From: J <jeevacation@gmail.com>
To: Brice
Cc: ar>,
Richard IC michael lidd
e >, LSJ GSJ
, Kyle reavis
Subject: Re: LSJ RO Fiber
Date: Sun, 11 Nov 2018 16:21:33 +0000
ok
On Sun, Nov 11, 2018 at 11:11 AM brice gordon > wrote:
Hello Rich
Attached:
AVL Proposal, Supply and Terminate, Fiber Link of between the RO Plant and Sea Water Intake Pumps.
Cost:$2753.69
Rogers Electric for Conduit.
Cost:$7520.43 plus shipping
Estimated Cost: $10,274.12
We are unable to Pull New Fiber in the the Existing Conduit from the Generator Building to Sea Water Intake Pump Controls. The fiber
connection allows the RO Plant to communicate to the Sea Water Intake Pumps located outside the Tunnel.
The conduit is for the Duct Bank, to be dug from the Generator Building out to the Sea Water Intake building, with a new feeder for
GS].
At this time the Sea Water Intake pumps are being run in Manual Mode.
LSJ will Dig, Install conduit and Pull Fiber.
Can we proceed with ordering Fiber and Conduit?
regards
Brice Cordon
The Saint James Gnu)
USVI
Ph:
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jea@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01016959