RAsee Co "In nirtnA
Red—tel -it& a -GC ft- 7A
04- Atf 4441—
Budget Adjustment
13 October 2010
Code Description Budget Adjustment Revised
01-610 Matenal Handling $9,000 00 3! 500 0:: $1,500 00
01-665 Equipment Operation 56.600.00 iz 1IX: 14. 51,500.00
02-000 Testing $ 15.000 00 57.500 00
02.005 Layout I Survey SO 00 52.500 00 52.530 00
02-071 Disposai 55.600.00 $0 00
02-200 Excavation : Backfil; $21.000.00 Cn, )f. 516.000.00
03-210 Reber $800 00 5400.00 51.200 00
03-303 Grouting - CMU 51,450.00 52.100 00 53.550 00
03-35t Cistern Coating 510.000.00 57 r. :‘r• 52.500 00
04.450 Native Stone Veneer 5141.000.00 0: S106.000.00
06.200 Finish Carpentry - 55.000 00 55.000 00 $10 000 00
06.201 Finish Carpentry - M 53 500 00 512.50C 00 $16.000.00
08-213 Ext. Wood Doors i Frames 58.000 00 58.166 00 516.166 CO
09.200 Plaster S8.000 00 515.000 00 523.000 00
09.341 Marble Ceilings - Material $70.000.00 530.000 00 5100.000 00
09.550 Wood Flooring $14 600.00 $5.000 00 $19 600.00
09.600 Floor Tile Patch - Repair 59.350 00 -S5 "./247 54.350.00
09-602 Cora! Stone Flooring - Mat 52.158.00 $7 500.00 59.658 00
09.604 Terrace Stone Flooring - M 53.466 00 r33 U33 $0.00
10-801 Toilet Accessories - L $480.00 52 000.00 52.480 00
12.310 Granite Countertops S13 500.00 4 $0 00
12.311 Reuse Existing Vanities $240 00 55 TOO 20 S5 240 00
5348.744.00 $0 .00 5348.744.00
Increase in Bildget $0.00
Approved: id1-14-1.,/
EFTA01118356
Mechanical Building #1002
Budget Adjustment
03 January 2011
Code Description Budget Adjustment Revised
02-000 Testing $34.771.00 $8,000.00 $42,771.00
02-200 Earthwork $78,678.00 ($8.000.00) $70,678.00
07-110 Membrane Waterproofing $9,080.00 $1,500.00 $10,580.00
07-270 Fire Stopping $6,000.00 ($1.500.00) $4,500.00
$128,529.00 $0.00 $128,529.00
Increase i Budget $0.00
Approve
11)1
II
__c-A tla
4,0,6 L.A% Ai zarA,—
;4- tAfral 0_01-nua__
EFTA01118357
2:14 pm LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
Est. Cost Act. Cost (S) Dill.
Service
Office Pavillon
01 General Requirements
01-100 - Holiday Allocation 0.00 82.594.15 62594.15
01-101 - Burden 0.00 48.56192 48.56192
01-514 • Temp Phones 4,200.00 3,598.00 -802.00
01-516 - Temporary Toilet 0.00 0.00 0.00
01.517 • First Aid Supplies 0.00 0.00 0.00
01.518 -Temporary Fire Protect 0.00 0.00 0.00
01-522 - Temporary Enclosures 3,000.00 2,664.00 436.00
01.562 - Dust Control L 0.00 0.00 0.00
01-562 - Dust Control M 0.00 0.00 0.00
01-590 • Field Office Supplies 1,200.00 634.23 -565.77
01-610 - Material Handling 19,960.00 8,344.50 -11.615.50
01.621 - Temporary Protect 6.000 00 5,748.66 •251.34
01-624 - Construction Cleaning 10,400.00 8.557.20 .1.842.80
01.625 - Final Cleaning 1,850.00 0.00 -1,850.00
01-628 - Safety 157.19 157.19 0.00
01.640 • Personnel Transport 0.00 0.00 0.00
01-641 - Container 25,000.00 21,323.09 -3.676.92
01.645 • Expendables 18,000.00 8,105.73 .1894.27
01-665 - Equipment Operation 11,750.00 3,283.35 -8.466.65
01.712 - Super. Transport 0.00 0.00 0.00
01-712 - Superintendent 0.00 0.00 0.00
01-714 - Clerk 0.00 0.00 0.00
01.715 - Time Keeper 0.00 0.00 0.00
01-603 - Photographs 900.00 0.00 -900.00
01450 - Plans Reproduction 5.000.00 90.00 -4.910.00
01-900 - General Office Require 20,000.00 10,104.31 -9,895.69
Total 01 General Requirements 127,417 19 181788.32 58.351.13
02 Sitework
02-000 - Testing 50.000.00 48,700.73 -1.299.27
02-005 - Survey 15,000.00 8,900.83 -8,099.17
02-120 - Erosion Control L 3,200.00 1,918.00 -1,282.00
02-121 - Erosion Control M 5,100.00 759.44 -4,340.56
02-160 - Rock Anchors 47,916.76 47.916.76 0.00
02-200 • Earthwork 37.000.00 29.696.05 -7,303.95
02-211 - Rock Removal 71287.16 73,287.16 0.00
02-281 - Pest Control 1550.00 8,550.00 0.00
02-713 - Pot. Water UG Piping 2.000.00 316.50 -1,683.50
02-740 - Waste Disposal Systems 3,100.00 1,284.04 -1.815.96
Total 02 Sllework 245,153.92 219329.51 45,824.41
03 Concrete
03-120 - Complete Sub 422,266.03 422.266.03 0.00
03-121 - Standish 23,11150 23,116.50 0.00
03-130 - 4000N Concrete 95.366.03 96.71055 1,344.52
inin - Site Concrete 8.000.00 3,990.15 -4.009.85
03-362 - Pumping 8,570.00 8.570.00 0.00
03-400 - Pre-Cast Concrete 1,000.00 200.24 -799.78
Total 03 Concrete 558,318.56 554.853.47 -3.465.09
04 Masonry
04425 - EIFS 100,000.00 89,123.94 -10,876.08
04-450 - Native Stone Veneer 40,000.00 33,779.52 -6.220.48
04451 • Stephen Auguste 280.00000 218032.07 -60,967.93
Total 04 Masonry 420,000.00 341.93553 -78.064.47
05 Metals
05-120 - Structural Steel 143.000.00 142,903.54 -96.46
05.120 - Structural Steel (S&C) 0.00 0.00 0.00
05-380 - Steel Erection 58,500.00 57,355.88 -1.144.12
Total 05 Metals 201,500.00 200,259.42 -1,240.58
Page 1
EFTA01118358
2:14 PM LSJ, LLC
mom Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
Est Cost Act. Cost (S) Dill.
