From: Richard Kahn
To: "Jeffrey E." <jeevacation@gmail.com>
Subject: Re: Feedback from Mr. Epstein - August 3, 2016
Date: Wed, 17 Aug 2016 15:10:21 +0000
ok
thank you
Richard Kahn
HBRK Associates Inc.
On Aug 17, 2016, at 11:01 AM, Jeffrey E. leevacation®gmail.com> wrote:
i have to know from amy and czm if they are going to approve otherwsie this is a waste excercise. and expense
On Wed, Aug 17, 2016 at 8:39 AM, Richard Kahn <1 > wrote:
are you ok with drawings - are there any revisions you would like made?
is it ok to release 5,100 payment to bateman
please advise
thank you
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Daphne Wallace <I
Subject: Fwd: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016
Date: August 15, 2016 at 6:04:29 PM EDT
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: Rich Kahn < >, ann rodriquez
EFTA00821062
Greetings Sir,
Preliminary Dock drawings from Jeff Bateman for your review and comments.
Respectfully, Daphne
------- Forwarded messa e
From:
Date: Aug 15, 2016 5:50 PM
Subject: RE: Re: Re: Feedback from Mr. E stein - August 3, 2016
To: "Daphne Wallace"
Cc: "Ivan Sanchez V"
Hi Daphne -
Attached is a very preliminary set of plans based on our conversations and direction from Amy. The
structural engineer hasn't reviewed, he will as the design gets closer to fruition. Sheet 4 is for the plan and
profile of each dock, what is shown is not for this project - NOAA has not verified the water levels for
July 20 yet, so the contours will all change slightly. Once the water levels are verified, we will process
the data to generate the profiles. Notes and details will also go on this sheet.
Please pass these for review, and let us know your comments. Again, these are preliminary and not a final
work product.
Thanks and have a great evening !!
Jeff
Original Message
Subject: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016
From: "Daphne Wallace" <1
Date: 8/15/16 7:43 am
To: "Jeffrey Bateman"
Cc: "ann rodriquez" "Rich Kahn"
Greetings Mr. Bateman,
Perfect. I will look out for your email.
Kind regards, Daphne
On Aug 15, 2016 7:17 AM, > wrote:
good morning Daphne -
we are finalizing the preliminary drawings and will have you something by the end of the day
thanks !!
Original Message
Subject: Re: Re: Feedback from Mr. E stein - Au ust 3, 2016
From: "Daphne Wallace"
EFTA00821063
Date: 8/12/16 4:22 pm
To: "Jeffrey Bateman" "ann rodriquez"
Greetings Mr. Bateman,
Thank you so much. No matter the hour, please feel free to email them to me, and I will forward
to Mr. Epstein. He is anxious to see them :) Daphne
On Fri, Aug 12, 2016 at 3:21 PM, < > wrote:
Hi Daphne -
I am awaiting the draft sketches and will forward them as soon as I receive them. They are
expected shortly. Thanks and have a great weekend !!
Jeff
---- Original Message
Subject: Re: Feedback from Mr. E stein - Au ust 3, 2016
From: "Daphne Wallace"
Date: 8/12/16 3:59 pm
To: "Jeffrey Bateman"
Cc: "ann rodriquez"
Greetings Mr. Bateman,
Just checking in with you on the initial drawings for Mr. Epstein's review.
Kind regards, Daphne
On Wed, Aug 10, 2016 at 2:06 PM, Daphne Wallace wrote:
Greetings Mr. Bateman,
As promised, the lengths of the existing vessels are as follows:
Little C (Pro Catamaran) - 36 feet
PRD (Cape Horn) - 32 feet
Nanna (Rib-tech) - 34 feet
Sportis (Sportis) - 34 feet
Big N (LMC-8 barge) - 74 feet
Pursuit (Pursuit) - 23 feet 6 inches
Pending for the fleet is a 42 foot Nautica boat.
Hope this helps. Kind regards, Daphne
On Tue, Aug 9, 2016 at 9:23 AM, wrote:
good morning daphne and ann !!
hope all is well. i have a couple questions from my engineers that I'd like your feedback
on. thanks and have a great day !!!
For barge docks (100x15Ft)
- Barge specifications.
- Capacity (how many barges to be docked at the same time).
- Docking purpose.
EFTA00821064
- Facilities needed on dock.
- Dock Facilities to propose.
- Maritime signaling, buoys and other dock approach requirements.
For pleasure dock 100x10Ft)
- Boat expectations (biggest boat allowed to dock).
- Capacity (how many boats allowed to dock at the same time, considering the biggest
ones)
- Facilities needed on dock.
- Dock Facilities to propose.
- Maritime signaling, buoys and other dock approach requirements.
Original Message
Subject: Feedback from Mr. Epstein - August 3, 2016
From: "Daphne Wallace"
Date: 8/3/16 5:26 pm
To: "Jeffre Bateman" "ann rodriquez"
Greetings Mr. Bateman,
Mr. Epstein says the barge docks will need to be 100 feet in length and 15 feet in width.
The private dock can be 100 feet in length by 10 feet in width.
Please do not hesitate to email or call if you need any additional information, and I will
touch base with you on Friday, August 12.
Kind regards, Daphne
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00821065