From: Jeffrey Epstein <jeevacation@gmail.com>
To:' <
Subject: Re: What I'm working on
Date: Fri, 10 Apr 2009 22:05:09 +0000
i want to do the addtion in steel
On Fri, Apr 10, 2009 at 4:36 PM, Doug Schoettle < wrote:
Hello Jeffrey,
I have been working with deJongh architects on the master bathroom addition and prepared a sketch to help
them configure the addition to match the sketch from Pinto and have talked them thorugh the design. DeJongh
architects will issue the building department documents next week for review and issuance to the building
department for filing.
I have been working with Gensler Group to further the design development of the existing house, especially
the column and cornice design so that the deJongh architects can incorporate these details onto the master
bathroom extension of the porches.
I have (finally) received the dimensiions of the painted canvas ceiling panel for the office building ceiling
from Andre at JPM studio and am completing the ceiling layout drawing to be issued to the field for layout.
I have been reviewing the revised budgets for the mechanical building. The exact scope of the additions needs
to be carefully considered for each stage of expansion and extension.
I am sending to Brice (with a copy to Richard Barnett) options for generators in Palm Beach taking into
account town regulations. Including the costs by Owner I think the overall cost will be about $ 125 K. Brice
and I have just had a long conversation about this.
I've been organizing and finalizing reimbursbles, a task that I don't like to do and keep putting off. I'm an
architect, not an accountant.
My very best regards, Douglas
- - On Fri, 4/10/09, Jeffrey Epstein efrevacation@gmaiLcons> wrote:
From: Jeffrey Epstein <jeevacation@gmail.com>
Subject:
To: "Doug Schoettle"
Date: Friday, April 10, 2009, 8:29 AM
what are you working on?
EFTA00748707