06 Wood
06-050 • Fasteners Material 4.500.00 4.172,01 -327.99
06-100 - Rough Carpentry L 36,000.00 27,438.30 4,561.70
06-101 - Rough Carpentry M 30,000.00 23,620.80 -6,379.20
06.400- Sarah's Woodwork. Kitc 35,000.00 32.112.08 -2,887.92
Total 06 Wood 105,500.00 87,343.19 -18,156.81
07 Moisture/Thermal
07-110 - Membrane Water Proof 1.736.53 1,736.53 0.00
07-160 - Bituminous Damp Proof. 1,327.24 1,327.24 0.00
07-170 - Protection Board 1,943.50 1,943.50 0.00
07-212 - Rigid Insulation L 3,200.00 3.074.20 -125.80
07-213 - Rigid Insulation M 11,520.00 11.35765 -162.95
07-325 - Concrete Roof Tiles L 9,661.20 9,661.20 0.00
07-326 - Concrete Roof Tiles M 41,227.78 40,903.78 -324.00
07423 - Copper Flashing L 601.00 600.30 -0.70
07424 • Copper Flashing M 23.396.96 16.926.96 4.470.00
07-632 - Downspout RoughlL&M 4,153.35 4,15335 0.00
07-800 • Bluestone Services 26,334.00 28,334.00 0.00
07-900 • Joint Sealant-L&M 3.000.00 2263.44 -73656
Total 07 Moisture/Thermal 128,101.56 1208145 -7,820.01
08 Doors and Windows
08-210 - Doors & Frames Labor 1,80000 4,405.99 2.605 99
08-210 - Exterior Door & Frame 0.00 0.00 0.00
08-211 - Int. Doors & Frame (S& 0.00 0.00 0.00
08-211 • Interior Door & Frame 0.00 0.00 0.00
08-212 - UtiIlity Door&Frame M 2,840.00 1,320.22 -1.519.78
08-250 • Hartman Windows & Door 111,476.00 111,327.80 -148.20
08.350 - Access Doors 1,000.00 753.91 -246.09
08410 - Wood Windows L 12,000.00 11,534.51 -465.49
08411 - Type B Window Storm Sh 1,210.00 1,210.00 0.00
08-710 - Door Hardware 60,000.00 4,249.88 -55,750.12
08.711 - Door Hardware (S&C) 12.000.00 7,867.44 4,132.56
08-810 - Mirror Glass L & M 675.00 0.00 -675.00
Total 08 Doors and Windows 203,001.00 142669.75 40,331.25
09 Finishes
09-120 - Ceiling Support Coff. 52,940.00 52.940.00 0.00
09-121 - Terrace Ceiling Framin 14,640.00 13.107.75 -1,532.25
09-200 - Plaster & Lath 25.760.00 25.760.00 0.00
09-220- Cementitious Coatings 30,000.00 30,000.00 0.00
09-230- Aggregate Coatings 0.00 0.00 0.00
09-350 • Portugese Tile L 0.00 0.00 0.00
09-510 - Wood Ceiling • M 22,000.00 18.127.45 -3,872.55
09-511 - Wood Ceiling-Material 18,000.00 16,183.76 -1,816.24
09-550-Wood Flooring-L 20,000.00 2,978.16 -17.021.84
09-551-Wood Flooring-M 66,000.00 48,914.35 -17.085.65
09-600 - Stone Flooring L 22,290.00 21,857.20 -43280
09-601 - Stone Flooring - Mater 13,500.00 12,157.38 -1,342.62
09-920 - Interior Painting 7,000.00 5,146.66 -1.853.34
09-930 - Int. Painting - M 1,500.00 915.00 -58560
09.940 - Roof 23000.00 15,256.90 -9,743.10
09-950 - Est. Painting Material 5,000.00 922.38 -4,077.62
09.960 - Decorative Painting 0.00 7,212.75 7,212.75
Total 09 Finishes 323,630.00 271,479.74 -52,150.26
10 Specialities
10.200 - Vents 50.00 9.47 •40.53
10-800 - Toilet Accessories 500.00 0.00 -500.00
10-801 -Accessories - Material 1,450.00 617.21 -832.79
Total 10 Specialities 2,000.00 626.68 -1,373.32
11 Equipment
11.451 • Kitchen Equipment 2.504.00 679.43 -1,824.57
Total 11 Equipment 2,504.00 679.43 -1.824.57
Page 2
EFTA01118359
2:14 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
Est. Cost Act. Cost (5) Dill.
12 Furnishings
12-310 - Granite Countertop
Total 12 Furnishings
3.000.00
looaco
4,933.80
4.933.80
1.933.80
1533.80
e)
15 Mechanical
15-400 - Plumbing-AC 238,530.00 234.779.15 -3,750.85
15401-Nash Installation 22,718.00 10.050.00 -12.668.00
15.402 -Nash AC 9.000.00 6.850.20 -2,149.80
Total 15 Mechanical 270.248.00 251.679.35 -18.568.85
16 Electrical
16-000 - Electrical Complete 86,385.00 85.111.50 -1.273.50
16-010 • Optical Fiber 9,000.00 0.00 -9,000.00
16-020 - Wire Pull 2.500.00 0.00 -2500.00
18-030 - Data&Telecom Install 5,000.00 0.00 -5,000.00
16-040 • Data8Telecom Install M 3,000.00 0.00 -3000.00
16-050-Data&Teletom Equip8Terrn 5,000.00 0.00 -5.000.00
Total 16 Electrical 110,885.00 85.111,50 -25.773.50
17 Electrical Fixtures
17.010-Glidden Revised Fixtures 15,000.00 15.735.54 735.54
17-020-Glidden Add Outlets 1,200.00 0.00 -1,200.00
17-030-Glidden Dimming Access 10,000.00 254.53 -9,745.47
17-040-Glidden Temp Power 5.000.00 0.00 -5.000.00
Total 17 Electrical Fixtures 31,200.00 15,990.07 -15.209.93
Total Office Pavilion 2,732,459.23 2.480.941.31 -251517.92
Total Service 2,732,459.23 2,480,941.31 -251.517.92
TOTAL 2,732,459.23 2,480,941.31 -251,517.92
Page 3
EFTA01118360
2:14 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Dale Num Source Name Amount
Service
Office Pavilion
08 Doors and Windows
08.210 - Doors & Frames Labor
Check 11/712008 13938 M.S.I. Building Supplies 203.94
Credit Card Charge 4/152009 Tropical Shipping Co., Ltd. 703.75
Check 4/30/2009 MEMO Island Grounds. Inc. - Timesheet 1.159.20
Check 5/14/2009 MEMO Island Grounds. Inc. - Timesheet 1,925.10
Check 6/4/2009 MEMO Island Grounds. Inc. - Timesheet 165.60
Check 6/302010 MEMO Island Grounds, Inc. - Timesheet 248.40
Total 08-210 - Doors & Frames Labor
_ 4.405.99
.
Total 08 Doors and Windows 4,405.99
Total Office Pavilion 4.405.99
Total Service 4.405.99
TOTAL 4,405.49
Page 1
EFTA01118361
2:15 PM LSJ, LLC
mom Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Office Pavilion
12 Furnishings
12-310 - Granite Countertop
Check 10/21/2009 MEMO VI Granite & Marble 2.466.90
Check 10/27/2009 MEMO VI Granite & Marble 2.466.90
Total 12-310 • Granite Countertop 4,933.80
Total 12 Furnishings 4,933.80
Total Office Pavilion 4,933.80
Total Service 4.933.80
TOTAL 4,933.80
Page 1
EFTA01118362
2:08 PM LSJ, LLC
mom Job Estimates vs. Actuals Detail for 1002 - Mechanical Building
All Transactions
Est. Cost Act. Cost (5) Diff.
