CAMP 737-72UBJ REVISION 21 S/N 29273 (YG006) VP-BB]
OWNER: PICTON II LTD. OPERATOR: PICTON II LTD.
ADDRESS: C/O JET AVIATION ADDRESS: C/0 JET AVIATION
GENEVA AIRPORT CH-1215 GENEVA AIRPORT CH-1215
PHONE: PHONE:
FAX: FAX:
ANALYST: DENNIS RUFFINI ) (OFFICE)
(EFAX-CARDS)
EMAIL: (OFFICE) (FAX)
PROJECTED : 60 MOS. to 05-AUG-2019
AIRCRAFT SERIAL/REGNO: 29273 (YG006)/VP-BBJ MODEL: 737-72UBJ REVISION 21 MANUFACTURER: BOEING COMPANY
DATES LAST ACTUALS PROJECTED
INSERVICE DATE: 08-OCT-1999 3753:19 NC HRS as of 30-JUN-2014 6273
922 AFL as of 30-JUN-2014 1822
3455:18 APH as of 30-JUN-2014 5855
APU SERIAL/PART: P-5180/3800702-1 MODEL: 131-95 MANUFACTURER: HONEYWELL
INSTALLED ON 25-JUN-2010 LAST ACTUALS PROJECTED
3001 APU HRS 3455:18 APU HRS as of 30-JUN-2014 5855
2487 APUS 2961 APUS as of 30-JUN-2014 4161
ENGINE NO. 1 SERIAL/PART: 874437/CFM56-7827/53 MODEL: CFM56-7627/B3 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 05-MAY-2011 LAST ACTUALS PROJECTED
3556:48 ENG. HRS 3525:36 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 6273
821 ENC 886 ENC as of 30-JUN-2014 1786
ENGINE NO. 2 SERIAL/PART: 874438/CFM56-7827/53 MODEL: CFM56-7627/B3 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 08-OCT-1999 LAST ACTUALS PROJECTED
44 ENG. HRS 44 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 6273
15 ENC 886 ENC as of 30-JUN-2014 1786
BOEING AND BM ME TRADEMAPAS OF THE BOEING COMPANY
05-AUG-2014 Due List Report © CAMP SYSTEMS 1 Of 79
EFTA01190601
C O MP
NEW REQUIREMENT ITEMS
Astant.frar•
Operator Review And Action Required
737-72UBJ REVISION 215/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
These tasks or requirements have been added newly to your aircraft status. Please review them and approve or modify as appropriate. Please
pay particular attention to the Base and Next Due Times for these tasks. tt is Important to note that any task that has Insufficient Information
(marked by 7), will never come due unless the necessary information is provided by you.
TASK NO TASK DESCRIPTION EFFECTIVE DATE UNIT INTERVAL BASE TIME NEXT DUE DISPOSITION
Current Change To
EASA 2013-0020 INSPECT THE MARKINGS OF SAFETY BELTS AND/OR TORSO RESTRAINT SYSTEMS, TO DETERMINE IF THEY HAVE BEEN MAINTAINED OR REPAIRED BY
R4 (1) ORGANISATIONS OTHER THAN THE DESIGN APPROVAL HOLDER
14-FEB-2013 MOS 11-JUL-2014d MANDATORY
DUE EVERY HRSIMSC DUE
REF: AD AFL
NEW REOUIREMENT ADDED ON 16../UL-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
FAA 2014-13-07 INSTALL A NEW TAIL STROBE LIGHT HOUSING, INSTALL A NEW DISCONNECT BRACKET, AND CHANGE THE WIRE BUNDLES (FOR AIRPLANES ON WHICH
PARA (G) SB 737-33.1146 HAVE NOT BEEN DONE BEFORE THE EFFECTIVE DATE OF THIS AD)
19-AUG-2014 DUE NEXT MOS 72 19-AUG-201,1 9-AUG-2020 MANDATORY
NRSIMSC
REF: AD AFL
NEW REOUiREMENT ADDED ON 17-RA-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES
FAA 2014-13-10 DETAIL INSPECTION TO DETERMINE IF A WIRE SUPPORT CLAMP HAVING PART NUMBER (P/N) TA0930034.10, TA0930034.10P, TA0930034-11, OR
PARA (G) TA0930034-12P IS INSTALLED, & DO ALL APPLICABLE RELATED INVESTIGATIVE & CORRECTIVE ACTIONS
IS-AUG-2014 DUE NEXT MOS 60 19-AUG-201,1 19-AUG-2019 MANDATORY
HRVMSC
REF: AD AFL
NEW REOUiREMENT ADDED ON ISJUL-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
AUTHORIZED BY CERT.. DATE
7-Insufficient Information (s) Suppressed Requirement •-EstImated Due (New Requirement) (EB1)-Esdmated Base Time
05-AUG-2014 © CAMP SYSTEMS
2 Of 79
EFTA01190602
qmp Ari•lionfrum the fumtI up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENM l AN TIME REMAINING
EASA 2013-0020 R4 INSPECT THE MARKINGS OF SAFETY BELTS AND/OR TORSO RESTRAINT SYSTEMS, TO DETERMINE IF THEY HAVE MANDATORY
(1) BEEN MAINTAINED OR REPAIRED BY ORGANISATIONS OTHER THAN THE DESIGN APPROVAL HOLDER
MOS 11-JUL-2014 M NEW 11-JUL-2014
HRSiMSC DUE REQMT
REF AD AFL
NEW REQUIREMENT ADDED ON 16-JUL-2014 (EFFECTIVE: 14-FEB-2013). REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
SB 737-32-1448 TABLE PERFORM LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION RECOMMENDED
1.2 AND CHANGE, SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE MLG FORWARD AND AFT TRUNNION PIN
ASSEMBLIES WITH THE MLG NOT REMOVED FOR SIGNS OF CORROSION AND/OR CHROME PLATING DAMAGE FOR
ALL AIRPLANES
MOS 18 09-AUG-2011 09-FEB-2013 CC<
HRSiMSC 3533:32
REF BULLETINS AFL 863
WO. Al CHECK VP-88J FEB. 2013. VP-813J DUE LIST JULY 2014. VP-BBJ MONTHLY APR.
05-00014 ACTIVE STORAGE PROCEDURE
DAYS 7 14-JUN-2014 21-JUN-2014 CC<
HRS4MSC 3749:42
REF AFL 920
VVO. Al CHECK VP-8BJ FEB. 2013. VP-BBJ MONTHLY APR.2014. VP-BBJ MONTHLY MAY13
+ 347101 UPDATE NAV DATABASE
MOS 27-MAY-2014 25-JUN-2014 M CC<
HRS/MSC DUE 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. 8VBBJ007 - DUE CARDS * MONTHLY. VP-BBJ DUE LIST JULY 2014. VP-BBJ DUE TASKS DEC 2013. VP-BBJ MONTHLY
APR.2014. VP-BBJ MONTHLY JUNE 2014. VP-BBJ MONTHLY MAY13, VP-BBJ MX DUE JAN. 2014
FAA 2005-18-23 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL MANDATORY
MOS 12 03-JUL-2013 03-JUL-2014 CC<
HRS:MSC 3723:21
REF AD AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
3 Of 79
EFTA01190603
qmp AL,iariost frum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
FAA 2006-21-01 PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - REPETATIVE LUBRICATION MANDATORY
2
MOS 12 03-JUL-2013 03-JUL-2014 ccc
HRSMSC 4000 3723:21 7723:21 Mi70:02
REF AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
FAA 2011.27-03 PARA LUBRICATE TO PREVENT AN UNDETECTED FAILURE OF THE PRIMARY LOAD PATH FOR THE BALLSCREW IN THE MANDATORY
(G)(1)(0(2) DRIVE MECHANISM OF THE HSTA AND SUBSEQUENT WEAR AND FAILURE OF THE SECONDARY LOAD PATH IN
ACCORDANCE SERVICE BULLETIN 737-27A1277 R2
MOS 12 03-JUL-2013 03-JUL-2014 c.c.<
HRSMSC 1600 3723:21 5323:21 1570:02
REF AD AFL 908
YVO. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
FAA 2014-08.11 LUBRICATE THE LEFT MLG FORWARD TRUNNION PINS MANDATORY
(PARA G) (LEFT)
DAYS 30 (EFF) 03-JUL-2014 <<<
HRS/MSC
REF AFL
WO VP-BBJ DUE LIST JULY 2014
FAA 2014-08-11 LUBRICATE THE RIGHT MLG FORWARD TRUNNION PINS MANDATORY
(PARA G) (RIGHT)
DAYS 30 (EFF) 03-JUL-2014 <<<
HRSMSC
REF AFL
WO: VP-BBJ DUE UST JULY 2014
+ 050020 A-2 CHECK
MOS 12 03-JUL-2013 03-JUL-2014 <<.<
HRSMSC 3723:21
REF AFL 908
WO: VP-BBJ 2A JUNE 2013. VP-BBJ C CHECK JULY 2014
(xEXT) - Extension Incorporated in the next due (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) H - Task also due In hours due list
0 CAMP SYSTEMS
0 Of 79
EFTA01190604
qp
m Ari•liorsfrum Metres:Mu/1.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
050060 MONTHLY CHECK
MOS 1 13-JUN-20I4 09-JUL-2014 CC<
HRS.MSC 3749:42
REF AFL 920
WO: Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. VP-BBJ 2A JUNE 2013. VP-BBJ C CHECK JULY 2014. VP-BBJ MONTHLY APR.2014. VP-BBJ MX DUE JAN. 2014
H + 29.230-00 OPERATIONAL CHECK STANDBY RUDDER SYSTEM TO INCLUDE OBSERVING LOW PRESSURE LIGHT ILLUMINATION
AND THEN EXTINGUISHING.
29.480 DAYS 150 12-FEB-2074 12-JUL-2014 ccc
HRSiMSC 1000 3743:34 4743:34 990:15
REF ETC 29-230-00-01 AFL 917
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
FAA 2009.12-06 ENSURE THAT THE FLIGHTCREW IS ABLE TO TURN OFF ELECTRICAL POWER TO IFE SYSTEMS AND OTHER MANDATORY
NON-ESSENTIAL ELECTRICAL SYSTEMS THROUGH A SWITCH IN THE FLIGHT COMPARTMENT
MOS 60 (EFF) 16-JUL-2014 <CC
HRS/MSC
REF AD AFL
WO: VP-BBJ DUE LIST JULY 2014
24-120-00 (001.1) RESTORE MAIN BATTERY RESTORE
24.240 P/N: 539CH-1 MOS 6 23-JAN-2014 23-JUL-2014 <CC
S/N: 090520010322D HRS/MSC
REF BTC 24-120-00-01 AFL
WO. Al CHECK VP-88J FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
24-120-00 (002.1) RESTORE AUXILIARY BATTERY RESTORE
24.240 P/N: 539CH-1 MOS 6 23-JAN-2014 23-JUL-2014
S/N: 09052000364D0 HRS/MSC
REF BTC 24-120-00-01 AFL
WO: Al CHECK VP-88J FEB. 2013. W-BBJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBY) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) H - Task also due In hours due list
CAMP SYSTEMS
5 Of 79
EFTA01190605
qmp Aviaries. frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH
TIME REMAINING
+ 050030 C-1 CHECK
MOS 36 29-AUG-2011 09-AUG-2014 4d 09-AUG-2014
HRSMSC 35.33:32
REF AFL 863
WO: VP-BBJ C CHECK JULY 2014
25.60-00 GENERAL VISUAL INSPECTION OF ALL COCKPIT / CABIN EMERGENCY EQUIPMENT
MOS 12 09-AUG-2014 M 4d 09-AUG-2014
HRSMSC
REF AFL
+ 050010 A-1 CHECK
MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
HRS/MSC 3743:34
REF AFL 917
WO Al CHECK VP-88J FEB. 2013. VP-613J 2A JUNE 2013. VP-BBJ C CHECK JULY 2014, VP-BBJ MX DUE JAN. 2014
256323 (001.1) OPERATIONAL CHECK OF THE NO. 1 FORWARD EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FES-2014 12-AUG-2014 7d 12-AUG-2014
S/N: N/SN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
256323 (002.1) OPERATIONAL CHECK OF THE NO. 2 FORWARD EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
256323 (003.1) OPERATIONAL CHECK OF THE NO. 1 COCKPIT FLASHLIGHT
P/N: UNKNOWN MOS 13 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
S/N: NSN HRS/MSC 3743:34
REF AFL 917
WO: Al CHECK VP-B8.1FEB. 2013. VP-BBJ DUE CARDS JUNE 2013, VP-BBJ DUE LIST JULY 2014, VP-BBJ MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
6 Of 79
EFTA01190606
qmp Ari•liorsfrum therm:ad up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
256323 (004.1) OPERATIONAL CHECK OF THE NO. 2 COCKPIT FLASHLIGHT
P/N: PN-UNKNOWN MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. VP-B8J DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-8BJ MX DUE JAN. 2014
256323 (005.1) OPERATIONAL CHECK OF THE NO. 1 AFT EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
256325 (003.1) OPERATIONAL CHECK OF THE CARGO NET
P/N: 453A1810-13 MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: N/SN HRSMSC 3743:34
REF AFL 917
WO. Al CHECK VP-88J FEB. 2013. VF-B8J DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
33.5140 DEEP CYCLE ALL EMERGENCY BATTERIES
MOS 3 12-MAY-2014 12-AUG-2014 7d 12-AUG-2014
HRSMSC 3743:34
REF AFL 917
WO. Al CHECK VP-88J FEB. 2013. VF-B8J DUE CARDS JUNE 2013. VP-8BJ MX DUE JAN. 2014
+ 34-BBJ-01 SERVICE HEADS UP DISPLAY OVERHEAD UNIT DESICCANT CAPSULE
34.452 MOS 3 12-MAY-2014 12-AUG-2014 7d I2-AUG-2014
HRSMSC 3743:34
REF BTC 34-88J-01-Ill AFL 917
WO. Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ MX DUE JAN. 2014
347105 (1) BIANNUAL CHECK EGPWS TERRAIN DATABASE VERSION STATUS
MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
HRS/MSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. W-BEIJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flap Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
7 Of 79
EFTA01190607
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 252501 VISUALLY CHECK FORWARD ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER
PRESSURE
PIN: 5A3086-301 MOS 2 14-JUN-2014 14-AUG-2014 9d 14-AUG-2014
SIN: 83F476 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
•
WO: Al CHECK VP-88J FEB. 2013. 8VBELI007 - DUE CARDS + MONTHLY. VP-88J DUE CARDS JUNE 2013, VP-88J MONTHLY APR.2014, VP-88J MX DUE JAN. 2014
+ 252502 VISUALLY CHECK FORWARD SERVICE DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER
PRESSURE
P/N: 5A3086-301 MOS 2 14-JUN-2014 14-AUG-2014 90 14-AUG-2014
S/N: 83F481 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
•
WO: Al CHECK VP-88J FEB. 2013. 8VBBJ007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 252503 VISUALLY CHECK AFT ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE
P/N: 5A3088-301 MOS 2 14-JUN-2014 14-AUG-2014 9d 14-AUG-2014
S/N: 83A333 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
WO: Al CHECK VP-88J FEB. 2013. 8VBB1007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 252504 VISUALLY CHECK AFT SERVICE DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE
P/N: 5A3088-301 MOS 2 14-JUN-2014 14-AUG-2014 9d id-AUG-201a
S/N: 83A315 HRSAISC 3749:42
REF BTC 25-250-00-01 Aft 920
WO: Al CHECK VP-8BJ FEB. 2013. 8VB81007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 262901 WEIGHT CHECK COCKPIT PORTABLE FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 90 14-AUG-2014
S/N: X-841371 HRS/MSC
REF AFL
WO: Al CHECK VP-88J FEB. 2013. W-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
8 Of 79
EFTA01190608
qmpAviaries. frum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05•AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
(Elm) AFH TIME REMAINING
+ 262902 WEIGHT CHECK ENTRANCE WAY PORTABLE FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X402285 HRSMSC
REF AFL
WO: Al CHECK VP-BEU FEB. 2013. VP-BELI DUE LIST JULY 2014
+ 262903 WEIGHT CHECK GALLEY PORTABLE HALON FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X-841372 HRSMSC
REF AFL
WO: Al CHECK VP-BEU FEB. 2013. VP-BEU DUE LIST JULY 2014
262904 WEIGHT CHECK MID CABIN PORTABLE HALON FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X-840288 HRSMSC
REF AFL
WO: Al CHECK VP-BBJ FEB. 2013. VP-813J DUE LIST JULY 2014
25.390.00 REPLACE THE EMERGENCY FLASHLIGHT (NON-RECHARGEABLE) BATTERIES AT THE MANUFACTURER'S
RECOMMENDED INTERVAL.
