SECURE FLIGHT DECK DOOR - DESIGN CHANGE FOR THE SOLENOID STRIKER LINK. SERVICE LETTER RECOMMENDED
MOS
06-AUG-20I0
51 737-SL-52-052 FORWARD AIRSTAIR ASSEMBLY - ACTUATOR GEAR- DISCREPANCY. SERVICE LETTER RECOMMENDED
MOS
07-OCT-2010
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 359 Of 748
@ Camp Systems
EFTA00618650
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-52-053 DURABILITY IMPROVEMENT FOR THE BEARING PLATE ON THE DOORSTOP PAD INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
I I -NOV-2010
SL 737-SL-52-054 POSSIBLE INCORRECTLY INSTALLED 0 -RING IN DOOR HANDLES IN THE FORWARD GALLEY. AFT GALLEY AND AFT SUPERSEDED
ENTRY DOORS (SUPERSEDED BY SL 737-SL-52-054 REV. A). SERVICE LETTER
MOS
SL 737-SL-52-054 REV. A POSSIBLE INCORRECTLY INSTALLED 0 -RING IN DOOR HANDLES IN THE FORWARD GALLEY. AFT GALLEY AND AFT RECOMMENDED
ENTRY DOORS. SERVICE LETTER
MOS
23-AUG-2011
SL 737-SL-52-05S DOORS - FORWARD AIRSTAIR - BALLSCREW - DISCREPANT MATERIAL. SERVICE LETTER RECOMMENDED
MOS
27-JAN-2011
SL 737-SL-52-057 FORWARD AIRSTAIRS -DOOR - CONTROLS - OCK PIN ACTUATOR- MODIFICATION. SERVICE LETTER RECOMMENDED
MOS
29-NOV-2011
SL 737-SL-52-058 "FORWARD AIRSTAIR - AFT HANDRAIL BRACKET - STRIKER RECOMMENDED
PLATE'. SERVICE LETTER
MOS
08-FEB-2012
SL 737-SL-52-080 FORWARD ENTRY DOOR PROXIMITY SENSOR TARGET UPGRADE. SERVICE LETTER RECOMMENDED
MOS
16-NOV-2012
SL 737-SL-53-047 NOSE RADOME DIVERTER STRIP ATTACHINSERT SEALING IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
22-DEC-2008 - (s)
SL 737-SL-53-048 POSSIBLE MISSING SEALANT COMMON TO A BSTA 727 BRACKET. SERVICE LETTER INFORMATIONAL
MOS
17-OCT-2000 - (s)
SL 737-SL-53-049 POSSIBLE MISLOCATED ELEVATOR CONTROL CABLE ISOLATION BLOCKS ON SECTION 43 SEAT TRACKS. SERVICE INFORMATIONAL
LETTER
MOS
29-SEP-2000 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 360 Of 748
@ Camp Systems
EFTA00618651
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-050 POSSIBLE CRACKS IN THE COUNTERSINKS OF FASTNER HOLES COMMON TO FRONT SPAR TO REAR SPAR INFORMATIONAL
UNDERWING PANELS. SERVICE LETTER
MOS 72 (s) 08-OCT-1999
20-SEP-2000
SL 737-SL-53-051 SKIN PANEL ASSEMBLY REPLACEMENT4AP JOINT FASTNER SIZE INSTALLATION. SERVICE LETTER INFORMATIONAL
MOS
04-OCT-2000 - (s)
SL 737-SL-53-051 REV. A SKIN PANEL ASSEMBLY REPLACEMENT-LAP JOINT FASTENER SIZE INSTALLATION. SERVICE LETTER
MOS
OI -SEP-2006
SL 737-SL-53-054 MISSING WING-TO-BODY FAIRING ELECTRICALLY BONDED FASTENERS. SERVICE LETTER INFORMATIONAL
MOS
30-OCT-2000 - (s)
SL 737-SL-53-055 MISSING FASTENERS COMMON TO EIS 420 STRINGER CLIPS AT S- 19FU22R/23R/24R. SERVICE LETTER RECOMMENDED
MOS
28-MAR-2002
SL 737-SL-53-056 ALLOWABLE FUSELAGE SKIN WRINKLING CRITERIA, SERVICE LETTER RECOMMENDED
MOS
22-AUG-2001 - (s)
SL 737-SL-53-056 REV. A ALLOWABLE FUSELAGE SKIN WRINKLING CRITERIA, SERVICE LETTER
MOS
I2-MAR-2002 -(s)
SL 737-SL-53-057 EXAMINATION OF BS1016 AFT PRESSURE BULKHEAD AND SURROUNDING SECTION 48 STRUCTURE. SERVICE
LETTER
MOS
25-SEP-2001 - (s)
SL 737-SL-53-058 POSSIBLE RIDING CONDITION BETWEEN FASTENER AND RUDDER PEDAL SHAFT NUT P/N BACN1ORF25. SERVICE INFORMATIONAL
LETTER
MOS
I6-NOV-2001 -
SL 737-SL-53-058 REV. A POSSIBLE RIDING CONDITION BETWEEN FASTENER AND RUDDER PEDAL SHAFT NUT P/N BACN1ORF25. SERVICE INFORMATIONAL
LETTER
MOS
I2-JUL-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 361 Of 748
@ Camp Systems
EFTA00618652
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-059 SECTION 48- MISSING STRINGER 2AL AND 2AR FASTENERS. SERVICE LETTER INFORMATIONAL
MOS
I5-JAN-2002 - Is)
SL 737-SL-53-060 GREASE EXTRUDING FROM THE SPLIT LINE OF THE BODY STATION 706 MAIN LANDING GEAR SUPPORT FITTING
ASSEMBLY.. SERVICE LETTER
MOS 6 (s)
I8-JUL-2002
51 737-SL-53-060 REV. A GREASE EXTRUDING FROM THE SPLIT LINE OF THE BODY STATION 706 MAIN LANDING GEAR SUPPORT FITTING
ASSEMBLY. SERVICE LETTER
MOS
28-MAR-2003 - (s)
51 737-SL-53-061 POSSIBLE INADEQUATE SEALING BETWEEN THE BODY STATION 1016 BULKHEAD WEB AND VERTICAL FIN ATTACH INFORMATIONAL
FITTING. SERVICE LETTER
MOS
72-APR-2002 - (s)
51 737-SL-53-062 MISSING FASTENERS COMMON TO FUSELAGE SKIN JUST FORWARD OF BS 1016 (SUPERSEDED BY SL 737-SL-53-062 SUPERSEDED
REV. A). SERVICE LETTER
MOS
- (s)
SL 737-SL-53-062 REV. A MISSING FASTENERS COMMON TO FUSELAGE SKIN JUST FORWARD OF BS 1016. SERVICE LETTER RECOMMENDED
MOS
30-JUL-2010
51 737-SL-53-064 MISSING FASTNERS COMMON TO BS 360 SHEAR TIE BETWEEN STRINGER 14R AND STRINGER 15R. SERVICE LETTER COMPLIED WITH
MOS 29-AUG-2011
31-MAR-2004 3533:32
AFL 863
51 737-SL-53-065 POSSIBLE TOOL MARK ON BSTA 178 BULKHEAD. SERVICE LETTER
MOS
06-MAY-2005
51 737-SL-53-066 REV. A CARGO COMPARTMENT CORROSION. SERVICE LETTER
MOS
29-JAN-2007
51 737-SL-53-067 TORLON CLIP-ON NUTS FOR FLOOR PANEL INSTALLATION. SERVICE LETTER
MOS
07-SEP-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 362 Of 748
@ Camp Systems
EFTA00618653
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-068 POSSIBLE TOOL MARKS ON PASSENGER WINDOW FRAMES. SERVICE LETTER
MOS
15-SEP-2005 •
SL 737-SL-53-069 BS 294.5 JACK PAD FITTING FASTENER HOLES DISCREPANCY. SERVICE LETTER
MOS
I4-JUL-2006
SL 737-SL-53-070 SECTION 41 DRAIN PATH PLUGGED. SERVICE LETTER
MOS
I4-JUL-2006
SL 737-SL-53-071 FUSELAGE SKIN WEAR DAMAGE FROM DORSAL FIN WEAR BETWEEN BS 851.5 TO 853.5. SERVICE LETTER
MOS
01-JUN-2007
SL 737-SL-53-072 POSSIBLE EXCESS THREAD PROTRUSION ON KEEL BEAM BOLTS AT BS540. WL150. LBL10 AND RBL10, SERVICE COMPLIED WITH
LETTER
MOS 22-AUG-2008
22-JUN-2007 3260:48
AFL 782
SI. 737-SL-53-072 REV. A POSSIBLE EXCESS THREAD PROTRUSION ON KEEL BEAM RECOMMENDED
BOLTS AT BS540. WL150. LBL10 AND RBL10. SERVICE LETTER
MOS
13-AUG-2009
SL 737-SL-53-073 MISSING FILLET SEAL AT VACUUM WASTE SERVICE PANEL SUPPORT STRUCTURE. SERVICE LETTER
MOS
25-JAN-2007
SL 737-SL-53-075 IN FLIGHT DEPARTURE OF VYING-TO-BODY FAIRING. AFT WHEEL WELL FAIRING PANEL. SERVICE LETTER
MOS
05-MAR-2007
SL 737-SL-53-075 REV. A IN FLIGHT DEPARTURE OF VYING-TO-BODY FAIRING. AFT
WHEEL WELL FAIRING PANEL. SERVICE LETTER
MOS
13-NOV-2007
AFL 1000 (s)
SL 737-SL-53-076 POSSIBLE MISSING FILLER IN MAIN ENTRY DOOR UPPER
SILLAT BS294.5. SERVICE LETTER
MOS
09-APR-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 363 Of 748
@ Camp Systems
EFTA00618654
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-077 POSSIBLE DRILL START MARKS IN THE OUTBOARD EDGE OF THE PIN 141A1116-10 FRAME WEB AND THE OUTBOARD
RADIUS OF THE PIN 141A1115-4 FAIL SAFE CHORD. SERVICE LETTER
MOS
I2-APR-2007
SL 737-SL-53-078 MAIN CABIN FLOOR BEAM CORROSION. SERVICE LETTER
MOS
I4-JUN-2007
SL 737-SL-53-078 REV. A MAIN CABIN FLOOR BEAM CORROSION (SUPERSEDED BY 737-SL-53-078 REV. B). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-53-078 REV. B MAIN CABIN FLOOR BEAM CORROSION. SERVICE LETTER
MOS
28-FEB-2008
SI. 737-SL-53-079 BOLTS INSTALLED WITH GAPS. MISSING WASHERS. AND COMPUED WITH
INCORRECT NUTS AT BS 727 AT S-19R AND S-19L.. SERVICE LETTER
MOS 22-AUG-2008
21-AUG-2007 3260:48
AFL 782
SL 737-SL-53-080 POSSIBLE DAMAGED HI-LOKS IN MAIN ENTRY DOOR UPPER
SILL AT BS303.90. SERVICE LETTER
MOS
04-OCT-2007
SL 737-SL-53-081 EXCESSIVE SEALANT IN NOSE LANDING GEAR HINGE
CAVITY, SERVICE LETTER
MOS
04-DEC-2007
SL 737-SL-53-082 TOOL MARK COMMON TO THE LOWER INBOARD EDGE OF
STRAP AT STRINGER 18A. SERVICE LETTER
MOS
09-OCT-2007
SL 737-SL-53-083 POSSIBLE GAP COMMON TO THE BODY STATION 203
WATERLINE 234 INNER CHORD SPUCE STRUCTURE (SUPERSEDED BY SL 737-SL-53-083 REV. A). SERVICE LETTER
MOS
09-NOV-2007
SL 737-SL-53-083 REV. A POSSIBLE GAP COMMON TO THE BODY STATION 203 WATERLINE 234 INNER CHORD SPLICE STRUCTURE SUPERSEDED
(SUPERSEDED BY SL 737-SL-53-083 REV. 8). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 364 Of 748
@ Camp Systems
EFTA00618655
AD/SI Status Report AIRCRAFT
COMP Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-083 REV. 8 POSSIBLE GAP COMMON TO THE BODY STATION 203 WATERLINE 234 INNER CHORD SPLICE STRUCTURE. SERVICE RECOMMENDED
LETTER
MOS
23-MAR-2012
a 737-SL-53-084 EXTERNAL GROUND POWER RECEPTACLE SKIN AND
DOUBLER - PREVENTIVE MODIFICATION. SERVICE LETTER
MOS
10-MAR-2008
SL 737-SL-53-085 MISSING AND MISLOCATED FASTENERS IN SECTION 48 SKIN RECOMMENDED
ASSEMBLY AT APPROXIMATELY STA 1088. S-20L AND S-20R, SERVICE LETTER
MOS
II -JAN-2010
a 737-SL-53-088 POSSIBLE MISSING STIFFENER IN TRANSVERSE FLOOR BEAM
AT BS 344. RBL 54.6.. SERVICE LETTER
MOS
03-OCT-2008
SL 737-SL-53-089 REPLACEMENT OF INSULATION BLANKET ATTACHMENT TCLAMPS! SUPERSEDED
SPRING CLIPS WITH BOND-ON PINS AT THE MAIN LANDING SUPPORT FRAME STA 695 AND 716 ABOVE S-17.
(SUPERSEDED BY 737-SL-53-089 REVA), SERVICE LETTER
MOS
I9-DEC-2008
SL 737-SL-53-089 REV. A REPLACEMENT OF INSULATION BLANKET ATTACHMENT T-CLAMPS/SPRING CLIPS WITH BOND-ON PINS AT THE MAIN
LANDING SUPPORT FRAME STA 695 AND 716 ABOVE S-17. SERVICE LETTER
MOS
29-JUN-20I0
SL 737-SL-53-090 SEAL VOIDS AT BS 1016 AND BS 1088 VERTICAL FIN LUGS (SUPERSEDED BY a 737-SL-53-090 REV. A). SERVICE RECOMMENDED
LETTER
MOS
24-APR-2009
a 737-SL-53-090 REV. A SEAL VOIDS AT BS 1016 AND BS 1088 VERTICAL FIN LUGS. SERVICE LETTER RECOMMENDED
MOS
08-FEB-20I3
a 737-SL-53-091 EXCESSIVE SEALANT IN APU DOOR HINGE CORNERS. SERVICE LETTER RECOMMENDED
MOS
02-JUL-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 365 Of 748
@ Camp Systems
EFTA00618656
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-093 LOWER AIRSTAIR SILL INSTALLATION GAPPING ON AIRCRAFT WITH AIRSTAJRS AND WITHOUT AIRSTAIRS. SERVICE RECOMMENDED
LETTER
MOS
22-DEC-2010
SL 737-SL-53-095 POSSIBLE MISSING FASTENERS FROM A GUSSET ASSY AND ANGLE ASSY AT FORWARD INBOARD CORNER OF WALL RECOMMENDED
SURROUNDING WASTE TANK IN AFT CARGO BAY. SERVICE LETTER
MOS
12-NOv-2010
SL 737-SL-53-097 POTENTIALLY INSUFFICIENT GRIP LENGTH FOR FLIGHT DECK FORWARD PANEL SUPPORT FASTENERS AT STA RECOMMENDED
20.1.v.1208.RBL 8 LBL 29. SERVICE LETTER
MOS
25-APR-2011
SL 737-SL-53-098 "AIR STAIR DOOR JUMPER POSSIBLY INSTALLED INCORRECTLY'. SERVICE LETTER RECOMMENDED
MOS
20-SEP-201i
SL 737-SL-53-099 DIFFICULTY CLOSING AND OPENING THE 141A5130-21 ALTERNATE GEAR EXTENSION DOOR ASSEMBLY DUE TO RECOMMENDED
POSSIBLE INTERFERENCE (SUPERSEDED BY SL 737-SL-53-099 REV. A). SERVICE LETTER
MOS
09-APR-2012
SL 737-SL-53-099 REV. A DIFFICULTY CLOSING AND OPENING THE 141A5130-21 ALTERNATE GEAR EXTENSION DOOR ASSEMBLY DUE TO RECOMMENDED
POSSIBLE INTERFERENCE. SERVICE LETTER
MOS
08-APR-2013
SL 737-SL-53-100 POTENTIAL DRILL STARTS COMMON TO BS 540 FRAME. SERVICE LETTER RECOMMENDED
MOS
13-APR-2012
SL 737-SL-53-101 POTENTIAL GOUGES FOUND AT BSTA 727 BULKHEAD FRAME. LBL AND RBL 10 (SUPERSEDED BY SL 737-SL-53-101 SUPERSEDED
REV. A). SERVICE LETTER
MOS
SL 737-SL-53-10i REV. A POTENTIAL GOUGES FOUND AT BSTA 727 BULKHEAD FRAME. LBL AND RBL 10. SERVICE LETTER RECOMMENDED
MOS
07-AUG-2012
SL 737-SL-53-102 POTENTIALLY MISSING NAS1368 GROMMETS AT STA312 AND STA328. TRANSVERSE FLOOR BEAM. SERVICE LETTER RECOMMENDED
MOS
18-SEP-2012
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 366 Of 748
Camp Systems
EFTA00618657
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-53-103 BS 578 T0639 STUB BEAM FASTENERS MISSING COUNTER BORE WASHER (SUPERSEDED BY SL 737-SL-53-103 REV. SUPERSEDED
A). SERVICE LETTER
MOS
SL 737-SL-53-103 REV. A BS 578 TO 639 STUB BEAM FASTENERS MISSING COUNTER BORE WASHER. SERVICE LETTER RECOMMENDED
MOS
19-AUG-2013
SL 737-SL-53-104 CLEARING FALSE-POSITIVE CHEM-MILL CRACK INDICATIONS. SERVICE LETTER RECOMMENDED
MOS
29-APR-2013
SL 737-SL-53-105 POSSIBLE INADEQUATE SEALANT COMMON TO THE BS 887 RECOMMENDED
STRINGER SPLICES. SERVICE LETTER
MOS
30-JAN-2014
SL 737-SL-53-106 X-BAND RADOME MOISTURE INGRESSION. SERVICE LETTER RECOMMENDED
MOS
25-FEB-2014
SL 737-SL-54-019 POTENTIAL MISSING PRIMER FROM NACELLE STRUT DIAGONAL BRACE. SERVICE LETTER INFORMATIONAL
MOS 60 (s) 08-OCT-1999
27-APR-1999
SL 737-SL-54-021 AFT STRUT MIRING PANEL HEAT DAMAGE. SERVICE LETTER INFORMATIONAL
MOS
23-JAN-2004
SL 737-SL-55-019 VERTICAL STABILIZER AFT REAR SPAR-PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER
DAYS 180(s)
SL 737-SL-55-019 REV. A VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
DAYS 180(s)
04-MAR-2002
SL 737-SL-55-019 REV. B VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
MOS 180(s)
02-MAY-2005
SL 737-SL-55-019 REV. C VERTICAL STABILIZER REAR SPAR SHIM MIGRATION (SUPERSEDED BY SL 737-SL-55-019 REV. 0). SERVICE LETTER SUPERSEDED
MOS
- (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 367 Of 748
@ Camp Systems
EFTA00618658
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-55-019 REV. D VERTICAL STABILIZER REAR SPAR SHIM MIGRATION (SUPERSEDED BY SL 737-SL-55-019 REV. E). SERVICE LETTER SUPERSEDED
MOS
- Is)
SL 737-SL-55-019 REV. E VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER RECOMMENDED
MOS 24 (s)
7-JUN-2014
AFL 4800
SL 737-SL-55-019 STEP 1 VERTICAL STABILIZER AFT REAR SPAR - PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER INFORMATIONAL
MOS
01-JAN-2000 - (s)
SL 737-SL-55-019 STEP 5 VERTICAL STABILIZER AFT REAR SPAR - PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER RECOMMENDED
MOS
01-JAN-2000 - (s)
SL 737-SL-55-020 HORIZONTAL STABILIZER HINGE PIN BUSHING RETAINER MISSING. SERVICE LETTER INFORMATIONAL
MOS
C6-JUL-2001 - (s)
SL 737-SL-55-021 CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE ON ELEVATOR TAB EXTERIOR. SERVICE LETTER INFORMATIONAL
MOS
05-MAR-2002 -(s)
SL 737-SL-55-021 REV. A CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE ON ELEVATOR TAB EXTERIOR. SERVICE LETTER INFORMATIONAL
MOS
10-MAY-2002 - (8)
SL 737-SL-55-023 VERTICAL STABILIZER REAR SPAR ATTACHMENT-POSSIBLE INCORRECT SPACER INSTALLATION AND FITTING INFORMATIONAL
DAMAGE. SERVICE LETTER
MOS
25-SEP-2003
SL 737-SL-55-024 HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
MOS 24 (s)
25-SEP-2003
SL 737-SL-55-024 REV. A HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
MOS 24 (s)
03-NOV-2003
SL 737-SL-55-024 REV. B HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
MOS 24 (s)
12-N0V-2003
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 368 Of 748
@ Camp Systems
EFTA00618659
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-55-024 REV. C HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER
MOS 24 (s)
12-SEP-2005
SL 737-SL-55-025 HORIZONTAL STABILIZER REMOVABLE LEADING EDGE ASSEMBLY REWORK, SERVICE LETTER
MOS
18-DEC-2006
SL 737-SL-55-025 REV. A HORIZONTAL STABILIZER REMOVEABLE LEADING EDGE ASSEMBLY REWORK. SERVICE LETTER
MOS
I2-JUN-2008
SL 737-SL-55-026 HORIZONTAL STABILIZER AND HORIZONTAL STABILIZER CENTER SECTION MIGRATED BUSHING INSPECTION.
SERVICE LETTER
MOS
21-MAY-2007
SL 737-SL-55-027 HORIZONTAL STABILIZER FRONT SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK. SERVICE LETTER
MOS
12-APR-2007
SL 737-SL-55-028 HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK (SUPERSEDED BY SL SUPERSEDED
737-SL-55-028 REV. A). SERVICE LETTER
MOS
SI. 737-SL-55-028 REV. A CANCELLED - HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK SUPERSEDED
(SUPERSEDED BY SL 737-SL-55-028 REV. 8). SERVICE LETTER
MOS
SI. 737-SL-55-028 REV. 8 CANCELLED - HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK. SERVICE CANCELLED
LETTER
MOS
C6-JUN-20I2
SL 737-SL-55-029 GAP BETWEEN DORSAL FIN AND VERTICAL STABILIZER. SERVICE LETTER
MOS
24-APR-2007
SL 737-SL-55-030 USE OF POLYURETHANE PROTECTIVE TAPE FOR EROSION RECOMMENDED
PROTECTION ON HF ANTENNA. SERVICE LETTER
MOS
21-MAY-2009
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 369 Of 748
@ Camp Systems
EFTA00618660
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-55-031 IMPROVEMENTS FOR EROSION PROTECTION OF HF ANTENNA FIBERGLASS PANEL LEADING EDGE. SERVICE LETTER RECOMMENDED
MOS
31-JUL-2010
SI. 737-SL-55-033 HORIZONTAL STBILIZER AND HORIZONTAL STABILIZER CENTER SECTION DAMAGED BUSHING ASSESSMENT. RECOMMENDED
SERVICE LETTER
MOS
I8-MAR-2014
SL 737-SL-56-01I INABILITY TO OPEN CO-PILOTS RIGHT HAND NUMBER 2 SLIDING WINDOW WITH EMERGENCY EXIT RELEASE INFORMATIONAL
HANDLE. SERVICE LETTER
MOS
26-AUG-2004
SL 737-SL-56-012 AVAILICABILITY OF IMPROVED PASSENGER WINDOW ASSEMBLY TO REDUCE FOGGING.. SERVICE LETTER
MOS
I3-APR-2006
SL 737-SL-56-013 AVAILABILITY OF IMPROVED DOOR WINDOW ASSEMBLY TO REDUCE FOGGING. SERVICE LETTER
MOS
28-JUN-2007
SL 737-SL-56-014 AVAILABILITY OF NUMBER 2 TRANSPARENCY WITH IMPROVED TEMPERATURE SENSOR WIRE ROUTING AND RECOMMENDED
INTERNAL CONNECTION. SERVICE LETTER
MOS
29-JUL-2013
SL 737-SL-57-074 AILERON BALANCE PANEL FASTENERS. SERVICE LETTER RECOMMENDED
MOS
I2-JUN-2000 - (s)
SL 737-SL-57-075 WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB-IMPROVED NUT LOCKINF MECHANISMS. RECOMMENDED
SERVICE LETTER
MOS
07-SEP-2000 - (s)
SL 737-SL-57-075 REV. A WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB-IMPROVED NUT LOCKINF MECHANISMS. RECOMMENDED
SERVICE LETTER
MOS
04-OCT-2000 - (s)
SL 737-SL-57-075 REV. E WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB - IMPROVED NUT LOCKING MECHANISMS. RECOMMENDED
SERVICE LETTER
MOS
25-SEP-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 370 Of 748
@ Camp Systems
EFTA00618661
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-57-075 REV. F WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB - IMPROVED NUT LOCKING MECHANISIM.
SERVICE LETTER
MOS
I8-FEB-2002 - (s)
51 737-SL-57-077 WING TRAILING EDGE OUTBOARD AND INBOARD FLAP INSTALLATION. DESIGNANSTALLATION IMPROVEMENTS TO INFORMATIONAL
THE CARRIAGE AND GIMBAL ASSEMBLIES.. SERVICE LETTER
MOS
07-AUG-2001 - (s)
51 737-SL-57-078 LOOSE FASTNERS IN THE AFT FLAP PROGRAMMING TRACKS. SERVICE LETTER INFORMATIONAL
MOS
I4-NOV-2001 - (s)
51 737-SL-57-079 WING TRAILING EDGE - INBOARD FIXED PANEL INTERFERENCE WITH GROUND SPOILERS. SERVICE LETTER INFORMATIONAL
MOS
I4-NOV-2001 - (s)
51 737-SL-57-080 INBOARD AFT FLAP LOWER SERVICE FOREIGN OBJECT DEBRIS (FCC) PROTECTION. SERVICE LETTER INFORMATIONAL
MOS
01-JUL-2002 - (s)
51 737-SL-57-080 REV. A 737-NG INBOARD AFT FLAP LOWER SURFACE FOREIGN OBJECT DEBRIS (F0D) PROTECTION. SERVICE LETTER INFORMATIONAL
MOS
09-JAN-2003
SI. 737-SL-57-081 INBOARD TRAILING EDGE FLAP. MAIN INBOARD TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. INFORMATIONAL
SERVICE LETTER
MOS 6 (s)
03-OCT-2003
AFL 1000
SL 737-SL-57-081 REV. A 737NG INBOARD TRAILING EDGE FLAP. MAIN INBOARD TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. INFORMATIONAL
SERVICE LETTER
MOS
24-AUG-2004 - (s)
SL 737-SL-57-081 REV. B 737NG INBOARD TRAILING EDGE FLAP. MAIN INBOARD
TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. SERVICE LETTER
MOS
I3-NOV-2008
SL 737-SL-57-082 WING TRAILING EDGES INBOARD MAIN FLAP AND OUTBOARD AFT FLAP DISBONDS. SERVICE LETTER
MOS
I6-MAY-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 371 Of 748
@ Camp Systems
EFTA00618662
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-57-082 REV. A WING TRAILING EDGE - INBOARD MAIN FLAP AND SUPERSEDED
OUTBOARD AFT FLAP DISBONDS (SUPERSEDED BY SL 737-SL-57-082 REV. B). SERVICE LETTER
MOS
51 737-SL-57-082 REV. B WING TRAILING EDGE - INBOARD MAIN FLAP AND OUTBOARD AFT FLAP DISBONDS. SERVICE LETTER RECOMMENDED
MOS
09-SEP-2013
51 737-SL-57-083 LEADING EDGE SLAT ASSEMBLY PART NUMBER IDENTIFICATION. SERVICE LETTER NOT APPLICABLE
MOS
06-OCT-2005
51 737-SL-57-084 FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER
MOS
15-DEC-2005
51 737-SL-57-084 REV. A FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER
MOS
28-MAR-2006
SL 737-SL-57-084 REV. B FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER COMPLIED WITH - IA.W. AD 2007-18-52
MOS 05-SEP-2007
10-JUL-2007 2971:33
AFL 703
51 737-SL-57-084 REV. C FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN (SUPERSEDED BY 737-SL-57-084-0). SERVICE LETTER SUPERSEDED
MOS
01-FEB-2010
SL 737-SL-57-084 REV. D FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER
MOS
07-JUN-2010
51 737-SL-57-085 MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. A). SERVICE LETTER SUPERSEDED
MOS
51 737-SL-57-085 REV. A MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. B). SERVICE LETTER SUPERSEDED COMPLIED WITH
MOS 28-SEP-2009
3378:04
AFL 812
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 372 Of 748
@ Camp Systems
EFTA00618663
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-57-085 REV. B MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. C). SERVICE LETTER SUPERSEDED
MOS
51 737-SL-57-085 REV. C MESH GASKETS FOR FUEL TANK ACCESS DOORS. SERVICE LETTER RECOMMENDED
MOS
28-OCT-2011
51 737-SL-57-087 INBOARD MAIN FLAP -AFT FLAP DRIVE BUSHING. SERVICE LETTER
MOS
23-JUL-2007
SL 737-SL-57-088 SLAT TRAILING EDGE WEDGE WEAR. SERVICE LETTER
MOS
IO-OCT-2007
SL 737-SL-57-088 REV. A SLAT TRAILING EDGE WEDGE WEAR. SERVICE LETTER
MOS
24-MAR-2008
51 737-SL-57-089 SLAT TRACK CAN/HOUSING - INADVERTENT DAMAGE. SERVICE LETTER
MOS
22-FEB-2008
51 737-SL-57-090 COSMETIC FINISH CRACK OF WINGLET TRAIUNG EDGE. SERVICE LETTER RECOMMENDED
MOS
08-DEC-2009
51 737-SL-57-093 SPAR CORROSION COMMON TO MAIN FUEL TANK BOOST PUMP BONDING JUMPERS. SERVICE LETTER INFORMATIONAL
MOS
21-APR-2010
51 737-SL-57-094 WING FIXED TRAILING EDGE PANEL ELECTRIC BONDING WASHERS. SERVICE LETTER RECOMMENDED
MOS
07-SEP-2010
51 737-SL-57-095 MID SPAN FIXED TRAILING EDGE TURNBUCKLE CLEVIS INSTALLATION. SERVICE LETTER RECOMMENDED
MOS
04-NOV-20I0
51 737-SL-57-097 AFT ROLLER BEARING. OUTBOARD FLAP INBOARD CARRAIGE. SERVICE LETTER RECOMMENDED
MOS
06-SEP-2011
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 373 Of 748
@ Camp Systems
EFTA00618664
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-57-098 737NG MAIN FLAP TRACKS UPPER AND LOWER FLANGES WEAR COMMON TO ROLLER CONTACT SURFACES. RECOMMENDED
SERVICE LETTER
MOS
06-SEP-2011
51 737-SL-57-099 WING LEADING EDGE? SLAT DETENT ARM AND ROLLER ALIGNMENT (SUPERSEDED BY 51737-SL-57-099 REV. A), RECOMMENDED
SERVICE LETTER
MOS
28-FEB-2012
51 737-SL-57-099 REV. A WING LEADING EDGE SLAT 4 AND 5 DETENT ARM AND ROLLER RECOMMENDED
ALIGNMENT. SERVICE LETTER
MOS
18-JUN-2012
SL 737-SL-57-101 WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE COMMON TO BEARING AND RUB PADS. SERVICE LETTER RECOMMENDED
MOS
26-JUN-2012
51 737-SL-57-101 REV. A WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE COMMON TO BEARING AND RUB PADS (SUPERSEDED BY SL SUPERSEDED
737-SL-57-101 REV. B). SERVICE LETTER
MOS
51 737-SL-57-101 REV. B WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE, SERVICE LETTER RECOMMENDED
MOS
20-SEP-2013
51 737-SL-57-102 MLG FORWARD TRUNNION FITTING BEARING RETAINING NUT INSPECTION. SERVICE LETTER RECOMMENDED
MOS
06-SEP-2012
51 737-SL-57-103 POSSIBLE INCORRECT OR MISSING FASTENERS IN THE WING CENTER SECTION REAR SPAR. SERVICE LETTER RECOMMENDED
MOS
19-DEC-2012
51 737-SL-57-104 POSSIBLE LOOSE HARDWARE ON UPPER TRAILING EDGE PANEL SUPPORT. SERVICE LETTER RECOMMENDED
MOS
19-APR-2013
SL 737-SL-57-106 LH AND RH WING NACELLE SUPPORT OUTBOARD SIDELOAD BACKUP FITTING - MISSING FILLET SEAL (SUPERSEDED SUPERSEDED
BY SL 737-SL-57-106 REV. A). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 374 Of 748
@ Camp Systems
EFTA00618665
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-57-106 REV. A U-I AND RH WING NACELLE SUPPORT OUTBOARD SIDELOAD BACKUP FITTING - MISSING FILLET SEAL. SERVICE RECOMMENDED
LETTER
MOS
07-NOV-20I3
SL 737-SL-57-107 FRONT SPAR WEB CORROSION PREVENTION (SUPERSEDED BY SL 737-SL-57-107 REV. A). SERVICE LETTER SUPERSEDED
MOS
51 737-SL-57-107 REV. A FRONT SPAR WEB CORROSION PREVENTION. SERVICE LETTER RECOMMENDED
MOS
30-SEP-2013
51 737-SL-57-108 FRONT SPAR LEADING EDGE STRAP CORROSION PREVENTION, SERVICE LETTER RECOMMENDED
MOS
20-SEP-2013
51 737-SL-57-109 RESTORATION OF ANTI-STATIC COATING COMMON TO THE AILERON FAIRINGS. SERVICE LETTER RECOMMENDED
MOS
10-OCT-2013
SL 737-SL-71-028 REV. A 737 ENGINE INLET HAZARD ZONE BOUNDRIES PAINTED ON RAMP SURFACES. SERVICE LETTER INFORMATIONAL
MOS
25-APR-2002 - Is)
51 737-SL-71-047 ENGINE COWLING PLACARD REVISION, SERVICE LETTER RECOMMENDED
MOS
I3-JAN-2000 - (s)
51 737-SL-71-047 REV. A ENGINE COWLING PLACARD REVISION. SERVICE LETTER INFORMATIONAL
MOS
03-OCT-2000 - (s)
51 737-SL-71-049 THRUST LINK DESIGN IMPROVEMENT-INTRODUCTION OF ANTI-ROTATION WASHER. SERVICE LETTER RECOMMENDED
MOS
0I -JUN-2001 - (s)
51 737-SL-71-050 INCORRECT GRIP LENGTH OF AFT ENGINE MOUNT BOLTS. SERVICE LETTER RECOMMENDED
MOS
05-SEP-2001 - Is)
51 737-SL-71-050 REV. A INCORRECT GRIP LENGTH OF AFT ENGINE MOUNT BOLTS. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 375 Of 748
@ Camp Systems
EFTA00618666
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-71-05I SPLIT DUCT PRESSURE DURING HIGH POWER ENGINE OPERATION. SERVICE LETTER INFORMATIONAL
MOS
I9-OCT-2001 - (s)
51 737-SL-71-053 INLET COWL LIPSKIN CORROSION PREVENTION. SERVICE LETTER
MOS
04-AUG-2003
51 737-SL-71-053 REV. A INLET COWL LIPSKIN CORROSION PREVENTION.. SERVICE LETTER
MOS
23-MAR-2005
51 737-SL-71-054 ENGINE FAN CASE BRACKET IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
30-SEP-2003
51 737-SL-71-054 REV. A ENGINE FAN CASE BRACKET IMPROVEMENT, SERVICE LETTER
MOS
20-NOV-2007
51 737-SL-71-055 ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. A), SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-71-055 REV. A ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. 8), SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-71-055 REV. 8 ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. C). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-71-055 REV. C ENGINE FIRE DETECTOR WIRE ROUTING CHANGE. SERVICE LETTER RECOMMENDED
MOS
03-OCT-2012
SL 737-SL-71-056 GROUND SUPPORT EQUIPMENT(GSE) FITTING ASSEMBLY FOR AFT BOOTSTRAP EQUIPMENT. SERVICE LETTER
MOS
20-MAY-2005
SL 737-SL-71-057 FORWARD ENGINE MOUNT DESIGN IMPROVEMENT -
INTRODUCTION OF ANTI-ROTATION WASHER, SERVICE LETTER
MOS
08-OCT-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 376 Of 748
@ Camp Systems
EFTA00618667
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-71-058 POWER FEEDER WIRE BUNDLE CHAFED AGAINST FAN COWL HINGE BRACKET. SERVICE LETTER
MOS
24-AUG-2066
SL 737-SL-71-059 ENGINE COWL ANTI-ICE DUCT BOLT RETENTION DISCREPANCY. SERVICE LETTER
MOS
SL 737-SL-71-059 REV. A ENGINE COWL ANTI-ICE DUCT BOLT RETENTION DISCREPANCY. SERVICE LETTER
MOS
SI. 737-SL-71-059 REV. 8 ENGINE COWL ANTI-ICE DUCT BOLT RETENTION
DISCREPANCY. SERVICE LETTER
MOS
04-APR-2008 500(s)
SI. 737-SL-71-061 INCORRECT MATERIAL USED FOR BACP18BC03808P COTTER SUPERSEDED
PINS INSTALLED ON ENGINE MOUNTS. SERVICE LETTER
MOS
- (s)
SL 737-SL-71-061 REV. A INCORRECT MATERIAL USED FOR BACP18BC03808P COTTER PINS INSTALLED ON ENGINE MOUNTS. SERVICE RECOMMENDED
LETTER
MOS
30-SEP-2009 4000(s)
SL 737-SL-71-062 ENGINE-MOUNTED FAN COWL RADIAL SUPPORT BRACKET RECOMMENDED
IMPROVEMENT. SERVICE LETTER
MOS
12-OCT-2009
SL 737-SL-71-064 INLET COWL LIPSKIN FASTENER IMPROVEMENTS. SERVICE LETTER RECOMMENDED
MOS
18-DEC-2013
SL 737-SL-71-065 IMPROVED COWL THERMAL ANTI-ICE (CTAI) DUCT. SERVICE LETTER RECOMMENDED
MOS
27-MAR-2014
SL 737-SL-72-009 REDUCED INSPECTION INTERVAL FOR THE AFT SUMP CHIP DETECTOR - CFM56-7B ENGINES. SERVICE LETTER RECOMMENDED
MOS
22-FEB-1999 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 377 Of 748
@ Camp Systems
EFTA00618668
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-72-010 ENGINE FAN BLADE LUBRICATION RECOMMENDATION. SERVICE LETTER
MOS
28-NOV-2001 - Is)
St 737-SL-72-010 REV. A ENGINE FAN BLADE LUBRICATION RECOMMENDATION, SERVICE LETTER INFORMATIONAL
MOS
05-NOV-2002
St 737-SL-72-012 CFM56-7BE ENGINE INTRODUCTION (SUPERSEDED BY SL 737-SL-72-012 REV. A). SERVICE LETTER SUPERSEDED
MOS
St 737-SL-72-012 REV. A CFM56-7BE ENGINE INTRODUCTION. SERVICE LETTER RECOMMENDED
MOS
21-DEC-2011
St 737-SL-73-013 CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
04-AUG-1998 - (s)
St 737-SL-73-013 REV. A CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
08-OCT-1999 - (s)
St 737-SL-73-013 REV. B CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
08-FEB-1999 - (s)
St 737-SL-73-013 REV. C CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
I9-JAN-2000 - (s)
St 737-SL-73-013 REV. D CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
21-JUN-2060 - (8)
SI. 737-SL-73-013 REV. E CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
19-DEC-2000 - Is/
St 737-SL-73-013 REV. F CFM56-78 ENGINE ECC SOFTWARE AND HARDWARE INTERCHANGEABILITY, SERVICE LETTER INFORMATIONAL
MOS
26-SEP-2001 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 378 Of 748
@ Camp Systems
EFTA00618669
AD/SI Status Report AIRCRAFT
CORP
As man wire„veland up 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-73-013 REV. G CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
I7-OCT-2001 - Is)
51 737-SL-73-013 REV. H CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2002
51 737-SL-73-013 REV. I CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER
MOS 6 (s)
28-APR-2003
51 737-SL-73-013 REV. J CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER
MOS
05-MAR-2004
51 737-SL-73-013 REV. K CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
03-MAR-2005
51 737-SL-73-013 REV. L CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER
MOS
07-SEP-2005
51 737-SL-73-013 REV. M CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER
MOS
28-MAR-2006
51 737-SL-73-013 REV. N CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER
MOS
01-JUN-2007
SL 737-SL-73-013 REV. 0 CFM56-7B ENGINE EEC SOFTWARE AND HARDWARE COMPLIED WITH
INTERCHANGEABILITY. SERVICE LETTER
MOS 22-AUG-2008
04-OCT-2007 3260:48
AFL 782
SL 737-SL-73-013 REV. P CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE
INTERCHANGEABILITY, SERVICE LETTER
MOS
28-NOV-2007
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 379 Of 748
@Camp Systems
EFTA00618670
AD/SI Status Report AIRCRAFT
CORP
As man wire„veland up 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-73-013 REV. R CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE
INTERCHANGEABILITY. SERVICE LETTER
MOS
03-JUN-2008
SL 737-SL-73-013 REV. S CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE SUPERSEDED
INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-73-013 REV. T). SERVICE LETTER
MOS
SL 737-SL-73-013 REV. T CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-73-013 REV. SUPERSEDED
U). SERVICE LETTER
MOS
SL 737-SL-73-013 REV. U CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED
MOS
22-JUL-2014
SL 737-SL-73-014 ENGINE RATING CHECK. SERVICE LETTER RECOMMENDED
MOS
12-AUG-1998 - (s)
SL 737-SL-73-017 HYDRO-MECHANICAL UNIT P/N 1853M56P08. SERVICE LETTER
MOS
13-MAR-2002 - (s)
SI. 737-SL-73-018 IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH. TO REDUCE FALSE ENGINE FUEL FILTER BYPASS SUPERSEDED
WARNING LIGHT INDICATIONS (SUPERSEDED BY SL 737-SL-73-018 REV. A). SERVICE LETTER
MOS
SL 737-SL-73-018 REV. A IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH TO REDUCE FALSE ENGINE FUEL FILTER BYPASS SUPERSEDED
WARNING LIGHT INDICATIONS (SUPERSEDED BY SL 737-SL-73-018 REV. B). SERVICE LETTER
MOS
SL 737-SL-73-018 REV. B IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH RECOMMENDED
TO REDUCE FALSE ENGINE FUEL FILTER BYPASS WARNING
LIGHT INDICATIONS. SERVICE LETTER
MOS
06-SEP-2012
SL 737-SL-73-019 DIODE DECALS MAY BE INCORRECTLY LABELED. (SUPERSEDED BY SL 737-SL-73-019 REV. A). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 380 Of 748
@Camp Systems
EFTA00618671
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-73-019 REV. A DIODE DECALS MAY BE INCORRECTLY LABELED.. SERVICE LETTER RECOMMENDED
MOS
I8-SEP-2012
51 737-SL-76-020 ENGINE START BRAKE ASSEMBLY SWITCH IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
29-NOV-1999 - (s)
51 737-SL-76-021 AUTOTHROTTLE SWITCHPACK - IMPROVED WIRE ROUTING. SERVICE LETTER INFORMATIONAL
MOS
27-NOV-2001 - Is)
51 737-SL-76-021 REV. A AUTOTHROTTLE SWITCHPACK - IMPROVED WIRE ROUTING. SERVICE LETTER INFORMATIONAL
MOS
I 7-JAN-2002 - (s)
51 737-SL-76-022 CRACKED ROLLER IN REVERSE THRUST LEVER ASSEMBLY. SERVICE LETTER
MOS
I3-DEC-2007
51 737-SL-77-014 AIRBORNE VIBRATION MONITORING (AVM) SIGNAL CONDITIONER IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
29-JUN-1998 - (s)
51 737-SL-77-015 . SERVICE LETTER INFORMATIONAL
MOS
21-MAY-1999 -(s)
51 737-SL-77-015 REV. A ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY. SERVICE LETTER INFORMATIONAL
MOS
26-JUN-2060 - (s)
51 737-SL-77-015 REV. 8 ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY SERVICE LETTER. INFORMATIONAL
SERVICE LETTER
MOS
26-JUN-2000 - (s)
St 737-SL-77-015 REV. C ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY SERVICE LETTER. INFORMATIONAL
SERVICE LETTER
MOS
26-APR-2001 - (s)
SL 737-SL-77-015 REV. D ENGINE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL
MOS
I2-APR-2002 - (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 381 Of 748
@ Camp Systems
EFTA00618672
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-77-015 REV. E ENGINE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGEABILITY. SERVICE LETTER
MOS
I 3-JAN-2004
SI. 737-SL-77-015 REV. F ENGINE VIBRATION MONITORING SIGNAL CONDITIONER RECOMMENDED
INTERCHANGEABILITY. SERVICE LETTER
MOS
02-OCT-2009
SL 737-SL-77-016 AIRPLANE OPERATION WITH ENGINE NUMBER 1 BEARING VIBRATION SENSOR DEACTIVATED. SERVICE LETTER INFORMATIONAL
MOS
21-SEP-1999 - Is)
SL 737-SL-77-018 ADVANCED AIRBORNE VIBRATION MONITOR. SERVICE LETTER RECOMMENDED
MOS
I9-NOV-2009
SL 737-SL-78-041 . SERVICE LETTER INFORMATIONAL
MOS
27-MAY-1999 - (s)
SL 737-SL-78-041 REV. A AUTO THROTTLE SWITCH PACK IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
I7-SEP-1999 - (s)
SL 737-SL-78-042 T/R INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER INFORMATIONAL
MOS
I0-SEP-1999 - Is)
SL 737-SL-78-042 REV. A T/R INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER
MOS
- Is)
SL 737-SL-78-042 REV. B THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER
MOS
II -MAR-2002 -(s)
SL 737-SL-78-042 REV. C THRUST REVERSER INSULATION BLANKET INTERFERENCE SUPERSEDED
WITH ENGINE COMPONENTS (SUPERSEDED BY SL 737-SL-78-042 REV. O). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 382 Of 748
@ Camp Systems
EFTA00618673
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-042 REV. D THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS (SUPERSEDED BY SL SUPERSEDED
737-SL-78-042 REV. E). SERVICE LETTER
MOS
St 737-SL-78-042 REV. E THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS (SUPERSEDED BY St SUPERSEDED
737-SL-78-042 REV. F). SERVICE LETTER
MOS
St 737-SL-78-042 REV. F THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER RECOMMENDED
MOS
I6-APR-2014
St 737-SL-78-044 REV. 8 INCORRECT DOUBLE FLUSH RIVET INSTALLATION ON FAN DUCT COWL AND THRUST REVERSER AFT COWL. INFORMATIONAL
SERVICE LETTER
MOS
10-JUL-2001 - (s)
St 737-SL-78-045 THRUST REVERSER SYSTEM - HINGE FITTING MIS-LOCATION. EXAMINATION AND RE-ALIGNMENT. SERVICE LETTER INFORMATIONAL
MOS
14-AUG-2000 - (s)
St 737-SL-78-048 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER INFORMATIONAL
MOS
24-SEP-2001 - (s)
St 737-SL-78-048 REV. A THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER INFORMATIONAL
MOS
25-FEB-2004
St 737-SL-78-048 REV. 8 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER COMPLIED WITH
MOS 07-SEP-2005
05-MAY-2005 2202:24
AFL 541
St 737-SL-78-048 REV. C THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER INFORMATIONAL
MOS
14-SEP-2005
St 737-SL-78-048 REV. 0 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER
MOS
08-DEC-2005
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 383 Of 748
@ Camp Systems
EFTA00618674
AD/SI Status Report AIRCRAFT
C a liP tAt enand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-049 TROUBLESHOOTING OF THRUST REVERSER SYSTEM ANOMALITIES. SERVICE LETTER
MOS
06-FEB-2002 -
SL 737-SL-78-049 REV. A TROUBLESHOOTING OF THRUST REVERSER SYSTEM ANOMALIES. SERVICE LETTER INFORMATIONAL
MOS
16-APR-2002 - (s)
SL 737-SL-78-050 THRUST REVERSER INSULATION BLANKET REPAIRS (SUPERSEDED BY SL 737-SL-78-050 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-78-050 REV. A THRUST REVERSER INSULATION BLANKET REPAIRS. SERVICE LETTER RECOMMENDED
MOS
II -NOV-20I3
SL 737-SL-78-051 THRUST REVERSER CASCADE ASSEMBLY INSTALLATION ANOMALIES. SERVICE LETTER
MOS 6 (s)
ISMAR-2004
SL 737-SL-78-052 THRUST REVERSER AFT WEB TOROUE BOX CRACKING. SERVICE LETTER INFORMATIONAL
MOS
02-JAN-2004
SL 737-SL-78-052 REV. A THRUST REVERSER AFT WEB TORQUE BOX CRACKING. SERVICE LETTER
MOS
02-MAY-2005
SL 737-SL-78-052 REV. B TRHUST REVERSER AFT WEB TORQUE BOX CRACKING. SERVICE LETTER
MOS
04-MAY-2006
SL 737-SL-78-053 THRUST REVERSER BLOCKER DOOR WEAR PAD SEPARATION. SERVICE LETTER INFORMATIONAL
MOS
24-MAR-2004
SL 737-SL-78-053 REV. A THRUST REVERSER BLOCKER DOOR WEAR PAD SEPARATION, SERVICE LETTER COMPUED WITH
MOS 28-SEP-2009
17-OCT-2007 3378:04
AFL 812
SL 737-SL-78-054 THRUST REVERSER BLOCKER DOOR COVER IMPROVEMENTS. SERVICE LETTER INFORMATIONAL
MOS
13-APR-2004
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 3M Of 748
@Camp Systems
EFTA00618675
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-054 REV. A THRUST REVERSER BLOCKER DOOR COVER IMPROVEMENTS. SERVICE LETTER
MOS
Of -MAR-2005
SL 737-SL-78-055 NUMBER 2 ENGINE THRUST REVERSER INDICATION ANOMALIES - IMPROVED W5160 WIRE ROUTING. SERVICE INFORMATIONAL
LETTER
MOS
07-MAR-2005
SL 737-SL-78-055 REV. A NUMBER 2 ENGINE THRUST REVERSER INDICATION ANOMALIES - IMPROVED W5160 WIRE ROUTING.. SERVICE
LETTER
MOS
29-APR-2005
SL 737-SL-78-056 IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN TRACK SEAL. SERVICE LETTER
MOS
I4-SEP-2005
SL 737-SL-78-056 REV. A IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN TRACK SEAL. SERVICE LETTER
MOS
28-MAR-2006
SL 737-SL-78-056 REV. 8 IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN
TRACK SEAL. SERVICE LETTER
MOS
I9-FEB-2009
SL 737-SL-78-057 THRUST REVERSER SYNC-SHAFT TUBE IMPROVEMENT. SERVICE LETTER
MOS
I8-APR-2006
SL 737-SL-78-057 REV. A THRUST REVERSER SYNC-SHAFT TUBE IMPROVEMENT. SERVICE LETTER
MOS
06-DEC-2006
SL 737-SL-78-058 AVAILABILITY OF THRUST REVERSER BLOCKER DOOR DRAG LINK SPHERICAL LINER BEARING 8ACB10ESO6AG.
SERVICE LETTER
MOS
09-JUN-2006
SL 737-SL-78-059 AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER
MOS
30-JUN-2006
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 385 Of 748
@ Camp Systems
EFTA00618676
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-059 REV. A AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE SERVICE LETTER
MOS
09-N0V-2006
SL 737-SL-78-059 REV. 8 AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC
CONTROL VALVE MODULE. SERVICE LETTER
MOS
30-APR-2008
SL 737-SL-78-059 REV. C AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC
CONTROL VALVE MODULE. SERVICE LETTER
MOS
24-OCT-2008
SL 737-SL-78-059 REV. D AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC SUPERSEDED
CONTROL VALVE MODULE (SUPERSEDED BY SL 737-SL-78-059 REV. E). SERVICE LETTER
MOS
SL 737-SL-78-059 REV. E AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER RECOMMENDED
MOS
30-JUN-2011
SL 737-SL-78-060 CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE CRACKING. SERVICE LETTER
MOS
29-AUG-2066
SL 737-SL-78-060 REV. A CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE
CRACKING. SERVICE LETTER
MOS
13-JUL-2007
SL 737-SL-78-060 REV. 8 CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE
CRACKING. SERVICE LETTER
MOS
03-OCT-2007
SL 737-SL-78-061 THRUST REVERSER OPENING ACTUATOR HEAT TREATMENT
DISCLOSURE. SERVICE LETTER
MOS
28-NOV-2007
SL 737-SL-78-061 REV. A THRUST REVERSER OPENING ACTUATOR HEAT TREATMENT
DISCLOSURE. SERVICE LETTER
MOS
08-JUL-2008
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 386 Of 748
@ Camp Systems
EFTA00618677
AD/SI Status Report AIRCRAFT
COMP
Astant.frar• Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-062 AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER
MOS
27-JUL-2007
SL 737-SL-78-062 REV. A AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER COMPUED WITH
MOS 14-FEB-2008
21-JAN-2008 3151:22
AFL 746
SL 737-SL-78-062 REV. B AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER RECOMMENDED
MOS
12-MAY-2009
SL 737-SL-78-062 REV. C AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER RECOMMENDED
MOS
30-OCT-2009
SL 737-SL-78-063 THRUST REVERSER OVERHAUL PROGRAM GUIDELINES (SUPERSEDED BY SL 737-SL-78-063 REV. A) SUPERSEDED
. SERVICE LETTER
MOS
SL 737-SL-78-063 REV. A THRUST REVERSER OVERHAUL PROGRAM GUIDELINES. SERVICE LETTER RECOMMENDED
MOS
22-APR-20I1
SL 737-SL-78-065 IMPROVED AUTOTHROTTLE SWITCHPACK (SUPERSEDED BY SL 737-SL-78-065 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-78-065 REV. A IMPROVED AUTOTHROTTLE SWITCHPACK SERVICE LETTER RECOMMENDED
MOS
08-JUN-2011
SL 737-SL-78-067 UNDER-TOROUED FASTENERS INSTALLED ON THRUST RECOMMENDED
REVERSER HINGE BEAM FAIRING. SERVICE LETTER
MOS
13-JUL-2009
SL 737-SL-78-068 THRUST REVERSER INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-78-068 REV. A). SERVICE LETTER SUPERSEDED
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 387 Of 748
@ Camp Systems
EFTA00618678
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-068 REV. A THRUST REVERSER INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED
MOS
16-MAR-2011
SL 737-SL-78-069 THRUST REVERSER LATCH BEAM FAIRING MISSING SEALANT. SERVICE LETTER RECOMMENDED
MOS
05-NOV-2009
SL 737-SL-78-069 REV. A THRUST REVERSER LATCH BEAM FAIRING MISSING SEALANT. SERVICE LETTER RECOMMENDED
MOS
07-JAN-2010
SL 737-SL-78-070 THRUST REVERSER CONTROL VALVE MODULE - QUALITY DISCLOSURE. SERVICE LETTER RECOMMENDED
MOS
15-MAR-2010
SL 737-SL-78-071 THRUST REVERSER LVDT IMPROVEMENT (SUPERSEDED BY SL 737-SL-78-071 REV. A). SERVICE LETTER SUPERSEDED
MOS
SL 737-SL-78-071 REV. A THRUST REVERSER LVDT IMPROVEMENT. SERVICE LETTER RECOMMENDED
MOS
21-JAN-2011
SI. 737-SL-78-073 "ALTERNATE SPLIT-LINE FASTENERS FOR CFM56-78 EXHAUST SUPERSEDED
PRIMARY PLUG' (SUPERSEDED BY SL 737-SL-78-073 REV. A). SERVICE LETTER
MOS
SL 737-SL-78-073 REV. A ALTERNATE SPLIT-LINE FASTENERS FOR CFM56-76 EXHAUST PRIMARY PLUG. SERVICE LETTER RECOMMENDED
MOS
27-FEB-2014
SL 737-SL-78-074 PIP EXHAUST RETROFIT SERVICE BULLETINS 737-78-1089 AND 737-54-1047 PRELIMINARY PLANNING INFORMATION. RECOMMENDED
SERVICE LETTER
MOS
09-JAN-2012
SL 737-SL-78-076 THRUST REVERSER BLOCKER DOOR SUPPORT LOOSE OR MISSING SCREWS (SUPERSEDED BY SL 737-SL-78-076 SUPERSEDED
REV. A). SERVICE LETTER
MOS
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 388 Of 748
@ Camp Systems
EFTA00618679
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SL 737-SL-78-076 REV. A THRUST REVERSER BLOCKER DOOR SUPPORT LOOSE OR MISSING SCREWS. SERVICE LETTER RECOMMENDED
MOS
02-JUN-2014
SL 737-SL-78-077 THRUST REVERSER PART MARKING RECOMMENDATIONS UNDER FAA AD 2012-05-02. SERVICE LETTER RECOMMENDED
MOS
20-JUN-2014
SL 737-SL-80-001 STARTING. GENREAL. START SYSTEM. RELIABILITY IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
15-DEC-1980 - (s)
SL 737-SL-80-001 REV. A STARTING. GENREAL. START SYSTEM. RELIABILITY IMPROVEMENT. SERVICE LETTER INFORMATIONAL
MOS
15-JUN-2000 - (s)
SL 737-SL-80-018 ENGINE PNEUMATIC START VALVE QUALITY DISCLOSURE. SERVICE LETTER
MOS 6 (s)
11-OCT-2004
SL BISJ-28-17A AUXILIARY FUEL SYSTEM ALERT AND MAINTENANCE MESSAGES. SERVICE LETTER
MOS
SL BBJ-28-6 TANK RAIL MODIFICATION. SERVICE LETTER
MOS
20-FEB-2000
SL BBJ2-28-04A AUXILIARY FUEL SYSTEM ALERT AND MAINTENENACE MESSAGES, SERVICE LETTER
MOS
SL ST00936NY-28-SL-001 CENTER WING FUEL TANK REFUEL LINE B-NUT TORQUE. SERVICE LETTER COMPLIED WITH
MOS 18-AUG-2009
IS-JUN-2005 3378:04
AFL 812
SL INSTRUCTIONS FOR BOEING SERVICE BULLETIN 737-26-1121. REV 1. SERVICE LETTER
ST00936NY-D-26-SL-007
MOS
SL ST01384NY-28-SL-001 CENTER WING FUEL TANK REFUEL LINE B-NUT TORQUE. SERVICE LETTER NOT APPLICABLE
MOS
15-JUN-2005
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 389 Of 748
@ Camp Systems
EFTA00618680
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
VSB 174080-35-04 REV OXYGEN - PASSENGER OXYGEN SYSTEM MASK IN-LINE FLOW INDICATOR REPLACEMENT. VENDOR SERVICE MANDATORY
000 BULLETIN
MOS
06-SEP-2010
VSB 3289562-36-1909 PNEUMATIC - FOUR INCH DIAMETER PRECOOLER CONTROL VALVE - REWORK FOUR INCH DIAMETER PRECOOLER RECOMMENDED
CONTROL VALVE, PN 3289562-7 TO PN 3289562-5. VENDOR SERVICE BULLETIN
MOS
09-APR-2074
VS8 3289562-36-1911 PNEUMATIC - FOUR INCH DIAMETER PRECOOLER CONTROL VALVE - REWORK FOUR INCH DIAMETER PRECOOLER RECOMMENDED
CONTROL VALVE (PCCV). PN 32895624 TO PN 3289562-5, VENDOR SERVICE BULLETIN
MOS
09-APR-20I4
VSB 4091900-31-0005 INDICATING/RECORDING SYSTEMS - PHASE 3 DISPLAY UNIT -MODIFICATION (MOD) B TO PHASE 3 DISPLAY UNIT. P51 RECOMMENDED
4091900-931 THRU -934. -941 THRU -944: REPLACE BOTH BACKLIGHT ASSEMBLY. PN 4091896-902. AND BACKLIGHT
ELECTRONICS PRINTED BOARD ASSEMBLY (PBA). PN 4091894-1002. WITH NEW PART NUMBERS IF ONE IS
UNSERVICEABLE AND CANNOT BE REPAIRED OR REPLACED WITH THE SAME PART NUMBER. VENDOR SERVICE
BULLETIN
MOS
27-5IAR-2014
VSB 4091900-31-0006 INDICATING/RECORDING SYSTEMS- PHASE 3 DISPLAY UNIT - MODIFICATION (MOD) C TO PHASE 3 DISPLAY UNIT. PN RECOMMENDED
4091900-931 THRU -934. -941 THRU -944: IMPROVE DISPLAY UNIT CONTROLLER (DUC) SEQUENCER FIRMWARE IN
DETECTING WHEN LIGHT EMITTING DIODE (LED) STRING IS OUT. VENDOR SERVICE BULLETIN
MOS
27-MAR-2014
VS8 930-3000/3001-34-1 NAVIGATION - DA-IA/DA-1B ANTENNA DRIVE ASSEMBLIES - MODIFICATION (MOD) OF THE DA-IA/DA-1B ANTENNA SUPERSEDED
DRIVE ASSEMBLIES. PN 930-3000-001 AND PN 930-3001-001: REPLACEMENT OF THE TRANSMITTER RECEIVER
(TRyGIMBAL DRIVE INTERCONNECT CABLE ASSEMBLIES AND THE CLOCK SPRING CLAMPS (SUPERSEDED BY S8
930-3000/3001-34-1 Ft1). VENDOR SERVICE BULLETIN
MOS
VSB 930-300013001-34-1 NAVIGATION - DA-IfvDA-I8 ANTENNA DRIVE ASSEMBLIES - MODIFICATION (MOD) OF THE DA-1A/DA-1B ANTENNA RECOMMENDED
RI DRIVE ASSEMBLIES. PN 930-3000-001 AND PN 930-3001-001: REPLACEMENT OF THE TRANSMITTER RECEIVER
(TRyGIMBAL DRIVE INTERCONNECT CABLE ASSEMBLIES AND THE CLOCK SPRING CLAMPS. VENDOR SERVICE
BULLETIN
MOS
15-APR-2014
VSB 964-0052-23-41 COMMUNICATION - XK516D HF RADIO SYSTEM - UNIT MODIFICATION (MOD) 49 TO XK51601 HIGH FREQUENCY (HF) OPTIONAL
TRANSCEIVER (TRANSCEIVER). PN 964-0452-011. -022. OR -042: DISABLE TWO DISCRETE COUPLER FAULT INPUT
UNES TO REDUCE NUISANCE 'COUPLER NOGG' FAULT MESSAGES (BOEING). VENDOR SERVICE BULLETIN
MOS
08-MAY-20I4
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 390 Of 748
@ Camp Systems
EFTA00618681
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
VSB TPA-100-34-01 R9 NAVIGATION - TPA-100 TCAS PROCESSOR - TPA-100 TCAS PROCESSOR. TPA-100A. PN 940-0300-001. PN 940-0330-001. RECOMMENDED
PN 940-0331-001. PN 940-0400-001. PN 940-0430-001. PN 940-0431-001. PN 941-1431-001. AND TPA-1008. PN
940-0351-001. PN 940-0351-010. PN 940-0451-001. PN 940-0451-010: TO PROVIDE ACCEPTANCE TEST PROCEDURE
(ATP) SOFTWARE UPGRADE TO PN 998-3449-537 FOR RETURN-TO-SERVICE (RTS) TESTING OF THE TPA-103 TCAS
PROCESSOR. VENDOR SERVICE BULLETIN
MOS
05-JUN-2014
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 391 Of 748
@ Camp Systems
EFTA00618682
AD/SI Status Report AIRCRAFT
COMP Mernund 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 131-494084 APU - AUXILIARY AIRBORNE POWER - GAS TURBINE ENGINE - REPLACE THE STARTER/GENERATOR. PN 288545-7A. RECOMMENDED
-7B. OR -7C. WITH PN 288545-9A. SERVICE BULLETIN
MOS
27-JUL-2012
SB 131-49-8122 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - INSPECT THE STARTER/GENERATOR. PN 288545-7 AND SUPERSEDED
-9. AND REWORK AS NECESSARY (SUPERSEDED BY SB 131-49-8122 RH. SERVICE BULLETIN
MOS
MSC
SB 131-49-8122 RI APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - INSPECT THE STARTER/GENERATOR. PN 288545-7 AND RECOMMENDED
-9. AND REWORK AS NECESSARY ON THE 131-9(BJ APU. SERVICE BULLETIN
MOS
09-JUL-2014 MSC AR
SB 131-49-8128 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - APPROVE THE USE OF IGNITION UNIT. PN 3888058-5. IN OPTIONAL
PLACE OF IGNITION UNIT, PN 3888058-7. FOR THE 131-9(8) AUXILIARY POWER UNIT (APU). SERVICE BULLETIN
MOS
07-FEB-2014 MSC
SB 2024215 APU - TESTING - DATA MEMORY MODULE (DMM) READER - PN 2024215-2: IMPROPER FIRMWARE PROGRAMMING RECOMMENDED
WITH PN 2024215-2, SERVICE BULLETIN
MOS
09-FEB-20 I 1 MSC
SB 24-4232 APU- ELECTRICAL POWER- STARTER/GENERATOR- MODIFICATION OF STARTER/GENERATOR, PN 288545-9 - SUPERSEDED
REPLACEMENT OF ROTOR. SERVICE BULLETIN
MOS
06-DEC-2012 MSC
SB 24-4232 RI APU- ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR, PN 28B545-9 - SUPERSEDED
REPLACEMENT OF ROTOR. SERVICE BULLETIN
MOS
21-DEC-2012 MSC
SB 24-4232 R2 APU - ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR. PN 288545-9 - RECOMMENDED
REPLACEMENT OF ROTOR. SERVICE BULLETIN
MOS
10-JAN-2013 MSC DUE (s)
SB 24-4232 R3 APU - ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR. PN 288545-9 -
REPLACEMENT OF ROTOR. SERVICE BULLETIN
MOS
MSC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 392 Of 748
@ Camp Systems
EFTA00618683
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 28B545-2I-4231 APU - ELECTRICAL POWER - STARTERiGENEFIATOR - MODIFICATION OF THE STARTENGENERATOR FROM PN
28B545-7 STYLE C TO PN 288545.9 STYLE A. SERVICE BULLETIN
MOS
26-JUL-2012 MSC
SB 28B545-24-4233 APU - ELECTRICAL POWER - STARTERGENERATOR - MODIFICATION OF STARTER;GENERATOR. PN 286545-7 AND -9 - RECOMMENDED
REPLACEMENT OF STATOR HOUSING ASSEMBLY. PN 6430800.4. SERVICE BULLETIN
MOS
09-JUL-2014 MSC
SB 3291238.19.7032 APU - AIRBORNE AUXILIARY POWER - 3.0 INCH DIAMETER SURGE CONTROL VALVE - INSPECTION OF THE CHROME CUSTOMER
PLATING ON THE BUTTERFLY SHAFT. PN 3180688-1. USED ON THE 3.0 INCH DIAMETER SURGE CONTROL VALVE. PN CONVENIENCE
3291238-2. SERVICE BULLETIN
MOS
22-APR-2014 MSC
SB 49-0001 APU - FCU INSPECTION FOR MISSING LOAD SPRING. SERVICE BULLETIN
MOS
MSC
SB 49-0002 APU - INCORPORATE AN IMPROVED FCU TORQUE MOTOR METERING VALVE. SERVICE BULLETIN
MOS
MSC
SB 49-2376 APU - SERVICE BULLETIN COMPLIED WITH
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-2377 APU - SERVICE BULLETIN COMPLIED WITH
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-7031 APU - INSPECT 3291238.2 SCV FOR THE UPPER BUTTERFLY SHAFT BUSHING. SERVICE BULLETIN
MOS
MSC
SB 49-7365 APU - REPLACE IG1/4/ CLEVIC ASSY MD BOLT TO ELIMINATE CAPTIVE BOLT DESIGN. SERVICE BULLETIN
MOS
MSC
SB 49-7366 APU - REPLACE IGV ASSEMBLY 3810821-4 WITH 3810821-5 TO ELIMINATE CAPTIVE BOLT DESIGN. SERVICE BULLETIN
MOS
MSC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 393 Of 748
1' Camp Systems
EFTA00618684
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 49-7373 APU - REPL COMP COUP SHAFT P/N 3822510-1 WI-2 TO ELIMINATE A POTENTIAL TOLERANCE STACK CONDITION
THAT WOULD RESULT IN. SERVICE BULLETIN
MOS
MSC
SB 49-7431 APU - REWORK UPPER AND LOWER INLET PLENUM TO EUMINATE RIVETED GROUND STRAPS. SERVICE BULLETIN
MOS
MSC
SB 49-7476 APU - REWORK TURBINE BEARING SUPPORT AND REAR BEARING SEAL RETAINER FOR SOFT HYDRAULIC MOUNT.