Service
Mechanical Building
01 General Requirements
01.100 - Holiday Allocation 0.00 57.522.60 57.52200
01.101 - Burden 0.00 44.068.82 44,068.82
01-516 - Temp. Toilet Supplies 0.00 0.00 0.00
01.517 First Aid Supplies 0.00 0.00 0.00
01-518 - Temp. Fire Protection 350.00 0.00 -350.00
01.522 • Temp. Enclosures 1,750.00 511.20 -1,238.80
01-590 - Field Office Supplies 0.00 0.00
01.610 • Misc. Labor 7,200.00
0.003.00 2.205.04 4.994.96
01.621 - Temp. Protection 3,500.00 L465.20 -2.034.80
01.624 - Construction Cleaning 7,100.00 4,112.72 -2987.28
01.625 - Final Cleaning 2.51090 0.00 -2.510.50
01.628 - Safety 2,750.00 1.903.90
01-645 - Expendables 5,500.00 3.62
9451:8
47
1 -1978
-846.1099
01.864 • Equipment Rental 3,000.00 -2.054.13
01-665 - Equipment Operation 10,000.00 8.460.80 -1,539.20
01.712 • Superintendent 0.00 0.00 :000717
0...8400
00
01450 - Plans - Reproduction 2,000.00 0.00 -2
01-900 - Gen. Office Requires 2,72000 2,002.16
Total 01 General Requirements 48,380.50 128,819.72 78.43822
02 Sitework
02-000 - Testing 34,771.00 37.611.10 2.840.10
02-050 - Survey 9,853.00 6.347.17 -3.505.83
02-051 - Core Drilling 8,000.00 765.02 -7.234.98
02-120ECL - Erosion Control - L 450.00 0.00 -450.00
02-120ECM • Erosion Control - M 0.00 0.00 0.00
02-120ECMi - Erosion Mats 1,320.00 1,320.00 0.00
02-120ECMii - Erosion Staples 180.00 90.00 -90.00
02-120EFLL - Erosion Fence - L 1,320.00 0.00 -1.320.00
02-120EFM - Erosion Fence • M 3,698.00 0.00 -3.698.00
02-120EML - Erosion Mats - L 2,160.00 0.00 -2.160.00
02-120EM0 - Erosion Mat Deliver 160.00 115.72 -44.28
02-200 - Dump Truck & Operator 26,000.00 26.000.00 0.00
02-200 - Earthwork 78.675.00 69,369.67 -9,305.33
02-200 - Fuel 0.00 0.00 0.00
02-211 - Rock Removal 7,875.00 7.446.90 -428.10
02-281 - Pest Control 2,521.00 2,400.00 -121.00
02-411 - Foundation Drain 4,600.00 4,595.52 -4.48
02.800 - Trench Conduit 19,655.00 9,498.45 -10156.55
Total 02 Sitework 201,238.00 165,559.55 -35,678.45
03 Concrete
03-110 - CIP Concrete - Labor 39,799.00 11.989.36 -27.809.64
03-120 - Complete Sub 709,500.00 687,402.06 -22.097.94
03-130 - 50004 Concrete 151,800.00 129,540.27 -22.259.73
03.130 • Low Strength Buttress 0.00 0.00 0.00
03-154 - FormS & Accessories 10.500.00 5.288.74 -5,211.26
03-301 - Admixtures 2,000.00 885.00 -1.11500
03-362 - Pumping 23.000.00 17,910.00 -5,090.00
Total 03 Concrete 936,599.00 853,015.43 -83,583.57
04 Masonry
04-220 - CMU 27,000.00 21,343.64 -5.656.36
Total 04 Masonry 27,000.00 21,343.64 -5.656.36
05 Metals
05-050 - Fasteners (SS) - M 800.00 753.18 -46.82
05-120 • Steel Railing 10.000.00 3,537.62 -6.462.38
05-541 - CIP Stair Nosings 0.00 0.00 0.00
05-542 - Bollards 350.00 191.96 -158.04
Total 05 Metals 11,150.00 4,482.78 -6.667.24
Page 1
EFTA01118363
2:08 PM LSJ, LLC
mon, Job Estimates vs. Actuals Detail for 1002 - Mechanical Building
All Transactions
Est. Cost Act. Cost (5) Dili.
06 Wood
06-050 - Fasteners (SS) • M 3,000.00 0.00 -3.000.00
06-100 - Rough Carpentry - L 11,600.00 5.127.46 -6.472.54
06-101 - Rough Carpentry - M 2000.00 0.00 .2,50000
Total 06 Wood 17,100.00 5.127.46 -11.972.54
07 Moisture/Thermal
07-110 - Membrane Water Proofin 9.080.00 10.16730 1,087.30
07-270 - Fire Stopping 6,000.00 0.00 -6,000.00
07450 - Roof Water Proofing 8.823.50 8.87837 54.87
07.900 - Joint Sealants • L&M 2,521.00 1.264.60 -1.256.40
Total 07 Moisture/Thermal 26,42450 20.310.27 -6,114.23
08 Doors and Windows
06-100 • FRP Doors & Frames - L. 23.675.00 8.46430 -15.210.70
08-100 - FRP Doors & Frames - M 41,525.00 40,165.41 -1.359.59
08-510 - Int. Lite Frames - L 0.00 0.00 0.00
08-510 - IM. Lite Frames - M 0.00 0.00 0.00
08-710 • Door Hardware 6800.00 1,159.20 -4.640.80
Total 08 Doors and Windows 71,000.00 49,788.91 -21.211.09
09 Finishes
09-910 - Painting Complete 15,000.00 12.52440 -2.475.60
Total 09 Finishes 15.000.00 12.52440 -2.475.60
10 Specialities
10-200 - Louvers 25,500.00 25076.52 -423.48
10-400 - Signage 500.00 0.00 -500.00
10-520 - Fire Extinguishers 1,725.00 0.00 -1.725.00
10-700 • Hurricane Shutter 26,400.00 26.142.00 -258.00
Total 10 Specialities 54.125.00 51,218.52 -2.906.48
13 Special Construction
13-410 • Storage Tanks • M 130,98691 130,988.91 0.00
13-411 - Storage Tanks - L 1,853.60 1,853.60 0.00
13-450-Fuel Pumping Systems•M 90,420.00 85.850.34 -4569.66
13-500 - Power Gen. Systems - M 312,400.00 312.15962 -24038
13-501 - Power Gen. Systems - L 0940.00 6,752.72 •187.28
13-502-Power Gen. Sys. - Set Up 14,000.00 3.953.45 -10,046.55
Total 13 Special Construction 556,602.51 541,558.64 •15,043.87
15 Mechanical
15-310 - Mech. Piping Systems 100,631.49 32,068.33 -68543.16
15-400 - Plumbing 45,000.00 14,725.00 -30.275.00
15-500 - Fire Protection System 259,892.00 198,866.83 -61.025.17
15-800 - HVAC 56344.52 31,668.27 -26076.25
Total 15 Mechanical 463,868.01 277,348.43 -186.519.58
16 Electrical
16-000 - Electrical Complete 1,030,261.00 892,320.30 -137.940.70
16-001 - Mach Building to Comp 158.760.05 156760.00 -0.05
16-002- Mech Building to Eng 50,582.00 50,582.00 0.00
16-003 - Comp to Pavilion 42,932.00 42,932.00 0.00
16-004 - Eng to Woodshop 2224200 22243.00 0.00
16-005 - Can to Mach Building 28,404.00 26,404.00 0.00
Total 16 Electrical 1,331,182.05 1,193,241.30 -137.940.75
Total Mechanical Building 3,759,669.57 3.322.339.03 -437.330.54
Total Service 3,759,669.57 3,322,339.03 -437.330.54
TOTAL 3,759,669.57 3,322,339.03 -437,330.54
Page 2
EFTA01118364
2:09 PM LSJ, LLC
0110/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Mechanical Building
02 Sitework
02-000 - Testing
Check 1/9/2009 14090 Kraus Manning, Inc. 523.50
Check 2/13/2009 14144 Kraus Manning. Inc. 1,527.00
Check 2/26/2009 14163 Kraus Manning, Inc. 4,114.00
Check 4/1/2009 14225 Kraus Manning, Inc. 2365.60
Check 7/29/2009 MEMO Kraus Manning. Inc. 9.241.00
Check 8/12/2009 MEMO Kraus Manning. Inc. 885.00
Check 9/30/2009 MEMO Kraus Manning. Inc. 910.00
Credit Card Charge 10/15/2009 M.S.I. Building Supplies 161.00
Check 6/14/2010 WIRE Kraus Manning. Inc. 390.00
Check 6/14/2010 WIRE Kraus Manning. Inc. 585.00
Check 8117/2010 WIRE Kraus Manning. Inc. 4.745.00
Check 8/17/2010 WIRE Kraus Manning. Inc. 520.00
Check 817/2010 WIRE Kraus Manning. Inc. 4,576.00
Check 9/20/2010 WIRE Kraus Manning. Inc. 2.613.00
Check 11/16/2010 WIRE Kraus Manning. Inc. 2,245.00
Check 12/17/2010 WIRE Kraus Manning. Inc. 2,210.00
Total 02000 - Testing 37,811.10
Total 02 Sitework 37,611.10
Total Mechanical Building 37,611.10
Total Service 37,611.10
TOTAL 37,611.10
Page 1
EFTA01118365
2:10 PM LSJ, LLC
01110/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Mechanical Building
07 Moisture/Thermal
07-110 - Membrane Water Proolin
Credit Card Charge 2/26/2009 Home Depot Credit Services 359.91
Credit Card Charge 4/16/2009 Sea Chest 94.96
Check 4/24/2009 14258 Home Depot Credit Services 84.66
Check 4/30/2009 MEMO Island Grounds, Inc. - Timesheet 1,530.00
Credit Card Charge 8/14/2009 Red Hook Ace - Lafayette 299.94
Check W30/2009 MEMO Island Grounds. Inc. Timesheet 360.00
Check 10/21/2009 MEMO Island Grounds. Inc. • Timesheet 1,183.20
Check 11/3/2009 MEMO Island Grounds. Inc. - Timesheet 2,043.90
Check 12/28/2009 WIRE American Export Company 3,746.15
Credit Card Charge 1/1/2010 Tropical Shipping Co., Ltd. 464.58
Total 07.110 - Membrane Water Proolin 10,167.30
Total 07 Moisture/Thermal 10,167.30
Total Mechanical Building 10,167.30
Total Service 10.167.30
TOTAL 10,16730
Page 1
EFTA01118366
2:05 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1004 - Master Suite
All Transactions
Est. Cost Act. Cost CS) Diff.