25.421 MOS 24 17-AUG-2012 17-AUG-2014 12 d 17-AUG-2014
HRS:MSC 3655:09
REF BTC 25-390-00-01 AFL 888
WO VP-BBJ DUE LIST JULY 2014
+ 33-020-00 OPERATIONAL CHECK FLIGHT DECK EMERGENCY LIGHTING SWITCH "OW AND "ARMED" POSITION AND
ATTENDANT PANEL EMERGENCY LIGHTING SWITCH "ON" POSITION.
33.160 MOS 24 17-AUG-2012 17-AUG-2014 12 d 17-AUG-2014
HRSMSC 3655:09
REF See Workcard AFL 888
WO: VP-BBJ DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
9 Of 79
EFTA01190609
qmp
A,,iatiostfrum thvgrwend up'
Due List
737-72UB3 REVISION 21 5/N 29273 (YG006) (VP-BEU): 3753:19 HRS, 922 AFL as of 30-3un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH) TIME REMAINING
FAA 2011-14-08 PARA RECORD TO DETERMINE IF ANY OXYGEN MASK ASSEMBLY PART NUMBER LISTED IN B/E AEROSPACE SERVICE MANDATORY
(G) BULLETIN 174080.35-04, REV 000, DATED SEPTEMBER 6, 2010, IS INSTALLED IN THE AIRCRAFT
MOS 36 (EFF) 19-AUG-2014 14 d 19-AUG-2014
HRSMSC
REF AFL 6500 7366 6004
WO. VP-88J DUE LIST JULY 2014
FAA 2011-14-08 PARA MODIFY THE OXYGEN MASK ASSEMBLY BY REPLACING THE IN-LINE FLOW INDICATOR FOLLOWING B/E MANDATORY
(H) AEROSPACE SERVICE BULLETIN 174080-35-04, REV 000, DATED SEPTEMBER 6, 2010
MOS 36 (EFF) 19-AUG-2014 14 d 19-AUG-2014
HRS/MSC
REF AFL 6500 7366 6144
WO. VP-88J DUE LIST JULY 2014
« 20-020-00 GENERAL VISUAL INSPECTION OF HIRFIL SENSITIVE WIRE RUNS INSIDE THE PRESSURE
VESSEL. LOOK FOR OBVIOUS DAMAGE AND CONDITION OF SECURITY OF WIRE RUNS
20.030 t•IOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF BTC 20-020-00-01 AFL 782
WO. VP-88J DUE UST JULY 2014
+ 20-050-00 DETAILED VISUAL INSPECTION OF HIRF/L SENSITIVE CONNECTORS INSIDE THE PRESSURE VESSEL. DURING THE
INSPECTION DO NOT DISCONNECT CONNECTORS. LOOK FOR CONDITION, SECURITY, AND SIGNS OF CORROSION
20.090 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF BTC 20-050.00-01 AFL 782
WO: VP-88J DUE LIST JULY 2014
+ 20-060-00 FUNCTIONAL CHECK OF HIRFIL. SENSITIVE CONNECTORS INSIDE THE PRESSURE VESSEL BY DC RESISTANCE
CHECK FROM BACKSHELL TO GROUND.
20.100 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF BTC 20-060-00-01 AFL 782
WO. VP-88J DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
10 Of 79
EFTA01190610
qmpAviaries. frum thvgrwend up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 MRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH) AFH TIME REMAINING
+ 20-070-00 DETAILED VISUAL INSPECTION OF THE HIRF/L SENSITIVE PIG TAILS INSIDE THE PRESSURE VESSEL. LOOK FOR
CONDITION OF SECURITY AND SIGNS OF CORROSION.
20.110 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF BTC 20-070-00-01 AFL 782
WO VP-BBJ DUE UST JULY 2014
28-00-01 PATS GENERAL VISUAL INSPECTION OF AFS PLACARDS AND DECALS
28.025 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO: VP-BBJ DUE UST JULY 2014
28-00-02 PATS INSPECT AFS ELECTRICAL COMPONENTS CONNECTORS AND CABLES FOR CHAFFING, FRAYED LEADS, BENT PINS,
CORROSION, CHAFFING AND CONDITION
28.045 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
Wa: VP-BBJ DUE UST JULY 2014
28-10-01 PATS FUNCTIONAL CHECK CORE VACUUM CHECK OF INDIVIDUAL AUXILIARY FUEL CELLS
MOS 72 08-OCT-1999 22-AUG-2014 M 17 d 22-AUG-2014
HRSMSC 44
REF AFL 38
WO VP-BBJ DUE LIST JULY 2014
28-10-02 PATS DETAILED INSPECTION AUXILIARY FUEL CELL EXTERIOR STRUCTURE (INCLUDING DOORS/PANELS) FOR DAMAGE
AND CONDITION
1105 72 08-OCT-1999 22-AUG-2014 M 17 d 22-AUG-2014
HRSMSC 44
REF AFL 38
WO VP-BBJ DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
11 Of 79
EFTA01190611
qmp
A,,iatiostfrum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) ArH
TIME REMAINING
28-20-02 PATS FUNCTIONAL CHECK OF THE AUXILIARY FLOAT SWITCHES BY REMOVING FROM MASTER CELL AND VERIFY
OPERATION WITH OHMMETER. (FS1,FS2,FS3,FS51, FS52,FS53)
28.085 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO. VP-B8J DUE LIST JULY 2014
28-20-02-01 PATS FUNCTIONAL CHECK OF THE CENTER WING TANK FLOAT SWITCHES BY REMOVING FROM CENTER WING TANK
(CWT) AND VERIFY OPERATION WITH OHMMETER (FS4/FS5 OR FS6/FS7)
28.086 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO. VP-B8J DUE LIST JULY 2014
28.20.06 PATS GENERAL VISUAL INSPECTION OF THE AUXILIARY FUEL SYSTEM CELL INTERNAL HORIZONTAL AND VERTICAL
STRUCTURAL TUBES AND ALL ATTACHMENTS FOR CRACKS AND LOOSE FASTNERS.
MOS 72 08-OCT-1999 22-AUG-2014 M 17 d 22-AUG-2014
HRSMSC 44
REF AFL 38
WO: VP-88J DUE UST JULY 2014
28-AWL-01 PATS DETAILED INSPECTION OF THE CRITICAL ALI
WIRE HARNESS SEPARATION, BRACKETS, CLAMPS,
SHIELDING, SHIELDING TERMINATION POINTS,
DIELECTRIC SLEEVING, AND ROUTING (EWIS)
28A46 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO: VP-88J DUE UST JULY 2014
28-AWL-02 PATS DETAILED INSPECTION OF ALL AFS COMPONENTS (INCLUDING VALVE PLATE, FILLJTRANSFERNENT LINES) ALI
BONDING JUMPERS AND GROUNDING STUDS FOR MISSING OR DAMAGE HARDWARE, CORROSION, FRAYING OR
LOOSE PHYSICAL CONNECTIONS
28.152 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO: VP-88J DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time IEFF) Effective CAW
• - Estknated Due (applies to New Requirement)
0 CAMP SYSTEMS
12 Of 79
EFTA01190612
qmp
A,,iatiost
frum thvgriramd up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE
MAX LIMIT DISPOSITION EST. DUE
I ENH ) AfH
TIME REMAINING
28-AWL-03 PATS DETAILED INSPECTION OF DRY BAY WIRING HARNESS ROUTING, CLAMPING, AND ATTACHING BRACKETS FOR Ail
CONTAMINATION BY FUEL OR FUEL VAPOR, PHYSICAL DAMAGE, CRACKING AND SECURITY. INSPECT DRY BAY
VALVE ACTUATORS FOR SIGNS OF OVERHEATING, PHYSICAL DAMAGE, OR CRACKING. INSPECT DRY BAY DUAL
REDUNDANT BONDING JUMPERS FOR CORROSION, MECHANICAL WEAR, FRAYING AND SECURITY (EWIS)
28.154 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO: VP-88J DUE UST JULY 2014
28-AWL-04 PATS FUNCTIONAL CHECK TO VERFIY THE 10 PSID DIFFERENTIAL PRESSURE RELIEF VALVE FREELY OPENS AND AU
CLOSES RELATIVE TO AMBIENT PRESSURE.
28.158 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:418
REF AFL 782
WO VP-BBJ DUE LIST JULY 2014
28-AWL-05 PATS DETAILED INSPECTION OF THE BLEED AIR SOLENOID VALVE, DUAL CHECK VALVE, VENTURI AND PLUMBING FOR AU
DETERIORATION, CORROSION, EVIDENCE OF OVERHEATING OR LEAKAGE. INSPECT IMMEDIATE SURROUNDING
STRUCTURE FOR SIGNS OF HEAT DAMAGE AND/OR DISCOLORATION DUE TO HEAT DAMAGE.
28.159 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:48
REF AFL 782
WO VP-BBJ DUE UST JULY 2014
28-AWL-06 PATS DETAILED INSPECTION OF CWT (AFS) ASSOCIATED EQUIPMENT) WIRING HARNESS ROUTING, CLAMPING, AND ALI
ATTACHING BRACKETS FOR PHYSICAL DAMAGE, CRACKING, AND SECURITY. (EWIS)
INSPECT CENTER WING TANK FILL VALVE ACTUATORS FOR SIGNS OF OVERHEAT,PHYSICAL DAMAGE, OR
CRACKING.
INSPECT CENTER WING TANK UPPER AND LOWER FLOAT SWITCHES FOR SECURITY,PHYSICAL DAMAGE, CRACKING
OR LEAKAGE.
INSPECT CENTER WING TANK (AFS ASSOCIATED) DUAL REDUNDANT BONDING JUMPERS FOR CORROSION,
MECHANICAL WEAR, FRAYING AND SECURITY.
28.163 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:418
REF AFL 782
WO VP-88J DUE LIST JULY 2014
(xEXT) - Extension Incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBT)- Estimated Base Time 1EFF) Effective CM/
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
13 Of 79
EFTA01190613
qmpAL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AfH TIME REMAINING
« 53-160-00 INSPECT (INTERNAL-GENERAL VISUAL) FORWARD BILGE SKIN PANELS (SKINS, FRAMES, STRINGERS),
LONGITUDINAL LAP SPLICES, AND CARGO DOOR CUTOUT SURROUND STRUCTURE IN BILGE. [NOTE: INSPECTION
INCLUDES THE CIRCUMFERENTIAL SKIN AND STRINGER SPLICE AT STA 500E FOR THE -900ER MODELS]
53.190 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:,18
REF BTC 53-160-00-01 AFL 782
WO: VP-BBJ DUE LIST JULY 2014
+ 53.250-00 INSPECT (INTERNAL-GENERAL VISUAL) AFT BILGE SKIN PANELS (SKINS, FRAMES, STRINGERS),
LONGITUDINAL LAP SPLICES, CIRCUMFERENTIAL SKIN AND STRINGER SPLICES, [NOTE: LOCATED AT STA 7271 FOR
-900ER AND 727L FOR - 900ER MODELS]; STA 727 BULKHEAD AND PRESSURE WEB, AND CARGO DOOR CUTOUT
SURROUND STRUCTURE IN BILGE.
53.235 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:418
REF BTC 53-250.00-01 AFL 782
WO: VP-BBJ DUE LIST JULY 2014
+ 53-260-00 INSPECT (INTERNAL-GENERAL VISUAL) AREA AFT OF CARGO COMPARTMENT INCLUDING: 1. SKIN
PANELS (SKINS, FRAMES, STRINGERS), LONGITUDINAL LAP SPLICES, CIRCUMFERENTIAL SKIN AND STRINGER
SPLICES; 2. AFT ENTRY AND GALLEY DOOR CUTOUT SURROUND STRUCTURE IN LOWER LOBE; 3. STA 1016
BULKHEAD, INCLUDING CHORDS, PRESSURE WEB, STIFFENERS, CHORD/WEB ATTACHMENTS; 4. STRINGER SPLICE
FITTINGS AND TENSION BOLTS AT STA 1016.
53.240 MOS 72 22-AUG-2008 22-AUG-2014 17 d 22-AUG-2014
HRSMSC 3260:418
REF BTC 53-260-00-01 Aft 782
WO. VP-BBJ DUE UST JULY 2014
342412 COMPASS SWING
MOS 36 29-AUG-2011 29-AUG-2014 24 d 29-AUG-2014
HRS/MSC 3533:32
REF AFL 863
WO. VP-8BJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
14 Of 79
EFTA01190614
qmpAviaries. frum thvgrinend up'
Due List
737-72UB) REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
FNII , AFH TIME REMAINING
+ 35-060-00 VISUALLY CHECK THE TEMPERATURE SENSITIVE TAPE ON EACH PASSENGER CABIN,
(INCLUDING LAVATORY AND CABIN ATTENDANTS), CHEMICAL OXYGEN GENERATOR
35.110 MOS 36 29-AUG-20 1I 29-AUG-2014 24 d 29-AUG-2014
HRSMSC 3533:32
REF BTC 35-060-00-01 AFL 863
WO VP-BBJ DUE UST JULY 2014
• 53.390-00 INSPECT (INTERNAL-GENERAL VISUAL) PASSENGER COMPARTMENT FLOOR STRUCTURE WET AREA (WITHIN
APPROXIMATELY 20 INCHES FROM DOORS, GALLEYS
AND LAVS AND THE FLOORS STRUCTURE BELOW THE DOOR TO AND INCLUDING THE FIRST FRAME FROM THE
DOOR).
53.351 MOS 36 29-AUG.2014 24 d 29-AUG-2014
HRS/MSC
REF BTC 53.393.0001 AFL
WO VP-B8J DUE LEST JULY 2314
• 55-080-01 INSPECT (INTERNAL-GENERAL VISUAL) LEFT HORIZONTAL STABILIZER FRONT SPAR TERMINAL FITTINGS AND
CENTER SECTION FRONT SPAR LUGS-
55.130 MOS 36 29-AUG-2011 29-AUG-2014 24 d 29-AUG-2014
HRSMSC 3533:32
REF BTC 55-080-01-01 AFL 863
WO: VP-88J DUE UST JULY 2014
+ 55-080-02 INSPECT (INTERNAL-GENERAL VISUAL) RIGHT HORIZONTAL STABILIZER FRONT SPAR TERMINAL FITTINGS AND
CENTER SECTION FRONT SPAR LUGS-
55.140 MOS 36 29-AUG-2011 29-AUG-2014 24 d 29-AUG-2014
HRSMSC 3533:32
REF BTC 55-080-02-01 AFL 863
WO: VP-BBJ DUE UST JULY 2014
+ 55-12041 INSPECT (INTERNAL-GENERAL VISUAL) LEFT HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTINGS AND
CENTER SECTION REAR SPAR LUGS-
56.330 MOS 36 29-AUG-2011 29-AUG-2014 24 d 29-AUG-2014
HRSMSC 3533:32
REF BTC 55-120-01-01 AFL 863
WO: VP-BBJ DUE UST JULY 2014
(xEXT) - Extension Incorporated in the next due (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time lEFF) Effective CM
• - Estimated Due (applies to New Requirement)
O CAMP SYSTEMS
15 Of 79
EFTA01190615
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 55-12042 INSPECT (INTERNAL-GENERAL VISUAL) RIGHT HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTINGS AND
CENTER SECTION REAR SPAR LUGS-
55.340 MOS 36 29-AUG-20 I I 29-AUG-2014 24 d 29-AUG-2014
HRS/MSC 3533:32
REF BTC 55-120-02-01 AFL 863
WO: VP-BBJ DUE LIST JULY 2014
+ 57.03040 INSPECT (EXTERNAL-GENERAL VISUAL) AFT SIDE OF REAR SPAR, INCLUDING KEEL BEAM STIFFENERS AT BL 6.2,
AND SIDE OF BODY REAR SPAR TERMINAL FITTING.