SERVICE BULLETIN
MOS
MSC
SB 49-7480 APU - REWORK OR REPLACE DRIVEN COMPRESSOR BEARING HOUSING AND COUPLING SHAFT FOR IMPROVED L/C
SEAL CAVITY DRAINAGE.. SERVICE BULLETIN
MOS
MSC
SB 49-7483 APU - RPURWK SURGE DUCT P/N 3885003-1 TO 3885003-2. SERVICE BULLETIN
MOS
MSC
SB 49-7513 APU - INSTALL MS25083-5887 GROUND STRAP TO IMPROVE ELECTRICAL PATH BETWEEN PERFORATED INLET COMPUED WITH
HOUSING AND MAIN APU ELECTRICAL GROUND. SERVICE BULLETIN
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-7527 APU - REPLACE EDUCTOR HOUSING WITH NEW IGNITION UNIT BRACKET THAT ALLOWS ELIMINATION OF 3617110-2
IGNITION UNIT ADAPTER BRACKET.. SERVICE BULLETIN
MOS
MSC
58 49-7541R1 APU - INSTL NEW 3884980-38 3884984-3 STATIC/TOTAL PRESS TUBES HAVING DRAIN HOLES ADDED CLEANING PROC
TO REMOVE ALL CONTAM. SERVICE BULLETIN
MOS
MSC
SB 49-7561 APU - RPL TRBN SEAL GSKT P/N 3844707-1 WI 3844707-2. SERVICE BULLETIN COMPUED WITH
MOS 25-JUN-20I0
MSC 3001
APUS 2487
SB 49-7577 APU - PROVIDE VE HARDWARE-PWR SECTION ASSY PM 3801103-2 REPLACES 3801103-1. SERVICE BULLETIN
MOS
MSC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 394 Of 748
@ Camp Systems
EFTA00618685
AD/SI Status Report AIRCRAFT
COMP J..,. 64-ern/whip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 49-7597 APU - PROVIDE COST REDUCE TURBINE 8RG CAVITY DESIGN-PWR SECT ASSY PIN 3801103-3 REPLACES 3801103-2.
SERVICE BULLETIN
MOS
MSC
SB 49-7667 APU - PROVIDE ADDITIONAL RETENTION FOR PLUG P/N AS9902-6 AND AS169J6L REPLACES MS9901-6. SERVICE COMPLIED WITH - IAW THE SB
BULLETIN
MOS 22-AUG-2008
MSC 2778
APUS 2287
SB 49-7688 APU - ENHANCE PRODUCIBILITY AND COSTS-FCU P/N 441921-5 REPLACES 4491921-4. SERVICE BULLETIN
MOS
MSC
SB 49-7743 APU - IMPROVES FIELD RELIABIUTY-OIL COOLER PIN 160564-2 REPLACES 160564-1. SERVICE BULLETIN
MOS
MSC
SB 49-7776 APU - IMPROVE PERFORMANCE AND RELIABILITY-ROTATING GRP P/N 38225054 REPLACES PIN 3822505-7. SERVICE
BULLETIN
MOS
MSC
SB 49-7857R1 APU - REPLACE/REWORK FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840303-1. TO FIRST STAGE TURBINE RECOMMENDED
ROTOR ASSEMBLY. PART NO. 3840160-7. SERVICE BULLETIN
MOS
20-DEC-2005 MSC
SB 49-7860R1 APU - REPLACE FIRST STAGE TURBINE ROTOR ASSEMBLY. RECOMMENDED
PART NO. 3840303-1. WITH FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840160-8. REPLACE/REWORK FIRST
STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840160-5. WITH/TO FIRST STAGE TURBINE ROTOR ASSEMBLY. PART
NO. 3840160-8. SERVICE BULLETIN
MOS
20-DEC-2005 MSC
SB 49-7881 APU -. SERVICE BULLETIN COMPUED WITH
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-7903 APU - REWORK ENGINE WIRING HARNESS. PN 3888449-1. TO PN 3888449-2 (SUPERSEDED BY SB 3888449-49-7903 RI). SUPERSEDED
SERVICE BULLETIN
MOS
MSC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 395 Of 748
@ Camp Systems
EFTA00618686
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 49-7903 R1 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REWORK ENGINE WIRING HARNESS. PN 3888449-1 TO RECOMMENDED
PN 3888449-2. SERVICE BULLETIN
MOS
05-N0V-2013 MSC
SB 49-7953 APU -. SERVICE BULLETIN COMPLIED WITH
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-7971 R3 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE FIRST STAGE TURBINE ASSEMBLY. PN RECOMMENDED
3840160-5. -7. -8 OR PN 3840303-1. AND STATIONARY SEAL ASSEMBLY. PN 3844738-5. WITH FIRST STAGE TURBINE
ASSEMBLY. PN 3840310-3 AND STATIONARY SEAL ASSEMBLY. PN 3844738-6. SERVICE BULLETIN
MOS
26-NOV-2012 MSC
SB 49-7988 APU - . SERVICE BULLETIN COMPUED WITH
MOS 25-JUN-2010
MSC 3001
APUS 2487
SB 49-7997 R2 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - STANDARD STORAGE AND PRESERVATION
GUIDELINES. SERVICE BULLETIN
MOS
22-DEC-2010 MSC
SB 49-7997 R3 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - STANDARD STORAGE AND PRESERVATION
GUIDELINES. SERVICE BULLETIN
MOS
16-JAN-2014 MSC
SB 49-8023 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE THE FUEL DRAIN TUBE. PN 3883848-3 WITH RECOMMENDED
FCU DRAIN TUBE ASSEMBLY. PN 3879078-1. SCV DRAIN TUBE ASSEMBLY. PN 3879078-2. IGV DRAIN
TUBE ASSEMBLY. PN 3879078-3. FUEL DRAIN TUBE ASSEMBLY. PN 3879078-4. AND DRAIN TUBE ASSEMBLY. PN
3879078-5. SERVICE BULLETIN
MOS
28-OCT-2010 MSC
SB 49-8027 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE THE INLET GUIDE VANE ACTUATOR. PN OPTIONAL
3886188-2 WITH PN 3886188-3. SERVICE BULLETIN
MOS
13-DEC-2010 MSC
SB 49-8054 APU- AIRBORNE AUXILIARY POWER- GAS TURBINE ENGINE - REPLACE THE FLOW DIVIDER TEE. PN 3883830-1 WITH OPTIONAL
PN 3883830-2. SERVICE BULLETIN
MOS
07-SEP-2011 MSC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 396 Of 748
@ Camp Systems
EFTA00618687
AD/SI Status Report AIRCRAFT
C O Mien
MPwinin Mernund
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 49-8065 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE DUPLEX BALL BEARING ASSEMBLY. RECOMMENDED
MATCHED SET. PN 3822478-1. WITH PN 3822666-2. COMPRESSOR BEARING HOUSING. PN 3827265-4. WITH PN
3827265-8. COMPRESSOR BEARING RETAINER PLATE. PN 3827385-1. WITH PN 3827385-2. AND COMPRESSION SPRING
WASHER. PN 3827075-1. WITH PN 791-548-9301. REMOVE BEARING DAMPER RING. PN 3827173-3. AND SPRING
RETAINER. PN 3827074-4. SERVICE BULLETIN
MOS
27-JUN-2012 MSC
SB 49-8065 RI APU - GAS TURBINE ENGINE - REPLACE DUPLEX BALL BEARING ASSEMBLY. MATCHED SET. PN 3822478-1. WITH PN RECOMMENDED
3822666-2. COMPRESSOR BEARING HOUSING. PN 38272654. WITH PN
3827265-8. COMPRESSOR BEARING RETAINER PLATE. PN 3827385-1. WITH PN 3827385-2. AND COMPRESSION SPRING
WASHER. PN 3827075-1. WITH PN 791-548-9301. REMOVE BEARING DAMPER RING. PN 3827173-3. AND SPRING
RETAINER. PN 3827074-4. SERVICE BULLETIN
MOS
10-SEP-2012 MSC
SB 49-8079 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACEMENT OF DISCREPANT DATA MEMORY RECOMMENDED
MODULE (DMM). PN 3876287-1. SERVICE BULLETIN
MOS
20-JUN-2012 MSC
SB 49-8079 RI APU - AIRBORNE AUXILIARY POWER- GAS TURBINE ENGINE - REPLACEMENT OF DISCREPANT DATA MEMORY RECOMMENDED
MODULE (DMM). PN 3876287-1. SERVICE BULLETIN
MOS
I9-NOV-2012 MSC
SB 49-8091 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE RECOMMENDED
ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS. SERVICE BULLETIN
MOS
27-NOV-2012 MSC
APUS 17450 (s)
SB 49-8091 RI APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE SUPERSEDED
ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS (SUPERSEDED BY 58 49-8091 R2). SERVICE BULLETIN
MOS
MSC - (s)
SB 49-8091 R2 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE
ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS. SERVICE BULLETIN
MOS
MSC
APUS
SB 49-8098 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACEMENT OF THE BEARING SET (TURBINE RECOMMENDED
ROLLER BEARING). PH 3840242-1. WITH THE INCORRECT ROLLING ELEMENT MATERIAL. SERVICE BULLETIN
MOS
19-NOV-2012 MSC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 397 Of 748
@ Camp Systems
EFTA00618688
AD/SI Status Report AIRCRAFT
CAMP
Miatioafra ihrenninthur 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 49-8100 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR RECOMMENDED
ASSEMBLY. PN 288545-9. SERVICE BULLETIN
MOS
I0-DEC-2012 MSC
SB 49-8100 R1 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR RECOMMENDED
ASSEMBLY. PN 288545-9. SERVICE BULLETIN
MOS (EFF)
19-DEC-2012 MSC
SB 49-8100 R2 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR
ASSEMBLY. PN 288545-9. SERVICE BULLETIN
MOS
MSC
SIL 126 R3 APU - 131-9(8) WOFtKSCOPE PLANNING GUIDE (WPG). SERVICE INFORMATION LETTER
MOS
30-APR-2013 MSC
7-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks - -Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 398 Of 748
Camp Systoms
EFTA00618689
AD/SI Status Report AIRCRAFT
Meg arroyo' 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
ASB 72-A0328 NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION.
ALERT SERVICE BULLETIN
MOS
12-MAR-2002 MSC
ASB 72-A0328 RI NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION.
ALERT SERVICE BULLETIN
DAYS I (s)
12-MAR-2002 HRSAISC
ENC
ASB 72-A0329 NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REPLACEMENT OF NO.4 ROLLER BEARING.. ALERT SERVICE
BULLETIN
MOS
12-MAR-2002 HRSAISC -
ENC
ASB 7340026 NO. 1 ENGINE - INTRODUCITON OF SOFTWARE VERSION 7.B.J (763A). ALERT SERVICE BULLETIN
MOS
15-JAN-1999 HRSAISC -
ENC
ASB 73-A0034 RI NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. ALERT SERVICE BULLETIN
MOS
HRSAISC -
ENC
S8 72-0000 NO. 1 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SUPERSEDED
SERVICE BULLETIN
MOS
HRS1SISC
ENC
SB 72-0000 R1 NO. 1 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 (SUPERSEDED BY 72-0000 SUPERSEDED
R2). SERVICE BULLETIN
MOS
HRSAISC
ENC
S8 72-0000 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN INFORMATIONAL
CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN
MOS
11-MAY-2011 HRSJIASC -
ENC
SB 72-0001 NO. 1 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED - INFORMATION ONLY
MOS
HRSAISC -
ENC
S8 72-0001 R1 NO. 1 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 399 Of 748
@Camp Systems
EFTA00618690
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0001 R2 NO. 1 ENGINE - CFUS6-7B ENGINE MODELS I DENIIFICATION.. SERVICE BULLETIN SUPERSEDED
MOS
HRSAISC -
ENC
SB 72-0001 R3 NO. 1 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED
MOS
27-JUL-2006 HRSAISC -
ENC
SB 72-0001 R4 NO. 1 ENGINE - CFP.156-7B ENGINE MODELS IDENTIFICATION
. SERVICE BULLETIN
MOS
2S-MAY-2007 HRSAISC
ENC
SB 72-0001 RS NO. 1 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN
MOS
MRS/P.1SC
ENC
SB 72-0002 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRS/MSC
ENC
SB 72-0002 RI NO. I ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HRS/PASC -
ENC
SB 72-0003 NO. I ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN - PRODUCT IMPROVEMENT
MOS
HRSAISC -
ENC
SB 72-0003 RI NO. 1 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0003 R10 NO. I ENGINE - ENGINE - GENERAL (72-00-60) - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE OPTIONAL
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
15-JUN-20 1 HRSAISC -
ENC
SB 72-0003 R2 NO. 1 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0003 R3 NO. 1 ENGINE - CONVERSION OF CFP.456-76 TO DERIVATIVE MODELS. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 400 Of 748
@ Camp Systems
EFTA00618691
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0003 R4 NO. ENGINE - CONVERSION OF CR156-76 TO DERIVATIVE MODELS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0003 Ft5 NO. ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS.
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0003 R6 NO. ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS.
SERVICE BULLETIN
MOS
17-APR-2007 HRSMSC -
ENC
SB 72-0003 R7 NO 1 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
11-JUN-2009 HRSMSC -
ENC
SB 72-0003 Re NO. ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0003 R9 NO ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFNI56-76 MODEL ENGINES TO ALLOWABLE SUPERSEDED
DERIVATIVE MODEL DESIGNATIONS (SUPERSEDED BY 72-0003 RIO). SERVICE BULLETIN
MOS
10-MAR-2011 HR&MSC -
ENC
SB 72-0004 NO. 1 ENGINE - INSTALLATION OF CERTIFIED CFM56.7B ENGINE NAMEPLATE. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0004 Ri NO 1 ENGINE - CERTIFIED CFP0156-7B ENGINE NAMEPLATE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC
ENC
SB 72-0005 NO. ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSMSC
ENC
SB 72-0006 R1 NO. ENGINE - CFNI56-7B ENGINE CONVERSION TO CFNI56-7618. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 401 Of 748
Camp Systems
EFTA00618692
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0006 R2 NO. ENGINE - CFLI56-78 ENGINE CONVERSION TO CP356-7618. SERVICE BULLETIN
MOS
HRSi LISC
ENC
SB 72-0006R3 NO. ENGINE - CONVERSION TO CFM56-7B18. SERVICE BULLETIN
MOS
HRSi LISC
ENC
SB 72-0006 R4 NO. ENGINE - CONVERSION TO CFM56-7B18. SERVICE BULLETIN
MOS
HRS, ?A SC
ENC
SB 72-0007R1 NO. ENGINE - CFP.I56-7B ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN
MOS
HRSNSC -
ENC
SB 72-0007 R2 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN
MOS
HRS., MSC -
ENC
SB 72-0007 R3 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 72-0007 R4 NO. ENGINE - CONVERSION TO CFM56-7B20. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 72-0008 Ri NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN
MOS
HRSi MSC
ENC
SB 72-0008 R3 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN
MOS
HRS,P.ISC -
ENC
SB 72-0008 R4 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN
MOS
HRS., kISC -
ENC
SB 72-0008R5 NO. ENGINE - CONVERSION TO CFNI56-7622. SERVICE BULLETIN
MOS
HRSi MSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 402 Of 748
Camp Systems
EFTA00618693
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0009 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (7628). SERVICE BULLETIN
MOS
HRSiliSC -
ENG
SB 72-0009 R1 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN
MOS
HRSikiSC -
ENC
SB 72-0009 R2 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0009 R3 NO. I ENGINE - CRIS6-7B ENGINE CONVERSION TO CFm56-7624. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0009 R4 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN
MOS
HRS4ISC -
ENG
SB 72-0010 R1 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN
MOS
HRS.' hiSC -
ENC
SB 72-0010 R2 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS.' hiSC -
ENC
SB 72-0010 R3 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN
MOS
HRS.' hiSC -
ENG
SB 72-0010 R4 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFm50-7626. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0010 RS NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CRI56-7626. SERVICE BULLETIN OPTIONAL
MOS
17-FEB-2011 HRSASC -
ENG
SB 72-0011 R2 NO. I ENGINE - CW56-7E: ENGINE CONVERSION TO CRI56-7627. SERVICE BULLETIN OPTIONAL
MOS
HRS.' hiSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 403 Of 748
Camp Systems
EFTA00618694
AD/SI Status Report AIRCRAFT
C4INIP
AsianwftimMetnundieli 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0011 R3 NO 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CR156-7B27. SERVICE BULLETIN OPTIONAL
MOS
HRS' LISC
ENC
SB 72-0011 R4 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CP.156-7627. SERVICE BULLETIN OPTIONAL
MOS
28-APR-2000 HRSi siSC
ENC
SB 72-0012 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSAISC
ENC
SB 72-0013 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRS4.1SC
ENC
SB 72-0014 NO 1 ENGINE - NUT AND TORQUE CHANGE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS4.1SC 0
ENC 0
SB 72-0015 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSLISC
ENC
SB 72-0016 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
11-JUL-1997 HRS;LISC -
ENC
SB 72-0016 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
05-AUG-1997 HRS;LISC 0
ENC 0
SB 72-0017 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS.4.1SC 0
ENC 0
SB 72-0017 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
HRS4.1SC -
ENC
SB 72-0018 NO. I ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN
MOS
HRS.4.1SC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 404 Of 748
Camp Systems
EFTA00618695
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0018 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0018 R2 NO. 1 ENGINE - INCREASING OF LENGTH BOLT AND ADDITION OF A WASHER, SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0019 NO. 1 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC -
ENC
SB 72-0020 RI NO. 1 ENGINE - ADDITON OF A SPACER ON THE RETAINING CABLE OF THE IDENTIFICATION PLUG NIT. SERVICE COMPUED WITH -AT MANUFACTURE
BULLETIN
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0021 NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0021 RIO NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0021R1 NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0022 NO. 1 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0022 RI NO. 1 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0093
MOS
HRSAISC -
ENC
SB 72-0023 NO. 1 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0023 RI NO. 1 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 405 Of 748
@ Camp Systems
EFTA00618696
AD/SI Status Report AIRCRAFT
Cl Akinn the g nd 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0024 NO. 1 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0024 R1 NO. 1 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0025 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0025 R2 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0026 R1 NO. 1 ENGINE - REWORK OF SHROUD PAD. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0027 NO. 1 ENGINE - REPOSITIONING OF VBV HARNNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SS 72-0028 R2 NO. 1 ENGINE - THRUST REVERSER KIT MODIFICATION OF INTERNAL VEE GROOVE AND FITTING SHROUDS, SERVICE COMPUED WITH - AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0029 NO. 1 ENGINE - REPLACEMENT OF BOLTS, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0030 R1 NO. 1 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
MRS/11SC - 0
ENC 0
SB 72-0030 R2 NO. 1 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SS 72-0031 NO. 1 ENGINE - INTRODUCTION OF THE NEW PLATFORM FAN BLADE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 406 Of 748
@Camp Systems
EFTA00618697
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0032 NO 1 ENGINE - INTRODUCTION OF A NEW FAN CASE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisISC 0
ENC 0
SB 72-0033 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFM.56-78 IPC. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HR&MSC - 0
ENC 0
SB 72-0033 R1 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0033 R2 NO. I ENGINE - . SERVICE BULLETIN
MOS
HR&P.ISC
ENC
SB 72-0034 R1 NO 1 ENGINE - TURBINE CLEARANCE CONTROL VALVE SUPPORT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HR&LISC 0
ENC 0
SB 72-0035 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .J5 AND J6. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0101
MOS
HRSI.ISC -
ENC
SB 72-0035 R1 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .15 AND J6. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0036 R1 NO 1 ENGINE - INSTALLATION OF A TUBE OIL DRAIN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisiSC 0
ENC 0
SB 72-0037 NO. I ENGINE - REPLACEMENT OF ONE BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC 0
ENC 0
SB 72-0038 NO 1 ENGINE - MODIFICATION OF AXIAL LOAD LINK. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS.P.ISC 0
ENC 0
SB 72-0039 R2 NO 1 ENGINE - INSTALLATION OF NEW BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisISC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 407 Of 748
Camp Systems
EFTA00618698
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0040 R1 NO. I ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0040 R2 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0041 NO 1 ENGINE - DELETION OF BRACKETS ASSY FOLOWING PRECOOLER DEFLECTOR AST SIDE PANELS REMOVAL. NOT APPLICABLE
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0042 NO. I ENGINE - HPTCC MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0043 NO. I ENGINE - INTRODUCTION OF NEW BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0044 R1 NO. I ENGINE - SUPPORT BRACKET IMPROVEMENTS FOR THE CJ9 HARNESS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0045 R2 NO. I ENGINE - REWORK OF SHROUD PAD OF STRUT N',1 ON 'VEE GROOVE". SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIASC 0
ENC 0
SB 72-0045 R3 NO. I ENGINE - REWORK OF SHROUD PAD OF STRUT N',1 ON 'VEE GROOVE". SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0046 NO 1 ENGINE - MODIFICATION OF TWO BRACKETS ON BOEING FUEL SUPPLY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIASC 0
ENC 0
SB 72-0047 NO 1 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIASC - 0
ENC 0
SB 72-0047 R1 NO. I ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN
MOS
HRSIASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 408 Of 748
Camp Systems
EFTA00618699
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0047 R2 NO. I ENGINE - HPT AND LPT NOZZLE STAGE 1 - INTRODUCTION OF NEW LOW STRESS C-CLIPS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0048 R1 NO. 1 ENGINE - ANTI-ICE AND DRAIN MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0098
MOS
HRS/MSC -
ENC
SB 72-0049 R1 NO. 1 ENGINE - MODIFICATION OF HARNESS MW0304. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
MRS/MSC - 0
ENC 0
SB 72-0050 NO. 1 ENGINE - MODIFICATION OF HARNESS MW0301. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0051 NO. I ENGINE - GENERAL (72-00-00) SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0052 NO.1 ENGINE - INSPECTION OF J5. J6. J10. MW0301,MW0302, AND MW0304 HARNESSES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0053 R1 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG 52X
CWM-91X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0054 NO. I ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0054R1 NO. 1 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0055 R1 NO. I ENGINE - CHANGE OF HARDWARE FROM CORE ASSEMBLY TO ENGINE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0056 NO.1 ENGINE - VBV FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 409 Of 748
@ Camp Systems
EFTA00618700
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0057 NO. 1 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0099
MOS
HRSAISC -
ENC
SB 72-O058 NO. 1 ENGINE - INTRODUCTION OF NEW FRONT FLANGE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0059 NO. 1 ENGINE - NEW VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0080 NO. 1 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0060 R1 NO. 1 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0061 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
32X,41X.52X91X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0062 NO. 1 ENGINE - INTRODUCTION OF A REPLACEABLE CUSHION FOR HINGED CLAMP (ELECTRICAL HARNESSES
ATTACHMENT). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0063 R1 NO. 1 ENGINE - REPLACEMENT OF HOLD OPEN ROD BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-O064 R1 NO. 1 ENGINE - REPLACEMENT OF TWO BRACKETS ATTACHING THE J12 HARNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0065 NO. 1 ENGINE - INTRODUCTION OF A NEW SOURCE FOR THE VIBRATION BRG1. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0066 NO. 1 ENGINE - INTRODUCTION OF NEW SOURCE FOR SENSOR VIBRATION FFCC. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 410 Of 748
@ Camp Systems
EFTA00618701
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0067 R1 NO. I ENGINE - INTRODUCTION OF A HEAT SHIELD BETWEEN THE OIL PRESSURE SENSOR AND THE OIL COMPLIED WITH -AT MANUFACTURE 9IX
DISTRIBUTION BLOCK. SERVICE BULLETIN NA-SUPERSEDED 72-0151 - 23X
MOS 16-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0068 NO. 1 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0068 RI NO. 1 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0068 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN INFORMATIONAL
MOS
03-MAY-2012 HRS/MSC -
ENC
SB 72-0069 NO. I ENGINE - INTRODUCTION/REWORK OF TWO PS3 BRACKETS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 76-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0070 RI NO. I ENGINE - ECS DUCT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0071 NO. 1 ENGINE - MODIFICATION OF BRACKET ATTACHING THE MW0312, SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0072 NO. 1 ENGINE - INTRODUCTION OF A PAINT-MARKED COVER ASSY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0073 NO. 1 ENGINE - DRAIN TUBE SUPPORT CHANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0074 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0074 RI NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 41X,91X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 411 Of 748
@ Camp Systems
EFTA00618702
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (VG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0075 NO 1 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE AND IGNITER HARDWARE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSSISC
ENC
SB 72-0076 NO 1 ENGINE - INTRODUCTION OF NEW IDG OIL COOLER WITH A NEW GOEMETRY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC
ENC
SB 72-0077 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0077 R2 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0078 R1 NO 1 ENGINE - INTRODUCTION OF LONGER SCREWS ON LPTACC PANEL. SERVICE BULLETIN COMPLIED WITH - PARTIALLY AT MFG
MOS 16-DEC-1998
HR&P.ISC
ENC
SB 72-0079 NO 1 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSSISC -
ENC
SB 72-0079 R1 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSSISC
ENC
SB 72-0079 R2 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSilASC -
ENC
SB 72-0079 R3 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0079 R4 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 72-0079 RS NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSSISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 412 Of 748
11 Camp Systems
EFTA00618703
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0079 R6 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN RECOMMENDED
MOS
23-NOv-2010 HRSMSC
ENC
SB 72-0080 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSMSC
ENC
SB 72-0081 NO. I ENGINE - CMF56-78 ENGINE CONVERSION TO CW56-7B20:2. SERVICE BULLETIN NOT APPLICABLE
MOS
HR&MSC -
ENC
SB 72-0081 Ft1 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B20:2. SERVICE BULLETIN
MOS
MRS/4SC -
ENC
SB 72-0082 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B22r2. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC -
ENC
SB 72-0082 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CRISS-7822/2. SERVICE BULLETIN
MOS
HRS.7.ISC -
ENC
SB 72-0083 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B24/2. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS.7.ISC -
ENC
SB 72-0083 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B24/2. SERVICE BULLETIN
MOS
HRS.7.ISC -
ENC
SB 72-0084 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7826a. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS7.ISC -
ENC
SB 72-0084 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7826a. SERVICE BULLETIN
MOS
HRS7.ISC -
ENC
SB 72-0085 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CRISS-7B27a. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS.7.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 413 Of 748
Camp Systems
EFTA00618704
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0085 R1 NO. I ENGINE - CFP.156-7B ENGINE CONVERSION TO CR156-7827/2. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0086 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0086 RI NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
04-DEC-2007 HRS/MSC -
ENC
SB 72-0087 NO.1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0103
MOS
HRS/MSC -
ENC
SB 72-0088 NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0088 RI NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0088 R2 NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0089 NO. I ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1NOZZLE SEGMENT AND COMPUED WITH - AT MANUFACTURE 53X.54X
STAGE I SEAL SEGMENT. SERVICE BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0089 RI NO. I ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1NOZZLE SEGMENT AND
STAGE I SEAL SEGMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0089 R2 NO.1 ENGINE - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT
STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL SEGMENT. SERVICE BULLETIN
MOS
27-JAN-2006 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 414 Of 748
@ Camp Systems
EFTA00618705
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0089 R3 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR
INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1
SEAL-SEGMENT. SERVICE BULLETIN
MOS
10-APR-2009 HRS/MSC
ENC
SB 72-0090 NO.1 ENGINE - REINFORCEMENT OF FORWARD MOUNTING LUG OF THE LPT COOLING MANIFOLDS. SERVICE
BULLETIN
MOS 16-DEC-1998
HRSAISC 0
ENC 0
SB 72-0091 NO. 1 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107.
874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0091 R1 NO. 1 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. NOT APPLICABLE
874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0092 NO. 1 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS(MSC - 0
ENC 0
SB 72-0092 R1 NO. 1 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0093 NO. 1 ENGINE - INTRODUCTION OF NEW MOUNT HARNESS WITH S. J10. MW0311. MW0315. MW0316 ASSOCIATED COMPLIED WITH - AT MANUFACTURE
HARNESSES. SERVICE BULLETIN
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
SB 72-0094 NO. 1 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
SB 72-0094 R1 NO. 1 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0095 NO.1 ENGINE - INTRODUCTION OF LARGE BORE TRANSIENT BLEED VALVE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 415 Of 748
@ Camp Systems
EFTA00618706
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0096 NO. I ENGINE - INTRODUCTION OF HPT NOZZLE SUPPORT WITH IMPROVED PINS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0097 RI NO. 1 ENGINE - INTRODUCTION OF LONGER BOLTS ON ENGINE AND CORE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0098 NO. 1 ENGINE - INTRODUCTION OF A NEW AIR DUCT SUPPORT BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0099 NO. 1 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS WITH INNER SEAL. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 76-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0100 NO. 1 ENGINE - CFM56-78 ENGINE NAMEPLATE MARKING. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0101 NO. 1 ENGINE - NEW ROUTING OF JS AND J6 HARNESSES. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0102 NO. 1 ENGINE - INTRODUCTION OF DAC HPT ROTOR ASSEMBLY FOR USE ON THE SAC HPT ROTOR ASSEMBLY.
SERVICE BULLETIN
MOS
MRS/MSC
ENC
SB 72-0103 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0103 RI NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0103 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN RECOMMENDED
MOS
I7-FEB-2011 HRS/MSC -
ENC
SB 72-0101 NO. 1 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN - SUPERSEDED SB-PENDING
MOS
HRSAISC -
ENC
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 416 Of 748
@ Camp Systems
EFTA00618707
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0104 R1 NO. I ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0105 NO. I ENGINE - ARRANGEMENT OF VBV TURNBUCKLE. BELLCRANK. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-O106 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 72-O106 R2 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0106 R3 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0106 R4 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
I4-AUG-2007 HRS/MSC
ENC
SB 72-0107 NO. 1 ENGINE - REPLACEMENT CLAMP FOR DAC AFT SUMP OIL SUPPLY TUBE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0108 NO. 1 ENGINE - NEW VBV FUEL MANIFOLD BOLTS AND VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0109 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0109 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 417 Of 748
@ Camp Systems
EFTA00618708
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0109 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN
MOS
HRSO4SC -
ENC
SB 72-0110 RI NO. 1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER COMPUED WITH - AT MANUFACTURE
WITH ONE LUG KEY. SERVICE BULLETIN
MOS 16-DEC-1998
HRS(MSC - 0
ENC 0
SB 72-0110 R2 NO. 1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER
WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0110 R3 NO.1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER
WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0110 R4 NO.1 ENGINE - COMBUSTION CHAMBER - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF
COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0111 NO.1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH INCREASED LIFE LIMIT. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0114
MOS
HRS/MSC -
ENC
SB 72-0112 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0113 NO. 1 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0113 R1 NO. 1 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0114 NO.1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSO4SC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 418 Of 748
@ Camp Systems
EFTA00618709
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0114 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0115 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0115 R1 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0115 R2 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-O116 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/81SC -
ENC
SB 72-0117 NO.1 ENGINE - LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0117 R1 NO.1 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0118 NO. 1 ENGINE - INTRODUCTION OF A NEW I-PT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0119 NO. 1 ENGINE - RN APPLICATION ADJUSTMENT ON THE NEW VEE GROOV SYSTEM. SERVICE BULLETIN - PRODUCT IMPROVEMENT
MOS
HRS/MSC -
ENC
SB 72-0120 NO. 1 ENGINE - WASHERS TO PC FUEL TUBE/MANIFOLD. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
FIRS/MSC - 0
ENC 0
SB 72-0121 R1 NO. 1 ENGINE - CORE ASSEMBLY HARDWARE CHANGE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 419 Of 748
@ Camp Systems
EFTA00618710
AD/SI Status Report AIRCRAFT
COMP
Mien wfran Meowed up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0122 NO. 1 ENGINE - DELETION OF THE STAGE 5 BLEED COVER PLATE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0123 RI NO.1 ENGINE - INSPECTION OF TGB AIR/OIL TUBE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0124 NO. I ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVI) REMOVABLE AT ENGINE LEVEL. SERVICE COMPLIED WITH - AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
FIRS/MSC 0
ENC 0
SB 72-0124 R3 NO. 1 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVT) REMOVABLE AT ENGINE LEVEL. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0125 NO. 1 ENGINE - HPT NOZZLE INNER SEAL REPLACEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0126 NO. I ENGINE - CORE CONFIGURATION UPDATES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0128 NO. 1 ENGINE - REPLACEMENT OF BOLTS AND WASHERS ATTACHING THE REM CONE FLANGE ON THE FAN DISK COMPLIED WITH - AT MANUFACTURE
FRONT FLANGE. SERVICE BULLETIN
MOS 16-DEC-1998
HRS(MSC 0
ENC 0
SB 72-0129 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0129 RI NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0130 NO. 1 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE L5 STARTER
GEARSHAFT SERIAL NUMBER
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 420 Of 748
@ Camp Systems
EFTA00618711
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0130 R1 NO. 1 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0131 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0132 NO. 1 ENGINE - REDUCED INTERVAL FOR MAGNETIC CHIP DETECTOR INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE AG8
STARTER GEARSHAFT SERIAL NUMBER
MOS
HRSIMSC -
ENC
SB 72-0133 NO. 1 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID COMPUED WITH - AT MANUFACTURE 23X.91X
AIR TUBE. SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0133 R1 NO. 1 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID
AIR TUBE. SERVICE BULLETIN
MOS
HIRSOASC
ENC
SB 72-0134 NO. 1 ENGINE - INTRODUCTION OF A NEW CLAMP-LOOP AND ITS BRACKET FOR J12 ELECTRIC HARNESS HOLDING. COMPUED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0135 NO. 1 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. COMPUED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
MRS/MSC 0
ENC 0
SB 72-0135 R1 NO. 1 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0136 R1 NO. 1 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE COMPUED WITH -AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0136 R2 NO. 1 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 421 Of 748
@ Camp Systems
EFTA00618712
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0136 R3 NO. I ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0138 NO. 1 ENGINE - INTRODUCTION OF A HEAT SHRINK SLEEVE ON J7 AND J8 HARNESSES. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0146
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0139 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0140 NO. 1 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0140 R1 NO. 1 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0141 NO. 1 ENGINE - INTRODUCTION OF NEW LPTACC TUBE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0142 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0143 NO. 1 ENGINE - REPLACEMENT OF SUSPECT J9 HARNESSES .. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0144 NO. 1 ENGINE - INTRODUCTION OF A NEW PS3 AIR TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0145 NO. 1 ENGINE - CLAMP ASSEMBLY ADDITION TO THE TRANSIENT BLEED VALVE DRAIN TUBE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0146 NO. 1 ENGINE - J8 HARNESS ECU CONNECTION - NEW ROUTING OF TP0808* LEG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 422 Of 748
@ Camp Systems
EFTA00618713
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0147 NO. I ENGINE - N1 MODIFIER SCHEDULE CHANGE FOR CFM56-7826 AND CFM56-7827 ENGINES. SERVICE BULLETIN NOT APPLICABLE
MOS
MRS/MSC -
ENC
SB 72-0148 NO. 1 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF COMPUED WITH - AT MANUFACTURE
SAFETY WIRE. SERVICE BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0148 R1 NO.1 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF
SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0149 NO.1 ENGINE - FAN AND BOOSTER ADDITION OF A NEW WASHER ON PT25 AIR TUBE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0150 NO. 1 ENGINE - BRACKETS ASSY DELETION OF ALERNATES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC
ENC
SB 72-0151 NO. 1 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND COMPUED WITH - AT MANUFACTURE 9IX
FUEL TUBE BRACKETS. SERVICE BULLETIN NA-SUPERSEDED 72-0133 - 23X
MOS 16-DEC-1998
HRSAISC 0
ENC 0
SB 72-0151 R1 NO. 1 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND
FUEL TUBE BRACKETS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0152 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH- AT MANUFACTURE 9IX
OPEN-51X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0153 NO. I ENGINE - INTRODUCTION OF A NEW J7 HARNESS WITH COIL INTEGRATED. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0154 NO.1 ENGINE - INTRODUCTION OF A NEW VSV FUEL TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 423 Of 748
@ Camp Systems
EFTA00618714
AD/SI Status Report AIRCRAFT
COAtiaheW
•fra the clued up' 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0155 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0155 RI NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0156 NO. 1 ENGINE - HPT NOZZLE SHROUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0156 RI NO.1 ENGINE - HPT NOZZLE SHRUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0156 R2 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE (72-53-00)- HPT NOZZLE SHROUD SUPPORT OPTIONAL
REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
13-FEB-2012 HRS/MSC -
ENC
SB 72-0157 NO. 1 ENGINE - IMPROVED SEAL MATERIAL. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 72-0158 NO. 1 ENGINE - COMBUSTOR LINER PROOUCIBILITY IMPROVEMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0158 RI NO. 1 ENGINE - COMBUSTOR LINER PRODUCIBILTY IMPROVEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0159 NO. 1 ENGINE - INCREASING OF BOLT LENGTH ON T49.5 PROBE BOX. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0160 NO. 1 ENGINE - REMOVAL OF INTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU
874-105. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0161 NO. 1 ENGINE - REPLACEMENT OF ECU BRACKET ASSY ON THE FAN FRAME. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 424 Of 748
@Camp Systems
EFTA00618715
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0162 NO. I ENGINE - INSPECT HPT STR MANIFOLD/LPT STAGE I NOZZLE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0163 NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
58 72-0164 NO. 1 ENGINE - HPT CLEARANCE CONTROL MANIFOLD. LPT COOLING/TF SENSOR AND ELECTRICAL SUPPORT
BRACKET CHANGES. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0165 NO. 1 ENGINE - RETROFIT INSTALLATION FOR COMPLYANCE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0166 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN NOT APPLICABLE - 91X OPEN-56X
MOS
HRS/MSC -
ENC
SB 72-0166 R1 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0166 R2 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0167 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0167 R1 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0167 R2 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0168 NO. 1 ENGINE - CONVERSION OF CFM56-7B TO 7827/83. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 425 Of 748
@ Camp Systems
EFTA00618716
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0168 R1 NO 1 ENGINE - CONVERSION OF CFM56-7B TO 7827.'63. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0168 R2 NO 1 ENGINE - CFM 56-7B ENGINE CONVERSION TO CFM 56-7827183.. SERVICE BULLETIN
MOS
HRS/LISC -
ENC
SB 72-0169 NO. I ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0169 R1 NO 1 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSASC -
ENC
SB 72-0169 R2 NO 1 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRS.,mSC -
ENC
SB 72-0170 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSIISC -
ENC
SB 72-0171 NO. I ENGINE - INTRODUCTION OF A NEW STAGE I VANE ASSY. SERVICE BULLETIN
MOS
HRS.,mSC -
ENC
SB 72-0172 NO. I ENGINE - REPLACEMENT OF BRACKET FOR INSTALLATION OF BOEING FLOWMETER KIT. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0173 NO. I ENGINE - LPT SHIFT MARAGING 250 MATERIAL. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0173 R1 NO. I ENGINE - LOW PRESSURE TURBINE SHAFT - INTRODUCTION OF A NEW LPT SHAFT MADE OF MARAGING 250
MATERIAL. SERVICE BULLETIN
MOS
HRSASC
ENC
SB 72-0174 NO 1 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 426 Of 748
1, Camp Systems
EFTA00618717
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0175 NO. 1 ENGINE - INTRODUCTION OF TWO WAISTS ON ATTACHMENT STRUT 4 AND STRTUT 10 CLAMPS ASSY. SERVICE
BULLETIN
MOS
HRS(MSC
ENC
SB 72-0176 NO. 1 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 72-0176 R1 NO.1 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0176 R2 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - NEW OUTER DOME AND INNER DOME INTRODUCTION.
SERVICE BULLETIN
MOS
30-SEP-2009 HRSPASC
ENC
SB 72-0177 NO. 1 ENGINE - INTRODUCTION OF A NEW I-PT STATOR PIN RETAINER. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0178 NO.1 ENGINE - NEW NO. 5 BEARING SUPPORT. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0179 NO.1 ENGINE - VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0180 NO.1 ENGINE - REDUCED INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE
BULLETIN
MOS
HRSOASC -
ENC
SB 72-0181 NO.1 ENGINE - FAN FRAME -NEW BRACKET ASSEMBLY. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0182 NO.1 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 427 Of 748
@ Camp Systems
EFTA00618718
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0182 R1 NO. 1 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN
MOS
10-JAN-2008 HRSISISC -
ENG
SB 72-0183 NO. 1 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HR&MSC -
ENG
SB 72-0184 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0185 NO. 1 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN
MOS
HRSNSC -
ENG
SB 72-0185 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN
MOS
HRSIMSC -
ENG
SB 72-0186 NO. I ENGINE - NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
23-SEP-1999 HRSIMSC -
ENG
SB 72-0186 R1 NO. I ENGINE - INTRODUCTION OF NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
OS-MAR-2005 HRSIMSC -
ENG
SB 72-0187 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSISISC -
ENG
SB 72-0188 NO. I ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN
MOS
HRSNSC -
ENG
SB 72-0188 R1 NO. I ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN
MOS
HRSNSC -
ENG
SB 72-0188 R2 NO. 1 ENGINE - FAN FRAME ASSEMBLY - DISCONNECTION AND RECONNECTION OF MW0301 (J01) AND MW0302 (J02)
HARNESSES AT THEIR APPROPRIATE LOCATION. SERVICE BULLETIN
MOS
HRSi MSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 428 Of 748
Camp Systems
EFTA00618719
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0189 NO. 1 ENGINE - INTRODUCTION OF A NEW VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET CHANGE. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0190 NO. 1 ENGINE - REPLACEMENT OF STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0191 NO. 1 ENGINE - SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0191 RI NO. 1 ENGINE - NEW SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0192 NO. 1 ENGINE - REPLACEMENT OF NOA ROLLER BEARING 335-352-301-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0193 NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON FLANGE B6. J1 ELECTRIC HARNESS
HOLDING, SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0194 NO. 1 ENGINE - INTRODUCTION OF A WAIST ON STRUT PROFILE (9 O'CLOCK). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0195 NO. 1 ENGINE - INTRODUCTION OF NEW NIPPLE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0196 NO. 1 ENGINE - ABRADABLE STAGE 3 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0197 NO. 1 ENGINE - CHAMFER ON LOCKS-STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0198 NO. 1 ENGINE - LPT STAGE 2 SEAL SEGMENT WITH NEW LOCK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 429 Of 748
@ Camp Systems
EFTA00618720
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0199 NO. I ENGINE - TWO NEW LONGER BOLTS FOR ELECTRICAL HARNESS SUPPORT (3 O'CLOCK). SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0200 NO. I ENGINE - INTRODUCTION OF A NEW ASSY WITH NEW DESIGN ON FLANGE B6. FUEL TUBE HOLDING. SERVICE
BULLETIN
MOS
HRSIMSC
ENC
SB 72-0201 NO. I ENGINE - SPARE PARTS RELEASE FOR CFN156-7 PC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0202 NO. I ENGINE - REMOVAL OF SILICONE ELASTOMER SEALS FROM FAN DUCT PANELS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0203 NO. I ENGINE - INTRODUCTION OF A STRAIGHT HEADLESS PIN TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRS.4.1SC -
ENC
SB 72-0204 NO. I ENGINE - FUEL TRANSIENT BLEED VALVE MANIFOLD BOLT CHANGE. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0205 NO. I ENGINE - MODIFICATION OF ONE FIRE DETECTION BRACKET ASSY AND INCREASING OF OVERTAKING BOLTS
ON FLANGE B6. SERVICE BULLETIN
MOS
ENC
SB 72-0206 NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0207 NO. I ENGINE - RETURN TO CFMI OF NO.4 ROLLER BEARING 335-352-301-0 STORED AS SPARES. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0208 NO. I ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0208 R1 NO. I ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 430 Of 748
Camp Systems
EFTA00618721
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0208 R2 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0208 R3 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
08-MAR-2005 HRS/LISC
ENC
SB 72-0208 R4 NO. 1 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
25-MAY-2C07 HRS.4.ISC
ENC
SB 72-0208 R5 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW
ACCOMPLISHMENT
INSTRUCTIONS FOR MARKING. SERVICE BULLETIN
MOS
14-JAN-2009 HRSMSC -
ENC
SB 72-0209 R1 NO. I ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRSitISC
ENC
SB 72-0209 R2 NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE
BULLETIN
MOS
HR&P.ISC
ENC
SB 72-0209 R4 NO. 1 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 72-0209 R5 NO. 1 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0209 R6 NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY
AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
05-FEB-2010 HRSI.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 431 Of 748
1' Camp Systems
EFTA00618722
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0209 R7 NO 1 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72.41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY RECOMMENDED
AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
13-FEB-2012 HR&MSC -
ENG
SB 72-0210 NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3
SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRS.MSC -
ENG
SB 72-0210 R2 NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3
SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRS.P.ISC -
ENG
SB 72-0211 NO. I ENGINE - INTRODUCTION OF A NEW FORWARD INNER NOZZLE SUPPORT. SERVICE BULLETIN
MOS
HRS.MSC -
ENG
SB 72-0212 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0212 Ri NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN
MOS
HRS.IISC -
ENG
SB 72-0213 NO. I ENGINE - INTRODUCTION OF A INTERMEDIATE FLANGE WITH A NEW DESIGN. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0214 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0215 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN
MOS
HRS.MSC -
ENG
SB 72-0216 NO. I ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON THE ACCESSORY GEARBOX.
ELECTRIC HARNESSES AND POWERS FEEDERS IDG CABLE HOLDING. SERVICE BULLETIN
MOS
HRS.P.ISC -
ENG
9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 432 Of 748
'2 Camp Systems
EFTA00618723
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0217 NO. I ENGINE - LPT BLADES STAGE 4 IMPROVEMENT. SERVICE BULLETIN
MOS
HRSimSC -
ENG
SB 72-0218 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0219 NO. I ENGINE - INTRODUCTION OF A NEW FOOL PROOF PLATE. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0220 NO 1 ENGINE - INTRODUCTION OF NEW N2 SENSOR. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0221 NO 1 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0221 R1 NO. I ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN
MOS
HRSimSC -
ENG
SB 72-0222 NO. I ENGINE - REMOVAL EXTERNAL INSTRUMENTATION. SERVICE BULLETIN
MOS
HRSimSC -
ENG
SB 72-0223 NO. I ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRSimSC -
ENG
SB 72-0224 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7-8 IPC. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0225 NO. I ENGINE - INTRODUCTION OF NEW LPT COOLING MANIFOLD. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0225 R1 NO. I ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD. SERVICE BULLETIN
MOS
HRS' mSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 433 Of 748
1, Camp Systems
EFTA00618724
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0226 NO. 1 ENGINE - INTRODUCTION OF STAGE 2 AND STAGE 4 BLADE KITS TO THE SPARE PARTS LIST. SERVICE
BULLETIN
MOS
MRS/51SC
ENC
SB 72-0227 NO. 1 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0227 RI NO. 1 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0228 NO. 1 ENGINE - INTRODUCTION OF A NEW NEXT HIGHER ASSEMBLY COOLING MANIFOLD UP AND DOWN. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0229 NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0229 RI NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
II -FEB-2008 HRS./MSC -
ENC
SB 72-0229 R2 NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
22-FEB-2011 MRS/51SC -
ENC
SB 72-0229 R3 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD CUSTOMER
REWORK. SERVICE BULLETIN CONVENIENCE
MOS
13-SEP-2011 MRS/51SC -
ENC
SB 72-0229 R4 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD
REWORK. SERVICE BULLETIN
MOS
23-FEB-2012 MRS/51SC -
ENC
SB 72-0230 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 434 Of 748
@ Camp Systems
EFTA00618725
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0230 R1 NO. 1 ENGINE - . SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0231 NO. 1 ENGINE - INTRODUCTION OF A NEW TURNBUCKLE ASSY WITH A NEW DESIGN. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0232 NO. 1 ENGINE - INTRODUCTION OF A NEW HARNESS WITH NEW ROUTING, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0233 NO. 1 ENGINE - INTRODUCTION OF A FIELD REWORKED HPT NOZZLE STATOR SEGMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0234 NO. 1 ENGINE - INTRODUCTION OF UPPER DRAIN MANIFOLD nASKET, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0235 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0236 NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT HOUSING. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0237 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN FRAME WITH GANGS CHANNEL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0239 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING
VALVE FUNCTION. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0239 R1 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING
VALVE FUNCTION. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0240 R1 NO. 1 ENGINE - INTRODUCTION OF THE NEW MOUNT HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 435 Of 748
@ Camp Systems
EFTA00618726
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0240 R2 NO. I ENGINE - MODIFICATION OF HARNESSES MOUNTS. SERVICE BULLETIN
MOS
11-MAR-2005 HRS.11ASC -
ENC
SB 72-0241 NO. I ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN
MOS
HRS.i MSC -
ENC
SB 72-0241 R1 NO. I ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN
MOS
08-JAN-2007 HRS1MSC
ENC 25000 (s)
SB 72-0242 NO 1 ENGINE - INTRODUCTION OF NEW LONGER BOLTS ON KIT CLOSE OMS BOX ATTACHMENT. SERVICE BULLETIN
MOS
HRSLISC -
ENC
SB 72-0243 NO. I ENGINE - INTRODUCTION OF A BRACKET ASSY ON NO.1 AND NO. 2 BEARING SUPPORT OIL SUPPLY TUBE
HOLDING. SERVICE BULLETIN
MOS
HRS,MSC
ENC
SB 72-0244 121 NO. I ENGINE - POSITIONING MODIFICATION OF 2 CLAMPS ATTACHING THE FUEL TUBE AND THE OIL RETURN TUBE
TO FACILITATE THE ENGINE COVER INSTALLATION. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0245 NO. I ENGINE - SPARE PARTS RELEASE CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSLISC -
ENC
SB 72-0246 NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRSLISC -
ENC
SB 72-0246 R1 NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRS.11ASC -
ENC
SB 72-0246 R2 NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
11-MAR-2005 HRS1MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 436 Of 748
Camp Systems
EFTA00618727
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0247 NO. 1 ENGINE - INTRODUCTION OR REWORK OF THE BRACKET ASSY ON ACCESSORY GEARBOX ATTACHING THE J5
ELECTRIC WIRING HARNESS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0248 NO.1 ENGINE - REPLACEMENT OR REWORK OF BRACKET ASSY ATTACHING THE MW0301 ELECTRICAL HARNESS ON
FLANGE 84. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0249 NO. 1 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0249 RI NO. 1 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN
MOS
23-OCT-2007 HRSAISC -
ENC
SB 72-0251 NO. I ENGINE - FAN FRAME ASSEMBLY. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0252 NO. 1 ENGINE - INTRODUCTION OF NEW RADIAL SHAFT SUPPORT GUIDE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0253 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE COMPLIED WITH
UNDERCUT. SERVICE BULLETIN
MOS 07-SEP-2005
HRSfMSC 2202:24
ENC 511
SB 72-0253 RI NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE
UNDERCUT. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0253 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE
UNDERCUT. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0253 R3 NO.1 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 437 Of 748
@ Camp Systems
EFTA00618728
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0253 R4 NO. I ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HRSimSC
ENC
SB 72-0253 R5 NO 1 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HR&LISC
ENC
SB 72-0253 R6 NO 1 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HR&P.ISC
ENC
SB 72-0254 NO. I ENGINE - INTRODUCTION OF A NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0255 NO 1 ENGINE - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR T49.5 HARNESS HOLDING. SERVICE
BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0255 RI NO. I ENGINE - ENGINE ASSEMBLY - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR 749.5
HARNESS ATTACHMENT. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 72-0256 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 72-0257 NO. I ENGINE - FAN FRAME ASSEMBLY - REPLACEMENT OF TWO BRACKETS ASSY TO ATTACH THE mw0315 AND
MW0316 ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0258 NO. I ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0258 RI NO. I ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN
MOS
HRSIISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 438 Of 748
Camp Systems
EFTA00618729
AD/SI Status Report AIRCRAFT
CI AWInne Met mini 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 72-0259 NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0259 RI NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-O259R2 NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0260 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-O26OR1 NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0261 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0262 NO. 1 ENGINE - NEW MW0311 ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0262 RI NO. 1 ENGINE - NEW MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0263 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0264 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0265 NO. 1 ENGINE - INTRODUCTION OF NEW LPT SHAFT. SERVICE BULLETIN
MOS
HRSOASC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 439 Of 748
© Camp Systems
EFTA00618730
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0266 NO. I ENGINE - INTRODUCTION OF A NEW ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING. SERVICE
BULLETIN
MOS
HRS11.1SC
ENC
SB 72-0266 RI NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING,
SERVICE BULLETIN
MOS
II -MAR-2005 HRS11.1SC
ENC
SB 72-0267 NO. 1 ENGINE - INTRODUCTION OF A NEW LOCKS OF STAGE 2.3 AND 4 BLADES. SERVICE BULLETIN
MOS
HRS11.1SC -
ENC
SB 72-0267 RI NO.1 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0267 R2 NO.1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE
BULLETIN
MOS
77-DEC-2001 HRS(P.ISC
ENC
SB 72-0267 R3 NO.1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE
BULLETIN
MOS
HRS11.1SC
ENC
SB 72-0268 NO.1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0268 RI NO. 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0268 R2 NO. 1 ENGINE - INTRODUCTION OF NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0268 R3 NO. 1 ENGINE - FAN AND BOOSTER- INTRODUCTION OF THE NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
77-DEC-2001 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 440 Of 748
@ Camp Systems
EFTA00618731
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0269 NO. I ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE
BULLETIN
MOS
HRS4.ISC
ENC
SB 72-0269 Ri NO 1 ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE
BULLETIN
MOS
HRSIASC
ENC
SB 72-0270 NO 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY-J7 HARNESS HOLDING. SERVICE BULLETIN
MOS
HRS4.ISC -
ENC
SB 72-0271 NO. I ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM
BUSHING. SERVICE BULLETIN
MOS
HRS4.1SC -
ENC
SB 72-0271 R2 NO. I ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM
BUSHING. SERVICE BULLETIN
MOS
HRS4.1SC -
ENC
SB 72-0271 R3 NO. I ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRS(IISC
ENC 10000 (s)
SB 72-0271 R4 NO. I ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRSAISC
ENC 10000 (s)
SB 72-0271 R5 NO. I ENGINE - FAN AND BOOSTER (72-21.00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRSitiSC -
ENC
SB 72-0272 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
HRS4.1SC -
ENC
SB 72-0273 NO. I ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES kiW0301 AND MW0302. SERVICE
BULLETIN
MOS
HRS4.1SC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 441 Of 748
Camp Systems
EFTA00618732
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0273 R1 NO. 1 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MVV0301 AND MW0302. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0274 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0275 NO. 1 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY AIRFOIL
SEAL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0275 RI NO.1 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT ASSEMBLY - INTRODUCTION OF A NEW NO.1 BEARING
STATIONARY SEAL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0276 NO. 1 ENGINE -SPARE PARTS FOR CFM56-78. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0277 NO. 1 ENGINE - INTRODUCTION OF NEW OIL COLLECTOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0278 NO. 1 ENGINE - INTRODUCTION OF HPT/LPT NOZZLE SHROUD ASSEMBLY 9324M62G05 AND HPT NOZZLE SHROUD
SUPPORT 2002M69G03. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0279 NO. 1 ENGINE - INTRODUCTION OF NEW HPT STATOR AIR MANIFOLD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0280 NO. 1 ENGINE - INTRODUCTION OF NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0281 NO. 1 ENGINE - HARDWARE TRANSFER TO ENGINE LEVEL FROM CORE LEVEL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 442 Of 748
@ Camp Systems
EFTA00618733
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0283 NO. 1 ENGINE - GENERAL - INTRODUCTION OF CLAMP AND ATTACHING BOLT OF MW0325 HARNESS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0284 NO. 1 ENGINE - TRANFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0284 R1 NO. 1 ENGINE - TRANSFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY
LEVEL. SERVICE BULLETIN
MOS
II -MAR-2005 HRS/MSC
ENC
SB 72-0285 NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED.. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0285 R1 NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0285 R2 NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0286 RI NO. 1 ENGINE - TURBINE LOW PRESSURE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0286 R2 NO.1 ENGINE - INTRODUCTION OF A NEW LPT BLADE STAGE 1. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0287 NO.1 ENGINE - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0287 RI NO. 1 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 443 Of 748
@ Camp Systems
EFTA00618734
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0287 R2 NO. I ENGINE - ENGINE - ENGINE(72-O0-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY SB 72-0287 R3). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0287 R3 NO. I ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY 58 72-0287 R4). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0287 R4 NO. I ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN INFORMATIONAL
MOS
I5-OCT-2013 HRS/MSC -
ENC
SB 72-0288 NO. 1 ENGINE - INTRODUCTION OF NEW HPT INNER STATOR STATIONARY SEAL HEAT SHIELD TO THE SPARE PARTS
LIST. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0289 NO. 1 ENGINE - INTRODUCTION OF ALTERNATE INNER DOME. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0290 NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0290 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0291 NO. I ENGINE - TRANSFER GEARBOX. SERVICE BULLETIN
MOS
HRS/S1SC
ENC
SB 72-0291 R1 NO. I ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT.
SERVICE BULLETIN
MOS
HRS/S1SC
ENC
SB 72-0291 R2 NO. I ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT.
SERVICE BULLETIN
MOS
HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 444 Of 748
@ Camp Systems
EFTA00618735
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0292 NO. I ENGINE - LOW PRESSURE TURBINE SHAFT - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE
AIR'OIL SEAL TO THE LPT SHAFT. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0292 R1 NO. I ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT (72-55-00) - DELETION OF THE PRELIMINARY ATTACHMENT
SYSTEM OF THE AINOIL SEAL OF THE LPT SHAFT. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0293 NO 1 ENGINE - INTRODUCTION OF A SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN
MOS
HRSitISC -
ENC
SB 72-0293 R1 NO. I ENGINE - TURBINE LOW PRESSURE (72-54-00) - INTRODUCTION OF SELF LOCKING BORESCOPE CAP
ASSEMBLY. SERVICE BULLETIN
MOS
HRSIISC
ENC
SB 72-0294 NO 1 ENGINE - INTRODUCTION OF STAINLESS STEEL NUTS TO REPLACE CADMIUM PLATING NUTS. SERVICE
BULLETIN
MOS
HRSIISC
ENC
SB 72-0295 NO 1 ENGINE - FAN AND BOOSTER (72-21-00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R1). SUPERSEDED
SERVICE BULLETIN
MOS
HRSilISC
ENC
SB 72-0295 R1 NO 1 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R2). SUPERSEDED
SERVICE BULLETIN
MOS
HRSAISC -(s)
ENC
SB 72-0295 R3 NO. I ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL. SERVICE BULLETIN
MOS
22-JUN-2007 HRS,IISC
ENC 15000 (s)
SB 72-0296 NO. I ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 RI ). SERVICE BULLETIN SUPERSEDED
MOS
HRSI.ISC -
ENC
SB 72-0296 R1 NO. I ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 R2). SERVICE BULLETIN SUPERSEDED
MOS
HRSitISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 445 Of 748
Camp Systems
EFTA00618736
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0296 R2 NO. I ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R3). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0296 R3 NO. 1 ENGINE - INTRODUCTION OF COUNTER WEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R4). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC - (s)
ENC
SB 72-0296 R4 NO. I ENGINE - FAN AND BOOSTER. INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL.(SUPERSEDED SUPERSEDED
BY 72-0296 R5). SERVICE BULLETIN
MOS
MRS/P.1SC - (s)
ENC
513 72-0296 R5 NO. 1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL
(SUPERSEDED BY 72-0296 R6). SERVICE BULLETIN
MOS
I7-DEC-2001 MRS/P.1SC
ENC 7000 (s)
SB 72-0296 R6 NO. 1 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R7). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC - (s)
ENC
513 72-0296 R7 NO. I ENGINE - ENGINE -FAN AND BOOSTER (72-21-00) - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER
SPOOL. SERVICE BULLETIN
MOS
HRS/MSC
ENC 7000 (s)
SB 72-0297 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
MRS/P.1SC
ENC
SB 72-0298 NO. 1 ENGINE - NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS/PASC -
ENC
SB 72-0298 RI NO. 1 ENGINE - FAN FRAME ASSEMBLY - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH
INSERTS. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0298 R2 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED
LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 446 Of 748
@ Camp Systems
EFTA00618737
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0298 R3 NO. ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED
LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS4ASC
ENC
SB 72-0299 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSIMSC
ENC
SB 72-0300 NO. I ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-O300R1 NO 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0300 R2 NO 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS4.ISC -
ENC
SB 72-0300 R3 NO. ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE.
SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0300 R4 NO. I ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE.
SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 72-0301 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSMSC
ENC
SB 72-0302 NO. I ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS4.ISC -
ENC
SB 72-0303 NO. I ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 447 Of 748
Camp Systems
EFTA00618738
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0303 R1 NO. 1 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0304 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) -ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
13-NOV-2001 HRS/MSC 1700 (s)
ENC
SB 72-0304 R1 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)- ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
HRS/MSC 15000 (s)
ENC
SB 72-0304 R2 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)- ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
HRS/MSC 15000 (s)
ENC
SB 72-0304 R3 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) -ON-WING BORESCOPE INSPECTION OF THE RECOMMENDED
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
20-MAR-2007 HRS/MSC 15000 (s)
ENC
SB 72-0305 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0306 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0308 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/81. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0309 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/81. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0310 NO.1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 448 Of 748
@ Camp Systems
EFTA00618739
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0311 NO. 1 ENGINE - (PT SHAFT - REPLACEMENT OF THE NO.4 ROLLER BEARING. SERVICE BULLETIN
MOS
24-JAN-2001 HRSPISC
ENC
SB 72-0312 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRSPISC
ENC
SB 72-0313 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/hISC
ENC
SB 72-0314 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRSPASC
ENC
SB 72-0315 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 72-0316 NO. 1 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE
BULLETIN
MOS
HRSPASC -
ENC
SB 72-0316 RI NO. 1 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE
BULLETIN
MOS
HRSPASC -
ENC
SB 72-0316 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 72-0316 R3 NO. I ENGINE - ENGINE - GENERAL (72-00-00)- REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 72-0316R4 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
24-JUN-2011 HRSPISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 449 Of 748
@ Camp Systems
EFTA00618740
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0317 NO. 1 ENGINE - SPARE PARTS INTRODUCTION. SERVICE BULLETIN CANCELLED
MOS
HRSAISC -
ENC
SB 72-O318 NO. 1 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (RTV) ON THE FAN BLADE RETAING FLANGE.
SERVICE BULLETIN
MOS
MRS/51SC
ENC
SB 72-O318 RI NO. 1 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (R1V) ON THE FAN BLADE RETAINING FLANGE.
SERVICE BULLETIN
MOS
MRS/51SC
ENC
SB 72-0319 NO. 1 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0319 RI NO. 1 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN
MOS
10-DEC-2007 HRSAISC -
ENC
SB 72-0320 NO. 1 ENGINE - INTRODUCTION OF THE NEW REAR FLANGE AS ALTERNATE ON THE LPT NOZZLE STAGE 1. SERVICE
BULLETIN
MOS
MRS/MSC
ENC
SB 72-0321 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRSAISC
ENC
SB 72-0322 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0322 RI NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
20-NOV-2006 MRS/51SC -
ENC
SB 72-0323 NO. 1 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 450 Of 748
@ Camp Systems
EFTA00618741
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0323 R1 NO. I ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0324 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0324 R2 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRSiI.ISC -
ENC
SB 72-0324 R3 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0324 R5 NO. I ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - INTRODUCTION OF REWORKED FAN DISKS AND NEW OPTIONAL
SPACERS AND SHIMS. SERVICE BULLETIN
MOS
03-JAN-202 HRS.ISC -
ENC
SB 72-0325 NO. I ENGINE - ELASTOMER AXIAL STOP PIN. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0325 R1 NO. I ENGINE - ELASTOMETER AXIAL STOP PIN. SERVICE BULLETIN
MOS
HRSiI.ISC -
ENC
SB 72-0325 R2 NO. I ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING
FLANGE. SERVICE BULLETIN
MOS
17-DEC-2001 HRSLISC
ENC
SB 72-0325 R3 NO. I ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING
FLANGE. SERVICE BULLETIN
MOS
HRS1P.ISC
ENC
SB 72-0326 NO. I ENGINE - ON-WING BORESCOPE INSPECTION OF HPT BLADES. SERVICE BULLETIN COMPLIED WITH
MOS 22-AUG-2C08 RECURRING
14-NOV-2C01 HRS1.ISC 3260:48
ENC WOO 7.16 1746
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 451 Of 748
Camp Systems
EFTA00618742
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0327 NO. I ENGINE - ENGINE - GENERAL - INSTALLATION OF A SAFETY WIRE OVER THE OIL TEMPERATURE PROBE CANCELLED
HOUSING. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0328 NO 1 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR OliiS INSPECTION. SERVICE
BULLETIN
MOS
HRS4ISC
ENC
SB 72-0328 Fei NO 1 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE
BULLETIN
MOS
HRS,IISC
ENC
SB 72-0329 NO. I ENGINE - REPLACEMENT OF NO. 4 ROLLER BEARING 305-355-717-0. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0330 NO. I ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0330 R1 NO 1 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
HRSi siSC -
ENC
SB 72-0331 NO 1 ENGINE - DELETION OF BURNER STAGING VALVE PARKING BRACKET. SERVICE BULLETIN
MOS
HRSisiSC -
ENC
SB 72-0332 NO 1 ENGINE - INTRODUCTION OF NEW VSV INNER BUSHING AND WASHERS. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0332 R1 NO. I ENGINE - COMPRESSOR FRONT STATOR - INTRODUCTION OF NEW VSV INNER BUSHINGS AND WASHERS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0333 NO 1 ENGINE - CORE MODULE AND FAN MODULE. SERVICE BULLETIN
MOS
HRSi P.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 452 Of 748
Camp Systems
EFTA00618743
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0333 R1 NO. 1 ENGINE - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0333 R2 NO. 1 ENGINE - CORE MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND
TUBE NIPPLE WITH SAFETY WIRE HOLES. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 72-0333 R3 NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED
PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0333 R4 NO.1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED
PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0334 NO.1 ENGINE - FAN MAJOR MODULE - INTRODUCTION OF A 4-5 O'CLOCK LPYACC STRUT PANEL WITH DESIGN
IMPROVED OR REWORKED. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0334 R1 NO. 1 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPTACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0334 R2 NO. 1 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPT ACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED.
SERVICE BULLETIN
MOS
II -MAR-2005 HRS/MSC
ENC
SB 72-0335 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0336 NO. 1 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE COMPLIED WITH
BULLETIN
MOS 07-JUL-2001
HRS/MSC - 782
ENC 54
SB 72-0337 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 453 Of 748
@ Camp Systems
EFTA00618744
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0337 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0338 NO. 1 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0338 RI NO. 1 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B
. SERVICE BULLETIN
MOS
HRS1P.ISC
ENC
SB 72-O339 NO. 1 ENGINE - LPT FRAME - REPLACEMENT OF THE CURRENT OIL SUPPLY TUBE BY A REMOVABLE TUBE. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-O340 NO. 1 ENGINE - TURBINE FRAME. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-O341 NO. 1 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-O341 RI NO. 1 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0342 NO. 1 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0342 RI NO. 1 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0343 NO. 1 ENGINE - INTRODUCTION OD IMPROVED HPT ROTOR SPOOL WEIGHTS FOR STAGES 6-9. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0344 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 454 Of 748
@ Camp Systems
EFTA00618745
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0344 RI NO. I ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0345 RI NO. I ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND
A NEW SEALING PLATE. SERVICE BULLETIN
MOS
HRS;LISC
ENC
SB 72-0345 R2 NO. I ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND
A NEW SEALING PLATE. SERVICE BULLETIN
MOS
HRS., MSC
ENC
SB 72-0346 NO 1 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON
THE LPT STAGE I. SERVICE BULLETIN
MOS
HRS,MSC
ENC
SB 72-0346 RI NO 1 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-CO) - REPLACEMENT OF BLADES AND DEFLECTORS ON
THE LPT STAGE I. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0346 R2 NO. I ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS OF THE
LPT STAGE I. SERVICE BULLETIN
MOS
02-MAR-2006 HRS'MSC -
ENC
SB 72-0347 NO. I ENGINE - ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0347 RI NO 1 ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4 BLADES. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0348 NO. I ENGINE - SPARE PARTS RELEASE FOR CRI56-7B IPC. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0349 NO. I ENGINE - SPARE PARTS RELEASE FOR CRI56-7B IPC. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 455 Of 748
Camp Systems
EFTA00618746
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0350 NO. I ENGINE - ENGINE - NIGH PRESSURE TURBINE NOZZLE - INTRODUCTION OF FIELD REWORK FOR HPT AIR
MANIFOLD. SERVICE BULLETIN
MOS
HRS.P.ISC -
ENC
SB 72-0350 R1 NO. I ENGINE - INTRODUCE A FIELD REWORKED AIR HPT STATOR MANIFOLD PIN 2071M29G02. SERVICE BULLETIN
MOS
30-JAN-2009 HRS'MSC -
ENC
SB 72-0351 RI NO. I ENGINE - INTRODUCTION OF HIGH PRESSURE TURBINE BLADE KIT 737L325G03 AND HPT BLADE 1957M10P01.
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0352 NO 1 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE
BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0352 R1 NO 1 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE
BULLETIN
MOS
HR&MSC -
ENC
SB 72-0353 NO. I ENGINE - FAN AND BOOSTER (12-21-O0) - INTRODUCTION OF A NEW FAN BLADE PLATFORM DESIGN
340-001414-0. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0354 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0355 NO 1 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN.
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0355 R1 NO. I ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN.
SERVICE BULLETIN
MOS
04-AUG-2C05 HRSimSC
ENC
SB 72-0356 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRS'MSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 456 Of 748
Camp Systems
EFTA00618747
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0357 R1 NO. 1 ENGINE - INTRODUCTION OF NO. 4 STRUT FAIRING WITH NEW MATERIAL ( STEEL VERSION). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0358 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH AN OBLONG HOLE
AND REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSLMSC -
ENC
SB 72-0359 NO. 1 ENGINE - INTRODUCTION OF NEW LPT REAR FRAME AND NEW OIL COLLECTOR WITH DELETION OF 16 HOLES
AND BOLTS OUT OF 32, SERVICE BULLETIN
MOS
HRSLMSC
ENC
SB 72-0360 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0361 NO. 1 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE WITH A 2D BARRED MANUFACTURER CODE.
SERVICE BULLETIN
MOS
HRSLMSC
ENC
SB 72-0362 NO. 1 ENGINE - INTRODUCTION OF NEW AFT ACOUSTICAL PANEL ASSEMBLY AT IDG AIR / OIL COOLER LOCATION.
SERVICE BULLETIN
MOS
HRSLMSC
ENC
SB 72-0363 NO. 1 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN
MOS
HRSLMSC -
ENC
SB 72-0363 RI NO. 1 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN
MOS
22-APR-2005 HRS/MSC -
ENC
SB 72-0364 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSLMSC -
ENC
SB 72-0365 NO. 1 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 457 Of 748
@ Camp Systems
EFTA00618748
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0365 R1 NO. 1 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0366 NO. 1 ENGINE - REPLACEMENT OF FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0366 R1 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN RETAINING FLANGE OR
REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0367 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0368 R1 NO. 1 ENGINE -ENGINE-ACCESSORY GEARBOX (72-63-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0368 R2 NO. I ENGINE -ENGINE-ACCESSORY GEARBOX ASSEMBLY (7263-00)- REPLACEMENT OF BALL BEARING
340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN
MOS
25-SEP-2006 HRSAISC -
ENC
SB 72-0368 R3 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING SUPERSEDED
340-052-602-0 IN A SUSPECT LOT (SUPERSEDED BY SB 72-0368 R4), SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0368 R4 NO. 1 ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
I8-OCT-2013 HRS/MSC
ENC
SB 72-0369 NO.1 ENGINE - VGB GUIDE PAD INSPECTION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0371 R1 NO.1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 458 Of 748
@ Camp Systems
EFTA00618749
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0372 NO. 1 ENGINE - OIL TEMP PROBE SAFETYWIRE. SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2008
HRSAISC - 3260:48
ENC 746
SB 72-0374 NO.1 ENGINE - FAN AND BOOSTER - TIGHTENING OF BOOSTER SPOOL FOWARD PINS. SERVICE BULLETIN
MOS
HRSAISC
ENC 1500 (s)
SB 72-0375 NO. 1 ENGINE - HPT REAR SHAFT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0376 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0379 NO.1 ENGINE - ENGINE-HIGH PRESSURE TURBINE NOZZLE ( 72-51-00 )- REAR SUPPORT NUT SHIELD MATERIAL
CHANGE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0380 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0381 NO. 1 ENGINE - INTRO HPC STG 4 BLADE KIT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0381 RI NO. 1 ENGINE - INTRODUCTION OF STAGE 4 BLADE KIT TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0382 NO. 1 ENGINE - REPLACEMENT OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE
THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0382 RI NO. 1 ENGINE - INTRODUCTION OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE
THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 459 Of 748
@ Camp Systems
EFTA00618750
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 72-0383 NO. 1 ENGINE - TURBINE LOW PRESSURE - BORESCOPE INSPECTION FOR STAGE 1 LPT BLADE POSITION. SERVICE
BULLETIN
MOS
HRS/MSC
ENC 800(s)
SB 72-0384 NO.1 ENGINE - FAN AND BOOSTER - ONE TIME INSPECTION FOR RETAINING FLANGE THREADED PIN PRESENCE.
SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0385 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0386 NO. 1 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN SUPERSEDED
MOS
HRS/MSC - (s)
ENC
SB 72-0386 R1 NO.1 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN
MOS
HRSfMSC
ENC 1500 (s)
SB 72-0388 NO. 1 ENGINE - HPTR FRT DAMPER SLEEVE INSPECT. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0389 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR (72-52-00)- INTRODUCTION OF HIGH PRESSURE TURBINE
BLADE PM I957M72P01 AND PM 1957M72P02 THROUGH FIELD REWORK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0390 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0391 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - DRAIN TUBE REDUCER ELIMINATION, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0392 NO. I ENGINE - ENGINE - CORE ENGINE MAJOR MODULE (72-00-02) - FUEL NOZZLE BOLT LENGTH. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 460 Of 748
@ Camp Systems
EFTA00618751
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0392 R1 NO. I ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN
MOS
I I -JAN-2007 HRS/MSC -
ENC
SB 72-0392 R2 NO. 1 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN
MOS
I3-JUN-2007 HRS/MSC -
ENC
SB 72-0393 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY
GEARBOX ASSY. SERVICE BULLETIN
MOS
HRS'MSC
ENC
SB 72-0393 R1 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY
GEARBOX ASSY. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0394 NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE - BRACKET HARDWARE ELIMINATION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0395 NO.1 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0395 R1 NO.1 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 R1 NO. 1 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 R2 NO. 1 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 461 Of 748
@ Camp Systems
EFTA00618752
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0398 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0399 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0399 RI NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0000 NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN
FIELD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0000 RI NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN
FIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0000 R2 NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN SUPERSEDED
FIELD (SUPERSEDED BY 72-0000 R3). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0000 R3 NO. 1 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE
MATERIAL FOR NO.0 ROLLER BEARINGS IN FIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0001 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0002 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0003 NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR REAR SHAFT WITH IMPROVED DAMPING. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 462 Of 748
@ Camp Systems
EFTA00618753
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0404 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSiliSC -
ENC
SB 72-0411 NO. I ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0414 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
07-JUL-2008 HRSUMSC -
ENC
SB 72-0415 NO. I ENGINE - SPARE PARTS RELEASE FOR CF56-78 IPC. SERVICE BULLETIN
MOS
20-DEC-2002 HRSUMSC -
ENC
SB 72-0417 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRS.IISC -
ENC
SB 72-0419 NO. I ENGINE - SPARE PARTS FOR CFm56-78 IPC. SERVICE BULLETIN
MOS
HRS.IISC -
ENC
SB 72-0420 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0421 NO. I ENGINE - INTRODUCTION OF HPC REAR STATOR 18871417601. SERVICE BULLETIN
MOS
HRSiliSC -
ENC
SB 72-0422 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
23-NOV-2009 HRSLISC -
ENC
SB 72-0423 NO. I ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT SENSOR
RETAINING PLATE. SERVICE BULLETIN
MOS
HRSLISC
ENC
SB 72-0423 R1 NO. I ENGINE - ENGINE - LPT ROTOFuSTATOR ASSEMBLY (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT
SENSOR RETAINING PLATE. SERVICE BULLETIN
MOS
02-SEP-2011 HRSAISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 463 Of 748
Camp Systems
EFTA00618754
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0425 NO. 1 ENGINE - ENGINE-GENERAL-SPARE PARTS RELEASE FOR CFM56-7 PC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0427 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0429 NO. 1 ENGINE - ACCESSORY GEARBOX (72-63-00)- INTRODUCTION OF N2 SENSOR ADJUSTMENT SHIM SCREWS.
SERVICE BULLETIN
MOS
HR/MSC
ENC
SB 72-0431 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00)-INTRODUCTION OF IMPROVED DOUBLE ANNULAR
COMBUSTION (DAC) CHAMBER INNER LINER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0432 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56.78 IPC. SERVICE BULLETIN
MOS
08-APR-2008 HRSAISC -
ENC
SB 72-0433 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0434 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) PIN AND MATING SLOT ELIMINATION. SERVICE BULLETIN
MOS
HRS/LISC -
ENC
SB 72-0435 NO. 1 ENGINE -CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE.
SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0436 NO. I ENGINE - ENGINE FUEL AND CONTROL ( 73-00-00)- FUEL SPRAY SHIELD MATERIAL IMPROVEMENT. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0437 NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 464 Of 748
@ Camp Systems
EFTA00618755
AD/SI Status Report AIRCRAFT
CORP 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 72-0438 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
10-APR-2006 HRS/MSC -
ENC
58 72-0439 NO. 1 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE
DETECTION ROUTING. SERVICE BULLETIN
MOS
MRS/61SC
ENC
SB 72-0439 R1 NO. 1 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE
DETECTION ROUTING. SERVICE BULLETIN
MOS
28-APR-2003 HRS/MSC
ENC
SB 72-0440 R1 NO.1 ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOL ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP
INSPECTION OF FAN FRAME SHROUD.. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0440 R3 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0440 R4 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0440 R6 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
25-SEP-2006 HRS/MSC DUE
ENC
SB 72-0441 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1
(72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0442 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1
(72-53-00) - INTRODUCTION OF A NEW REAR FLANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 465 Of 748
@ Camp Systems
EFTA00618756
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0442 R1 NO. ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
REAR FLANGE ON
THE LPT STAGE I NOZZLE. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0444 NO. ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
30-N0v-2666 HRS.1SC -
ENG
SB 72-0445 NO. ENGINE - ENGINE-TRANSFER GEARBOX (72-62-00) - REPLACEMENT OF BALL BEARING 340.052-502-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0446 NO. 1 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0446 R1 NO. ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
30.4MAY-2CC6 HRSIASC -
ENG
SB 72-0447 NO. ENGINE - HIGH PRESSURE COMPRESSOR (72-31.00) - BLADE AND VANE IMPROVEMENT. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0447 R1 NO. ENGINE - IMPROVE THE DURABILITY OF THE HPC BLADES AND VANES. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0448 NO. ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0449 NO. ENGINE - SPARE PARTS RELEASE FOR CFA156-7B IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0449 R1 NO. I ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CF1A56-78 IPC. SERVICE BULLETIN
MOS
26-JUN-2008 HRSIASC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 466 Of 748
Camp Systems
EFTA00618757
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0450 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN
RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LOG PINS ON ALL CFM56078 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0450 RI NO. I ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN
RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LUG PINS ON ALL CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0451 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF
FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC
ENC 1500 (s)
SB 72-0451 RI NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF
FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC
ENC 1500 (s)
SB 72-0452 NO. I ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE
SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0452 RI NO. 1 ENGINE - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL
LEADING EDGE. SERVICE BULLETIN
MOS
HRS/MSC
ENC 9000 (s)
SB 72-0453 NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/S1SC -
ENC
SB 72-0454 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO
PREVENT THE CORROSION. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0454 RI NO. 1 ENGINE - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE
CORROSION IN FIELD ONLY. SERVICE BULLETIN
MOS
06-DEC-2007 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 467 Of 748
@ Camp Systems
EFTA00618758
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0454 R2 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO
PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN
MOS
01-JUL-2039 HRS., LISC -
ENC
SB 72-0455 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00)- SwIRLERS - THICK FLANGE (SUPERSEDED BY SB 72-0455 RI).
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0455 R1 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) - SwiRLERS - THICK FLANGE. SERVICE BULLETIN CATEGORY 7
MOS
02-MAY-2014 HRS,LISC -
ENC
SB 72-0457 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRS,IISC -
ENC
SB 72-0459 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSitISC -
ENC
SB 72-0460 NO. I ENGINE - ENGINE - GENERAL (72-00-OD) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSilISC -
ENC
SB 72-0460 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRS,LISC -
ENC
SB 72-0461 NO. I ENGINE - ENGINE - HPT ROTOR (72-52-00) - NEW DISK WITH IMPROVED LIFE DESIGN. SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-0462 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204
CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0462 R1 NO. I ENGINE - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR
AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN
MOS
27-AUG-2C08 HRSASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 468 Of 748
Camp Systems
EFTA00618759
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0463 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0463 R1 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0464 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD ASSY AND OF NEW BRACKETS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0465 NO. 1 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0465 R1 NO. 1 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0466 NO.1 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0466 R1 NO.1 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0467 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0468 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE FLAT WASHERS AT THE MAIN OlUFUEL HEAT
EXCHANGER AND FUEL RETURN TUBE LOCATION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0469 NO. 1 ENGINE - HPC (72-32-00) - STAGES 2 AND 3 SHROUDS - LEADING EDGE CUTBACK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 469 Of 748
@ Camp Systems
EFTA00618760
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0471 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 PC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0474 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0475 NO. 1 ENGINE - INTRODUCTION OF NEW AIR TUBE. A NEW BRACKET ASSY WITH SAFETY WIRE HOLES AND REWORK
OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN
MOS
HRSAMSC -
ENC
SB 72-0476 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CRASS-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0477 NO.1 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN
MOS
HRS/IASC -
ENC
SB 72-0477 R2 NO. 1 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN
MOS
06-FEB-2008 HRS/IASC -
ENC
SB 72-0480 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN
MOS
HRS/IASC -
ENC
SB 72-0481 RI NO.1 ENGINE - IN FIELD INTRODUCTION OF FAN BLADE SHIMS WITH NEW AXIAL STOP. SERVICE BULLETIN
DAYS I (s)
HRS/MSC
ENC
SB 72-0482 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM58-713 IPC. SERVICE BULLETIN
MOS
HRSAMSC -
ENC
SB 72-0483 NO. 1 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0483 RI NO. I ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN
MOS
HRSAMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 470 Of 748
@ Camp Systems
EFTA00618761
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0484 NO. I ENGINE - INTRODUCTION OF A NEW FUEL SUPPLY TUBE. SERVICE BULLETIN
MOS
11-MAR-200.5 HRSisiSC -
ENG
SB 72-0485 NO. I ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN
MOS
HRSisiSC -
ENC
SB 72-0485 I21 NO. I ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN
MOS
13-AUG-2094 HR&MSC -
ENG
SB 72-0486 NO. I ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENG
SB 72-0487 NO. 1 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND NEW NO.1 BEARING VIBRATION
SENSOR ATTACHING PARTS. SERVICE BULLETIN
MOS
C9-NOV-2C01 HRS.I.ISC -
ENG
SB 72-0487121 NO. 1 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND INTRODUCTION OF A NEw NO.1
BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0488 RI NO. I ENGINE - REPLACEMENT OF IDENTIFICATION PLATES ON THE TRANSFER
GEARBOX ASSEMBLY AND THE ACCESSORY GEARBOX ASSEMBLY. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0489 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0489 RI NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENG
SB 72-0490 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 471 Of 748
Camp Systems
EFTA00618762
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0491 NO. 1 ENGINE - NEW MATERIAL (N5-) TO ELIMINATE YTTRIUM AND REDUCE SULFUR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0493 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0494 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0495 R2 NO. 1 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0495 R3 NO. 1 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0497 NO. 1 ENGINE - INTRODUCTION OF VESPEL NUTS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
513 72-0498 NO. 1 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING
SYSTEM. SERVICE BULLETIN
MOS
HRS/MSC 50 (s)
ENC
513 72-0498 R1 NO. 1 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING
SYSTEM. SERVICE BULLETIN
MOS
HRS/MSC 50 (s)
ENC
SB 72-0499 R1 NO. 1 ENGINE - INTRODUCTION OF NEW NO.5 BEARING SUPPORT NIPPLE DESIGN OR REWORK OF THE OLD ONE.
SERVICE BULLETIN
MOS
16-DEC-2006 HRS/MSC
ENC
SB 72-0500 NO. 1 ENGINE - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN SUPERSEDED
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 472 Of 748
@ Camp Systems
EFTA00618763
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0500 R2 NO. I ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL
MOS
02-MAR-2011 HRSAISC -
ENC
SB 72-0500 R3 NO.1 ENGINE - ENGINE - HPC (72-31-00)- REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL
MOS
I7-AUG-2011 HRSAISC -
ENC
SB 72-0501 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE BLANKING PLATE AND INTRODUCTION OF A NEW
OIL SUPPLY TUBE WITH
ITS NEW ATTACHMENT BRACKETS.. SERVICE BULLETIN
MOS
I4-OCT-2008 HRS/MSC -
ENC
SB 72-0502 R1 NO. 1 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION
). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0502 R2 NO.1 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION
). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0503 NO. I ENGINE - FORWARD INNER NOZZLE SUPPORT - FORWARD FLANGE REPLACEMENT AND COATING. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0503 R1 NO. I ENGINE - FORWARD INNER NOZZLE SUPPORT- FORWARD FLANGE REPLACEMENT AND COATING. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0503 R2 NO. I ENGINE - 81/65279:ENGINE -HPT (7241-00) -FORWARD INNER NOZZLE SUPPORT -FORWARD FLANGE
REPLACEMENT AND COATING
. SERVICE BULLETIN
MOS
29-JUN-2007 HRS/MSC
ENC
SB 72-0506 NO. 1 ENGINE - INSPECTION OF COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN
MOS
30-JUL-2004 HRSAISC - (s)
ENC
SB 72-0506 R1 NO. 1 ENGINE - INSPECTION OF OUTER LINER COOLING HOLES. SERVICE BULLETIN SUPERSEDED
MOS
23-AUG-2006 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 473 Of 748
@ Camp Systems
EFTA00618764
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0507 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B ENGINES. SERVICE BULLETIN
MOS
HR mSC
E NC
SB 72-0509 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 IPC. SERVICE BULLETIN
MOS
HRSNSC -
ENG
SB 72-0509 R.1 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156,78 IPC. SERVICE BULLETIN
MOS
11-APR-2008 HRSitISC -
ENG
SB 72-0510 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 72-0511 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN
MOS
HRSitISC -
ENG
SB 72-0512 NO. I ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AIRCilL COOLER PANEL IN TWO
PARTS. SERVICE BULLETIN
MOS
HRS/P.ISC -
ENG
SB 72-0512 R2 NO 1 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AIRCilL COOLER PANEL IN TWO
PARTS AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN
MOS
CG-OCT-2000 HRS.ISC -
ENG
SB 72-0513 NO 1 ENGINE - SPARE PARTS INFORMATION. SERVICE BULLETIN
MOS
HRSitISC -
ENG
SB 72-0514 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC (SUPERSEDED BY SB SUPERSEDED
72-0514 R2). SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0514 R2 NO 1 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN CATEGORY 8
MOS
22-NOv-2013 HRSIASC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 474 Of 748
Camp Systems
EFTA00618765
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0515 NO. I ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HIRSAISC 24000 (s)
ENC
SB 72-0515 RI NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HIRSAISC 24000 (s)
ENC
SB 72-0515 R2 NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
I8-APR-2006 HRS/MSC 24000 (s)
ENC
SB 72-0515 R3 NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HRS/MSC 24000 (s)
ENC
SB 72-0515 R4 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
I2-FEB-2009 HRS/MSC 24000 (s)
ENC
SB 72-0515 R5 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HRS/MSC 24000 (s)
ENC
SB 72-0515 R6 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
03-OCT-2011 HRS/MSC 24000 (s)
ENC
SB 72-0515 R7 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
21-OCT-2011 HIRSAISC 24000 (s)
ENC
SB 72-0520 NO. 1 ENGINE - INSPECTION OF THE FORWARD LPT SHAFT FOR MISSING PAINT, SERVICE BULLETIN
MOS
08-FEB-2066 HRS(MSC -
ENC
SB 72-0521 NO. 1 ENGINE - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 475 Of 748
@ Camp Systems
EFTA00618766
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0521 R1 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INSPECTION OF INNER AND OUTER LINER NUGGET RECOMMENDED
THICKNESS. SERVICE BULLETIN
MOS
13-JUN-2012 HRS/PASC
ENC
SB 72-0522 NO. I ENGINE - INTRODUCTION OF AN IDENTIFICATION PLATE COMPLYING WITH THE NEW EUROPEAN REGULATION.
SERVICE BULLETIN
MOS
HRS/PASC
ENC
SB 72-0523 NO. I ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN
MOS
HRS/PASC -
ENC
SB 72-0523 RI NO. 1 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN
MOS
29-NOV-2006 HRS/MSC -
ENC
SB 72-0524 NO. 1 ENGINE - ENGINE - COMBUSTOR (7242-00) - NEW DOME. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0525 NO. 1 ENGINE -FAN DISK DOVETAIL FACES WEAR DEPTH INSPECTION. SERVICE BULLETIN
MOS
25-MAR-2005 HRS/PASC
ENC 3000 (s)
SB 72-0525 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN RECOMMENDED
MOS
HRS/PASC -
ENC
SB 72-0525 R2 PARA D (1) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000410-0)
MOS
HRS/MSC
ENC 2000 (s)
SB 72-0525 R2 PARA D (2) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-420-0)
MOS
HRS/PASC
ENC 7000 (s)
SB 72-0525 R2 PARA D (3) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-471/472/473/474)
MOS
HRS/PASC
ENC 7000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 476 Of 748
@ Camp Systems
EFTA00618767
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0525 R2 PARA D (4) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-485/486/490-0)
MOS
HRS/MSC
ENC 7000 (s)
58 72-0527 NO.1 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE
TUBE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0527 RI NO. 1 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE
TUBE. SERVICE BULLETIN
MOS
29-SEP-2005 HRS/P.1SC
ENC
SB 72-0527 R2 NO. 1 ENGINE - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE.
SERVICE BULLETIN
MOS
2I-JAN-2008 MRS/P.1SC
ENC
SB 72-0527 R3 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR
FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN
MOS
22-DEC-2009 HRSfMSC -
ENC
SB 72-0527 R4 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR CUSTOMER
FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN CONVENIENCE
MOS
04-JUL-2013 HRS/MSC -
ENC
SB 72-0528 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0529 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0530 NO. 1 ENGINE - BELLCRANK SUPPORT NUT LENGTH. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0531 RI NO.1 ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
26-SEP-2006 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 477 Of 748
@ Camp Systems
EFTA00618768
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0531 R2 NO. I ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
10-APR-2008 HRSi MSC -(s)
ENC
SB 72-0531 R3 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
25-MAY-2C09 HRSi MSC -
ENC
SB 72-0531 R4 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
18-APR-2013 HRS/MSC ESV
ENC
SB 72-0533 NO. I ENGINE - ENGINE - COMBUSTOR (72-41-00) - SWIRLER. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0536 NO. I ENGINE - INNER LINER EXTENSION FOR REPAIR. SERVICE BULLETIN
MOS
HRS,IISC -
ENC
SB 72-0539 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-76 ENGINES. SERVICE BULLETIN
MOS
HRSi MSC
ENC
SB 72-0540 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS.i'MSC -
ENC
SB 72-0540 R1 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
18-APR-2005 HRS.i'MSC -
ENC
SB 72-0540 R2 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
29-AUG-2C07 HRS.I.ISC -
ENC
SB 72-0541 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0542 NO 1 ENGINE - HPT NOZZLE FORWARD INNER NOZZLE SUPPORT (FINS) WITH IMPROVED EROSION COATING.
SERVICE BULLETIN
MOS
HRSilISC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 478 Of 748
Camp Systems
EFTA00618769
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0543 NO. 1 ENGINE - INTRODUCTION OF A NEW OIL INLET COVER 0 -RING. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0545 NO. 1 ENGINE -FAN DISK LIFE LIMIT INCREASE. SERVICE BULLETIN
MOS
HRSAISC
ENC 16000 (s)
SB 72-0547 NO. 1 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOT INNER AND OUTER LINERS. SERVICE BULLETIN
MOS
HRSAISC
ENC 1600 (s)
SB 72-0547 RI NO. 1 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOR INNER AND OUTER LINERS. SERVICE BULLETIN
MOS
08-MAR-2006 HRS/MSC
ENC 1600 (s)
SB 72-0548 NO. 1 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN
MOS
17-FEB-2006 HRS/MSC 5000 (s)
ENC 3000
SB 72-0548 RI NO. 1 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN
MOS
25-OCT-2006 HRSAISC 5000 (s)
ENC 3000
SB 72-0550 NO. 1 ENGINE - INTRODUCTION OF A NEW REAR VENT TUBE. SERVICE BULLETIN
MOS
16-FEB-2007 HRSAISC -
ENC
SB 72-0552 NO. 1 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN
FIELD. SERVICE BULLETIN
MOS
27-JAN-2006 HRSAISC
ENC
SB 72-0552 RI NO. 1 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN
FIELD. SERVICE BULLETIN
MOS
16-FEB-2012 HRSAISC
ENC
SB 72-0553 NO. 1 ENGINE - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY, SERVICE BULLETIN
MOS
20-OCT-2006 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 479 Of 748
@ Camp Systems
EFTA00618770
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0553 RI NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN
FRAME ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC
ENC
S8 72-0554 NO. 1 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS
MONITORING SYSTEM. SERVICE BULLETIN
MOS
HRSAISC 50 (s)
ENC
SB 72-0554 RI NO. 1 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS
MONITORING SYSTEM. SERVICE BULLETIN
MOS
HRSAISC 50 (s)
ENC
SB 72-0555 NO.1 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS‘MSC -
ENC
SB 72-0556 NO. 1 ENGINE - FORWARD INNER NOZZLE SUPPORT (FINS) - WITH IMPROVED EROSION COATING. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0557 NO.1 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0558 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
18-JAN-2006 HRSfMSC -
ENC
SB 72-0558 RI NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
21-SEP-2007 HRSAISC
ENC 16350 (s)
SB 72-0558 R2 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY - INSPECTION OF TURBINE REAR FRAME ON
DAC ENGINES. SERVICE BULLETIN
MOS
02-DEC-2008 HRS1MSC
ENC 16350 (s)
SB 72-0558 R3 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
HRSfMSC
ENC 16350 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 480 Of 748
@ Camp Systems
EFTA00618771
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0558 R4 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER
FRAME ON DAC ENGINES. SERVICE BULLETIN CONVENIENCE
MOS
21-MAY-2013 HRS1MSC -
ENC
SB 72-0559 NO. 1 ENGINE - INTRODUCTION OF NEW MW0316 FIRE DETECTION HARNESS. SERVICE BULLETIN
MOS
06-JUN-2007 MRS/P.1SC -
ENC
SB 72-0560 NO. 1 ENGINE - INTRODUCTION OF A NEW MW0301 HARNESS WITH A NEW ROUTING. SERVICE BULLETIN
MOS
OI -MAR-2007 HRSAISC -
ENC
SB 72-0561 NO. 1 ENGINE - INTRODUCTION OF OLD NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS WITH NEW
STATIONARY SEAL. SERVICE BULLETIN
MOS
HRS(MSC
ENC
SB 72-0562 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I7-JAN-2006 HRS(MSC -
ENC
SB 72-0563 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
22-MAY-2006 HRSAISC -
ENC
SB 72-0564 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION IN PRODUCTION OF A NEW ACCESSORY GEARBOX
ASSEMBLY
(AGB) WITH NEW STARTER DRIVE PAD AND NEW HANDCRANCKING COVER. SERVICE BULLETIN
MOS
3-OCT-2009 HRS(MSC -
ENC
SB 72-0564 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB)
WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0564 R2 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB)
WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
16-NOV-2010 HRS1MSC -
ENC
S8 72-0564 R3 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A SUPERSEDED
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AG8 TO THE NEW ONE (SUPERSEDED BY S8 72-0564 R4).
SERVICE BULLETIN
MOS
HRS(MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 481 Of 748
@ Camp Systems
EFTA00618772
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0564 R4 NO 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE (SUPERSEDED BY SB 72-0564 R5).
SERVICE BULLETIN
MOS
HRSMSC
ENC
SB 72-0564 R5 NO 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A CATEGORY 3
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
14-JAN-2014 HRSMSC ESV
ENC
SB 72-0565 RI NO. I ENGINE - ENGINE - LPT ROTOR ?STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE. SERVICE
BULLETIN
MOS
04-MAY-2CO9
ENC
SB 72-0566 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
23-MAY-2C06 HRSMSC -
ENC
SB 72-0567 NO. I ENGINE - INTRODUCTION OF A NEW OR REWORKED STAGE I SEAL SEGMENT. SERVICE BULLETIN
MOS
10-MAY-2C07 HRS.P.ISC -
ENC
SB 72-0567 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OR REWORKED STAGE I SEAL
SEGMENT. SERVICE BULLETIN
MOS
12-MAY-2C09 HRSMSC -
ENC
SB 72-0568 NO. I ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
20-MAR-2006 HRS4.ISC -
ENC
SB 72-0568 RI NO 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
21-SEP-2007 HRSMSC
ENC 17400 (s)
SB 72-0568 R2 NO 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER
FRAME ON SAC ENGINES. SERVICE BULLETIN CONVENIENCE
MOS
HRSI.ISC
ENC 17400 (s)
SB 72-0569 NO 1 ENGINE - INTRODUCTION OF NEW SPACERS ON THE B6 FRONT FLANGE OF THE FAN FRAME. SERVICE
BULLETIN
MOS
2-3-VAR.23D7 HRSMSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 482 Of 748
Camp Systems
EFTA00618773
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0569 R1 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SPACERS ON THE 86 FRONT
FLANGE OF THE FAN FRAME. SERVICE BULLETIN
MOS
14-OCT-2008 HRSTASC -
ENC
SB 72-0570 RI NO. 1 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD. SERVICE
BULLETIN
MOS
03-JUL-2008 HRS9(1SC
ENC
SB 72-0570 R2 NO. 1 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD, SERVICE
BULLETIN
MOS
02-SEP-2008 HRSOASC
ENC
SB 72-0570 R3 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND
FAN FRAME SHROUD (SUPERSEDED BY SB 72-0570 R4). SERVICE BULLETIN
MOS
13-JUN-2012 HRSO,ISC -
ENC
SB 72-0570 R4 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND CATEGORY 7
FAN FRAME SHROUD. SERVICE BULLETIN
MOS
26-JUN-2014 HRSO4SC
ENC
SB 72-0571 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
23-MAR-2007 HRSOASC -
ENC
SB 72-0572 NO. 1 ENGINE - HPT OUTER STATIONARY SEAL WITH INTEGRAL NUT SHIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0573 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
24-JAN-2008 HRSAISC -
ENC
SB 72-0574 NO. 1 ENGINE - NEW NO.3 BEARING REAR STATIONARY AlFUOIL SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
I0-APR-2066 HRSAISC -
ENC
SB 72-0574 RI NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
24-JUL-2006 HRSO4SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 483 Of 748
@ Camp Systems
EFTA00618774
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0574 R2 NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
20-SEP-2006 HRSAISC -
ENC
SB 72-0574 R3 NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
24-OCT-2006 HRSAISC -
ENC
SB 72-0574 R4 NO. 1 ENGINE - NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
31-AUG-2007 HRS/MSC -
ENC
SB 72-0575 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0576 NO. 1 ENGINE - REPAIR PARTS. SERVICE BULLETIN
MOS
20-JUL-2006 HRS/MSC -
ENC
SB 72-0578 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0579 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
04-JUL-2006 HRSAISC -
ENC
SB 72-0579 R1 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
27-OCT-2006 HRS,MSC
ENC 19000 (s)
SB 72-0579 R2 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
HRS,MSC
ENC 19000 (s)
SB 72-0579 R3 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
09-APR-2008 HRS/MSC
ENC 19000 (s)
SB 72-0579 R4 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
01-DEC-2008 HRSIMSC
ENC 19000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 484 Of 748
@ Camp Systems
EFTA00618775
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0579 R5 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
HRSAISC
ENC 19000 (s)
SB 72-0579 R6 NO. 1 ENGINE - ENGINE -LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
15-DEC-2009 HRS1MSC
ENC 19000 (s)
SB 72-0579 R7 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
I9-FEB-2010 HRSAISC
ENC 19000 (s)
SB 72-0579 Re NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
25-JAN-2012 HRS1MSC
ENC 19000 (s)
SB 72-0580 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR
LOCATION. SERVICE BULLETIN
MOS
25-MAY-2007 HRSfMSC
ENC
SB 72-0580 R1 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR LOCATION. SERVICE
BULLETIN
MOS
25-MAY-2008 I-IRS/MSC -
ENC
SB 72-0580 R2 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE
BULLETIN
MOS
27-APR-2009 HRSAISC -
ENC
SB 72-0580 R3 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REWORK FOR FAN CONTAINMENT CASE 81FLANGE AT
FIRE DETECTOR LOCATION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0581 NO. 1 ENGINE -STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE
BULLETIN
MOS
26-JUL-2006 HRS1MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 485 Of 748
@ Camp Systems
EFTA00618776
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0581 RI NO. I ENGINE - STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE
BULLETIN
MOS
12-JAN-2007 HRSIISC
ENC
SB 72-0581 R2 NO. I ENGINE - ENGINE - HPC STATOR FORWARD ASSEMBLY t72-32-00)- STAGE 2 AND STAGE 3 IMPROVED INNER
BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN
MOS
14-AUG-2009 HRSI.ISC -
ENC
SB 72-0582 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM.56-7B ENGINES. SERVICE BULLETIN
MOS
07-AUG-2C06 HR&MSC -
ENC
SB 72-0582 R1 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM.56-7B ENGINES. SERVICE BULLETIN
MOS
25-SEP-2006 HRS,IISC -
ENC
SB 72-0584 RI NO. I ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN
MOS
04-JUN-2007 HRSilISC -
ENC
SB 72-0584 R2 NO. I ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN
MOS
31-AUG-2C07 HRSimSC -
ENC
SB 72-0585 NO. I ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN
MOS
04-SEP-2006 HRSI.ISC -
ENC
SB 72-0585 R1 NO. I ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN OPTIONAL
MOS
25-APR-2008 HR&MSC -
ENC
SB 72-0585 R2 NO 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - FIELD INTRODUCTION OF REWORKED FAN DISK. OPTIONAL
SPACERS AND SHIMS. SERVICE BULLETIN
MOS
03-JAN-2012 HRSI.ISC
ENC
SB 72-0586 NO 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE
BULLETIN
MOS
24-NOV-2CC6 HR&MSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 486 Of 748
Camp Systems
EFTA00618777
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0586 R1 NO. I ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE
BULLETIN
MOS
02-JAN-2007 HRSAISC
ENC
SB 72-0587 NO. 1 ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
04-JUL-2008 HRSAISC -
ENC
SB 72-0588 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7618/3. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0589 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0589 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSAISC -
ENC
SB 72-0589 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-7B ENGINE CONVERSION TO CFM56-7620f3. SERVICE BULLETIN
MOS
04-MAY-2009 HRSAISC -
ENC
SB 72-0590 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/3. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0591 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0591 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSAISC -
ENC
SB 72-0593 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/3. SERVICE BULLETIN
MOS
I3-APR-2007 HRS1MSC -
ENC
SB 72-0593 RI NO. 1 ENGINE - CONVERSION OF ANY AFFECTED CFM56-7/3 MODEL ENGINE TO ALLOWABLE DERIVATIVE MODEL
DESIGNATIONS. SERVICE BULLETIN
MOS
I3-APR-2007 HRS1MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 487 Of 748
@ Camp Systems
EFTA00618778
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0593 R2 NO. 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7624:3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSimSC -
ENG
SB 72-0594 NO 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CW56-7824:381. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0594 R1 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-7624:381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENG
SB 72-0595 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN
MOS
13-APR-2007 HRS.I.ISC -
ENG
SB 72-0595 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN
MOS
13-AUG-2C07 HRS,IISC -
ENG
SB 72-0595 R2 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSimSC -
ENC
SB 72-0596 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3F. SERVICE BULLETIN
MOS
17-APR-2007 HRSimSC -
ENC
SB 72-0596 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7826:3F. SERVICE BULLETIN
MOS
24-OCT-2007 HRSimSC -
ENG
SB 72-0597 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CW56-7826:381. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0597 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-7626:381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENG
SB 72-0600 NO. I ENGINE - CFm56-76 ENGINE CONVERSION TO CFM56-7827t3. SERVICE BULLETIN
MOS
17-APR-2007 HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 488 Of 748
Camp Systems
EFTA00618779
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0601 RI NO. 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CFMSG-7627:3B1. SERVICE BULLETIN
MOS
24-OCT-2037 HRSMSC -
ENC
SB 72-0602 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t383. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0603 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0603 RI NO. I ENGINE - CRIS6-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0604 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7827/381F. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0604 RI NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3Bi F. SERVICE BULLETIN
MOS
24-OCT-2007 HRSMSC -
ENC
SB 72-0605 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
07-NOV-2C06 HR&MSC -
ENC
SB 72-0606 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
31-MAY-2C07 HRSMSC -
ENC
SB 72-0607 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
01-SEP-2006 HR&P.ISC -
ENC
SB 72-0608 NO. I ENGINE - INSPECTION OF THE LOw PRESSURE TURBINE (LPT) CASE. SERVICE BULLETIN
MOS
23-AUG-2C07 HR&MSC -
ENC
SB 72-0608 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INSPECTION OF THE LOW PRESSURE TURBINE (LPT) CASE ON
ASSEMBLED
LPT MODULE. SERVICE BULLETIN
MOS
I2-MAY-2C09 HRSMSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 489 Of 748
Camp Systems
EFTA00618780
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0609 NO. I ENGINE - INTRODUCTION OF N5 HPT SHROUDS WITH HEAT TRANSFER ENHANCEMENT (HTE) BUMPS. SERVICE
BULLETIN
MOS
25-SEP-2006 HRS11.1SC
ENC
SB 72-0610 NO. 1 ENGINE - INTRODUCTION OF 8 MIL THICK HPC GUIDE SECTORS. SERVICE BULLETIN
MOS
I5-NOV-2006 MRS/P.1SC -
ENC
SB 72-0611 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
31-OCT-2006 HRSAISC -
ENC
SB 72-0612 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I2-OCT-2006 MRS/P.1SC -
ENC
SB 72-0613 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
25-SEP-2006 HRS11.1SC -
ENC
SB 72-0611 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
09-NOV-2006 HRS11.1SC -
ENC
SB 72-0615 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
08-FEB-2007 HRSAISC -
ENC
SB 72-0616 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0617 NO. I ENGINE - CLEANING OF THE CONTROL ALTERNATOR AND CHANGE OF THE NUTS ATTACHING THE LINE NO. I
BEARING OUTER RACE ON THE AGB HOUSING. SERVICE BULLETIN
MOS
03-JUL-2007 HRSAISC 10000 (s)
ENC 5000
SB 72-0617 R2 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)-f FAKING OF THE CONTROL ALTERNATOR RECOMMENDED
AND INSPECTION OF THE KEY-LOCKED STUDS ATTACHING THE LINE NO. 1 BEARING OUTER RACE ON THE AGB
HOUSING, SERVICE BULLETIN
MOS
MRS/P.1SC 10000 (s)
ENC 5000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 490 Of 748
@ Camp Systems
EFTA00618781
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0618 NO. 1 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
25-JAN-2007 HRS/MSC -
ENC
SB 72-0618 RI NO. 1 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0618 R2 NO. 1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
DESIGN OF
LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
09-OCT-2008 HRS/MSC -
ENC
SB 72-0619 NO. 1 ENGINE - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN
MOS
27-SEP-2007 HRS/MSC -
ENC
SB 72-0619 RI NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING
RING. SERVICE BULLETIN
MOS
02-DEC-2008 HRS/MSC -
ENC
SB 72-0619 R2 NO.1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3
ROTATING RING. SERVICE BULLETIN
MOS
04-MAY-2009 HRS/MSC -
ENC
SB 72-0620 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B ENGINES. SERVICE BULLETIN
MOS
19-DEC-2006 HRSAISC -
ENC
SB 72-0621 NO. I ENGINE -FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM
INFORMATION. SERVICE BULLETIN
MOS
I6-JUL-2007 HRS/MSC
ENC
SB 72-0621 R2 NO.1 ENGINE - ENGINE - GENERAL (72-00-00)- FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS
INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN
MOS
Of -DEC-2011 HRS/MSC -
ENC
SB 72-0622 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
20-SEP-2007 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 491 Of 748
@ Camp Systems
EFTA00618782
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0623 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
20-JUN-2007 MRS/MSC -
ENC
SB 72-0626 NO. 1 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
28-SEP-2007 HRSAISC -
ENC
SB 72-0626 RI NO. 1 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
21-APR-2008 HRS/hISC -
ENC
SB 72-0626 R2 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND
NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
04-MAY-2009 HRS/MSC -
ENC
58 72-0626 R3 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW CUSTOMER
STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN CONVENIENCE
MOS
30-MAR-2012 FIRSAISC -
ENC
SB 72-0627 NO. 1 ENGINE - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE
BULLETIN
MOS
28-SEP-2007 FIRSAISC -
ENC
SB 72-0627 RI NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - DELETION IN PRODUCTION OF THE ALTERNATE
STAGE 3 ROTATING AIR
SEAL RING. SERVICE BULLETIN
MOS
02-DEC-2008 HRS/MSC
ENC
SB 72-0630 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
07-MAR-2008 HRS/MSC -
ENC
SB 72-0631 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC.
SERVICE BULLETIN
MOS
13-OCT-2008 HRS/MSC
ENC
SB 72-0632 NO. I ENGINE - BOOSTER SPOOL FORWARD FLANGE INSPECTION, SERVICE BULLETIN
MOS
22-JUN-2007 HRS/MSC
ENC 15000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 492 Of 748
@ Camp Systems
EFTA00618783
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0634 NO. I ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
22-JUN-2007 HRSAISC -
ENC
SB 72-0631RI NO. 1 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
30-JUL-2007 HRSAISC -
ENC
SB 72-0631R2 NO. 1 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0635 NO. 1 ENGINE - INTRODUCTION OF LOW PRESSURE TURBINE AIR COOLING TUBES. SERVICE BULLETIN
MOS
I6-FEB-2007 HRS/MSC -
ENC
SB 72-0636 NO. 1 ENGINE - INSPECTION FOR ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT
INGESTION. SERVICE BULLETIN
MOS
HRS/MSC
ENC 4800 (s)
SB 72-0636 R1 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA SERVICE BULLETIN
MOS
09-FEB-2012 HRSAISC
ENC 800(s)
SB 72-0636 R2 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR SUPERSEDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA (SUPERSEDED BY 72-0636 R3). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0636 R3 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0637 NO. 1 ENGINE - INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL
DISTRESS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 493 Of 748
@ Camp Systems
EFTA00618784
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 PART I NO 1 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES
MOS
HRS4ISC
ENC 9600 (s)
SB 72-0637 PART 2 NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES
MOS
HRSI.ISC
ENC 6400 (s)
SB 72-0637 Fel NO. ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL
DISTRESS. SERVICE BULLETIN
MOS
16-AUG-2C07 HR&MSC
ENC
SB 72-0637 RI PART I NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES
MOS
HRSAISC
ENC 9600(s)
SB 72-0637 RI PART 2 NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES
MOS
HRSI.ISC
ENC 6400 (s)
SB 72-0637 R2 NO ENGINE - STAGE I NOZZLES. SERVICE BULLETIN
MOS
OS-SEP-2007 HRS.i.ISC -
ENC
SB 72-0637 R2 PART I NO 1 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT
MOS
HRSI.ISC
ENC 9600 (s)
SB 72-0637 R2 PART 2 NO. ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN LPT
MOS
HRS.1.ISC
ENC 6400 (s)
SB 72-0637 R3 NO. ENGINE - STAGE I NOZZLES. SERVICE BULLETIN
MOS
Oa-APR-2008 HRSIASC -
ENC
SB 72-0637 R3 PART I NO. ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT
MOS
HRSI.ISC
ENC 9600 (s)
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 494 Of 748
Camp Systems
EFTA00618785
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 R3 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 NOZZLES. SERVICE BULLETIN LPT
MOS
HRSAISC
ENC 6400 (s)
SB 72-0637 R5 NO. I ENGINE - ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT RECOMMENDED
NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE
BULLETIN
MOS
24-JUN-2011 HRS/MSC
ENC
SB 72-0637 R5 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED
INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS
(SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN HPT
MOS
24-JUN-2011 HRSAISC -(s)
ENC
SB 72-0637 R5 PART 2 NO. I ENGINE - BORESCOPE INSPECTION ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED
INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS
(SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN !PT
MOS
24-JUN-2011 HRS/MSC -(s)
ENC
SB 72-0637 R6 NO. I ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0637 Ft6 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND !PT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF RECOMMENDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637
R7). SERVICE BULLETIN HPT
MOS
HRSAISC
ENC 800(x)
SB 72-0637 R6 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND LPT NOZZLES (7241-01 AND 72-53-01)- INSPECTION OF RECOMMENDED
STAGE 1 HPT NOZZLES AND STAGE 1(PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637
R7). SERVICE BULLETIN LPT
MOS
HRS/MSC
ENC 800(s)
58 72-0637 R7 NO. I ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE
BULLETIN
MOS
I-IRStAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 495 Of 748
@ Camp Systems
EFTA00618786
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 R7 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1(PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R8). SERVICE BULLETIN OF THE STAGE 1HPT NOZZLES
MOS
HRS/MSC -
ENC
SB 72-0637 R7 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R8). SERVICE BULLETIN OF THE STAGE 1LPT NOZZLES
MOS
HRS/MSC -
ENC
SS 72-0637 R8 NO.1 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE
BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0637 R8 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R9). SERVICE BULLETIN OF THE STAGE 1HPT NOZZLES
MOS
HRS/MSC -
ENC
SS 72-0637 R8 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SS
72-0637 R9). SERVICE BULLETIN OF THE STAGE 1LPT NOZZLES
MOS
HRS/MSC -
ENC
SS 72-0637 R9 NO.1 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES CATEGORY 7
AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN
MOS
31-MAR-2014 I-ROO/1SC -
ENC
SB 72-0637 R9 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF
THE STAGE 1 HPT NOZZLES
MOS
31-MAR-2014 HRS/MSC
ENC
58 72-0637 R9 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF
THE STAGE 1LPT NOZZLES
MOS
31-MAR-2014 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 496 Of 748
@ Camp Systems
EFTA00618787
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0638 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0639 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
09-APR-2007 HRS(MSC -
ENC
SB 72-0640 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
27-JUN-2007 HRS/MSC -
ENC
SB 72-0640 RI NO. 1 ENGINE - INTRODUCTION OF PRE-GROUND HPT BLADE KIT (SPD). SERVICE BULLETIN
MOS
18-FEB-2008 HRS/MSC -
ENC
SB 72-0643 NO. 1 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN
MOS
28-JUN-2007 HRS/MSC -
ENC
SB 72-0643 RI NO. 1 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0643 R3 NO. I ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING RECOMMENDED
PARTS. SERVICE BULLETIN
MOS
24-JUN-2011 HRS/MSC
ENC
SB 72-0645 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
17-APR-2007 HRS(MSC -
ENC
SB 72-0646 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
17-APR-2007 HRS(MSC -
ENC
SB 72-0647 NO. 1 ENGINE - COMBUSTION CHAMBER OUTER LINER REWORK. SERVICE BULLETIN
MOS
IS-JUN-2007 HRS/MSC -
ENC
SB 72-0647 RI NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK.
SERVICE BULLETIN
MOS
05-JUN-2009 MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 497 Of 748
@ Camp Systems
EFTA00618788
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0647 R2 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK.
SERVICE BULLETIN
MOS
20-NOV-2009 HRS.0.1SC -
ENC
SB 72-0647 R3 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK SERVICE CATEGORY 7
BULLETIN
MOS
30-MAY-20I4 HRS.0.1SC -
ENC
SB 72-0648 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-751ENGINES. SERVICE BULLETIN
MOS
I4-JUN-2007 HRS./MSC -
ENC
SB 72-0649 NO. 1 ENGINE - INTRODUCTION OF NEW FAN BLADE SHIM ASSY. SERVICE BULLETIN
MOS
08-FEB-2008 HRSAISC - (s)
ENC
SB 72-0649 RI NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE SHIM RECOMMENDED
ASSY. SERVICE BULLETIN
MOS
I8-JAN-2011 HRS.0.1SC ESV
ENC
SB 72-0650 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
25-JUN-2007 HRSAISC -
ENC
SB 72-0652 NO. I ENGINE - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0-RING MATERIAL AND
REWORK OF OLD MAGNETIC SEAL AND OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN
MOS
29-JUL-2008 MRS/MSC 8000 (s)
ENC
SB 72-0652 R2 NO.1 ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)- INTRODUCTION OF NEW MAGNETIC SEAL AND NEW
SEALOL SEAL WITH NEW 0 -RING MATERIAL AND REWORK OF OLD SEALOL SEAL TO THE NEW ONE. SERVICE
BULLETIN
MOS
I2-JAN-2011 HRS.0.1SC 8000 8000
ENC
SB 72-0653 NO. 1 ENGINE - ENGINE - NO.1 AND NO.2 BEARING SUPPORT ASSEMBLY (72-22-00) - SPARE PARTS RELEASE FOR
CFM56-78 IPC. SERVICE BULLETIN
MOS
02-OCT-2008 HRS.0.1SC -
ENC
SB 72-0655 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
I I -SEP-2007 HRS.0.1SC -
ENC
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 498 Of 748
@ Camp Systems
EFTA00618789
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0656 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSS-7B IPC. SERVICE BULLETIN
MOS
11-SEP-2007 HRS7ASC -
ENC
SB 72-0657 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
11-SEP-2007 HRS(MSC -
ENC
SB 72-0658 NO. I ENGINE - INTRODUCTION OF NEW ALTERNATE LOOP CLAMP. SERVICE BULLETIN
MOS
24-JAN-2008 HRS4.ISC -
ENC
SB 72-0659 NO 1 ENGINE - DELETION OF THE ALTERNATE TRIM BALANCE BOLTS IN PRODUCTION ONLY. SERVICE BULLETIN
MOS
13-DEC-2007 HRS.ISC -
ENC
SB 72-0661 NO 1 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO N 4
ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN
MOS
23-AUG-2C07 HRS,MSC 5C0 (s)
ENC
SB 72-0661 RI NO. I ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO NO a
ROLLER BEARING SUSPECTED BATCH.. SERVICE BULLETIN
MOS
HRS(MSC 500(s)
ENC
SB 72-0661 R2 NO. I ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO NO.4
ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN
MOS
21-JAN-2008 HRS(MSC 500(s)
ENC
SB 72-0662 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
29-APR-2008 HRS,MSC -
ENC
SB 72-0663 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP(156-78 ENGINES. SERVICE BULLETIN
MOS
26-FEB-2008 HRS4.ISC -
ENC
SB 72-0663 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN
MOS
12-JAN-2009 HRS7ASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 499 Of 748
Camp Systems
EFTA00618790
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0665 NO. I ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN
MOS
27-SEP-2007 HRSimSC -
ENC
SB 72-0665 R1 NO. I ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN
MOS
10-DEC-2007 HRSUMSC -
ENC
SB 72-0666 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
15-JAN-2008 HRSUMSC -
ENC
SB 72-0667 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
09-OCT-2007 HRSUMSC -
ENC
SB 72-0667 R1 NO 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN
MOS
11-MAY-2012 HRSUMSC -
ENC
SB 72-0668 NO. I ENGINE - ENGINE - GENERAL (72-00-01) - INTRODUCTION OF A NEW FLAT WASHER AT THE JUNCTION OF
RADIAL DRIVE SHAFT
SLEEVE AND THE FAN FRAME SHROUD. SERVICE BULLETIN
MOS
11-JUN-2008 HRSUMSC -
ENC
SB 72-0669 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
16-JAN-2008 HRS.I.ISC -
ENC
SB 72-0670 NO. I ENGINE - SPARE PARTS RELEASE FOR CFNI56-78 IPC. SERVICE BULLETIN
MOS
25-JAN-2008 HRSUMSC -
ENC
SB 72-0670 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
09-JAN-2009 HRSUMSC -
ENC
SB 72-0671 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMS6-78 IPC. SERVICE BULLETIN
MOS
04-DEC-2007 HRSUMSC -
ENC
SB 72-0673 NO. I ENGINE - INTRODUCTION OF A NEW ANTI-ROTATION STRAIGHT HEADED PIN. SERVICE BULLETIN
MOS
02-NOV-2007 HRSUMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 500 Of 748
Camp Systems
EFTA00618791
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0673 R1 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - NEW VSV SHROUD HEADED ANTI- ROTATION PIN
- INTRODUCTION. SERVICE BULLETIN
MOS
5-MAY-2009 HRSAISC
ENC
SB 72-0674 NO. I ENGINE - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD (SUPERSEDED BY 72-0674 RI), SERVICE SUPERSEDED
BULLETIN
MOS
HRSAISC
ENC
SB 72-0674 RI NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND STAGE 1 LOW PRESSURE TURBINE NOZZLE
ASSEMBLY
(72-53-00) - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0676 NO. 1 ENGINE - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW RANGE
ASSEMBLY. SERVICE BULLETIN
MOS
30-JUN-2008 HRSAISC
ENC
SB 72-0676 RI NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INTRODUCTION OF A NEW LOW PRESSURE TURBINE
(LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN
MOS
I7-NOV-2008 HRSAISC -
ENC
SB 72-0676 R2 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF A NEW LOW PRESSURE TURBINE
(LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN
MOS
I6-JUN-2009 HRSAISC -
ENC
SB 72-0677 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC AND CMM. SERVICE BULLETIN
MOS
31-JAN-2008 HRSAISC -
ENC
SB 72-0678 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW AXIAL STOP PIN.