07 Moisture/Thermal
07-160 - Bituminous Damprooling 5.900.00 4048.38 -1,851.84
07-240-EFTS Cornice-Gutter 25.600.00 15.175.44 -10.424.56
07-412-Metal Roofing-Labor 33.000.03 25.538.52 -7.461.48
07-413-Metal Roofing-Material 35,000.00 30.97732 -4,022.48
07-623-Copper Flashing-Labor 18000.00 11,442.20 -3,557.80
07-624-Copper Flashing-Material 12.000.00 4.985.73 -7.014.27
07-632 - Downspout Rough-L&M 4,000.00 2,544.18 -1.455.82
07-900 - Joint Sealants-L&M 3,000.00 1.563.80 -1.419.20
Total 07 Moisture/thermal 133.500.00 96.292.75 -37.207.25
08 Doors and Windows
08-210 • Ext. Wood Doors/Frames 18188.00 18512.62 -5.853.38
08-2114nt. Doors&Frames-Labor 1,500.00 0.00 -1.500.00
08.212•Int.Doors&Frames•Materia 7,500.00 4.977.00 -2.523.00
08-370-AI.Doors-Frames-Sub 11,000.00 9,116.70 -1,883.30
08-371-Glass Shower Enclosures 20,000.00 0.00 -20.000.00
08.610-Door-Window Shutters-Sub 10,000.00 7,500.50 -8499.50
08-710•Finish Hardware-Labor 700.00 0.00 -700.00
08-711-Finish Hardware-Material 8600.00 387.50 -2.212.50
08.810•Mirror Glass•t.&M 2,430.00 0.00 -2.430.00
Total 08 Doors and Windows 71,896.00 32,494.32 -39.401.68
09 Finishes
09.120-Ceiling Support•Flat 3,500.00 1,593.60 -1.906.40
09-200 • Plaster 23.00800 20.79780 -2203.00
09-320-Wall Coral Stone-Labor 0.00 0.00 0.00
09-321-Wall Coral Stone-Materia 0.00 0.00 0.00
09-340-Marble Ceilings-Labor 38,000.00 22.386.00 •15.614.00
09.341-Marble Ceilings-Material 100.000.00 104,159.80 415960
O
09-510 - Wood Ceilings 18.280.00 18,250.11 -29.89
09-550 - Wood Flooring 19,600.00 10.818.98 -8.781.02
09-551-Wood Flooring Refinishin 5,320.00 5,197.00 -123.00
09400-Floor Tile Patch•Repair 4,350.00 2,007.76 -2,342.24
09-601-Coral Stone Flooring-Lab 166.00 165.60 43.40
09-602-Coral Stone Flooring•Mat 9,658.00 6,500.00 4.15880
09-603-Terrace Stone Flooring-L 9,550.00 7314.00 -2.236.00
09-604-Terrace Stone Flooring-M 0.00 1,444.80 1,444.80
09-910-Exterior Painting 10.00800 745.66 -9.254.34
09-920 - Interior Painting 18,000.00 1,178.00 -16,824.00
Total 09 Finishes 259.424.00 202.558.11 -58887.89
10 Specialties
10-800 • Toilet Accessories-M 8.850.00 0.00 4850.00
10-801-Toilet Accessories - L 2,480.00 0.00 -2.480.00
Total 10 Specialties 11,330.00 0.00 -11.330.00
12 Furnishings
12-311- Reuse Existing Vanities 5,240.00 0.00 -5.240.00
Total 12 Furnishings 5,240.00 0.00 -5.240.00
13 Special Construction
13-085 • Exterior Shower 32,500.00 2,135.30 40.364.70
13-130 • Steam Room Equipment-M 4,750.00 4,830.90 80.90
13.131-Steam Room Equipment-L 500.00 115.00 -385.00
Total 13 Special Construction 37,750.00 7,081.20 40.868.80
15 Mechanical
15-305 - Cistern Piping 350.00 343.92 -6.06
15-400 - Plumbing 16.500.00 16.678.72 178.72
15-401 - Plumbing Fixture Allow 19.000.00 15.180.33 -3.819.87
15-451 - Fixture Allowance 500.00 0.00 -500.00
15-800 - HVAC 50,000.00 33.208.77 -16,791.23
Total 15 Mechanical 86,350.00 65,411.74 -20.938.26
Pegs 2
EFTA01118367
2:05 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1004 - Master Suite
All Transactions
Est. Cost Act. Cost MDR
16 Electrical
16-000 - Electrical Complete 31,500.00 18.092.00 -13.40800
16-001 - Electrical Finish 5,000.00 0.00 -5.000.00
16-510-Electrical Fixture Allow 21,000.00 0.00 -21,000.00
16-700 - Communications 5,000.00 0.00 -5.000.00
Total 16 Electrical 82.500.00 18,092.00 -44.408.00
Total Master Suite 1,128,935.00 772.588.98 -354.348.02
Total Service 1.126.935.00 772.586.98 -354.348.02
TOTAL 1,126.935.00 772,586.98 -354,348.02
Page 3
EFTA01118368
2:06 PM LSJ, LLC
(mom Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Master Suite
09 Finishes
09-341-Marble Ceilings-Material
Check 8/5/2010 WIRE Makedonika Marble, Inc. 36450.00
Check 8/17/2010 WIRE Makedonika Marble. Inc. 47,652.50
Check 9/1/2010 WIRE Makedonika Marble, Inc. 1,575.00
Credit Card Charge 9/20/2010 M.S.I. Building Supplies 485.86
Credit Card Charge 8/20/2010 M.S.I. Building Supplies 344.24
Credit Card Charge 9/2012010 M.S.I. Building Supplies 357.00
Credit Card Charge 9/20/2010 M.S.I. Building Supplies 1.444.80
Check 9/20/2010 1921 U.S. Customs and Border Protecti0n 1475.00
Credit Card Charge 9/23/2010 Tropical Shipping Co.. Lid. 502.50
Check 9/29/2010 14579 Johnny Weekes 103.02
Credit Card Charge 10/19/2010 M.S.I. Building Supplies 1,357.50
Check 10/20/2010 1926 V. I. Bureau of Internal Revenue 50.00
Check 10/20/2010 1927 U.S. Customs and Border Protection 2.706.18
Credit Card Charge 1021/2010 Tropical Shipping Co.. Ltd. 3,741.00
Chock 11/17/2010 14802 Johnny Weekes 415.00
Check 12/28/2010 WIRE Makedonika Marble. Inc. 5,200.00
Total 09-341-Marble Ceilings-Material 104,159.60
Total 09 Finishes 104,159.60
Total Master Suite 104,15940
Total Service 104,159.60
TOTAL 104,159.60
Page 1
EFTA01118369
2:06 PM LSJ, LLC
01/10/i1 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
TYM Date Num Source Nam* Amount
Service
Master Suite
09 Finishes
09-604-Terrace Stone Flooring-M
Credit Card Charge 10/19/2010 M.S.I. Building Supplies 1.44480
Total 09404-Terrace Stone Floodng-M 1.44480
Total 09 Finishes 1,444.80
Total Master Suite 1,444.80
Total Service 1,444.80
TOTAL 1,444.80
Page 1
EFTA01118370
1:54 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1006 - Laundry
All Transactions
Esc Cost Act. Cost ($) Dirt.
