From: Daphne Wallace <dlbwallace@gmail.com>
To: Jeffrey Epstein <*eevacation ail.com>
Cc: brice gordon Sarah K < > Rich Kahn
om>
Lafayette Monique Harry <
Subject: Photographs - July 26, 2012
Date: Thu, 26 Jul 2012 21:13:59 +0000
Attachments: 7_Engineering_storage_wall_formed up_for concrete_pour (1).JPG;
7 Engineering_storage wall formerup_for concrete_pour (2).JPG; 4_Five Palms.JPG;
8—Triangle_palms_(1),IPG; I TriangTe_palms_(2).JPG; 8 Triangle_palms_(3TJPG;
8_Triangle_palms_(4).JPG; —
— 8_Triangle_palms_(5).JPG; —
8_Triangle_palms_(6).JPG;
8_Triangle_palms_(7).JPG; 8Triangle_palms_(8).JPG; 8_Triangle_palms_(9).JPG;
8Triangle_palms_(10).JPG; Triangle_palms_(11).JPG;8 Triangle_palms 2).JPG;
8—Triangle_palms_(13).JPG; 8—Triangle_palms_(14).JPG; 8:Triangle_palms_05).JPG;
8—Triangle_palms_06).JPG; 8—Triangle_palms_07).JPG; 8 Triangle_palms_08).JPG;
15_Dock floor (1).JPG; 10_DOck floor (2).JPG; IO_Dock—floor (3).JPG;
IO_Dock—floor (4).JPG; 10_Dockploor (5).JPG; 10 Dock:floor (6).JPG;
IO_Dock—fl oor (7).JPG; 23 Pineapple_plantings_(1)7JPG;
23 Pineapple_plantings_(2)7JPG; 23_Pineapple_plantings_(3).JPG;
23 Pineapple_plantings_(4).JPG; 23_Pineapple_plantings_(5).JPG
Greetings Mr. Epstein,
July 26 photographs for your review and comments:
4 Five Palms
7 Engineering storage wall formed up for concrete pour
8 Triangle palms
10 Dock floor staining
23 Pineapple plantings
Respectfully submitted,
Daphne
EFTA01179736