SERVICE BULLETIN
MOS
C6-JAN-2008 HRSAISC -
ENC
SB 72-0679 NO.1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE
BULLETIN
MOS
29-AUG-2008 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 501 Of 748
@ Camp Systems
EFTA00618792
AD/SI Status Report AIRCRAFT
CAMP fra the enund up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0680 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
29-JAN-2008 HIRS(MSC -
ENC
SB 72-0680 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
09-JUL-2008 HRS(MSC -
ENC
SB 72-0681 NO. I ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO
CFM56-7818.CFM.56-7820.CFM.56-7/322.CFM56-7/324.CFM.56-7/326 OR CFM56-7827. SERVICE BULLETIN
MOS
I4-MAY-2008 HRS/MSC -
ENC
SB 72-0682 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I 7-JAN-2008 HRS/MSC -
ENC
SB 72-0683 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE
VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN
MOS
25-FEB-2008 HRS(MSC -
ENC
SB 72-0683 R1 NO. I ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE SUPERSEDED
VERTICAL SEAL SLOT CONFIGURATION (SUPERSEDED BY SB 72-0683 R2). SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0683 R2 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - SPLIT VANE REPAIR AND REWORK TO CATEGORY 7
DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN
MOS
2I-JAN-2014 HRS(MSC -
ENC
SB 72-0684 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
19-DEC-2007 HRS/MSC -
ENC
SB 72-0685 NO. 1 ENGINE - DELETION OF SOME ALTERNATE NO.4 ROLLER BEARINGS. SERVICE BULLETIN
MOS
0I-APR-2008 HRS(MSC -
ENC
SB 72-0686 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
05-MAR-2008 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 502 Of 748
@ Camp Systems
EFTA00618793
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0687 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
06-FEB-2008 HRS/MSC -
ENC
SB 72-0689 NO. 1 ENGINE - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD
ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN
MOS
I9-AUG-2008 MRS/51SC -
ENC
SB 72-0689 RI NO. I ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW ACCESSORY
GEARBOX WITH NEW
ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN
MOS
04-DEC-2009 MRS/51SC -
ENC
SB 72-0689 R2 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - INTRODUCTION OF NEW ACCESSORY
GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE
BULLETIN
MOS
22-DEC-2011 HRS/MSC
ENC
SB 72-0690 NO. 1 ENGINE - BOLTS COMMONALITY FOR AIR LPT COOLING TUBE RETAINING STRAPS. SERVICE BULLETIN
MOS
20-MAR-2008 HRS/MSC -
ENC
SB 72-0694 RI NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF THE INNER COMBUSTION RECOMMENDED
CHAMBER LINER. SERVICE BULLETIN
MOS
21-OCT-2011 HRS/MSC
ENC
SB 72-0696 NO. 1 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN
MOS
21-MAR-2008 HRS/MSC -
ENC
SB 72-0696 RI NO. 1 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN
MOS
28-MAR-2008 HRS/MSC -
ENC
SB 72-0696 R2 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
MOS
02-SEP-2011 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 503 Of 748
@ Camp Systems
EFTA00618794
AD/SI Status Report AIRCRAFT
CAMP
Ael...imp.= taken...lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0698 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF ALTERNATE LPT REAR FRAMES ON
SAC ENGINES
IN FIELD. SERVICE BULLETIN
MOS
23-MAR-2009 HRS(MSC
ENC
SB 72-0699 NO. 1 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO FCM.56-78/3 TI ENGINE MODEL. SERVICE
BULLETIN
MOS
14-MAY-2008 HRSPASC
ENC
SB 72-0699 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFM56-78 (SAC) TO CFM56-78/3 (TI). SERVICE
BULLETIN
MOS
03-NOV-2009 HRS(MSC
ENC
SB 72-0700 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - IMPROVEMENT OF THE FUEL SUPPLY TUBE WITH NEW INSERTS.
SERVICE BULLETIN
MOS
24-FEB-2009 HRS(MSC
ENC
SB 72-0701 NO. 1 ENGINE - NEW SPARE PARTS THAT ARE INTERCHANGABLE WITH THE OLD PARTS THEY REPLACE. SERVICE
BULLETIN
MOS
13-MAY-2008 HRS(MSC
ENC
SB 72-0702 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
06-JUN-2008 HRS(MSC -
ENC
SB 72-0704 NO. 1 ENGINE - INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING RECOMMENDED
DETERIORATION. SERVICE BULLETIN
MOS
23-JUN-2008 HRS(MSC 1000 (s)
ENC
SB 72-0704 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING
DETERIORATION. SERVICE BULLETIN
MOS
HRSOASC 500(s)
ENC
SB 72-0706 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626A32. SERVICE
BULLETIN
MOS
11-JUN-2009 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 504 Of 748
@ Camp Systems
EFTA00618795
AD/SI Status Report AIRCRAFT
CAMP
Asicitiomfra 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0707 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFP.156-78 ENGINE CONVERSION TO CR156-7826/382. SERVICE
BULLETIN
MOS
I I -JUN-2009 HRS/MSC -
ENC
SB 72-0707 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382. SERVICE BULLETIN RECOMMENDED
MOS
22-FEB-2011 MRS/P.1SC -
ENC
SB 72-0708 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE
BULLETIN
MOS
II -JUN-2009 HRS/MSC -
ENC
SB 72-0708 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN RECOMMENDED
MOS
22-FEB-2011 HRS/MSC -
ENC
SB 72-0709 RI NO. 1 ENGINE - INTRODUCTION OF NEW BOLT FOR RECOMMENDED COMPLIED WITH
HPTACC MANIFOLD ASSEMBLY. SERVICE BULLETIN
MOS 28-SEP-2009
29-OCT-2008 HRSAISC - (s) 3378:01
ENC 776
SB 72-0711 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
I6-OCT-2008 HRS/MSC
ENC
SB 72-0712 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
06-NOV-2008 MRS/P.1SC -
ENC
SB 72-0713 RI NO. I ENGINE - FUEL NOZZLE COUPLING NUT INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY
MOS 28-SEP-2009
25-JUL-2008 HRS,MSC - 3378:04
ENC 776
SB 72-0716 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- SPARE PARTS RELEASE FOR CFM56-7B IPC.
SERVICE BULLETIN
MOS
20-OCT-2008 HRS(MSC
ENC
SB 72-0718 RI NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - REWORK OF THE LPT CALF RAIL "0° SUPPORT
RING AND REIDENTIFICATION OF THE LPT CASE. SERVICE BULLETIN
MOS
04-JUN-2013 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 505 Of 748
@ Camp Systems
EFTA00618796
AD/SI Status Report AIRCRAFT
CANIP
Asiatic,film Ow imam, up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0720 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW FAN BLADE SPACER.
SERVICE BULLETIN
MOS
28-APR-2009 HRS/MSC
ENC
SB 72-0720 RI NO.1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE SPACER.
SERVICE BULLETIN
MOS
I1-JAN-2010 HRS/MSC
ENC
SB 72-0722 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
I0-DEC-2008 HRS/MSC -
ENC
SB 72-0724 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
I0-AUG-2009 HRS/MSC -
ENC
SB 72-0725 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO NEW BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
29-JAN-2009 HRS/MSC -
ENC
SB 72-0726 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
26-FEB-2009 HRS/MSC -
ENC
SB 72-0727 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW SILVER PLATED NUT FOR THE LPT ROTOR
SUPPORT I LPT SHAFT
ATTACHMENT FLANGE JUNCTION. SERVICE BULLETIN
MOS
28-MAY-2009 MRS/P.1SC -
ENC
SB 72-0728 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
06-MAR-2009 HRSfMSC
ENC
SB 72-0728 RI NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 506 Of 748
@ Camp Systems
EFTA00618797
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0728 R2 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
09-FEB-2010 HRS/MSC
ENC
SB 72-0730 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REIDENTIFICATION OF THE CONTAINMENT CASE
340-059-813-0
AND 300-059-814-0. SERVICE BULLETIN
MOS
13-FEB-2009 HRS1MSC
ENC
SB 72-0731 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - REPLACEMENT OF BALL BEARING
301-080-320-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
26-FEB-2009 HRSAISC -
ENC
SB 72-0732 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
02-JUN-2009 HRS1MSC
ENC 19000 (s)
SB 72-0732 RI NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC RECOMMENDED
ENGINES. SERVICE BULLETIN
MOS
HRSAISC
ENC 19000 (s)
SB 72-0733 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
14-APR-2009 HRS/MSC -
ENC
SB 72-0734 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INTRODUCTION OF NEW
LPT STAGE 1
NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
13-AUG-2009 HRS1MSC
ENC
SB 72-0734 RI NO. I ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF NEW
LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0735 NO. 1 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR
SHROUD- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN
MOS
26-JUN-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 507 Of 748
@ Camp Systems
EFTA00618798
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0735 R1 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD
- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN
MOS
04-DEC-2009 HRSOASC -
ENC
SB 72-0737 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS TO
CFM56-7827A ENGINES. SERVICE BULLETIN
MOS
15-MAY-2009 FIRS1MSC
ENC
SB 72-0738 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC,
SERVICE BULLETIN
MOS
28-JAN-2009 HRSOASC
ENC
SB 72-0738 RI NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
30-JUN-2011 HRSOASC
ENC
SB 72-0739 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - PRECAUTIONS TO BE FOLLOWED CONCERNING
INSULATION BLANKETS CONTAINING RCF. SERVICE BULLETIN
MOS
08-FEB-20I3 HRSAISC -
ENC
SB 72-0740 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN INFORMATIONAL
MOS
17-FEB-2009 HRSOASC -
ENC
SB 72-0742 NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE ASSEMBLY (72-00-02) - HPC FRONT CASE BLEED PORT
REMOVAL AND SIMPLIFICATION. SERVICE BULLETIN
MOS
30-JUN-2009 HRSAISC -
ENC
SB 72-0743 NO. I ENGINE - ENGINE - LPT ROTOR I STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT
DISK
336-002-006-0. SERVICE BULLETIN
MOS
26-OCT-2009 HRSAISC
ENC 9500 (s)
SB 72-0743 RI NO.1 ENGINE - ENGINE - LPT ROTOR/ STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT RECOMMENDED
DISK 336-002-006-0, SERVICE BULLETIN
MOS
09-NOV-20I0 HRSOASC
ENC 9500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 508 Of 748
@ Camp Systems
EFTA00618799
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0744 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF THREE BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
12-MAY-2009 HRS/MSC -
ENC
SB 72-0745 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF AN ALTERNATE PROVISIONING SOURCE FOR THE
NO. 1.2 AND
5 BEARINGS. SERVICE BULLETIN
MOS
26-AUG-2009 HRS.0.1SC
ENC
SB 72-0747 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE.
SERVICE BULLETIN
MOS
04-JUN-2009 HRSfMSC
ENC
SB 72-0747 R1 NO. I ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE CATEGORY 9
BULLETIN
MOS
03-MAR-2014 HRS/MSC
ENC
S8 72-0748 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
30-JUN-2009 HRSfMSC -
ENC
SB 72-0749 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW RETAINING PLATE.
SERVICE BULLETIN
MOS
01-FEB-2011 HRS/MSC -
ENC
SB 72-0750 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/P.1SC -
ENC
S8 72-0751 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/MSC -
ENC
SB 72-0752 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
02-JUL-2009 HRS/MSC -
ENC
SB 72-0753 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK IN FIELD OF THE FAN BLADE REAR
SHANK FOR WEAR. SERVICE BULLETIN
MOS
14-OCT-2009 HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 509 Of 748
@ Camp Systems
EFTA00618800
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0753 R1 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - REWORK IN FIELD OF THE FAN BLADE REAR
SHANK FOR WEAR. SERVICE BULLETIN
MOS
03-DEC-2012 HRS‘MSC
ENC
SB 72-0750 NO.1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF ONE BRACKET ON THE FLANGE Al RECOMMENDED
AND THREE
BRACKETS ASSY ON THE FLANGE 86 WITH A NEW DESIGN. SERVICE BULLETIN
MOS
I0-NOV-2010 HRS1MSC -
ENC
SB 72-0756 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW
DESIGN. SERVICE BULLETIN
MOS
HRSfMSC
ENC
SB 72-0757 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
28-AUG-2009 HRSfMSC -
ENC
SB 72-0758 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR
BLADES. SERVICE BULLETIN
MOS
22-SEP-2009 HRSfMSC
ENC
SB 72-0759 NO. I ENGINE - ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION OPTIONAL
HARNESSES. SERVICE BULLETIN
MOS
27-OCT-2010 HRS/MSC
ENC
SB 72-0759 R1 NO. 1 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES SUPERSEDED
(SUPERSEDED BY SB 72-0759 R2). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0759 R2 NO. 1 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
22-OCT-2013 HRS1MSC
ENC
SB 72-0760 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
03-SEP-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 510 Of 748
@ Camp Systems
EFTA00618801
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0761 NO 1 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE
BULLETIN
MOS
08-OCT-2009 HR&MSC -
ENC
SB 72-0762 NO 1 ENGINE - ENGINE - TRANSFER GEARBOX ASSEMBLY (72-62-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC.
SERVICE BULLETIN
MOS
29-SEP-2009 HRS.ISC
ENC
SB 72-0763 NO 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE
BULLETIN
MOS
HRS.ISC
ENC
SB 72-0764 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT
ROTOR r STATOR ASSEMBLY. SERVICE BULLETIN
MOS
HRS'MSC -
ENC
SB 72-0764 R2 NO. I ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR r OPTIONAL
STATOR ASSEMBLY. SERVICE BULLETIN
MOS
25-JUL -2012 HRSitISC
ENC
SB 72-0767 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN
MOS
28-OCT-2009 HRS'MSC -
ENC
SB 72-0768 NO. I ENGINE - NOT ISSUED. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0769 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-.12-00) - INTRODUCTION OF INNER AND OUTER
SEGMENT LINER SPARE PARTS. SERVICE BULLETIN
MOS
06-FEB-2010 HRS'MSC -
ENC
SB 72-0772 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN
MOS
04-DEC-2009 HRS'MSC -
ENC
SB 72-0773 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
25-NOV-2009 HRS'MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 511 Of 748
Camp Systems
EFTA00618802
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0774 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
20-JAN-2010 MRS/MSC -
ENC
SB 72-0775 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0776 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0777 NO. 1 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN DISK MIDDLE LUG REWORK IN FIELD.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0778 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0779 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0311 ELECTRICAL HARNESS AND IN
FIELD REWORK
OF THE OLD MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0780 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00)- REWORK IN FIELD OF FAN CONTAINMENT CASE
B1 FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN
MOS
I8-JAN-2011 HRS/MSC -
ENC
SB 72-0780 RI NO. 1 ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00) - REWORK IN FIELD OF FAN CONTAINMENT CASE BI
FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN
MOS
1 1-MAY-20I2 HRS/MSC -
ENC
SB 72-0781 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW LPT COOLING MANIFOLDS. SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
26-JUN-2073 HRSAISC -
ENC
SB 72-0783 NO. 1 ENGINE - ENGINE - HPT ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE
BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 512 Of 748
@ Camp Systems
EFTA00618803
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0784 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PART RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0785 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - DAC FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE
DISTRESS. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SS 72-0786 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW OUTER LINER FOR HARSH
ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SS 72-0787 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS0ASC -
ENC
SS 72-0789 NO. 1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES
ZONE FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SS 72-0789 R1 NO. I ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-03) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE RECOMMENDED
FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN
MOS
21-JUL-2011 HRS/MSC -
ENC
58 72-0789 R2 NO.1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - INTRODUCTION OF A LEADING INDICATOR PROGRAM FOR RECOMMENDED
ENGINE OPERATION IN LOW CONCENTRATIONS OF VOLCANIC ASH, SERVICE BULLETIN
MOS
I4-DEC-2011 HRS/MSC -
ENC
58 72-0790 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
HRSOASC -
ENC
58 72-0791 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS0ASC -
ENC
SS 72-0792 NO. 1 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (7261-00)- NEW BALL THRUST NO.3 BEARING OPTIONAL
WITH NITRIDE HARDENING
. SERVICE BULLETIN
MOS
30-JUL-2010 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 513 Of 748
@ Camp Systems
EFTA00618804
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0794 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE
BULLETIN
MOS
15-OCT-2010 HRSAISC
ENC
SB 72-0795 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY OPTIONAL
FOR HARSH ENVIRONMENT OPERATORS
. SERVICE BULLETIN
MOS
03-NOV-2010 HRS1MSC
ENC
SB 72-0795 R2 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY RECOMMENDED
FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
16-APR-2012 HRSfMSC -
ENC
SB 72-0795 R3 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY FOR HARSH RECOMMENDED
ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
18-JUN-2012 HRSAISC -
ENC
SB 72-0796 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS ( SUPERSEDED
SUPERSEDED BY SB 72-0796 R1). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0796 R1 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS. SERVICE CATEGORY 4
BULLETIN
MOS
18-FEB-2013 HRS1MSC
ENC
SB 72-0797 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN BLADE MOMENT-WEIGHT MISMARKING.
SERVICE BULLETIN
MOS
27-JAN-2011 HRS1MSC
ENC
SB 72-0798 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00)- REWORK OF HPC STAGE I THROUGH STAGE RECOMMENDED
9 BLADES. SERVICE BULLETIN
MOS
24-JAN-2011 HRS1MSC
ENC
SB 72-0799 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - REWORK OF HPC TECH INSERTION HPC BLADES. RECOMMENDED
SERVICE BULLETIN
MOS
20-JAN-2011 HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 514 Of 748
@ Camp Systems
EFTA00618805
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0801 NO. 1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
FRONT FLANGE WITH 6 VENTILATION HOLES AND REWORK OF THE OLD PART. SERVICE BULLETIN
MOS
30-JUN-2011 HRS/MSC -
ENC
SB 72-0802 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0803 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
12-OCT-2010 HRS/MSC -
ENC
513 72-0801 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
09-NOV-2010 HRS/MSC -
ENC
SS 72-0804 RI NO. 1 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
24-MAR-2011 HRS/MSC -
ENC
SS 72-0805 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
02-NOV-2010 HRS/MSC -
ENC
513 72-0806 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SUPPORT WITH CAPTNE NUT.
SERVICE BULLETIN
MOS
18-JUL-2011 HRS/MSC -
ENC
SS 72-0807 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INSPECTION OF TURBINE REAR FRAME ON CFM56-7827A OPTIONAL
ENGINES. SERVICE BULLETIN
MOS
19-JAN-2012 HRS/MSC
ENC 11200 (s)
SS 72-0808 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INSPECTION OF STAGE 1 CUSTOMER
LPT NOZZLES DUE TO INDIA ENVIRONMENTAL DISTRESS. SERVICE BULLETIN CONVENIENCE
MOS
27-SEP-2013 HRS/MSC -
ENC
SB 72-0809 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF CFM56-7BE LPT HARDWARE ON CFM56-76.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 515 Of 748
@ Camp Systems
EFTA00618806
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0810 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMGS-7B IPC. SERVICE BULLETIN
MOS
09-JUN-2011 HRSiliSC -
ENG
SB 72-0811 NO. I ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR INLET RECOMMENDED
GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
20-JAN-2011 HRSitiSC -
ENG
SB 72-0811 R1 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR RECOMMENDED
INLET GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
29-NOV-2011 HRS,IISC -
ENG
SB 72-0812 NO. I ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED
WITH NITRIDE HARDENING. SERVICE BULLETIN
MOS
26-SEP-2011 HRS.1SC -
ENG
SB 72-0812 R1 NO. I ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED
WITH NITRIDE HARDENING. SERVICE BULLETIN
MOS
CS-FEB-2012 HRSI.1SC -
ENG
SB 72-0813 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT BLADE INFORMATIONAL
PIN 2403M91P02. SERVICE BULLETIN
MOS
30-JAN-2012 HR&P.ISC -
ENG
SB 72-0814 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
11-APR-2011 HR&P.ISC -
ENG
SB 72-0815 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
20-DEC-2011 HRS., LISC -
ENG
SB 72-0816 NO. I ENGINE - HPTILPT NOZZLE SHROUD ASSEMBLY (72-53-00) - NEW SHROUD HPT STATOR HANGER WITH RECOMMENDED
MODIFIED AIR FILTER. SERVICE BULLETIN
MOS
19-JAN-2011 HRSI.1SC -
ENG
SB 72-0817 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED
OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
03-OCT-2011 HR&LISC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 516 Of 748
Camp Systems
EFTA00618807
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0817 R1 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER
OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0818 RI NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR. RECOMMENDED
SERVICE BULLETIN
MOS
24-MAR-2011 HRS/MSC
ENC
SB 72-0819 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
03-N0V-2011 HRS/MSC -
ENC
SB 72-0820 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF NO. 4 MIRING STEEL VERSION. SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
31-JUL-2012 HRS/MSC
ENC
SB 72-0821 NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
MOS
04-JUL-2011 HRSOASC
ENC
SB 72-0821 RI NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
610S
26-MAR-2013 HRSOASC
ENC
SB 72-0822 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF NEW BOLT TO ATTACH THE MW0325 HARNESS.
SERVICE BULLETIN
MOS
I8-AUG-201I HRS/MSC
ENC
SB 72-0822 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF NEW BOLTS TO ATTACH THE MW0325 HARNESS.
SERVICE BULLETIN
MOS
26-APR-20I2 HRSIMSC
ENC
SB 72-0823 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05 SUPERSEDED
(SUPERSEDED BY 72-0823 R1). SERVICE BULLETIN
MOS
11-APR-2011 HRSIMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 517 Of 748
@ Camp Systems
EFTA00618808
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0823 R1 NO. 1 ENGINE - ENGINE - I-IPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05. INFORMATIONAL
SERVICE BULLETIN
MOS
I1-MAY-2011 HRS/MSC
ENC
SB 72-0823 R2 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE PM 2080M35G05. INFORMATIONAL
SERVICE BULLETIN
MOS
23-JUN-20I1 HRS/MSC
ENC
SB 72-0824 NO.1 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- MANIFOLD HPT CLEARANCE CONTROL BRACKET OPTIONAL
CHANGE. SERVICE BULLETIN
MOS
2I -NOV-20I 1 HRS/MSC
ENC
SB 72-0825 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED
PRE-CFM56-78 SIB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE
BULLETIN
MOS
I-IRS/NISC
ENC 25000 (s)
SB 72-0825 R1 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED
PRE-CFM56-7B SiB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE
BULLETIN
MOS
29-NOV-2011 HRS/MSC
ENC 15000 (s)
SB 72-0825 R2 NO. I ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (7232-00)- ON WING INSPECTION OF PRE-CFM56-7B SB SUPERSEDED
72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES (SUPERSEDED BY SB 72-0825 R3).
SERVICE BULLETIN
MOS
HIRSAISC - (s)
ENC
SB 72-0825 R3 NO. 1 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF PRE-CFM56-7B SB CATEGORY 2
72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN
MOS
30-APR-2014 HIRSAISC -
ENC
SB 72-0826 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0827 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK OF THE BOOSTER SPOOL. SERVICE CUSTOMER
BULLETIN CONVENIENCE
MOS
27-MAY-20I3 HRSO4SC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 518 Of 748
@ Camp Systems
EFTA00618809
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0829 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - RELEASE OF CFM56-78E HPT ROTOR HARDWARE TO EARLIER RECOMMENDED
CFM56-78 ENGINE MODELS. SERVICE BULLETIN
MOS
30-JAN-2012 HRS(MSC -
ENC
SB 72-0830 NO.1 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - RELEASE OF CFM56-7BE COMBUSTION CASE TO RECOMMENDED
EARLIER CFM56-7B ENGINE MODELS. SERVICE BULLETIN
MOS
10-JAN-2012 HRS(MSC -
ENC
SB 72-0831 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
02-DEC-2011 HRS(MSC -
ENC
SB 72-0832 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE
BULLETIN
MOS
05-JUL-2011 HRS(MSC -
ENC
SB 72-0833 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B TURBOFAN ENGINES.
SERVICE BULLETIN
MOS
31-AUG-20I1 HRSOASC -
ENC
SB 72-0833 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 TURBOFAN ENGINES.
SERVICE BULLETIN
MOS
28-N0V-2011 HRSOASC -
ENC
SB 72-0834 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART CUSTOMER
NUMBERS AND CONVENIENCE
REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN
MOS
08-JUN-2011 HIRSAISC -
ENC
SB 72-0834 RI NO. I ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART NUMBERS AND CUSTOMER
REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN CONVENIENCE
MOS
20-JUL-2012 HRSOASC -
ENC
SB 72-0835 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION RECOMMENDED
COMBUSTION CHAMBER INNER LINER WITH THIN TBC. SERVICE BULLETIN
MOS
01-DEC-2011 HRS/1,1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 519 Of 748
@ Camp Systems
EFTA00618810
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0836 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED
INNER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
23-SEP-2011 HRS0ASC -
ENC
SB 72-0837 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B20E, SERVICE BULLETIN OPTIONAL
MOS
I6-JUN-2011 HRSOASC -
ENC
SB 72-0838 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7622E. SERVICE BULLETIN OPTIONAL
MOS
76-JUN-2011 HRS/MSC -
ENC
SB 72-0839 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B228B1. SERVICE OPTIONAL
BULLETIN
MOS
I6-JUN-2011 HRS/MSC -
ENC
SB 72-0840 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E, SERVICE BULLETIN OPTIONAL
MOS
I5-JUN-2011 HRS/MSC -
ENC
SB 72-0841 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E/B1. SERVICE OPTIONAL
BULLETIN
MOS
15-JUN-20 1 HRS/MSC -
ENC
SB 72-0842 R1 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7626E. SERVICE BULLETIN RECOMMENDED
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0843 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/B1. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0844 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B268B2. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0845 R1 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRSOASC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 520 Of 748
@ Camp Systems
EFTA00618811
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0846 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFP.156-7B ENGINE CONVERSION TO CFP.156-7826E62F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0848 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7627E431, SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0850 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7627E/F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0852 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW I.PT ROTOR CUSTOMER
SUPPORT. SERVICE BULLETIN CONVENIENCE
MOS
I6-OCT-2012 HRS/MSC
ENC
SB 72-0853 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE MATE FACE RECOMMENDED
SURFACE INSPECTION. SERVICE BULLETIN
MOS
72-SEP-2011 HRS/MSC
ENC
SB 72-0854 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY ON THE FILTER SUPPORT.
SERVICE BULLETIN
MOS
15-N0V-2011 HRS/MSC -
ENC
SB 72-0856 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE
BULLETIN
MOS
28-FEB-20 I 2 HRS/MSC
ENC
SB 72-0857 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
21-DEC-2011 HRSfMSC -
ENC
SB 72-0858 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INSPECTION OF SUSPECT FAN CONTAINMENT CASE FOR
MISSING OR
MISLOCATED ANODIZATION. SERVICE BULLETIN
MOS
72-SEP-2011 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 521 Of 748
@ Camp Systems
EFTA00618812
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0859 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED
DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN
MOS
21-SEP-2011 HRS/PASC -
ENC
SB 72-0859 RI NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED
DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN
MOS
28-JAN-2013 HRS/MSC -
ENC
SB 72-0861 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER UNER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
09-JAN-2012 HRS/PASC -
ENC
SB 72-0862 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER UNER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
I2-JAN-2012 HRS/MSC -
ENC
SB 72-0863 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED
EROSION COATING (SUPERSEDED BY 72-0863 RI). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0863 RI NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED
EROSION COATING (SUPERSEDED BY 72-0863 R2). SERVICE BULLETIN
MOS
HRStAISC -
ENC
SB 72-0863 R2 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD RECOMMENDED
EROSION COATING. SERVICE BULLETIN
MOS
22-MAY-2012 HRS/MSC
ENC
SB 72-0864 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - INTRODUCTION OF NEW STAGE 2 RECOMMENDED
AND STAGE 3 SHROUDS AND STAGE 4 THROUGH 8 VANE ASSEMBLIES AND SECTORS. SERVICE BULLETIN
MOS
25-AUG-2011 HRS/PASC -
ENC
SB 72-0865 NO. 1 ENGINE - ENGINE - LPT ROTORISTATOR ASSEMLY (72-54-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
08-DEC-2011 HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 522 Of 748
@ Camp Systems
EFTA00618813
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnit4 up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0866 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY FOR ATTACHMENT OF J5 HARNESS. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
14-FEB-2012 HRS1MSC
ENC
SB 72-0867 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - RELEASE OF NEW HPT STATOR SHROUD. RECOMMENDED
SERVICE BULLETIN
MOS
20-APR-2072 HRS1MSC
ENC
SB 72-0868 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER LINER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
07-FEB-2012 HRS1MSC -
ENC
SB 72-0869 NO. 1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - RELEASE OF SPD AIR DUCT SLEEVE PIN 1812M68G02.
SERVICE BULLETIN
MOS
02-NOV-2011 MRS/P.1SC -
ENC
SB 72-0871 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED
LOCK ON-WING INSPECTION. SERVICE BULLETIN
MOS 6 (s)
19-OCT-2011 HRSAISC
ENC
SB 72-0871 R1 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED
LOCK ON-WING INSPECTION. SERVICE BULLETIN
MOS
I I -APR-2012 HRSOISC DUE (s)
ENC
SB 72-0872 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 3 BLADES. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
12-DEC-2012 HRSAISC
ENC
SB 72-0873 NO. 1 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - INTRODUCTION OF A NEW SEAL ON THE CENTER VENT TUBE.
SERVICE BULLETIN
MOS
27-FEB-20I2 HRS(MSC
ENC
SB 72-0874 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS. RECOMMENDED
SERVICE BULLETIN
MOS
20-OCT-2011 HRS1MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 523 Of 748
@ Camp Systems
EFTA00618814
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0874 R1 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS RECOMMENDED
(SUPERSEDED BY SI3 72-0874 R2). SERVICE BULLETIN
MOS
08-FEB-2012 HRSAISC -
ENC
SB 72-0870 R2 NO. 1 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS, SERVICE CATEGORY 4
BULLETIN
MOS
14-JUL-2014 HRS11.1SC
ENC
SB 72-0875 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
23-APR-2072 HRS/MSC -
ENC
SB 72-0876 NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-03-02) - INSPECTION OF FUEL NOZZLE SUPPLY TUBE NO. 7 RECOMMENDED
FOR WEAR OR CLOSE CLEARANCE, SERVICE BULLETIN
MOS 12 (s)
27-DEC-2011 HRS11.1SC
ENC
SB 72-0877 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
18-007-2012 HRS/MSC -
ENC
SB 72-0878 NO. I ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - FUEL MANIFOLD SUPPORT BRACKETS AND IGNITER CABLE OPTIONAL
BRACKET ASSEMBLY REDESIGN. SERVICE BULLETIN
MOS
21-NOV-2011 HRS/MSC -
ENC
SB 72-0879 RI NO.1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW
HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE.
SERVICE BULLETIN
MOS
12-APR-2012 MRS/P.1SC
ENC
SB 72-0879 R3 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW CATEGORY 6
HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AG8 TO THE NEW ONE.
SERVICE BULLETIN
MOS
15-JAN-2014 HRSAISC
ENC
SB 72-0880 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION INNER RECOMMENDED
COMBUSTION CHAMBER LINER INTO MULTI-HOLE COOLING PATCH WITH THIN IBC CONFIGURATION. SERVICE
BULLETIN
MOS
22-FEB-2012 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 524 Of 748
@ Camp Systems
EFTA00618815
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 72-0881 NO. 1 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - HPT STATOR AIR IMPINGEMENT MANIFOLD REWORK. SERVICE RECOMMENDED
BULLETIN
MOS
II -APR-2012 HRS/MSC -
ENC
SB 72-0882 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
26-SEP-2012 HRS(MSC -
ENC
SB 72-0884 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REPETITIVE ON-WING INSPECTION OF THE FAN RECOMMENDED
BLADE PLATFORMS. SERVICE BULLETIN
MOS 12 (s)
24-JAN-2012 FIRS/MSC
ENC
SB 72-0885 NO. 1 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 2 BLADES. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0886 NO. I ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN RECOMMENDED
MOS
27-FEB-20I2 HRS/MSC
ENC 400(s)
SB 72-0886 RI NO. 1 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0888 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER WITH A RECOMMENDED
MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN
MOS
30-AUG-2012 HRS(MSC -
ENC
SB 72-0888 RI NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF NEW OUTER LINERS WITH A CUSTOMER
MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN CONVENIENCE
MOS
03-JAN-2013 HRS/MSC -
ENC
SB 72-0889 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER RECOMMENDED
WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN
MOS
23-AUG-2012 HRS/MSC -
ENC
SB 72-0889 RI NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER CUSTOMER
WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN CONVENIENCE
MOS
17-OCT-2012 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 525 Of 748
@ Camp Systems
EFTA00618816
AD/SI Status Report AIRCRAFT
CAMP
Aviation/nem the ernit4 up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0890 NO. 1 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION CHAMBER ASSEMBLY. RECOMMENDED
SERVICE BULLETIN
MOS
23-AUG-20I2 HRS/MSC
ENC
SB 72-0892 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
13-FEB-20 I 2 HRSOASC -
ENC
SB 72-0893 NO. 1 ENGINE - INTRODUCTION OF A NEW BOLT-WASHER ASSEMBLY TO IMPROVE THE FLANGE ASSEMBLY
ATTACHMENT. SERVICE BULLETIN
MOS
HRS/1.1SC
ENC
SB 72-0894 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF A NEW COMPRESSOR RECOMMENDED
ROTOR STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN
MOS
14-MAR-2012 HRS/MSC -
ENC
SB 72-0894 R1 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION Of A NEW COMPRESSOR ROTOR RECOMMENDED
STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0895 NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT RECOMMENDED
ROTOR KIT. SERVICE BULLETIN
MOS
10-MAY-2012 HRS/MSC
ENC
58 72-0895 R1 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT
ROTOR KIT. SERVICE BULLETIN
MOS
HRS/MSC
ENC
58 72-0897 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE
AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN
MOS
20-MAR-2012 HRS/MSC -
ENC
58 72-0897 R1 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE
AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN
MOS
28-MAR-2013 HRS/MSC -
ENC
SB 72-0898 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
12-MAR-2012 HRS/MSC -
ENC
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 526 Of 748
@ Camp Systems
EFTA00618817
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0699 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE RECOMMENDED
REPAIR. SERVICE BULLETIN
MOS
17-OCT-2012 HRS/MSC -
ENC
SB 72-0900 NO. 1 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 1 BLADES. SERVICE
BULLETIN
MOS
HRS.4.1SC
ENC
SB 72-0902 NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - DELETION OF ALTERNATE COMBUSTION CHAMBER RECOMMENDED
ASSEMBLY. SERVICE BULLETIN
MOS
20-APR-2012 HRS/MSC
ENC
SB 72-0903 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-5340) - REWORK OF N500 MATERIAL HPT STATOR RECOMMENDED
SHROUDS. SERVICE BULLETIN
MOS
12-APR-20I3 HRSOASC
ENC
SB 72-0904 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW AIR/OIL SEPARATOR AND REWORK OF THE
OLD ONE. SERVICE BULLETIN
MOS
17-OCT-2012 HRS/MSC
ENC
SB 72-0907 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-7BE BASELINE CONFIGURATION HARDWARE RELEASED TO INFORMATIONAL
EARLIER CFM56-76 SAC ENGINE MODELS. SERVICE BULLETIN
MOS
04-JUN-2013 HRS/MSC -
ENC
SB 72-0909 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE CUSTOMER
PLATFORM. SERVICE BULLETIN CONVENIENCE
MOS
20-NOV-2012 HRS/PASC
ENC
SB 72-0911 NO.1 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
17-JUL-2012 HRSfMSC -
ENC
SB 72-0912 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
27-SEP-2012 HRS/MSC -
ENC
SB 72-0913 NO.1 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
OS-NOV-2012 HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 527 Of 748
@ Camp Systems
EFTA00618818
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0914 NO. 1 ENGINE - ENGINE - GENERAL (72-00-W) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
25-MAR-2013 MRS/MSC -
ENC
58 72-0914 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
12-APR-2013 HRSAISC -
ENC
58 72-0915 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
30-NOV-2012 HRSAISC -
ENC
SS 72-0916 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE
REPAIR. SERVICE BULLETIN
MOS
15-JAN-2013 HRSAISC -
ENC
SS 72-0917 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OIL SCAVENGE TUBE CLAMP. SERVICE RECOMMENDED
BULLETIN
MOS
16-OCT-2012 HRSAISC -
ENC
SS 72-0918 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR BLADE MANAGEMENT SUPERSEDED
(SUPERSEDED BY 93 72-0918 RI). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0918 RI NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. CATEGORY 4
SERVICE BULLETIN
MOS
11-JUN-2014 HRSAISC
ENC
SB 72-0920 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT NOZZLE KIT. SERVICE LIMITED
BULLETIN DISTRIBUTION
MOS
15-NOV-20I3 HRS/MSC
ENC
SB 72-0921 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SUPERSEDED
72-0921 RI). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0921 RI NO. 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SB 72-0921 SUPERSEDED
R2). SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 528 Of 748
@ Camp Systems
EFTA00618819
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0921 R2 NO. 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE. SERVICE BULLETIN CATEGORY 5
MOS
09-DEC-2013 HRSAISC -
ENC
SB 72-0922 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
25-FEB-2013 HRSAISC -
ENC
SB 72-0924 NO.1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW BRACKET ASSEMBLIES, SERVICE BULLETIN CATEGORY 7
MOS
23-JUL-2014 HRS/MSC -
ENC
SB 72-0926 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE SUPERSEDED
3 OUTER BUSHINGS (SUPERSEDED BY SB 72-0926 R1). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0926 R1 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE
3 OUTER BUSHINGS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0927 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0
ALTERNATIVE FOR THE liANDCRANKING LINE (SUPERSEDED BY SB 72-0927 R1). SERVICE BULLETIN
MOS
03-JUL-2013 HRS/MSC -
ENC
SB 72-0927 R1 NO. I ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 CATEGORY 3
ALTERNATIVE FOR THE liANDCRANKING LINE. SERVICE BULLETIN
MOS
I4-APR-2014 HRS/MSC ESV
ENC
SB 72-0928 NO. 1 ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - REPLACEMENT OF LPT STAGE 1
NOZZLE SEGMENTS DUE TO ENVIRONMENTAL DISTRESS, SERVICE BULLETIN
MOS
22-JUL-2013 HRSIMSC -
ENC
SB 72-0929 NO. 1 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR DISK AIR SLOT REDESIGN. SERVICE CUSTOMER
BULLETIN CONVENIENCE
MOS
06-AUG-2013 HRS/MSC -
ENC
SB 72-0930 NO. 1 ENGINE - ENGINE - HPT/LPT SHROUD NOZZLE ASSEMBLY (72-53-00)- FORWARD FLANGE WEAR GROOVE CUSTOMER
HPT/LPT SHROUD NOZZLE SUPPORT REWORK. SERVICE BULLETIN CONVENIENCE
MOS
02-OCT-2013 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 529 Of 748
@ Camp Systems
EFTA00618820
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0931 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE SUPERSEDED
(SUPERSEDED BY SI3 72-0931 RH. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 72-0931 RI NO. 1 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE. CATEGORY 7
SERVICE BULLETIN
MOS
10-JAN-2014 MRS/51SC
ENC
SB 72-0933 NO. I ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW CUP TO ATTACH THE OUTER CATEGORY 7
PLATFORM OF THE OGV TO THE CONTAINMENT CASE. SERVICE BULLETIN
MOS
20-FEB-2014 HRS/MSC -
ENC
SB 72-0931 NO. I ENGINE - COMBUSTION ASSEMBLY (72-41-00) - REWORK OF THE COMBUSTION CASE PM 2002MM G09. SERVICE CATEGORY 7
BULLETIN
MOS
14-FEB-2014 FIRS/MSC
ENC
SB 72-0935 NO. 1 ENGINE - -1PT ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT ROTOR BLADE P/N 2403M91P03 AND CUSTOMER
76-BLADE HPT ROTOR KIT. SERVICE BULLETIN CONVENIENCE
MOS
03-SEP-2013 HRSfMSC -
ENC
SB 72-0938 NO. I ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF A NEW METALLIC C-SEAL TO THE RECOMMENDED
SPARE PARTS LIST. SERVICE BULLETIN
MOS
04-SEP-2013 HRS/MSC
ENC
58 72-0939 NO. 1 ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00)- INTRODUCTION OF HPT STATOR SHROUD P/N CATEGORY 7
2080M28P06. SERVICE BULLETIN
MOS
21-NOV-2013 HRS/MSC
ENC
SB 72-0940 NO. I ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD SUPERSEDED
FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING (SUPERSEDED BY SB 72-0940 R1). SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0940 RI NO. I ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD CATEGORY 7
FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING. SERVICE BULLETIN
MOS
04-FEB-2014 HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 530 Of 748
@ Camp Systems
EFTA00618821
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0946 NO. 1 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4
HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND PM 2048M21P03 (SUPERSEDED BY SB 72-0946 R1). SERVICE
BULLETIN
MOS
29-JAN-2014 HRS/MSC
ENC
SB 72-0946 R1 NO. I ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4
HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND P/N 2048M21P03. SERVICE BULLETIN
MOS
06-KWY-2014 HRS/MSC -
ENC
SB 72-0952 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF IMPROVED CAST INCO 718 BLADE CATEGORY 7
LOCKS FOR STAGES 4 THROUGH 9. SERVICE BULLETIN
MOS
14-JUL-2014 HRSO4SC -
ENC
SB 72-223 NO. 1 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
02-FEB-2000 MRS/P.1SC -
ENC
SB 72-A0140 R1 NO.1 ENGINE - INTRODUCTION OF A BONDED CAUTION PLATE ON HANDCRANKING COVER. SERVICE BULLETIN
MOS
25-JUN-1999 HRS/MSC -
ENC
SB 72-A0336 NO. 1 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-A0368 NO. 1 ENGINE - ACCESSORY GEARBOX - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A DEFECTIVE BATCH.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0001 NO.1 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 73-0002 NO. I ENGINE - EEC-SOFTWARE VERSION 7.B.D. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73-0008R1
MOS
HRS/MSC -
ENC
SB 73-0003 NO.1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 531 Of 748
@ Camp Systems
EFTA00618822
AD/SI Status Report AIRCRAFT
COMP
Alisanwilm• the greyly, up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0003 R1 NO. 1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73-0007
MOS
HRSAISC -
ENC
SB 73-0003 R2 NO. 1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0004 NO.1 ENGINE - HMU 1853M56P05(VIN 442026). SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0020
MOS
HRSAISC -
ENC
SB 73-0005 NO. 1 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION.
SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R1 NO. 1 ENGINE - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL MANIFOLDS (SUPERSEDED BY SB SUPERSEDED NOT APPLICABLE
73-0005 R2). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R2 NO. 1 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3
MANIFOLDS. SERVICE BULLETIN
MOS
29-OCT-2013 HRSAISC -
ENC
SB 73-0005 R3 NO. I ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL SUPERSEDED
MANIFOLDS (SUPERSEDED BY SB 73-0005 R4). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R4 NO. I ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3
MANIFOLDS. SERVICE BULLETIN
MOS
I4-JUL-2014 HRS/MSC ESV
ENC
SB 73-0006 R1 NO. 1 ENGINE - TRANSFER OF THE COOLING AIR ORIFICE PLATE TO THE EEC COMPONENT ASSEMBLY LEVEL. COMPLIED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 73-0007 NO.1 ENGINE - INTRODUCTION OF NEW MAIN FUEL PUMP WITH A NEW STATIONARY SHAFT SEAL. SERVICE COMPLIED WITH - AT MANUFACTURE
BULLETIN
MOS I6-DEC-1998
HRSAISC 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 532 Of 748
@ Camp Systems
EFTA00618823
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0008 Fti NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.E.. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0009
MOS
HRSI.ISC -
ENC
SB 73-0009 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (782B). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0012
MOS
HRSitiSC -
ENC
SB 73-0010 NO 1 ENGINE - DRAIN TUBE AND FUEL MANIFOLD REPLACEMENT. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSLISC • 0
ENC 0
SB 73-0011 NO 1 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS le-DEC-1998
HRS.ISC • 0
ENC 0
SB 73-001 NO 1 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 73-0012 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F3 (782E). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0015
MOS
HRSuSC -
ENC
SB 73-0013 NO. ENGINE - OPERATE CFLI USING CIS TS-1 FUELS. SERVICE BULLETIN
MOS
HRSuSC -
ENC
SB 73-0014 R2 NO. ENGINE - INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC • 0
ENC 0
SB 73-0015 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F4 (7831). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0018R1
MOS
HRS.ISC -
ENC
SB 73-0017 NO. ENGINE - INTRODUCTION OF ECUIEEC HARDWARE/SOFTWARE KITS. SERVICE BULLETIN NOT APPLICABLE
MOS
HR&P.ISC -
ENC
SB 73-0018R1 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.G (7B30). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0021R1
MOS
HRSuSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 533 Of 748
'2 Camp Systems
EFTA00618824
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0019 NO. I ENGINE - NEW FUEL TRANSIENT BLEED VALVE MANIFOLD AND SUPPORTING BRACKET. SERVICE BULLETIN
MOS
HRSi 1.1SC -
ENC
SB 73-0020 NO. I ENGINE - INTRODUCTION OF HMU VIN 442098 (GE 18535156P06). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSilISC - 0
ENC 0
SB 73-0021 R1 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.H2 (7B36). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0023R1
MOS
HRSMSC -
ENC
SB 73-0022 NO 1 ENGINE - MODIFICATION OF FUEL NOZZLE FILTER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSP.ISC 0
ENC 0
SB 73-0023 NO 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 (7B37). SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 73-0023 R1 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.I(7837). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0024
MOS
HRSilISC -
ENC
SB 73-0024 NO. I ENGINE - EEC-SOFTWARE VERSION 7.8.11 (7B38). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSilISC - 0
ENC
SB 73-0025 NO. 1 ENGINE - MODIFICATION OF THE FUEL NOZZLE FILTER. SERVICE BULLETIN
MOS
HRSNSC -
ENC
SB 73-0026 NO. I ENGINE - INTRODUCTION OF EEC- SOFTWARE VERSION 7.B.J(7133A). SERVICE BULLETIN
MOS
HRSIISC
ENC
SB 73-0027 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSIISC
ENC
SB 73-0028 NO. I ENGINE - INTRODUCTION TO HMU 18535156P07 WIN 442124). SERVICE BULLETIN
MOS
HRSilISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 534 Of 748
11 Camp Systems
EFTA00618825
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0028 R1 NO. 1 ENGINE - INTRODUCTION TO HMU 1853M56P07 (VIN 442124). SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0029 NO.1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0029 R1 NO.1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0029 R2 NO. 1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0030 NO. I ENGINE - ECU/EECS WITH DPM-3 CONVERSION. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0030 R1 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC ENGINE CONTROL (73-00-00)- INTRODUCTION OF NEW OPTIONAL
ECU/EECS WITH NEW DPM-3 AND CONVERSION, SERVICE BULLETIN
MOS
22-FEB-20 I 1 MRS/51SC
ENC
SB 73-0031 NO.1 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
MRS/51SC
ENC
SB 73-0032 NO.1 ENGINE - REPLACEMENT OF VESPEL BALL PM 1419-240. SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0033 NO. 1 ENGINE - CONVERSION NON-PMUX ENGINE AND PMUX TO NON-PMUX ENGINE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0034 NO. 1 ENGINE - INTRODUCTION OF NEW FIEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0035 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.J1 (7820). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 535 Of 748
@ Camp Systems
EFTA00618826
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0036 NO. I ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSI.ISC -
ENC
SB 73-0037 NO. I ENGINE - ENGINE FUEL CONTROL (73-00.00) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0037 R1 NO. I ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 73-0037 R2 NO. I ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSIASC -
ENG
SB 73-0037 R3 NO. ENGINE - HPSOV SWITCH. SERVICE BULLETIN
MOS
19-DEC-2001 HR&MSC -
ENG
SB 73-0037 R4 NO. I ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSi MSC -
ENG
SB 73-0037 RS NO. I ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 73-0038 NO. I ENGINE - INTRODUCTION OF NEW FUEL FLOW TRANSMITTER. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 73-0039 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 73-0040 NO. I ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P16 (7B41). SERVICE BULLETIN
MOS
HRS., MSC -
ENG
SB 73-0041 NO. I ENGINE - INTRODUCTION OF A NEW VSV RIGHT SIDE DRAIN MANIFOLD. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 536 Of 748
Camp Systems
EFTA00618827
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 73-0042 NO. 1 ENGINE - NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0042 RI NO. 1 ENGINE - NEW FUEL DIFFERNTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0043 NO. 1 ENGINE - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0043 RI NO.1 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 73-0043 R2 NO. 1 ENGINE - ELECTRONIC FUEL CONTROL - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 73-0044 NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0044 RI NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0044 R2 NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0045 NO. 1 ENGINE - NEW HPTCC VALVE FUEL MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0046 NO.1 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P17 (7842). SERVICE BULLETIN
MOS
HRS,MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 537 Of 748
@ Camp Systems
EFTA00618828
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0047 NO. ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN
MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRS.LISC -
ENG
SB 73-0047 RI NO 1 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN
MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRSLISC -
ENG
SB 73-0049 NO 1 ENGINE - INSPECTION OF HMU MAIN BODY FOR HPT2 THIN WALL CASTING. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 73-0050 NO 1 ENGINE - ELECTRONIC ENGINE CONTROL INTRODUCTION OF SOFTWARE 1853M78P18 (7B46). SERVICE
BULLETIN
MOS
HRS.1.ISC -
ENG
SB 73-0050 F21 NO 1 ENGINE - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P18 (7946). SERVICE
BULLETIN
MOS
-
ENG
SB 73-0051 NO 1 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS.1.ISC -
ENG
SB 73-0052 NO 1 ENGINE - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED
PACKING. SERVICE BULLETIN
MOS
HRS.1.ISC
ENC
SB 73-0052 R2 NO 1 ENGINE - ENGINE FUEL CONTROL (73-00-C0) - MAIN FUEL PUMP - INTRODUCTION OF A NEW IMPELLER DRIVE
SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN
MOS
HRSLISC -
ENG
SB 73-0053 NO. 1 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
HRSLISC -
ENG
SB 73-0053 RI NO. ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
19-DEC-2001 HRSisISC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 538 Of 748
Camp Systems
EFTA00618829
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0053 R2 NO 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION.
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 73-0053 R3 NO. I ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0054 NO 1 ENGINE - FIELD DELETION BURN STAGE VALVE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0054 RI NO 1 ENGINE - CORE ENGINE MAJOR MODULE - FIELD DELETION OF THE BURNER STAGING VALVE SYSTEM.
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 73-0055 NO 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0055 RI NO 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 73-0056 NO. 1 ENGINE - . SERVICE BULLETIN
MOS
HR&LISC
ENC
SB 73-0057 NO 1 ENGINE - SPARE PARTS RELEASE FOR BAE SYSTEMS CONTROLS. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 73-0058 NO 1 ENGINE - ENGINE FUEL AND CONTROL - CFm56-78 SAC ENGINE CONFIGURATIONS J9 AND J10 HARNESS WITH
IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0058 Ft1 NO 1 ENGINE - CFm56-78 SAC ENGINE CONFIGURATIONS Jr9 AND Ji 0 HARNESSES WITH IMPROVED OR REWORKED
DESIGN. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 539 Of 748
1, Camp Systems
EFTA00618830
AD/SI Status Report AIRCRAFT
C14 Akinn Meg whip' 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0059 NO. 1 ENGINE - ECU DPM INSPECTION. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0060 NO. 1 ENGINE - ENGINE FUEL CONTROL - INTRODUCTION OF A NEW SERVO FUEL HEATER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0061 NO. 1 ENGINE - ENGINE FUEL AND CONTROL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-O061R1 NO. 1 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
19-DEC-2001 HRS/MSC -
ENC
SB 73-0061 R2 NO. I ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0061 R3 NO. 1 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0062 NO. 1 ENGINE - INTRODUCTION OF NEW/REWORKED ECU WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-O062R1 NO. 1 ENGINE - INTRODUCTION OF NEW OR REWORKED ELECTRONIC CONTROL UNIT WITH LOCKWIRE CAPABILITY.
SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 73-0063 NO. 1 ENGINE - INTRODUCTION OF FUEL MANIFOLDS WITH INTERNAL DRAIN PLUGS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0064 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 540 Of 748
@Camp Systems
EFTA00618831
AD/SI Status Report AIRCRAFT
COMP
Moan.Aim thernand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0064 R1 NO. 1 ENGINE - ELCTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0065 NO. 1 ENGINE - ELECTRONIC ENGINE CONTROL - PRESSURE SUBSYSTEM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0066 NO. I ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND
THRUST WASHER.. SERVICE BULLETIN
MOS
19-DEC-2001 HRS/MSC
ENC
SB 73-0066 R1 NO. I ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND
THRUST WASHER. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0067 NO. 1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0067 R1 NO. 1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0067 R2 NO.1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0067 R3 NO.1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0068 NO. 1 ENGINE - REWORK OF THE HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) TO HYDROMECHANICAL
UNIT VIN 442124 ( GE 1853M56P07). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0069 NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 541 Of 748
@ Camp Systems
EFTA00618832
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0069 R1 NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRSIASC
ENC
SB 73-0069 R2 NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRS4.ISC
ENC
SB 73-0070 NO. 1 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM CONVERSION. SERVICE BULLETIN
MOS
HRS.uSC -
ENC
SB 73-0071 R2 NO. I ENGINE - INTRODUCTION OF SOFTWARE 7. B. 01 1853m78P23. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 73-0073 NO. I ENGINE - ENGINE FUEL CONTROL - ENGINE FUEL CONTROL (73-00-00) - RESISTOR MODIFICATION FOR PSS
TRANSDUCER INCOMPATIBILITY. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 73-0074 NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR
PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0074 RI NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR
PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0074 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF
SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSP.ISC -
ENC
SB 73-0074 R3 NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF
SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 73-0075 NO. I ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00.00) - HYDROMECHANICAL UNIT -
INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 542 Of 748
Camp Systems
EFTA00618833
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0075 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00)- HYDROMECHANICAL UNIT -
INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0076 NO. 1 ENGINE - MEC SERVO FUEL HTR LEAKS. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 73-0077 NO. 1 ENGINE - FIELD REWORK OF SINGLE ANNULAR COMBUSTOR (SAC) FUEL MANIFOLDS TO ELIMINATE DEAD-END
ZONE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0078 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - INTRODUCTION OF A NEW FUEL COMPLIED WITH
FILTER ELEMENT. SERVICE BULLETIN
MOS 0I -MAR-2007
HRS0ASC - 2871:05
ENC 646
SB 73-0079 NO. 1 ENGINE - REPLACEMENT OF THE CURRENT DEFECTIVE SIXTH ATTACHMENT OF THE FUEL FILTER COVER OF
THE MAIN FUEL PUMP EQUIPPED WITH 0-HEAD BOLT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0080 NO.1 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - REPLACEMENT OF SHUTOFF
SPACER 2687048 WITH NEW DESIGN. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0081 NO. 1 ENGINE - HYDROMECHANICAL UNIT (HMU) (73-21-10)- INTRODUCTION OF HONEYWELL HMU VIN 442317 (GE
1853M56P09). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0082 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 7.B.N
1853M78P21. SERVICE BULLETIN
MOS
HRS(MSC
ENC
SB 73-0083 NO. 1 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY.
SERVICE BULLETIN
MOS
HRS(MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 543 Of 748
@ Camp Systems
EFTA00618834
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0083 R1 NO. 1 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 73-0084 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN
MOS 6 (s)
HRSAISC
ENC
SB 73-0084 RI NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN
MOS 6 (s)
HRSAISC
ENC
SB 73-0085 RI NO. 1 ENGINE - INTRODUCTION OF NEW J10 HARNESSES OR REWORK OF THE OLD ONES. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0086 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0088 NO. 1 ENGINE - IMPROVED FUEL FLOW TRANSMITTER, SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0089 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE HARNESSES CJ9. CJIO (73-24-05) - INTRODUCTION OF A NEW
CS HARNESS OR REWORK OF THE OLD ONE AND DELETION OF THE DUMMY RECEPTACLE BRACKET. SERVICE
BULLETIN
MOS
HRSAISC -
ENC
SB 73-0090 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC
FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0090 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00)- REPLACEMENT OF CLAMPS WITH METALLIC
FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0093 NO. 1 ENGINE - HYDROMECHANICAL UNIT ( 73-21-10) -INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE
ELECTROHYDRAULIC SERVO VALVE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 544 Of 748
@ Camp Systems
EFTA00618835
AD/SI Status Report AIRCRAFT
Cli tagiren Meg' nehip. 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0094 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 73-0094 RI NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
FIRS,MSC -
ENC
SB 73-0094 R2 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0095 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF IMPROVED BURNER STAGING VALVE (BSV)
SOLENOID AND VALVE ASSEMBLY. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 73Ø96R1 NO. I ENGINE - REPLACEMENT OF FLUOROSILICONE PREFORMED PACKINGS WITH FLUOROCARBON PREFORMED SUPERSEDED
PACKINGS (SUPERSEDED BY 73-0096 R2). SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0096 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HMU (73-21-79) - REPLACEMENT OF FLUOROSILICONE PREFORMED RECOMMENDED
PACKINGS WITH FLUOROCARBON PREFORMED PACKINGS. SERVICE BULLETIN
MOS
O5-JAN-2012 FIRS/MSC -
ENC
SB 73-0097 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN
MOS 6 (s)
HRS(MSC
ENC
SB 73-0097 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN
MOS 6 (s)
08-MAR-2005 FIRS/MSC
ENC
SB 73-0098 NO.1 ENGINE - ECU CHASSIS MODIFICATION (SUPERSEDED BY SB 73-0098 RI). SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0098 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU CHASSIS MODIFICATION. CATEGORY 7
SERVICE BULLETIN
MOS
01-APR-2014 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 545 Of 748
@Camp Systems
EFTA00618836
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0099 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED ADJUSTMENT SCREW (PN
2689127). SERVICE BULLETIN
MOS
HRS/1,1SC
ENC
SB 73-01 NO. 1 ENGINE - FUEL FLOW TRANSMITTER CAUBRATION IMPROVEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 73-0100 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0102 NO. 1 ENGINE - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 11W 400HZ DISCONNECTS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 73-0102 R1 NO. 1 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR
115V 400HZ DISCONNECTS. SERVICE BULLETIN
MOS
07-MAR-2006 HRS(MSC -
ENC
SB 73-0102 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY RECOMMENDED
ROBUSTNESS MODIFICATION FOR 115V 400 HZ DISCONNECTS (SUPERSEDED BY SB 73-0102 R3). SERVICE BULLETIN
MOS
10-N0V-2010 HRS/MSC -
ENC
SB 73-0102 R3 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY CATEGORY 7
ROBUSTNESS MODIFICATION FOR 11W 400 HZ DISCONNECTS. SERVICE BULLETIN
MOS
20-JUN-2014 HRS/MSC -
ENC
SB 73-0103 NO.1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT(73-21-10) - LOW PRESSURE LEAK CHECK,
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0104 NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - ONE TIME INSPECTION OF 3 FUEL SUPPLY COMPUED WITH - IAW THE SB
TUBES FOR WEAR AND INTRODUCTION OF KEVLAR CUSHION CLAMPS. SERVICE BULLETIN
MOS 22-AUG-2008
HRS/MSC - 3260:48
ENC 746
SB 73-0106 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE
BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 546 Of 748
@ Camp Systems
EFTA00618837
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0106 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE
BULLETIN
MOS
HRSAISC
ENC
S8 73-0107 NO. 1 ENGINE - INSPECTION OF PUMP COVER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0108 RI NO.1 ENGINE - BURNER STAGING VALVE SOLENOID REMOVAL FROM HMU. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0108 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- HMU (73-21-79) - BURNER STAGING VALVE SOLENOID REMOVAL FROM RECOMMENDED
HMU. SERVICE BULLETIN
MOS
I6-FEB-2012 HRSAISC
ENC
SB 73-0109 RI NO. I ENGINE - NEW SOLENOID AND VALVE. SERVICE BULLETIN
MOS
07-MAR-2006 HRSfMSC -
ENC
SB 73-0111 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-00-00) - INTRODUCTION OF FADEC3 HARDWARE AND
SOFTWARE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 73-0113 NO. 1 ENGINE - INSPECTION OF MAIN-STAGE CHECK VALVE SPRING (SUPERSEDED BY 73-0113 R1). SERVICE SUPERSEDED
BULLETIN
MOS
HRSAISC -
ENC
SB 73-0113 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL NOZZLES (73-00-00) - INSPECTION OF MAIN-STAGE CHECK RECOMMENDED
VALVE SPRING. SERVICE BULLETIN
MOS
13-JAN-2012 HRSAISC -
ENC
SB 73-0115 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW 713.O SOFTWARE. SERVICE BULLETIN
MOS 6 (s)
06-JUN-2005 HRSAISC
ENC
SB 73-0115 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.O SOFTWARE. SERVICE BULLETIN
MOS 6 (s)
30-MAY-2008 HRSAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 547 Of 748
@ Camp Systems
EFTA00618838
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0116 NO. I ENGINE - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 73-0116 R1 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-2140) - INTRODUCTION OF NEW
ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC. SERVICE BULLETIN
MOS
I3-NOV-2009 HRSAISC -
ENC
SB 73-0117 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0118 RI NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH A NEW COVER. SERVICE BULLETIN
MOS
23-FEB-2006 HRSAISC -
ENC
SB 73-0120 NO.1 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 73-0120 RI NO.1 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN
MOS
30-MAY-2008 HRS1MSC -
ENC
SB 73-0121 NO.1 ENGINE - FRONT PANEL ASSEMBLY ALIGNMENT PIN MODIFICATION PROCEDURE. SERVICE BULLETIN
MOS
27-JUN-2007 HRSAISC -
ENC
SB 73-0122 NO.1 ENGINE - FADEC3 -SIA CONNECTOR HARDWARE RETENTION, SERVICE BULLETIN
MOS
27-JUN-2007 HRSAISC -
ENC
SB 73-0123 NO.1 ENGINE - VSV SYSTEM (72-00-02) - NEW FUEL MANIFOLDS. SERVICE BULLETIN
MOS
I2-APR-2006 HRSAISC -
ENC
SB 73-0124 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
21-APR-2008 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 548 Of 748
@ Camp Systems
EFTA00618839
AD/SI Status Report AIRCRAFT
CAMP
Aviation/nem the ernit4 up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0126 NO. 1 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS
. SERVICE BULLETIN
MOS
I 7-JUL-2006 HRS.0.1SC
ENC
SB 73-0126 RI NO.1 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE
BULLETIN
MOS
I4-AUG-2007 HRMISC
ENC
SB 73-0126 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION.
ADDITION OF SIDE
TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN
MOS
02-OCT-2009 HRSfMSC -
ENC
SB 73-0127 NO. 1 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
I 7-JUL-2006 MRS/P.1SC -
ENC
SB 73-0127 RI NO.1 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
26-FEB-2008 HRS/LISC -
ENC
SB 73-0127 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION - SUPERSEDED
REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS 9SUPERSEDED BY 73-0127 R3). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0127 R3 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL (73-00-00) - ECU/EEC MODIFICATION
- REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
HRS/P.1SC -
ENC
SB 73-0128 RI NO.1 ENGINE - INTRODUCTION OF FADEC3 HARDWARE FOR DAC ENGINES. SERVICE BULLETIN
MOS
02-APR-2007 HRS/MSC -
ENC
SB 73-0130 NO.1 ENGINE - INSPECTION OF HYDROMECHANICAL UNIT FOR NON-HYDROCARBON CONTAMINATION. SERVICE RECOMMENDED
BULLETIN
MOS 6 (s)
07-MAY-2007 MRS/P.1SC 1500
ENC
SB 73-0132 NO. 1 ENGINE - INTRODUCTION OF FUEL NOZZLE WITH REVISED
0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN
MOS
13-JUN-2007 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 549 Of 748
@ Camp Systems
EFTA00618840
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0132 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- INTRODUCTION OF FUEL NOZZLE WITH REVISED RECOMMENDED
0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN
MOS
13-JUN-20I2 HRS/MSC -
ENC
SB 73-0133 NO. 1 ENGINE - REPLACEMENT OF SUSPECT T12 SENSOR. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER S/N
874437 N/A
MOS 08-NOV-2007
12-APR-2007 HRS/MSC 1200
(s)/DUE
ENC
58 73-0134 NO. I ENGINE - INTRODUCTION OF NEW
UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1
(2123M62P01). SERVICE BULLETIN
MOS
08-JUN-2007 HRS/MSC -
ENC
SB 73-0134 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - POWERPLANT - ALTERNATOR (73-00-00) - INTRODUCTION OF NEW
UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1
(2123M62P01). SERVICE BULLETIN
MOS
04-MAY-2009 HRS/MSC -
ENC
SB 73-0135 NO.1 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN COMPLIED WITH - IAW THE SB
MOS 22-AUG-2008
30-MAR-2007 HRS/MSC - 3260:48
ENC 746
SB 73-0135 RI NO.1 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN
MOS
30-MAY-2008 HRS/MSC -
ENC
SB 73-0136 NO.1 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE
ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN
MOS
20-JUN-2007 HRS/MSC -
ENC
SB 73-0136 RI NO. 1 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE.
