GSJ Tiki House
Scope of work:
Demo the following
1. Cabinets and Veneer Counter Tops
2. Existing Thatch
3. Manufacture Wood Flooring
Install new Hardwood Counter Tops ,High Gloss Finish, with bar sink and faucet.
Install New Roof Decking and Pick up points
Finish Ceiling in T&G Cedar.
Install Dura Rock Subfloor and Finish with Rustic Grey floor tile
Install New Cabinets
Refinish Bar Seat with Hardwood in a High Gloss Finish
Duration: 23 days, 2 Men
GSI Sea Water Intake Shed
Scope of Work:
Fabricate a 4' X 4' concrete base
Fabricate a 4' X 4' motor and pump cover to house new Sea Water Pump.
Piping and Electrical in house.
Duration: 2 Days, 2 Men
labor Cost
Brian: $300.00 per day @ 25 days = $7500.00
Buck: $120.00 per day @ $25 days = $3000.00
Total Labor Cost: $10,500.00
All material and tools supplied by Owner.
EFTA00802886