Bluewater Construction, Inc
Estimate
6501 Red Hook Plaza #201
St Thomas, VI, 00802 Date Estimate #
2122/2018 152
Name /Address
LSG/GSG
Brice Gordan
Project
Guest house addition...
Description Qty Rate Total
GUEST HOUSE GSJ
Remodel existing kitchen. "'Allowance until final design is 12,600.00 12,600.00
decided/ approver"' Includes demolition, cabinet and hardware
install, new closet area, fixture installation and hookup, electric and
plumbing.
FRP concrete columns and pads for new deck 9,250.00 9,250.00
Build 16 x 16 structure off of existing rough floor. Including new 8 22,400.00 22,400.00
x 16 deck with handrail
Frame roofand tie into existing structure. 25,000.00 25,000.00
Materials for new structure, deck, and roof. (This is a seperate line 36,500.00 36,500.00
item because it was mentioned that there may be materials on site
that can be used)
Install new gutters and downspouts 2,256.00 2,256.00
Interior buildout including stud walls, drywall, flooring and paint. 27,600.00 27,600.00
Supply and Install new metal roof including tying into existing. 22,320.00 22,320.00
Sliding door at deck, and 3 windows 7,680.00 7,680.00
GR Overhead, Profit. 20% 33,121.20 33,121.20
Total 5198,727.20