hi jeffrey,
..so one mechanical building is done, or almost done... i didnt do the bottom side if the columns yet... i just did that at
one column (the third picture in attachments) and i want you to see that before i do to all columns.
i was thinking that if i do the bottom part of the column then the architecture type would look somehow different than the
main building architecture (the first picture in attachments)
..so what do you think? do, or not do the bottom side.. anyway it wouldn't take too much time to do that
thank you,
ion
Ps
tomorrow i will start the second mechanical building..the scaffolding is already up on one side of the building.
while working on that i will do the samples for cabana no 4, ..and then i have to do some touch ups in cabana no 1 and 2,
..then some repair in master bedroom garry kerney told me today.
i hope finish everything next week.
the relax room is done..i just have a few touch ups to do... these days i"ve concentrated more to the mechanical building
because i wanted give the painter something to do on that building..
both sides of the mechanical building no 1needs to be painted but they said that they have to do some repairs before
primer and paint... they can do that later.. i picked the color already..is matching the gray in the back of the building
check the left side on the facade in the picture attachment no3...i put also on top of the gray a little green here and there
to match the bushes in the back of the building...)