They need to do exactly what was done to the Gym. (Replace the bad wood under the Galvanize and change a
portion of the existing galvanize)
The Banana tree heads were blown over and damaged which then damaged the smaller ones, Chris said he had
no choice but to cut them all back to the stump. He said they will grow back healthier and fuller.
Jules said he still have about 2-3 more days until Pebble Beach is completed.
Ann R.
On Sep 10, 2015, at 6:51 PM, jeffrey E. leevacation@gmail.com> wrote:
what shlud we do to lirbarry roof?? . the banansa were taken away not cleaned by the master?? yes break
the slan on pebble and no rock in cement ok. . yes Jules canmake better.
On Thu, Sep 10, 2015 at 11:24 PM, Daphne Wallac wrote:
Greetings Sir,
September 10 photos for your review and comments:
Banana field - the bananas on the hillside below the Master have been cut and the area clean up is in progress
Library Roof assessment - major damage has been discovered to the wood underneath the galvanize on the
Library side
MBR flooring progress - today was sanding #2 - 9/11 is sanding #3 and epoxy - 9/14 is polyurethane #1 -
9/15 is light sand ofpolyurethane #1 and polyurethane #2 - 9/16 is light sand of polyurethane #2 and final
polyurethane - 9/17 is cleanup - 9/18 is curing - 9/19 is ready to move in
Pebble Beach - Jules is almost complete with the cleanup - he wants to add more rocks to shore up the
waterside barrier against the waves - Danny marked two lines for your review of how far you would like the
slab to extend - the first marking is where the original slab ended and the second marking is another 15 feet.
Danny would like to know if you wish to put back the same rough texture as what is presently there - if so,
the concrete will need to be mixed in the concrete mixers - the stones are too large to move through the pump
truck hose - Danny and Tom came up with the mix that is presently there - Danny and Chris are also
concerned about the erosion beneath the remaining slab and are recommending the slab be removed and re-
poured - Jules would prefer to jack hammer this final slab away rather than use the trackhoe because he is
concerned about the steps cracking if the slab is not removed carefully
Seaweed - has returned - Anna will try to schedule getting it off the shoreline again before your return
Stonewall along road to Info Center - in progress
Waterfall cistern - in progress - 9/11 will pour concrete - 9/14 will be block work
EFTA00846576
Info Center entrance drive - the gravel was scraped away, the landscaping mesh was added, and new gravel
laid down
Big Salt Pond - re-hydration completed
Grotto - blinds and floors repainted, the blind louvers that are broken will be repaired and touched up, the
weeds will be removed, weed kill applied and fresh gravel laid down
Hillside above Flagpole Pool - cleanup progress
Respectfully submitted, Daphne
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00846577