57.050 MOS 36 29-AUG-2011 29-AUG-2014 24 d 29-AUG-2014
HRS/MSC 3533:32
REF BTC 57-030-00-01 AFL 863
VVO. VP-BBJ DUE LIST JULY 2014
25420.00 (001.1) RESTORE FORWARD FIRST AID KIT RESTORE
P/N: RE1013-107 MOS 12 02-SEP-2013 02-SEP-2014 280 02-SEP-2014
SIN: FA52009 HRSIMSC 3728:53
REF BTC 25-420-00-01 AFL 911
WO BVBI3J007 - DUE CARDS + MONTHLY. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
25420.00 (002.1) RESTORE AFT FIRST AID KIT RESTORE
P/N: RE1013-107 MOS 12 02-SEP-2013 02-SEP-2014 280 02-SEP-2014
SIN: FA52007 HRSIMSC 3728:53
REF BTC 25-420-00-01 AFL 911
WO. BVBEU007 - DUE CARDS + MONTHLY. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
25430.00 (001.1) RESTORE MEDAIRE • BLUE FIRST AID MEDICAL KIT
25.461 P/N: IFAX MOS 12 02-SEP-2013 02-SEP-2014 280 02-SEP-2014
SIN: DUM150710 HRSIMSC 3728:53
REF BTC 25-430-00-01 AFL 911
WO: BVBBJ007 - DUE CARDS + MONTHLY. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
16 Of 79
EFTA01190616
qmp Ari•liorsfrum therm:ad up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
25-300-00 (002.1) INSPECT AFT LIFE RAFT INSPECT
P/N: 5A3212-10121 MOS 12 30.SEP-2013 30-SEP-2014 56 d 30-SEP-2014
S/N: 12R099 HRS/MSC
REF BTC 25-300-00-01 AFL
WO: VP-BBJ DUE LIST JULY 2014
25-300-00 (003.1) INSPECT NO. 3 LIFE RAFT INSPECT
P/N: 5A3212-10121 MOS 12 30.SEP-2013 30-SEP-2014 56 d 30-SEP-2014
S/N: 12R098 HRS/MSC
REF BTC 25-300-00-01 AFL
WO VP-BBJ DUE LIST JULY 2014
SB 737-28Al206 R3 FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE, RECOMMENDED
SERVICE BULLETIN
MOS 36 (EFF) 30-SEP-2014 560 30.SEP-2014
HRS/MSC
REF BULLETINS AFL
+ 53.170-00 INSPECT (INTERNAL-GENERAL VISUAL) AREA AFT OF FORWARD CARGO COMPARTMENT, INCLUDING SKIN PANELS
(SKINS, FRAMES, STRINGERS), LONGITUDINAL LAP
SPLICES, CIRCUMFERENTIAL SKIN AND STRINGER SPLICES AND
FORWARD SIDE OF STA 540 BULKHEAD AND BULKHEAD SPLICES
53.195 MOS 180 08-OCT-1999 08-OCT-2014 64 d 08-OCT-2014
HRSIMSC 44
REF BTC 53-170-00-01 AFL 38
VVO. VP-BBJ DUE LIST JULY 2014
28-054-00 OPERATIONAL CHECK (BITE) THE FUEL PUMP GFI RELAY
28.890 MOS 12 30-OCT-2013 30-OCT-2014 86 d 30-OCT-2014
HRSA4SC 3728:53
REF AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
17 Of 79
EFTA01190617
qmp AL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05•AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
28-056-00 FUNCTIONALLY CHECK THE CENTER TANK FUEL BOOST PUMP POWER FAILED ON PROTECTION SYSTEM
28.895 MOS 12 30OCT-2013 30-OCT-2014 86 d 30-OCT-2014
HRSMSC 3728:53
REF AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
28-115-00 FUNCTIONALLY CHECK THE CENTER TANK BOOST PUMP AUTO SHUTOFF SYSTEM
28.115 MOS 12 30-OCT-2013 30-OCT-2014 86d 30-OCT-2014
HRSMSC 3728:53
REF AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
28-AWL-20 OPERATIONALLY CHECK THE GFI OF ALL AC FUEL TANK BOOST PUMPS PER AMM 28.22.41 AU
28.900 MOS 12 30-OCT-2013 30-OCT-2014 86d 30-OCT-2014
HRSMSC 3728:53
REF BTC 28-AWL AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
28-AWL-23 FUNCTIONALLY TEST CENTER TANK FUEL BOOST PUMP POWER FAILED ON PROTECTION SYSTEM. ALI
28.320 MOS 12 30-OCT-2013 30-OCT-2014 86d 30-OCT-2014
HRSMSC 3728:53
REF BTC 28-AWL AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
737015 (1) ANNUAL CHECK OF EEC#1 8 EEC#2 SOFTWARE ENGINE FUEL AND CONTROL ECU SOFTWARE STATUS
P/N: 1853M78P33 MOS 12 30OCT-2013 30-OCT-2014 86 d 30-OCT-2014
S/N: 122 HRS/MSC 3728:53
REF AFL 911
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ DUE CARDS JUNE 2013, VP-BBJ DUE LIST JULY 2014
35-031-00 (001.1) HYDROSTATIC TEST CREW OXYGEN CYLINDER HYDRO CHECK
35.080 P/N: 801307-00 MOS 36 31-OCT-2011 31-OCT-2014 87d 31-OCT-2014
S/N: ST60796 HRSMSC
REF See Workcard AFL
WO: VP-BBJ DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
18 Of 79
EFTA01190618
qmpAL,iariost frum Mrgr./old .4'
Due List
737-72UBJ REVISION 21 5/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
CHM ) AFH TIME REMAINING
FAA 2012-05-02 PARA ACCOMPLISH ENGINE EXHAUST - THRUST REVERSERS - TO DETECT AND CORRECT HEAT DAMAGE TO THE INNER MANDATORY
& (J) WALL OF THE THRUST REVERSERS A DETAILED INSPECTION FOR DAMAGE OF THE ENGINE SIDE AND INNER WALL
SIDE OF THE UPPER AND LOWER INSULATION BLANKETS; MEASURE THE ELECTRICAL CONDUCTIVITY ON THE
ALUMINUM UPPER COMPRESSION PADS 2 AND 3,; AND INSPECT FOR DISCREPANCIES OF THE THRUST REVERSER
INNER WALL
MOS 30 10-NOV-2014 97 d 10-NOV-2014
HRSMSC
REF AD AFL
WO. VP-BBJ DUE UST JULY 2014
35.111-00 (001.1) HYDROSTATIC TEST CABIN PORTABLE OXYGEN CYLINDER HYDRO CHECK
35.200 PIN: DOT-3AA2100 MOS 60 10-NOV-2009 10-NOV-2014 97 d 10-N0V-2014
SIN: 47901U FIRS/MSC
REF BTC 35-111.00-01 AFL
WO. VP-8BJ DUE LIST JULY 2014
35.111-00 (002.1) HYDROSTATIC TEST PORTABLE OXYGEN CYLINDER HYDRO CHECK
35.205 P/N: DOT-3AA1800 MOS GO 10-NOV-2009 10-NOV-2014 97 d 10-N0V-2014
S/N: 493157 HRSMSC
REF SIC 35-111-00-01 AFL
WO: VP-BIEU DUE UST JULY 2014
35-11140 (003.1) HYDROSTATIC TEST PORTABLE OXYGEN CYLINDER HYDRO CHECK
35.210 DOT-3AA1800 MOS 60 10-NOV-2009 10-NOV-2014 97 d 10-NOV-2014
S/N: ST16269 HRSMSC
REF SIC 35-111-00-01 AFL
WO: VP-88J DUE UST JULY 2014
35-111-00 (004.1) HYDROSTATIC TEST PORTABLE OXYGEN CYLINDER HYDRO CHECK
35215 P/N: DOT-3AA1800 MOS GO 10-NOV-2009 10-NOV-2014 97 d 10-NOV-2014
S/N: 497254 HRSMSC
REF SIC 35-111-00-01 AFL
WO: VP-88J DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EST) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
it/ CAMP SYSTEMS
19 Of 79
EFTA01190619
qmpAL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
25300-00 (001.1) INSPECT FORWARD LIFE RAFT INSPECT
P/N: 5A3212-10121 MOS 12 01-NOV-2013 30-NOV-2014 117 d 30-NOV-2014
S/N: 12R100 HRS/MSC
REF ETC 25-300-00-01 AFL
FAA 2014-08-11 DETAILED INSPECTION FOR DISCREPANCIES (INCLUDING FINISH DAMAGE, CORROSION, PITTING, AND BASE METAL MANDATORY
(PARA H) (LEFT) SCRATCHES) OF THE TRANSITION RADIUS OF THE LEFT MLG FORWARD TRUNNION PINS
MOS 6 (EFF) 03-DEC-2014 120 d 03-DEC-2014
HRSMSC
REF AFL
WO VP-88J DUE LIST JULY 2014
FAA 2014-08-11 DETAILED INSPECTION FOR DISCREPANCIES (INCLUDING FINISH DAMAGE, CORROSION, PITTING, AND BASE METAL MANDATORY
(PARA H) (RIGHT) SCRATCHES) OF THE TRANSITION RADIUS OF THE LEFT MLG FORWARD TRUNNION PINS
MOS 6 (EFF) 03-DEC-2014 120d 03-DEC-2014
HRSMSC
REF AFL
WO VP-88J DUE UST JULY 2014
057001 RENEWAL CERTIFICATE OF WORTHINESS
MOS 09-DEC-2013 16-DEC-2014 M 133 d 16-DEC-2014
HRS/MSC DUE 3729:30
REF AFL 912
23-070-00 REPLACE THE ULB BATTERY AT VENDOR'S RECOMMENDATION
23.090 MOS 02-DEC-2009 31-DEC-2014 M 148 d 31-DEC-2014
HRSMSC DUE 3402:19
REF ETC 23-070-00-01 AFL 824
FAA 2012-24-08 TO PREVENT ICE FROM FORMING ON AIR DATA SYSTEM SENSORS AND CONSEQUENT LOSS OF OR MISLEADING MANDATORY
AIRSPEED INDICATION ON ALL AIRSPEED INDICATING SYSTEMS
MOS 24 (EFF) 14-JAN-2015 162 d 14-JAN-2015
HRSMSC
REF AD AFL
(xEXT) Extension incorporated in the next due Is) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CsW
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
20 Of 79
EFTA01190620
Due List Calendar Section
qmatioa
p
.tpi /non the groesorthip. 737-72UB3 REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-3un-2014
Operator: PICTON II LTD.
Projected To: 60 MOS. to 05-AUG-2019
Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I Erni ) API TIME REMAINING
SB 737-30A1063 R2 ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT MANDATORY
AUTOMATION INSTALLATION, SERVICE BULLETIN
MOS 24 (EFF) 14-JAN-2015 162 0 14-JAN-2015
HRS:MSC
REF BULLETINS AFL
347001 (1) ANNUAL CHECK OF FMC OPS SOFTWARE STATUS
MOS 12 12-FEB-2014 12-FEB-2015 191 0 12-FEB-2015
HRSIMSC 3743:34
REF AFL 917
YVO. Al CHECK VP-88J FEB. 2013. VP-BBJ MX DUE JAN. 2014
347005 (1) ANNUAL CHECK OF FMC MEDB SOFTWARE STATUS
MOS 12 12-FEB-2014 12-FEB-2015 191 0 12-FEB-2015
HRSIMSC 3743:34
REF AFL 917
YVO. Al CHECK VP-88J FEB. 2013. VP-BBJ MX DUE JAN. 2014
347010 (1) ANNUAL CHECK FMC OPC SOFTWARE STATUS
P/N: 242A6030-1093 MOS 12 12-FEB-2014 12-FEB-2015 191 0 12-FEB-2015
S/N: 22464401 HRS:MSC 3743:34
REF AFL 917
WO. Al CHECK VP-8BJ FEB. 2013. VP-BBJ MX DUE JAN. 2014
31.31.00.710.801 OPERATIONAL TEST FLIGHT DATA RECORDER SYSTEM
MOS 24 21-FEB-2013 21-FEB-2015 200 0 21-FEB-2015
HRSIMSC 3702:13
REF AFL 897
WO: Al CHECK VP-8BJ FEB. 2013
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
21 Of 79
EFTA01190621
qmpAri•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) API TIME REMAINING
FAA 2009-01-02 (F1) GENERAL VISUAL INSPECTION PREVENT FRAME CRACKING TO DETERMINE IF THE SUPPORT BRACKETS OF THE MANDATORY
A/C OUTLET EXTRUSIONS BETWEEN BODY STATION (BS) 360 AND BS 907 HAVE TWO-RIVET ATTACHMENT FITTINGS
IN ACCORDANCE WITH PART 2 OF THE ACCOMPLISHMENT INSTRUCTIONS OF BOEING SPECIAL ATTENTION SERVICE
BULLETIN 737-25.1544, REVISION 1,
DATED JANUARY 16, 2008
MOS 72 (EFF) 27-FEB-2015 206 27-FEB-2015
HRS:MSC
REF AFL
FAA 2009-01-02 (F2) EDDY CURRENT INSPECTION PREVENT FRAME CRACKING ,MEDIUM- AND HIGH FREQUENCY FOR CRACKING OF MANDATORY
THE FRAME AROUND THE ATTACHMENT HOLES OF THE
SUPPORT BRACKET
MOS 72 (EFF) 27-FEB-2015 206 d 27-FEB-2015
HRS:MSC
REF AFL
FAA 2009-01-02 (G) REPLACE PREVENT FRAME CRACKING THE SUPPORT FITTINGS OF ALL NC OUTLET EXTRUSIONS BETWEEN BS 360 MANDATORY
AND BS 907 WITH NEW, IMPROVED SUPPORT FITTINGS, IN ACCORDANCE WITH PART 4 OF THE ACCOMPLISHMENT
INSTRUCTIONS OF BOEING SPECIAL ATTENTION SERVICE BULLETIN 737-25-1544, REVISION 1, DATED JANUARY 16,
2008
MOS 72 (EFF) 27-FEB-2015 206 0 27-FEB-2015
HRS/MSC
REF AFL
23.110-00 (001.1) DISCARD (AUTOMATIC/FIXED) EMERGENCY LOCATOR TRANSMITTER BATTERY DISCARD
23.020 MOS 16-FEB-2010 28-FEB-2015 M 207 0 28-FEB-2015
HRSiMSC DUE 3417:51
REF BTC 23-110-00-01 AFL 829
SB 737-25A1626 EQUIPMENT/FURNISHINGS - ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - LIQUID CONTAMINATION RECOMMENDED
PROTECTION IMPROVEMENTS ON THE E5 ELECTRONIC RACK DRIPSHIELD EQUIPMENT, SERVICE BULLETIN
MOS 60 (EFF) 25-MAR-2015 232 0 25-MAR-2015
HRS:MSC
REF BULLETINS AFL
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
22 Of 79
EFTA01190622
qmpAviaries. frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
F1111) AFH
TIME REMAINING
254205 INSPECT DEFIBRILLATOR
P/N: LAERDAL HEARTSTART MOS 12 09-APR-2014 09-APR-2015 247 cl 09-APR-2015
Elk: 23069 HRS/MSC 3743:34
REF AFL 917
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ MONTHLY APR.2014
FAA 2013.19.23 PARA INSPECTIONS MANDATORY
(G) (2)
MOS 18 (EFF) 07-MAY-2015 2750 07-MAY-2015
HRSMSC
REF AFL
FAA 2013-07-09 PARA GENERAL VISUAL INSPECTION INSPECT/IDENTIFY/REPLACE/REIDENTIFY CREW OXYGEN MASK STOWAGE BOX MANDATORY
(G) UNITS TO DETERMINE IF THE SERIAL NUMBER OF THE CREW OXYGEN MASK STOWAGE BOX UNIT IS IDENTIFIED IN
THE APPENDIX OF INTERTECHNIQUE SERVICE BULLETIN MXP1/4-35-175 R2
MOS 24 (EFF) 20-MAY-2015 288 d 20-MAY-201S
HRSMSC
REF AD AFL
FAA 2013-08-18 MODIFY THE FLUID DRAIN PATH IN THE WING LEADING EDGE AREA, FORWARD OF THE WING FRONT SPAR, AND DO MANDATORY
ALL APPLICABLE RELATED INVESTIGATIVE AND CORRECTIVE ACTIONS
MOS 24 (EFF) 05-JUN-2015 304 d 05-JUN-2015
HRSMSC
REF AD AFL
FAA 2006-21-01 PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - MEASURE THE FREEPLAY OF BOTH AILERON MANDATORY
1 CONTROL BALANCE TABS
MOS 24 03-JUL-2013 03-JUL-2015 332d 03-JUL-2015
HRSMSC 8000 3723:21 11723:21 7970:02
REF AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013
(xEXT) - Extension incorporated in the next due Is) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
23 Of 79
EFTA01190623
qmp
A,,iatiostfrum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 MRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH) AEH TIME REMAINING
FAA 2011-27-03 PARA DETAILED INSPECTION TO PREVENT AN UNDETECTED FAILURE OF THE PRIMARY LOAD PATH FOR THE MANDATORY
(G)(1)(l)(1) BALLSCREW IN THE DRIVE MECHANISM OF THE HSTA AND SUBSEQUENT WEAR AND FAILURE OF THE SECONDARY
LOAD PATH IN ACCORDANCE WITH SERVICE BULETIN 737-27A1277 R2
MOS 24 03-JUL-2013 03-JUL-2015 332 d 03-JUL-2015
HRSMSC 6400 3723:21 10123:21 6370:02
REF AD AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013
254206 LAERDAL HEARTSTART FR DEFIBRILLATOR PADS
P/N: M3713A MOS TSN:0 12-FEB-2014 01-AUG-2015 M 361 d 01-AUG-2015
S/N: LOT090613-01 HRSMSC DUE TSN:0 3743:34
REF AFL TSN:0 917
WO VP-BBJ MX DUE JAN. 2014
28-AWL-101 OPERATIONAL TEST ENGINE FUEL SUCTION FEED AU
MOS 36 (EFF) 01-AUG-2015 36t d 01-AUG-2015
HRSMSC 7500 11153:10 7399:51
REF AFL
081001 WEIGHT CHECK OF AIRCRAFT
08.010 1105 GO 09-AUG-2010 09-AUG-2015 369 d 09-AUG-2015
HRSMSC 34,18:31
REF AFL 841
+ 252901 CAPTAIN LIFE JACKET RESTORE
P/N: S-51150-7300 MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 369 d 09-AUG-2015
S/N: 33973 HRSMSC 3448:31
REF AFL 841
« 252902 FIRST OFFICER LIFE JACKET RESTORE
P/N: S-51150-7300 1105 GO TSO:0 09-AUG-2010 09-AUG-2015 369 d 09-AUG-2015
S/N: 33917 HRS:MSC 34,18:31
REF AFL 841
(xEXT) - Extension incorporated in the next due Cs) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
24 Of 79
EFTA01190624
OMP
Due List Calendar Section
tfir gmnndup 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014 Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
1E.M1 4F8 TIME REMAINING
+ 252903 FIRST OBSERVER LIFE JACKET RESTORE
PIN: 9-51150-7300 MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 369 cl 09-AUG-20I5
SIN: 33911 HRS/MSC 3448:31
REF AFL 841
+ 252904 NO. 1 FORWARD FLIGHT ATTENDANT LIFE JACKET RESTORE
PIN: 9-51150-73OD MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 369 cl 09-AUG-2015
S/N: 33928 HRS/MSC 3448:31
REF AFL 841
+ 252905 NO. 2 FORWARD FLIGHT ATTENDANT LIFE JACKET RESTORE
PIN: S-5I150-7300 MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 369 0 09-AUG-2015
S/N: 33982 HRS/MSC 3448:31
REF AFL 841
+ 252906 NO. 1 AFT FLIGHT ATTENDANT LIFE JACKET RESTORE
P/N: 5-51150-73OD MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 3690 09-AUG-2015
S/N: 33936 HRS/MSC 3448:31
REF AFL 841
+ 252907 NO. 2 AFT FLIGHT ATTENDANT LIFE JACKET RESTORE
PIN: MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 3690 09-AUG-2015
ft liper79100-999001S-51150-7
k a
HRS/MSC
AFL
TSN:2106:28 3448:31
TSN:490 841
252909 SECOND OBSERVER LIFE JACKET RESTORE
PIN: S-5I150-7300 MOS 60 TSO:0 09-AUG-2010 09-AUG-2015 3690 09-AUG-2015
S/N: 33959 HRS/MSC 3448:31
REF AFL 841
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
25 Of 79
EFTA01190625
OMP
Due List Calendar Section
Ari•lionfrum tfir gmnndup 737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014 Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE
MAX LIMIT DISPOSITION EST. DUE
TIME REMAINING I ENH ) AFH
+ 33460-00 RESTORE EMERGENCY LIGHTING BATTERY PACK (TWO OR MORE COMPLETE DEEP CYCLES) BATTERY CAPACITY RESTORE
TO REQUIRED STANDARD
33.170 MHOS 24 23-AUG-2013 23-AUG-2015 383 d 23-AUG-2015
HRS/MSC 3728:53
REF See Workcard AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
+ 38-04040 RESTORE WASTE DRAIN BALL VALVE THE WASTE DRAIN BALL-VALVE BY REPLACING SEALS (2) (OFF AIRCRAFT)
38.130 PIN: 2651-278-21 MOS 72 28-SEP-2009 28-SEP-2015 419 d 28-SEP-2015
SIN: 1138 HRSAISC 3378:04
REF BTC 38-040-00-01 AFL 812
26-330-00 (002.1) REPLACE (LRD2) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB UFE LIMIT
26.035 P/N: M446616 1405 120 30-SEP-2005 30-SEP-2015 M 421 d 30-SEP-2015
SIN: 00078 HRSiMSC
REF BTC 26-330-00-02 AFL
+ 23-050-00 FUNCTIONAL CHECK OF THE VOICE RECORDER FOR AUDIO FIDELITY
23.080 K405 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSiMSC 3728:53
REF BTC 23-050-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
23-060-00 OPERATIONAL CHECK OF THE ULB
23.090 K405 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSiMSC 3728:53
REF BTC 23-060-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
+ 25-370-00 VISUALLY CHECK ALL DETACHABLE EMERGENCY EQUIPMENT (GLOVES, SMOKE GOGGLES, CRASH AXE, FLASH
LIGHTS, FIRST AID KITS, AND MEDICAL KITS, AS APPLICABLE) FOR CONDITION AND PRESENCE.
