From: Larry Visoski
To: Je vacation <jeevacation®gmail.com>
Subject: Eric
Date: Fri, 23 Feb 2018 21:22:56 +0000
Jeffrey
I spoke with Eric„
He will be out of town March 9-13th,,, he would like to select G550 divan material in person with you March
14th or later „ he'll need to check Availability of a selected material, and also send for fire block certification.
Eric recommends 2 to 3 weeks after you select a material before dropping the G550 for Divan fabric install, as
well as Divan end cap fabrication., he will use your current foam for divan as oppose to making a second set of
divan cushions. (I think it Makes sense to fabricate new cushions to save on Down time, maybe?),
With this information, Gulfstream in Savanah can start the 24month inspection March 12th to be completed by
March 23rd to be safe„ virtually picking up the G550 and dropping off the GIV.
This way the GIV will be ready to fly when you decide to leave the G550 at Eric by April 1st, as long Eric has all
fabrics in stock with proper fire certs,.
I prefer Savanah over Palm Bch,,, in the past West Palm Beach has always delivered late, I don't think we will
have that issue in Savannah.
Do you approve of Savannah input for GIV March 12th based on G550 in service March 9th?
Pls advise„
Thx
Larry
Sent from my iPhone
EFTA00875100