SERVICE BULLETIN
MOS
I8-FEB-2008 HRS/MSC -
ENC
SB 73-0137 NO. 1 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN
MOS
20-JUN-2007 HRS,MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 550 Of 748
@ Camp Systems
EFTA00618841
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0137 R1 NO. 1 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN
MOS
I8-FEB-2008 HRSAISC -
ENC
SB 73-0138 NO. 1 ENGINE - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN SUPERSEDED
MOS
HRSAISC -
ENC
SB 73-0138 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - (73-00-00)- USE OF CIS FUELS IN CFM56-7B ENGINES. SERVICE
BULLETIN
MOS
HRS/AISC
ENC
SB 73-0138 R1 PARA 3.A NO. 1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES.
(2) SERVICE BULLETIN AND CLEAN HMU
MOS
HRSAISC
ENC 10000 (s)
SB 73-0138 R1 PARA 3.A NO. 1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
HRS/LISC 3000 (s)
ENC
SB 73-0138 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
BULLETIN
MOS
20-DEC-2010 HRS/MSC
ENC
SB 73-0138 R2 PARA 3.A NO.1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-03-00)- USE OF CIS FUELS IN CFM58-78 ENGINES. RECOMMENDED
(2) SERVICE BULLETIN AND ('I FAN HMU
MOS
20-DEC-2010 HRS/MSC 10000 (s)
ENC
SB 73-0138 R2 PARA 3.A NO.1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
20-DEC-2010 HRS/L1SC 3000 (s)
ENC
SB 73-0138 R3 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
BULLETIN
MOS
I2-SEP-2011 HRS/MSC
ENC
SB 73-0138 R3 PARA 3.A NO. 1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-03-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. RECOMMENDED
(2) SERVICE BULLETIN AND CLEAN HMU
MOS
HRS/MSC 10000 (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 551 Of 748
@ Camp Systems
EFTA00618842
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0138 R3 PARA 3.A NO. 1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
HRS/MSC 3000 (s)
ENC
SB 73-0138 R4 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
BULLETIN
MOS
25-SEP-2012 HRS/MSC
ENC
SB 73-0138 R4 PARA 3.A NO.1 ENGINE -FLOW ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFMSG-7B ENGINES. SERVICE RECOMMENDED
(1) BULLETIN CHECK OF ALL FUEL NOZZLES
MOS
25-SEP-2012 HRSAISC ESV (s)
ENC
SB 73-0138 R4 PARA 3.A NO. 1 ENGINE - CLEAN ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
(2) BULLETIN AND OVERHAUL HMU
MOS
25-SEP-2012 MRS/P.1SC 10000
(syESV
ENC
SB 73-0138 R4 PARA 3.A NO. I ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
25-SEP-2012 MRS/P.1SC 3000 (s)
ENC
SB 73-0139 NO.1 ENGINE - NEW SOFTWARE VERSION 7.8.S. SERVICE BULLETIN COMPLIED WITH
MOS 22-AUG-2008
12-OCT-2007 HRS/MSC - 3260:48
ENC 746
SB 73-0140 NO. 1 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
28-NOV-2007 MRS/P.1SC -
ENC
SB 73-0140 RI NO. 1 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
12-FEB-2008 HRS/MSC -
ENC
SB 73-0140 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-21-60) - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3
FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
I3-APR-2009 HRS/MSC -
ENC
SB 73-0140 R3 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU1EEC (73-21-60) - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 RECOMMENDED
FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
23-FEB-2012 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 552 Of 748
@ Camp Systems
EFTA00618843
AD/SI Status Report AIRCRAFT
CAMAsiont.P
/nrro Megnsind•O' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0141 NO 1 ENGINE - FRONT TRANSIENT PROTECTION BOARD FUSE INSPECTION AND REWORK ON FADEC3 FOR CFM.56-78 RECOMMENDED
ENGINES. SERVICE BULLETIN
MOS 4 (5)
28-NOV-2C07 HR&MSC
ENC
SB 73-0142 R1 NO 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRICAL HARNESS CJ9. CJ10
(73-24-05) - DELETION OF CJ9 WIRING HARNESS TS BRANCH FOR
NON-PMUX ENGINE IN THE FIELD. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 73-0143 NO 1 ENGINE - PRESSURE SUBSYSTEM (PSS) TRANSDUCER RELIABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
21-FEB-2008 HRS/MSC -
ENC
SB 73-0144 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
04-APR-2008 HR&MSC
ENC
SB 73-0145 NO. I ENGINE - ENGINE FUEL AND CONTROL SYSTEM (73-00-00) - SPARE PARTS RELEASE FOR
CFM56-78 CMM. SERVICE BULLETIN
MOS
25-AUG-2e08 HRSMSC
ENC
SB 73-0146 NO. I ENGINE - REPLACEMENT OF SUSPECTED J7 WIRING HARNESS. SERVICE BULLETIN
MOS
08-APR-2008 HRS,IISC
ENC 5(s)
SB 73-0151 R1 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.T SOFTWARE VERSION. SERVICE BULLETIN
MOS
27-FEB-2009 HRSilISC
ENC
SB 73-0152 NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B CMM.
SERVICE BULLETIN
MOS
08-OCT-2009 HR&MSC
ENC
SB 73-0153 NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INSPECTION OF MAIN BODY
ASSEMBLY. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 73-0154 NO. I ENGINE - FADEC3 - CFMS6-78 - EEOECU CONVERSION FROM PIN
2042M67P02 TO P.'N 2042M67P04. SERVICE BULLETIN
MOS
C4-VAY.2CC9 HRSLISC -
ENC
?-insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 553 Of 748
Camp Systems
EFTA00618844
AD/SI Status Report AIRCRAFT
flP Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0154 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FADEC3 - CFM56-78 - EEC/ECU CONVERSION FROM PIN 2042M67P02
TO P/N 2042M67PO4. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
S8 73-0156 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ENGINE HARNESSES CJ9. CJ10 (73-24-05)- SPARE PARTS RELEASE
FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
16-NOV-2011 HRS/MSC -
ENC
S8 73-0157 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60)- NEW SOFTWARE VERSION 7.B.UI. SERVICE BULLETIN RECOMMENDED
MOS 6 (s)
27 -JUL-2009 HRS/MSC
ENC
S8 73-0157 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN
MOS 6 (s)
14-AUG-2009 HRS/MSC
ENC
S8 73-0157 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN
MOS 6 (s)
02-FEB-2010 HRS/MSC
ENC
S8 73-0158 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF MODIFIED
METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN
MOS
15-MAY-2009 HRS/MSC -
ENC
S8 73-0159 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - INTRODUCTION OF FADEC3
ECU/EEC WITH NEW MAIN CHANNEL BOARD. SERVICE BULLETIN
MOS
09-DEC-2009 HRS/MSC -
ENC
S8 73-016 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-00-00)- SCHEDULED INSPECTION. NOT APPLICABLE - BASED ON THE
SERVICE BULLETIN HYDROMECHANICAL UNIT (HMU) PART NUMBER
MOS
HRS/MSC -
ENC
SB 73-0161 NO.1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- SPARE PARTS RELEASE FOR CFM56-7B
ENGINES. SERVICE BULLETIN
MOS
27 -JUL-2009 HRS/MSC -
ENC
S8 73-0163 NO.1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- SPARE PARTS RELEASE FOR CFM56-7B CMM.
SERVICE BULLETIN
MOS
05-OCT-2009 HIRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 554 Of 748
@Camp Systems
EFTA00618845
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0167 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION SUPERSEDED
-REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM (SUPERSEDED BY 73-0167 RI). SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0167 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION - RECOMMENDED
REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM. SERVICE BULLETIN
MOS
04-JAN-2012 HRS1MSC -
ENC
SB 73-0169 NO.1 ENGINE - ENGINE FUEL AND CONTROL-ELECTRONIC CONTROL UNIT (73-00-00)-DIGITAL INTERFACE UNIT
MODIFICATION. SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 73-0169 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT OPTIONAL
MODIFICATION. SERVICE BULLETIN
MOS
I3-JUL-2011 HRS1MSC
ENC
SB 73-0169 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT RECOMMENDED
MODIFICATION (SUPERSEDED BY SB 73-0169 R3). SERVICE BULLETIN
MOS
22-SEP-2011 HRSfMSC -
ENC
SB 73-0169 R3 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT CATEGORY 7
MODIFICATION. SERVICE BULLETIN
MOS
I7-APR-2014 HRSMSC
ENC
SB 73-0170 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT BODY SUPERSEDED
NON-FERROUS RING CHIP CONTAMINATION (SUPERSEDED BY 73-0170 RI ). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0170 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT BODY RECOMMENDED
NON-FERROUS RING CHIP CONTAMINATION. SERVICE BULLETIN
MOS
16-MAY-2011 HRSAISC -
ENC
SB 73-0171 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT OPTIONAL
MANUFACTURABILITY IMPROVEMENTS. SERVICE BULLETIN
MOS
24-SEP-2010 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 555 Of 748
@ Camp Systems
EFTA00618846
AD/SI Status Report AIRCRAFT
COMP
Asicreimfra therm...1W 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0172 NO. 1 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL OPTIONAL
METERING VALVE RESOLVER MODIFICATION
. SERVICE BULLETIN
MOS
17-DEC-2010 HRSPASC
ENC
SB 73-0172 RI NO. I ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF FUEL RECOMMENDED
METERING VALVE RESOLVER MODIFICATION. SERVICE BULLETIN
MOS
15-FEB-2012 HRSPASC -
ENC
SB 73-0173 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - RECOMMENDED
IOM SOLDER JOINT CRACKING (SUPERSEDED BY SB 73-0173 R1). SERVICE BULLETIN
MOS
20-JAN-2011 HRS04SC -
ENC
SB 73-0173 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - CATEGORY 5
IOM SOLDER JOINT CRACKING. SERVICE BULLETIN
MOS
I7-APR-2014 HRS(MSC -
ENC
SB 73-0174 NO. I ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-W-00)- INCORPORATION OF NEW RECOMMENDED
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN
MOS
23-NOV-2010 HRSPASC -
ENC
SB 73-0174 RI NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00)- INCORPORATION OF NEW CUSTOMER
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE
MOS
I9-JUL-2011 HRSPASC -
ENC
SB 73-0174 R2 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00)- INCORPORATION OF NEW SUPERSEDED
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE (SUPERSEDED BY SB
73-0193). SERVICE BULLETIN
MOS
Of -MAY-2013 HRS/MSC -
ENC
SB 73-0175 NO. I ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED
BYPASS VALVE ROTATION (SUPERSEDED BY 73-0175 R1)
. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 73-0175 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT RECOMMENDED
BYPASS VALVE ROTATION. SERVICE BULLETIN
MOS
I6-MAY-2011 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 556 Of 748
@ Camp Systems
EFTA00618847
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0175 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED
BYPASS VALVE ROTATION (SUPERSEDED BY SB 73-0194). SERVICE BULLETIN
MOS
Of -MAY-2013 HRS/MSC -
ENC
S8 73-0178 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN RECOMMENDED
MOS
07-JUN-2011 HRSAISC -
ENC
SB 73-0178 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN RECOMMENDED COMPLIED WITH- ENGINE #1 ECU SOFTWARE
PIN 1853M78P33, VERSION 7B98 (7.B.V2 F2)
MOS 28-AUG-2013
17-AUG-2011 HRS/MSC - 3728:53
ENC 875
SB 73-0180 NO. I ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - INTRODUCTION SUPERSEDED
OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY 73-0180 IR). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0180 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) -INTRODUCTION
OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
23-MAY-2012 HRS/MSC -
ENC
SB 73-0181 NO.1 ENGINE - ENGINE FUEL AND CONTROL-IDENTIFICATION PLUG (73-21.83) - INTRODUCTION OF NEW CODING
COMBINATIONS FOR -78E LPT HARDWARE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0182 NO. I ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 SUPERSEDED
BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS (SUPERSEDED BY SB 73-0182 R1). SERVICE
BULLETIN
MOS
HRS(MSC - (s)
ENC
SB 73-0182 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76
BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0184 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF T2 AND T4 RECOMMENDED
TRANSFORMER ON THE PSM. SERVICE BULLETIN
MOS
16-FEB-2012 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 557 Of 748
@ Camp Systems
EFTA00618848
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0185 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - BUCK POWER SUPPLY U540 RECOMMENDED
MODIFICATION. SERVICE BULLETIN
MOS
18-OCT-2011 HRS1MSC
ENC
SB 73-0186 NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE SUPERSEDED
INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN
MOS
28-N0V-2011 HRS1MSC 15000 (s)
ENC
SB 73-0186 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE
INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN
MOS
29-MAR-2013 MRS/MSC -
ENC
SB 73-0188 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED RECOMMENDED
TRANSIENT BLEED VALVE THREE WAY TWO STAGE ELECTROHYDAULIC SERVO VALVE WITH VENTED SLEEVE.
SERVICE BULLETIN
MOS
14-FEB-2012 HRSAISC
ENC
SB 73-0189 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- IDENTIFICATION PLUG (73-24-06)- SPARE PARTS RELEASE FOR
CFM56-7B CMM. SERVICE BULLETIN
MOS
I8-JUN-2012 HRSAISC
ENC
SB 73-0190 NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT Of SUPERSEDED
THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
20-JUL-2012 HRS/MSC - (s)
ENC
SB 73-0190 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT OF
THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0191 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3, SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
11-DEC-2012 HRS1MSC
ENC
SB 73-0191 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3. SERVICE BULLETIN RECOMMENDED
MOS
72-APR-2073 HRS1MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 558 Of 748
@ Camp Systems
EFTA00618849
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0192 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - FUEL
DIFFERENTIAL PRESSURE SWITCH MANAGEMENT. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0193 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INCORPORATION OF NEW CUSTOMER
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE
MOS
Of -MAY-2013 MRS/51SC -
ENC
SB 73-0194 NO.1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED
BYPASS VALVE IMPROVEMENT. SERVICE BULLETIN
MOS
01-MAY-2013 MRS/51SC ESV
ENC
SB 73-0195 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ADDMON OF ARINC SERIES OPTIONAL
RESISTORS ON TX3 LINES TO ACCOMMODATE NEWER MCB MN52 DEVICE. SERVICE BULLETIN
MOS
14-JUN-2013 MRS/51SC -
ENC
SB 73-0196 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MNS2 RECOMMENDED
ARINCICCDL/IMS8 CONTROLLER ON TRONICO MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN
MOS
25-JUL-2013 HRSfMSC -
ENC
SB 73-0198 NO. I ENGINE - ENGINE FUEL AND CONTROL- GENERAL (73-00-00) - INTRODUCTION OF NEW CONNECTORS FOR CATEGORY 6
ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
20-FEB-2014 HRS/MSC -
ENC
SB 73-0199 NO. I ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4 (SUPERSEDED BY SUPERSEDED
SB 73-0199 RI). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0199 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4. SERVICE BULLETIN CATEGORY 7
MOS
28-JAN-2014 HRSfMSC -
ENC
58 73-0203 NO. I ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSION CATEGORY 2
7.B.WF2 FOR DAC ENGINES. SERVICE BULLETIN
MOS 12 (s)
09-JUN-2014 HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 559 Of 748
@ Camp Systems
EFTA00618850
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0204 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSIONS CATEGORY 2
7.B.WF3 FOR SAC AND DAC ENGINES AND 7.B.WF2 FOR SAC ENGINES. SERVICE BULLETIN
MOS 12 (s)
09-JUN-2014 HRS/MSC
ENC
SS 73-A002 NO. 1 ENGINE - SERCK AVIATION SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 73-A0024 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.8.11 (7838), SERVICE BULLETIN
MOS
02-SEP-1998 HRS/MSC -
ENC
SB 73-A0034 NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN
MOS
23-JUL-1999 HRS/MSC -
ENC
SS 73-A0076 NO. 1 ENGINE - SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN
DAYS 30 (s)
MRS/P.1SC
ENC
SB 73-A0091 NO. I ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN CANCELLED NOT APPLICABLE
MOS 22-AUG-2008
HRS/MSC - (s) 3260:48
ENC 746
SS 73-A0091 R1 NO. 1 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SS 74-0001 NO. 1 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 74-0002 NO. 1 ENGINE - INTRODUCTION OF A NEW UNISON IGNITER PLUG. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
58 74-0003 NO. I ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - SCREENING OF IGNITION UNIT EXCITER VIN 10-631045-2 (PIN
9238M66P08) FOR SUSPECT DIODES. SERVICE BULLETIN
MOS 18 (s)
MRS/P.1SC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 560 Of 748
@ Camp Systems
EFTA00618851
AD/SI Status Report AIRCRAFT
CORP
Asmant sre the enand 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 74-0004 NO. 1 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - INTRODUCTION OF NEW IGNITION UNIT EXCITER VIN
10-631045-3 (PIN 9238M66P11). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 75-0001 R1 NO. 1 ENGINE - LPT ACC FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 75-0002 NO. 1 ENGINE - INTRODUCTION OF HPTC VALVE VIN 3291186-6 (CFMI 1821M59P06). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0003 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE ANO TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0003 R1 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 75-0003 R2 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 75-0004 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 75-0004 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0004 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 75-0005 NO. 1 ENGINE - INSPECTION OF PS3 LINE FITTING. SERVICE BULLETIN MANDATORY
SCRAP
MOS
14-NOV-2001 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 561 Of 748
@Camp Systems
EFTA00618852
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 75-0025 R1 NO. 1 ENGINE - INTRODUCTION OF REWORKED VBV ACUTATOR. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 75-0027 NO. 1 ENGINE - MODIFICATION OF THE PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF
PERMANENT BONDING TO THE CAP. SERVICE BULLETIN
MOS
HRSMISC -
ENC
SB 75-0027 RI NO. 1 ENGINE - AIR - COOLING AIR - MODIFICATION OF PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND
ADDITION OF PERMANENT BONDING OF THE CAP. SERVICE BULLETIN
MOS
HRSMISC -
ENC
SB 75-0030 NO.1 ENGINE - ENGINE AIR-TRANSIENT BLEED VALVE (72-00-02)- REWORK TRANSIENT BLEED VALVE PN 3291390-1
TO PN 3291390-3, SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0030 RI NO.1 ENGINE - AIR - AIR TRANSIENT BLEED VALVE (75-21-10) - REWORK OF TRANSIENT BLEED VALVE VIN 3291390-1
(PIN 1821M60P02) TO VIN 3291390-3 (PM 1821M60P04). SERVICE BULLETIN
MOS
I4-JUL-2009 HRS/LISC -
ENC
SB 75-0032 NO.1 ENGINE - REPLACEMENT OF VBV TURNBUCKLE (STEEL VERSION) BY NEW ONES WITH NEW MATERIAL
(ALUMINIUM VERSION). SERVICE BULLETIN
MOS
21-JUN-2005 HRS/MSC -
ENC
SB 75-0033 NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON
THE FAN MAJOR MODULE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0033 RI NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON
THE FAN MAJOR MODULE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 75-0033 R2 NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION.
SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 75-0035 NO. 1 ENGINE - INTRODUCTION OF A NEW AIR SUPPLY DUCT. SERVICE BULLETIN
MOS
HRSMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 562 Of 748
@ Camp Systems
EFTA00618853
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 75-0036 NO. 1 ENGINE - REWORK TURBINE CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186.6
(1821M59PC6) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 RI)
. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0036 RI NO. 1 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7
CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL
LEAKAGE (SUPERSEDED BY SB 75-0036 R2). SERVICE BULLETIN
MOS
25-APR-2014 HRS/MSC -
ENC
SB 75-0036 R2 NO. 1 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7
CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL
LEAKAGE. SERVICE BULLETIN
MOS
09-JUN-2014 HRS/MSC -
ENC
SB 75-0037 NO. 1 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN
MOS
08-SEP-2006 HRS/MSC -
ENC
SB 75-0037 RI NO.1 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN
MOS
13-FEB-2007 HRS/MSC -
ENC
SB 75-0038 NO. 1 ENGINE - INTRODUCTION OF PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
14-DEC-2006 HRS/MSC -
ENC
SB 75-0039 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) -INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
15-DEC-2008 HRSfMSC -
ENC
SB 75-0041 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
05-FEB-2009 MRS/P.1SC -
ENC
SB 75-0041 RI NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
15-JUN-2009 HRS/MSC -
ENC
SB 75-0042 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN
MOS
20-FEB-2008 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 563 Of 748
@ Camp Systems
EFTA00618854
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 75-0043 NO. 1 ENGINE - REWORK OF THE AIR MANIFOLD AND THE BRACKET OF THE COOLING MANIFOLD IN FIELD. SERVICE
BULLETIN
MOS
05-SEP-2008 HRS/MSC
ENC
SB 75-0044 NO. 1 ENGINE - MR-ACTUATOR VBV (75-32-14) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
C6-FEB-2010 HRS/MSC -
ENC
SB 75-0045 NO. 1 ENGINE - AIR - ACTUATOR VBV (75-32-14) - INTRODUCTION OF THE LVDT SENSOR VIN 8070287(325-500-002-0).
SERVICE BULLETIN
MOS
09-JAN-2009 HRS/MSC
ENC
SB 75-0047 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - IN FIELD REIDENTIFICATION OF LPTACC VALVE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0048 NO. I ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF A NEW LPTACC VALVE WITH A NEW OPTIONAL
IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
I9-JAN-2012 HRS/MSC
ENC
SB 75-0050 NO. I ENGINE - AIR - COOLING (75-22-10) - REWORK OF TURBINE CLEARANCE CONTROL VALVES VIN 3291186-5 (P/N RECOMMENDED
1821M59P05) AND VIN 3291186-6 (P/N 1821M59P06), SERVICE BULLETIN
MOS
23-FEB-20I2 HRS/MSC -
ENC
SB 75-0051 NO. I ENGINE - AIR - GENERAL - INTRODUCTION OF NEW TBV TUBE AND BRACKET. SERVICE BULLETIN RECOMMENDED
MOS
03-SEP-2012 HRS/MSC -
ENC
SB 75-0052 NO. 1 ENGINE - AIR - VARIABLE STATOR ACTUATOR (75-32-10) - REPLACEMENT OF LVDT FOR FAULTY VSV
ACTUATORS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-1040 NO. 1 ENGINE - REWORK HIGH PRESSURE TURBINE CLEARANCE VALVE. PN 3291186-5. TO PN 3291186-6. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 77-0001 NO.1 ENGINE - CONTROL UNIT ALTERNATOR - REPLACEMENT OF CONNECTOR SF41 C. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 564 Of 748
@ Camp Systems
EFTA00618855
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 77-0002 NO. 1 ENGINE - SPARE PARTS RELEASE FOR ENGINE CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 77-0003 NO. 1 ENGINE - ENGINE INDICATING - T49.5 THERMOCOUPLE LEAD ASSY (77-21-10) - INTRODUCTION OF NEW OR
REWORKED T49.5 PROBE. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 77-0004 NO. 1 ENGINE - ENGINE INDICATING- T5 SENSOR REMOVAL (77-22-10) - INTRODUCTION OF NEW TEMPERATURE
SENSOR. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 77-0004 RI NO. 1 ENGINE - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN
MOS
04-MAR-2005 HRS(MSC -
ENC
SB 77-0005 NO. 1 ENGINE - ELIMINATE CHAFING OF BOEING ECS TUBE. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 77-0007 NO. 1 ENGINE - INTRODUCTION OF A NEW NI SPEED SENSOR. SERVICE BULLETIN
MOS
OI -DEC-2006 HRS/MSC -
ENC
SB 77-0008 NO. 1 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
20-OCT-2006 HRS/MSC -
ENC
SB 77-0008 RI NO. 1 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
27-FEB-2008 MRS/51SC -
ENC
SB 77-0009 NO. 1 ENGINE - ENGINE INDICATING - (77-00-00) - SPARES PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN
MOS
I2-JAN-2009 HRS(MSC -
ENC
SB 77-0010 NO. 1 ENGINE - ENGINE INDICATING -NI SPEED SENSOR (77-12-19) - SPARE PARTS RELEASE FOR CFM56-7B CMM.
SERVICE BULLETIN
MOS
I 7-DEC-2009 HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 565 Of 748
@ Camp Systems
EFTA00618856
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Ad-own/lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0001 NO. 1 ENGINE - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN - INFORMATION ONLY
MOS
HRSAISC -
ENC
SB 79-0001 RI NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 RIO NO. I ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN CATEGORY 9
MOS
14-APR-2014 FIRSAISC -
ENC
SB 79-0001 R2 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0001 R3 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0001 R4 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 R5 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 R6 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
07-JUL-2006 HRSAISC -
ENC
SB 79-0001 R7 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
10-JUL-2008 FIRSAISC -
ENC
SB 79-0001 R8 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
14-MAY-2009 HRS/MSC -
ENC
SB 79-0001 R9 NO. 1 ENGINE - OIL - GENERAL (79.00-00) - APPROVED OILS FOR CFM56-7B ENGINES (SUPERSEDED BY SB 79-0001 INFORMATIONAL
R10). SERVICE BULLETIN
MOS
19-AUG-2011 FIRSAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 566 Of 748
@ Camp Systems
EFTA00618857
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0002 R1 NO. 1 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 79-0002 R2 NO. 1 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0002 R3 NO. 1 ENGINE - OIL - LUBRICATION UNIT (79-00-00) - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM
OPTIONAL KIT. SERVICE BULLETIN
MOS
14-MAY-2009 HRSAISC
ENC
SB 79-0003 NO. 1 ENGINE - INTRODUCTION OF A NEW OIL CLOGGING INDICATOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0004 RI NO. 1 ENGINE - ADDITION OF A CAUTION LABEL ON OIL SCAVENGE FILTER BOWL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0005 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN COMPUED WITH - NO REWORK REQUIRED
MOS 22-AUG-2008
HRS/MSC - 3260:48
ENC 746
SB 79-0006 NO. 1 ENGINE - OIL - OIL SYSTEM (79-00-00) - INTRODUCTION OF AN IMPROVED OIL SCAVENGE FILTER ASSY WITH
MODIFIED BOWL AND HEAD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0008 NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRS/MSC 1500 (s)
ENC
SB 79-0008 RI NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0008 R2 NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRSAISC 1500 (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 567 Of 748
@ Camp Systems
EFTA00618858
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0009 NO. ENGINE - LUBRICATION UNIT REMOVAL (79.21-10) - INTRODUCTION OF NEW PACKING PREFORMED O-RINGS
AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT.. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 79-0009 R1 NO 1 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK
OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRICATION UNIT. SERVICE BULLETIN
MOS
HRS.P.ISC -
ENC
SB 79-0009 R2 NO 1 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK
OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT. SERVICE BULLETIN
MOS
HRS.P.ISC -
ENC
SB 79-0010 NO. ENGINE - INTRODUCTION OF NEW FLUOROCARBONE O-RINGS ON OIL FUEL HEAT EXCHANGER. SERVICE
BULLETIN
MOS
HRSMSC
ENC
SB 79-O010 RI NO 1 ENGINE - OlLiFUEL HEAT EXCHANGER ( 79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE
O-RINGS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 79-0010 R2 NO 1 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN
MOS
20-DEC-2000 HRSMSC -
ENC
SB 79-0011 NO. I ENGINE - OlliFUEL HEAT EXCHANGER (79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE
O-RINGS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 79-O011 RI NO. ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RING. SERVICE BULLETIN
MOS
20-DEC-2000 HRS.P.ISC -
ENC
SB 79-0012 NO. I ENGINE - REWORK OF A SPECIFIC BATCH OF OIL LEVEL SENSORS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 79-0013 NO. ENGINE - INTRODUCTION OF A NEW OIL BYPASS VALVE. SERVICE BULLETIN
MOS
HRSi sISC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 568 Of 748
Camp Systems
EFTA00618859
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0014 NO. 1 ENGINE - OIL - OIL SYSTEM ( 79-00-00 ) - DELETION OF THE OIL BYPASS VALVE AND ITS HARDWARE. SERVICE
BULLETIN
MOS
MRS/P.1SC -
ENC
SB 79-0017 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE
BULLETIN
MOS 6 (s)
HRS/MSC
ENC
SB 79-0017 RI NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE
BULLETIN
MOS 6 (s)
MRS/P.1SC
ENC
SB 79-0017 R2 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE
BULLETIN
MOS 6 (s)
MRS/P.1SC
ENC
SB 79-0017 R3 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES (SUPERSEDED RECOMMENDED
BY SB 79-0017 R4). SERVICE BULLETIN
MOS 6 (s)
16-FEB-2007 HRS/MSC
ENC
SB 79-0017 R4 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE
BULLETIN
MOS
14-APR-2014 HRS/MSC -
ENC
SB 79-0018 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN
DAYS 30 (s)
HRSfMSC
ENC
SB 79-0018 RI NO. 1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING (SUPERSEDED BY SB 79-0018 R2). SERVICE BULLETIN
DAYS 30 (s)
MRS/P.1SC
ENC
SB 79-0018 R2 NO.1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN
MOS
14-APR-2014 HRS/P.1SC -
ENC
SB 79-0020 NO.1 ENGINE - OIL - DEBRIS MONITORING SYSTEM (DMS) (79-21-S4) - INTRODUCTION OF NEW OMS DETECTOR AND
REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 569 Of 748
@ Camp Systems
EFTA00618860
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0020 R1 NO. I ENGINE - INTRODUCTION OF NEW DOS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
I6-JAN-2006 HRS/MSC -
ENC
SB 79-0021 R2 NO. I ENGINE - INTRODUCTION OF A NEW OIL SCAVENGE HOSE TUBE WITH A NEW ROUTING AND A NEW BRACKET.
SERVICE BULLETIN
MOS
-MAR-2005 HRS/MSC -
ENC
SB 79-0022 NO.1 ENGINE - OIL - DMS JUNCTION BOX (79-21-53) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE
BULLETIN
MOS
26-NOV-2008 HRS/MSC -
ENC
SB 79-0023 NO. 1 ENGINE - OIL/FUEL HEAT EXCHANGER (79-21-25) - INTRODUCTION OF A NEW MAIN OlUFUEL HEAT EXCHANGER
WITH KEY LOCKED INSERTS. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 79-0023 RI NO. 1 ENGINE - INTRODUCTION OF A NEW MAIN OIL/FUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE
BULLETIN
MOS
20-DEC-2006 HRS/MSC -
ENC
SB 79-0024 NO. 1 ENGINE - INTRODUCTION OF NEW PACKING PREFORMED 0 -RINGS IN FLUOROCARBONE WITH BETTER
PERFORMANCE AT LOW TEMPERATURE. SERVICE BULLETIN
MOS
HRS/MSC 500(s)
ENC
SB 79-0025 NO. I ENGINE - NEW FORWARD TUBE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0026 NO.1 ENGINE - INTRODUCTION OF NEW OUTER SEALING SPOOL. SERVICE BULLETIN
MOS
25-OCT-2007 HRS/MSC -
ENC
SB 79-0027 NO. 1 ENGINE - OIL CONSUMPTION MONITORING. SERVICE BULLETIN
DAYS 30 (s)
10-JUL-2008 HRS/MSC
ENC
SB 79-0029 NO. I ENGINE - OIL - OIL SCAVENGE FILTER ASSEMBLY (79-21-42) - INTRODUCTION OF A NEW BYPASS VALVE
SPRING. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 570 Of 748
@ Camp Systems
EFTA00618861
AD/SI Status Report AIRCRAFT
CAMP
Ael...imp.= taken...lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0030 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INTRODUCTION OF AN OIL SUPPLY TUBE WITH A NEW DESIGN. SERVICE RECOMMENDED
BULLETIN
MOS
05-N0V-2010 HRS1MSC -
ENC
SB 79-0031 NO. 1 ENGINE - OIL - LUBRICATION UNIT (79-21-16) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN INFORMATIONAL
MOS
IO-DEC-2010 HRS(MSC -
ENC
SB 79-0032 NO. 1 ENGINE - OIL - GENERAL (79-0000) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
22-JAN-2013 HRSAISC -
ENC
SB 79-0069 NO. 1 ENGINE - DELETION OF ELECTRICAL CHIP DETECTOR KIT. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 80-0001 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 80-0001 R1 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 80-0003R1
MOS
HRS,MSC -
ENC
SB 80-0001 R3 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
PIRS1MSC -
ENC
SB 80-0001 R4 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
13-AUG-1999 HRSAISC -
ENC
SB 80-0002 NO. I ENGINE - AIR TURBINE STARTER CLAMP ROTATION, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
26-MAR-1998 HRSAISC - 0
ENC 0
SB 80-0003 R1 NO. I ENGINE - INTRODUCTION OF A NEW MR TURBINE STARTER. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS1MSC - 0
ENC 0
SB 80-0004 NO. 1 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 571 Of 748
@ Camp Systems
EFTA00618862
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 80-0004 R1 NO. 1 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0005 NO. 1 ENGINE - AIR TURBINE STARTER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0006 NO. 1 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD
UPGRADE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 80-0006 R1 NO. 1 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD
UPGRADE. SERVICE BULLETIN
MOS
-MAR-2004 HRS/MSC
ENC
SB 80-0007 NO. 1 ENGINE - INTRODUCTION OF AIR TURBINE STARTER VIN 3505945-10 (GE 1851M36P10). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0008 NO. 1 ENGINE - INSPECTION AND REPLACEMENT OF NONCONFORMING MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE COMPUED WITH
BULLETIN
MOS 22-AUG-2008
06-AUG-2002 HRS/MSC - (s) 326048
ENC 746
SB 80-0009 NO. I ENGINE - STARTING - STARTING (80-00-00) - AIR TURBINE STARTER VIN 3505945-9 (GE 1851M36P09) TO VIN
3505945-10 (GE 1851M36P10) REWORK. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 80-0010 NO.1 ENGINE - PACKINGS FOR HTS OILS. SERVICE BULLETIN
MOS
HRS/MSC DUE
ENC
SB 80-0010 RI NO.1 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 80-0010 R2 NO.1 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN
MOS
25-JUL-2006 HRS,MSC - (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 572 Of 748
@ Camp Systems
EFTA00618863
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 80-0011 NO. 1 ENGINE - MAGNETIC DRAIN PLUG WITH LARGER KNOB TO EASE REMOVAL. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0012 NO. 1 ENGINE - REPLACEMENT OF THE SPRING WASHER IN AIR TURBINE STARTERS VIN 3505945-9 (1851M36P09) AND
VIN 3505945-10 (1851M36P10). SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0013 NO. 1 ENGINE - STARTING - GENERAL (80-00-00)-ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER SUPERSEDED
DECOUPLER ASSEMBLY VIN 3504835-1 (SUPERSEDED BY 80-0013 RI). SERVICE BULLETIN
MOS
14-FEB-2012 HRS/MSC -
ENC
SB 80-0013 RI NO. I ENGINE - STARTING - GENERAL (80-00-00)- ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER RECOMMENDED
DECOUPLER ASSEMBLY VIN 3504835-1. SERVICE BULLETIN
MOS
28-MAR-2012 HRS/MSC -
ENC
SB 80-0014 NO.1 ENGINE - STARTING - STARTER (80-11-00) - INTRODUCTION OF NEW AIR TURBINE STARTERS VIN 3505945-11 OPTIONAL
(P/N 1851M36P11) AND VIN 3505945-12 (PIN 1851M36P12). SERVICE BULLETIN
MOS
17-APR-2013 HRS/MSC -
ENC
SB 80-0015 NO.1 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR SUPERSEDED
INSPECTION AND EVALUATION (SUPERSEDED BY SB 80-0015 RI). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0015 RI NO. 1 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR CATEGORY 2
INSPECTION AND EVALUATION. SERVICE BULLETIN
MOS
09-JAN-2014 HRS/MSC -
ENC
SB 80-1709 NO. 1 ENGINE - REWORK THE AIR TURBINE ENGINE STARTER. PN 3505945-5/-6 TO PN 3505945-7/-8. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SI SER 79-0001 NO. 1 ENGINE - SERVICE EVALUATION REQUEST OF FLIGHT EVALUATION OF OILS, SERVICE INSTRUCTIONS
MOS
HRS/MSC
ENC 5000 (s)
VSB 3291186-75-1074 R1 NO. I ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVE- REWORK HIGH PRESSURE TURBINE RECOMMENDED
CLEARANCE VALVES. PN 3291186-5 AND PN 3291186-6 TO REDUCE FUEL LEAKAGE. VENDOR SERVICE BULLETIN
MOS
19-FEB-2014 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 573 Of 748
@ Camp Systems
EFTA00618864
AD/SI Status Report AIRCRAFT
Meg arroyo' 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
ASB 72-A0328 NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION.
ALERT SERVICE BULLETIN
MOS
12-MAR-2002 HRSNSC
ENC
ASB 72-A0328 RI NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION.
ALERT SERVICE BULLETIN
DAYS I (s)
12-MAR-2002 HRSAISC
ENC
ASB 72-A0329 NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REPLACEMENT OF NO.4 ROLLER BEARING.. ALERT SERVICE
BULLETIN
MOS
12-MAR-2002 HRSAISC -
ENC
ASB 7340026 NO.2 ENGINE - INTRODUCITON OF SOFTWARE VERSION 7.B.J (763A). ALERT SERVICE BULLETIN
MOS
15-JAN-1999 HRSAISC -
ENC
ASB 73-A0034 RI NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. ALERT SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0000 NO.2 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SUPERSEDED
SERVICE BULLETIN
MOS
HRS1SISC
ENC
SB 72-O000R1 NO.2 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 (SUPERSEDED BY 72-0000 SUPERSEDED
R2). SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-O000R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN INFORMATIONAL
CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN
MOS
II -MAY-2011 HRSJIASC -
ENC
SB 72-0001 NO.2 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED - INFORMATION ONLY
MOS
HRSAISC -
ENC
S8 72-0001 R1 NO.2 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 574 Of 748
@Camp Systems
EFTA00618865
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0001 R2 NO.2 ENGINE - CFUS6-7B ENGINE MODELS I DENIIFICATION.. SERVICE BULLETIN SUPERSEDED
MOS
FIRSAISC -
ENC
SB 72-0001 R3 NO.2 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED
MOS
27-JUL-2006 HRSAISC -
ENC
SB 72-0001 R4 NO.2 ENGINE - CF1456-7B ENGINE MODELS IDENTIFICATION
. SERVICE BULLETIN
MOS
2S-MAY-2007 FIRSAISC
ENC
SB 72-0001 RS NO.2 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0002 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRS/SISC
ENC
SB 72-0002 RI NO.2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HRS/A1SC -
ENC
SB 72-0003 NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN - PRODUCT IMPROVEMENT
MOS
FIRSAISC -
ENC
SB 72-0003 RI NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 72-0003 R10 NO.2 ENGINE - ENGINE - GENERAL (72-00-60) - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE OPTIONAL
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
15-JUN-2011 HRSAISC -
ENC
SB 72-0003 R2 NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN
MOS
HRSOJSC -
ENC
SB 72-0003 R3 NO.2 ENGINE - CONVERSION OF CFM56-76 TO DERIVATIVE MODELS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 575 Of 748
@ Camp Systems
EFTA00618866
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0003 R4 NO 2 ENGINE - CONVERSION OF CR156-76 TO DERIVATIVE MODELS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0003 R5 NO 2 ENGINE - CONVERSION OF CFM56-7B MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS.
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0003 R6 NO 2 ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS.
SERVICE BULLETIN
MOS
17-APR-2007 HRSMSC -
ENC
SB 72-0003 R7 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
11-JUN-2009 HR&MSC -
ENC
SB 72-0003 Re NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE
DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0003 R9 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFNI56-76 MODEL ENGINES TO ALLOWABLE SUPERSEDED
DERIVATIVE MODEL DESIGNATIONS (SUPERSEDED BY 72-0003 RIO) SERVICE BULLETIN
MOS
10-MAR-2011 HR&MSC -
ENC
SB 72-0004 NO.2 ENGINE - INSTALLATION OF CERTIFIED CFM56.7B ENGINE NAMEPLATE. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0004 RI NO 2 ENGINE - CERTIFIED CFP0156-76 ENGINE NAMEPLATE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC
ENC
SB 72-0005 NO 2 ENGINE - SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSMSC
ENC
SB 72-0006 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7618. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 576 Of 748
Camp Systems
EFTA00618867
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0006 R2 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CRIBS-7818. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 72-0006 R3 NO 2 ENGINE - CONVERSION TO CFM56-7618. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 72-0006 R4 NO 2 ENGINE - CONVERSION TO CFM56-7818. SERVICE BULLETIN
MOS
HRS4.ISC -
ENG
SB 72-0007 R1 NO.2 ENGINE - CFP.I56-7B ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 72-0007 R2 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN
MOS
HRS1ISC -
ENG
SB 72-0007 R3 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 72-0007 R4 NO 2 ENGINE - CONVERSION TO CFM56-7820. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 72-0008 Ri NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 72-0008 R3 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN
MOS
HRS4.ISC -
ENG
SB 72-0008 R4 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN
MOS
HRSLISC -
ENG
SB 72-0008 R5 NO 2 ENGINE - CONVERSION TO CRISS-7822. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 577 Of 748
1, Camp Systems
EFTA00618868
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0009 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (7628). SERVICE BULLETIN
MOS
HRSiliSC -
ENG
SB 72-0009 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFMSS-7624. SERVICE BULLETIN
MOS
HRSikiSC -
ENC
SB 72-0009 R2 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0009 R3 NO 2 ENGINE - CRIS6-7B ENGINE CONVERSION TO CFm56-7624. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0009 R4 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN
MOS
HRS4ISC -
ENG
SB 72-0010 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN
MOS
HRS.' hiSC -
ENC
SB 72-0010 R2 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS.' hiSC -
ENC
SB 72-0010 R3 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN
MOS
HRS.' hiSC -
ENG
SB 72-0010 R4 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFm50-7626. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0010 RS NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CRI56-7626. SERVICE BULLETIN OPTIONAL
MOS
17-FEB-2011 HRSASC -
ENG
SB 72-0011 R2 NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CRI56-7627. SERVICE BULLETIN OPTIONAL
MOS
HRS.' hiSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 578 Of 748
Camp Systems
EFTA00618869
AD/SI Status Report AIRCRAFT
C4INIP
AsianwftimMetnundieli 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0011 R3 NO. 2 ENGINE - CFL156-78 ENGINE CONVERSION TO CR156-7B27. SERVICE BULLETIN OPTIONAL
MOS
HRS.' LISC -
ENC
SB 72-0011 R4 NO. 2 ENGINE - CP.156-78 ENGINE CONVERSION TO GP.156-7627. SERVICE BULLETIN OPTIONAL
MOS
28-APR-2000 HRS.' LISC
ENC
SB 72-0012 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSMSC
ENC
SB 72-0013 NO.2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSILISC
ENC
SB 72-0014 NO. 2 ENGINE - NUT AND TORQUE CHANGE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0015 NO.2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED
MOS
HRSMSC
ENC
SB 72-0016 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
11-JUL-1997 HRSMSC -
ENC
SB 72-0016 R1 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
05-AUG-1997 HRSMSC 0
ENC 0
SB 72-0017 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS4.1SC 0
ENC 0
SB 72-0017 R1 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
HRSILISC -
ENC
SB 72-0018 NO. 2 ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 579 Of 748
Camp Systems
EFTA00618870
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0018 R1 NO.2 ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0018 R2 NO.2 ENGINE - INCREASING OF LENGTH BOLT AND ADDITION OF A WASHER, SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0019 NO.2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC -
ENC
SB 72-0020 RI NO.2 ENGINE - ADDITON OF A SPACER ON THE RETAINING CABLE OF THE IDENTIFICATION PLUG NIT. SERVICE COMPUED WITH -AT MANUFACTURE
BULLETIN
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0021 NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0021 RIO NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0021R1 NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0022 NO.2 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0022 RI NO.2 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0093
MOS
HRSAISC -
ENC
SB 72-0023 NO.2 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0023 RI NO.2 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 580 Of 748
@ Camp Systems
EFTA00618871
AD/SI Status Report AIRCRAFT
CORP
Mianwpwre 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 72-0024 NO. 2 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0024 RI NO. 2 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0025 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0025 R2 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
MRS/51SC - 0
ENC 0
SB 72-0026 RI NO. 2 ENGINE - REWORK OF SHROUD PAD. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
MRS/51SC - 0
ENC 0
SB 72-0027 NO. 2 ENGINE - REPOSITIONING OF VBV HARNNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SS 72-0028 R2 NO. 2 ENGINE - THRUST REVERSER KIT MODIFICATION OF INTERNAL VEE GROOVE AND FITTING SHROUDS, SERVICE COMPUED WITH - AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0029 NO. 2 ENGINE - REPLACEMENT OF BOLTS, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0030 RI NO. 2 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0030 R2 NO. 2 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0031 NO. 2 ENGINE - INTRODUCTION OF THE NEW PLATFORM FAN BLADE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 581 Of 748
@Camp Systems
EFTA00618872
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0032 NO 2 ENGINE - INTRODUCTION OF A NEW FAN CASE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisISC 0
ENC 0
SB 72-0033 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC 0
ENC 0
SB 72-0033 R1 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0033 R2 NO. 2 ENGINE - . SERVICE BULLETIN
MOS
HR&P.ISC
ENC
SB 72-0034 R1 NO 2 ENGINE - TURBINE CLEARANCE CONTROL VALVE SUPPORT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HR&MSC 0
ENC 0
SB 72-0035 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .J5 AND J6. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0101
MOS
HRSI.ISC -
ENC
SB 72-0035 R1 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .15 AND J6. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0036 R1 NO 2 ENGINE - INSTALLATION OF A TUBE OIL DRAIN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisiSC 0
ENC 0
SB 72-0037 NO 2 ENGINE - REPLACEMENT OF ONE BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC 0
ENC 0
SB 72-0038 NO 2 ENGINE - MODIFICATION OF AXIAL LOAD LINK. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS.P.ISC 0
ENC 0
SB 72-0039 R2 NO 2 ENGINE - INSTALLATION OF NEW BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSisISC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 582 Of 748
Camp Systems
EFTA00618873
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0040 R1 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0040 R2 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0041 NO 2 ENGINE - DELETION OF BRACKETS ASSY FOLOWING PRECOOLER DEFLECTOR AST SIDE PANELS REMOVAL. NOT APPLICABLE
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0042 NO 2 ENGINE - HPTCC MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0043 NO 2 ENGINE - INTRODUCTION OF NEW BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0044 R1 NO. 2 ENGINE - SUPPORT BRACKET IMPROVEMENTS FOR THE CJ9 HARNESS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC 0
ENC 0
SB 72-0045 R2 NO 2 ENGINE - REWORK OF SHROUD PAD OF STRUT Nsi ON 'VEE GROOVE". SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIASC 0
ENC 0
SB 72-0045 R3 NO 2 ENGINE - REWORK OF SHROUD PAD OF STRUT Nsi ON 'VEE GROOVE". SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0046 NO 2 ENGINE - MODIFICATION OF TWO BRACKETS ON BOEING FUEL SUPPLY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIASC 0
ENC 0
SB 72-0047 NO 2 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS IC-DEC-1998
HRSIASC - 0
ENC 0
SB 72-0047 R1 NO 2 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN
MOS
HRSIASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 583 Of 748
Camp Systems
EFTA00618874
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0047 R2 NO.2 ENGINE - HPT AND LPT NOZZLE STAGE 1 - INTRODUCTION OF NEW LOW STRESS C-CLIPS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0048 R1 NO.2 ENGINE - ANTI-ICE AND DRAIN MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0098
MOS
HRS/MSC -
ENC
SB 72-0049 R1 NO.2 ENGINE - MODIFICATION OF HARNESS MW0304. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/hISC - 0
ENC 0
SB 72-0050 NO.2 ENGINE - MODIFICATION OF HARNESS MW0301. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0051 NO.2 ENGINE - GENERAL (72-00-00) SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/hISC -
ENC
SB 72-0052 NO.2 ENGINE - INSPECTION OF J5. J6. J10. MW0301,MW0302, AND MW0304 HARNESSES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0053 R1 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG 52X
CWM-91X
MOS
HRS/hISC -
ENC
SB 72-0054 NO.2 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0054R1 NO.2 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0055 R1 NO.2 ENGINE - CHANGE OF HARDWARE FROM CORE ASSEMBLY TO ENGINE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/hISC -
ENC
SB 72-0056 NO.2 ENGINE - VBV FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 584 Of 748
@ Camp Systems
EFTA00618875
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0057 NO.2 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0099
MOS
HRSAISC -
ENC
SB 72-0058 NO.2 ENGINE - INTRODUCTION OF NEW FRONT FLANGE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0059 NO.2 ENGINE - NEW VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-O060 NO.2 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0060 R1 NO.2 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0061 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
32X,41X.52X91X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0062 NO.2 ENGINE - INTRODUCTION OF A REPLACEABLE CUSHION FOR HINGED CLAMP (ELECTRICAL HARNESSES
ATTACHMENT). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0063 R1 NO.2 ENGINE - REPLACEMENT OF HOLD OPEN ROD BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0064 R1 NO.2 ENGINE - REPLACEMENT OF TWO BRACKETS ATTACHING THE J12 HARNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0065 NO.2 ENGINE - INTRODUCTION OF A NEW SOURCE FOR THE VIBRATION BRG1. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0066 NO.2 ENGINE - INTRODUCTION OF NEW SOURCE FOR SENSOR VIBRATION FFCC. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 585 Of 748
@ Camp Systems
EFTA00618876
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0067 R1 NO.2 ENGINE - INTRODUCTION OF A HEAT SHIELD BETWEEN THE OIL PRESSURE SENSOR AND THE OIL COMPLIED WITH -AT MANUFACTURE 91X
DISTRIBUTION BLOCK. SERVICE BULLETIN NA-SUPERSEDED 72-0151
MOS 16-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0068 NO.2 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0068 RI NO.2 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0068 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN INFORMATIONAL
MOS
03-MAY-2012 HRS/MSC -
ENC
SB 72-0069 NO.2 ENGINE - INTRODUCTION/REWORK OF TWO PS3 BRACKETS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 76-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0070 RI NO.2 ENGINE - ECS DUCT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0071 NO.2 ENGINE - MODIFICATION OF BRACKET ATTACHING THE MW0312, SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0072 NO.2 ENGINE - INTRODUCTION OF A PAINT-MARKED COVER ASSY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0073 NO.2 ENGINE - DRAIN TUBE SUPPORT CHANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0074 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0074 RI NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 41X,91X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 586 Of 748
@ Camp Systems
EFTA00618877
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (VG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0075 NO 2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE AND IGNITER HARDWARE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSimSC - 0
ENC 0
SB 72-0076 NO 2 ENGINE - INTRODUCTION OF NEW IDG OIL COOLER WITH A NEW GOEMETRY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS.mSC 0
ENC 0
SB 72-0077 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0077 R2 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0078 RI NO 2 ENGINE - INTRODUCTION OF LONGER SCREWS ON LPTACC PANEL. SERVICE BULLETIN COMPLIED WITH - PARTIALLY AT MFG
MOS 16-DEC-1998
HR&P.ISC
ENC
SB 72-0079 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0079 RI NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS IC-DEC-1998
HRSimSC 0
ENC 0
SB 72-0079 R2 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0079 R3 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0079 R4 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 72-0079 RS NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 587 Of 748
Camp Systems
EFTA00618878
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0079 R6 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN RECOMMENDED
MOS
23-NOv-2010 HRSMSC
ENC
SB 72-0080 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSMSC
ENC
SB 72-0081 NO 2 ENGINE - CMF56-78 ENGINE CONVERSION TO GFM56-7B20+2. SERVICE BULLETIN NOT APPLICABLE
MOS
HR&MSC -
ENC
SB 72-0081 fel NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MI56-7B20:2. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0082 NO 2 ENGINE - CFM56-78 ENGINE CONVERSION TO GFP456-7B22r2. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC -
ENC
SB 72-0082 ft1 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MI56-7B22,2. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0083 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFP456-7B24/2. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC -
ENC
SB 72-0083 ft1 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFP456-7B24/2. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0084 NO 2 ENGINE - CFM56-78 ENGINE CONVERSION TO GFM56-7B26a. SERVICE BULLETIN NOT APPLICABLE
MOS
HR&MSC -
ENC
SB 72-0084 fel NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFM56-7B2&2. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0085 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MISS-7B27a. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 588 Of 748
Camp Systems
EFTA00618879
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0085 R1 NO.2 ENGINE - CF5156-7B ENGINE CONVERSION TO CP.156-7827/2. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0086 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0086 RI NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
04-DEC-2007 MRS/51SC -
ENC
SB 72-0087 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0103
MOS
MRS/51SC -
ENC
SB 72-0088 NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
MRS/51SC - 0
ENC 0
SB 72-0088 RI NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0088 R2 NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0089 NO.2 ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1NOZZLE SEGMENT AND COMPUED WITH - AT MANUFACTURE 53X.54X
STAGE I SEAL SEGMENT. SERVICE BULLETIN
MOS 16-DEC-1998
HRSIMSC - 0
ENC 0
SB 72-0089 RI NO.2 ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1NOZZLE SEGMENT AND
STAGE I SEAL SEGMENT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0089 R2 NO.2 ENGINE - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT
STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL SEGMENT. SERVICE BULLETIN
MOS
27-JAN-2006 MRS/51SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 589 Of 748
@ Camp Systems
EFTA00618880
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0089 R3 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR
INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1
SEAL-SEGMENT. SERVICE BULLETIN
MOS
10-APR-2009 HRS/MSC
ENC
SB 72-0090 NO.2 ENGINE - REINFORCEMENT OF FORWARD MOUNTING LUG OF THE LPT COOLING MANIFOLDS. SERVICE COMPLIED WITH - AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HRSAISC 0
ENC 0
SB 72-0091 NO.2 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107.
874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0091 RI NO.2 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. NOT APPLICABLE
874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0092 NO.2 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRS(MSC - 0
ENC 0
SB 72-0092 RI NO.2 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0093 NO.2 ENGINE - INTRODUCTION OF NEW MOUNT HARNESS WITH S. J10. MW0311. MW0315. MW0316 ASSOCIATED COMPLIED WITH - AT MANUFACTURE
HARNESSES. SERVICE BULLETIN
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
SB 72-0094 NO.2 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
SB 72-0094 RI NO.2 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0095 NO.2 ENGINE - INTRODUCTION OF LARGE BORE TRANSIENT BLEED VALVE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
MRS/P.1SC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 590 Of 748
@ Camp Systems
EFTA00618881
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0096 NO.2 ENGINE - INTRODUCTION OF HPT NOZZLE SUPPORT WITH IMPROVED PINS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0097 RI NO.2 ENGINE - INTRODUCTION OF LONGER BOLTS ON ENGINE AND CORE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0098 NO.2 ENGINE - INTRODUCTION OF A NEW AIR DUCT SUPPORT BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0099 NO.2 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS WITH INNER SEAL. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0100 NO.2 ENGINE - CFM56-78 ENGINE NAMEPLATE MARKING. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0101 NO.2 ENGINE - NEW ROUTING OF JS AND J6 HARNESSES. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0102 NO.2 ENGINE - INTRODUCTION OF DAC HPT ROTOR ASSEMBLY FOR USE ON THE SAC HPT ROTOR ASSEMBLY.
SERVICE BULLETIN
MOS
MRS/MSC
ENC
SB 72-0103 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0103 RI NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0103 R2 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN RECOMMENDED
MOS
I7-FEB-2011 HRS/MSC -
ENC
SB 72-0101 NO.2 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN - SUPERSEDED - SB PENDING
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 591 Of 748
@ Camp Systems
EFTA00618882
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0104 R1 NO.2 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0105 NO.2 ENGINE - ARRANGEMENT OF VBV TURNBUCKLE. BELLCRANK. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0106 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 72-O106 R2 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0106 R3 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0106 R4 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS.
SERVICE BULLETIN
MOS
I4-AUG-2007 HRS/MSC
ENC
SB 72-0107 NO.2 ENGINE - REPLACEMENT CLAMP FOR DAC AFT SUMP OIL SUPPLY TUBE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0108 NO.2 ENGINE - NEW VBV FUEL MANIFOLD BOLTS AND VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0109 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0109 R1 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 592 Of 748
@ Camp Systems
EFTA00618883
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0109 R2 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN
MOS
HRSO4SC -
ENC
SB 72-0110 R1 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER COMPUED WITH - AT MANUFACTURE
WITH ONE LUG KEY. SERVICE BULLETIN
MOS 16-DEC-1998
MRS/51SC - 0
ENC 0
SB 72-0110 R2 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER
WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0110 R3 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER
WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0110 R4 NO.2 ENGINE - COMBUSTION CHAMBER - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF
COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0111 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH INCREASED LIFE LIMIT. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0114
MOS
HRS/MSC -
ENC
SB 72-0112 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0113 NO.2 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE
BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0113 R1 NO.2 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0114 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSO4SC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 593 Of 748
@ Camp Systems
EFTA00618884
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0114 R1 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0115 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0115 R1 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRSBASC -
ENC
SB 72-0115 R2 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-O116 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0117 NO.2 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0117 R1 NO.2 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0118 NO.2 ENGINE - INTRODUCTION OF A NEW I-PT NOZZLE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0119 NO.2 ENGINE -RN APPLICATION ADJUSTMENT ON THE NEW VEE GROOV SYSTEM. SERVICE BULLETIN - PRODUCT IMPROVEMENT
MOS
HRS/MSC -
ENC
SB 72-0120 NO.2 ENGINE - WASHERS TO PC FUEL TUBE/MANIFOLD. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
FIRS/MSC - 0
ENC 0
SB 72-0121 R1 NO.2 ENGINE - CORE ASSEMBLY HARDWARE CHANGE. SERVICE BULLETIN NOT APPLICABLE
MOS
MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 594 Of 748
@ Camp Systems
EFTA00618885
AD/SI Status Report AIRCRAFT
CAMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0122 NO.2 ENGINE - DELETION OF THE STAGE 5 BLEED COVER PLATE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0123 RI NO.2 ENGINE - INSPECTION OF TGB AIR/OIL TUBE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0124 NO.2 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVI) REMOVABLE AT ENGINE LEVEL. SERVICE COMPLIED WITH - AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HR/MSC 0
ENC 0
SB 72-0124 R3 NO.2 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVT) REMOVABLE AT ENGINE LEVEL. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0125 NO.2 ENGINE - HPT NOZZLE INNER SEAL REPLACEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0126 NO.2 ENGINE -CORE CONFIGURATION UPDATES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 72-0128 NO.2 ENGINE - REPLACEMENT OF BOLTS AND WASHERS ATTACHING THE REM CONE FLANGE ON THE FAN DISK COMPLIED WITH - AT MANUFACTURE
FRONT FLANGE. SERVICE BULLETIN
MOS 16-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0129 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0129 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0130 NO.2 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE L5 STARTER
GEARSHAFT SERIAL NUMBER
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 595 Of 748
@ Camp Systems
EFTA00618886
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0130 R1 NO.2 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0131 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0132 NO.2 ENGINE - REDUCED INTERVAL FOR MAGNETIC CHIP DETECTOR INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE AG8
STARTER GEARSHAFT SERIAL NUMBER
MOS
HRSIMSC -
ENC
SB 72-0133 NO.2 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID COMPUED WITH - AT MANUFACTURE 23X.91X
AIR TUBE. SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0133 R1 NO.2 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID
AIR TUBE. SERVICE BULLETIN
MOS
HIRSOASC
ENC
SB 72-0134 NO.2 ENGINE - INTRODUCTION OF A NEW CLAMP-LOOP AND ITS BRACKET FOR J¶2 ELECTRIC HARNESS HOLDING. COMPUED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0135 NO.2 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. COMPUED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
MRS/MSC 0
ENC 0
SB 72-0135 R1 NO.2 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0136 R1 NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE COMPUED WITH -AT MANUFACTURE
BULLETIN
MOS 16-DEC-1998
HRS/MSC 0
ENC 0
SB 72-0136 R2 NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 596 Of 748
@ Camp Systems
EFTA00618887
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0136 R3 NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE
BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0138 NO.2 ENGINE - INTRODUCTION OF A HEAT SHRINK SLEEVE ON J7 AND J8 HARNESSES. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0146
MOS
FIRSAISC -
ENC
SB 72-0139 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0140 NO.2 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0140 R1 NO.2 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0141 NO.2 ENGINE - INTRODUCTION OF NEW LPTACC TUBE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
FIRS1MSC - 0
ENC 0
SB 72-0142 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0143 NO.2 ENGINE - REPLACEMENT OF SUSPECT J9 HARNESSES .. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0144 NO.2 ENGINE - INTRODUCTION OF A NEW PS3 AIR TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
HRSfMSC - 0
ENC 0
SB 72-0145 NO.2 ENGINE - CLAMP ASSEMBLY ADDITION TO THE TRANSIENT BLEED VALVE DRAIN TUBE. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS1MSC -
ENC
SB 72-0146 NO.2 ENGINE - J8 HARNESS ECU CONNECTION - NEW ROUTING OF TP0808* LEG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS I6-DEC-1998
FIRS1MSC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 597 Of 748
@ Camp Systems
EFTA00618888
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0147 NO.2 ENGINE - N1 MODIFIER SCHEDULE CHANGE FOR CFM56-7826 AND CFM56-7827 ENGINES. SERVICE BULLETIN NOT APPLICABLE
MOS
MRS/MSC -
ENC
SB 72-0148 NO.2 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF COMPUED WITH - AT MANUFACTURE
SAFETY WIRE. SERVICE BULLETIN
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0148 R1 NO.2 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF
SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0149 NO.2 ENGINE - FAN AND BOOSTER ADDITION OF A NEW WASHER ON PT25 AIR TUBE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS I6-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0150 NO.2 ENGINE - BRACKETS ASSY DELETION OF ALERNATES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC
ENC
SB 72-0151 NO.2 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND COMPUED WITH - PARTIALLY AT MFG
FUEL TUBE BRACKETS. SERVICE BULLETIN
MOS 16-DEC-1998
HRSAISC 0
ENC 0
SB 72-0151 R1 NO.2 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND
FUEL TUBE BRACKETS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0152 NO.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH- AT MANUFACTURE 9IX
OPEN-51X
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 72-0153 NO.2 ENGINE - INTRODUCTION OF A NEW J7 HARNESS WITH COIL INTEGRATED. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSAISC -
ENC
SB 72-0154 NO.2 ENGINE - INTRODUCTION OF A NEW VSV FUEL TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE
MOS 76-DEC-1998
HRSAISC - 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 598 Of 748
@ Camp Systems
EFTA00618889
AD/SI Status Report AIRCRAFT
C4IMAtianageP
fra 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0155 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0155 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0156 NO.2 ENGINE - HPT NOZZLE SHROUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0156 RI NO.2 ENGINE - HPT NOZZLE SHRUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0156 R2 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE (72-53-00)- HPT NOZZLE SHROUD SUPPORT OPTIONAL
REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN
MOS
13-FEB-2012 HRS/MSC -
ENC
SB 72-0157 NO.2 ENGINE - IMPROVED SEAL MATERIAL. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 72-0158 NO.2 ENGINE - COMBUSTOR LINER PROOUCIBILITY IMPROVEMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0158 RI NO.2 ENGINE - COMBUSTOR LINER PRODUCIBILTY IMPROVEMENT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0159 NO.2 ENGINE - INCREASING OF BOLT LENGTH ON T49.5 PROBE BOX. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSAISC - 0
ENC 0
SB 72-0160 NO.2 ENGINE - REMOVAL OF INTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU
874-105. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0161 NO.2 ENGINE - REPLACEMENT OF ECU BRACKET ASSY ON THE FAN FRAME. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 599 Of 748
@Camp Systems
EFTA00618890
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0162 NO.2 ENGINE - INSPECT HPT STR MANIFOLD/LPT STAGE I NOZZLE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0163 NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS I6-DEC-1998
MRS/MSC - 0
ENC 0
SB 72-0164 NO.2 ENGINE - HPT CLEARANCE CONTROL MANIFOLD. LPT COOLING/TF SENSOR AND ELECTRICAL SUPPORT
BRACKET CHANGES. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0165 NO.2 ENGINE - RETROFIT INSTALLATION FOR COMPLYANCE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0166 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN NOT APPLICABLE - 91X OPEN-56X
MOS
HRS/MSC -
ENC
SB 72-0166 R1 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0166 R2 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0167 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/81. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0167 R1 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/81. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0167 R2 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/81. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0168 NO.2 ENGINE - CONVERSION OF CFM56-7B TO 7827/83. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 600 Of 748
@ Camp Systems
EFTA00618891
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0168 R1 NO 2 ENGINE - CONVERSION OF CFM56-7B TO 7827.'63. SERVICE BULLETIN
MOS
HRSuSC -
ENC
SB 72-0168 R2 NO 2 ENGINE - CFM 56-7B ENGINE CONVERSION TO CFM 56-7827183.. SERVICE BULLETIN
MOS
HRS/LISC -
ENC
SB 72-0169 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0169 R1 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSASC -
ENC
SB 72-0169 R2 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRS.,mSC -
ENC
SB 72-0170 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN NOT APPLICABLE
MOS
HRSIISC -
ENC
SB 72-0171 NO 2 ENGINE - INTRODUCTION OF A NEW STAGE I VANE ASSY. SERVICE BULLETIN
MOS
HRS.,mSC -
ENC
SB 72-0172 NO 2 ENGINE - REPLACEMENT OF BRACKET FOR INSTALLATION OF BOEING FLOWMETER KIT. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0173 NO 2 ENGINE - LPT SHIFT MARAGING 250 MATERIAL. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0173 R1 NO 2 ENGINE - LOW PRESSURE TURBINE SHAFT - INTRODUCTION OF A NEW LPT SHAFT MADE OF MARAGING 250
MATERIAL. SERVICE BULLETIN
MOS
HRSASC
ENC
SB 72-0174 NO 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN
MOS
HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 601 Of 748
1, Camp Systems
EFTA00618892
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0175 NO.2 ENGINE - INTRODUCTION OF TWO WAISTS ON ATTACHMENT STRUT 4 AND STRTUT 10 CLAMPS ASSY. SERVICE
BULLETIN
MOS
HRS(MSC
ENC
SB 72-0176 NO.2 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 72-0176 R1 NO.2 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0176 R2 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - NEW OUTER DOME AND INNER DOME INTRODUCTION.