25.395 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30.00T-2015
HRSiMSC 3728:53
REF BTC 25-370-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
26 Of 79
EFTA01190626
qmp AL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ) AN TIME REMAINING
+ 27-110-00 DETAILED VISUAL INSPECTION OF THE STABILIZER TRIM JACKSCREW, BALLNUT, BALLNUT RETURN TUBES AND
THE UPPER AND LOWER GIMBALL PINS.
27.420 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSMSC 3728:53
REF BTC 27-110-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
+ 34-010-00 FUNCTIONAL LEAK CHECK OF THE CAPTAIN'S PITOT SYSTEM .(NOTE: TASK MEETS INTENT OF FAR 91.411) RVSM
34.400 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSMSC 3728:53
REF BTC 34-010-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
34-020-00 FUNCTIONAL LEAK CHECK OF THE FIRST OFFICER'S PITOT SYSTEM . (TASK MEETS INTENT OF FAR 91.411) RVSM
34.080 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSMSC 3728:53
REF BTC 34-020-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
34-030-00 FUNCTIONAL LEAK CHECK OF THE STANDBY PITOT SYSTEM . (TASK MEETS INTENT OF FAR 91.411) RVSM
34.105 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSMSC 3728:53
REF BTC 34-030-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
34-040-00 FUNCTIONAL LEAK CHECK OF THE CAPTAIN'S STATIC SYSTEM . (TASK MEETS INTENT OF FAR 91.411) RVSM
34.120 MOS 24 3043CT-2013 30-OCT-2015 451 d 30.0CT-2015
HRSMSC 3728:53
REF BTC 34-040-00-01 AFL 911
WO. VP-8BJ DUE CARDS JUNE 2013
34-050-00 FUNCTIONAL LEAK CHECK OF THE FIRST OFFICER'S STATIC SYSTEM . (TASK MEETS INTENT OF FAR 91.411) RVSM
34.140 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30.00T-2015
HRSMSC 3728:53
REF BTC 34-050-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
(4EXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
© CAMP SYSTEMS
27 Of 79
EFTA01190627
qmp AL,iariost frum Hvg...xe up
Due List
737-72UBJ REVISION 21 5/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
(Erni) An( TIME REMAINING
34460-00 FUNCTIONAL LEAK CHECK OF THE STANDBY STATIC SYSTEM . (TASK MEETS INTENT OF FAR 91.411) RVSM
34.160 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSIMSC 3728:53
REF BTC 34-060-00-01 AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013
+ 34-11040 FUNCTIONAL CHECK AIRCRAFT'S ATC SYSTEM (NOTE: TASK MEETS INTENT OF FAR 91.413) RVSM
34.425 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
HRSMSC 3728:53
REF See Workcard AFL 911
WO: VP-Bill DUE CARDS JUNE 2013
341105 TEST STANDBY ALTIMETER INDICATOR PER FAR 91.411
34.010 P/N: WL102AMS3 MOS 24 30-OCT-2013 30-OCT-2015 451 d 30-OCT-2015
S/N: AL073 HRS:MSC 3728:53
REF AFL 911
WO VP-BBJ DUE CARDS JUNE 2013
FAA 2013.19-03 HYDRAULIC POWER - MAIN LANDING GEAR (MLG) WHEEL WELL - DETECT AND CORRECT POSSIBLE DAMAGE MANDATORY
BETWEEN WIRE BUNDLES AND HYDRAULIC TUBING
MOS 24 (EFF) 04-NOV-2015 456 d 04-NOV-2015
HRSMSC
REF AD AFL
+ 28-13040 (001.1) REPLACE EMERGENCY FUEL SHUTOFF BATTERY
28.710 P/N: S283W008-3 MOS 84 TS1:10 28-SEP-2009 26-NOV-2015 M 478 d 26-NOV-2015
S/N: 4363 HRSMSC 3378:04
REF BTC 28-130-00-01 Aft 812
FAA 2010-24-11 PARA ACCOMPLISH TO PREVENT ARCING AT CERTAIN FUEL TANK FASTENERS IN THE EVENT OF A LIGHTNING STRIKE OR MANDATORY
(G) FAULT CURRENT EVENT SEAL THE FASTENERS ON THE FRONT AND REAR SPARS INSIDE THE MAIN FUEL TANK
AND ON THE LOWER PANEL OF THE CENTER FUEL TANK
MOS 60 (EFF) 05-JAN-2016 518d 05-JAN-2016
HRSMSC
REF AFL
(xE)(7) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
iD CAMP SYSTEMS
28 Of 79
EFTA01190628
qmpAL,iariost frum thvgnraind up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE
MAX LIMIT DISPOSITION EST. DUE
1ENHI AFH
TIME REMAINING
FAA 2010-24-11 PARA GENERAL VISUAL INSPECTION TO PREVENT ARCING AT CERTAIN FUEL TANK FASTENERS IN THE EVENT OF A MANDATORY
(H) LIGHTNING STRIKE OR FAULT CURRENT EVENT OF THE WIRE BUNDLE SUPPORT INSTALLATION IN THE EQUIPMENT
COOLING SYSTEM BAYS TO IDENTIFY THE TYPE OF CLAMP INSTALLED, AND DETERMINE WHETHER THE TEFLON
SLEEVE IS INSTALLED
MOS 60 (EFF) 95-JAN-2016 518d 05-JAN-2016
HRSMSC
REF AFL
+ 341111 TEST NO. 1 ATC TRANSPONDER PER FAR 91.413
34.450 P/N: 822-1338-003 MOS 24 28-JAN-2014 28-JAN-2016 541 d 28-JAN-2016
S/N: 7BLX HRSMSC
REF AFL
+ 341112 TEST NO. 2 ATC TRANSPONDER PER FAR 91.413
34.451 PiN: 822-1338-003 MOS 24 28-JAN-2014 28-JAN-2016 541 d 28-JAN-2016
SIN: 1PY101X HRSMSC
REF AFL
FAA 2012-25-05 PARA MODIFY TO PREVENT FAILURE OF AN ESCAPE SLIDE TO DEPLOY THE ESCAPE SLIDE IN ACCORDANCE WITH THE MANDATORY
(G) ACCOMPLISHMENT INSTRUCTIONS OF GOODRICH SERVICE BULLETIN 5A3307.25.389, REVISION 2, DATED MAY 4,
2012.
MOS 36 (EFF) 31-JAN-2016 544 d 31-JAN-2016
HRSMSC
REF AD AFL
FAA 2012-25-05 PARA MODIFY TO PREVENT FAILURE OF AN ESCAPE SLIDE TO DEPLOY SLIDE P/N 5A3307.301 IN ACCORDANCE WITH THE MANDATORY
(H)(1) ACCOMPLISHMENT INSTRUCTIONS OF GOODRICH SERVICE BULLETIN 5A3307.25.339, REVISION 5, DATED MAY 4,
2012.
MOS 36 (EFF) 31-JAN-2016 544 d 31-JAN-2016
HRSMSC
REF AFL
(xEXT) • Extension incorporated in the next due (s) • Suppressed Requirement • FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
29 Of 79
EFTA01190629
qmpAviaries. frum thvgrwend up'
Due List
737-72U83 REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
F1111) AFH TIME REMAINING
FAA 2012.25-05 PARA MODIFY TO PREVENT FAILURE OF AN ESCAPE SLIDE TO DEPLOY THE VESPEL PISTON MANDATORY
(H)(2) , FOR SLIDE P/N 5A3307.301 OR 5A3307.5 IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS OF
GOODRICH SERVICE BULLETIN 25- 349, REVISION 1. DATED JANUARY 11. 201O.
MOS 36 E=F 31-JAN-2016 544 d 31-JAN-2016
HRS:MSC
REF AL AFL
FAA 2 00 5-11-05 (F) DETAIL INSPECTION DETECT AND CORRECT CRACKING IN THE VINYL INTERLAYER OR DAMAGE TO THE MANDATORY
TABLE 2 STRUCTURAL INNER GLASS PANES OF THE FLIGHT DECK NO.2. NO.4 AND NO.5 WINDOWS FOR CRACKING AND
DAMAGE IN THE VINYL INTERLAYER AND GLASS PANES FOR FLIGHT DECK NUMBER 4 WINDOW
MOS 24 I2-FEB-2014 12-FEB-2016 556 d 12-FEB-2016
HRS:MSC 6000 3743:34 9743:34 5990:15
REF AD Aft 917
WO: VP-BBJ MX DUE JAN.2014
FAA 2008-11-08 (F) DETAIL INSPECTION DETECT AND CORRECT CRACKING IN THE VINYL INTERLAYER OR DAMAGE TO THE MANDATORY
TABLE 3 STRUCTURAL INNER GLASS PANES OF THE FLIGHT DECK NO.2. NO.4 AND NO.5 WINDOWS FOR CRACKING AND
DAMAGE IN THE VINYL INTERLAYER AND GLASS PANES FOR FLIGHT DECK NUMBER 5 WINDOW
MOS 24 12-FEB-2014 12.F E13-2016 556 d 12-FEB-2016
HRSMSC 6000 3743:34 9743:34 5990:15
REF AD AFL Oil
WO: VP-BBJ MX DUE JAN 2014
FAA 2013-02-05 PARA INSTALL INSTRUMENTS - TO PREVENT FAILURE OF THE FLIGHTCREW TO RECOGNIZE AND REACT TO A VALID
(G) CABIN ALTITUDE WARNING HORN TWO WARNING LEVEL INDICATOR LIGHTS ON EACH OF THE P1-3 AND P3-1
INSTRUMENT PANELS IN THE FLIGHT COMPARTMENT, AND, AS APPLICABLE. REPLACE THE EXISTING P5-16 AND
P5-10 PANELS
MOS 36 E -F i 06-MAR-2016 579 d 0640AR-2016
HRS:MSC
REF AD Aft
SB 737-31A1332 R4 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING RECOMMENDED
SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS. SERVICE BULLETIN
MOS 36 ELF I 06-MAR-2016 579 d 0640AR-2016
HRSA4SC
REF BULLETINS AFL
(xEXT) - Extension incorporated in the next due Is) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CAW
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
30 Of 79
EFTA01190630
4MP i•lion/r gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE
MAX LIMIT DISPOSITION EST. DUE
( (NH ) AFH
TIME REMAINING
FAA 2014-05.27 APPLIANCE AD - NAVIGATION - ROCKWELL COLLINS, INC. TPR-720 AND TPR-900 MODE S TRANSPONDERS - TEST MANDATORY
AND CALIBRATION
MOS 24 (EFF) 02-MAY-2016 636 0 02-MAY-2016
HRS/MSC
REF AD AFL
FAA 2013-08-01 DETECT AND CORRECT DAMAGE TO THE FIRE SEALS MANDATORY
MOS 36 (EFF) 10-JUN-2016 6750 10-JUN-2016
HRS/MSC
REF AD AFL
FAA 2004-05.19 PARA INSPECT REAR SPAR ATTACH PINS AND FRONT SPAR ATTACH BOLTS (AD 2013-07-07 AFFECTS CERTAIN MANDATORY
D REQUIREMENTS OF THIS AD) REPLACED
MOS 60 29-AUG-2011 29-AUG-2016 7550 29-AUG-2016
HRS/MSC 3533:32
REF AFL 15000 863 15863 14941
25.240-00 (001.1) RESTORE FORWARD ENTRY ESCAPE RESTORE
SLIDE AT THE MANUFACTURER'S RECOMMENDED INTERVAL.