Service
laundry
01 Direct Expenses
01-100 - Holiday Allocation 0.00 296.31 298.31
01-101 - Burden 0.00 176.93 178.93
01.610 - Material Handling 2.400.00 1,287.12 -1,112.88
01-621 - Temporary Protection 1.500.00 80.00 -1,420.00
01-624 • Construction Cleaning 1.440.00 769.88 470.12
01.645 • Expendables 2250.00 1,278.77 -971.23
01-646 - Small Tools 1.700.00 533.40 -1,186.80
01.665 - Equipment Rental 1.500.00 0.00 -1,600.00
01-900 - Misc. Expenses 500.00 184.00 -316.00
Total 01 Direct Expenses 11.290.00 4,806.41 .8,883.59
02 Site Work
02-000 - Inspection-Testing 3,500.00 3,606.00 108.00
02.005. Layout/Survey 1,500.00 1,104.00 -396.00
02.200 - Excavation•BacMtll 10.000.00 10,437.86 437.86
02-281 - Pest Control 1.178.00 1,175.00 -1.00
02-480 - Landscaping 3,000.00 0.00 4.000.00
02.740 • Septic System 10,500.00 10,228.00 -272.00
Total 02 Site Work 29.876.00 26,552.86 -3,123.14
03 Concrete
03-111 • Footing 8.300.00 8,276.40 -23.80
03-130. 40004 Concrete 9,405.00 8.746.92 -658.08
03-154 - Shoring 900.00 855.20 -44.80
03-171 - Stairs 2225.00 2,201.44 -23.56
03-173 - Slab on Grade 1,350.00 1,332.80 -17.20
03-174 • Elevated Slab 8.280.00 8,279.04 -0.98
03-210 • Reber 6,700.00 6,884.16 -15.84
03-362 - Pumping 1,525.00 2,885.00 1,360.00
03-600 - Grouting 270.00 1,360.19 1,090.19
Total 03 Concrete 38,955.00 40,621.15 1,666.15
04 Masonry
04-220 - CMU 6.880.00 7,042.80 162.80
04-424 • Coral Stone Tile 19,550.00 270.32 -19,279.88
04-450 - Native Stone Veneer 21,000.00 20.659.20 •340.80
Total 04 Masonry 47.430.00 27,972.32 -19,457.68
06 Carpentry
06-050 - Fasteners • Material 1,500.00 1,459.04 40.96
06-100 - Rough Carpentry - L 3,200.00 1,423.60 -117040
06-101 - Rough Carpentry - M 3,000.00 0.00 -3.000.00
06-200 • Finished Carpentry 10,000.00 7,250.00 -2,750.00
Total 06 Carpentry 17,700.00 10.132.64 -7,587.38
08 Doors and Windows
08-100 - Metal Doors & FramesM 3.100.00 3.080.29 -19.71
08-101 • Metal Doors & Framest. 480.00 866.00 396.00
08-711 - Finish Hardware- L 240.00 0.00 -240.00
Total 08 Doors and Windows 3,820.00 3,946.29 128.29
09 Finishes
09-200 - Plaster 5,500.00 5,430.87 -69.13
09-310- Ceramic Tile Floor 8,500.00 8.369.61 -180.49
09-910 - Exterior Painting 500.00 0.00 -500.00
09-920 • Interior Painting 1,000.00 0.00 .1,00000
Total 09 Finishes 15,500.00 13,800.38 -1,899.02
10 Specialities
10-520 - Fire Extinguishers 500.00 0.00 -500.00
10-670 • Storage Shelving 3,500.00 0.00 -3.500.00
Total 10 Specialities 4,000.00 0.00 4.000.00
Page 1
EFTA01118371
1:54 PM LSJ, LLC
mom Job Estimates vs. Actuals Detail for 1006 - Laundry
All Transactions
Est. Cost Act. Cost (5) DK
11 Equipment
11.452 - Laundry Equipment 10.000.00 8,400.00 -1,000.00
Total 11 Equipment 10,000.00 8,400.00 -1,600.00
15 Mechanical
15400 - Plumbing 20,885.00 6,683.05 -14,201.95
15.600 • AC System 6.000.00 5.080.00 -920.00
Total 15 Mechanical 26,885.00 11,763.05 -15,121.95
16 Electrical
16-000 - Electrical Complete 15'50.00 18,303.41 2.563.41 LJ
Total 16 Electrical 15,750.00 18,303.41 2,553.41
Total Laundry 221,006.00 166,098.51 -54,907.49
Total Service 221,006.00 166,096.51 -54.907.49
TOTAL 221,006.00 166,098.51 -54,907.49
Page 2
EFTA01118372
1:58 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Laundry
03 Concrete
03-382 - Pumping
Check 8/5/2010 14553 Earl King 1,515.00
Check 10/15/2010 WIRE Pro Concrete Pumping 1,370.00
Total 03-382 - Pumping 2.885.00
Taal 03 Concrete 2,885.00
Total Laundry 2.885.00
Total Seivice 2,885.00
TOTAL 2,885.00
6 Page 1
EFTA01118373
1:59 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Laundry
03 Concrete
03-600 - Grouting
Check 8/13/2010 14558 Dream Engineering and Trucking 270,00
Crelt Card Charge 9/1/2010 Heavy Materials. LLC 1,090.19
Total 03-600 - Grouting 1,380.19
Total 03 Concrete I .380.19
Total Laundry 1,360.19
Total Service 1,360.19
TOTAL 1,360.19
Q) Page 1
EFTA01118374
1:69 PM LSJ, LLC
mom, Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Dale Num Source Name Amount
Service
Laundry
16 Electrical
16.000 - Electrical Complete
Credit Card Charge 12/18/2009 Commun(cations Supply Co. 844.54
Credit Card Charge 12/18/2009 Communications Supply Co. 1,101.38
Credit Card Charge 1/7/2010 Tropical Shipping Co., Ltd. 64.12
Credit Card Charge 1/7/2010 Tropical Shipping Co.. Ltd. 44.60
Credit Card Charge 1/7/2010 Tropical Shipping Co.. Ltd. 71.73
Credit Card Charge 1/21/2010 Communications Supply Co. $492.04
Check 10/20/2010 WIRE Michael J. Glidden Electrical Services 12.685.03
Total 16.030 - Electrical Complete 18,303.41
Total 16 Electrical 18.30341
Total Laundry 18,303.41
Total Service 18,303.41
TOTAL 18,303.41
Page 1
EFTA01118375
1:44 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1007 - Kitchen
All Transactions
Est. Cost Act. Cost (5) Diff.