SERVICE BULLETIN
MOS
30-SEP-2009 HRSPASC
ENC
SB 72-0177 NO.2 ENGINE - INTRODUCTION OF A NEW I-PT STATOR PIN RETAINER. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0178 NO.2 ENGINE - NEW NO. 5 BEARING SUPPORT. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0179 NO.2 ENGINE - VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0180 NO.2 ENGINE - REDUCED INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE
BULLETIN
MOS
HRSOASC -
ENC
SB 72-0181 NO.2 ENGINE - FAN FRAME -NEW BRACKET ASSEMBLY. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0182 NO.2 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 602 Of 748
@ Camp Systems
EFTA00618893
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0182 R1 NO 2 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN
MOS
10-JAN-2008 HRSimSC -
ENG
SB 72-0183 NO 2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED
MOS
HRS,mSC -
ENG
SB 72-0184 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
HRSIASC -
ENG
SB 72-0185 NO 2 ENGINE - INTRODUCTION OF A NEW N0. 4 ROLLER BEARING. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 72-0185 R1 NO 2 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN
MOS
HRSIISC -
ENG
SB 72-0186 NO 2 ENGINE - NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
23-SEP-1999 HRSIISC -
ENG
SB 72-0186 R1 NO 2 ENGINE - INTRODUCTION OF NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
OS-MAR-2005 HRSimSC -
ENG
SB 72-0187 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-76 IPC. SERVICE BULLETIN
MOS
HRSilASC -
ENG
SB 72-0188 NO 2 ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0188 R1 NO 2 ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN
MOS
HRSIASC -
ENG
SB 72-0188 R2 NO 2 ENGINE - FAN FRAME ASSEMBLY - DISCONNECTION AND RECONNECTION OF MW0301 (J01) AND MW0302 (J02)
HARNESSES AT THEIR APPROPRIATE LOCATION. SERVICE BULLETIN
MOS
HRSimSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 603 Of 748
1, Camp Systems
EFTA00618894
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0189 NO.2 ENGINE - INTRODUCTION OF A NEW VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET CHANGE. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0190 NO.2 ENGINE - REPLACEMENT OF STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0191 NO.2 ENGINE - SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0191 RI NO.2 ENGINE - NEW SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0192 NO.2 ENGINE - REPLACEMENT OF NOA ROLLER BEARING 335-352-301-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0193 NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON FLANGE B6. J1 ELECTRIC HARNESS
HOLDING, SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0194 NO.2 ENGINE - INTRODUCTION OF A WAIST ON STRUT PROFILE (9 O'CLOCK). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0195 NO.2 ENGINE - INTRODUCTION OF NEW NIPPLE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0196 NO.2 ENGINE - ABRADABLE STAGE 3 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0197 NO.2 ENGINE - CHAMFER ON LOCKS-STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0198 NO.2 ENGINE - LPT STAGE 2 SEAL SEGMENT WITH NEW LOCK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 604 Of 748
@ Camp Systems
EFTA00618895
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0199 NO 2 ENGINE - TWO NEW LONGER BOLTS FOR ELECTRICAL HARNESS SUPPORT (3 O'CLOCK). SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0200 NO. 2 ENGINE - INTRODUCTION OF A NEW ASSY WITH NEW DESIGN ON FLANGE B6. FUEL TUBE HOLDING. SERVICE
BULLETIN
MOS
HRSIMSC
ENC
SB 72-0201 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7 PC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0202 NO 2 ENGINE - REMOVAL OF SILICONE ELASTOMER SEALS FROM FAN DUCT PANELS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0203 NO 2 ENGINE - INTRODUCTION OF A STRAIGHT HEADLESS PIN TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-0204 NO. 2 ENGINE - FUEL TRANSIENT BLEED VALVE MANIFOLD BOLT CHANGE. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0205 NO 2 ENGINE - MODIFICATION OF ONE FIRE DETECTION BRACKET ASSY AND INCREASING OF OVERTAKING BOLTS
ON FLANGE B6. SERVICE BULLETIN
MOS
ENC
SB 72-0206 NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0207 NO 2 ENGINE - RETURN TO CFMI OF NO.4 ROLLER BEARING 335-352-301-0 STORED AS SPARES. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0208 NO 2 ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0208 R1 NO 2 ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
1
1-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 605 Of 748
Camp Systems
EFTA00618896
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0208 R2 NO.2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0208 R3 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
08-MAR-2005 HRSILISC
ENC
SB 72-0208 R4 NO. 2 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR
MARKING. SERVICE BULLETIN
MOS
25-MAY-2C07 HRSiLISC
ENC
SB 72-0208 R5 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW
ACCOMPLISHMENT
INSTRUCTIONS FOR MARKING. SERVICE BULLETIN
MOS
14-JAN-2009 HRSMSC -
ENC
SB 72-0209 RI NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0209 R2 NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE
BULLETIN
MOS
HRSMSC
ENC
SB 72-0209 R4 NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 72-0209 R5 NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND
HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0209 R6 NO 2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY
AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
05-FEB-2010 HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 606 Of 748
Camp Systems
EFTA00618897
AD/SI Status Report AIRCRAFT
CAMP
Asiont.inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0209 R7 NO 2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY RECOMMENDED
AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN
MOS
13-FEB-2012 HRS1MSC -
ENG
SB 72-0210 NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3
SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRS./.1SC -
ENG
SB 72-0210 R2 NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3
SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRSASC -
ENG
SB 72-0211 NO. 2 ENGINE - INTRODUCTION OF A NEW FORWARD INNER NOZZLE SUPPORT. SERVICE BULLETIN
MOS
HRS./.1SC -
ENG
SB 72-0212 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN
MOS
HRS1MSC -
ENG
SB 72-0212 R1 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0213 NO 2 ENGINE - INTRODUCTION OF A INTERMEDIATE FLANGE WITH A NEW DESIGN. SERVICE BULLETIN
MOS
HRS1MSC -
ENG
SB 72-0214 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN
MOS
HRS1MSC -
ENG
SB 72-0215 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-7B IPC. SERVICE BULLETIN
MOS
HRS./.1SC -
ENG
SB 72-0216 NO 2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON THE ACCESSORY GEARBOX.
ELECTRIC HARNESSES MD POWERS FEEDERS IDG CABLE HOLDING. SERVICE BULLETIN
11,1OS
HRS./.1SC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 607 Of 748
Camp Systems
EFTA00618898
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0217 NO 2 ENGINE - LPT BLADES STAGE 4 IMPROVEMENT. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0218 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRS.IISC -
ENG
SB 72-0219 NO 2 ENGINE - INTRODUCTION OF A NEW FOOL PROOF PLATE. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0220 NO 2 ENGINE - INTRODUCTION OF NEW N2 SENSOR. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0221 NO 2 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0221 R1 NO 2 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN
MOS
HRSiliSC -
ENG
SB 72-0222 NO 2 ENGINE - REMOVAL EXTERNAL INSTRUMENTATION. SERVICE BULLETIN
MOS
HRSiliSC -
ENG
SB 72-0223 NO 2 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0224 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7-8 IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0225 NO 2 ENGINE - INTRODUCTION OF NEW LPT COOLING MANIFOLD. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0225 R1 NO 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD. SERVICE BULLETIN
MOS
HRSi mSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 608 Of 748
'2 Camp Systems
EFTA00618899
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0226 NO.2 ENGINE - INTRODUCTION OF STAGE 2 AND STAGE 4 BLADE KITS TO THE SPARE PARTS LIST. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0227 NO.2 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0227 RI NO.2 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0228 NO.2 ENGINE - INTRODUCTION OF A NEW NEXT HIGHER ASSEMBLY COOLING MANIFOLD UP AND DOWN. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0229 NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0229 RI NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
II -FEB-2008 HRSIMSC -
ENC
SB 72-0229 R2 NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN
MOS
22-FEB-2011 HRS/MSC -
ENC
SB 72-0229 R3 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD CUSTOMER
REWORK. SERVICE BULLETIN CONVENIENCE
MOS
13-SEP-2011 MRS/51SC -
ENC
SB 72-0229 R4 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD
REWORK. SERVICE BULLETIN
MOS
23-FEB-2012 MRS/51SC -
ENC
SB 72-0230 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 6O Of 748
@ Camp Systems
EFTA00618900
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0230 R1 NO.2 ENGINE - . SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0231 NO.2 ENGINE - INTRODUCTION OF A NEW TURNBUCKLE ASSY WITH A NEW DESIGN. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0232 NO.2 ENGINE - INTRODUCTION OF A NEW HARNESS WITH NEW ROUTING, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0233 NO.2 ENGINE - INTRODUCTION OF A FIELD REWORKED HPT NOZZLE STATOR SEGMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0234 NO.2 ENGINE - INTRODUCTION OF UPPER DRAIN MANIFOLD nASKET, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0235 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0236 NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT HOUSING. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0237 NO.2 ENGINE - INTRODUCTION OF A NEW FAN FRAME WITH GANGS CHANNEL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0239 NO.2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING
VALVE FUNCTION. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0239 R1 NO.2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING
VALVE FUNCTION. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0240 R1 NO.2 ENGINE - INTRODUCTION OF THE NEW MOUNT HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 610 Of 748
@ Camp Systems
EFTA00618901
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0240 R2 NO 2 ENGINE - MODIFICATION OF HARNESSES MOUNTS. SERVICE BULLETIN
MOS
11-MAR-2005 HRSi'MSC -
ENC
SB 72-0241 NO 2 ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 72-0241 R1 NO 2 ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN
MOS
08-JAN-2007 HRSi'MSC
ENC 25000 (s)
SB 72-0242 NO 2 ENGINE - INTRODUCTION OF NEW LONGER BOLTS ON KIT CLOSE OMS BOX ATTACHMENT. SERVICE BULLETIN
MOS
HRS,LISC -
ENC
SB 72-0243 NO 2 ENGINE - INTRODUCTION OF A BRACKET ASSY ON NO.1 AND NO. 2 BEARING SUPPORT OIL SUPPLY TUBE
HOLDING. SERVICE BULLETIN
MOS
HRS,MSC
ENC
SB 72-0244 R1 NO.2 ENGINE - POSITIONING MODIFICATION OF 2 CLAMPS ATTACHING THE FUEL TUBE AND THE OIL RETURN TUBE
TO FACILITATE THE ENGINE COVER INSTALLATION. SERVICE BULLETIN
MOS
HRSilISC -
ENC
SB 72-0245 NO.2 ENGINE - SPARE PARTS RELEASE CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS,LISC -
ENC
SB 72-0246 NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRS,LISC -
ENC
SB 72-0246 R1 NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
HRSitISC -
ENC
SB 72-0246 R2 NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN
MOS
11-MAR-2005 HRSi'MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 611 Of 748
1, Camp Systems
EFTA00618902
AD/SI Status Report AIRCRAFT
COMP Jm. tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0247 NO.2 ENGINE - INTRODUCTION OR REWORK OF THE BRACKET ASSY ON ACCESSORY GEARBOX ATTACHING THE J5
ELECTRIC WIRING HARNESS. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 72-0248 NO.2 ENGINE - REPLACEMENT OR REWORK OF BRACKET ASSY ATTACHING THE MW0301 ELECTRICAL HARNESS ON
FLANGE B4. SERVICE BULLETIN
MOS
FIRS/MSC
ENC
SB 72-0249 NO.2 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 72-0249 RI NO.2 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN
MOS
23-OCT-2007 HRSAISC -
ENC
SB 72-0251 NO.2 ENGINE - FAN FRAME ASSEMBLY. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0252 NO.2 ENGINE - INTRODUCTION OF NEW RADIAL SHAFT SUPPORT GUIDE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0253 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE COMPLIED WITH
UNDERCUT. SERVICE BULLETIN
MOS 07-SEP-2005
HRSfMSC 2202:24
ENC 511
SB 72-0253 RI NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE
UNDERCUT. SERVICE BULLETIN
MOS
NRS1MSC
ENC
SB 72-0253 R2 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE
UNDERCUT. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0253 R3 NO.2 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 612 Of 748
@ Camp Systems
EFTA00618903
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0253 R4 NO. 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HRSimSC
ENC
SB 72-0253 R5 NO. 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HRS4ASC
ENC
SB 72-0253 R6 NO 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT.
SERVICE BULLETIN
MOS
HRS4.ISC
ENC
SB 72-0254 NO.2 ENGINE - INTRODUCTION OF A NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0255 NO 2 ENGINE - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR T49.5 HARNESS HOLDING. SERVICE
BULLETIN
MOS
HRSIASC -
ENC
SB 72-0255 Ri NO 2 ENGINE - ENGINE ASSEMBLY - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR 749.5
HARNESS ATTACHMENT. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 72-0256 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRS4.ISC -
ENC
SB 72-0257 NO 2 ENGINE - FAN FRAME ASSEMBLY - REPLACEMENT OF TWO BRACKETS ASSY TO ATTACH THE mw0315 AND
MW0316 ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0258 NO.2 ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0258 Ri NO 2 ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN
MOS
HRSIISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 613 Of 748
'2 Camp Systems
EFTA00618904
AD/SI Status Report AIRCRAFT
CI AWInne Met mini 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 72-0259 NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0259 RI NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-O259R2 NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0260 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-O26OR1 NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0261 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0262 NO.2 ENGINE - NEW MW0311 ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0262 RI NO.2 ENGINE - NEW MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0263 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0264 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0265 NO.2 ENGINE - INTRODUCTION OF NEW LPT SHAFT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 614 Of 748
© Camp Systems
EFTA00618905
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0266 NO.2 ENGINE - INTRODUCTION OF A NEW ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING. SERVICE
BULLETIN
MOS
HRS11.1SC
ENC
SB 72-0266 RI NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING,
SERVICE BULLETIN
MOS
II -MAR-2005 HRS11.1SC
ENC
SB 72-0267 NO.2 ENGINE - INTRODUCTION OF A NEW LOCKS OF STAGE 2.3 AND 4 BLADES. SERVICE BULLETIN
MOS
HRS11.1SC -
ENC
SB 72-0267 RI NO.2 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0267 R2 NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE
BULLETIN
MOS
77-DEC-2001 HRSAISC
ENC
SB 72-0267 R3 NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE
BULLETIN
MOS
HRS11.1SC
ENC
SB 72-0268 NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 72-0268 RI NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0268 R2 NO.2 ENGINE - INTRODUCTION OF NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0268 R3 NO.2 ENGINE - FAN AND BOOSTER- INTRODUCTION OF THE NEW BOOSTER SPOOL. SERVICE BULLETIN
MOS
77-DEC-2001 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 615 Of 748
@ Camp Systems
EFTA00618906
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0269 NO.2 ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE
BULLETIN
MOS
HRS1MSC
ENC
SB 72-0269 RI NO.2 ENGINE - FIRE DETECTION HARNESSES MW0325 AND ~326 TERMINAL LUG REPLACEMENT. SERVICE
BULLETIN
MOS
HRS,MSC
ENC
SB 72-0270 NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY-J7 HARNESS HOLDING. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0271 RI NO.2 ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM
BUSHING. SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 72-0271 R2 NO.2 ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM
BUSHING. SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 72-0271 R3 NO.2 ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRS1MSC
ENC 10000 (s)
SB 72-0271 R4 NO.2 ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRSfMSC
ENC 10000 (s)
58 72-0271 R5 NO.2 ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE
FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
58 72-0272 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0273 NO.2 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MW0301 AND MW0302. SERVICE
BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 616 Of 748
@ Camp Systems
EFTA00618907
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0273 R1 NO.2 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MVV0301 AND MW0302. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0274 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0275 NO.2 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY AIRFOIL
SEAL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0275 RI NO.2 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT ASSEMBLY - INTRODUCTION OF A NEW NO.1 BEARING
STATIONARY SEAL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0276 NO.2 ENGINE -SPARE PARTS FOR CFM56-78. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0277 NO.2 ENGINE - INTRODUCTION OF NEW OIL COLLECTOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0278 NO.2 ENGINE - INTRODUCTION OF HPT/LPT NOZZLE SHROUD ASSEMBLY 93241,462G05 AND HPT NOZZLE SHROUD
SUPPORT 2002M69G03. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0279 NO.2 ENGINE - INTRODUCTION OF NEW HPT STATOR AIR MANIFOLD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0280 NO.2 ENGINE - INTRODUCTION OF NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0281 NO.2 ENGINE - HARDWARE TRANSFER TO ENGINE LEVEL FROM CORE LEVEL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 617 Of 748
@ Camp Systems
EFTA00618908
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0283 NO.2 ENGINE - GENERAL - INTRODUCTION OF CLAMP AND ATTACHING BOLT OF 13W0325 HARNESS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0284 NO.2 ENGINE - TRANFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0284 R1 NO.2 ENGINE - TRANSFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY
LEVEL. SERVICE BULLETIN
MOS
II -MAR-2005 HRS/MSC
ENC
SB 72-0285 NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED.. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0285 R1 NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0285 R2 NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL
THICKNESS INCREASED. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0286 RI NO.2 ENGINE - TURBINE LOW PRESSURE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0286 R2 NO.2 ENGINE - INTRODUCTION OF A NEW LPT BLADE STAGE 1. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0287 NO.2 ENGINE - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0287 RI NO.2 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 618 Of 748
@ Camp Systems
EFTA00618909
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0287 R2 NO.2 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY SB 72-0287 R3). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0287 R3 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY 58 72-0287 R4). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0287 R4 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN INFORMATIONAL
MOS
I5-OCT-2013 HRS/MSC -
ENC
SB 72-0288 NO.2 ENGINE - INTRODUCTION OF NEW HPT INNER STATOR STATIONARY SEAL HEAT SHIELD TO THE SPARE PARTS
LIST. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0289 NO.2 ENGINE - INTRODUCTION OF ALTERNATE INNER DOME. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0290 NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0290 R1 NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0291 NO.2 ENGINE - TRANSFER GEARBOX. SERVICE BULLETIN
MOS
HRS/S1SC
ENC
SB 72-0291 R1 NO.2 ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT.
SERVICE BULLETIN
MOS
HRS/S1SC
ENC
SB 72-0291 R2 NO.2 ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT.
SERVICE BULLETIN
MOS
HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 619 Of 748
@ Camp Systems
EFTA00618910
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0292 NO 2 ENGINE - LOW PRESSURE TURBINE SHAFT - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE
AIR'OIL SEAL TO THE LPT SHAFT. SERVICE BULLETIN
MOS
HRS4ISC -
ENC
SB 72-0292 R1 NO 2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT (72-55-00) - DELETION OF THE PRELIMINARY ATTACHMENT
SYSTEM OF THE AINOIL SEAL OF THE LPT SHAFT. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENC
SB 72-0293 NO 2 ENGINE - INTRODUCTION OF A SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 72-0293 R1 NO 2 ENGINE - TURBINE LOW PRESSURE (72-54-00) - INTRODUCTION OF SELF LOCKING BORESCOPE CAP
ASSEMBLY. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0294 NO 2 ENGINE - INTRODUCTION OF STAINLESS STEEL NUTS TO REPLACE CADMIUM PLATING NUTS. SERVICE
BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0295 NO 2 ENGINE - FAN AND BOOSTER (72-21-00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R1). SUPERSEDED
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0295 R1 NO 2 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R2). SUPERSEDED
SERVICE BULLETIN
MOS
HRSoliSC -(s)
ENC
SB 72-0295 R3 NO 2 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL. SERVICE BULLETIN
MOS
22-JUN-2007 HRSi P.ISC
ENC 15000 (s)
SB 72-0296 NO.2 ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 RI ). SERVICE BULLETIN SUPERSEDED
MOS
HRS.I.ISC -
ENC
SB 72-0296 R1 NO 2 ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 R2). SERVICE BULLETIN SUPERSEDED
MOS
HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 620 Of 748
1, Camp System s
EFTA00618911
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0296 R2 NO.2 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R3). SUPERSEDED
SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 72-0296 R3 NO.2 ENGINE - INTRODUCTION OF COUNTER WEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R4). SUPERSEDED
SERVICE BULLETIN
MOS
HRS/MSC - (s)
ENC
SB 72-0296 R4 NO.2 ENGINE - FAN AND BOOSTER. INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL.(SUPERSEDED SUPERSEDED
BY 72-0296 R5). SERVICE BULLETIN
MOS
MRS/P.1SC - (s)
ENC
513 72-0296 R5 NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL
(SUPERSEDED BY 72-0296 R6). SERVICE BULLETIN
MOS
I7-DEC-2001 MRS/P.1SC
ENC 7000 (s)
SB 72-0296 R6 NO.2 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R7). SUPERSEDED
SERVICE BULLETIN
MOS
HRS(MSC - (s)
ENC
513 72-0296 R7 NO.2 ENGINE - ENGINE -FAN AND BOOSTER (72-21-00) - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER
SPOOL. SERVICE BULLETIN
MOS
HRS(MSC
ENC 7000 (s)
SB 72-0297 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
MRS/P.1SC
ENC
SB 72-0298 NO.2 ENGINE -NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS11.1SC -
ENC
SB 72-0298 RI NO.2 ENGINE - FAN FRAME ASSEMBLY - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH
INSERTS. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0298 R2 NO.2 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED
LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS(MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 621 Of 748
@ Camp Systems
EFTA00618912
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0298 R3 NO 2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED
LENGTH INSERTS. SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 72-0299 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSTASC
ENC
SB 72-0300 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-O300R1 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-0300 R2 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE.
SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-0300 R3 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE.
SERVICE BULLETIN
MOS
HRSTASC -
ENC
SB 72-0300 R4 NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0301 NO. 2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRS;MSC
ENC
SB 72-0302 NO. 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS4.ISC -
ENC
SB 72-0303 NO 2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSTASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 622 Of 748
'2 Camp Systems
EFTA00618913
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0303 R1 NO.2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0304 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
13-NOV-2001 HRS,MSC 15000 (s)
ENC
SB 72-0304 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
HRS/MSC 15000 (s)
ENC
SB 72-0304 R2 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
HRS/MSC 15000 (s)
ENC
SB 72-0304 R3 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE RECOMMENDED
COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN
MOS
20-MAR-2007 HRS/MSC 15000 (s)
ENC
SB 72-0305 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0306 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0308 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622A31. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0309 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624831. SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0310 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRSAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 623 Of 748
@ Camp Systems
EFTA00618914
AD/SI Status Report AIRCRAFT
COMP Jm. thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0311 NO.2 ENGINE - (PT SHAFT - REPLACEMENT OF THE NO.4 ROLLER BEARING. SERVICE BULLETIN
MOS
24-JAN-2001 HRS/MSC
ENC
SB 72-0312 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0313 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/hISC
ENC
SB 72-0314 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0315 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/51SC -
ENC
SB 72-0316 NO.2 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE
BULLETIN
MOS
HRS/51SC -
ENC
SB 72-0316 RI NO.2 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0316 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0316 R3 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0316R4 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN
TUBE BRACKET. SERVICE BULLETIN
MOS
24-JUN-20 I I HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 624 Of 748
@ Camp Systems
EFTA00618915
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0317 NO.2 ENGINE - SPARE PARTS INTRODUCTION. SERVICE BULLETIN CANCELLED
MOS
HRSAISC -
ENC
SB 72-0318 NO.2 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (RTV) ON THE FAN BLADE RETAING FLANGE.
SERVICE BULLETIN
MOS
MRS/51SC
ENC
SB 72-0318 RI NO.2 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (R1V) ON THE FAN BLADE RETAINING FLANGE.
SERVICE BULLETIN
MOS
MRS/51SC
ENC
SB 72-0319 NO.2 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0319 RI NO.2 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN
MOS
I0-DEC-2007 HRSAISC -
ENC
SB 72-0320 NO.2 ENGINE - INTRODUCTION OF THE NEW REAR FLANGE AS ALTERNATE ON THE LPT NOZZLE STAGE 1. SERVICE
BULLETIN
MOS
MRS/MSC
ENC
SB 72-0321 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRSAISC
ENC
SB 72-0322 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0322 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
20-NOV-2006 MRS/51SC -
ENC
SB 72-0323 NO.2 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 625 Of 748
@ Camp Systems
EFTA00618916
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0323 R1 NO. 2 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0324 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0324 R2 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRSiI.ISC -
ENC
SB 72-0324 R3 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0324 R5 NO 2 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - INTRODUCTION OF REWORKED FAN DISKS AND NEW OPTIONAL
SPACERS AND SHIMS. SERVICE BULLETIN
MOS
03-JAN-2012 HRS.ISC -
ENC
SB 72-0325 NO.2 ENGINE - ELASTOMER AXIAL STOP PIN. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0325 R1 NO 2 ENGINE - ELASTOMETER AXIAL STOP PIN. SERVICE BULLETIN
MOS
HRSiI.ISC -
ENC
SB 72-0325 R2 NO.2 ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING
FLANGE. SERVICE BULLETIN
MOS
17-DEC-2001 HRSLISC
ENC
SB 72-0325 R3 NO 2 ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING
FLANGE. SERVICE BULLETIN
MOS
HRS1P.ISC
ENC
SB 72-0326 NO 2 ENGINE - ON-WING BORESCOPE INSPECTION OF HPT BLADES. SERVICE BULLETIN COMPLIED WITH
MOS 22-AUG-2C08 RECURRING
14-NOv-2801 HRSIASC 3260:48
ENC WOO 746 1746
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 626 Of 748
11 Camp Systems
EFTA00618917
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0327 NO 2 ENGINE - ENGINE - GENERAL - INSTALLATION OF A SAFETY WIRE OVER THE OIL TEMPERATURE PROBE CANCELLED
HOUSING. SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 72-0328 NO 2 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR OliiS INSPECTION. SERVICE
BULLETIN
MOS
HRS4ISC
ENC
SB 72-0328 Fei NO 2 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE
BULLETIN
MOS
HRS,IISC
ENC
SB 72-0329 NO. 2 ENGINE - REPLACEMENT OF NO. 4 ROLLER BEARING 305-355-717-0. SERVICE BULLETIN
MOS
HRS. .ISC -
ENC
SB 72-0330 NO 2 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0330 R1 NO 2 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
HRSi siSC
ENC
SB 72-0331 NO 2 ENGINE - DELETION OF BURNER STAGING VALVE PARKING BRACKET. SERVICE BULLETIN
MOS
HRSisiSC -
ENC
SB 72-0332 NO 2 ENGINE - INTRODUCTION OF NEW VSV INNER BUSHING AND WASHERS. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0332 R1 NO 2 ENGINE - COMPRESSOR FRONT STATOR - INTRODUCTION OF NEW VSV INNER BUSHINGS AND WASHERS.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0333 NO 2 ENGINE - CORE MODULE AND FAN MODULE. SERVICE BULLETIN
MOS
HRSi P.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 627 Of 748
Camp Systems
EFTA00618918
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0333 R1 NO.2 ENGINE - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0333 R2 NO.2 ENGINE - CORE MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND
TUBE NIPPLE WITH SAFETY WIRE HOLES. SERVICE BULLETIN
MOS
HRSOASC -
ENC
SB 72-0333 R3 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED
PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0333 R4 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED
PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0334 NO.2 ENGINE - FAN MAJOR MODULE - INTRODUCTION OF A 4-5 O'CLOCK LPYACC STRUT PANEL WITH DESIGN
IMPROVED OR REWORKED. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0334 R1 NO.2 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPTACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0334 R2 NO.2 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPT ACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED.
SERVICE BULLETIN
MOS
II -MAR-2005 HRS/MSC
ENC
SB 72-0335 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0336 NO.2 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE COMPUED WITH
BULLETIN
MOS 07-JUL-2001
HRS/MSC - 782
ENC 54
SB 72-0337 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 628 Of 748
@ Camp Systems
EFTA00618919
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0337 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0338 NO.2 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0338 R1 NO.2 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B
. SERVICE BULLETIN
MOS
NRS1MSC
ENC
SB 72-O339 NO.2 ENGINE - LPT FRAME - REPLACEMENT OF THE CURRENT OIL SUPPLY TUBE BY A REMOVABLE TUBE. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 72-0340 NO.2 ENGINE - TURBINE FRAME. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-O341 NO.2 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0341 R1 NO.2 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0342 NO.2 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0342 R1 NO.2 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0343 NO.2 ENGINE - INTRODUCTION OD IMPROVED HPT ROTOR SPOOL WEIGHTS FOR STAGES 6-9. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0344 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 629 Of 748
@ Camp Systems
EFTA00618920
AD/SI Status Report AIRCRAFT
CIMP
Asiant.Inne Attn....14C 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0344 RI NO 2 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0345 RI NO 2 ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND
A NEW SEALING PLATE. SERVICE BULLETIN
MOS
HRSMSC
ENC
SB 72-0345 R2 NO.2 ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND
A NEW SEALING PLATE. SERVICE BULLETIN
MOS
HRS., MSC
ENC
SB 72-0346 NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON
THE LPT STAGE I. SERVICE BULLETIN
MOS
HRS,MSC
ENC
SB 72-0346 RI NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON
THE LPT STAGE I. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0346 R2 NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS OF THE
LPT STAGE I. SERVICE BULLETIN
MOS
02-MAR-2006 HRSIMSC -
ENC
SB 72-0347 NO. 2 ENGINE - ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0347 RI NO. 2 ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4 BLADES. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 72-0348 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0349 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 630 Of 748
Camp Systems
EFTA00618921
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0350 NO.2 ENGINE - ENGINE - NIGH PRESSURE TURBINE NOZZLE - INTRODUCTION OF FIELD REWORK FOR HPT AIR
MANIFOLD. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0350121 NO 2 ENGINE - INTRODUCE A FIELD REWORKED AIR HPT STATOR MANIFOLD PIN 20711-129G02. SERVICE BULLETIN
MOS
30-JAN-2009 HRSIASC -
ENC
SB 72-0351 R1 NO 2 ENGINE - INTRODUCTION OF HIGH PRESSURE TURBINE BLADE KIT 737L325G03 AND HPT BLADE 1957M10P01.
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0352 NO 2 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE
BULLETIN
MOS
HRSIASC -
ENC
SB 72-0352121 NO 2 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE
BULLETIN
MOS
HRSIASC -
ENC
SB 72-0353 NO 2 ENGINE - FAN AND BOOSTER (12-21-O0) - INTRODUCTION OF A NEW FAN BLADE PLATFORM DESIGN
340-001414-0. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0354 NO.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 72-0355 NO 2 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN.
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0355121 NO 2 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN.
SERVICE BULLETIN
MOS
04-AUG-2C05 HRSIASC
ENC
SB 72-0356 NO.2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSIASC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective C/W
(EBT)-Estimated Base Time 631 Of 748
1' Camp Systems
EFTA00618922
AD/SI Status Report AIRCRAFT
COMP Jm. tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0357 R1 NO.2 ENGINE - INTRODUCTION OF NO. 4 STRUT FAIRING WITH NEW MATERIAL ( STEEL VERSION). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0358 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH AN OBLONG HOLE
AND REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0359 NO.2 ENGINE - INTRODUCTION OF NEW LPT REAR FRAME AND NEW OIL COLLECTOR WITH DELETION OF 16 HOLES
AND BOLTS OUT OF 32, SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0360 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
HRS/MSC
ENC
SB 72-0361 NO.2 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE WITH A 2D BARRED MANUFACTURER CODE.
SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 72-0362 NO.2 ENGINE - INTRODUCTION OF NEW AFT ACOUSTICAL PANEL ASSEMBLY AT IDG AIR / OIL COOLER LOCATION.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0363 NO.2 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0363 RI NO.2 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN
MOS
22-APR-2005 HRS/MSC -
ENC
SB 72-0364 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM513-7B IPC. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0365 NO.2 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 632 Of 748
@ Camp Systems
EFTA00618923
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0365 R1 NO.2 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0366 NO.2 ENGINE - REPLACEMENT OF FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0366 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN RETAINING FLANGE OR
REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0367 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0368 RI NO.2 ENGINE -ENGINE-ACCESSORY GEARBOX (72-63-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
MRS/P.1SC
ENC
SB 72-0368 R2 NO.2 ENGINE -ENGINE-ACCESSORY GEARBOX ASSEMBLY (7263-00)- REPLACEMENT OF BALL BEARING
340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN
MOS
25-SEP-2006 HRS1MSC -
ENC
SB 72-0368 R3 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING SUPERSEDED
340-052-602-0 IN A SUSPECT LOT (SUPERSEDED BY SB 72-0368 R4), SERVICE BULLETIN
MOS
HRS1PASC -
ENC
SB 72-0368 R4 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
I8-OCT-2013 HRS1PASC
ENC
SB 72-0369 NO.2 ENGINE - VGB GUIDE PAD INSPECTION. SERVICE BULLETIN
MOS
HRS1PASC -
ENC
SB 72-0371 RI NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM-7B IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 633 Of 748
@ Camp Systems
EFTA00618924
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0372 NO.2 ENGINE - OIL TEMP PROBE SAFETYWIRE. SERVICE BULLETIN COMPUED WITH
MOS 22-AUG-2008
HRSAISC - 3260:48
ENC 746
SB 72-0374 NO.2 ENGINE - FAN AND BOOSTER - TIGHTENING OF BOOSTER SPOOL FOWARD PINS. SERVICE BULLETIN
MOS
HRSAISC
ENC 1500 (s)
SB 72-0375 NO.2 ENGINE - HPT REAR SHAFT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0376 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0379 NO.2 ENGINE - ENGINE-HIGH PRESSURE TURBINE NOZZLE ( 72-51-00 ) - REAR SUPPORT NUT SHIELD MATERIAL
CHANGE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0380 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0381 NO.2 ENGINE - INTRO HPC STG 4 BLADE KIT. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0381 RI NO.2 ENGINE - INTRODUCTION OF STAGE 4 BLADE KIT TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0382 NO.2 ENGINE - REPLACEMENT OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE
THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0382 RI NO.2 ENGINE - INTRODUCTION OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE
THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 634 Of 748
@ Camp Systems
EFTA00618925
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SS 72-0383 NO.2 ENGINE - TURBINE LOW PRESSURE - BORESCOPE INSPECTION FOR STAGE 1 LPT BLADE POSITION. SERVICE
BULLETIN
MOS
HRS/MSC
ENC 800(s)
SB 72-0384 NO.2 ENGINE - FAN AND BOOSTER - ONE TIME INSPECTION FOR RETAINING FLANGE THREADED PIN PRESENCE.
SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0385 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0386 NO.2 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN SUPERSEDED
MOS
HRS/MSC - (s)
ENC
SB 72-0386 R1 NO.2 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN
MOS
HRSfMSC
ENC 1500 (s)
SB 72-0388 NO.2 ENGINE - HPTR FRT DAMPER SLEEVE INSPECT. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0389 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR (72-52-00)- INTRODUCTION OF HIGH PRESSURE TURBINE
BLADE PM 1957M72P01 AND PM 1957M72P02 THROUGH FIELD REWORK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0390 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0391 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DRAIN TUBE REDUCER ELIMINATION, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0392 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE (72-00-02) - FUEL NOZZLE BOLT LENGTH. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 635 Of 748
@ Camp Systems
EFTA00618926
AD/SI Status Report AIRCRAFT
COMP
Mianistfre• thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0392 R1 NO.2 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN
MOS
I I -JAN-2007 HRS/MSC -
ENC
SB 72-0392 R2 NO.2 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN
MOS
I3-JUN-2007 HRS/MSC -
ENC
SB 72-0393 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY
GEARBOX ASSY. SERVICE BULLETIN
MOS
HRS'MSC
ENC
SB 72-0393 R1 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY
GEARBOX ASSY. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0394 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE - BRACKET HARDWARE ELIMINATION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0395 NO.2 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0395 R1 NO.2 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 R1 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0396 R2 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH
PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 636 Of 748
@ Camp Systems
EFTA00618927
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0398 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0399 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0399 R1 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0000 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN
FIELD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0000 R1 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN
FIELD. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0000 R2 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN SUPERSEDED
FIELD (SUPERSEDED BY 72-0000 R3). SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0000 R3 NO.2 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE
MATERIAL FOR NO.0 ROLLER BEARINGS IN FIELD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0001 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0002 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0003 NO.2 ENGINE -HIGH PRESSURE TURBINE ROTOR REAR SHAFT WITH IMPROVED DAMPING. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 637 Of 748
@ Camp Systems
EFTA00618928
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0404 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSiliSC -
ENC
SB 72-0411 NO. 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0414 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
07-JUL-2008 HRSUMSC -
ENC
SB 72-0415 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CF56-76 IPC. SERVICE BULLETIN
MOS
20-DEC-2002 HRSUMSC -
ENC
SB 72-0417 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFNI56-7(3 IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0419 NO 2 ENGINE - SPARE PARTS FOR CFm56-7B IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0420 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0421 NO 2 ENGINE - INTRODUCTION OF HPC REAR STATOR 18871.117601. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-O422 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CF80156-7B CMM. SERVICE BULLETIN
MOS
23-NOv-2809 HRSUMSC -
ENC
SB 72-0423 NO 2 ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT SENSOR
RETAINING PLATE. SERVICE BULLETIN
MOS
HRSmSC
ENC
SB 72-0423 R1 NO 2 ENGINE - ENGINE - LPT ROTOFuSTATOR ASSEMBLY (72-54-00) - REPLACEMENT OF BROKEN STUD OF 7419.5 EGT
SENSOR RETAINING PLATE. SERVICE BULLETIN
MOS
02-SEP-2011 HRSUMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 638 Of 748
Camp Systems
EFTA00618929
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0425 NO.2 ENGINE - ENGINE-GENERAL-SPARE PARTS RELEASE FOR CFM56-7 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0427 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0429 NO.2 ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF N2 SENSOR ADJUSTMENT SHIM SCREWS.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0431 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00)-INTRODUCTION OF IMPROVED DOUBLE ANNULAR
COMBUSTION (DAC) CHAMBER INNER LINER. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 72-0432 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56.7B IPC. SERVICE BULLETIN
MOS
08-APR-2008 HRS/MSC -
ENC
SB 72-0433 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0434 NO.2 ENGINE - COMBUSTION CHAMBER (72-42-00) PIN AND MATING SLOT ELIMINATION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0435 NO.2 ENGINE -CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE.
SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0436 NO.2 ENGINE - ENGINE FUEL AND CONTROL ( 73-00-00) - FUEL SPRAY SHIELD MATERIAL IMPROVEMENT. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0437 NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 639 Of 748
@ Camp Systems
EFTA00618930
AD/SI Status Report AIRCRAFT
CAMP J~rM~rnMlit 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 72-0438 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
10-APR-2006 HRS/MSC -
ENC
58 72-0439 NO.2 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE
DETECTION ROUTING. SERVICE BULLETIN
MOS
MRS/61SC
ENC
SB 72-0439 R1 NO.2 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE
DETECTION ROUTING. SERVICE BULLETIN
MOS
28-APR-2003 HRS/MSC
ENC
SB 72-0440 R1 NO.2 ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOL ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP
INSPECTION OF FAN FRAME SHROUD.. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0440 R3 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0440 R4 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0440 R6 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR
IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
25-SEP-2006 HRS/MSC DUE
ENC
SB 72-0441 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1
(72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0442 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1
(72-53-00) - INTRODUCTION OF A NEW REAR FLANGE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 640 Of 748
@ Camp Systems
EFTA00618931
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0442 R1 NO 2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
REAR FLANGE ON
THE LPT STAGE I NOZZLE. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0444 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
30-NOV-2CC6 HRSi P.ISC -
ENG
SB 72-0445 NO 2 ENGINE - ENGINE-TRANSFER GEARBOX (72-62-00) - REPLACEMENT OF BALL BEARING 340.052-502-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0446 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 72-0446 R1 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
30-MAY-2CC6 HRSitiSC -
ENG
SB 72-0447 NO 2 ENGINE - HIGH PRESSURE COMPRESSOR (72-31.00) - BLADE AND VANE IMPROVEMENT. SERVICE BULLETIN
MOS
HRSiliSC -
ENC
SB 72-0447 R1 NO 2 ENGINE - IMPROVE THE DURABILITY OF THE HPC BLADES AND VANES. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0448 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
SB 72-0449 NO 2 ENGINE - SPARE PARTS RELEASE FOR CR156-78 IPC. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0449 R1 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN
MOS
26-JUN-2008 HRSitiSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 641 Of 748
'2 Camp Systems
EFTA00618932
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0450 NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN
RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LOG PINS ON ALL CFM56078 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0450 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN
RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LUG PINS ON ALL CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC 5000 (s)
ENC 3000
SB 72-0451 NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF
FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC
ENC 1500 (s)
SB 72-0451 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF
FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC
ENC 1500 (s)
SB 72-0452 NO.2 ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE
SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0452 RI NO.2 ENGINE - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL
LEADING EDGE. SERVICE BULLETIN
MOS
HRS/MSC
ENC 9000 (s)
SB 72-0453 NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRS/S1SC -
ENC
SB 72-0454 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO
PREVENT THE CORROSION. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0454 RI NO.2 ENGINE - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE
CORROSION IN FIELD ONLY. SERVICE BULLETIN
MOS
06-DEC-2007 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 642 Of 748
@ Camp Systems
EFTA00618933
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0454 R2 NO 2 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO
PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN
MOS
01-JUL-2039 HRS., LISC -
ENC
SB 72-0455 NO 2 ENGINE - COMBUSTION CHAMBER (72-42-00)- SWIRLERS - THICK FLANGE (SUPERSEDED BY SB 72-0455 RI).
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0455 R1 NO 2 ENGINE - COMBUSTION CHAMBER (72-42-00) - SvaRLERS - THICK FLANGE. SERVICE BULLETIN CATEGORY 7
MOS
02-MAY-2014 HRS,LISC -
ENC
SB 72-0457 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSImSC -
ENC
SB 72-0459 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSImSC -
ENC
SB 72-0460 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSImSC -
ENC
SB 72-0460 R1 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRS,LISC -
ENC
SB 72-0461 NO 2 ENGINE - ENGINE - HPT ROTOR (72-52-00) - NEW DISK WITH IMPROVED LIFE DESIGN. SERVICE BULLETIN
MOS
HRS.4.ISC -
ENC
SB 72-0462 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204
CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0462 R1 NO 2 ENGINE - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR
AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN
MOS
27-AUG-2C08 HRSASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 643 Of 748
II Camp Systems
EFTA00618934
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0463 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0463 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0464 NO.2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD ASSY AND OF NEW BRACKETS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0465 NO.2 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0465 R1 NO.2 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0466 NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0466 R1 NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0467 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
58 72-0468 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE FLAT WASHERS AT THE MAIN OlUFUEL HEAT
EXCHANGER AND FUEL RETURN TUBE LOCATION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0469 NO.2 ENGINE - HPC (72-32-00) - STAGES 2 AND 3 SHROUDS - LEADING EDGE CUTBACK. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 644 Of 748
@ Camp Systems
EFTA00618935
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0471 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7(3 IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0474 NO 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0475 NO 2 ENGINE - INTRODUCTION OF NEW AIR TUBE. A NEW BRACKET ASSY WITH SAFETY WIRE HOLES AND REWORK
OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0476 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-713 IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0477 NO 2 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0477 R2 NO.2 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN
MOS
CE-FEB-2008 HRS,LISC -
ENG
SB 72-0480 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-713 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0481 R1 NO 2 ENGINE - IN FIELD INTRODUCTION OF FAN BLADE SHIMS WITH NEW AXIAL STOP. SERVICE BULLETIN
DAYS 1 (s)
HRSMSC
ENC
SB 72-0482 NO 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0483 NO 2 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 72-0483 Ri NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN
MOS
HRSMSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 645 Of 748
1, Camp Systems
EFTA00618936
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0484 NO. 2 ENGINE - INTRODUCTION OF A NEW FUEL SUPPLY TUBE. SERVICE BULLETIN
MOS
11-MAR-2005 HRSimSC -
ENG
SB 72-0485 NO. 2 ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN
MOS
HRSimSC -
ENC
SB 72-0485 Ri NO.2 ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN
MOS
13-AUG-2O0-1 HR&MSC -
ENG
SB 72-0486 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENG
SB 72-0487 NO 2 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND NEW NO.1 BEARING VIBRATION
SENSOR ATTACHING PARTS. SERVICE BULLETIN
MOS
0-NOV-2W-1 HRS.I.ISC -
ENG
SB 72-0487 Ri NO.2 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND INTRODUCTION OF A NEw NO.1
BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 72-0488 Ri NO 2 ENGINE - REPLACEMENT OF IDENTIFICATION PLATES ON THE TRANSFER
GEARBOX ASSEMBLY AND THE ACCESSORY GEARBOX ASSEMBLY. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0489 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 72-0489 Ri NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENG
SB 72-0490 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSitiSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 646 Of 748
'2 Camp Systems
EFTA00618937
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0491 NO.2 ENGINE - NEW MATERIAL (N5-) TO ELIMINATE YTTRIUM AND REDUCE SULFUR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0493 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0494 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0495 R2 NO.2 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0495 R3 NO.2 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0497 NO.2 ENGINE - INTRODUCTION OF VESPEL NUTS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
513 72-0498 NO.2 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING
SYSTEM. SERVICE BULLETIN
MOS
HRS/MSC 50 (s)
ENC
513 72-0498 R1 NO.2 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING
SYSTEM. SERVICE BULLETIN
MOS
HRS/MSC 50 (s)
ENC
SB 72-0499 R1 NO.2 ENGINE - INTRODUCTION OF NEW NO.5 BEARING SUPPORT NIPPLE DESIGN OR REWORK OF THE OLD ONE.
SERVICE BULLETIN
MOS
16-DEC-2006 HRS/MSC
ENC
SB 72-0500 NO.2 ENGINE - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN SUPERSEDED
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 647 Of 748
@ Camp Systems
EFTA00618938
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0500 R2 NO.2 ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL
MOS
02-MAR-2011 HRS(MSC -
ENC
SB 72-0500 R3 NO.2 ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL
MOS
I7-AUG-2011 HRS(MSC -
ENC
SB 72-0501 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE BLANKING PLATE AND INTRODUCTION OF A NEW
OIL SUPPLY TUBE WITH
ITS NEW ATTACHMENT BRACKETS.. SERVICE BULLETIN
MOS
I4-OCT-2008 HRS/MSC -
ENC
SB 72-0502 R1 NO.2 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION
). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0502 R2 NO.2 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION
). SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0503 NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT - FORWARD FLANGE REPLACEMENT AND COATING. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0503 R1 NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT- FORWARD FLANGE REPLACEMENT AND COATING. SERVICE
BULLETIN
MOS
HRS.0.1SC
ENC
SB 72-0503 R2 NO.2 ENGINE - 81/65279:ENGINE -HPT (7241-00) -FORWARD INNER NOZZLE SUPPORT -FORWARD FLANGE
REPLACEMENT AND COATING
. SERVICE BULLETIN
MOS
29-JUN-2007 HRS/MSC
ENC
SB 72-0506 NO.2 ENGINE - INSPECTION OF COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN
MOS
30-JUL-2004 HRS(MSC - (s)
ENC
SB 72-0506 R1 NO.2 ENGINE - INSPECTION OF OUTER LINER COOLING HOLES. SERVICE BULLETIN SUPERSEDED
MOS
23-AUG-2006 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 648 Of 748
@ Camp Systems
EFTA00618939
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0507 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 ENGINES. SERVICE BULLETIN
MOS
HR mSC
E NC
SB 72-0509 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0509 Ri NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156,78 IPC. SERVICE BULLETIN
MOS
11-APR-2008 HRSUMSC -
ENG
SB 72-0510 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 72-0511 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0512 NO 2 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AiRiOIL COOLER PANEL IN TWO
PARTS. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0512 R2 NO 2 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW JOG AiRiOIL COOLER PANEL IN TWO
PARTS AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN
MOS
CG-OCT-2030 HRSistSC -
ENG
SB 72-0513 NO 2 ENGINE - SPARE PARTS INFORMATION. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0514 R1 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC (SUPERSEDED BY SB SUPERSEDED
72-0514 R2). SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0514 R2 NO 2 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN CATEGORY 8
MOS
22-NOv-2013 HRSUMSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 649 Of 748
1, Camp Systems
EFTA00618940
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0515 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HIRSAISC 24000 (s)
ENC
SB 72-0515 R1 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HIRSAISC 24000 (s)
ENC
SB 72-0515 R2 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
I8-APR-2006 HRS/MSC 24000 (s)
ENC
SB 72-0515 R3 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
HRS/MSC 24000 (s)
ENC
SB 72-0515 R4 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00)- ON WING BORESCOPE INSPECTION FOR HPC
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
I2-FEB-2009 HRS/MSC 24000 (s)
ENC
SB 72-0515 R5 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
MRS/MSC 24000 (s)
ENC
SB 72-0515 R6 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
03-OCT-2011 HRS/MSC 24000 (s)
ENC
SB 72-0515 R7 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00)- ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED
STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN
MOS
21-OCT-2011 HIRS/MSC 24000 (s)
ENC
SB 72-0520 NO.2 ENGINE - INSPECTION OF THE FORWARD LPT SHAFT FOR MISSING PAINT. SERVICE BULLETIN
MOS
08-FEB-2006 HRS(MSC -
ENC
SB 72-0521 NO.2 ENGINE - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 650 Of 748
@ Camp Systems
EFTA00618941
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0521 R1 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INSPECTION OF INNER AND OUTER LINER NUGGET RECOMMENDED
THICKNESS. SERVICE BULLETIN
MOS
13-JUN-2012 HRS.11.1SC
ENC
SB 72-0522 NO.2 ENGINE - INTRODUCTION OF AN IDENTIFICATION PLATE COMPLYING WITH THE NEW EUROPEAN REGULATION.
SERVICE BULLETIN
MOS
HRS.11.1SC
ENC
SB 72-0523 NO.2 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN
MOS
HRS.11.1SC -
ENC
SB 72-0523 RI NO.2 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN
MOS
29-NOV-2006 MRS/MSC -
ENC
SB 72-0524 NO.2 ENGINE - ENGINE - COMBUSTOR (7242-00) - NEW DOME. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0525 NO.2 ENGINE -FAN DISK DOVETAIL FACES WEAR DEPTH INSPECTION. SERVICE BULLETIN
MOS
25-MAR-2005 HRS1MSC
ENC 3000 (s)
SB 72-0525 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN RECOMMENDED
MOS
HRS1MSC -
ENC
SB 72-0525 R2 PARA D (1) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000410-0)
MOS
HRS.11.1SC
ENC 2000 (s)
SB 72-0525 R2 PARA D (2) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-420-0)
MOS
HRS1MSC
ENC 7000 (s)
SB 72-0525 R2 PARA D (3) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-471/472/473/474)
MOS
HRS1MSC
ENC 7000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 651 Of 748
@ Camp Systems
EFTA00618942
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0525 R2 PARA D (4) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED
SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-485/486/490-0)
MOS
HRS/MSC
ENC 7000 (s)
58 72-0527 NO.2 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE
TUBE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0527 RI NO.2 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE
TUBE. SERVICE BULLETIN
MOS
29-SEP-2005 HRS/P.1SC
ENC
SB 72-0527 R2 NO.2 ENGINE - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE.
SERVICE BULLETIN
MOS
2I-JAN-2008 MRS/P.1SC
ENC
SB 72-0527 R3 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR
FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN
MOS
22-DEC-2009 HRSfMSC -
ENC
SB 72-0527 R4 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR CUSTOMER
FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN CONVENIENCE
MOS
04-JUL-2013 HRS/MSC -
ENC
SB 72-0528 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
MRS/P.1SC -
ENC
SB 72-0529 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS/P.1SC -
ENC
SB 72-0530 NO.2 ENGINE - BELLCRANK SUPPORT NUT LENGTH. SERVICE BULLETIN
MOS
HRS/PASC -
ENC
SB 72-0531 RI NO.2 ENGINE -NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
26-SEP-2006 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 652 Of 748
@ Camp Systems
EFTA00618943
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0531 R2 NO 2 ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
10-APR-2008 HRSMSC -(s)
ENC
SB 72-0531 R3 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
254.1RJ-2609 HRSMSC -
ENC
SB 72-0531 R4 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - NEw INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN
MOS
18-APR-2013 HRS.4.1SC ESV
ENC
SB 72-0533 NO 2 ENGINE - ENGINE - COMBUSTOR (72-41-00) - SWIRLER. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 72-0536 NO 2 ENGINE - INNER LINER EXTENSION FOR REPAIR. SERVICE BULLETIN
MOS
HRS,IISC -
ENC
SB 72-0539 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0540 NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0540 RI NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
18-APR-2005 HRSMSC -
ENC
SB 72-0540 R2 N0.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
29-AUG-2C07 HRSI.ISC -
ENC
SB 72-0541 NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 72-0542 NO 2 ENGINE - HPT NOZZLE FORWARD INNER NOZZLE SUPPORT (FINS) WITH IMPROVED EROSION COATING.
SERVICE BULLETIN
MOS
HRSMSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 653 Of 748
Camp Systems
EFTA00618944
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0543 NO.2 ENGINE - INTRODUCTION OF A NEW OIL INLET COVER 0 -RING. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0545 NO.2 ENGINE -FAN DISK LIFE LIMIT INCREASE. SERVICE BULLETIN
MOS
HRSAISC
ENC 16000 (s)
SB 72-0547 NO.2 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOT INNER AND OUTER LINERS. SERVICE BULLETIN
MOS
HRSAISC
ENC 1600 (s)
SB 72-0547 RI NO.2 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOR INNER AND OUTER LINERS. SERVICE BULLETIN
MOS
08-MAR-2006 HRS/MSC
ENC 1600 (s)
SB 72-0548 NO.2 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN
MOS
17-FEB-2006 HRS/MSC 5000 (s)
ENC 3000
SB 72-0548 RI NO.2 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN
MOS
25-OCT-2006 HRSAISC 5000 (s)
ENC 3000
SB 72-0550 NO.2 ENGINE - INTRODUCTION OF A NEW REAR VENT TUBE. SERVICE BULLETIN
MOS
16-FEB-2007 HRSAISC -
ENC
SB 72-0552 NO.2 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN
FIELD. SERVICE BULLETIN
MOS
27,JAN-2006 HRSAISC
ENC
SB 72-0552 RI NO.2 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN
FIELD. SERVICE BULLETIN
MOS
16-FEB-2012 HRSAISC
ENC
SB 72-0553 NO.2 ENGINE - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY. SERVICE BULLETIN
MOS
20-OCT-2006 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 654 Of 748
@ Camp Systems
EFTA00618945
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0553 RI NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN
FRAME ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC
ENC
S8 72-0554 NO.2 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS
MONITORING SYSTEM. SERVICE BULLETIN
MOS
HRSAISC 50 (s)
ENC
SB 72-0554 RI NO.2 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS
MONITORING SYSTEM. SERVICE BULLETIN
MOS
HRSAISC 50 (s)
ENC
SB 72-0555 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS‘MSC -
ENC
SB 72-0556 NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT (FINS) - WITH IMPROVED EROSION COATING. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0557 NO.2 ENGINE - ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0558 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
18-JAN-2006 HRSfMSC -
ENC
SB 72-0558 RI NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
21-SEP-2007 HRSAISC
ENC 16350 (s)
SB 72-0558 R2 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY - INSPECTION OF TURBINE REAR FRAME ON
DAC ENGINES. SERVICE BULLETIN
MOS
02-DEC-2008 HRS1MSC
ENC 16350 (s)
SB 72-0558 R3 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON DAC ENGINES. SERVICE BULLETIN
MOS
HRSfMSC
ENC 16350 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 655 Of 748
@ Camp Systems
EFTA00618946
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0558 R4 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER
FRAME ON DAC ENGINES. SERVICE BULLETIN CONVENIENCE
MOS
21-MAY-2013 HRS1MSC -
ENC
SB 72-0559 NO.2 ENGINE - INTRODUCTION OF NEW MW0316 FIRE DETECTION HARNESS. SERVICE BULLETIN
MOS
06-JUN-2007 MRS/P.1SC -
ENC
SB 72-0560 NO.2 ENGINE - INTRODUCTION OF A NEW MW0301 HARNESS WITH A NEW ROUTING. SERVICE BULLETIN
MOS
OI -MAR-2007 HRSAISC -
ENC
SB 72-0561 NO.2 ENGINE - INTRODUCTION OF OLD NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS WITH NEW
STATIONARY SEAL. SERVICE BULLETIN
MOS
HRS(MSC
ENC
SB 72-0562 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I7-JAN-2006 HRS(MSC -
ENC
SB 72-0563 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
22-MAY-2006 HRSAISC -
ENC
SB 72-0564 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION IN PRODUCTION OF A NEW ACCESSORY GEARBOX
ASSEMBLY
(AGB) WITH NEW STARTER DRIVE PAD AND NEW HANDCRANCKING COVER. SERVICE BULLETIN
MOS
13-OCT-2009 HRS(MSC -
ENC
SB 72-0564 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB)
WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0564 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB)
WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
16-NOV-2010 HRS1MSC -
ENC
S8 72-0564 R3 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A SUPERSEDED
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AG8 TO THE NEW ONE (SUPERSEDED BY S8 72-0564 R4).
SERVICE BULLETIN
MOS
HRS(MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 656 Of 748
@ Camp Systems
EFTA00618947
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0564 R4 NO 2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE (SUPERSEDED BY SB 72-0564 R5).