P/N: 5A3086-301 MOS 36 30-SEP-2013 30-SEP-2016 7870 30-SEP-2016
S/N: B3F476 HRSMSC
REF BTC 25-240-00-01 AFL
•
WO: BVBBJ007 - DUE CARDS • MONTHLY VP-BBJ DUE CARDS JUNE 2013
25-240-00 (002.1) RESTORE FORWARD SERVICE ESCAPE SLIDE AT THE MANUFACTURER'S RECOMMENDED INTERVAL. RESTORE
P/N: 5A3086-301 MOS 36 30-SEP-2013 30-SEP-2016 7870 30-SEP-2016
S/N: B3F481 HRSAASC
REF BTC 25-240-00-02 AFL
•
VVO. BVBBJ007 - DUE CARDS + MONTHLY. VP-B8.1 DUE CARDS JUNE 2013
25-240-00 (003.1) RESTORE AFT ENTRY ESCAPE SLIDE AT THE MANUFACTURER'S RECOMMENDED INTERVAL. RESTORE
P/N: 5A3088-301 MOS 36 30-SEP-2013 30-SEP-2016 7870 30-SEP-2016
S/N: B3A333 HRSiMSC
REF BTC 25-240-00-03 AFL
WO: BVBBJ007 - DUE CARDS + MONTHLY. W-BBJ DUE CARDS JUNE 2013
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
31 Of 79
EFTA01190631
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
( (NH ) AFH TIME REMAINING
25-240.00 (004.1) RESTORE AFT SERVICE ESCAPE SLIDE AT THE MANUFACTURER'S RECOMMENDED INTERVAL. RESTORE
P/N: 5A3088-301 MOS 36 30-SEP-2013 30-SEP-2016 787 d 30-SEP-2076
S/N: B3A315 HRS/MSC
REF BTC 25-240-00-04 AFL
WO: BVBEIJ007 - DUE CARDS + MONTHLY. VP-BBJ DUE CARDS JUNE 2013
FAA 2013.15.17 PARA PERFORM REPETITIVE OPERATIONAL TESTS OF THE ENGINE FUEL SUCTION FEED OF THE FUEL SYSTEM, AND MANDATORY
(G)(1) OTHER RELATED TESTING AND CORRECTIVE ACTION THE INITIAL OPERATIONAL TEST
MOS 36 (EFF) 01-OCT-2016 788 0 01-OCT-2016
HRSMSC 7500 11244:01 7490:42
REF AD AFL
26.181-00 (001.1) HYDROSTATIC TEST APU FIRE EXTINGUISHER BOTTLE
26290 P/N: 33000927-1 MOS 60 03-OCT-2011 31-OCT-2016 M 818 0 31-OCT-2016
S/N: 3942481 HRS/MSC
REF BTC 26-181-00-01 AFL
FAA 2011-20-10 PARA DETAILED INSPECTION DETECT AND CORRECT CONTACT BETWEEN THE WIRE BUNDLE AND THE LEFT FORWARD MANDATORY
(G) RUDDER QUADRANT OF WIRE BUNDLE W443 FOR DAMAGE AND MEASURE FOR SUFFICIENT CLEARANCE
MOS 60 (EFF) 09-NOV-2016 827 0 09-N0V-2016
HRS/MSC
REF AD AFL
SB 737-22A1215 AUTOFLIGHT - AUTOTHROTTLE SYSTEM - AUTOTHROTTLE COMPUTER REPLACEMENT, SERVICE BULLETIN RECOMMENDED
MOS 36 (EFF) 22-NOV-2016 840 0 22-NOV-2016
HRS/MSC
REF BULLETINS AFL
FAA 2011-26-09 TO PREVENT FAILURE OF THE FIRE SEAL MANDATORY
MOS 60 (EFF) 03-FEB-2017 913d 03-FEB-2017
HRS:MSC
REF AD AFL
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
32 Of 79
EFTA01190632
C4MP i•lion /r vv.:adult'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I EMI AFN TIME REMAINING
FAA 2008-11-08 (F) DETAIL INSPECTION DETECT AND CORRECT CRACKING IN THE VINYL INTERLAYER OR DAMAGE TO THE MANDATORY
TABLE 1 STRUCTURAL INNER GLASS PANES OF THE FLIGHT DECK NO.2, NO.4 AND NO.5 WINDOWS FOR CRACKING AND
DAMAGE IN THE VINYL INTERLAYER AND GLASS PANES ON NUMBER 2 WINDOW
MOS 36 12-FEB-2014 12-FEB-2017 922 d 12-FEB-2017
HRS/MSC 7500 3743:34 11243:34 7490:15
REF AD AFL 917
35-070-00 (001.1) DISCARD FORWARD LAVATORY OXYGEN GENERATOR DISCARD
PIN: 5417T401-43 MOS 180 22-FEB-2017 m 932 d 22-FEB-2017
S/N:ARSA-F011-451 HRS:MSC
REF BTC 35-070-00 AFL
35-070-00 (003.1) DISCARD FORWARD SERVICE DOOR OXYGEN GENERATOR DISCARD
P/N: 54171401-43 MOS 180 22-FEB-2017 M 932 d 22-FEB-2017
SIN: ARSA-F011-454 HRSIMSC
REF BTC 35-070-00 Aft
35-070-00 (004.1) DISCARD AFT ENTRY DOOR OXYGEN GENERATOR DISCARD
PIN: 54177401-43 MOS 180 22-FEB-2017 IN 932 d 22-FEB-2017
SIN: ARSA-F011-448 HRSIMSC
REF BTC 35-070-00 AFL
FAA 2012-02-14 PARA PERFORM TO PREVENT A FIRE IN THE FAN COMPARTMENT (A FIRE ZONE) FROM MIGRATING THROUGH THE SEAL MANDATORY
(G) TO A FLAMMABLE FLUID IN THE THRUST REVERSER ACTUATOR COMPARTMENT A ONE-TIME DETAILED
INSPECTION TO DETERMINE THE COLOR OF THE AERO/FIRE SEALS OF THE BLOCKER DOORS ON THE THRUST
REVERSER TORQUE BOXES ON THE ENGINES
MOS 60 (EFF) 19-MAR-2017 957 d 19-MAR-2017
HRSIMSC
REF AD AFL 8200 9080 8158
26-330-00 (001.1) REPLACE (LRD2) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB UFE LIMIT
26.035 PIN: M446617 MOS 120 30-JUN-2007 30-JUN-2017 M 1060d 30-JUN-2017
SIN: 00173 HRS/MSC
REF BTC 26-330-00-02 AFL
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
33 Of 79
EFTA01190633
qmpAL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-B83): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) ArH TIME REMAINING
+ 050040 C-2 CHECK
MOS 72 29-AUG-2011 09-AUG-2017 1100d 09-AUG-2017
HRS/MSC 3533:32
REF AFL 863
+ 352001 DETAILED VISUAL INSPECTION OF ALL (35) PASSENGER OXYGEN BOXES OVERHAUL
P/N: 5417T401-43 1105 GO TSN:0 17-AUG-2012 17-AUG-2017 1108d 17-AUG-2017
S/N: ALL HRSMSC TSN:0 3655:09
REF AFL TSN:0 888
+ 49-020-00 DETAILED INSPECTION OF THE APU MOUNTS
MOS 108 22-AUG-2008 22-AUG-2017 1113d 22-AUG-2017
HRSMSC 3260:48
REF ETC 49-020-00-01 AFL 782
55.135-01 INTERNAL DETAILED INSPECTION OF LEFT ELEVATOR HINGE FITTINGS, LEFT ELEVATOR
ACTUATOR FITTINGS, LEFT ELEVATOR BALANCE WEIGHT SUPPORT
STRUCTURE, LEFT ELEVATOR TAB MAST ARM FITTING AND LEFT
ELEVATOR TAB HINGE FITTINGS.
55.171 1105 108 22-AUG-2008 22-AUG-2017 1113 d 22-AUG-2017
HRSMSC 3260:48
REF BTC 55-135-01-01 Aft 782
55.135-02 INTERNAL DETAILED INSPECTION OF RIGHT ELEVATOR HINGE FITTINGS, RIGHT ELEVATOR
ACTUATOR FITTINGS, RIGHT ELEVATOR BALANCE WEIGHT SUPPORT STRUCTURE, RIGHT ELEVATOR TAB MAST
ARM FITTING AND RIGHT ELEVATOR TAB HINGE FITTINGS.
55.172 1105 108 22-AUG-2008 22-AUG-2017 1113 d 22-AUG-2017
HRSMSC 3260:48
REF BTC 55-135-02-01 AFL 782
25-410-00 (001.1) RESTORE NO.1 SMOKE HOOD RESTORE
P/N: 119-003 1105 120 24-AUG-2007 24-AUG-2017 11I5d 24-AUG-2017
S/N: 17687 HRSMSC 2968:28
REF BTC 25-410-00-01 AFL 699
(xEXT) • Extension incorporated in the next due (s) • Suppressed Requirement + • FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
34 Of 79
EFTA01190634
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
25-410-00 (002.1) RESTORE SMOKE HOOD RESTORE
P/N: 119-003 MOS 120 24-AUG-2007 24-AUG-2017 1115 0 24-AUG-20I7
S/N: 17690 HRS:MSC 2968:28
REF BTC 25-410-00-01 AFL 699
28-AWL-24 FUNCTIONAL CHECK MOTOR OPERATED VALVE (MOV) ACTUATOR PER AMM 28.22.11 ALI
28.905 MOS 72 29-AUG-2011 29-AUG-2017 1120 d 29-AUG-2017
HRS:MSC 3533:32
REF BTC 28-AWL Aft 863
+ 53-150-00 INSPECT (INTERNAL-DETAILED) FORWARD CARGO DOOR CUTOUT SURROUND STRUCTURE
53.185 MOS 72 29-AUG-2071 29-AUG-2017 1120 d 29-AUG-20I7
HRS:MSC 3533:32
REF BTC 53-150-00-01 AFL 863
+ 53-240-00 INSPECT (INTERNAL-DETAILED) AFT CARGO DOOR CUTOUT SURROUND STRUCTURE
53.230 MOS 72 29-AUG-2011 29-AUG-2017 1120 d 29-AUG-2017
HRS/MSC 3533:32
REF BTC 53-240-00-01 AFL 863
+ 53-360-00 (01) INSPECT (INTERNAL-DETAILED) FORWARD ENTRY DOOR CUTOUT SURROUND STRUCTURE LOOK AT DOOR CUTOUT
TO, AND INCLUDING THE DOORSIDE OF THE FIRST FRAME FROM THE DOOR.
53.335 MOS 72 29-AUG-2011 29-AUG-2017 1120 0 29-AUG-2017
HRS/MSC 3533:32
REF BTC 53-360-00-01 AFL 863
+ 53-360-00 (02) INSPECT (INTERNAL-DETAILED) FORWARD SERVICE DOOR CUTOUT SURROUND STRUCTURE LOOK AT DOOR
CUTOUT TO, AND INCLUDING THE DOORSIDE OF THE FIRST FRAME FROM THE DOOR.
53.336 MOS 72 29-AUG-2011 29-AUG-2017 1120 0 29-AUG-2017
HRS:MSC 3533:32
REF BTC 53-360-00-02 AFL 863
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
35 Of 79
EFTA01190635
qmpAviaries. frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
IFNH1 A01 TIME REMAINING
+ 53-360-00 (03) INSPECT (INTERNAL-DETAILED) AFT ENTRY DOOR CUTOUT SURROUND STRUCTURE LOOK AT DOOR CUTOUT TO,
AND INCLUDING THE DOORSIDE OF THE FIRST FRAME FROM THE DOOR.
53.340 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF ETC 53-360-00-03 AFL 863
4- 53-360-00 (04) INSPECT (INTERNAL-DETAILED) AFT SERVICE DOOR CUTOUT SURROUND STRUCTURE LOOK AT DOOR CUTOUT TO,
AND INCLUDING THE DOORSIDE OF THE FIRST FRAME FROM THE DOOR
53.341 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF BTC 53-360-00-04 AFL 863
« 53-380-00 INSPECT (INTERNAL-GENERAL VISUAL) PASSENGER COMPARTMENT FLOOR STRUCTURE IN WET AREA (WITHIN
APPROXIMATELY 20 INCHES FROM DOORS, GALLEYS
AND LAVS AND THE FLOOR STRUCTURE BELOW THE DOOR TO AND
INCLUDING THE FIRST FRAME FROM THE DOOR).
53.350 MOS 72 29-AUG-2011 29-AUG-2017 1120 d 29-AUG-2017
HRSMSC 3533:32
REF See Workcard Aft 863
4- 53.814-00 INTERNAL ZONAL INSPECTION (GV) AREA ABOVE FORWARD CARGO COMPARTMENT - SECTION 43, STATION 396 TO
FORWARD CARGO COMPARTMENT AFT BULKHEAD
53.696 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSIWSC 3533:32
REF ETC 53.814.00-01 AFL 863
4- 53.820-00 INTERNAL ZONAL INSPECTION (GV) AREA BELOW THE FORWARD CARGO COMPARTMENT - SECTION 43, STATION
396 TO FORWARD CARGO COMPARTMENT AFT BULKHEAD (EZAP)
53.705 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF ETC 53.820.00-01 AFL 863
(xEXT) • Extension incorporated in the next due (s) • Suppressed Requirement + • FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
36 Of 79
EFTA01190636
qmp Aviaries. frum thvgriramd up'
Due List
737-72L33 REVISION 21 S/N 29273 (YG006) (VP-B63): 3753:19 HRS, 922 AFL as of 30-3un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH
TIME REMAINING
+ 53.822-00 INTERNAL ZONAL INSPECTION (GV) AIR CONDITIONING DISTRIBUTION BAY - SECTION 43, FORWARD CARGO
COMPARTMENT TO STATION 540 (EZAP)
53.710 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF ETC 53.822.00-01 AFL 863
+ 53426-00 INTERNAL ZONAL INSPECTION (GV) PRESSURE DECK ABOVE THE MAIN LANDING GEAR WHEEL WELL - SECTION 44,
STATION 663.75 TO STATION 727 (EZAP)
53.720 MOS 72 29-AUG-2011 29-AUG-2017 1120 0 29-AUG-2017
HRSMSC 3533:32
REF ETC 53.826.00-01 AFL 863
+ 53.832-00 INTERNAL ZONAL INSPECTION (GV) AFT CARGO COMPARTMENT - SECTION 46 AND 47, (PART) STATION 727 TO
STATION 947.5
53.731 MOS 72 29-AUG-2011 29-AUG-2017 1120 d 29-AUG-2017
HRSMSC 3533:32
REF ETC 53.832.00-01 AFL 863
+ 53.840-00 INTERNAL ZONAL INSPECTION (GV) AREA BELOW THE AFT CARGO COMPARTMENT - SECTION 46 AND 47 (PART),
STATION 727 TO STATION 947.5 (EZAP)
53345 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF ETC 53410-00-01 AFL 863
+ 57-270-01 INSPECT THE INTERIOR OF LEFT WING TRAILING EDGE CAVITY,
INCLUDING SKINS, RIBS, AILERONS AND SPOILERS.
57.400 MOS 72 29-AUG-2011 29-AUG-2017 1120 d 29-AUG-2017
HRSMSC 3533:32
REF ETC 57-270-01-01 AFL 863
+ 57.270-02 INSPECT THE INTERIOR OF RIGHT WING TRAILING EDGE CAVITY,
INCLUDING SKINS, RIBS, AILERONS AND SPOILERS.
57.401 MOS 72 29-AUG-2011 29-AUG-2017 1120d 29-AUG-2017
HRSMSC 3533:32
REF ETC 57-270-02-01 AFL 863
(xE XI) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EB7) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
37 Of 79
EFTA01190637
qmpAL,iariost frum thvgriramd up'
Due List
737-72UB3 REVISION 21 5/N 29273 (YG006) (VP-BEt3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
26330-00 (005.1) REPLACE (HRD) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB UFE LIMIT
26.600 P/N: 446307 MOS 120 31-AUG-2007 31-AUG-2017 M 1122 d 31-AUG-2017
SIN: 03010 HRSIMSC
REF BTC 26-330-00-02 AFL
26.330-00 (006.1) REPLACE (HRD) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB UFE LIMIT
26.600 P/N: 446290 MOS 120 30-SEP-2007 30-SEP-2017 M 1152 d 30-SEP-2017
SIN: 05004 HRSMSC
REF BTC 26-330-00-02 AFL
20-141-00 FUNCTIONAL CHECK OF THE LIGHTNING/HIRF PROTECTION COMPONENTS IN THE TAIL CONE FOR
ELECTRICAL BOND DEGRADATION USING THE LOOP RESISTANCE TESTER (LRT). (UHIRF)
MOS 216 08-OCT-1999 08-OCT-2017 1160d 08-OCT-2017
HRSMSC 44
REF AFL 38
27-230-00 DETAILED VISUAL INSPECTION OF ALL FLIGHT CONTROL CABLES THAT ARE OVER THE CENTER WING SECTION
B.S. 540 TO 663.75 AND CABLE WITHIN PILOTS CONTROL QUADRANT
27.999 MOS 216 08-OCT-1999 08-OCT-2017 1160 d 08.00T-2017
HRSMSC 44
REF See Workcard AFL 38
32460-00 DETAILED VISUAL INSPECTION OF THE INTERNAL PORTIONS OF THE LANDING GEAR SYSTEMS CONTROL CABLES
THAT ARE OVER THE CENTER WING SECTION BS 540 TO BS 727 OR CABLES THAT REQUIRE SPECIAL ACCESS.
