From: "Curtis Royston" <M=IMIM>
To: "jeevacation®gmail.com" <jeevacation®gmail.com>
Subject: Re: Master suite draft budget
Date: Sat, 18 Apr 2009 12:45:51 +0000
In 30 minutes
Original Message
From: Jeevacation <jeevacation@gmail.com>
To: Curtis Royston <
Sent: Sat Apr 18 07:58:11 2009
Subject: Re: Master suite draft budget
Curtis - I've asked twice for photos of nursery -please follow through on a more timely
manner
Sent from my iPhone
On Apr 17, 2009, at 5:04 PM, curtis R .‘Z > wrote:
In the General Conditions -$63,500 - Boscoe, Bruce , Casey and Carlos and Arran
and any other labor -. This gets billed back to the construction budget
As well as Demolition $30,000
If we build with our own manpower, which we could, we would save. But it would take
from other island projects ,of course.
This budget is based on subcontractors for
Rock work
Concrete
Electrical
Milwork
Plumbing.
On this one - We might be able to use Gary for the electric, Brian/Arran combo for
the plumbing - etc . we could do our own concrete - but ..
Is that what you mean?
On 4/17/09 4:37 PM, "JEE" <jeevacation@gmail.com> wrote:
give me incremental cost.. plese„ boscoe salary and others is a fixed cost
whether or not i build
On Fri, Apr 17, 2009 at 3:50 PM, curtis R < > wrote:
Jeffrey,
Please find attached Draft Budget for the Master Suite.
Notes:
1. Demolition will include what is almost a ful gut job.
the entire roof
all the columns
the existing floor in the bedroom section.
2. The finishes need to be honed down and represent a large unknown.
3. The cost is around $600 per square foot for a total of 1,372,690
EFTA00774051
Call to review with Silvina or me for scope adjustment as needed.
Curtis