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 72-0564 R5 NO 2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A CATEGORY 3
NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN
MOS
14-JAN-2014 HRSMSC ESV
ENC
SB 72-0565 RI NO 2 ENGINE - ENGINE - LPT ROTOR ?STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE. SERVICE
BULLETIN
MOS
04-MAY-2CO9 HRS,IISC
ENC
SB 72-0566 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
23-MAY-2C06 HRSIASC -
ENC
SB 72-0567 NO 2 ENGINE - INTRODUCTION OF A NEW OR REWORKED STAGE 1 SEAL SEGMENT. SERVICE BULLETIN
MOS
10-MAY-2C07 HRSMSC -
ENC
SB 72-0567 RI NO 2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OR REWORKED STAGE 1 SEAL
SEGMENT. SERVICE BULLETIN
MOS
12-MAY-2C09 HRSMSC -
ENC
SB 72-0568 NO 2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
20-MAR-2006 HRS4.ISC -
ENC
SB 72-0568 RI NO 2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
21-SEP-2007 HRSMSC
ENC 17400 (s)
SB 72-0568 R2 NO 2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER
FRAME ON SAC ENGINES. SERVICE BULLETIN CONVENIENCE
MOS
HRSI.ISC
ENC 17400 (s)
SB 72-0569 NO 2 ENGINE - INTRODUCTION OF NEW SPACERS ON THE B6 FRONT FLANGE OF THE FAN FRAME. SERVICE
BULLETIN
MOS
2-3-VAR.2337 HRSMSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 657 Of 748
Camp Systems
EFTA00618948
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0569 R1 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SPACERS ON THE 86 FRONT
FLANGE OF THE FAN FRAME. SERVICE BULLETIN
MOS
14-OCT-2008 HRS9,1SC -
ENC
SB 72-0570 RI NO.2 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD. SERVICE
BULLETIN
MOS
03-JUL-2008 HRS9(1SC
ENC
SB 72-0570 R2 NO.2 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD, SERVICE
BULLETIN
MOS
02-SEP-2008 HRSOASC
ENC
SB 72-0570 R3 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND
FAN FRAME SHROUD (SUPERSEDED BY SB 72-0570 R4). SERVICE BULLETIN
MOS
I3-JUN-2012 HRSAISC -
ENC
SB 72-0570 R4 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND CATEGORY 7
FAN FRAME SHROUD. SERVICE BULLETIN
MOS
26-JUN-20I4 HRSO4SC
ENC
SB 72-0571 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
23-MAR-2007 HRSOASC -
ENC
SB 72-0572 NO.2 ENGINE - HPT OUTER STATIONARY SEAL WITH INTEGRAL NUT SHIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0573 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
24-JAN-2008 HRSAISC -
ENC
SB 72-0574 NO.2 ENGINE - NEW NO.3 BEARING REAR STATIONARY AlFUOIL SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
I0-APR-2066 HRSAISC -
ENC
SB 72-0574 RI NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
24-JUL-2006 HRSO4SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 658 Of 748
@ Camp Systems
EFTA00618949
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0574 R2 NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
20-SEP-2006 HRSfMSC -
ENC
SB 72-0574 R3 NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
24-OCT-2006 HRSfMSC -
ENC
SB 72-0574 R4 NO.2 ENGINE - NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN
MOS
31-AUG-2007 HRSAISC -
ENC
SB 72-0575 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0576 NO.2 ENGINE - REPAIR PARTS. SERVICE BULLETIN
MOS
20-JUL-2006 HRSAISC -
ENC
SB 72-0578 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0579 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
04-JUL-2006 HRSfMSC -
ENC
SB 72-0579 R1 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
27-OCT-2006 HRS,MSC
ENC 19000 (s)
SB 72-0579 R2 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
HRS‘MSC
ENC 19000 (s)
SB 72-0579 R3 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES, SERVICE BULLETIN
MOS
09-APR-2008 HRSAISC
ENC 19000 (s)
SB 72-0579 R4 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
01-DEC-2008 HRSIMSC
ENC 19000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 659 Of 748
@ Camp Systems
EFTA00618950
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0579 R5 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
HRSAISC
ENC 19000 (s)
SB 72-0579 R6 NO.2 ENGINE - ENGINE -LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES, SERVICE BULLETIN
MOS
15-DEC-2009 HRS1MSC
ENC 19000 (s)
SB 72-0579 R7 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR
FRAME ON SAC ENGINES. SERVICE BULLETIN
MOS
I9-FEB-2010 HRSAISC
ENC 19000 (s)
SB 72-0579 Re NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
25-JAN-2012 HRS1MSC
ENC 19000 (s)
SB 72-0580 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR
LOCATION. SERVICE BULLETIN
MOS
25-MAY-2007 HRSfMSC
ENC
SB 72-0580 R1 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE
BULLETIN
MOS
25-MAY-2008 HRSNSC -
ENC
SB 72-0580 R2 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE
BULLETIN
MOS
27-APR-2009 HRSAISC -
ENC
SB 72-0580 R3 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REWORK FOR FAN CONTAINMENT CASE 81FLANGE AT
FIRE DETECTOR LOCATION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0581 NO.2 ENGINE -STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE
BULLETIN
MOS
26-JUL-2006 HRS1MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 660 Of 748
@ Camp Systems
EFTA00618951
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0581 Ri NO 2 ENGINE - STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE
BULLETIN
MOS
12-JAN-2007 HRSitISC
ENC
SB 72-0581 R2 NO 2 ENGINE - ENGINE - HPC STATOR FORWARD ASSEMBLY t72-32-00)- STAGE 2 AND STAGE 3 IMPROVED INNER
BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN
MOS
14-AUG-2009 HRSI.ISC -
ENC
SB 72-0582 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
07-AUG-2C06 HR&MSC -
ENC
SB 72-0582 RI NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
25-SEP-2006 HRSitISC -
ENC
SB 72-0584 RI NO 2 ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN
MOS
04-JUN-2007 HRSilISC -
ENC
SB 72-0584 R2 NO 2 ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN
MOS
31-AUG-2C07 HRSiliSC -
ENC
SB 72-0585 NO 2 ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN
MOS
04-SEP-2006 HRSI.ISC -
ENC
SB 72-0585 RI NO. 2 ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN OPTIONAL
MOS
25-APR-2008 HR&MSC -
ENC
SB 72-0585 R2 NO 2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - FIELD INTRODUCTION OF REWORKED FAN DISK. OPTIONAL
SPACERS AND SHIMS. SERVICE BULLETIN
MOS
03-JAN-2012 HRSI.ISC
ENC
SB 72-0586 NO 2 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE
BULLETIN
MOS
24-NOV-2CC6 HR&MSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 661 Of 748
1, Camp Systems
EFTA00618952
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0586 R1 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE
BULLETIN
MOS
02-JAN-2007 HRSAISC
ENC
SB 72-0587 NO.2 ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
04-JUL-2008 HRSAISC -
ENC
SB 72-0588 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7618/3. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0589 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0589 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSAISC -
ENC
SB 72-0589 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-7B ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN
MOS
04-MAY-2009 HRSAISC -
ENC
SB 72-0590 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/3. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0591 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0591 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSAISC -
ENC
SB 72-0593 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/3. SERVICE BULLETIN
MOS
I3-APR-2007 HRS1MSC -
ENC
SB 72-0593 RI NO.2 ENGINE - CONVERSION OF ANY AFFECTED CFM56-7/3 MODEL ENGINE TO ALLOWABLE DERIVATIVE MODEL
DESIGNATIONS. SERVICE BULLETIN
MOS
I3-APR-2007 HRS1MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 662 Of 748
@ Camp Systems
EFTA00618953
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0593 R2 NO. 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624:3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSiliSC -
ENG
SB 72-0594 NO. 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CW56-7824:381. SERVICE BULLETIN
MOS
HRSUMSC -
ENC
SB 72-0594 R1 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CF6156-7624:381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENG
SB 72-0595 NO.2 ENGINE - CRIS6-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN
MOS
13-APR-2007 HRS.I.ISC -
ENG
SB 72-0595 Ri NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN
MOS
13-AUG-2C07 HRSUMSC -
ENG
SB 72-0595 R2 NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENC
SB 72-0596 NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFSI56-7826:3F. SERVICE BULLETIN
MOS
17-APR-2007 HRSUMSC -
ENC
SB 72-0596 Ri NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFSI56-7826:3F. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENG
SB 72-0597 NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFP.I56-7826:381. SERVICE BULLETIN
MOS
HRSUMSC -
ENG
SB 72-0597 Ri NO.2 ENGINE - CFNIS6-78 ENGINE CONVERSION TO CFM56-7626:381. SERVICE BULLETIN
MOS
24-OCT-2007 HRSUMSC -
ENG
SB 72-0600 NO 2 ENGINE - CFNIS6-76 ENGINE CONVERSION TO CFM56-7827t3. SERVICE BULLETIN
MOS
17-APR-2007 HRSUMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 663 Of 748
1' Camp Systems
EFTA00618954
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0601 F21 NO 2 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7627/381. SERVICE BULLETIN
MOS
24-OC-1-20)7 HRSMSC -
ENC
SB 72-0602 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t383. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0603 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN
MOS
HR&MSC -
ENC
SB 72-0603 Ri NO 2 ENGINE - CRIS6-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN
MOS
HRS.ISC -
ENC
SB 72-0604 NO 2 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7827/381F. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0604 R1 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3Bi F. SERVICE BULLETIN
MOS
24-OCT-2007 HRSMSC -
ENC
SB 72-0605 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
07-NOV-2C06 HR&MSC -
ENC
SB 72-0606 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
31-MAY-2C07 HRSMSC -
ENC
SB 72-0607 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
01-SEP-2006 HR&P.ISC -
ENC
SB 72-0608 NO 2 ENGINE - INSPECTION OF THE LOw PRESSURE TURBINE (LPT) CASE. SERVICE BULLETIN
MOS
23-AUG-2C07 HR&MSC -
ENC
SB 72-0608 Ri NO 2 ENGINE - ENGINE - GENERAL (72-00-03) - INSPECTION OF THE LOW PRESSURE TURBINE (LPT) CASE ON
ASSEMBLED
LPT MODULE. SERVICE BULLETIN
MOS
I2-MAY-2CO9 HRSMSC
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 664 Of 748
Camp Systems
EFTA00618955
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0609 NO.2 ENGINE - INTRODUCTION OF N5 HPT SHROUDS WITH HEAT TRANSFER ENHANCEMENT (I-ITE) BUMPS. SERVICE
BULLETIN
MOS
25-SEP-2006 HRS11.1SC
ENC
SB 72-0610 NO.2 ENGINE - INTRODUCTION OF 8 MIL THICK HPC GUIDE SECTORS. SERVICE BULLETIN
MOS
I5-NOV-2006 MRS/P.1SC -
ENC
SB 72-0611 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
31-OCT-2006 HRSAISC -
ENC
SB 72-0612 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I2-OCT-2006 MRS/P.1SC -
ENC
SB 72-0613 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
25-SEP-2006 HRS11.1SC -
ENC
SB 72-0611 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
09-NOV-2006 HRS11.1SC -
ENC
SB 72-0615 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
08-FEB-2007 HRSAISC -
ENC
SB 72-0616 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0617 NO.2 ENGINE - CLEANING OF THE CONTROL ALTERNATOR AND CHANGE OF THE NUTS ATTACHING THE LINE NO. I
BEARING OUTER RACE ON THE AGB HOUSING. SERVICE BULLETIN
MOS
03-JUL-2007 HRSAISC 10000 (s)
ENC 5000
SB 72-0617 R2 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)-f FAKING OF THE CONTROL ALTERNATOR RECOMMENDED
AND INSPECTION OF THE KEY-LOCKED STUDS ATTACHING THE LINE NO. 1 BEARING OUTER RACE ON THE AGB
HOUSING, SERVICE BULLETIN
MOS
MRS/P.1SC 10000 (s)
ENC 5000
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 665 Of 748
@ Camp Systems
EFTA00618956
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0618 NO.2 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
25-JAN-2007 HRS/MSC -
ENC
SB 72-0618 RI NO.2 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0618 R2 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
DESIGN OF
LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN
MOS
09-OCT-2008 FIRS1MSC -
ENC
SB 72-0619 NO.2 ENGINE - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN
MOS
27-SEP-2007 HRS/MSC -
ENC
SB 72-0619 RI NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING
RING. SERVICE BULLETIN
MOS
02-DEC-2008 HRSAISC -
ENC
SB 72-0619 R2 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3
ROTATING RING. SERVICE BULLETIN
MOS
04-MAY-2009 FIRS1MSC -
ENC
SB 72-0620 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B ENGINES. SERVICE BULLETIN
MOS
I9-DEC-2006 HRS/MSC -
ENC
SB 72-0621 NO.2 ENGINE -FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM
INFORMATION. SERVICE BULLETIN
MOS
I6-JUL-2007 HRS1MSC
ENC
SB 72-0621 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS
INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN
MOS
Of -DEC-2011 HRS1MSC -
ENC
SB 72-0622 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
20-SEP-2007 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 666 Of 748
@ Camp Systems
EFTA00618957
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0623 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
20-JUN-2007 MRS/MSC -
ENC
SB 72-0626 NO.2 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
28-SEP-2007 HRSAISC -
ENC
SB 72-0626 RI NO.2 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
21-APR-2008 HRS/hISC -
ENC
SB 72-0626 R2 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND
NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN
MOS
04-MAY-2009 HRS/MSC -
ENC
58 72-0626 R3 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW CUSTOMER
STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN CONVENIENCE
MOS
30-MAR-2012 FIRSAISC -
ENC
SB 72-0627 NO.2 ENGINE - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE
BULLETIN
MOS
28-SEP-2007 FIRSAISC -
ENC
SB 72-0627 RI NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - DELETION IN PRODUCTION OF THE ALTERNATE
STAGE 3 ROTATING AIR
SEAL RING. SERVICE BULLETIN
MOS
02-DEC-2008 HRS/MSC
ENC
SB 72-0630 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
07-MAR-2008 HRS/MSC -
ENC
SB 72-0631 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC.
SERVICE BULLETIN
MOS
13-OCT-2008 HRS/MSC
ENC
SB 72-0632 NO.2 ENGINE - BOOSTER SPOOL FORWARD FLANGE INSPECTION, SERVICE BULLETIN
MOS
22-JUN-2007 HRS/MSC
ENC 15000 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 667 Of 748
@ Camp Systems
EFTA00618958
AD/SI Status Report AIRCRAFT
CAMMictheaP
fra thenand •O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0634 NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
22-JUN-2007 HIRSAISC -
ENC
SB 72-0634 RI NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
30-JUL-2007 HRSAISC -
ENC
SB 72-0634 R2 NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0635 NO.2 ENGINE - INTRODUCTION OF LOW PRESSURE TURBINE AIR COOLING TUBES. SERVICE BULLETIN
MOS
I6-FEB-2007 FIRS1MSC -
ENC
SB 72-0636 NO.2 ENGINE - INSPECTION FOR ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT
INGESTION. SERVICE BULLETIN
MOS
HRSOASC
ENC 4800 (s)
SB 72-0636 R1 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA SERVICE BULLETIN
MOS
09-FEB-2012 HIRSAISC
ENC 800(s)
SB 72-0636 R2 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR SUPERSEDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA (SUPERSEDED BY 72-0636 R3). SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0636 R3 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED
ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND
NORTH AFRICA SERVICE BULLETIN
MOS
HIRSAISC
ENC
SB 72-0637 NO.2 ENGINE - INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL
DISTRESS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 668 Of 748
@ Camp Systems
EFTA00618959
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 PART I NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES
MOS
HRSIASC
ENC 9600 (5)
SB 72-0637 PART 2 NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE I HPT NOZZLES AND STAGE I LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES
MOS
HRSIISC
ENC 6400 (s)
SB 72-0637 RI NO 2 ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL
DISTRESS. SERVICE BULLETIN
MOS
16-AUG-2C07 HRSIISC
ENC
SB 72-0637 RI PART I NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES
MOS
HRSIASC
ENC 9600(s)
SB 72-0637 RI PART 2 NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE I HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE
TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES
MOS
HRSIISC
ENC 6400 (s)
SB 72-0637 R2 NO 2 ENGINE - STAGE I NOZZLES. SERVICE BULLETIN
MOS
OS-SEP-2007 HRSIASC -
ENC
SB 72-0637 R2 PART I NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT
MOS
HRSIISC
ENC 9600 (5)
SB 72-0637 R2 PART 2 NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN LPT
MOS
HRSIISC
ENC 6400 (s)
SB 72-0637 R3 NO 2 ENGINE - STAGE I NOZZLES. SERVICE BULLETIN
MOS
04-APR-2008 HRSIASC -
ENC
SB 72-0637 R3 PART I NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT
MOS
HRSIASC
ENC 4600 (s)
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 669 Of 748
'2 Camp Systems
EFTA00618960
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 R3 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 NOZZLES. SERVICE BULLETIN LPT
MOS
HRS(MSC
ENC 6400 (s)
SB 72-0637 R5 NO.2 ENGINE - ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT RECOMMENDED
NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE
BULLETIN
MOS
24-JUN-2011 MRS/81SC
ENC
SB 72-0637 R5 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED
INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS
(SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN HPT
MOS
24-JUN-2011 HRS(MSC -(s)
ENC
SB 72-0637 R5 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED
INSPECTION OF STAGE 1HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS
(SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN !PT
MOS
24-JUN-2011 MRS/81SC -(s)
ENC
SB 72-0637 R6 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE .% LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN
MOS
MRS/81SC -
ENC
SB 72-0637 R6 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND !PT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF RECOMMENDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637
R7). SERVICE BULLETIN HPT
MOS
HRS(MSC
ENC 800(s)
SB 72-0637 R6 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND LPT NOZZLES (7241-01 AND 72-53-01)- INSPECTION OF RECOMMENDED
STAGE 1 HPT NOZZLES AND STAGE 1(PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637
R7). SERVICE BULLETIN LPT
MOS
MRS/81SC
ENC 800(s)
58 72-0637 R7 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE
BULLETIN
MOS
MRS(AISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 670 Of 748
@ Camp Systems
EFTA00618961
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0637 R7 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1(PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R8). SERVICE BULLETIN OF THE STAGE 1HPT NOZZLES
MOS
HRS/MSC -
ENC
SB 72-0637 R7 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R8). SERVICE BULLETIN OF THE STAGE 1LPT NOZZLES
MOS
HRS/MSC -
ENC
SB 72-0637 R8 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED
AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0637 R8 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R9). SERVICE BULLETIN OF THE STAGE 1HPT NOZZLES
MOS
HRS/MSC -
ENC
SB 72-0637 R8 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB
72-0637 R9). SERVICE BULLETIN OF THE STAGE 1LPT NOZZLES
MOS
HRS/MSC -
ENC
SB 72-0637 R9 NO.2 ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE 1 HPT NOZZLES CATEGORY 7
AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN
MOS
31-MAR-2014 I-ROO/1SC -
ENC
SB 72-0637 R9 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF
THE STAGE 1 HPT NOZZLES
MOS
31-MAR-2014 HRS/MSC
ENC
SB 72-0637 R9 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7
STAGE 1 HPT NOZZLES AND STAGE 1LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF
THE STAGE 1LPT NOZZLES
MOS
31-MAR-2014 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 671 Of 748
@ Camp Systems
EFTA00618962
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0638 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0639 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
09-APR-2007 HRS/MSC -
ENC
SB 72-0640 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
27-JUN-2007 HRS/MSC -
ENC
SB 72-0640 RI NO.2 ENGINE - INTRODUCTION OF PRE-GROUND HPT BLADE KIT (SPD). SERVICE BULLETIN
MOS
I8-FEB-2008 HRS/MSC -
ENC
SB 72-0643 NO.2 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN
MOS
28-JUN-2007 HRS/MSC -
ENC
SB 72-0643 RI NO.2 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0643 R3 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING RECOMMENDED
PARTS. SERVICE BULLETIN
MOS
24-JUN-2011 HRS/MSC
ENC
SB 72-0645 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
17-APR-2007 HRS/MSC -
ENC
SB 72-0646 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
17-APR-2007 HRS(MSC -
ENC
SB 72-0647 NO.2 ENGINE - COMBUSTION CHAMBER OUTER LINER REWORK. SERVICE BULLETIN
MOS
IS-JUN-2007 HRS/MSC -
ENC
SB 72-0647 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK.
SERVICE BULLETIN
MOS
05-JUN-2009 MRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 672 Of 748
@ Camp Systems
EFTA00618963
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0647 R2 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK.
SERVICE BULLETIN
MOS
20-NOV-2009 HRS.O.1SC -
ENC
SB 72-0647 R3 NO.2 ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK SERVICE CATEGORY 7
BULLETIN
MOS
30-MAY-20I4 HRS.O.1SC -
ENC
SB 72-0648 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-751ENGINES. SERVICE BULLETIN
MOS
I4-JUN-2007 HRS./MSC -
ENC
SB 72-0649 NO.2 ENGINE - INTRODUCTION OF NEW FAN BLADE SHIM ASSY. SERVICE BULLETIN
MOS
08-FEB-2008 HRSAISC - (s)
ENC
SB 72-0649 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE SHIM RECOMMENDED
ASSY. SERVICE BULLETIN
MOS
I8-JAN-2011 HRS.O.1SC ESV
ENC
SB 72-0650 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
25-JUN-2007 HRSAISC -
ENC
SB 72-0652 NO.2 ENGINE - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0-RING MATERIAL AND
REWORK OF OLD MAGNETIC SEAL AND OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN
MOS
29-JUL-2008 MRS/MSC 8000 (s)
ENC
SB 72-0652 R2 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW
SEALOL SEAL WITH NEW 0 -RING MATERIAL AND REWORK OF OLD SEALOL SEAL TO THE NEW ONE. SERVICE
BULLETIN
MOS
I2-JAN-2011 HRS.O.1SC 8000 8000
ENC
SB 72-0653 NO.2 ENGINE - ENGINE - NO.1 AND NO.2 BEARING SUPPORT ASSEMBLY (72-22-00) - SPARE PARTS RELEASE FOR
CFM56-78 IPC. SERVICE BULLETIN
MOS
02-OCT-2008 HRS.O.1SC -
ENC
SB 72-0655 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
I I -SEP-2007 HRS.O.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 673 Of 748
@ Camp Systems
EFTA00618964
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0656 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSS-7B IPC. SERVICE BULLETIN
MOS
11-SEP-2007 HRS7ASC -
ENC
SB 72-0657 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
11-SEP-2007 HRS(MSC -
ENC
SB 72-0658 NO 2 ENGINE - INTRODUCTION OF NEW ALTERNATE LOOP CLAMP. SERVICE BULLETIN
MOS
24-JAN-2008 HRS4.1SC -
ENC
SB 72-0659 NO 2 ENGINE - DELETION OF THE ALTERNATE TRIM BALANCE BOLTS IN PRODUCTION ONLY. SERVICE BULLETIN
MOS
13-DEC-2007 HRS.1SC -
ENC
SB 72-0661 NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO N 4
ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN
MOS
23-AUG-2C07 HRS1ISC 5C0 (s)
ENC
SB 72-0661 RI NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO NO a
ROLLER BEARING SUSPECTED BATCH.. SERVICE BULLETIN
MOS
HRS(MSC 500(s)
ENC
SB 72-0661 R2 NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO NO.4
ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN
MOS
21-JAN-2008 HRS(MSC 500(s)
ENC
SB 72-0662 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
29-APR-2008 HRS,MSC -
ENC
SB 72-0663 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP(156-78 ENGINES. SERVICE BULLETIN
MOS
26-FEB-2008 HRS4.1SC -
ENC
SB 72-0663 RI NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
12-JAN-2009 HRS7ASC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 674 Of 748
Camp Systems
EFTA00618965
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0665 NO 2 ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN
MOS
27-SEP-2007 HRSimSC -
ENC
SB 72-0665 R1 NO 2 ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN
MOS
10-DEC-2007 HRSNSC -
ENC
SB 72-0666 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
15-JAN-2008 HRSuSC -
ENC
SB 72-0667 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN
MOS
09-OCT-2007 HRSuSC -
ENC
SB 72-0667 R1 NO 2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN
MOS
11-MAY-2012 HRS,IISC -
ENC
SB 72-0668 NO.2 ENGINE - ENGINE - GENERAL (72-00-01) - INTRODUCTION OF A NEW FLAT WASHER AT THE JUNCTION OF
RADIAL DRIVE SHAFT
SLEEVE AND THE FAN FRAME SHROUD. SERVICE BULLETIN
MOS
11-JUN-2008 HRSAISC -
ENC
SB 72-0669 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
16-JAN-2008 HRSI.ISC -
ENC
SB 72-0670 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
25-JAN-2008 HRSUMSC -
ENC
SB 72-0670 R1 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
09-JAN-2009 HRS,IISC -
ENC
SB 72-0671 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMS6-78 IPC. SERVICE BULLETIN
MOS
04-DEC-2007 HRSIISC -
ENC
SB 72-0673 NO 2 ENGINE - INTRODUCTION OF A NEW ANTI-ROTATION STRAIGHT HEADED PIN. SERVICE BULLETIN
MOS
02-NOV-2007 HRSimSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 675 Of 748
Camp Systems
EFTA00618966
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0673 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - NEW VSV SHROUD HEADED ANTI- ROTATION PIN
- INTRODUCTION. SERVICE BULLETIN
MOS
IS-MAY-2009 HRSAISC
ENC
SB 72-0674 NO.2 ENGINE - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD (SUPERSEDED BY 72-0674 RI), SERVICE SUPERSEDED
BULLETIN
MOS
HRSAISC
ENC
SB 72-0674 RI NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND STAGE 1 LOW PRESSURE TURBINE NOZZLE
ASSEMBLY
(72-53-00) - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0676 NO.2 ENGINE - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW RANGE
ASSEMBLY. SERVICE BULLETIN
MOS
30-JUN-2008 HRSAISC
ENC
SB 72-0676 RI NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INTRODUCTION OF A NEW LOW PRESSURE TURBINE
(LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN
MOS
I7-NOV-2008 HRSAISC -
ENC
SB 72-0676 R2 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF A NEW LOW PRESSURE TURBINE
(LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN
MOS
I6-JUN-2009 HRSAISC -
ENC
SB 72-0677 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC AND CMM. SERVICE BULLETIN
MOS
31-JAN-2008 HRSAISC -
ENC
SB 72-0678 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW AXIAL STOP PIN.
SERVICE BULLETIN
MOS
C6-JAN-2008 HRSAISC -
ENC
SB 72-0679 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE
BULLETIN
MOS
29-AUG-2008 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 676 Of 748
@ Camp Systems
EFTA00618967
AD/SI Status Report AIRCRAFT
CAMP fra tAtinand 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0680 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
29-JAN-2008 HIRS(MSC -
ENC
SB 72-0680 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
09-JUL-2008 HRS(MSC -
ENC
SB 72-0681 NO.2 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO
CFM56-7818.CFM.56-7820.CFM.56-7/322.CFM56-7/324.CFM.56-7/326 OR CFM56-7827. SERVICE BULLETIN
MOS
I4-MAY-2008 HRS/MSC -
ENC
SB 72-0682 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
I7-JAN-2008 HRS/MSC -
ENC
SB 72-0683 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE
VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN
MOS
25-FEB-2008 HRS(MSC -
ENC
SB 72-0683 R1 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE SUPERSEDED
VERTICAL SEAL SLOT CONFIGURATION (SUPERSEDED BY SB 72-0683 R2). SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0683 R2 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - SPLIT VANE REPAIR AND REWORK TO CATEGORY 7
DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN
MOS
2I-JAN-2014 HRS(MSC -
ENC
SB 72-0684 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
19-DEC-2007 HRS/MSC -
ENC
SB 72-0685 NO.2 ENGINE - DELETION OF SOME ALTERNATE NO.4 ROLLER BEARINGS. SERVICE BULLETIN
MOS
0I-APR-2008 HRS(MSC -
ENC
SB 72-0686 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
05-MAR-2008 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 677 Of 748
@ Camp Systems
EFTA00618968
AD/SI Status Report AIRCRAFT
CAMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0687 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
06-FEB-2008 HRS/MSC -
ENC
SB 72-0689 NO.2 ENGINE - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD
ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN
MOS
I9-AUG-2008 MRS/51SC -
ENC
SB 72-0689 RI NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW ACCESSORY
GEARBOX WITH NEW
ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN
MOS
04-DEC-2009 MRS/51SC -
ENC
SB 72-0689 R2 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - INTRODUCTION OF NEW ACCESSORY
GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE
BULLETIN
MOS
22-DEC-2011 HRS/MSC
ENC
SB 72-0690 NO.2 ENGINE - BOLTS COMMONALITY FOR AIR LPT COOLING TUBE RETAINING STRAPS. SERVICE BULLETIN
MOS
20-MAR-2008 HRS/MSC -
ENC
SB 72-0694 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF THE INNER COMBUSTION RECOMMENDED
CHAMBER LINER. SERVICE BULLETIN
MOS
21-OCT-2011 FIRS/MSC
ENC
SB 72-0696 NO.2 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN
MOS
21-MAR-2008 HRS/MSC -
ENC
SB 72-0696 RI NO.2 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN
MOS
28-MAR-2008 HRS/MSC -
ENC
SB 72-0696 R2 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
MOS
02-SEP-2011 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 678 Of 748
@ Camp Systems
EFTA00618969
AD/SI Status Report AIRCRAFT
CAMP
Ael...imp.= taken...lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0698 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF ALTERNATE LPT REAR FRAMES ON
SAC ENGINES
IN FIELD. SERVICE BULLETIN
MOS
23-MAR-2009 HRS(MSC
ENC
SB 72-0699 NO.2 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO FCM.56-78/3 TI ENGINE MODEL. SERVICE
BULLETIN
MOS
14-MAY-2008 HRSPASC
ENC
SB 72-0699 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFM56-78 (SAC) TO CFM56-78/3 (TI). SERVICE
BULLETIN
MOS
03-NOV-2009 HRS(MSC
ENC
SB 72-0700 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - IMPROVEMENT OF THE FUEL SUPPLY TUBE WITH NEW INSERTS.
SERVICE BULLETIN
MOS
24-FEB-2009 HRS(MSC
ENC
SB 72-0701 NO.2 ENGINE - NEW SPARE PARTS THAT ARE INTERCHANGABLE WITH THE OLD PARTS THEY REPLACE. SERVICE
BULLETIN
MOS
13-MAY-2008 HRS(MSC
ENC
SB 72-0702 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
06-JUN-2008 HRS(MSC -
ENC
SB 72-0704 NO.2 ENGINE - INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING RECOMMENDED
DETERIORATION. SERVICE BULLETIN
MOS
23-JUN-2008 HRS(MSC 1000 (s)
ENC
SB 72-0704 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING
DETERIORATION. SERVICE BULLETIN
MOS
HRSOASC 500(s)
ENC
SB 72-0706 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626432. SERVICE
BULLETIN
MOS
11-JUN-2009 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 679 Of 748
@ Camp Systems
EFTA00618970
AD/SI Status Report AIRCRAFT
CAMP
Asicitiomfra 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0707 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFP.156-78 ENGINE CONVERSION TO CR156-7826/382. SERVICE
BULLETIN
MOS
I I -JUN-2009 HRS/MSC -
ENC
SB 72-0707 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382. SERVICE BULLETIN RECOMMENDED
MOS
22-FEB-2011 MRS/P.1SC -
ENC
SB 72-0708 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE
BULLETIN
MOS
II -JUN-2009 HRS/MSC -
ENC
SB 72-0708 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN RECOMMENDED
MOS
22-FEB-2011 HRSAISC -
ENC
SB 72-0709 RI NO.2 ENGINE - INTRODUCTION OF NEW BOLT FOR RECOMMENDED COMPLIED WITH
HPTACC MANIFOLD ASSEMBLY. SERVICE BULLETIN
MOS 28-SEP-2009
29-OCT-2008 HRSAISC - (s) 3378:01
ENC 776
SB 72-0711 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
I6-OCT-2008 HRS/MSC
ENC
SB 72-0712 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
06-NOV-2008 MRS/P.1SC -
ENC
SB 72-0713 RI NO.2 ENGINE - FUEL NOZZLE COUPLING NUT INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY
MOS 28-SEP-2009
25-JUL-2008 HRS,MSC - 3378:04
ENC 776
SB 72-0716 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
20-OCT-2008 HRSAISC
ENC
SB 72-0718 RI NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - REWORK OF THE LPT CALF RAIL "0° SUPPORT
RING AND REIDENTIFICATION OF THE LPT CASE. SERVICE BULLETIN
MOS
04-JUN-2013 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 680 Of 748
@ Camp Systems
EFTA00618971
AD/SI Status Report AIRCRAFT
CANIP
Asiatic,film Ow imam, up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0720 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW FAN BLADE SPACER.
SERVICE BULLETIN
MOS
28-APR-2009 HRS/MSC
ENC
SB 72-0720 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE SPACER.
SERVICE BULLETIN
MOS
I 1-JAN-2010 HRS/MSC
ENC
SB 72-0722 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN
MOS
I0-DEC-2008 HRS/MSC -
ENC
SB 72-0724 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
I0-AUG-2009 HRS/MSC -
ENC
SB 72-0725 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO NEW BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
29-JAN-2009 HRS/MSC -
ENC
SB 72-0726 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
26-FEB-2009 HRS/MSC -
ENC
SB 72-0727 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW SILVER PLATED NUT FOR THE LPT ROTOR
SUPPORT I LPT SHAFT
ATTACHMENT FLANGE JUNCTION. SERVICE BULLETIN
MOS
28-MAY-2009 MRS/P.1SC -
ENC
SB 72-0728 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
06-MAR-2009 HRSfMSC
ENC
SB 72-0728 RI NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 681 Of 748
@ Camp Systems
EFTA00618972
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0728 R2 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS.
SERVICE BULLETIN
MOS 12 (s)
09-FEB-2010 HRS/MSC
ENC
SB 72-0730 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REIDENTIFICATION OF THE CONTAINMENT CASE
340-059-813-0
AND 340-059-814-0. SERVICE BULLETIN
MOS
13-FEB-2009 HRS1MSC
ENC
SB 72-0731 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - REPLACEMENT OF BALL BEARING
301-480-320-0 IN A
SUSPECT LOT. SERVICE BULLETIN
MOS
26-FEB-2009 HRSAISC -
ENC
SB 72-0732 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC
ENGINES. SERVICE BULLETIN
MOS
02-JUN-2009 HRS1MSC
ENC 19000 (s)
SB 72-0732 RI NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC RECOMMENDED
ENGINES. SERVICE BULLETIN
MOS
HRSAISC
ENC 19000 (s)
SB 72-0733 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
14-APR-2009 HRS/MSC -
ENC
SB 72-0734 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INTRODUCTION OF NEW
LPT STAGE 1
NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
13-AUG-2009 HRS1MSC
ENC
SB 72-0734 RI NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF NEW
LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 72-0735 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR
SHROUD- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN
MOS
26-JUN-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 682 Of 748
@ Camp Systems
EFTA00618973
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0735 RI NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD
- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN
MOS
04-DEC-2009 HRSOASC -
ENC
SB 72-0737 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS TO
CFM56-7827A ENGINES. SERVICE BULLETIN
MOS
15-MAY-2009 HRS/MSC
ENC
SB 72-0738 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC,
SERVICE BULLETIN
MOS
28-JAN-2009 HRS/MSC
ENC
SB 72-0738 RI NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
30-JUN-2011 HRS/MSC
ENC
SB 72-0739 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - PRECAUTIONS TO BE FOLLOWED CONCERNING
INSULATION BLANKETS CONTAINING RCF. SERVICE BULLETIN
MOS
08-FEB-20I3 HRS/MSC -
ENC
SB 72-0740 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN INFORMATIONAL
MOS
17-FEB-2009 HRSOASC -
ENC
SB 72-0742 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE ASSEMBLY (72-00-02) - HPC FRONT CASE BLEED PORT
REMOVAL AND SIMPLIFICATION. SERVICE BULLETIN
MOS
30-JUN-2009 HRS/MSC -
ENC
SB 72-0743 NO.2 ENGINE - ENGINE - LPT ROTOR I STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT
DISK
336-002-006-0. SERVICE BULLETIN
MOS
26-OCT-2009 HRS/MSC
ENC 9500 (s)
SB 72-0743 RI NO.2 ENGINE - ENGINE - LPT ROTOR/ STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT RECOMMENDED
DISK 336-002-006-0, SERVICE BULLETIN
MOS
09-NOV-20I0 HRS/MSC
ENC 9500 (s)
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 683 Of 748
@ Camp Systems
EFTA00618974
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0744 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF THREE BRACKETS ASSY WITH A NEW DESIGN.
SERVICE BULLETIN
MOS
12-MAY-2009 HRS/MSC -
ENC
SB 72-0745 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF AN ALTERNATE PROVISIONING SOURCE FOR THE
NO. 1.2 AND
5 BEARINGS. SERVICE BULLETIN
MOS
26-AUG-2009 HRS.0.1SC
ENC
SB 72-0747 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE.
SERVICE BULLETIN
MOS
04-JUN-2009 HRSfMSC
ENC
SB 72-0747 R1 NO.2 ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE CATEGORY 9
BULLETIN
MOS
03-MAR-2014 HRS/MSC
ENC
S8 72-0748 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
30-JUN-2009 HRSfMSC -
ENC
SB 72-0749 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW RETAINING PLATE.
SERVICE BULLETIN
MOS
01-FEB-2011 HRS/MSC -
ENC
SB 72-0750 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/P.1SC -
ENC
S8 72-0751 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/MSC -
ENC
SB 72-0752 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
02-JUL-2009 HRS/MSC -
ENC
SB 72-0753 NO.2 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK IN FIELD OF THE FAN BLADE REAR
SHANK FOR WEAR. SERVICE BULLETIN
MOS
14-OCT-2009 HRSfMSC -
ENC
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 684 Of 748
@ Camp Systems
EFTA00618975
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0753 R1 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - REWORK IN FIELD OF THE FAN BLADE REAR
SHANK FOR WEAR. SERVICE BULLETIN
MOS
03-DEC-2012 HRS‘MSC
ENC
SB 72-0750 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF ONE BRACKET ON THE FLANGE Al RECOMMENDED
AND THREE
BRACKETS ASSY ON THE FLANGE 86 WITH A NEW DESIGN. SERVICE BULLETIN
MOS
I0-NOV-2010 HRS1MSC -
ENC
SB 72-0756 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW
DESIGN. SERVICE BULLETIN
MOS
HRSfMSC
ENC
SB 72-0757 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
28-AUG-2009 HRSfMSC -
ENC
SB 72-0758 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR
BLADES. SERVICE BULLETIN
MOS
22-SEP-2009 HRSfMSC
ENC
SB 72-0759 NO.2 ENGINE - ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION OPTIONAL
HARNESSES. SERVICE BULLETIN
MOS
27-OCT-2010 HRS/MSC
ENC
SB 72-0759 R1 NO.2 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES SUPERSEDED
(SUPERSEDED BY SB 72-0759 R2). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0759 R2 NO.2 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
22-OCT-2013 HRS1MSC
ENC
SB 72-0760 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
03-SEP-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 685 Of 748
@ Camp Systems
EFTA00618976
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0761 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE
BULLETIN
MOS
08-OCT-2009 HR&MSC -
ENC
SB 72-0762 NO 2 ENGINE - ENGINE - TRANSFER GEARBOX ASSEMBLY (72-62-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
29-SEP-2009 HR&MSC
ENC
SB 72-0763 NO 2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE
BULLETIN
MOS
HR&MSC
ENC
SB 72-0764 121 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT
ROTOR r STATOR ASSEMBLY. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0764 R2 NO.2 ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR 1 OPTIONAL
STATOR ASSEMBLY. SERVICE BULLETIN
MOS
25-JUL -2012 HRSI.ISC
ENC
SB 72-0767 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
28-OCT-2009 HRSMSC -
ENC
SB 72-0768 NO 2 ENGINE - NOT ISSUED. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0769 NO 2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - INTRODUCTION OF INNER AND OUTER
SEGMENT LINER SPARE PARTS. SERVICE BULLETIN
MOS
CE-FEB-2010 HRSMSC -
ENC
SB 72-0772 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN
MOS
04-DEC-2009 HRSMSC -
ENC
SB 72-0773 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN
MOS
25-NOV-2009 HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 686 Of 748
1' Camp Systems
EFTA00618977
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0774 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
20-JAN-2010 MRS/MSC -
ENC
SB 72-0775 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0776 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0777 NO.2 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN DISK MIDDLE LUG REWORK IN FIELD.
SERVICE BULLETIN
MOS
HRSAISC
ENC
SB 72-0778 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0779 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0311 ELECTRICAL HARNESS AND IN
FIELD REWORK
OF THE OLD MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0780 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00)- REWORK IN FIELD OF FAN CONTAINMENT CASE
B1 FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN
MOS
I8-JAN-2011 HRS/MSC -
ENC
SB 72-0780 RI NO.2 ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00) - REWORK IN FIELD OF FAN CONTAINMENT CASE BI
FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN
MOS
II -MAY-2012 HRS/MSC -
ENC
SB 72-0781 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW LPT COOLING MANIFOLDS. SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
26-JUN-2073 HRSAISC -
ENC
SB 72-0783 NO.2 ENGINE - ENGINE - HPT ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE
BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 687 Of 748
@ Camp Systems
EFTA00618978
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0784 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PART RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0785 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - DAC FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE
DISTRESS. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 72-0786 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW OUTER LINER FOR HARSH
ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0787 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0789 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES
ZONE FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0789 R1 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE RECOMMENDED
FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN
MOS
21-JUL-2011 MRS/51SC -
ENC
SB 72-0789 R2 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - INTRODUCTION OF A LEADING INDICATOR PROGRAM FOR RECOMMENDED
ENGINE OPERATION IN LOW CONCENTRATIONS OF VOLCANIC ASH, SERVICE BULLETIN
MOS
I4-DEC-2011 MRS/51SC -
ENC
SB 72-0790 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0791 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0792 NO.2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (7261-00)- NEW BALL THRUST NO.3 BEARING OPTIONAL
WITH NITRIDE HARDENING
. SERVICE BULLETIN
MOS
30-JUL-2010 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 688 Of 748
@ Camp Systems
EFTA00618979
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 72-0794 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE
BULLETIN
MOS
15-OCT-2010 HRSAISC
ENC
SB 72-0795 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY OPTIONAL
FOR HARSH ENVIRONMENT OPERATORS
. SERVICE BULLETIN
MOS
03-NOV-2010 HRS1MSC
ENC
SB 72-0795 R2 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY RECOMMENDED
FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
16-APR-2012 HRSfMSC -
ENC
SB 72-0795 R3 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY FOR HARSH RECOMMENDED
ENVIRONMENT OPERATORS. SERVICE BULLETIN
MOS
18-JUN-2012 HRSAISC -
ENC
SB 72-0796 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS ( SUPERSEDED
SUPERSEDED BY SB 72-0796 R1). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0796 R1 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS. SERVICE CATEGORY 4
BULLETIN
MOS
18-FEB-2013 HRS1MSC
ENC
SB 72-0797 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN BLADE MOMENT-WEIGHT MISMARKING.
SERVICE BULLETIN
MOS
27-JAN-2011 HRS1MSC
ENC
SB 72-0798 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00)- REWORK OF HPC STAGE I THROUGH STAGE RECOMMENDED
9 BLADES. SERVICE BULLETIN
MOS
24-JAN-2011 HRS1MSC
ENC
SB 72-0799 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - REWORK OF HPC TECH INSERTION HPC BLADES. RECOMMENDED
SERVICE BULLETIN
MOS
20-JAN-2011 HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 689 Of 748
@ Camp Systems
EFTA00618980
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0801 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW
FRONT FLANGE WITH 6 VENTILATION HOLES AND REWORK OF THE OLD PART. SERVICE BULLETIN
MOS
30-JUN-2011 HRS/MSC -
ENC
SB 72-0802 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0803 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
12-OCT-2010 HRS/MSC -
ENC
513 72-0801 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
09-NOV-2010 HRSAISC -
ENC
SS 72-0804 RI NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
24-MAR-2011 HRS/MSC -
ENC
SS 72-0805 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
02-NOV-2010 MRS/MSC -
ENC
513 72-0806 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SUPPORT WITH CAPTNE NUT.
SERVICE BULLETIN
MOS
18-JUL-2011 HRS/MSC -
ENC
SS 72-0807 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INSPECTION OF TURBINE REAR FRAME ON CFM56-7827A OPTIONAL
ENGINES. SERVICE BULLETIN
MOS
19-JAN-2012 HRS/MSC
ENC 11200 (s)
SS 72-0808 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INSPECTION OF STAGE 1 CUSTOMER
LPT NOZZLES DUE TO INDIA ENVIRONMENTAL DISTRESS. SERVICE BULLETIN CONVENIENCE
MOS
27-SEP-2013 HRS/MSC -
ENC
SB 72-0809 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF CFM56-7BE LPT HARDWARE ON CFM56-76.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 690 Of 748
@ Camp Systems
EFTA00618981
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0810 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMGS-7B IPC. SERVICE BULLETIN
MOS
09-JUN-2011 HRSiliSC -
ENG
SB 72-0811 NO 2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR INLET RECOMMENDED
GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
20-JAN-2011 HRSitiSC -
ENG
SB 72-0811 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR RECOMMENDED
INLET GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
29-NOV-2011 HRS,IISC -
ENG
SB 72-0812 NO.2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED
WITH NITRIDE HARDENING. SERVICE BULLETIN
MOS
26-SEP-2011 HRS.I.1SC -
ENG
SB 72-0812 R1 NO 2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED
WITH NITRIDE HARDENING. SERVICE BULLETIN
MOS
06-FEB-2012 HRS.I.1SC -
ENG
SB 72-0813 NO.2 ENGINE - ENGINE - NIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT BLADE INFORMATIONAL
PIN 2403M91P02. SERVICE BULLETIN
MOS
30-JAN-2012 HR&P.ISC -
ENG
SB 72-0814 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN
MOS
11-APR-2011 HR&P.ISC -
ENG
SB 72-0815 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-76 ENGINES. SERVICE BULLETIN
MOS
20-DEC-2011 HRS., LISC -
ENG
SB 72-0816 NO 2 ENGINE - HPTILPT NOZZLE SHROUD ASSEMBLY (72-53-00) - NEW SHROUD HPT STATOR HANGER WITH RECOMMENDED
MODIFIED AIR FILTER. SERVICE BULLETIN
MOS
19-JAN-2011 HRS.I.1SC -
ENG
SB 72-0817 NO 2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED
OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
03-OCT-2011 HRS/LISC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 691 Of 748
Camp Systems
EFTA00618982
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0817 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER
OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0818 RI NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR. RECOMMENDED
SERVICE BULLETIN
MOS
24-MAR-2011 HRS/MSC
ENC
SB 72-0819 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
03-N0V-2011 HRS/MSC -
ENC
SB 72-0820 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF NO. 4 MIRING STEEL VERSION. SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
31-JUL-2012 HRS/MSC
ENC
SB 72-0821 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
MOS
04-JUL-2011 HRSOASC
ENC
SB 72-0821 RI NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE RECOMMENDED
MANAGEMENT. SERVICE BULLETIN
610S
26-MAR-2013 HRSOASC
ENC
SB 72-0822 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF NEW BOLT TO ATTACH THE MW0325 HARNESS.
SERVICE BULLETIN
MOS
I8-AUG-2011 HRS/MSC
ENC
SB 72-0822 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF NEW BOLTS TO ATTACH THE MW0325 HARNESS.
SERVICE BULLETIN
MOS
26-APR-20I2 HRSIMSC
ENC
SB 72-0823 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05 SUPERSEDED
(SUPERSEDED BY 72-0823 R1). SERVICE BULLETIN
MOS
11-APR-2011 HRSIMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 692 Of 748
@ Camp Systems
EFTA00618983
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0823 R1 NO.2 ENGINE - ENGINE - I-IPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05. INFORMATIONAL
SERVICE BULLETIN
MOS
I 1-MAY-20I1 HRS/MSC
ENC
SB 72-0823 R2 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE PM 2080M35G05. INFORMATIONAL
SERVICE BULLETIN
MOS
23-JUN-20I1 HRS/MSC
ENC
SB 72-0824 NO.2 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- MANIFOLD HPT CLEARANCE CONTROL BRACKET OPTIONAL
CHANGE. SERVICE BULLETIN
MOS
2I -NOV-20I 1 HRS/MSC
ENC
SB 72-0825 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED
PRE-CFM56-78 SIB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE
BULLETIN
MOS
I-IRS/NISC
ENC 25000 (s)
SB 72-0825 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED
PRE-CFM56-7B SiB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE
BULLETIN
MOS
29-NOV-2011 HRS/MSC
ENC 15000 (s)
SB 72-0825 R2 NO.2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (7232-00)- ON WING INSPECTION OF PRE-CFM56-7B SB SUPERSEDED
72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES (SUPERSEDED BY SB 72-0825 R3).
SERVICE BULLETIN
MOS
HIRSAISC - (s)
ENC
SB 72-0825 R3 NO.2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF PRE-CFM56-7B SB CATEGORY 2
72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN
MOS
30-APR-2014 HIRSAISC -
ENC
SB 72-0826 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 72-0827 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK OF THE BOOSTER SPOOL. SERVICE CUSTOMER
BULLETIN CONVENIENCE
MOS
27-MAY-20I3 HRSO4SC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 693 Of 748
@ Camp Systems
EFTA00618984
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0829 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - RELEASE OF CFM56-78E HPT ROTOR HARDWARE TO EARLIER RECOMMENDED
CFM56-78 ENGINE MODELS. SERVICE BULLETIN
MOS
30-JAN-2012 HRSO.ISC -
ENC
SB 72-0830 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - RELEASE OF CFM56-7BE COMBUSTION CASE TO RECOMMENDED
EARLIER CFM56-7B ENGINE MODELS. SERVICE BULLETIN
MOS
10-JAN-2012 HRSO.ISC -
ENC
SB 72-0831 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
02-DEC-2011 HRS(MSC -
ENC
SB 72-0832 NO.2 ENGINE - ENGINE -FAN FRAME ASSEMBLY (72-23-00) -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE
BULLETIN
MOS
05-JUL-2011 HRS(MSC -
ENC
SB 72-0833 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B TURBOFAN ENGINES.
SERVICE BULLETIN
MOS
31-AUG-2011 HRSOASC -
ENC
SB 72-0833 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 TURBOFAN ENGINES.
SERVICE BULLETIN
MOS
28-N0V-2011 HRSOASC -
ENC
SB 72-0834 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART CUSTOMER
NUMBERS AND CONVENIENCE
REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN
MOS
08-JUN-2011 HIRSAISC -
ENC
SB 72-0834 RI NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART NUMBERS AND CUSTOMER
REIDENT1FICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN CONVENIENCE
MOS
20-JUL-2012 HRSOASC -
ENC
SB 72-0835 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION RECOMMENDED
COMBUSTION CHAMBER INNER LINER WITH THIN TBC. SERVICE BULLETIN
MOS
01-DEC-2011 HRS/1,1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 694 Of 748
@ Camp Systems
EFTA00618985
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0836 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED
INNER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
23-SEP-2011 HRSAISC -
ENC
SB 72-0837 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B20E, SERVICE BULLETIN OPTIONAL
MOS
I6-JUN-2011 HRSOASC -
ENC
SB 72-0838 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7622E. SERVICE BULLETIN OPTIONAL
MOS
76-JUN-2011 HRS/MSC -
ENC
SB 72-0839 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B228B1. SERVICE OPTIONAL
BULLETIN
MOS
I6-JUN-2011 HRS/MSC -
ENC
SB 72-0840 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E, SERVICE BULLETIN OPTIONAL
MOS
I5-JUN-2011 HRS/MSC -
ENC
SB 72-0841 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E/B1. SERVICE OPTIONAL
BULLETIN
MOS
15-JUN-20 1 HRS/MSC -
ENC
SB 72-0842 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7626E. SERVICE BULLETIN RECOMMENDED
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0843 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/B1. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0844 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B268B2. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0845 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRSOASC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 695 Of 748
@ Camp Systems
EFTA00618986
AD/SI Status Report AIRCRAFT
COMP
Astant.frn• thernand up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0846 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFP.156-7B ENGINE CONVERSION TO CFP.156-7826E62F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0848 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7B27E431, SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0850 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7B27E/F. SERVICE RECOMMENDED
BULLETIN
MOS
25-JUL-2011 HRS/MSC -
ENC
SB 72-0852 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT ROTOR CUSTOMER
SUPPORT. SERVICE BULLETIN CONVENIENCE
MOS
16-OCT-2012 HRS/MSC
ENC
SB 72-0853 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE MATE FACE RECOMMENDED
SURFACE INSPECTION. SERVICE BULLETIN
MOS
12-SEP-2011 HRS/MSC
ENC
SB 72-0854 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY ON THE FILTER SUPPORT.
SERVICE BULLETIN
MOS
15-N0V-2011 HRS/MSC -
ENC
SB 72-0856 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE
BULLETIN
MOS
28-FEB-2012 HRS/MSC
ENC
SB 72-0857 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN
MOS
21-DEC-2011 HRSfMSC -
ENC
SB 72-0858 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INSPECTION OF SUSPECT FAN CONTAINMENT CASE FOR
MISSING OR
MISLOCATED ANODIZATION. SERVICE BULLETIN
MOS
12-SEP-2011 HRS/L1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 696 Of 748
@ Camp Systems
EFTA00618987
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0859 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) -INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED
DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN
MOS
21-SEP-2011 HRS/MSC -
ENC
SB 72-0859 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED
DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN
MOS
28-JAN-2013 HRS/MSC -
ENC
SB 72-0861 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER UNER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
09-JAN-2012 HRS/PASC -
ENC
SB 72-0862 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER UNER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
I2-JAN-2012 HRS/MSC -
ENC
SB 72-0863 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED
EROSION COATING (SUPERSEDED BY 72-0863 RI). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0863 RI NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED
EROSION COATING (SUPERSEDED BY 72-0863 R2). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 72-0863 R2 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD RECOMMENDED
EROSION COATING. SERVICE BULLETIN
MOS
22-MAY-2012 HRS/MSC
ENC
SB 72-0864 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - INTRODUCTION OF NEW STAGE 2 RECOMMENDED
AND STAGE 3 SHROUDS AND STAGE 4 THROUGH 8 VANE ASSEMBLIES AND SECTORS. SERVICE BULLETIN
MOS
25-AUG-2011 HRS/MSC -
ENC
SB 72-0865 NO.2 ENGINE - ENGINE - LPT ROTORISTATOR ASSEMLY (72-54-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC.
SERVICE BULLETIN
MOS
08-DEC-2011 HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 697 Of 748
@ Camp Systems
EFTA00618988
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnit4 up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0866 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY FOR ATTACHMENT OF J5 HARNESS. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
14-FEB-2012 HRS1MSC
ENC
SB 72-0867 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - RELEASE OF NEW HPT STATOR SHROUD. RECOMMENDED
SERVICE BULLETIN
MOS
20-APR-2072 HRS1MSC
ENC
SB 72-0868 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION OUTER RECOMMENDED
COMBUSTION CHAMBER LINER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN
MOS
07-FEB-2012 HRS1MSC -
ENC
SB 72-0869 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - RELEASE OF SPD AIR DUCT SLEEVE PIN 1812M68G02.
SERVICE BULLETIN
MOS
02-NOV-2011 MRS/P.1SC -
ENC
SB 72-0871 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED
LOCK ON-WING INSPECTION. SERVICE BULLETIN
MOS 6 (s)
19-OCT-2011 HRSAISC
ENC
SB 72-0871 R1 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED
LOCK ON-WING INSPECTION. SERVICE BULLETIN
MOS
11-APR-2012 HRSOISC DUE (s)
ENC
SB 72-0872 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 3 BLADES. CUSTOMER
SERVICE BULLETIN CONVENIENCE
MOS
12-DEC-2012 HRSAISC
ENC
SB 72-0873 NO.2 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - INTRODUCTION OF A NEW SEAL ON THE CENTER VENT TUBE.
SERVICE BULLETIN
MOS
27-FEB-20I2 HRS(MSC
ENC
SB 72-0874 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS. RECOMMENDED
SERVICE BULLETIN
MOS
20-OCT-2011 HRS1MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 698 Of 748
@ Camp Systems
EFTA00618989
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0874 R1 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS RECOMMENDED
(SUPERSEDED BY S8 72-0874 R2). SERVICE BULLETIN
MOS
08-FEB-2012 HRSAISC -
ENC
SB 72-0870 R2 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS, SERVICE CATEGORY 4
BULLETIN
MOS
14-JUL-2014 HRS11.1SC
ENC
SB 72-0875 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
23-APR-2072 HRS/MSC -
ENC
SB 72-0876 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-03-02) - INSPECTION OF FUEL NOZZLE SUPPLY TUBE NO. 7 RECOMMENDED
FOR WEAR OR CLOSE CLEARANCE, SERVICE BULLETIN
MOS 12 (s)
27-DEC-2011 HRS11.1SC
ENC
SB 72-0877 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
18-007-2012 HRS/MSC -
ENC
SB 72-0878 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - FUEL MANIFOLD SUPPORT BRACKETS AND IGNITER CABLE OPTIONAL
BRACKET ASSEMBLY REDESIGN. SERVICE BULLETIN
MOS
21-NOV-2011 HRS/MSC -
ENC
SB 72-0879 RI NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW
HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE.
SERVICE BULLETIN
MOS
12-APR-2012 MRS/P.1SC
ENC
SB 72-0879 R3 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW CATEGORY 6
HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE.
SERVICE BULLETIN
MOS
15-JAN-2014 HRSAISC
ENC
SB 72-0880 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION INNER RECOMMENDED
COMBUSTION CHAMBER LINER INTO MULTI-HOLE COOLING PATCH WITH THIN TBC CONFIGURATION. SERVICE
BULLETIN
MOS
22-FEB-2012 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 699 Of 748
@ Camp Systems
EFTA00618990
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0881 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - HPT STATOR AIR IMPINGEMENT MANIFOLD REWORK. SERVICE RECOMMENDED
BULLETIN
MOS
II -APR-2012 HRS/MSC -
ENC
SB 72-0882 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
26-SEP-2012 HRS(MSC -
ENC
SB 72-0884 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REPETITIVE ON-WING INSPECTION OF THE FAN RECOMMENDED
BLADE PLATFORMS. SERVICE BULLETIN
MOS 12 (s)
24-JAN-2012 HRS/MSC
ENC
SB 72-0885 NO.2 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 2 BLADES. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0886 NO.2 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN RECOMMENDED
MOS
27-FEB-20I2 HRS/MSC
ENC 400(s)
SB 72-0886 R1 NO.2 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0888 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER WITH A RECOMMENDED
MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN
MOS
30-AUG-2012 HRS(MSC -
ENC
SB 72-0888 R1 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF NEW OUTER LINERS WITH A CUSTOMER
MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN CONVENIENCE
MOS
03-JAN-2013 HRS/MSC -
ENC
SB 72-0889 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER RECOMMENDED
WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN
MOS
23-AUG-2012 HRS/MSC -
ENC
SB 72-0889 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER CUSTOMER
WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN CONVENIENCE
MOS
I7-OCT-2012 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 700 Of 748
@ Camp Systems
EFTA00618991
AD/SI Status Report AIRCRAFT
CAMP
Aviation/nem the ernit4 up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0890 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION CHAMBER ASSEMBLY. RECOMMENDED
SERVICE BULLETIN
MOS
23-AUG-20I2 HRS/MSC
ENC
SB 72-0892 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
13-FEB-20 I 2 HRSOASC -
ENC
SB 72-0893 NO.2 ENGINE - INTRODUCTION OF A NEW BOLT-WASHER ASSEMBLY TO IMPROVE THE FLANGE ASSEMBLY
ATTACHMENT. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 72-0894 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF A NEW COMPRESSOR RECOMMENDED
ROTOR STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN
MOS
Id-MAR-2012 HRS/MSC -
ENC
SB 72-0894 R1 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION Of A NEW COMPRESSOR ROTOR RECOMMENDED
STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0895 NO.2 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT RECOMMENDED
ROTOR KIT. SERVICE BULLETIN
MOS
10-MAY-2012 HRS/MSC
ENC
58 72-0895 R1 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT
ROTOR KIT. SERVICE BULLETIN
MOS
HRS/MSC
ENC
58 72-0897 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE
AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN
MOS
20-MAR-2012 HRS(MSC -
ENC
58 72-0897 R1 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE
AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN
MOS
28-MAR-2013 HRS(MSC -
ENC
SB 72-0898 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
12-MAR-2012 HRS(MSC -
ENC
74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 701 Of 748
@ Camp Systems
EFTA00618992
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0899 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE RECOMMENDED
REPAIR. SERVICE BULLETIN
MOS
17-OCT-2012 HRS/MSC -
ENC
SB 72-0900 NO.2 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 1 BLADES. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0902 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - DELETION OF ALTERNATE COMBUSTION CHAMBER RECOMMENDED
ASSEMBLY. SERVICE BULLETIN
MOS
20-APR-2012 HRS/MSC
ENC
SB 72-0903 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-5340) - REWORK OF N500 MATERIAL HPT STATOR RECOMMENDED
SHROUDS. SERVICE BULLETIN
MOS
12-APR-20I3 HRSOASC
ENC
SB 72-0904 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW AIR/OIL SEPARATOR AND REWORK OF THE
OLD ONE. SERVICE BULLETIN
MOS
17-OCT-2012 HRS/MSC -
ENC
SB 72-0907 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-7BE BASELINE CONFIGURATION HARDWARE RELEASED TO INFORMATIONAL
EARLIER CFM56-76 SAC ENGINE MODELS. SERVICE BULLETIN
MOS
04-JUN-2013 HRSOJSC -
ENC
SB 72-0909 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE CUSTOMER
PLATFORM. SERVICE BULLETIN CONVENIENCE
MOS
20-NOV-2012 HRS/PASC
ENC
SB 72-0911 NO.2 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
17-JUL-2012 HRSfMSC -
ENC
SB 72-0912 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
27-SEP-2012 HRSOASC -
ENC
SB 72-0913 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED
BULLETIN
MOS
OS-NOV-2012 HRSfMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 702 Of 748
@ Camp Systems
EFTA00618993
AD/SI Status Report AIRCRAFT
CAMP
/al/thaw/ma tAtinand 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0914 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
25-MAR-2013 HRS(MSC -
ENC
SB 72-0914 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
12-APR-20I3 HRS(MSC -
ENC
SB 72-0915 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN
MOS
30-NOV-20I 2 MRS/MSC -
ENC
SB 72-0916 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE
REPAIR. SERVICE BULLETIN
MOS
15-JAN-2013 HRS(MSC -
ENC
SB 72-0917 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OIL SCAVENGE TUBE CLAMP. SERVICE RECOMMENDED
BULLETIN
MOS
16-OCT-2012 HRS(MSC -
ENC
SB 72-0918 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR BLADE MANAGEMENT SUPERSEDED
(SUPERSEDED BY S8 72-0918 R1). SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 72-0918 RI NO.2 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. CATEGORY 4
SERVICE BULLETIN
MOS
1 1-JUN-20I4 HRSOASC
ENC
SB 72-0920 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT NOZZLE KIT. SERVICE LIMITED
BULLETIN DISTRIBUTION
MOS
15-NOV-20I 3 HRS(MSC
ENC
SB 72-0921 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SUPERSEDED
72-0921 RI). SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 72-0921 RI NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SB 72-0921 SUPERSEDED
R2). SERVICE BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 703 Of 748
@ Camp Systems
EFTA00618994
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0921 R2 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE. SERVICE BULLETIN CATEGORY 5
MOS
09-DEC-2013 HRS/MSC -
ENC
SB 72-0922 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN
MOS
25-FEB-2013 HRS/MSC -
ENC
SB 72-0924 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW BRACKET ASSEMBLIES, SERVICE BULLETIN CATEGORY 7
MOS
23-JUL-2014 HRS/MSC -
ENC
SB 72-0926 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE SUPERSEDED
3 OUTER BUSHINGS (SUPERSEDED BY SB 72-0926 R1). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0926 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE
3 OUTER BUSHINGS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 72-0927 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0
ALTERNATIVE FOR THE liANDCRANKING LINE (SUPERSEDED BY SB 72-0927 R1). SERVICE BULLETIN
MOS
03-JUL-2013 HRS/MSC -
ENC
SB 72-0927 R1 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 CATEGORY 3
ALTERNATIVE FOR THE liANDCRANKING LINE. SERVICE BULLETIN
MOS
I4-APR-2014 HRS/MSC ESV
ENC
SB 72-0928 NO.2 ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - REPLACEMENT OF LPT STAGE 1
NOZZLE SEGMENTS DUE TO ENVIRONMENTAL DISTRESS, SERVICE BULLETIN
MOS
22-JUL-2013 HRSIMSC -
ENC
SB 72-0929 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR DISK AIR SLOT REDESIGN. SERVICE CUSTOMER
BULLETIN CONVENIENCE
MOS
06-AUG-2013 HRS/MSC -
ENC
SB 72-0930 NO.2 ENGINE - ENGINE - HPT/LPT SHROUD NOZZLE ASSEMBLY (72-53-00)- FORWARD FLANGE WEAR GROOVE CUSTOMER
HPT/LPT SHROUD NOZZLE SUPPORT REWORK. SERVICE BULLETIN CONVENIENCE
MOS
02-OCT-2013 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 704 Of 748
@ Camp Systems
EFTA00618995
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0931 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE SUPERSEDED
(SUPERSEDED BY SI3 72-0931 RH. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 72-0931 RI NO.2 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE. CATEGORY 7
SERVICE BULLETIN
MOS
10-JAN-2014 MRS/51SC
ENC
SB 72-0933 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW CUP TO ATTACH THE OUTER CATEGORY 7
PLATFORM OF THE OGV TO THE CONTAINMENT CASE. SERVICE BULLETIN
MOS
20-FEB-2014 HRS/MSC -
ENC
SB 72-0934 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - REWORK OF THE COMBUSTION CASE PM 2002MMG09. SERVICE CATEGORY 7
BULLETIN
MOS
14-FEB-2014 FIRS/MSC
ENC
SB 72-0935 NO.2 ENGINE - -1PT ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT ROTOR BLADE P/N 2403M91P03 AND CUSTOMER
76-BLADE HPT ROTOR KIT. SERVICE BULLETIN CONVENIENCE
MOS
03-SEP-2013 HRSfMSC -
ENC
SB 72-0938 NO.2 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF A NEW METALLIC C-SEAL TO THE RECOMMENDED
SPARE PARTS LIST. SERVICE BULLETIN
MOS
04-SEP-2013 MRS/MSC
ENC
58 72-0939 NO.2 ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - INTRODUCTION OF HPT STATOR SHROUD P/N CATEGORY 7
2080M28P06. SERVICE BULLETIN
MOS
21-NOV-2013 HRS/MSC
ENC
SB 72-0910 NO.2 ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD SUPERSEDED
FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING (SUPERSEDED BY SB 72-0940 R1). SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-0940 RI NO.2 ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD CATEGORY 7
FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING. SERVICE BULLETIN
MOS
04-FEB-2014 HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 705 Of 748
@ Camp Systems
EFTA00618996
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 72-0946 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4
HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND PM 2048M21P03 (SUPERSEDED BY SB 72-0946 R1). SERVICE
BULLETIN
MOS
29-JAN-2014 HRS/MSC
ENC
SB 72-0946 R1 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4
HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND P/N 2048M21P03. SERVICE BULLETIN
MOS
06-KWY-2014 HRS/MSC -
ENC
SB 72-0952 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF IMPROVED CAST INCO 718 BLADE CATEGORY 7
LOCKS FOR STAGES 4 THROUGH 9. SERVICE BULLETIN
MOS
14-JUL-2014 HRSO4SC -
ENC
SB 72-223 NO.2 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN
MOS
02-FEB-2000 HRS/MSC -
ENC
SB 72-A0140 R1 NO.2 ENGINE - INTRODUCTION OF A BONDED CAUTION PLATE ON HANDCRANKING COVER. SERVICE BULLETIN
MOS
25-JUN-1999 HRS/MSC -
ENC
SB 72-A0336 NO.2 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 72-A0368 NO.2 ENGINE - ACCESSORY GEARBOX - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A DEFECTIVE BATCH.