32.160 MOS 216 08-OCT-1999 08-007-2017 1160d 08.0CT-2017
HRSMSC 44
REF See Workcard AFL 38
31.150-00 REPLACE FDR ULB BATTERY AT VENDOR'S RECOMMENDATION
31.125 MOS 10-FEB-2012 01-DEC-2017 M 1214 d 01-0EC-2017
HRSMSC OUE 3609:52
REF ETC 31-150-00-01 AFL 879
(xEXT) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
' - Estimated Due (applies to New Requirement)
G3 CAMP SYSTEMS
38 Of 79
EFTA01190638
qmpAri•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 FIRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 M05. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE
MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH
TIME REMAINING
FAA 2012-23-08 TO PREVENT FAILURE OF THE DRAIN TUBE ASSEMBLIES AND CLAMPS ON THE AFT FAIRINGS OF THE ENGINE MANDATORY
STRUTS
K4OS 60 (EFF) 31-DEC-2017 1244 d 31-DEC-2017
HRS/MSC
REF AD AFL
FAA 2013-26-08 PARA GENERAL VISUAL INSPECTION OF THE ORIENTATION OF THE COIL CORD CONNECTOR KEYWAYS ON THE MANDATORY
(G) (1) CAPTAIN'S AND FIRST OFFICER'S SIDES OF THE FLIGHT COMPARTMENT I TURN THE RECEPTACLE CONNECTOR TO
THE CORRECT POSITION IF THE ORIENTATION IS NOT AT THE SPECIFIED POSITION. (FOR AIRPLANES IDENTIFIED AS
GROUP 1, CONFIGURATION 1)
MOS 48 (EFF) 10-FEB-2018 1285d 10-FEB-20(8
HRS:MSC
REF AD AFL
FAA 2013-26-08 PARA REPLACE THE COIL CORDS WITH NEW COIL CORDS ON BOTH SIDES OF THE FLIGHT DECK (FOR AIRPLANES MANDATORY
(G) (2) IDENTIFIED AS GROUP 1, CONFIGURATION 1)
MOS 48 (EFF) 10-FEB-2018 1285d 10-FEB-20(8
HRSIMSC
REF AD AFL
FAA 2013-02-07 TO PREVENT DETACHMENT OF COS BOXES AT FORWARD LOAD LEVELS LESS THAN 9 G DURING AN EMERGENCY MANDATORY
LANDING
MOS 60 (EFF) 06-MAR-2018 1309 d 06-MAR-2018
HRS/MSC
REF AD AFL
FAA 2013-04-11 PARA DO DETAILED INSPECTION AND CORRECTIVE ACTIONS WIRE SUPPORT CLAMP A DETAILED INSPECTION AND MANDATORY
(G) CORRECTIVE ACTIONS FOR PART NUMBER (P/N) TA0930034-10 WIRE SUPPORT CLAMP AT THE LOCATIONS
SPECIFIED
MOS 60 (EFF) 11-APR-2018 1345d II-APR-2018
HRS/MSC
REF AD AFL
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
39 Of 79
EFTA01190639
qmpAviaries. frum thvgrinend up'
Due List
737-72U83 REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
FNH , AfH TIME REMAINING
FAA 2013-06-05 PARA REPLACE REPLACING THE LEFT AND RIGHT ELEVATOR TAB CONTROL MECHANISMS WITH ELEVATOR TAB MANDATORY
(U) (1) CONTROL MECHANISMS THAT HAVE THE MODIFIED ATTACH LUGS THE LEFT AND RIGHT ELEVATOR TAB CONTROL
MECHANISMS WITH ELEVATOR TAB CONTROL MECHANISMS THAT HAVE NEW MACHINED AFT ATTACH LUGS. FOR
AIRPLANES HAVING LINE NUMBERS 1 THROUGH 3909 INCLUSIVE.
MOS 60 EFFI 09-MAY-2018 1373d 09-MAY-9018
HRSMSC
REF AD AFL
FAA 2012.09-06 PARA REPLACE REPLACE. WITH NEW COMPONENTS. CERTAIN FLOOR PANELS, SEAT TRACK PIVOT LINK ASSEMBLIES, MANDATORY
(G) AND SEAT TRACK SECTIONS WITH NEW COMPONENTS. AND MODIFY CERTAIN SEAT TRACKS WITH NEW
COMPONENTS, CERTAIN FLOOR PANELS. SEAT TRACK PIVOT LINK ASSEMBLIES. AND SEAT TRACK SECTIONS WITH
NEW COMPONENTS, AND MODIFY CERTAIN SEAT TRACKS
?JOS /2 i EFF ) 12-JUN-2018 1407 d 12-JUN-2018
HRS vsc
REF AD AF._
FAA 2012.09-06 PARA ACCOMPLISH REPLACE. WITH NEW COMPONENTS. CERTAIN FLOOR PANELS, SEAT TRACK PIVOT LINK MANDATORY
(H) ASSEMBLIES. AND SEAT TRACK SECTIONS WITH NEW COMPONENTS. AND MODIFY CERTAIN SEAT TRACKS MOVING
SEAT ROWS AFTER MODIFYING SEAT TRACK STRUCTURE
?JOS 12 EFFi 12-JUN•2018 1407 d 12-JUN-2078
H RS kSC
REF AD
FAA 2012.09-06 PARA VISUAL INSPECTION REPLACE. WITH NEW COMPONENTS. CERTAIN FLOOR PANELS, SEAT TRACK PIVOT LINK MANDATORY
& (J) ASSEMBLIES. AND SEAT TRACK SECTIONS WITH NEW COMPONENTS. AND MODIFY CERTAIN SEAT TRACKS OF
CERTAIN AREAS OF THE SEAT TRACKS FOR DAMAGE
MOS 72 EFFi 12-JUN.2018 1407 d 2-JUN-2018
HRSMSC
REF AD AFL
26.351-00 (001.1) HYDROSTATIC TEST (LRD2) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE
26.035 PIN: 473957 MOS 120 25-JUL-2008 25.JUL-2018 1450 d 25-JUL-2018
SIN: 25627EL FIRS/MSC
REF BTC 26-351-00-02 AFL
(xEXT) Extension incorporated in the next due Is) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CM/
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
40 Of 79
EFTA01190640
qmpAL,iariost frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) ArH TIME REMAINING
26351-00 (002.1) HYDROSTATIC TEST (LRD1) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE
26.036 P/N: 34600010-28 MOS 120 25-JUL-2008 25-JUL-2018 1450 d 25-JUL-2018
SiN: 10661F1 HRS/MSC
REF BTC 26-351-00-02 AFL
26.351-00 (003.1) HYDROSTATIC TEST (HRD) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE
26.600 P/N: 474089-1 MOS 120 01-AUG-2008 01-AUG-2018 1457 d 01-AUG-2018
SiN: 10033EL HRS:MSC
REF BTC 26-351-00-02 AFL
25310-00 (003.1) RESTORE NO. 3 LIFE RAFT PRESSURE BOTTLE RESTORE
P/N: 5A3212-10121 MOS 60 30-AUG-2013 30-AUG-2018 1486 d 30-AUG-2018
SiN: 12R098 HRS:MSC
REF AFL
25-310-00 (002.1) RESTORE NO. 2 LIFE RAFT PRESSURE BOTTLE RESTORE
P/N: 5A3212-10111 MOS 60 31-AUG-2013 31-AUG-2018 1487 d 31-AUG-2018
SiN: 12R099 HRSMSC
REF AFL
25-310-00 (001.1) RESTORE FORWARD LIFE RAFT PRESSURE BOTTLE RESTORE
PiN: 5A3212-10121 MOS GO 31-OCT-2013 31-OCT-2018 1548 d 31-OCT-2018
SIN: 12R100 HRSMSC
REF AFL
FAA 2012-19-11 TO PREVENT THE LOSS OF CABIN ALTITUDE WARNING MANDATORY
MOS 72 (EFF) 07-NOV-2018 1555d 07-NOV-2018
HRS:MSC
REF AD AFL
+ 25-290-00 (002.1) RESTORE PASSENGER ADULTICHILD/INFANT LIFE JACKETS-VESTS
25.500 MOS 120 T519 28-SEP-2009 31-DEC-2018 M 1609 d 31-DEC-2018
HRSMSC 3378:04
REF BTC 25-290-00-01 AFL 812
(xEXT)- Extension Incorporated in the next due (s)- Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
41 Of 79
EFTA01190641
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 S/N 29273 (YGOO6) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
FAA 2013-24-13 PARA INSTALL NEW, IMPROVED PIVOT LINK ASSEMBLIES, IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS MANDATORY
(G) (1) OF BOEING SERVICE BULLETIN 737-53.1244 R5.
MOS GO (EFF) 07-JAN-2019 1616 d 07-JAN-2019
HRS:tASC
REF AD AFL
26-210-00 (001.1) REPLACE APU FIRE EXTINGUISHER BOTTLE FORWARD SQUIB UFE LIMIT
26.290 P/N: 30903872 MOS 120 30-APR-2009 30-APR-2019 1729 d 30-APR-2019
S/N: 0108MD HRS/MSC
REF BTC 26-210-00-01 AFL
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBY) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
42 Of 79
EFTA01190642
qmpAviaries. frum thvgriramd up*
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 73-02041 INTERROGATE LEFT ENGINE FMC CDU FAULTS (BASIC AND DAC ENGINE).
73.130 MOS 21-FEB-2013 15-OCT-2014
HRS/MSC 150 3702:13 3852:13 98:54
REF BTC 73-020-01-01 AFL 897
WO: Al CHECK VP-BBJ FEB. 2013
+ 73-02042 INTERROGATE RIGHT ENGINE FMC CDU FAULTS (BASIC AND DAC ENGINE)
73.140 MOS 21-FEB-2013 15-OCT-2014
HRSMSC ISO 3702:13 3852:13 98:54
REF BTC 73-020-02-01 AFL 897
WO. Al CHECK VP-BBJ FEB. 2013
27.160-00 OPERATIONALLY CHECK THE FLAP SKEW SYSTEM BY INT1ATING A BITE CHECK AT THE FLAP SLAT ELECTRONICS
UNIT (FSEU)
27.995 MOS 18-AUG-2006 07-NOV-2014
HRS/MSC 1250 2633:50 3883:50 130:31
REF BTC 27-160-00-01 AFL 633
WO VP-BBJ DUE UST JULY 2014
+ 72-320-01 NO. 1 ENGINE - DETAILED INSPECTION ENGINE FWD SUMP, AFT SUMP, AGB/TGB MAGNETIC CHIP DETECTORS OR
DEBRIS MONITORING SYSTEM DETECTORS AND SCAVENGE SCREENS FOR PARTICLES.
72.310 MOS 09-AUG-2010 24-DEC-2014
HRSMSC 500 3448:28 (3948:28) 3948:28 195:09
REF See Workcard ENC
WO VP-88J DUE LIST JULY 2014
+ 72-320-01 NO. 2 ENGINE - DETAILED INSPECTION ENGINE FWD SUMP, AFT SUMP, AGB/TGB MAGNETIC CHIP DETECTORS OR
DEBRIS MONITORING SYSTEM DETECTORS AND SCAVENGE SCREENS FOR PARTICLES.
72.310 MOS 09-AUG-20t0 24-DEC-2014
HRSMSC 500 3448:28 (3948:28)3948:28 195:09
REF See Workcard ENC
WO VP-BBJ DUE UST JULY 2014
(xEXT) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
43 Of 79
EFTA01190643
qmpAL,iariost frum thvgriramd up
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-663): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) nrH TIME REMAINING
+ 21-150-00 CLEAN/REPLACE THE CABIN TEMPERATURE SENSOR FILTERS (737-700 HAS ONE
EACH IN THE CONTROL AND PASSENGER CABIN, 737-800/900ER HAS 3 FILTERS)
21.260 MOS 24-AUG-2007 07-JAN-2015
HRSMSC 1000 2968:28 3968:28 215:09
REF BTC 21-150-00-01 AFL 699
WO VP-BBJ DUE UST JULY 2014
+ 257008 CHECK WASTE BINS
MOS 24-AUG-2007 07-JAN-2015
HRS.IMSC 1000 2968:28 3968:28 215:09
REF AFL 699
WO: VP-BBJ DUE UST JULY 2014
+ 26420-00 VISUAL CHECK LAVATORY WASTE COMPARTMENT TEMPERATURE INDICATOR STRIP FOR HEAT EXPOSURE (NOTE:
ETOPS SIGNIFICANT TASK)
26.380 MOS 24-AUG-2007 07-JAN-2015
HRSMSC 1000 2968:28 3968:28 215:09
REF BTC 26-320-00-01 AFL 699
WO: VP-BBJ DUE UST JULY 2014
+ 32-300-00 CHECK BRAKE ACCUMULATOR PRECHARGE PRESSURE, SERVICE AS REQUIRED
32.725 MOS 24-AUG-2007 07-JAN-2015
HRSMSC 1000 2968:28 3968:28 215:09
REF BTC 32-300.00-01 AFL 699
WO: VP-BBJ DUE UST JULY 2014
+ 78.120-01 OPERATIONAL CHECK (BITE) ON THE LEFT ENGINE EAU
78.200 MOS 24-AUG-2007 07-JAN-2015
HRSMSC 1000 2968:28 3968:28 215:09
REF BTC 78-120-01-01 AFL 699
WO: VP-BBJ DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due Is) Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
44 Of 79
EFTA01190644
qmpAL,iariost frum Mr grwend up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
1ENH ) AFH TIME REMAINING
+ 78-120-02 OPERATIONAL CHECK (BITE) ON THE RIGHT ENGINE EAU
78.210 MOS 24-AUG-2007 07-JAN-2015
HRSMSC 1000 2968:28 3968:28 215:09
REF BTC 78-120-02-01 AFL 699
WO: VP-BEIJ DUE UST JULY 2014
+ 79420-01 NO. 1 ENGINE - DETAILED INSPECTION OIL SUPPLY FILTER POP-OUT INDICATOR
79.020 MOS 24-AUG-2007 07-JAN-2015
HRS:MSC 1000 2968:28 (3968:28) 3968:28 215:09
REF BTC 79-020-01-01 ENC 669
WO: VP-BEIJ DUE UST JULY 2014
+ 79420-01 NO. 2 ENGINE - DETAILED INSPECTION OIL SUPPLY FILTER POP-OUT INDICATOR
79.020 MOS 24-AUG-2007 07-JAN-2015
HRS:MSC 1000 2968:28 (3968:28) 3968:28 215:09
REF BTC 79-020-02-01 ENC 669
WO: VP-BBJ DUE LIST JULY 2014
SB 737-23A1170 R2 COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE, SERVICE BULLETIN RECOMMENDED
PART II
MOS 30-JAN-2015
HRS:MSC 4000 4000 246 41
REF BULLETINS AFL
+ 21420-00 OPERATIONAL CHECK THE ALTERNATE E/E COOLING SUPPLY FAN
21.120 MOS 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290 41
REF BTC 21-020-00-01 AFL 38
+ 21-030-00 OPERATIONAL CHECK ALTERNATE ElE COOLING EXHAUST FAN
21.130 MOS 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290:41
REF BTC 21-030-00-01 AFL 38
(xEXT) - Extension incorporated in the next due Is) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
45 Of 79
EFTA01190645
Due List Hours Section
C O Aviation/row
I P Me grand up' 737-72UB) REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
F Nht ! AT H TIME REMAINING
23-08040 OPERATIONAL CHECK OF OXYGEN MASK MICROPHONE
23.010 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4C00 44 4044 290:41
REF ETC 23-080-00-01 AFL 38
+ 25410-01 FUNCTIONAL CHECK THE HORIZONTAL ADJUSTMENT HOLES IN CAPTAIN SEAT TRACKS FOR ELONGATION AND
VERIFY CAPTAIN SEAT TRACKS FOR WEAR, CONDITION AND SECURITY
25.100 MOS 08-OCT-1999 03-MAR-2015
HRSIMSC 4000 44 4044 290:41
REF BTC 25-010-01-01 AFL 38
25-010-02 FUNCTIONAL CHECK THE HORIZONTAL ADJUSTMENT HOLES IN FIRST OFFICER SEAT TRACKS FOR ELONGATION
AND VERIFY FIRST OFFICER SEAT TRACKS FOR WEAR. CONDITION AND SECURITY
25.105 MOS 08-OCT-1999 03-MAR-201
HRSIMSC 4000 44 4044 :, it; 41
REF ETC 25-010-02-01 AFL 38
25-080-00 INSPECT (DETAILED) THE ATTENDANT SEAT BOTTOMS FOR PROPER RETRACTION, CONDITION AND SECURITY
25.C'.93 MOS 08-OCT-1999 03-MAR-20I5
HRS/MSC 4000 44 4044 290:41
REF :, 1 AFL 38
25-090-00 INSPECT (DETAILED) THE ATTENDANT SEAT HARNESS AND ATTACHMENTS WIO REMOVAL FOR
WEAR. CONDITION. AND SECURITY.