Service
Kitchen
01 Direct Expenses
01.045 - Cut 8 Patch 1.500.03 0.00 -1,500.00
01.100 - Holiday Allocation 0.00 0.00 0.00
01.101 - Burden 0.00 0.00 0.00
01410 • Material Handling 8.320.00 1,576.92 4,743.08
01421 - Temporary Protection 1,500.00 0-00 -1,500.00
01.624 • Construction Cleaning 3.12000 215.12 4,904.88
01-645 - Expendables 3.0(10.00 771.29 -2,228.71
01-646 • Small Tools 3,200.00 713.52 -2486.48
01.665 - Equipment Rental 2,000.00 0.00 -2.000.00
01-900 - Misc. Expenses 5,000.00 0.00 4.000.00
Total 01 Direct Expenses 27,640.00 3,276.85 -24.363.15
02 Sitework
02-000 - Inspection • Testing 2.500.00 2,500.00 0.00
02-005 - Layout/Survey 3,000.00 1,610.00 -1,390.00
02.050 - Demolition 12,000.00 11,872.35 .127.65
02-200 - Excavation-BacIdill 3.000.00 1,788.40 -1,211.60
02.281 - Pest Control 625.00 825.00 0.00
Total 02 Sitework 21.125.00 18,395.75 -2,729.25
03 Concrete
03-111 - Footings 2,500.00 2,573.52 73.52
03-130 - 40004 Concrete 4,800.00 4,394.78 405.22
03-172 - Retaining Walls 14.000.00 14,352.59 352.59
03-173 - Slab on Grade 2,581.00 2,493.60 -87.40
03-600 - Growing 1,200.00 1,138.09 -63.91
Total 03 Concrete 25,081.00 24.95058 -130.42
04 Masonry
04-220 - CMU 6,500.00 7,106.46 606.46
04-424 - Coral Stone Tile 8,325.00 000 4,325.00
04-450 - Native Stone Veneer 35,000.00 34,090.00 -910.00
Total 04 Masonry 49.825.00 41.198.46 -8,628.54
06 Carpentry
06-050 • Fasteners 3,000.00 237848 421.54
06.100 • Rough Carpentry -1. 21,250.00 21,351.05 101.05
06-101 • Rough Carpentry - M 52.000.00 28,161.82 -23,838.18
06.400 - Casework 129,487.00 105,210.00 44,257.03
Total 06 Carpentry 205,717.00 157,101.33 -48,815.67
07 Moisture and Thermal
07-240 - EFIS Cornice - Gutter 3,000.00 375.34 -2,624.88
07-412 - Metal Roofing - L. 2880.00 2,787.12 107.12
07.413 - Metal Roofing - M 6.36000 0.00 -6,360.00
07423 • Copper Flashing - L 1,840.00 168.00 -1.672.00
07424 - Copper Flashing - M 2,400.00 1,257.17 .1,142.83
07.632 -Downspout Rough L&M 5.000.00 1,779.31 4,220.69
07-810 - Skylights 4,500.00 3,112.00 -1,388.00
07-900 - Joint Sealants • L&M 1,500.00 0.00 -1,600.00
Total 07 Moisture and Thermal 27,280.00 9,478.94 -17,801.06
08 Doors and Windows
08-210 • Ext. Wood Doors • M 18,382.00 12,553.55 -5,828.45
08-211 -Ext. Wood Doors L 1,86000 43200 -1,228.00
08.270 - Al. Doors 7,500.00 1,48200 4,011.00
08.610 - Door Shutters 7,000.00 816.00 4,184.00
08.710 - Finish Hardware M 3,150.00 0.00 -3,150.00
08-711 - Finish Hardware L 1.980.00 000 -1,980.00
Total 08 Doors and Windows 39,672.00 15.290.55 -24,381.45
Page 1
EFTA01118376
1:44 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1007 - Kitchen
All Transactions
Est. Cost Act. Cost (5) M.
09 Finishes
09-200 • Plaster
• Floor Tile • Labor
09.301 • Floor Tile • Material
09-301
5.000.00
39.000.00
16,486.44
YAM
32,130.00
11.46644
-8,870.00
0
09.511 - Wood Ceilings • M 22.500.00 1.49600 -21,010.00
09-910 - Exterior Painting 2,500.00 1,557.80 -942.20
09.911 • Interior Painting 5200.00 2.095.70 -2,904.30
Total 09 Finishes 78,000.00 53,739.94 -24,260.06
10 Specialties
10-520 - Fire Extinguishers 1.000.00 0.00 -1.000.00
10-670 - Storage Shelving 10.000.00 0.00 -10,000.00
Total 10 Specialties 11.000.00 0.00 -11,000.00
11 Equipment
11-451 - Kitchen Equipment 50.000.00 25.669.00 -24.331.00
Total 11 Equipment 50.000.00 25.869.00 -24.331.00
12 Furnishings
12-310 - Stone Countertops 35,000.00 11,268.92 -23,731.08
Total 12 Furnishings 30.00060 11268.92 -23,731A8
15 Mechanical
15.400 - Plumbing 5.50060 4,396.45 -1,103.55
15-600 - AC System 31,000.00 4,684.10 -26,315.90
Total 15 Mechanical 36.500.00 9,080.56 -27,419.45
16 Electrical
16-000 - Electrical Complete 25,75060 10,533.44 -15,216.56
Total 16 Electrical 25.750.00 10,533.44 -15,216.56
Total Kitchen 632,590.00 379,982.31 -252,807.69
Total Service 632,590.00 379,982$1 -252.607.69
TOTAL 632,590.00 379,982.31 -252,607.69
Page 2
EFTA01118377
1:46 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1996 through January 22, 2011
Type Dare Num Source Name Amount
Service
Kitchen
09 Finishes
09-200 - Plaster
Check 10/13/2010 MEMO Island Grounds. Inc. • Timesheet 592.81
Check 10/25/2010 MEMO Island Grounds. Inc. • Timesheet 4,593.52
Check 10/29/2010 MEMO Wand Grounds. Inc. - Timesheet 2.58544
Check 11/1/2010 14597 Dream Engineering and Trucking 98.75
Credit Card Charge 115/2010 M.S.I. Builckng Supplies 367.00
Credit Card Charge 11/5/2010 M.S.I. Building Supplies 714.00
Chock 11/17/2010 MEMO Island Grounds. Inc. Timesheet 4,544.80
Check 11/29/2010 MEMO Island Grounds. inc. - Timesheet 1,324.80
Credit Card Charge 12/7/2010 M.S.I. Building Supplies 357.00
Credit Card Charge 12/712010 M.S.I. Buildng Supplies 45.36
Credit Card Charge 12/7/2010 M.S.I. Bullring Supplies 357.00
Check 12/29/2010 MEMO isiand Grounds. Inc. - Timesheet 886.16
Total 09.200 • Plaster 16,468.44
Total 09 Finishes 16.486.44
Total Kitchen 16,468.44
Total Service 16.46544
TOTAL 16,466.44
Page 1
EFTA01118378
1:41 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1008 - Tiki Hut
All Transactions
Est. Cost Act. Cost (6) Diff.
Service
Tiki Hut
01 Direct Expenses
01.045 - Cut & Patch 1.600.00 0.00 -1,800.00
01-522 • Temp Enclosures/Safety 500.00 0.00 -500.00
01.610 - Material Handling 1,000.00 0.00 -1,000.00
01.624 - Construction Cleaning 320.00 0.00 -320.00
01445 - Expendables 500.00 227.57 -272.43
01-665 - Equipment Operation 600.00 0.00 -600.00
01-900 - Misc. Expenses 500.00 0.00 -500.00
Total 01 Direct Expenses 5.020.00 227.57 -4,792.43
02 Sitework
02-050 - Demolition 1,600.00 0.00 -1,800.00
02-150 - Shoring/Staging 5,060.00 0.00 -5.000.00
02-200 - Walls/Pads 206000 0.00 -2,000.00
Total 02 Sltework 8.603.00 0.00 -8,800.00
06 Wood
06-050 - Fasteners 1,500.00 0.00 -1.500.00
06-100 - Carpentry 0.00 3,771.08 3,771.08
Total 06 Wood 1,500 00 3,771.08 2,271.08
07 Moisture/Thermal
07-412 • Metal Roofing - Labor 20,00a00 11,379.91 -8,820.09
Total 07 Moisture/Thermal 20,000.00 11,379.91 -8,620.09
09 Finishes
09-510 - Bamboo Ceilings 6,000.00 241.49 -5,758.51
09.920 • Painting 2.500.00 0.00 -2,500.00
Total 09 Finishes 8,500.00 241A9 -8,258.51
16 Electrical
16-000 - Electrical Complete 10,000.00 254.00 -9,746.00
Total 16 Electrical 10,000.00 254.00 4,748.00
Total Tiki Hut 53,620.00 15,874.05 -37,745.95
Total Service 53.820.00 15,874.05 47,745.95
TOTAL 53,620.00 15,874.05 -37,745.95
Page 1
EFTA01118379
1:42 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Tiki Hut
06 Wood
06-100 - Carpentry
Check 12/14/2010 MEMO Island Grounds. Inc. - Timesbeet 3.427.08
Check 12/29/2010 MEMO Island Grounds. Inc. - Timesheel 344.00
Total 06.100 • Carpentry 3,771.08
Total 06 Wood 3.771.08
Total Tiki Hut 3.771.06
Total Service 3.771.06
TOTAL 3,771.06
Page 1
EFTA01118380
1:13 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1009 - Main House Expansion
All Transactions
Est. Cost Act. Cost (S) Dill.