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0001 NO.2 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS/MSC -
ENC
SB 73-0002 NO.2 ENGINE - EEC-SOFTWARE VERSION 7.B.D. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0008R1
MOS
HRS/MSC -
ENC
SB 73-0003 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0007
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 706 Of 748
@ Camp Systems
EFTA00618997
AD/SI Status Report AIRCRAFT
CORP
Mianistfrn• therrantulqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0003 R1 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0003 R2 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0004 NO.2 ENGINE - HMU 1853M56P05(VIN 442026). SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0020
MOS
HRSAISC -
ENC
SB 73-0005 NO.2 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION.
SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R1 NO.2 ENGINE - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL MANIFOLDS (SUPERSEDED BY SB SUPERSEDED NOT APPLICABLE
73-0005 R2). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R2 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3
MANIFOLDS. SERVICE BULLETIN
MOS
29-OCT-2013 HRSAISC -
ENC
SB 73-0005 R3 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL SUPERSEDED
MANIFOLDS (SUPERSEDED BY SB 73-0005 R4). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0005 R4 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3
MANIFOLDS. SERVICE BULLETIN
MOS
I4-JUL-2014 HRS/MSC ESV
ENC
SB 73-0006 R1 NO.2 ENGINE - TRANSFER OF THE COOLING AIR ORIFICE PLATE TO THE EEC COMPONENT ASSEMBLY LEVEL. COMPLIED WITH - AT MANUFACTURE
SERVICE BULLETIN
MOS I6-DEC-1998
HRS/MSC - 0
ENC 0
SB 73-0007 NO.2 ENGINE - INTRODUCTION OF NEW MAIN FUEL PUMP WITH A NEW STATIONARY SHAFT SEAL. SERVICE COMPLIED WITH - AT MANUFACTURE
BULLETIN
MOS I6-DEC-1998
HRSAISC 0
ENC 0
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 707 Of 748
@ Camp Systems
EFTA00618998
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0008 Ri NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.E.. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0009
MOS
HRSIASC -
ENC
SB 73-0009 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (782B). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0012
MOS
HRSuSC -
ENC
SB 73-0010 NO 2 ENGINE - DRAIN TUBE AND FUEL MANIFOLD REPLACEMENT. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRS4.ISC 0
ENC 0
SB 73-0011 NO 2 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS.ISC 0
ENC 0
SB 73-O011 R1 NO 2 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN
MOS
HRS7.ISC -
ENC
SB 73-0012 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F3 (782E). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0015
MOS
HRSuSC -
ENC
SB 73-0013 NO 2 ENGINE - OPERATE CFM USING CIS TS-1 FUELS. SERVICE BULLETIN
MOS
HRSuSC -
ENC
SB 73-0014 R2 NO 2 ENGINE - INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRSI.ISC 0
ENC 0
SB 73-0015 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F4 (7831). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0018R1
MOS
HRS.ISC -
ENC
SB 73-0017 NO 2 ENGINE - INTRODUCTION OF ECUIEEC HARDWARE/SOFTWARE KITS. SERVICE BULLETIN NOT APPLICABLE
MOS
HRS7.ISC -
ENC
SB 73-O018R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.G (7B30). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0021R1
MOS
HRSuSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 708 Of 748
Camp Systems
EFTA00618999
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0019 NO 2 ENGINE - NEW FUEL TRANSIENT BLEED VALVE MANIFOLD AND SUPPORTING BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC - 0
ENC 0
SB 73-0020 NO 2 ENGINE - INTRODUCTION OF HMU VIN 442098 (GE 1853:056P06). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC - 0
ENC 0
SB 73-0021 R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.H2 (7B36). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0023R1
MOS
HRS., MSC -
ENC
SB 73-0022 NO 2 ENGINE - MODIFICATION OF FUEL NOZZLE FILTER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS,MSC 0
ENC 0
SB 73-0023 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 Si (7B37). SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0023 R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.I(7837). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0024
MOS
HRSMSC -
ENC
SB 73-0024 NO. 2 ENGINE - EEC-SOFTWARE VERSION 7.8.11 (7B38). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSMSC - 0
ENC
SB 73-0025 NO. 2 ENGINE - MODIFICATION OF THE FUEL NOZZLE FILTER. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0026 NO. 2 ENGINE - INTRODUCTION OF EEC- SOFTWARE VERSION 7.B.J(783A). SERVICE BULLETIN
MOS
HRSMSC
ENC
SB 73-0027 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSMSC
ENC
SB 73-0028 NO 2 ENGINE - INTRODUCTION TO HMU 18535156KM WIN 442124). SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 709 Of 748
11 Camp Systems
EFTA00619000
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0028 R1 NO.2 ENGINE - INTRODUCTION TO HMU 1853M56P07 (VIN 442124). SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0029 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0029 R1 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0029 R2 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0030 NO.2 ENGINE - ECU/EECS WITH DPM-3 CONVERSION. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0030 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC ENGINE CONTROL (73-00-00) - INTRODUCTION OF NEW OPTIONAL
ECU/EECS WITH NEW DPM-3 AND CONVERSION, SERVICE BULLETIN
MOS
22-FEB-20 I 1 MRS/51SC
ENC
SB 73-0031 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED
MOS
MRS/51SC
ENC
SB 73-0032 NO.2 ENGINE - REPLACEMENT OF VESPEL BALL PM 1419-240. SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0033 NO.2 ENGINE - CONVERSION NON-PMUX ENGINE AND PMUX TO NON-PMUX ENGINE. SERVICE BULLETIN
MOS
MRS/MSC -
ENC
SB 73-0034 NO.2 ENGINE - INTRODUCTION OF NEW FIEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0035 NO.2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.J1 (7820). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 710 Of 748
@ Camp Systems
EFTA00619001
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0036 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED
MOS
HRSI.ISC -
ENC
SB 73-0037 NO 2 ENGINE - ENGINE FUEL CONTROL (73-00.00) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0037 Ri NO 2 ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSitISC -
ENG
SB 73-0037 R2 NO. 2 ENGINE - ENGINE FUEL CONTROL (73-00-W) HMU HPSOV SWITCH. SERVICE BULLETIN
MOS
HRS.ISC -
ENG
SB 73-0037 R3 NO 2 ENGINE - HPSOV SWITCH. SERVICE BULLETIN
MOS
19-DEC-2001 HR&MSC -
ENG
SB 73-0037 R4 NO 2 ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSisiSC -
ENG
SB 73-0037 RS NO 2 ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 73-0038 NO 2 ENGINE - INTRODUCTION OF NEW FUEL FLOW TRANSMITTER. SERVICE BULLETIN
MOS
HRSitISC -
ENG
SB 73-0039 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 73-0040 NO 2 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P16 (7641). SERVICE BULLETIN
MOS
HRSLISC -
ENG
SB 73-0041 NO 2 ENGINE - INTRODUCTION OF A NEW VSV RIGHT SIDE DRAIN MANIFOLD. SERVICE BULLETIN
MOS
HRSisiSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective C/W
(EBT)-Estimated Base Time 711 Of 748
Camp Systems
EFTA00619002
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0042 NO.2 ENGINE - NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0042 RI NO.2 ENGINE - NEW FUEL DIFFERNTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0043 NO.2 ENGINE - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0043 RI NO.2 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 73-0043 R2 NO.2 ENGINE - ELECTRONIC FUEL CONTROL - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 73-0044 NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0044 RI NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0044 R2 NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION, SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0045 NO.2 ENGINE - NEW HPTCC VALVE FUEL MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0046 NO.2 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P17 (7842). SERVICE BULLETIN
MOS
HRS,MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 712 Of 748
@ Camp Systems
EFTA00619003
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0047 NO.2 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN
MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRS.?.ISC -
ENG
SB 73-0047 RI NO 2 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN
MANIFOLD INTRODUCTION. SERVICE BULLETIN
MOS
HRSI.ISC -
ENG
SB 73-0049 NO 2 ENGINE - INSPECTION OF HMU MAIN BODY FOR HPT2 THIN WALL CASTING. SERVICE BULLETIN
MOS
HRSMSC -
ENG
SB 73-0050 NO 2 ENGINE - ELECTRONIC ENGINE CONTROL INTRODUCTION OF SOFTWARE 1853M781518 (7846). SERVICE
BULLETIN
MOS
HR&MSC -
ENG
SB 73-0050 F21 NO 2 ENGINE - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853s178P18 (7946). SERVICE
BULLETIN
MOS
-
ENG
SB 73-0051 NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HR&MSC -
ENG
SB 73-0052 NO 2 ENGINE - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED
PACKING. SERVICE BULLETIN
MOS
HR&MSC
ENC
SB 73-0052 R2 NO 2 ENGINE - ENGINE FUEL CONTROL (73-00-C0) - MAIN FUEL PUMP - INTRODUCTION OF A NEW IMPELLER DRIVE
SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN
MOS
-
ENG
SB 73-0053 NO.2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
-
ENG
SB 73-0053 RI NO 2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
19-DEC-2001 HRSisiSC -
ENG
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 713 Of 748
Camp Systems
EFTA00619004
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0053 R2 NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION.
SERVICE BULLETIN
MOS
HRSIASC
ENC
SB 73-0053 R3 NO.2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0054 NO 2 ENGINE - FIELD DELETION BURN STAGE VALVE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0054 RI NO 2 ENGINE - CORE ENGINE MAJOR MODULE - FIELD DELETION OF THE BURNER STAGING VALVE SYSTEM.
SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 73-0055 NO 2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 73-0055 R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN
MOS
HRSI.ISC
ENC
SB 73-0056 NO.2 ENGINE - . SERVICE BULLETIN
MOS
HR&LISC
ENC
SB 73-0057 NO 2 ENGINE - SPARE PARTS RELEASE FOR BAE SYSTEMS CONTROLS. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
SB 73-0058 NO 2 ENGINE - ENGINE FUEL AND CONTROL - CFm56-78 SAC ENGINE CONFIGURATIONS J9 AND Ji 0 HARNESS WITH
IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN
MOS
HRS.I.ISC -
ENC
SB 73-0058 Fei NO 2 ENGINE - CFNI56-78 SAC ENGINE CONFIGURATIONS Jr9 AND Ji 0 HARNESSES WITH IMPROVED OR REWORKED
DESIGN. SERVICE BULLETIN
MOS
HR&P.ISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN
(EBT)-Estimated Base Time 714 Of 748
Camp Systems
EFTA00619005
AD/SI Status Report AIRCRAFT
CORP
Miantstinne the enand 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0059 NO.2 ENGINE - ECU DPM INSPECTION. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0060 NO.2 ENGINE - ENGINE FUEL CONTROL - INTRODUCTION OF A NEW SERVO FUEL HEATER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0061 NO.2 ENGINE - ENGINE FUEL AND CONTROL. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-O061R1 NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
19-DEC-2001 MRS/MSC -
ENC
SB 73-0061 R2 NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0061 R3 NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM
INSTALLED. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0062 NO.2 ENGINE - INTRODUCTION OF NEW/REWORKED ECU WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 73-O062R1 NO.2 ENGINE - INTRODUCTION OF NEW OR REWORKED ELECTRONIC CONTROL UNIT WITH LOCKWIRE CAPABILITY.
SERVICE BULLETIN
MOS
FIRS/MSC
ENC
SB 73-0063 NO.2 ENGINE - INTRODUCTION OF FUEL MANIFOLDS WITH INTERNAL DRAIN PLUGS. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0064 NO.2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN
MOS
HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 715 Of 748
@Camp Systems
EFTA00619006
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0064 R1 NO.2 ENGINE - ELCTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0065 NO.2 ENGINE - ELECTRONIC ENGINE CONTROL - PRESSURE SUBSYSTEM. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0066 NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND
THRUST WASHER.. SERVICE BULLETIN
MOS
19-DEC-2001 HRSIMSC
ENC
SB 73-0066 R1 NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND
THRUST WASHER. SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 73-0067 NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0067 R1 NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0067 R2 NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0067 R3 NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH
PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0068 NO.2 ENGINE - REWORK OF THE HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) TO HYDROMECHANICAL
UNIT VIN 442124 ( GE 1853M56P07). SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0069 NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRSIMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 716 Of 748
@ Camp Systems
EFTA00619007
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Ad-tilting:KY 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0069 R1 NO. 2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRSIASC
ENC
SB 73-0069 R2 NO. 2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE
BULLETIN
MOS
HRS4ISC
ENC
SB 73-0070 NO. 2 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM CONVERSION. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 73-0071 R2 NO. 2 ENGINE - INTRODUCTION OF SOFTWARE 7. B. 01 1853m78P23. SERVICE BULLETIN
MOS
HRSiliSC -
ENC
SB 73-0073 NO 2 ENGINE - ENGINE FUEL CONTROL - ENGINE FUEL CONTROL (73-00-00) - RESISTOR MODIFICATION FOR PSS
TRANSDUCER INCOMPATIBILITY. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 73-0074 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR
PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0074 R1 NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR
PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSI.ISC -
ENC
SB 73-0074 R2 NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF
SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSP.ISC -
ENC
SB 73-0074 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF
SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 73-0075 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00.00) - HYDROMECHANICAL UNIT -
INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 717 Of 748
Camp Systems
EFTA00619008
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0075 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - HYDROMECHANICAL UNIT -
INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0076 NO.2 ENGINE - MEC SERVO FUEL HTR LEAKS. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0077 NO.2 ENGINE - FIELD REWORK OF SINGLE ANNULAR COMBUSTOR (SAC) FUEL MANIFOLDS TO ELIMINATE DEAD-END
ZONE. SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 73-0078 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - INTRODUCTION OF A NEW FUEL COMPLIED WITH
FILTER ELEMENT. SERVICE BULLETIN
MOS 0I-MAR-2007
HRSIMSC - 2871:05
ENC 646
SB 73-0079 NO.2 ENGINE - REPLACEMENT OF THE CURRENT DEFECTIVE SIXTH ATTACHMENT OF THE FUEL FILTER COVER OF
THE MAIN FUEL PUMP EQUIPPED WITH 0-HEAD BOLT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0080 NO.2 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - REPLACEMENT OF SHUTOFF
SPACER 2687048 WITH NEW DESIGN. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 73-0081 NO.2 ENGINE - HYDROMECHANICAL UNIT (HMU) (73-21-10) - INTRODUCTION OF HONEYWELL HMU VIN 442317 (GE
1853M56P09). SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 73-0082 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 7.B.N
1853M78P21. SERVICE BULLETIN
MOS
HRSIMSC
ENC
SB 73-0083 NO.2 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY.
SERVICE BULLETIN
MOS
HRSIMSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 718 Of 748
@ Camp Systems
EFTA00619009
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0083 R1 NO.2 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY.
SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 73-0084 NO.2 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN
MOS 6 (s)
FIRSAISC
ENC
SB 73-0084 R1 NO.2 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN
MOS 6 (s)
HRSAISC
ENC
SB 73-0085 RI NO.2 ENGINE - INTRODUCTION OF NEW J10 HARNESSES OR REWORK OF THE OLD ONES. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0086 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0088 NO.2 ENGINE - IMPROVED FUEL FLOW TRANSMITTER, SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73-0089 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE HARNESSES CJ9. CJIO (73-24-05) - INTRODUCTION OF A NEW
CS HARNESS OR REWORK OF THE OLD ONE AND DELETION OF THE DUMMY RECEPTACLE BRACKET. SERVICE
BULLETIN
MOS
HRSAISC -
ENC
SB 73-0090 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC
FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0090 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC
FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0093 NO.2 ENGINE - HYDROMECHANICAL UNIT ( 73-21-10) -INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE
ELECTROHYDRAULIC SERVO VALVE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 719 Of 748
@ Camp Systems
EFTA00619010
AD/SI Status Report AIRCRAFT
Cli tagiren Meg' nehip. 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
52‘ 73-0094 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 73-0094 RI NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
FIRS,MSC -
ENC
SB 73-0094 R2 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF NEW METERING VALVE RESOLVER BODY
ASSEMBLY. SERVICE BULLETIN
MOS
I-IRS/MSC -
ENC
SB 73-0095 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED BURNER STAGING VALVE (BSV)
SOLENOID AND VALVE ASSEMBLY. SERVICE BULLETIN
MOS
FIRS/MSC -
ENC
SB 73Ø96R1 NO.2 ENGINE - REPLACEMENT OF FLUOROSILICONE PREFORMED PACKINGS WITH FLUOROCARBON PREFORMED SUPERSEDED
PACKINGS (SUPERSEDED BY 73-0096 R2). SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0096 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HMU (73-21-79) - REPLACEMENT OF FLUOROSILICONE PREFORMED RECOMMENDED
PACKINGS WITH FLUOROCARBON PREFORMED PACKINGS. SERVICE BULLETIN
MOS
05-JAN-2012 FIRS/MSC -
ENC
SB 73-0097 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN
MOS 6 (s)
HRS(MSC
ENC
SB 73-0097 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN
MOS 6 (s)
08-MAR-2005 FIRS/MSC
ENC
SB 73-0098 NO.2 ENGINE - ECU CHASSIS MODIFICATION (SUPERSEDED BY SB 73-0098 RI). SERVICE BULLETIN
MOS
FIRSAISC -
ENC
SB 73-0098 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU CHASSIS MODIFICATION. CATEGORY 7
SERVICE BULLETIN
MOS
O1-APR-2014 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 720 Of 748
@Camp Systems
EFTA00619011
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0099 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED ADJUSTMENT SCREW (PN
2689127). SERVICE BULLETIN
MOS
HRS/h1SC
ENC
SB 73-01 NO.2 ENGINE - FUEL FLOW TRANSMITTER CAUBRATION IMPROVEMENT. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 73-0100 NO.2 ENGINE - ENGINE FUEL AND CONTROL - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0102 NO.2 ENGINE - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 115V 400HZ DISCONNECTS. SERVICE
BULLETIN
MOS
HRS(MSC
ENC
SB 73-0102 R1 NO.2 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR
115V 400HZ DISCONNECTS. SERVICE BULLETIN
MOS
07-MAR-2006 HRS(MSC -
ENC
SB 73-0102 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY RECOMMENDED
ROBUSTNESS MODIFICATION FOR 115V 400 HZ DISCONNECTS (SUPERSEDED BY SB 73-0102 R3). SERVICE BULLETIN
MOS
10-N0V-2010 HRS/MSC -
ENC
SB 73-0102 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY CATEGORY 7
ROBUSTNESS MODIFICATION FOR 11W 400 HZ DISCONNECTS. SERVICE BULLETIN
MOS
20-JUN-2014 HRS/h1SC -
ENC
SB 73-0103 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT(73-21-10) - LOW PRESSURE LEAK CHECK,
SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 73-0104 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - ONE TIME INSPECTION OF 3 FUEL SUPPLY COMPUED WITH - IAW THE SB
TUBES FOR WEAR AND INTRODUCTION OF KEVLAR CUSHION CLAMPS. SERVICE BULLETIN
MOS 22-AUG-2008
HRS/MSC - 3260:48
ENC 746
SB 73-0106 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE
BULLETIN
MOS
HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 721 Of 748
@ Camp Systems
EFTA00619012
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2O14
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0106 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE
BULLETIN
MOS
HRSAISC
ENC
SB 73-0107 NO.2 ENGINE - INSPECTION OF PUMP COVER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0108 RI NO.2 ENGINE - BURNER STAGING VALVE SOLENOID REMOVAL FROM HMU. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0108 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HMU (73-21-79) - BURNER STAGING VALVE SOLENOID REMOVAL FROM RECOMMENDED
HMU. SERVICE BULLETIN
MOS
I6-FEB-2012 HRSAISC
ENC
SB 73-0109 RI NO.2 ENGINE - NEW SOLENOID AND VALVE. SERVICE BULLETIN
MOS
07-MAR-2006 HRSfMSC -
ENC
SB 73-0111 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-00-00) - INTRODUCTION OF FADEC3 HARDWARE AND
SOFTWARE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 73-0113 NO.2 ENGINE - INSPECTION OF MAIN-STAGE CHECK VALVE SPRING (SUPERSEDED BY 73-0113 RI). SERVICE SUPERSEDED
BULLETIN
MOS
HRSAISC -
ENC
SB 73-0113 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL NOZZLES (73-00-00) - INSPECTION OF MAIN-STAGE CHECK RECOMMENDED
VALVE SPRING. SERVICE BULLETIN
MOS
I3-JAN-2012 HRSAISC -
ENC
SB 73-0115 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW 713.O SOFTWARE. SERVICE BULLETIN
MOS 6 (s)
06-JUN-2005 HRSAISC
ENC
SB 73-0115 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.O SOFTWARE. SERVICE BULLETIN
MOS 6 (s)
30-MAY-2008 HRSAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 722 Of 748
@ Camp Systems
EFTA00619013
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0116 NO.2 ENGINE - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE I PC.
SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 73-0116 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-2140) - INTRODUCTION OF NEW
ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC. SERVICE BULLETIN
MOS
I3-NOV-2009 HRSAISC -
ENC
SB 73-0117 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0118 RI NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH A NEW COVER. SERVICE BULLETIN
MOS
23-FEB-2006 HRSAISC -
ENC
SB 73-0120 NO.2 ENGINE - NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
SB 73-0120 RI NO.2 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN
MOS
30-MAY-2008 HRS1MSC -
ENC
SB 73-0121 NO.2 ENGINE - FRONT PANEL ASSEMBLY ALIGNMENT PIN MODIFICATION PROCEDURE. SERVICE BULLETIN
MOS
27-JUN-2007 HRSAISC -
ENC
SB 73-0122 NO.2 ENGINE - FADEC3 -SIA CONNECTOR HARDWARE RETENTION, SERVICE BULLETIN
MOS
27-JUN-2007 HRSAISC -
ENC
SB 73-0123 NO.2 ENGINE - VSV SYSTEM (72-00-02) - NEW FUEL MANIFOLDS. SERVICE BULLETIN
MOS
I2-APR-2006 HRSAISC -
ENC
SB 73-0124 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN
MOS
21-APR-2008 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 723 Of 748
@ Camp Systems
EFTA00619014
AD/SI Status Report AIRCRAFT
CAMP
Aticieteafra theireandge 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0126 NO.2 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS
. SERVICE BULLETIN
MOS
17-JUL-2006 MRS/51SC
ENC
SB 73-0126 RI NO.2 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE
BULLETIN
MOS
I4-AUG-2007 HRS/MSC
ENC
SB 73-0126 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION.
ADDITION OF SIDE
TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN
MOS
02-OCT-2009 MRS/MSC -
ENC
SB 73-0127 NO.2 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
17-JUL-2006 MRS/51SC -
ENC
SB 73-0127 RI NO.2 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
26-FEB-2008 MRS/51SC -
ENC
SB 73-0127 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION - SUPERSEDED
REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS 9SUPERSEDED BY 73-0127 R3). SERVICE BULLETIN
MOS
HRS/hISC -
ENC
SB 73-0127 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL (73-00-00) - ECU/EEC MODIFICATION
- REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0128 RI NO.2 ENGINE - INTRODUCTION OF FADEC3 HARDWARE FOR DAC ENGINES. SERVICE BULLETIN
MOS
02-APR-2007 MRS/51SC -
ENC
SB 73-0130 NO.2 ENGINE - INSPECTION OF HYDROMECHANICAL UNIT FOR NON-HYDROCARBON CONTAMINATION. SERVICE RECOMMENDED
BULLETIN
MOS 6 (s)
07-MAY-2007 MRS/51SC 1500
ENC
SB 73-0132 NO.2 ENGINE - INTRODUCTION OF FUEL NOZZLE WITH REVISED
0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN
MOS
13-JUN-2007 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 724 Of 748
@ Camp Systems
EFTA00619015
AD/SI Status Report AIRCRAFT
COMP
Astant.fran Aetna/4pp 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0132 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - INTRODUCTION OF FUEL NOZZLE WITH REVISED RECOMMENDED
0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN
MOS
13-JUN-20I2 HRS/MSC -
ENC
SB 73-0133 NO.2 ENGINE - REPLACEMENT OF SUSPECT T12 SENSOR. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER S/N
874438 N/A
MOS 08-NOV-2007
12-APR-2007 HRS/MSC 1200
(s)/DUE
ENC
58 73-0134 NO.2 ENGINE - INTRODUCTION OF NEW
UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1
(2123M62P01). SERVICE BULLETIN
MOS
08-JUN-2007 HRS/MSC -
ENC
SB 73-0134 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - POWERPLANT - ALTERNATOR (73-00-00) - INTRODUCTION OF NEW
UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1
(2123M62P01). SERVICE BULLETIN
MOS
04-MAY-2009 HRS/MSC -
ENC
SB 73-0135 NO.2 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN COMPLIED WITH - IAW THE SB
MOS 22-AUG-2008
30-MAR-2007 HRS/MSC - 3260:48
ENC 746
SB 73-0135 RI NO.2 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN
MOS
30-MAY-2008 HRS/MSC -
ENC
SB 73-0136 NO.2 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE
ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN
MOS
20-JUN-2007 HRS/MSC -
ENC
SB 73-0136 RI NO.2 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE.
SERVICE BULLETIN
MOS
I8-FEB-2008 HRS/MSC -
ENC
SB 73-0137 NO.2 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN
MOS
20-JUN-2007 HRS,MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 725 Of 748
@ Camp Systems
EFTA00619016
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0137 R1 NO.2 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN
MOS
I8-FEB-2008 HRS(MSC -
ENC
SB 73-0138 NO.2 ENGINE - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN SUPERSEDED
MOS
HRS(MSC -
ENC
SB 73-0138 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-7B ENGINES. SERVICE
BULLETIN
MOS
HRS/AISC
ENC
SB 73-0138 R1 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES.
(2) SERVICE BULLETIN AND CLEAN HMU
MOS
HRS(MSC
ENC 10000 (s)
SB 73-0138 R1 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL - (73-00.00) - USE OF CIS FUELS IN
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
HRS/MSC 3000 (s)
ENC
SB 73-0138 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-03) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
BULLETIN
MOS
20-DEC-2010 HRS/MSC
ENC
SB 73-0138 R2 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-00.00)- USE OF CIS FUELS IN CFM58-78 ENGINES. RECOMMENDED
(2) SERVICE BULLETIN AND ('I FAN HMU
MOS
20-DEC-2010 HRS/MSC 10000 (s)
ENC
SB 73-0138 R2 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
20-DEC-2010 HRS/MSC 3000 (s)
ENC
SB 73-0138 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
BULLETIN
MOS
I2-SEP-2011 HRS/MSC
ENC
SB 73-0138 R3 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-00.00)- USE OF CIS FUELS IN CFM56-78 ENGINES. RECOMMENDED
(2) SERVICE BULLETIN AND CLEAN HMU
MOS
HRS/MSC 10000 (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 726 Of 748
@ Camp Systems
EFTA00619017
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed lip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0138 R3 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
HRS/MSC 3000 (s)
ENC
SB 73-0138 R4 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES, SERVICE RECOMMENDED
BULLETIN
MOS
25-SEP-2012 HRS/MSC
ENC
SB 73-0138 R4 PARA 3.A NO.2 ENGINE -FLOW ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFMSG-7B ENGINES. SERVICE RECOMMENDED
(1) BULLETIN CHECK OF ALL FUEL NOZZLES
MOS
25-SEP-2012 HRS/MSC ESV (s)
ENC
SB 73-0138 R4 PARA 3.A NO.2 ENGINE - CLEAN ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED
(2) BULLETIN AND OVERHAUL HMU
MOS
25-SEP-2012 MRS/P.1SC 10000
(syESV
ENC
SB 73-0138 R4 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED
(3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS
MOS
25-SEP-2012 MRS/P.1SC 3000 (s)
ENC
SB 73-0139 NO.2 ENGINE - NEW SOFTWARE VERSION 7.8.S. SERVICE BULLETIN COMPLIED WITH
MOS 22-AUG-2008
12-OCT-2007 HRS/MSC - 3260:48
ENC 746
SB 73-0140 NO.2 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
28-NOV-2007 MRS/P.1SC -
ENC
SB 73-0140 RI NO.2 ENGINE - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3 FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
12-FEB-2008 HRS/MSC -
ENC
SB 73-0140 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-21-60) - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3
FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
I3-APR-2009 HRS/MSC -
ENC
SB 73-0140 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU1EEC (73-21-60) - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 RECOMMENDED
FOR CFM56-78 ENGINES. SERVICE BULLETIN
MOS
23-FEB-20 I 2 HRS(MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 727 Of 748
@ Camp Systems
EFTA00619018
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0141 NO 2 ENGINE - FRONT TRANSIENT PROTECTION BOARD FUSE INSPECTION AND REWORK ON FADEC3 FOR CFM56-78 RECOMMENDED
ENGINES. SERVICE BULLETIN
MOS 4 (5)
28-NOV-2007 HRSASC
ENC
SB 73-0142 R1 NO 2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRICAL HARNESS CJ9. CJ10
(73-24-05) - DELETION OF CJ9 WIRING HARNESS TS BRANCH FOR
NON-PMUX ENGINE IN THE FIELD. SERVICE BULLETIN
MOS
HRSi MSC -
ENC
SB 73-0143 N0.2 ENGINE - PRESSURE SUBSYSTEM (PSS) TRANSDUCER RELIABILITY IMPROVEMENT. SERVICE BULLETIN
MOS
21-FEB-2008 HRS/MSC -
ENC
SB 73-0144 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFNIS6-78 CMM. SERVICE BULLETIN
MOS
04-APR-2008 HR&MSC
ENC
SB 73-0145 NO 2 ENGINE - ENGINE FUEL AND CONTROL SYSTEM (73-00-00) - SPARE PARTS RELEASE FOR
CFM56-78 CMM. SERVICE BULLETIN
MOS
25-AUG-2008 HRSMSC
ENC
SB 73-0146 NO 2 ENGINE - REPLACEMENT OF SUSPECTED J7 WIRING HARNESS. SERVICE BULLETIN
MOS
08-APR-2008 HRSIISC
ENC 5(s)
SB 73-0151 R1 NO 2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.T SOFTWARE VERSION. SERVICE BULLETIN
MOS
27-FEB-2009 HRSilISC
ENC
SB 73-0152 NO 2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B CMM.
SERVICE BULLETIN
MOS
08-OCT-2009 HRSMSC
ENC
SB 73-0153 NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INSPECTION OF MAIN BODY
ASSEMBLY. SERVICE BULLETIN
MOS
HRSIISC -
ENC
SB 73-0154 N0.2 ENGINE - FADEC3 - CFMS6-78 - EEGECU CONVERSION FROM PIN
2042M67P02 TO PIN 2042M67PO4. SERVICE BULLETIN
MOS
01.MAY.2CC-9 HRSLISC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV
(EBT)-Estimated Base Time 728 Of 748
'2 Camp Systems
EFTA00619019
AD/SI Status Report AIRCRAFT
flP Megnand up'
737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0154 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FADEC3 - CFM56-78 - EEC/ECU CONVERSION FROM PIN 2042M67P02
TO P/N 2042M67PO4. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
S8 73-0156 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ENGINE HARNESSES CJ9. CJ10 (73-24-05)- SPARE PARTS RELEASE
FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
16-NOV-2011 HRS/MSC -
ENC
S8 73-0157 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.UI. SERVICE BULLETIN RECOMMENDED
MOS 6 (s)
27 -JUL-2009 HRS/MSC
ENC
S8 73-0157 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN
MOS 6 (s)
14-AUG-2009 HRS/MSC
ENC
S8 73-0157 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN
MOS 6 (s)
02-FEB-2010 HRS/MSC
ENC
S8 73-0158 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF MODIFIED
METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN
MOS
15-MAY-2009 HRS/MSC -
ENC
S8 73-0159 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - INTRODUCTION OF FADEC3
ECLYEEC WITH NEW MAIN CHANNEL BOARD. SERVICE BULLETIN
MOS
09-DEC-2009 HRS/MSC -
ENC
S8 73-016 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-00-00) - SCHEDULED INSPECTION. NOT APPLICABLE - BASED ON THE
SERVICE BULLETIN HYDROMECHANICAL UNIT (HMU) PART NUMBER
MOS
HRS/MSC -
ENC
SB 73-0161 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFM56-7B
ENGINES. SERVICE BULLETIN
MOS
27 -JUL-2009 HRS/MSC -
ENC
S8 73-0163 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM.
SERVICE BULLETIN
MOS
05-OCT-2009 HIRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 729 Of 748
@Camp Systems
EFTA00619020
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0167 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION SUPERSEDED
-REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM (SUPERSEDED BY 73-0167 RI). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0167 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION - RECOMMENDED
REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM. SERVICE BULLETIN
MOS
04-JAN-2012 HRS1MSC -
ENC
SB 73-0169 NO.2 ENGINE - ENGINE FUEL AND CONTROL-ELECTRONIC CONTROL UNIT (73-00-00)-DIGITAL INTERFACE UNIT
MODIFICATION. SERVICE BULLETIN
MOS
HRS1MSC
ENC
SB 73-0169 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT OPTIONAL
MODIFICATION. SERVICE BULLETIN
MOS
I3-JUL-2011 HRSAISC
ENC
SB 73-0169 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT RECOMMENDED
MODIFICATION (SUPERSEDED BY SB 73-0169 R3). SERVICE BULLETIN
MOS
22-SEP-2011 HRSfMSC -
ENC
SB 73-0169 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT CATEGORY 7
MODIFICATION. SERVICE BULLETIN
MOS
17-APR-2014 HRSMSC
ENC
SB 73-0170 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BODY SUPERSEDED
NON-FERROUS RING CHIP CONTAMINATION (SUPERSEDED BY 73-0170 RI). SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 73-0170 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BODY RECOMMENDED
NON-FERROUS RING CHIP CONTAMINATION. SERVICE BULLETIN
MOS
16-MAY-2011 HRSAISC -
ENC
SB 73-0171 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT OPTIONAL
MANUFACTURABILITY IMPROVEMENTS. SERVICE BULLETIN
MOS
24-SEP-2010 HRSAISC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 730 Of 748
@ Camp Systems
EFTA00619021
AD/SI Status Report AIRCRAFT
COMP
Asiatimfra the nand up' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0172 NO.2 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL OPTIONAL
METERING VALVE RESOLVER MODIFICATION
. SERVICE BULLETIN
MOS
17-DEC-2010 HRSPASC
ENC
SB 73-0172 RI NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL RECOMMENDED
METERING VALVE RESOLVER MODIFICATION. SERVICE BULLETIN
MOS
15-FEB-2012 HRSPASC -
ENC
SB 73-0173 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - RECOMMENDED
IOM SOLDER JOINT CRACKING (SUPERSEDED BY SB 73-0173 R1). SERVICE BULLETIN
MOS
20-JAN-2011 HRS04SC -
ENC
SB 73-0173 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - CATEGORY 5
IOM SOLDER JOINT CRACKING. SERVICE BULLETIN
MOS
17-APR-2014 HRSPASC -
ENC
SB 73-0174 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-W-00) - INCORPORATION OF NEW RECOMMENDED
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN
MOS
23-NOV-2010 HRSPASC -
ENC
SB 73-0174 RI NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00) - INCORPORATION OF NEW CUSTOMER
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE
MOS
I9-JUL-2011 HRSPASC -
ENC
SB 73-0174 R2 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00) - INCORPORATION OF NEW SUPERSEDED
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE (SUPERSEDED BY SB
73-0193). SERVICE BULLETIN
MOS
Of -MAY-2013 HRS/MSC -
ENC
SB 73-0175 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED
BYPASS VALVE ROTATION (SUPERSEDED BY 73-0175 R1)
. SERVICE BULLETIN
MOS
HRSPASC -
ENC
SB 73-0175 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED
BYPASS VALVE ROTATION. SERVICE BULLETIN
MOS
I6-MAY-2011 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 731 Of 748
@ Camp Systems
EFTA00619022
AD/SI Status Report AIRCRAFT
C O MP
Atiant.fran Meowed up 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0175 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED
BYPASS VALVE ROTATION (SUPERSEDED BY SB 73-0194). SERVICE BULLETIN
MOS
Of -MAY-2013 HRS/MSC -
ENC
SB 73-0178 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V2. SERVICE BULLETIN RECOMMENDED
MOS
07-JUN-2011 HRSAISC -
ENC
SB 73-0178 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN RECOMMENDED COMPLIED WITH- ENGINE #2 ECU SOFTWARE
PIN 1853M78P33, VERSION 7898 (7.B.V2 F2)
MOS 28-AUG-20I3
17-AUG-2011 HRS/MSC - 3728:53
ENC 875
SB 73-0180 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - INTRODUCTION SUPERSEDED
OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY 73-0180 IR). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0180 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) -INTRODUCTION
OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
23-MAY-2012 HRS/MSC -
ENC
SB 73-0181 NO.2 ENGINE - ENGINE FUEL AND CONTROL-IDENTIFICATION PLUG (73-21.83) - INTRODUCTION OF NEW CODING
COMBINATIONS FOR -7BE LPT HARDWARE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0182 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 SUPERSEDED
BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS (SUPERSEDED BY SB 73-0182 R1). SERVICE
BULLETIN
MOS
HRS(MSC - (s)
ENC
SB 73-0182 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76
BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 73-0184 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF T2 AND T4 RECOMMENDED
TRANSFORMER ON THE PSM. SERVICE BULLETIN
MOS
I6-FEB-2012 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 732 Of 748
@ Camp Systems
EFTA00619023
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0185 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - BUCK POWER SUPPLY U540 RECOMMENDED
MODIFICATION. SERVICE BULLETIN
MOS
18-OCT-2011 HRSAISC
ENC
SB 73-0186 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE SUPERSEDED
INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN
MOS
28-N0V-2011 HRSAISC 15000 (s)
ENC
SB 73-0186 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE
INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN
MOS
29-MAR-2013 MRS/MSC -
ENC
SB 73-0188 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED RECOMMENDED
TRANSIENT BLEED VALVE THREE WAY TWO STAGE ELECTROHYDAULIC SERVO VALVE WITH VENTED SLEEVE.
SERVICE BULLETIN
MOS
14-FEB-2012 HRSAISC
ENC
SB 73-0189 NO.2 ENGINE - ENGINE FUEL AND CONTROL - IDENTIFICATION PLUG (73-24-06)- SPARE PARTS RELEASE FOR
CFM56-7B CMM. SERVICE BULLETIN
MOS
I8-JUN-2012 HRSAISC
ENC
SB 73-0190 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT Of SUPERSEDED
THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
20-JUL-2012 HRS/MSC - (s)
ENC
SB 73-0190 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT OF
THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 73-0191 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3, SERVICE BULLETIN CUSTOMER
CONVENIENCE
MOS
1 1-DEC-2012 HRS1MSC
ENC
SB 73-0191 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3. SERVICE BULLETIN RECOMMENDED
MOS
72-APR-2073 HRS1MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 733 Of 748
@ Camp Systems
EFTA00619024
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: O5-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0192 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - FUEL
DIFFERENTIAL PRESSURE SWITCH MANAGEMENT. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 73-0193 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INCORPORATION OF NEW CUSTOMER
INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE
MOS
Of -MAY-2013 MRS/51SC -
ENC
SB 73-0194 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED
BYPASS VALVE IMPROVEMENT. SERVICE BULLETIN
MOS
01-MAY-2013 MRS/51SC ESV
ENC
SB 73-0195 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ADDMON OF ARINC SERIES OPTIONAL
RESISTORS ON TX3 LINES TO ACCOMMODATE NEWER MCB MN52 DEVICE. SERVICE BULLETIN
MOS
14-JUN-2013 MRS/51SC -
ENC
SB 73-0196 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MNS2 RECOMMENDED
ARINCICCDUIMS8 CONTROLLER ON TRONICO MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN
MOS
25-JUL-2013 HRSO4SC -
ENC
SB 73-0198 NO.2 ENGINE - ENGINE FUEL AND CONTROL- GENERAL (73-00-00) - INTRODUCTION OF NEW CONNECTORS FOR CATEGORY 6
ELECTRICAL HARNESSES. SERVICE BULLETIN
MOS
20-FEB-2014 HRS/MSC -
ENC
SB 73-0199 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4 (SUPERSEDED BY SUPERSEDED
SB 73-0199 RI). SERVICE BULLETIN
MOS
HRSO4SC
ENC
SB 73-0199 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4. SERVICE BULLETIN CATEGORY 7
MOS
28-JAN-2014 HRSfMSC -
ENC
SB 73-0203 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSION CATEGORY 2
7.B.WF2 FOR DAC ENGINES. SERVICE BULLETIN
MOS 12(s)
09-JUN-2014 HRSO4SC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 734 Of 748
@ Camp Systems
EFTA00619025
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 73-0204 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSIONS CATEGORY 2
7.B.WF3 FOR SAC AND DAC ENGINES AND 7.B.WF2 FOR SAC ENGINES. SERVICE BULLETIN
MOS 12 (s)
09-JUN-2014 HRS/MSC
ENC
SS 73-A002 NO.2 ENGINE - SERCK AVIATION SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE
BULLETIN
MOS
HRS/MSC
ENC
SB 73-A0024 NO.2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.8.11 (7838), SERVICE BULLETIN
MOS
02-SEP-1998 HRS/MSC -
ENC
SB 73-A0034 NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN
MOS
23-JUL-1999 HRS/MSC -
ENC
SB 73-A0076 NO.2 ENGINE -SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN
DAYS 30 (s)
MRS/P.1SC
ENC
SS 73-A0091 NO.2 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN CANCELLED NOT APPLICABLE
MOS 22-AUG-2008
HRS/MSC - (s) 3260:48
ENC 746
SS 73-A0091 R1 NO.2 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SS 74-0001 NO.2 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 74-0002 NO.2 ENGINE - INTRODUCTION OF A NEW UNISON IGNITER PLUG. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
58 74-0003 NO.2 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - SCREENING OF IGNITION UNIT EXCITER VIN 10-631045-2 (P/N
9238M66P08) FOR SUSPECT DIODES. SERVICE BULLETIN
MOS 18 (s)
MRS/P.1SC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 735 Of 748
@ Camp Systems
EFTA00619026
AD/SI Status Report AIRCRAFT
CORP
Asmant sre the enand 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
S8 74-0004 NO. 2 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - INTRODUCTION OF NEW IGNITION UNIT EXCITER VIN
10-631045-3 (PIN 92381066P11). SERVICE BULLETIN
MOS
FiRS11,1SC -
ENC
SB 75-0001 R1 NO. 2 ENGINE - LPT ACC FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRS(MSC - 0
ENC 0
SB 75-0002 NO. 2 ENGINE - INTRODUCTION OF HPTC VALVE VIN 3291186-6 (CFMI 1821M59P06). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0003 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0003 R1 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0003 R2 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE
ASSEMBLIES. SERVICE BULLETIN
MOS
MRS/1,1SC
ENC
SB 75-0004 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 75-0004 R1 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0004 R2 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN
MOS
HRS1MSC -
ENC
SB 75-0005 NO. 2 ENGINE - INSPECTION OF PS3 LINE FITTING. SERVICE BULLETIN MANDATORY
SCRAP
MOS
14-NOV-2001 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 736 Of 748
@Camp Systems
EFTA00619027
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 75-0025 R1 NO.2 ENGINE - INTRODUCTION OF REWORKED VBV ACUTATOR. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 75-0027 NO.2 ENGINE - MODIFICATION OF THE PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF
PERMANENT BONDING TO THE CAP. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 75-0027 RI NO.2 ENGINE - AIR - COOLING AIR - MODIFICATION OF PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND
ADDITION OF PERMANENT BONDING OF THE CAP. SERVICE BULLETIN
MOS
HRSMISC -
ENC
SB 75-0030 NO.2 ENGINE - ENGINE AIR-TRANSIENT BLEED VALVE (72-00-02)- REWORK TRANSIENT BLEED VALVE PN 3291390-1
TO PN 3291390-3, SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0030 RI NO.2 ENGINE - AIR - AIR TRANSIENT BLEED VALVE (75-21-10) - REWORK OF TRANSIENT BLEED VALVE VIN 3291390-1
(PIN 1821M60P02) TO VIN 3291390-3 (PM 1821M60P04). SERVICE BULLETIN
MOS
14-JUL-2009 HRS/LISC -
ENC
SB 75-0032 NO.2 ENGINE - REPLACEMENT OF VBV TURNBUCKLE (STEEL VERSION) BY NEW ONES WITH NEW MATERIAL
(ALUMINIUM VERSION). SERVICE BULLETIN
MOS
21-JUN-2005 HRS/MSC -
ENC
SB 75-0033 NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON
THE FAN MAJOR MODULE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0033 RI NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON
THE FAN MAJOR MODULE. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 75-0033 R2 NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION.
SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 75-0035 NO.2 ENGINE - INTRODUCTION OF A NEW AIR SUPPLY DUCT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 737 Of 748
@ Camp Systems
EFTA00619028
AD/SI Status Report AIRCRAFT
CAMP fin. thermiewlqi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
58 75-0036 NO.2 ENGINE - REWORK TURBINE CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186.6
(1821M59PC6) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 RI)
. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 75-0036 RI NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7
CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL
LEAKAGE (SUPERSEDED BY SB 75-0036 R2). SERVICE BULLETIN
MOS
25-APR-2014 HRS/MSC -
ENC
SB 75-0036 R2 NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7
CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL
LEAKAGE. SERVICE BULLETIN
MOS
09-JUN-2014 HRS/MSC -
ENC
SB 75-0037 NO.2 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN
MOS
08-SEP-2006 HRS/MSC -
ENC
SB 75-0037 RI NO.2 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN
MOS
13-FEB-2007 HRS/MSC -
ENC
SB 75-0038 NO.2 ENGINE - INTRODUCTION OF PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN
MOS
14-DEC-2006 HRS/MSC -
ENC
SB 75-0039 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) -INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
15-DEC-2008 HRSfMSC -
ENC
SB 75-0041 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
05-FEB-2009 MRS/P.1SC -
ENC
SB 75-0041 RI NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN
MOS
15-JUN-2009 HRS/MSC -
ENC
SB 75-0042 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN
MOS
20-FEB-2008 MRS/P.1SC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 738 Of 748
@ Camp Systems
EFTA00619029
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 75-0043 NO.2 ENGINE - REWORK OF THE AIR MANIFOLD AND THE BRACKET OF THE COOLING MANIFOLD IN FIELD. SERVICE
BULLETIN
MOS
05-SEP-2008 HRS/MSC
ENC
SB 75-0044 NO.2 ENGINE - MR-ACTUATOR VBV (75-32-14) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN
MOS
C6-FEB-2010 HRS/MSC -
ENC
SB 75-0045 NO.2 ENGINE - AIR - ACTUATOR VBV (75-32-14) - INTRODUCTION OF THE LVDT SENSOR VIN 8070287(325-500-002-0).
SERVICE BULLETIN
MOS
09-JAN-2009 HRS/MSC
ENC
SB 75-0047 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - IN FIELD REIDENTIFICATION OF LPTACC VALVE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-0048 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF A NEW LPTACC VALVE WITH A NEW OPTIONAL
IDENTIFICATION PLATE. SERVICE BULLETIN
MOS
I9-JAN-2012 HRS/MSC
ENC
SB 75-0050 NO.2 ENGINE - AIR - COOLING (75-22-10) - REWORK OF TURBINE CLEARANCE CONTROL VALVES VIN 3291186-5 (P/N RECOMMENDED
1821M59P05) AND VIN 3291186-6 (P/N 1821M59P06), SERVICE BULLETIN
MOS
23-FEB-20I2 HRS/MSC -
ENC
SB 75-0051 NO.2 ENGINE - AIR - GENERAL - INTRODUCTION OF NEW TBV TUBE AND BRACKET. SERVICE BULLETIN RECOMMENDED
MOS
03-SEP-2012 HRS/MSC -
ENC
SB 75-0052 NO.2 ENGINE - AIR - VARIABLE STATOR ACTUATOR (75-32-10) - REPLACEMENT OF LVDT FOR FAULTY VSV
ACTUATORS. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 75-1040 NO.2 ENGINE - REWORK HIGH PRESSURE TURBINE CLEARANCE VALVE. PN 3291186-5. TO PN 3291186-6. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SB 77-0001 NO.2 ENGINE - CONTROL UNIT ALTERNATOR - REPLACEMENT OF CONNECTOR SF41 C. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 739 Of 748
@ Camp Systems
EFTA00619030
AD/SI Status Report AIRCRAFT
COMP Jm. tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 77-0002 NO.2 ENGINE - SPARE PARTS RELEASE FOR ENGINE CFM56-78 I PC. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 77-0003 NO.2 ENGINE - ENGINE INDICATING - T49.5 THERMOCOUPLE LEAD ASSY (77-21-10) - INTRODUCTION OF NEW OR
REWORKED T49.5 PROBE. SERVICE BULLETIN
MOS
MRS/51SC -
ENC
SB 77-0004 NO.2 ENGINE - ENGINE INDICATING- T5 SENSOR REMOVAL (77-22-10) - INTRODUCTION OF NEW TEMPERATURE
SENSOR. SERVICE BULLETIN
MOS
FIRS/51SC -
ENC
SB 77-0004 RI NO.2 ENGINE - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN
MOS
04-MAR-2005 HRS(MSC -
ENC
SB 77-0005 NO.2 ENGINE - ELIMINATE CHAFING OF BOEING ECS TUBE. SERVICE BULLETIN
MOS
HRS(MSC -
ENC
SB 77-0007 NO.2 ENGINE - INTRODUCTION OF A NEW NI SPEED SENSOR. SERVICE BULLETIN
MOS
OI -DEC-2006 HRS/MSC -
ENC
SB 77-0008 NO.2 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
20-OCT-2006 HRS/MSC -
ENC
SB 77-0008 RI NO.2 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN
MOS
27-FEB-2008 MRS/51SC -
ENC
SB 77-0009 NO.2 ENGINE - ENGINE INDICATING - (77-00-00) - SPARES PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN
MOS
I2-JAN-2009 HRS(MSC -
ENC
SB 77-0010 NO.2 ENGINE - ENGINE INDICATING -NI SPEED SENSOR (77-12-19) - SPARE PARTS RELEASE FOR CFM56-7B CMM.
SERVICE BULLETIN
MOS
I 7-DEC-2009 HRS/MSC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 740 Of 748
@ Camp Systems
EFTA00619031
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0001 NO.2 ENGINE - APPROVED OILS FOR CFM56-78 ENGINES. SERVICE BULLETIN - INFORMATION ONLY
MOS
HRSAISC -
ENC
SB 79-0001 RI NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 RIO NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN CATEGORY 9
MOS
14-APR-2014 FIRSAISC -
ENC
SB 79-0001 R2 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0001 R3 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0001 R4 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 R5 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0001 R6 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
07-JUL-2006 HRSAISC -
ENC
SB 79-0001 R7 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
10-JUL-2008 FIRSAISC -
ENC
SB 79-0001 R8 NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-761ENGINES. SERVICE BULLETIN
MOS
14-MAY-2009 HRS/MSC -
ENC
SB 79-0001 R9 NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-7B ENGINES (SUPERSEDED BY SB 79-0001 INFORMATIONAL
R10). SERVICE BULLETIN
MOS
19-AUG-2011 FIRSAISC
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 741 Of 748
@ Camp Systems
EFTA00619032
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0002 RI NO.2 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE
MOS 16-DEC-1998
HRS/USC - 0
ENC 0
SB 79-0002 R2 NO.2 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0002 R3 NO.2 ENGINE - OIL - LUBRICATION UNIT (79-00-00) - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM
OPTIONAL KIT. SERVICE BULLETIN
MOS
14-MAY-2009 HRSAISC
ENC
SB 79-0003 NO.2 ENGINE - INTRODUCTION OF A NEW OIL CLOGGING INDICATOR. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0004 RI NO.2 ENGINE - ADDITION OF A CAUTION LABEL ON OIL SCAVENGE FILTER BOWL. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0005 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN COMPUED WITH - NO REWORK REQUIRED
MOS 22-AUG-2008
HRS/MSC - 3260:48
ENC 746
SB 79-0006 NO.2 ENGINE - OIL - OIL SYSTEM (79-00-00) - INTRODUCTION OF AN IMPROVED OIL SCAVENGE FILTER ASSY WITH
MODIFIED BOWL AND HEAD. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0008 NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRS/MSC 1500 (s)
ENC
SB 79-0008 RI NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 79-0008 R2 NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL
HEATER. SERVICE BULLETIN
MOS
HRSAISC 1500 (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 742 Of 748
@ Camp Systems
EFTA00619033
AD/SI Status Report AIRCRAFT
CAMAsiont.P
inn• Megnsind•fs' 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 Service Information
Report Date: OS-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0009 NO 2 ENGINE - LUBRICATION UNIT REMOVAL (79.21-10) - INTRODUCTION OF NEW PACKING PREFORMED O-RINGS
AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT.. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0009 R1 NO 2 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK
OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRICATION UNIT. SERVICE BULLETIN
MOS
HRS,P.ISC -
ENC
SB 79-0009 R2 NO 2 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK
OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT. SERVICE BULLETIN
MOS
HRS,P.ISC -
ENC
SB 79-0010 NO 2 ENGINE - INTRODUCTION OF NEW FLUOROCARBONE O-RINGS ON OIL FUEL HEAT EXCHANGER. SERVICE
BULLETIN
MOS
HRSI.ISC
ENC
SB 79-0010 R1 NO 2 ENGINE - OILIFUEL HEAT EXCHANGER ( 79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE
O-RINGS. SERVICE BULLETIN
MOS
HRSIASC -
ENC
SB 79-0010 R2 NO 2 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN
MOS
20-DEC-2000 HRSMSC -
ENC
SB 79-0011 NO.2 ENGINE - OlUFUEL HEAT EXCHANGER (79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE
O-RINGS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 79-0011 R1 NO 2 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RING. SERVICE BULLETIN
MOS
20-DEC-2000 HRS,P.ISC -
ENC
SB 79-0012 NO.2 ENGINE - REWORK OF A SPECIFIC BATCH OF OIL LEVEL SENSORS. SERVICE BULLETIN
MOS
HRSMSC -
ENC
SB 79-0013 NO 2 ENGINE - INTRODUCTION OF A NEW OIL BYPASS VALVE. SERVICE BULLETIN
MOS
HRSMSC -
ENC
?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW
(EBT)-Estimated Base Time 743 Of 748
1, Camp Systems
EFTA00619034
AD/SI Status Report AIRCRAFT
C O MP Megnsind 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0014 NO.2 ENGINE - OIL - OIL SYSTEM ( 79-00-00 ) - DELETION OF THE OIL BYPASS VALVE AND ITS HARDWARE. SERVICE
BULLETIN
MOS
MRS/P.1SC -
ENC
SB 79-0017 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE
BULLETIN
MOS 6 (s)
HRS/MSC
ENC
SB 79-0017 RI NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE
BULLETIN
MOS 6 (s)
MRS/P.1SC
ENC
SB 79-0017 R2 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE
BULLETIN
MOS 6 (s)
MRS/P.1SC
ENC
SB 79-0017 R3 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES (SUPERSEDED RECOMMENDED
BY SB 79-0017 R4). SERVICE BULLETIN
MOS 6 (s)
16-FEB-2007 HRS/MSC
ENC
SB 79-0017 R4 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE
BULLETIN
MOS
14-APR-2014 HRS/MSC -
ENC
SB 79-0018 NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN
DAYS 30 (s)
HRSfMSC
ENC
SB 79-0018 RI NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING (SUPERSEDED BY SB 79-0018 R2). SERVICE BULLETIN
DAYS 30 (s)
MRS/P.1SC
ENC
SB 79-0018 R2 NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN
MOS
14-APR-2014 HRS/P.1SC -
ENC
SB 79-0020 NO.2 ENGINE - OIL - DEBRIS MONITORING SYSTEM (DMS) (79-21-S4) - INTRODUCTION OF NEW OMS DETECTOR AND
REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
HRSfMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 744 Of 748
@ Camp Systems
EFTA00619035
AD/SI Status Report AIRCRAFT
COMP
Atant.fre• therrnewhip' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0020 R1 NO.2 ENGINE - INTRODUCTION OF NEW DMS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN
MOS
I6-JAN-2006 HRS/MSC -
ENC
SB 79-0021 R2 NO.2 ENGINE - INTRODUCTION OF A NEW OIL SCAVENGE HOSE TUBE WITH A NEW ROUTING AND A NEW BRACKET.
SERVICE BULLETIN
MOS
-MAR-2005 HRS/MSC -
ENC
SB 79-0022 NO.2 ENGINE - OIL - DMS JUNCTION BOX (79-21-53) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE
BULLETIN
MOS
26-NOV-2008 HRS/MSC -
ENC
SB 79-0023 NO.2 ENGINE - OIL/FUEL HEAT EXCHANGER (79-21-25) - INTRODUCTION OF A NEW MAIN OlUFUEL HEAT EXCHANGER
WITH KEY LOCKED INSERTS. SERVICE BULLETIN
MOS
HRS,MSC -
ENC
SB 79-0023 RI NO.2 ENGINE - INTRODUCTION OF A NEW MAIN OIL/FUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE
BULLETIN
MOS
20-DEC-2006 HRS/MSC -
ENC
SB 79-0024 NO.2 ENGINE - INTRODUCTION OF NEW PACKING PREFORMED 0 -RINGS IN FLUOROCARBONE WITH BETTER
PERFORMANCE AT LOW TEMPERATURE. SERVICE BULLETIN
MOS
HRS/MSC 500(s)
ENC
SB 79-0025 NO.2 ENGINE - NEW FORWARD TUBE. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 79-0026 NO.2 ENGINE - INTRODUCTION OF NEW OUTER SEALING SPOOL. SERVICE BULLETIN
MOS
25-OCT-2007 HRS/MSC -
ENC
SB 79-0027 NO.2 ENGINE - OIL CONSUMPTION MONITORING. SERVICE BULLETIN
DAYS 30 (s)
10-JUL-2008 HRS/MSC
ENC
SB 79-0029 NO.2 ENGINE - OIL - OIL SCAVENGE FILTER ASSEMBLY (79-21-42) - INTRODUCTION OF A NEW BYPASS VALVE
SPRING. SERVICE BULLETIN
MOS
08-OCT-2009 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 745 Of 748
@ Camp Systems
EFTA00619036
AD/SI Status Report AIRCRAFT
CAMP
Ael...imp.= taken...lop' 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 79-0030 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INTRODUCTION OF AN OIL SUPPLY TUBE WITH A NEW DESIGN. SERVICE RECOMMENDED
BULLETIN
MOS
05-N0V-2010 HRSIMSC -
ENC
SB 79-0031 NO.2 ENGINE - OIL - LUBRICATION UNIT (79-21-16) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN INFORMATIONAL
MOS
IO-DEC-2010 HRSIMSC -
ENC
SB 79-0032 NO.2 ENGINE - OIL - GENERAL (79-0000) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN
MOS
22-JAN-2013 HRSIMSC -
ENC
SB 79-0069 NO.2 ENGINE - DELETION OF ELECTRICAL CHIP DETECTOR KIT. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0001 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0001 R1 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 80-0003R1
MOS
HRSIMSC -
ENC
SB 80-0001 R3 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0001 R4 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN
MOS
13-AUG-1999 HRSIMSC -
ENC
SB 80-0002 NO.2 ENGINE - AIR TURBINE STARTER CLAMP ROTATION, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
26-MAR-1998 HRSIMSC - 0
ENC 0
SB 80-0003 R1 NO.2 ENGINE - INTRODUCTION OF A NEW MR TURBINE STARTER. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE
MOS 16-DEC-1998
HRSIMSC - 0
ENC 0
SB 80-0004 NO.2 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 746 Of 748
@ Camp Systems
EFTA00619037
AD/SI Status Report AIRCRAFT
COMP Jm.thernanditfi 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 80-0004 R1 NO.2 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0005 NO.2 ENGINE - AIR TURBINE STARTER. SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0006 NO.2 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD
UPGRADE. SERVICE BULLETIN
MOS
HRS/MSC
ENC
SB 80-0006 R1 NO.2 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD
UPGRADE. SERVICE BULLETIN
MOS
-MAR-2004 HRS/MSC
ENC
SB 80-0007 NO.2 ENGINE - INTRODUCTION OF AIR TURBINE STARTER VIN 3505945-10 (GE 1851M36P10). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0008 NO.2 ENGINE - INSPECTION AND REPLACEMENT OF NONCONFORMING MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE COMPUED WITH
BULLETIN
MOS 22-AUG-2008
06-AUG-2002 HRS/MSC - (s) 326048
ENC 746
SB 80-0009 NO.2 ENGINE - STARTING - STARTING (80-00-00) - AIR TURBINE STARTER VIN 3505945-9 (GE 1851M36P09) TO VIN
3505945-10 (GE 1851M36P10) REWORK. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 80-0010 NO.2 ENGINE - PACKINGS FOR HTS OILS. SERVICE BULLETIN
MOS
HRS/MSC DUE
ENC
SB 80-0010 RI NO.2 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN
MOS
HRSAISC -
ENC
SB 80-0010 R2 NO.2 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN
MOS
25-JUL-2006 HRS,MSC - (s)
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 747 Of 748
@ Camp Systems
EFTA00619038
AD/SI Status Report AIRCRAFT
COMP Jm.tMrrnM•O 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 Service Information
Report Date: 05-Aug-2014
Task No. Description Unit Interval Compliance Next Due Disposition MOC
SB 80-0011 NO.2 ENGINE - MAGNETIC DRAIN PLUG WITH LARGER KNOB TO EASE REMOVAL. SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0012 NO.2 ENGINE - REPLACEMENT OF THE SPRING WASHER IN AIR TURBINE STARTERS VIN 3505945-9 (1851M36P09) AND
VIN 3505945-10 (1851M36P10). SERVICE BULLETIN
MOS
HRSIMSC -
ENC
SB 80-0013 NO.2 ENGINE - STARTING - GENERAL (80-00-00)-ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER SUPERSEDED
DECOUPLER ASSEMBLY VIN 3504835-1 (SUPERSEDED BY 80-0013 RI). SERVICE BULLETIN
MOS
14-FEB-2012 HRS/MSC -
ENC
SB 80-0013 RI NO.2 ENGINE - STARTING - GENERAL (80-00-00)- ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER RECOMMENDED
DECOUPLER ASSEMBLY VIN 3504835-1. SERVICE BULLETIN
MOS
28-MAR-2012 HRS/MSC -
ENC
SB 80-0014 NO.2 ENGINE - STARTING - STARTER (80-11-00) - INTRODUCTION OF NEW AIR TURBINE STARTERS VIN 3505945-11 OPTIONAL
(P/N 1851M36P11) AND VIN 3505945-12 (PIN 1851M36P12). SERVICE BULLETIN
MOS
17-APR-2013 HRS/MSC -
ENC
SB 80-0015 NO.2 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR SUPERSEDED
INSPECTION AND EVALUATION (SUPERSEDED BY SB 80-0015 RI). SERVICE BULLETIN
MOS
HRS/MSC -
ENC
SB 80-0015 RI NO.2 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR CATEGORY 2
INSPECTION AND EVALUATION. SERVICE BULLETIN
MOS
09-JAN-2014 HRS/MSC -
ENC
SB 80-1709 NO.2 ENGINE - REWORK THE AIR TURBINE ENGINE STARTER. PN 3505945-5/-6 TO PN 3505945-7/-8. SERVICE
BULLETIN
MOS
HRS/MSC -
ENC
SI SER 79-0001 NO.2 ENGINE - SERVICE EVALUATION REQUEST OF FLIGHT EVALUATION OF OILS. SERVICE INSTRUCTIONS
MOS
HRS/MSC
ENC 5000 (s)
VSB 3291186-75-1074 RI NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVE- REWORK HIGH PRESSURE TURBINE RECOMMENDED
CLEARANCE VALVES. PN 3291186-5 AND PN 3291186-6 TO REDUCE FUEL LEAKAGE. VENDOR SERVICE BULLETIN
MOS
19-FEB-2014 HRS/MSC -
ENC
7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM
(EBT)-Estimated Base Time 748 Of 748
@ Camp Systems
EFTA00619039