fuel truck rebuilt as flatbed. ? buy dipwitch? hodge advised switches?
Forwarded message
From: J <jeevacation@gmail.com>
Date: Fri, Mar 29, 2019 at 8:46 PM
Subject: Re: Progress Report 032519 033119
To: Stephanie Remington >, Richard Kahn <1
did tap fix quadski? did five plam windows get ordered. ? 8 by 8 clear? , . where are we with liston and
jermaine upgrade? internet steel builidngs? dock cabinets.? shade house chandelier by =? . planintg on
gsj ?? when does roof arrive for containers./ ? we need to plant out in front of containers. . to block the view
from boats. . white rug in library, . id lie to know what peter eli is doing „ id like him to try to make some
planters. . . we need to buy switches cables , water line . for gsj from lsj. . . solar lights? two orders? .
On Fri, Mar 29, 2019 at 8:36 PM Stephanie Remington > wrote:
Please note:
This is a summary of the last week's focus, not a comprehension of all projects.
Carpentry. Continue work on lattice frames for tiki. Assisted with added tiki tile. Tile work complete.
Building new doors for FPP. Weatherproofing roof connection between tiki kitchen and main tiki on
LSJ. Loaded F450 with all GSJ kitchen cabinets and appliances from tunnel storage and transferred
to GSJ container.
Electrical/Plumbing. Install new lights in FPP kitchen. Replaced lights and bulbs in library. Installed
new water pump at FPP cabana for bathroom and kitchen. Added landscape lighting up to LSJ
Cabana drive. Assisted with emptying and moving containers and relocating contents.
Engineering. Fluid check — all equipment. Commissioned new lull. Tropical run for hitch, installed on
new tractor. Inaugural water wagon run w JD tractor to GSJ and went well. Installed hammer (again)
on Cat 325. Clean carmix. New tires, change electrical cable on bikes. Polaris work. Worked on
Polaris, Quadski, Dump Truck. Change batteries on roller compactor. Clean F450. Clean tire
changing room. Put tracks back on 307 cat. Clean wreck shop and vehicle storage area.
Heavy Equipment. Transitioned and set containers from LSJ to GSJ. Trenching for Liston at LSJ
tower. Made more stone at pebble beach for Dupson. Clear out entire footprint of "The Barn" on
GSJ. Assisted with landscaping on GSJ beach area (grass, seagrapes, ficus). Cleaned Blue Beach.
Ongoing seaweed battle.
Housekeeping. Usual rounds. Laborers brought in to move heavy items in storage areas and clean
underground spaces.
Landscaping/Masonry. Received and caring for large ABC shipment that looks mostly dead but
they will work their magic. Pebble beach is ongoing. Completed forming 5 Palms bunker. Will be
poured Monday morning, weather permitting.
EFTA01034679
Marine. Maintenance on trailers — tongues, tires, hubs, stands, wheel bearings,carpeting, derusting.
Replaced steering cylinder on Little C. New props on Little C. Haulout and pressure wash Sportis
and Zodiac. Nanna maintenance, oil change, fuel filters.
Painters. Continued painting hardware around main compound. Began fresh coat of paint in
Cabanas.
RO/Maintenance. Oversee cistern cleaning and sealing. Acquired pump for FPP kitchen/bath.
Standard pool and RO maintenance.
Contractors on island:
Absolute Flooring — work complete.
Jeffers — Coloring shipping next week.
Danny — Continuing work on MC Flower Bed.
Kitchen Solvers - Countertops scheduled for install May 3-6.
Paul's Petroleum — added check valve to gasoline pump to eliminate delay.
Other Notes:
Rust remediation. Attaching photo file.
Master cistern. Cleaned. First round of thoroseal complete. Will repeat thoroseal in one week.
5 Palms Power. Trenching to begin Tuesday.
Rubbish. All trash bins on GSJ emptied.
Proposal for storm Shutters for RO, Generator, GSJ staff cottage, LSJ staff cottage — submitted to
Rich and was approved.
All interior and exterior doors for RO, generator buildings ordered.
40X60 replacement building for engineering has been ordered.
Construction drawings for GSJ staff cottage have been submitted.
Next week's focus will be pulling cabanas 1-4, the flagpole pool, chillax room and bath, and library
back together after floors have adequately cured.
Stephanie Remington
LSJE, LLC
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
EFTA01034680
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01034681