Subject: Fiber project update
Date: Sat, 28 Nov 2015 02:06:54 +0000
Good evening Everyone,
Omar confirmed that Choice (Hector) will be on LSJ on Monday (11/30/15) morning to complete their side of
project. Hector will do the following:
I. Install ViNGN via the new router. Test it and switch the island over this new primary connection.
2. Take down the Dragonwave connection and add some switches to be able to monitor the link and take
over the maintenance. Once this is complete;
3. He will reconnect the Dragonwave as the secondary link
4. Lastly, he will test the failover to Secondary.
The above steps have a one to two minute downtime.
VINGN will not need to go to LSJ. They will install the crossovers at the Cabrita site. If ViNGN is not ready on
Monday, Hector can still do his install but he will also need to install the switches required to monitor the
Dragonwave. With this scenario, there will be a downtime of a few hours as Hector can do the swap but no
testing will be done.
Omar also confirmed when I spoke to him today that if the crossover cables arrive on or before Monday, VINGN
will be able to do there crossover. If not, it will be done as soon as the cables arrive. Please note that when I
asked Omar for the list of materials needed, the cables were not on the list; we ordered everything on the list
provided by Choice.
Regards
Jruan
Good day all
Please be advised that Choice has moved the install date to Monday the 30th. There was an issue between vingn
and choice pertaining to the fiber crossover to the circuit for Lsj. Choice is working to resolve the matter.
Regards
Jruan