25.C9' MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF B7C 2:3C6.1;<:-1)1 AFL 38
25-100-00 OPERATIONAL CHECK THE ATTENDANT SEAT HARNESS INERTIA REEL LOCK FEATURE.
?JOS 03-MAR-2015
H RS vsc aS.0 4044 290:41
REF iiTC 2 .6.CC-1, 1
(xEXT)- Extension incorporated in the next due (s) - Suppressed Requirement 4.- FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CM/
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
48 Of 79
EFTA01190646
OMP
Due List Hours Section
Avislioogrum the groom( up' 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
25-110-00 OPERATIONAL CHECK THE ATTENDANT SEAT HARNESS INERTIA REELS
25.150 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BIC 25-110-00-01 AFL 38
+ 27-011-00 GENERAL VISUAL INSPECTION OF THE FORWARD AILERON MECHANICAL COMPONENTS
27.170 MOS 08-OCT-1999 03-MAR-2015
HRSiMSC 4000 44 4044 290:41
REF SIC 27-011-00-01 AFL 38
+ 27-013-01 GENERAL VISUAL INSPECTION LEFT WING AILERON MECHANICAL COMPONENTS FROM THE AILERON PCU TO THE
AILERON AND THE FLIGHT SPOILER MECHANICAL CONTROL PATH
27.180 MOS 08-OCT-1999 03-MAR-2015
HRSiMSC 4000 44 4044 290 41
REF SIC 27-013-01-01 AFL 38
+ 27-013-02 GENERAL VISUAL INSPECTION RIGHT WING AILERON MECHANICAL COMPONENTS FROM THE AILERON PCU TO THE
AILERON AND THE FLIGHT SPOILER MECHANICAL CONTROL PATH
27.181 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BTC 27-013-02-01 AFL 38
+ 27-215-01 GENERAL VISUAL INSPECTION LEFT WING SPOILER ACTUATORS
27.650 MOS 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290:41
REF SIC 27-215-01-01 AFL 38
+ 27.215-02 GENERAL VISUAL INSPECTION RIGHT WING SPOILER ACTUATORS
27.651 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF SIC 27-215-02-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
47 Of 79
EFTA01190647
C4MP i•lion /r gmnndup
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
27-215-03 GENERAL VISUAL INSPECTION OF THE SPOILER MECHANISM CONTROL PATH
27.017 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BTC 27-215-03-01 AFL 38
+ 28-010-00 GENERAL VISUAL INSPECTION OF THE MAIN AND CENTER FUEL TANK (WING) EXTERNAL LOWER SURFACES
INCLUDING TANK VENTS, SUMP DRAIN VALVES, SKIN LAP JOINTS FOR OBVIOUS LEAKS, CONDITION, AND SECURITY
28.190 K4OS 08-007-1999 03-MAR-2015
HRSIMSC 4000 44 4044 290:41
REF BTC 28-010-00-01 AFL 38
28-14-01 PATS FUNCTIONAL CHECK OF THE FORWARD AND AFT SUMP DRAIN LINE
MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF AFL 38
+ 29-070-00 CLEAN RESERVOIR PRESSURIZATION MODULE FILTER
29.240 4.109 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290:41
REF BIC 29-070-00-02 AFL 38
+ 29-080-00 OPERATIONAL CHECK EMDP GROUND FAULT PROTECTION SYSTEM
29.250 K409 08-OCT-1999 03-MAR-2015
HRSIMSC 4000 44 4044 290:41
REF BTC 29-080-00-01 AFL 38
+ 35-010-00 OPERATIONAL CHECK EACH FLIGHT CREW OXYGEN MASK/REGULATOR (OUT OF THE BOX ASSEMBLY)
35.060 K409 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BTC 35-010-00-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
48 Of 79
EFTA01190648
4MP/r i•lion gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD.
Hours Section
Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
52-050-00 (01) GENERAL VISUAL INSPECTION THE FORWARD ENTRY DOOR PRESSURE AND FLAPPER SEALS FOR DEGRADATION.
52.105 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BTC 52-050-00-01 AFL 38
52-050-00 (02) GENERAL VISUAL INSPECTION THE FORWARD SERVICE DOOR PRESSURE SEAL FOR DEGRADATION.
52.115 MOS 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290:41
REF BIC 52-050-00-02 AFL 38
52-050-00 (03) GENERAL VISUAL INSPECTION THE AFT ENTRY DOOR PRESSURE SEAL FOR DEGRADATION.
52.120 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BIC 52-050-00-03 AFL 38
52-050-00 (04) GENERAL VISUAL INSPECTION THE AFT SERVICE DOOR PRESSURE SEAL FOR DEGRADATION.
52.125 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290 41
REF BIC 52-050-00-04 AFL 38
52.100-00 (01) GENERAL VISUAL INSPECTION THE FORWARD CARGO COMPARTMENT DOOR PRESSURE SEAL FOR DEGRADATION.
52.245 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BTC 52-100-00-01 AFL 38
52.100-00 (02) GENERAL VISUAL INSPECTION THE AFT CARGO COMPARTMENT DOOR PRESSURE SEAL FOR DEGRADATION.
52.250 MOS 08-OCT-1999 03-MAR-2015
HRS:MSC 4000 44 4044 290:41
REF BTC 52-100-00-02 AFL 38
+ 52430-00 INSPECT (GENERAL VISUAL) ELECTRICAL/ELECTRONICS ACCESS DOOR PRESSURE SEAL FOR DEGRADTION
52.160 MOS 08-OCT-1999 03-MAR-2015
HRS/MSC 4000 44 4044 290:41
REF BIC 52-130-00-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
49 Of 79
EFTA01190649
qmp
A,,iatiostfrum thvgriramd up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 MRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
AFH TIME REMAINING
+ 52-180-00 INSPECT (DETAILED) THE AIRSTAIR DOOR PRESSURE SEAL FOR DEGRADATION.
52.190 MOS 08-OCT-1999 03-MAR-2015
HRSMSC 4000 44 4044 290:41
REF BTC 52-180.00-O1 AFL 38
+ 52-200-00 OPERATIONAL CHECK THE DOOR SENSORS (PROXIMITY OR MECHANICAL SWITCHES AS APPLICABLE) FOR THE
PASSENGER CABIN ENTRY/SERVICE, E/E ACCESS, AUTOMATIC OVERWING EMERGENCY EXIT, FORWARD ACCESS,
CARGO DOORS AND AIRSTAIR DOOR PROXIMITY SENSOR (AS APPLICABLE, IF AIRSTAIRS SYSTEM INCLUDING
STAIRS INSTALLED)
52.195 MOS 08-OCT-1999 03-MAR-2015
HRSMSC 4000 44 4044 290:41
REF See Workcard AFL 38
+ 52-210-00 OPERATIONAL CHECK FLIGHT LOCK MECHANICAL SWITCHES FOR AUTOMATIC OVERWING EMERGENCY EXIT
DOORS
52.200 MOS 08-OCT-1999 03-MAR-2015
HRSMSC 4000 44 4044 290:41
REF BTC 52-210.0O-01 AFL 38
+ 24-02041 DETAIL INSPECTION LEFT INTEGRATED DRIVE GENERATOR OF LEFT IDG DELTA P INDICATOR
24.140 PiN: 761574 MOS 17-AUG-2012 11-MAR-2015
SIN: 0034 FIRS/MSC 400 3655:09 4055:09 301:50
REF BTC 24-020-01-01 AFL 888
24-020-02 DETAIL INSPECTION RIGHT INTEGRATED DRIVE GENERATOR OF RIGHT IDG DELTA P INDICATOR
24.150 P/N: 761574 MOS 17-AUG-2012 11-MAR-2015
S/N: 0358 HRSMSC 400 3655:09 4055:09 301:50
REF BTC 24-020-02-01 AFL 888
« 24-030-01 DETAIL INSPECTION LEFT INTEGRATED DRIVE GENERATOR OF LEFT IDG OIL LEVEL
24.160 P/N: 761574 MOS 17-AUG-2012 11-MAR-2015
S/N: 0034 HRSMSC 400 3655:09 4055:09 301:50
REF BTC 24-030-01-01 AFL 888
(xEXT) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
50 Of 79
EFTA01190650
qmp AL,iariost frum thvgrAmmd up*
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 24-030-02 DETAIL INSPECTION RIGHT INTEGRATED DRIVE GENERATOR OF RIGHT IDG OIL LEVEL
24.170 P/N: 761574 MOS 17-AUG-2012 11-MAR-2015
S/N: 0358 HRSMSC 400 3655:09 4055:09 301:50
REF BTC 24-030-02-01 AFL 888
+ 29-050-01 REPLACE "A" SYSTEM EDP CASE DRAIN FILTERS
29.210 MOS I3-MAY-2005 06-MAY-2015
HRSMSC 2000 2132:54 4132:54 379:35
REF BTC 29-050.01-01 AFL 518
• 35-050-00 VISUAL (CROSS) CHECK THE FLIGHT CREW OXYGEN CYLINDER PRESSURE INDICATOR AND THE CONTROL
COMPARTMENT FLIGHT CREW OXYGEN INDICATOR
35.100 MOS 13-MAY-2005 06-MAY-2015
HRSMSC 2000 2132:54 4132:54 379:35
REF BTC 35-050-00-01 AFL 518
+ 38-020-00 SERVICE TOILET WASTE LINES
38.110 MOS 18-MAY-2005 06-MAY-2015
HRSMSC 2000 2132:54 4132:54 379:35
REF BTC 38-020-00-01 AFL 518
« 52-170-00 INSPECT (DETAILED) THE AIRSTAIR SYSTEM (EXTENDED) FOR CONDITION
52.185 MOS I3-MAY-2005 06-MAY-2015
HRS:MSC 2000 2132:54 4132:54 379:35
REF BTC 52-170-00-01 AFL 518
+ 25.140-00 INSPECT (GENERAL VISUAL) THE STA 396 BULKHEAD PANELS FOR CONDITION AND SECURITY
25.163 MOS 22-AUG-2008 27-MAY-2015
HRSMSC 900 3260:48 4160:48 40729
REF BTC 25-140-00-01 AFL 782
(xE Xi) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
O CAMP SYSTEMS
51Of 79
EFTA01190651
qmp Aviaries. frum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
« 25.160-00 (01) INSPECT (GENERAL VISUAL) THE FORWARD CARGO COMPARTMENT FLOOR, CEILING, AND SIDEWALL
PANELS/LINERS FOR HOLES/TEARS, CONDITION, AND SECURITY.
25.188 MOS 22-AUG-2008 27-MAY-2015
HRSMSC 900 3260:48 4160:48 40729
REF ETC 25-160.0O-01 AFL 782
« 25.160-00 (02) INSPECT (GENERAL VISUAL) AFT CARGO COMPARTMENT FLOOR, CEILING, AND SIDEWALL PANEULINES FOR
HOLES/TEARS, CONDITION, AND SECURITY.
25.177 MOS 22-AUG-2008 27-MAY-2016
HRSMSC 900 3260:48 4160:48 407:29
REF ETC 25-160.0O-02 AFL 782
+ 29-030.01 REPLACE "A" HYDRAULIC SYSTEM ELECTRIC MOTOR DRIVEN PUMP (EMDP) CASE DRAIN FILTER
29.190 MOS 22-AUG-2008 27-MAY-201S
HRSMSC 900 3260:48 4160:48 40729
REF ETC 29-030-01-01 Aft 782
+ 29-030-02 REPLACE "B" HYDRAULIC SYSTEM ELECTRIC MOTOR DRIVEN PUMP (EMDP) CASE DRAIN FILTER
29.200 MOS 22-AUG-2008 27-MAY-2015
HRSMSC 900 3260:48 4160:48 40729
REF ETC 29-030-02-01 AFL 782
+ 29.09040 GENERAL VISUAL INSPECTION OF THE DELTA "P" INDICATION OF "A" 8 "B" SYSTEM RETURN FILTER MODULE
29.260 MOS 22-AUG-2008 27-MAY-2015
HRSMSC 900 3260:48 4160:48 40729
REF ETC 29-090-00-01 AFL 782
« 71-010-01 VISUALLY CHECK THE LEFT INLET COWL (INNER SIDE AND OUTER SKIN)
71.080 MOS 22-AUG-2008 27-MAY-2015
HRSMSC 900 3260:48 4160:48 407:29
REF ETC 71-010-01-01 AFL 782
xE XI) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
62 Of 79
EFTA01190652
qmpAL,iariost frum thvgriramd up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
+ 71-010-02 VISUAL CHECK THE RIGHT INLET COWL (INNER SIDE AND OUTER SKIN)
71.081 MOS 22-AUG-2008 27-MAY-2015
HRS/MSC 900 3260:48 4160:48 407:29
REF BTC 71-010-02-01 AFL 782
+ 29-050-02 REPLACE "B" SYSTEM EDP CASE DRAIN FILTERS
29.220 MOS 07-SEP-2005 26-JUN-2015
HRSMSC 2000 2202:24 4202:24 449:05
REF BTC 29-050-02-01 AFL 541
FAA 2011-12-13 PARA TEST TO DETECT AND CORRECT A TAKEOFF WARNING SYSTEM SWITCH FAILURE THE STABILIZER TAKEOFF MANDATORY
(G) WARNING SWITCHES
MOS 29-AUG-2011 16-AUG-2015
HRS:MSC 750 3522:32 4272:32 519:13
REF AD AFL 863
27-162-00 OPERATIONALLY CHECK THE FLAP ASYMMETRY SYSTEM
27.990 MOS 29-AUG-2011 23-AUG-2015
HRS:MSC 750 3533:32 4283:32 530:13
REF BTC 27-162-00-01 AFL 863
SB 737-27-1289 737 STABILIZER TAKEOFF WARNING SWITCHES - TEST OF THE TAKEOFF WARNING INDICATION, SERVICE BULLETIN RECOMMENDED
DAYS 29-AUG-2011 23-AUG-2015
HRSMSC 750 3533:32 4283:32 530:13
REF BULLETINS AFL 863
FAA 1974-08-09 R3 LAVATORY PAPER OR LINEN WASTE RECEPTACLE FIRE PREVENTION MANDATORY
MOS 20-MAR-2012 16-APR-2016
HRSMSC WOO 3609:52 4609:52 856:33
REF AD AFL 879
(xEXT) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
53 Of 79
EFTA01190653
qmp
A,,iatiostfrum thvgrwend up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH) AFH TIME REMAINING
25-120-00 OPERATIONAL CHECK THE LAVATORY WASTE COMPARTMENT FLAPPER DOOR SPRING. INSPECT THE WASTE
RECEPTACLES PER AD 74-08-09R2.
25.020 MOS 20-MAR-2012 16-APR-2016
HRSMSC 1000 3609:52 4609:52 856:33
REF BTC 25-120.0O-01 AFL 879
25-130-00 DETAILED INSPECTION OF THE LAVATORY WASTE COMPARTMENT FLAPPER DOOR AND WASTE COMPARTMENT
ACCESS DOOR LATCHING MECHANISM FOR WEAR, CONDITION AND SECURITY. MEETS INTENT OF AD 74-08-09R2
25.030 MOS 20-MAR-2012 16-APR-2016
HRSMSC 1000 3609:52 4609:52 856:33
REF BTC 25-130.0O-01 AFL 879
C + 29.230-00 OPERATIONAL CHECK STANDBY RUDDER SYSTEM TO INCLUDE OBSERVING LOW PRESSURE LIGHT ILLUMINATION
AND THEN EXTINGUISHING.