Service
Main House Expansion
01 Direct Expenses
01.100 - Holiday Allocation 0.00 9134.71 2,134.71
01-101 - Burden 0.00 1,499.34 1,499.34
01-514 - Phones 1,200.00 0.00 -1,200.00
01.522 - Temp. Enclosure/Safety 2.500.00 0.00 -2,500.00
01410 - Material Handling 8,480.00 1.382.40 -7,097.60
01.621 -Temp. Protection 1.500.00 422.17 -1.077.83
01-624 - Construction Cleaning 4,320.00 2.502.24 -1,817.76
01-645 - Expendables 6.000.00 3,090.90 -2,909.10
01.665 - Equipment Rental 4,000.00 492.95 -3,507.05
01.900 - Misc. Expenses 5,000.00 810.99 -4,189.01
Total 01 Direct Expenses 33,000.00 12,335.70 -20,684.30
02 Sitework
02-000 - Inspection-Testing 0.00 0.00 0.00
02-050 • Demolition 15.000.00 5,558.25 -9,441.75
02.150 - Shoring 10.00000 6,245.80 -2.754.40
Total 02 Sitework 25,000.00 11,803.85 -13.196.15
04 Masonry
04-450 - Native Stone Veneer 75,000.00 21.263.13 -53.736.87
Total 04 Masonry 75.000 00 21,263.13 -53.736.87
06 Wood
06-050 - Fasteners - M 8,000.00 1,102.60 -8.897.40
06.100 - Rough Carpentry - L 104,000.00 61.708.39 -42,291.61
06.201 • Interior Trim 9,500.00 8,342.20 -1,157.80
06-400 - Arch. Woodworking 12,000.00 12,983.00 983.00
Total 06 Wood 133,500.00 84.136.19 49.363.81
07 Moisture/Thermal
07412 - Roofing Assembly 204.000.00 178.818.39 -25,181.61
Total 07 Moisture/Thermal 204,000.00 178,818.39 -25,181.61
08 Doors and Windows
08-210 - Wood Doors
Total 08 Doors and Windows
84,901.00
84,901.00
97,219.04
97.219.04
12,31904
12,318.04
0
09 Finishes
09-200 - Plaster 26,000.00 33336.09 7.338.09
09-600-Floor Tile Patch/Repair 11,500.00 8,966.69 -2,533.31
09-920 - Painting 8000 00 18.325.64 10.325.64
Total 09 Finishes 45.500 00 60.628.42 15,128.42
10 Specialties
10-800 - Toilet Accessories 3,000.00 2,636.58 -363.42
Total 10 Specialties 3,000.00 2.836.58 -363.42
12 Furnishings
12-310 - Granite Countertops 9000.00 15,050.28 6,050.28 t-C9
Total 12 Furnishings 9,000.00 15,050.28 6,050.28
15 Mechanical
15-400 - Plumbing 5,000.00 5,118.03 118.03
15-800 - VAC 52,000.00 21,795.43 -30.204.57
Total 15 Mechanical 57,000.00 26.913.46 40,086.54
Page 1
EFTA01118381
1:13 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1009 - Main House Expansion
All Transactions
Est. Cost Act. Cost (5) Dirt
16 Electrical
16.000 - Electrical 38.000.00 645.50 47.354.50
Total 16 Electrical 38,000.00 645.50 47,354.50
Total Main House Expansion 707,901.00 511,450.54 ,196,450.46
Total Service 707,901.00 511,450.54 -196,450.46
TOTAL 707,901.00 511,450.54 -196,450.45
Pag• 2
EFTA01118382
1:22PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Main House Expansion
06 Doors and Windows
06410 • Wood Doors
Check 5/6/2010 WIRE Tom Hoch Designs 2.197.03
Check 5/18/2010 WIRE Tom Hoch Designs 22.689.50
Check 6/16/2010 WIRE American Export Company 1.098.50
Check 6/30/2010 MEMO Island Grounds. Inc. - Timesheet 82.80
Crecal Card Charge 702010 Tropical Shipping Co., Ltd_ 20.93
Check 7/14/2010 MEMO Island Grounds. Inc. - Timesheet 496.80
Check 7/16/2010 WIRE Tom Hoch Designs 27089.50
Check 7/26/2010 MEMO Island Grounds. Inc. - Timesheet 165.60
Credit Card Charge 7/27/2010 Classic Engineering 85.00
Check 8/19/2010 Online Home Depot Credit Services 270.21
Credit Card Charge 9/7/2010 Tropical Shipping Co.. Ltd. 552.50
Check 9/13/2010 MEMO Island Grounds, Inc. • Timesheet 1,008.00
Check 9/27/2010 MEMO Island Grounds. Inc. • Timeshooi 2912.00
Check 9/28/2010 WIRE AM Development. LLC 11,450.50
Credit Card Charge 10/12/2010 Sea Chest 16611
Check 10/13/2010 MEMO Island Grounds. Inc. - Timesheet 1,797.00
Check 10/25/2010 MEMO Island Grounds. Inc. - Timesheet 3568.00
Check 10/29/2010 MEMO Island Grounds. Inc. - Timesheet 1,880.00
Chock 11/3/2010 WIRE American Export Company 349.24
Check 11/17/2010 MEMO Island Grounds. Inc. - Timesheet 120.00
Check 11/17/2010 MEMO Island Grounds, Inc • Timeshoet 2.752.35
Check 11/19/2010 Online Home Depot Credit Services 588.14
Credit Card Charge 11/23/2010 Tropical Shipping Co.. Ltd. 33.56
Check 11/29/2010 WIRE A&I Development. LLC 5,725.25
Check 11/29/2010 MEMO Island Grounds. Inc. - Timesheet 2,535.20
Check 12/14/2010 MEMO Island Grounds. Inc. - Timesheet 1,488.00
Check 12/17/2010 WIRE American Export Company 69.66
Check 12/17/2010 WIRE A&I Development, LLC 5,725.25
Credit Card Charge 12/22/2010 Tropical Shipping Co.. Ltd. 14.44
Check 12/29/2010 MEMO Island Grounds. Inc. - Timesheet 288.00
Total 08-210 - Wood Doors 97.219.04
Total 08 Doors and Windows 97.219.04
Total Main House Expansion 97,219.04
Total Service 97,219.04
TOTAL 97,219.04
Page 1
EFTA01118383
1:25 PM LSJ, LLC
ouiom, Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Main House Expansion
09 Finishes
09-200 - Plaster
Check 6/16/2010 MEMO Island Grounds. Inc. - Timesheet 741.60
Check 6/17/2010 Online Home Depot Credit Services 674.10
Check 6/30/2010 MEMO Island Grounds, Inc. Timesheat 8,990.20
Credit Card Charge 7/7/2010 Red HOOk Ace - Construction 22.74
Credit Card Charge 7/2/2010 Red Hook Ace - Construction -2.13
Credit Card Charge 7/2/2010 Home Depot 465.38
Check 7/6/2910 Online Home Depot Credit Services 95.74
Check 7/6/2010 Online Home Depot Credit Services 455.60
Credit Card Charge 7/12/2010 M.S.I. Budding Supplies 130.08
Credit Card Charge 7/12/2010 M.S.I. Budding Supplies 811.04
Credit Card Charge 7/12/2010 M.S.I. Building Supplies 141.80
Credit Card Charge 7/12/2010 M.S.I. Building Supplies 722.40
Credit Card Charge 7/12/2010 M.S.I. Budding Supplies 637.28
Check 7/14/2010 MEMO Island Grounds. Inc. - Timesheet 3,771.82
