From: ion nicola
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: cabana no 3 and master bedroom
Date: Wed, 01 Dec 2010 01:54:45 +0000
Importance: Normal
hi Jeffrey,
..so cabana no 3 and the master bedroom are ready to go.
cabana no 3 still needed today a little work so in the meantime i did a little area with venetian plasrter in master
bedroom to see how it goes, because the walls are not that flat..but it looks good after a few coats of venetian
plaster. i started the samples for the master bedroom vestibule too..the background will be white venetian
plaster too.
tomorrow i'll start cabana no 3 and i was thinking that we could start master bedroom too. i think would be
good if we have one or two more people because if i do by myself the entire area with venetian plaster its going
to take forever: usualy i put 3 or 4 coats of venetian plaster, but here we have to put like 4 maybe 5 coats because
the walls are not flat.. they are pretty bumpy, then i have to put 2 more coats of wax and then burnishing
everything with blade. and there are two small rooms , the vestibule, and the master bedroom means kind of a lot
to do. so maybe two people would be even better..besides i might need an asistant for the cabana no 1..it has big
walls
anyway, this is just a thought for finishing faster the all bedrooms.
so, what do you think?
thank you,
ion
EFTA00751762