From: "John P. Woods"
To: mjeffrey E."' leevacation@gmail.com>
Cc: "'Daphne Wallace
Subject: FW: Estimate 3600-2 from Marvin Beming and Associates
Date: Wed, 04 Jan 2017 17:09:12 +0000
Attachments: .pdf
Jeffrey,
Attached is the estimate for the survey work we need for the Lal Pavilion. Once we have that information, we can
determine how we are going to deal with the perimeter of the pavilion. Judging from the existing topo. that was done
before the present pool was built, it looks like there will be a more than 15 feet drop from the floor level of the pavilion to
the existing grade. This is as a result of elevating the pavilion almost 2.5 feet to match the elevation of the existing house
as well as the enclosure of the middle section to create a Great Room. As a result of that, we have to increase the area on
the pool side because of the steps, making the building wider. The perimeter stone wall is an attempt to create a plateau
for the building to sit on. Other options we can consider looking at could be shortening the middle portion of the pavilion
by 10 to 14 feet, and relocating the bathroom to the western side, flanking the existing guest cottage. These changes
could significantly reduce the height of the structure on the perimeter. Another idea to consider is with that much of a
grade drop, we could consider putting the movie theater underneath the pavilion. The topo. Information will help us to
better plan that. We are also working on a rendering of the screen wall on the western side of the pool that we will
transmit tomorrow.
JPW
From: [mailto:
Sent: Tuesday, January 3, 2017 5:34 PM
To:
Subject: Estimate 3600-2 from Marvin Berning and Associates
Dear Customer :
Please review the estimate below. Feel free to contact us if you have any questions.
We look forward to working with you.
Sincerely,
Marvin Beming and Associates
This email has been checked for viruses by Avast antivirus software.
glAvast logo
www.avast.com