Check 8/10/2010 MEMO Island Grounds, Inc. • Timesheet 245.60
Check 8/19/2010 Online Home Depot Credit Services 543.87
Check 8/27/2010 MEMO Island Grounds. Inc. Timesheet 2815.12
Check 9/13/2010 MEMO Island Grounds. Inc. Timesheet 379.12
Check 9/27/2010 MEMO Island Grounds. Inc. Timesheet 2.290.00
Check 10/13/2010 MEMO Island Grounds. Inc. - Timesheet 1,377.36
Credit Card Charge 10/19/2010 M.S.I. Budding Supplies 667.52
Check 10/25/2010 MEMO Island Grounds. Inc. - Timesheet 160.00
Check 10/29/2010 MEMO Island Grounds, Inc. • Timesheet 1940.56
Check 11/17/2010 MEMO Island Grounds. Inc. • Timesheet 2.457.92
Check 11/29/2010 MEMO Island Grounds, Inc. - Timesheet 2,380.24
Check 12/14/2010 Home Depot Credit Services 332.57
Check 12/14/2010 MEMO Island Grounds, Inc. - Timesheet 888.56
Total 09-200 • Plaster 33.338.09
Total 09 Finishes 33,336.09
Total Main House Expansion 33,336.09
Total Service 33,336.09
TOTAL 33,338.09
Page 1
EFTA01118384
1:26 PM LSJ, LLC
mom Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Main House Expansion
09 Finishes
09-920 - Palming
Credit Card Charge 7/2/2010 The Paint Depot 35.10
Credit Card Charge 7/2/2010 The Paint Depot 370.60
Credit Card Charge 8/19/2010 The Paint Depot 740.55
Credit Card Charge 9/17/2010 The Paint Depot 591.30
Credit Card Charge 9/17/2010 The Paint Depot 306.00
Check 9/27/2010 MEMO Island Grounds. Inc. - Tomesheet 1.245.00
Check 10/13/2010 MEMO Island Grounds, Inc. • Timesheet 1.880.38
Credit Card Charge 10/19/2010 The Paint Depot 161.22
Check 10/25/2010 MEMO Island Grounds. Inc. - Timesheet 2,206.00
Check 10/29/2010 MEMO Wand Grounds, Inc. - Timesheet 1,526.00
Check 11/17/2010 MEMO Island Grounds. Inc. Timesheet 838.00
Check 11/19/2010 Online Home Depot Credit Services 247.49
Check 11/29/2010 MEMO Island Grounds, Inc. Timesheet 812.40
Credit Card Charge 12/9/2010 The Paint Depot 153.00
Credit Card Charge 12/9/2010 The Paint Depot 459.00
Check 12/14/2010 MEMO Island Grounds. Inc. - Timesheet 3,404.00
Check 1229/2010 MEMO Island Grounds, Inc. - Timesheet 3,369.60
Total 09-920 - Painting 18,325.64
Total 09 Finishes 18,325.64
Total Main House Expansion 18,325.64
Total Service 18325.64
TOTAL 18,325.64
Page 1
EFTA01118385
1:27 PM LSJ, LLC
01/10/11 Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type Date Num Source Name Amount
Service
Main House Expansion
12 Furnishings
12-310 • Granite Countertops
Check 815/2010 WIRE VI Granite & Marble 2,812.99
Check 10/12/2010 WIRE VI Granite & Marble 6,134.52
Check 11/2(2010 WIRE VI Granite & Marble 2,550.07
Check 12/7/2010 WIRE VI Granite & Marble 3.552.70
Total 12-310 Granite Countertops 18050.28
Total 12 Furnishings 15,050.28
Total Main House Expansion 15,050.28
Total Service 15,050.28
TOTAL 15,050.28
Page 1
EFTA01118386
2:31 PM LSJ, LLC
mom Job Estimates vs. Actuals Detail for 1011 - Main House
All Transactions
Est.... Act. Cost (6) Diff.
Service
Main House
01 General Requirements
01-100 - Holiday Allocation 0.00 189.54 189.54
01-101 - Burden 0.00 141.88 141.86
01.807 • Professional fees 1.00 9695.35 9,694.35
01.900 - Gen. Office 0.00 20.21 20.21
Total 01 General Requirements 1.00 10.046.96 10,045.96
02 Sitework
02-005 • Layout/Survey 0.00 1,889.12 1.889.12
02-200 - Excavation-SW(1dt 0.00 7,952.00 7.952k0
Total 02 Sitework 0.00 9841.12 9.841.12
03 Concrete
03-130 - Concrete 0.00 750.60 750.60
03-171 - Stairs 0.00 5,80&00 5804.00
Total 03 Concrete 0.00 6.554.60 9554.80
06 Wood
08-100 -Rough Carpentry 0.00 828.00 828.00
Total 06 Wood 0.00 826.00 828.00
09 Finishes
09.510 • Wood Ceilings 0.00 2.19952 2.199.52
09401 - Coral tiles 0.00 41.796.86 41,796.86
Total 09 Finishes 0.00 43.99938 43.996.38
15 Mechanical
15-400 - Plumbing 0.00 100.65 100.65
Total 15 Mechanical 0.00 100.65 100.65
Total Main House 1.00 71.387.71 71,36971
Total Service 1.00 71.367.71 71.386.71
TOTAL 1.00 71,367.71 71,386.71
Page 1
EFTA01118387
2:32 PM LSJ, LLC
01/10/11 Job Estimates vs. Actuals Detail for 1012 - Island Trails
All Transactions
Est. Cost Act. Cost (5) Dill.
Service
Island Trails
01 Gen. Requirements
01-100 - Holiday Allocation 0.00 1,026.71 1,026.71
01.101 • Burden 0.00 744.16 744.16
01410 - Material Handling 1.00 1,032.60 143180
01-621 - Temporary Protection 0.00 429.18 429.18
01824- Construction Cleaning 0.00 718.00 718.00
01-645 - Expendables 0.00 370.81 370.81
01-646 - Small Tools 0.00 1.49325 1.493.25
Total 01 Gen. Requirements 1.00 5.814.71 5.81371
02 - Sitework
02-000- Testing/Inspections 0.00 455.00 455.00
02-005 - Layout 0.00 5,477.41 5.477.41
02-050 - Demolition 0.00 3.156.93 3.156.90
02-112 - Storm Drainage 0.00 0.00 0.00
02-200 - Earthwork 0.00 9.613.56 9.613.56
02-530 - Concrete Paving 0.00 29,789.36 29.789.36
Total 02 - Sitework 0.00 48.492.23 48492.23
03 Concrete
03-111 - Footings 0.00 2.343.84 2143.84
03-130 - Concrete 0.00 19.40746 19.407.46
03-210 - Rebar 0.00 1.08730 1.08710
03-220 - VAVM 0.00 1.200.00 1.200 00
03-301 - Admixtures 0.00 9,236.06 9.236.06
03-350 - Tiki Hut Slab 0.00 5,130.00 5.130.00
Total 03 Concrete 0.00 38.404.66 38.404.66
04 Masonry
04-200 - Unit Masonry 0.00 1.603.04 1.603.04
04-450 - Native Stone Veneer 0.00 101.758.61 101.758.61
Total 04 Masonry 0.00 103.36185 103,361.65
09 Finishes
09-950 - Decorative Painting 0.00 273.60 273.60
Total 09 Finishes 0.00 27380 27360
Total Island Trails 1.00 19614685 196,345.85
Total Service 1.00 196,346.85 196145.85
TOTAL 1.00 196,346.85 196,345.85
Page 1
EFTA01118388