From: Daphne Wallace
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: Gary Kerne
Subject: Photographs - January 28, 2011
Date: Fri, 28 Jan 2011 21:44:07 +0000
Attachments: Roof and_walkway_painting.JPG; Roof and_walkway_painting_(2).JPG;
Roof and_walkway_painting_(3).JPG; Barbeque_tilework.JPG;
Kitchen_terrace_tile_work.JPG; Kitchen_terrace_tile_work_(2).JPG;
Landscaping_behind_master_suite.JPG; Landscaping_behind_master suite_(2).JPG;
Wall in area behind master suite.JPG; Wall_in_area_behind_master suite_(2).JPG;
Floating_dock.JPG; Floating_dock_(2).JPG; Floating_dock_(3).JPG;
Floating_dock_(4).JPG; Floating_dock_(5).JPG; Floating_dock_(6).JPG;
Master_suite_bedroom.JPG; Master_suite_bedroom_(2).JPG;
Master_suite_bedroom_(3).JPG; Tub_area_floor_vamishing.JPG;
Tub_area_floor_vamishing_(2).JPG; Tub_area_floor_vamishing_(3).JPG;
Tub_area_floor_vamishing_(4).JPG; Tub_area_floor_vamishing_(5).JPG;
Floor_vamishing_in_water closet.JPG; Outdoor_tub_progress.JPG;
Outdoor tub_progress_(2).JPG; Nanna_paint_primer_applied.JPG;
Additional_boulders_for entry_way_wall_project.JPG;
Additional_boulders_for entry_way_wall_project_(2).JPG;
Additional_boulders_for entry_way_wall_project_(3).JPG;
Additional boulders_for entry_way_wall_project_(4).JPG
Greetings Mr. Epstein,
Ion will paint samples of brown trim for office so you can choose on your next visit which one you
would like applied. Is this okay?
Photographs of January 28, 2011 for your review and comments:
Roof and walkway painting progress
Kitchen terrace and barbeque tile work
Landscaping behind master suite
Stone wall in progress in area behind master suite
Floating dock
Master suite bedroom preparation
Master suite tub area and water closet floor progress
Outdoor tub progress
Nanna paintwork progress
Additional boulders collected for the entry way wall project
Respectfully submitted,
Daphne
EFTA00698825