Begin forwarded message:
From: Bill Hague
Subject: Re: Bent rod repair inspection
Date: Jul 3, 2018 at 10:20:26 AM EDT
To:
et
Cc: >,
Richard Kahn <
Ok.
Lee said we can likely do the repair with the engine on its bed albeit very difficult to do. It's gonna require
the parts in hand and two days labor if nothing goes wrong. Lee leaves for STM on Saturday with an under
timings return date.
The barge is running acceptably as is so if it's decided to wait to completely repair the port engine, it is likely
that the barge will continue to run till the later date, however, it is not assured. The parts are still in Puerto Rico
as well so there is that to consider as well. I'll report when I hear they are in hand on S11'.
On Jul 2, 2018, at 21:08, wrote:
Ok
Will adjust schedule accordingly
Please note there maybe a need to work
Saturday, please let Karl know
Sent from my iPhone
Begin forwarded message:
EFTA00868091
From: LSJ GSJ
Date: July 2, 2018 at 9:04:51 PM AST
To:
Subject: Fwd: Bent rod repair inspection
Begin forwarded message:
From: Bill Hague
Date: July 2 2018 at 8:17:48 PM AST
To: " "michael glidden"
, Rich Kahn
Subject: Bent rod repair inspection
Good Evening.
Before the 10:00 run with Jonny for the container, Lee Thomas is performing a feasibility study to see if
the bent rod can be removed and replaced with the engine installed on its ways or in its present place.
If it can't, it's really gonna complicate things...