CONSTRUCTION COMRANLS, INC.
April 13, 2017
Jeremy Henkel
Bluewater Construction Inc.
RE: Proposal for Slab Extension and Retaining Wall
LSJ Maintenance Building and workshop
Dear Mr. Henkel;
Apex Construction Co., Inc. is pleased for the opportunity to quote you on the concrete
slab extension and retaining wall for the above referenced project and as detailed in
drawings by Jaredian Design Group dated 9/15/15. We propose to perform the work
listed below inclusive of materials, labor, equipment and supervision for the sum of Two
Hundred and Fourteen Thousand Five Hundred and Eighty Six Dollars
($214,586.00). The scope of work is listed below:
• Construct 105 LF Retaining wall
• Construct nineteen (19) Fl pier footings
• Form and pour 240 LF of B1 grade beams
• Form and pour 240 LF of B2 grade beams
• Construct 7" thick structural slab extension
• Construct nineteen (19) pier columns
• Form and pour trench drains and oil pits
Specifically excluded from this proposal are; (1) all excavation and backfill (2) all sea
and land transportation (3) concrete testing (4) concrete pumps if needed.
Should you have any questions concerning this proposal, please do not hesitate to contact
this writer.
Reggds,
Denswe 1 Hodge
Vice president
EFTA00804979