29.480 DAYS 150 12-FEB-2014 12-JUL-2014 e<e
HRS/MSC 1000 3743:34 4743:34 990:15
REF BTC 29-230-00-01 AFL 917
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
+ 27-216-00 FUNCTIONAL CHECK AUTOSLAT SYSTEM TO INCLUDE A BITE CHECK OF STALL MANAGEMENT/YAW DAMPER
(SMYD) COMPUTER
27.655 MOS 29-AUG-2011 20-AUG-2016
HRSMSC 1250 3533:32 4783:32 1030:13
REF BTC 27-216-00-01 AFL 863
+ 27-224-00 OPERATIONAL CHECK LEADING EDGE DEVICES UNCOMMANDED MOTION PROTECTION USING STANDBY
HYDRAULIC SYSTEM
27.675 MOS 29-AUG-2011 20-AUG-2016
HRSMSC 1250 3533:32 4783:32 1030:13
REF BTC 27-224.0O-01 AFL 863
+ 24-010-01 CHANGE LEFT INTEGRATED DRIVE GENERATOR LEFT IDG OIL
24.120 PiN: 761574 MOS 22-AUG-2008 15-OCT-2016
SIN: 0034 HRSMSC 1600 3260:48 4860:48 1107:29
REF BTC 24-010-01-01 AFL 782
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EB7) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) C - Task also due In calendar due list
CAMP SYSTEMS
64 Of 79
EFTA01190654
OMP
Due List Hours Section
Ari•lionfrum tfir gmnndup 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 24-010-02 CHANGE RIGHT INTEGRATED DRIVE GENERATOR RIGHT IDG OIL
24.121 P/N: 761574 1,405 22-AUG-2008 1SOCT-2016
S/N: 0358 HRS/MSC 1600 3260:48 4860:48 110729
REF BTC 24-010-02-01 AFL 782
+ 24-040-01 REPLACE LEFT IDG CHARGE/SCAVENGE FILTERS
24.180 1,405 22-AUG-2008 1SOCT-2016
HRS/MSC 1600 3260:48 4860:48 1107:29
REF SIC 24-040.01-01 AFL 782
+ 24-040-02 REPLACE RIGHT IDG CHARGE/SCAVENGE FILTERS
24.190 MO5 22-AUG-2008 1SOCT-2016
HRS/MSC 1600 3260:48 4860:48 1107:29
REF SIC 24-040-02-01 AFL 782
+ 24-050-01 TORQUE CHECK LEFT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH
24.200 P/N: 762246 1405 22-AUG-2008 1SOCT-2016
S/N: 0334 HRS/MSC 1600 3260:48 4860:48 1107:29
REF BTC 24-050-01-01 AFL 782
+ 24-050-02 TORQUE CHECK RIGHT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH
24.210 P/N: 762246 1405 22-AUG-2008 15-OCT-2016
S/N: 0333 HRS/MSC 1600 3260:48 4860:48 1107:29
REF BTC 24-050-02-01 AFL 782
+ 26-050-00 VISUALLY CHECK ENGINE FIRE BOTTLE PRESSURE GAGES FOR CORRECT PRESSURE. (AND APU FIRE BOTTLE
PRESSURE GAUGE IF INSTALLED)
26.170 1405 22-AUG-2008 15.00T-2016
HRS/MSC 1600 3260:48 4860:48 1107:29
REF EITC 26-050-00-01 AFL 782
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
55 Of 79
EFTA01190655
OMP
Due List Hours Section
Ari•lionfrum tfir gmnndup 737-72UB3 REVISION 21 5/N 29273 (YG006) (VP-BEt3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I Erni AFH TIME REMAINING
FAA 2014-03-19 PARA DEATILED INSPECTION FOR CRACKS OF THE RADOME ASSEMBLY MANDATORY
(G)
MOS (EFF) 27-JAN-2017
HRS/MSC 1250 5004:49 1251:30
REF AD AFL
+ 27-154-00 OPERATIONAL CHECK FLAP LOAD RELIEF SYSTEM
27.530 MOS 02-MAR-2006 30-JAN-2017
HRS/MSC 2500 2509:38 5009:38 1256:19
REF 8TC 27-154-00-01 AFL 609
+ 38-030-00 RESTORE (CLEAN) OR REPLACE WASTE VACUUM BLOWER FILTER (IF INSTALLED)
38.120 P/N: 606802-2 MOS 02-MAR-2006 30-JAN-2017
SIN: 78-4698 HRS4MSC 2500 2509:38 5009:38 1256:19
REF BTC 38-030-00-01 AFL 609
+ 21.100-00 CLEAN THE PRIMARY AND SECONDARY HEAT EXCHANGERS
21.200 MOS 08-OCT-1999 24-FEB-2017
HRSIMSC 5000 44 5044 1290:41
REF BTC 21-100-00-01 AFL 38
+ 27-056-00 GENERAL VISUAL INSPECTION STANDBY RUDDER POWER CONTROL UNIT WITH HYDRAULIC POWER ON
27.280 MOS 08-OCT-1999 24-FEB-2017
HRS/MSC 5000 44 5044 1290:41
REF BTC 27-056-00-01 AFL 38
+ 27-171-01 GENERAL VISUAL INSPECTION LEFT WING FLAP DRIVE SEAL RIB ANGLE GEAR BOX, MLG BEAM ANGLE GEAR BOX,
FLAP DRIVE TORQUE TUBES, TORQUE TUBE COUPLINGS AND SUPPORTS AND FLAP TRANSMISSIONS
27.570 MOS 08-OCT-1999 24-FEB-2017
HRS:MSC 5000 44 5044 1290.41
REF BTC 27-171-01-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
56 Of 79
EFTA01190656
qmp
A,,iatiostfrum thvgriramd up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AfN TIME REMAINING
+ 27-171-02 GENERAL VISUAL INSPECTION RIGHT WING FLAP DRIVE SEAL RIB ANGLE GEAR BOX, MLG BEAM ANGLE GEAR
BOX, FLAP DRIVE TORQUE TUBES, TORQUE TUBE COUPLINGS AND SUPPORTS AND FLAP TRANSMISSIONS
27.571 MOS 08-OCT-1999 24-FEB-2017
HRSMSC 5000 44 5044 1290:41
REF ETC 27-171.02-01 AFL 38
+ 27-190-00 OPERATIONAL CHECK SPEEDBRAKES EXTENDED LIGHT
27.620 MOS 08-OCT-1999 24-FEB-2017
HRS/MSC 5000 44 5044 1290:41
REF ETC 27-190-00-01 AFL 38
+ 78-110-01 OPERATIONAL CHECK OF THE LEFT ENGINE TIR SYNC LOCK CMR
78.180 MOS 08-OCT-1999 24-FEB-2017
HRSMSC 5000 44 5044 1290:41
REF BTC 78-110-01-01 AFL 38
+ 78.110-02 OPERATIONAL CHECK OF THE RIGHT ENGINE TM SYNC LOCK CMR
78.190 MOS 08-OCT-1999 24-FEB-2017
HRSMSC 5000 44 5044 1290:41
REF ETC 78-110.02-01 AFL 38
+ 28-060-01 (001.1) RESTORE LEFT FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). RESTORE
28.380 P/N: 68E125-9 MOS 27-AUG-2002 06-MAR-2017
S/N: 1433 HRSMSC 4000 1057:48 5057:48 1304:29
REF BTC 28-060-01-01 AFL 271
+ 28-060.02 (001.1) RESTORE RIGHT FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). RESTORE
28.390 P/N: 68E125-9 MOS 27-AUG-2002 06-MAR-2017
S/N: 1266 HRSMSC 4000 1057:48 5057:48 1304:29
REF BTC 28-060-02-01 AFL 271
xE XI) - Extension incorporated in the next due (s) Suppressed Requirement FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
57 Of 79
EFTA01190657
qmp AL,iariost frum thvgriramd up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
+ 28-06043 (001.1) RESTORE LEFT CENTER FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). RESTORE
28.065 P/N: 68E125-9 MOS 27-AUG-2002 06-MAR-2017
S/N: 1441 HRSMSC 4000 1067:48 5057:48 1304:29
REF BTC 28-060-03-01 AFL 271
28-060-03 (002.1) RESTORE RIGHT CENTER FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK.)." RESTORE
P/N: 68E125-9 MOS 27-AUG-2002 06-MAR-2017
S/N: 1285 HRSMSC 4000 1057:48 5057:48 1304:29
REF BTC 28-060-03-01 AFL 271
+ 78-090-01 VISUALLY CHECK THE LEFT ENGINE T/R FIRE SEAL
78.140 MOS 07-SEP-200.5 19-JUN-2017
HRSMSC 3000 2202:21 5202:21 144902
REF ETC 78-090-01-01 AFL 541
+ 78-09042 VISUALLY CHECK THE RIGHT ENGINE T/R FIRE SEAL
78.150 MOS 07-SEP-200.5 19-JUN-2017
HRSMSC 3000 2202:21 5202:21 144962
REF BTC 78-090-02-01 AFL 541
C FAA 2011-27-03 PARA LUBRICATE TO PREVENT AN UNDETECTED FAILURE OF THE PRIMARY LOAD PATH FOR THE BALLSCREW IN THE MANDATORY
(G)(1)(I)(2) DRIVE MECHANISM OF THE HSTA AND SUBSEQUENT WEAR AND FAILURE OF THE SECONDARY LOAD PATH IN
ACCORDANCE SERVICE BULLETIN 737-27A1277 R2
MOS 12 03-JUL-2013 03-JUL-2014 cc<
HRSMSC 1600 3723:21 5323:21 1570:02
REF AD AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
FAA 2010.17.19 PARA DETAILED INSPECTION TO PREVENT FROM REPORTS OF FAILURE OF THE AFT ATTACH LUGS ON ELEVATOR TAB MANDATORY
(N)(3) CONTROL MECHANISMS (SUPERSEDED BY FAA AD 2013A6A5) FOR DISCREPANCIES OF THE INBOARD AND
OUTBOARD AFT ATTACH LUGS OF THE LEFT AND RIGHT ELEVATOR TAB CONTROL MECHANISMS (GROUP 3)
DAYS 28-FEB-2011 18-SEP-2017
HRSMSC 1800 3525:36 5325:36 1572:17
REF AFL 857
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EB7) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) C - Task also due in calendar due list
CAMP SYSTEMS
58 Of 79
EFTA01190658
CAMP
Due List Hours Section
.tpiatioa from the grommI tip. 737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION, RECOMMENDED
TABLE (1) SERVICE BULLETIN OF THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM
MOS 16-SEP-2017
HRS4MSC 1800 5325:36 1572:17
REF BULLETINS AFL
SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION, RECOMMENDED
TABLE (2) SERVICE BULLETIN OF THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM
MOS 16-SEP-20I7
HRS4MSC 1800 5325:36 1572:17
REF BULLETINS AFL
27-093-00 (01) DETAILED VISUAL INSPECTION OF THE LEFT ELEVATOR TAB RODS, TAB MECHANISM CMR
27.940 MOS 22-AUG-2003 28-SEP-20I7
HRS/MSC 4000 1342 5342 1588:41
REF BTC 27-093-00-01 AFL 2000 351 2351 1429
27-093-00 (02) DETAILED VISUAL INSPECTION OF THE RIGHT ELEVATOR TAB RODS, TAB MECHANISM CMR
27.945 MOS 22-AUG-2003 28-SEP-20I7
HRS/MSC 4000 1342 5342 1588:41
REF BTC 27-093-00-02 AFL 2000 351 2351 1429
27-099-00 (01) FUNCTIONALLY CHECK THE LEFT ELEVATOR TAB FREEPLAY CMR
27.950 MOS 22-AUG-2003 28-SEP-20I7
HRS:MSC 4000 1342 5342 1588:41
REF BTC 27-099-00-01 AFL 2000 351 2351 1429
27-099-00 (02) FUNCTIONALLY CHECK THE RIGHT ELEVATOR TAB FREEPLAY CMR
27.955 MOS 22-AUG-2003 28-SEP-20I7
HRS/MSC 4000 1342 5342 1588:41
REF BTC 27-099-00-02 AFL 2000 351 2351 1429
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
59 Of 79
EFTA01190659
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
( EMI ) AN TIME REMAINING
+ 73-01041 NO. 1 ENGINE - REPLACE FUEL FILTER
73.010 MOS 01-MAR-2007 16.0CT-2018
HRS/MSC 3000 2871:05 (5871:05) 5871:05 2117:46
REF BTC 73-010-01-01 ENC 646
+ 73-010-01 NO. 2 ENGINE - REPLACE FUEL FILTER
73.010 MOS 01-MAR-2007 16.0CT-2018
HRSIMSC 3000 2871:05 (5871:05) 5871:05 2117:46
REF BTC 73-010-02-01 ENC 646
+ 26-30040 DETAILED VISUAL INSPECTION LAVATORY FIRE BOTTLES FUSIBLE TIPS AND DISCHARGE TUBES
26.370 MOS 24-AUG-2007 26-DEC-2018
HRSIMSC 3000 2968:28 5968:28 2215:09
REF BTC 26-300-00-01 AFL 699
+ 26-150-00 FUNCTIONAL CHECK OF THE ENGINE FIRE EXTINGUISHING DISTRIBUTION SYSTEM (PRESSURE CHECK)
26.241 MOS 0S-OCT-1999 18-JAN-2019
HRS/MSC 6000 0 6000 2246:41
REF BTC 26-150-00-01 AFL 0
+ 26-170-00 GENERAL VISUAL INSPECTION OF THE ENGINE FIRE EXTINGUISHING DISTRIBUTION SYSTEM
26.242 MOS 0S-OCT-1999 18-JAN-2019
HRS/MSC 6000 0 6000 2246:41
REF BTC 26-170-00-01 AFL 0
+ 20.110-01 GENERAL VISUAL INSPECTION OF THE LEFT ENGINE EXTERNAL (COWL OPEN) HARNESS CONDITION AND SECURITY
20.160 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 20-110-01-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
60 Of 79
EFTA01190660
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 20-11042 GENERAL VISUAL INSPECTION OF THE RIGHT ENGINE EXTERNAL (COWL OPEN) HARNESS CONDITION AND
SECURITY.
20.170 MOS 08-007-1999 78-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BIC 20-710-02-01 AFL 38
* 20-130-01 GENERAL VISUAL INSPECTION OF THE TWO ENGINE BONDING STRAPS RELATED TO HIRFILIGHTNING FOR
CONDITION AND SECURITY ON THE LEFT ENGINE
20.200 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BIC 20-130-01-01 AFL 38
* 20-130-02 GENERAL VISUAL INSPECTION OF THE TWO ENGINE BONDING STRAPS RELATED TO HIRFILIGHTNING FOR
CONDITION AND SECURITY ON THE RIGHT ENGINE.
20.210 MOS 08-007-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BIC 20-730-02-01 AFL 38
21-015-00 DETAILED INSPECTION OF THE RECIRCULATION FAN CHECK VALVE(S) FOR CONDITION, SECURITY AND, PROPER
OPERATION.
21.020 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BIC 21-015-00-01 AFL 38
+ 21450-00 OPERATIONAL CHECK THE OVERBOARD EXHAUST VALVE IN SMOKE CLEARANCE MODE
21.150 MOS 08-OCT-1999 78-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BIC 21-050-00-01 AFL 38
+ 21-06040 OPERATIONAL CHECK THE OUTFLOW VALVE MANUAL MODE (MOTOR), SELECTOR PANEL, INDICATOR, INDICATOR
FEEDBACK MODULE
21.160 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BIC 21-060-00-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
61 Of 79
EFTA01190661
qmpAL,iariost frum thvgriramd up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH TIME REMAINING
+ 26-010-00 OPERATIONAL CHECK LAVATORY SMOKE DETECTORS
26.140 MOS 08-OCT-1999 18-FEB-2019
HRS:MSC 6000 44 6044 2290A1
REF BTC 26-010-00-01 AFL 38
26-080-00 FUNCTIONAL CHECK THE ENGINE SQUIB FIRING CIRCUIT USING THE ENGINE FIRE HANDLE SWITCH
26.250 MOS 08-OCT-1999 18-FEB-2019
HRS:MSC 6000 44 6044 2290A1
REF ETC 26-080-00-01 AFL 38
+ 26-110-00 OPERATIONAL CHECK ENGINE FIRE HANDLE (INCLUDING FIRE HANDLE LOCK OVERRIDE CIRCUITRY) FOR ENGINE
SHUTDOWN AND ISOLATION
26.250 MOS 08-OCT-1999 18-FEB-2019
HRS:MSC 6000 44 6044 22490:41
REF BIC 26-110-00-01 AFL 38
26-220-00 FUNCTIONAL CHECK OF APU SQUIB FIRING CIRCUIT USING THE APU FIRE HANDLE SWITCH
AND VERIFY SQUIB CONTINUITY
26.250 MOS 08-OCT-1999 I8-FEB-2019
HRS:MSC 6000 44 6044 2290 41
REF BTC 26-220-00-01 AFL 38
26-230-00 OPERATIONAL CHECK APU FIRE HANDLE (INCLUDING FIRE HANDLE LOCK OVERRIDE CIRCUITRY AND P28 REMOTE
APU CONTROL PANEL) FOR APU SHUTDOWN AND ISLOLATION
26.250 MOS 08-OCT-1999 18-FEB-2019
HRS:MSC 6000 44 6044 2290 41
REF BTC 26-230-00-01 AFL 38
+ 26-25040 GENERAL VISUAL INSPECTION APU REMOTE CONTROL PANEL FOR CONDITION AND SECURITY OF INSTALLATION
26.320 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290 41
REF ETC 26-250-00-01 AFL 38
(xEXT) • Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
62 Of 79
EFTA01190662
qmpAL,iariost frum thvgriramd up'
Due List
737-72U63 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
FN/1) nrH TIME REMAINING
+ 26-280-00 DETAILED VISUAL INSPECTION APU FIRE EXTINGUISHER DISTRIBUTION SYSTEM AND APU FIRE BOTTLE
26.330 MOS 08-OCT-1999 18-FEB-2019
HRSMSC 6000 44 6044 2290:41
REF BTC 26-280-00-01 AFL 38
+ 26470-00 OPERATIONAL CHECK CARGO FIRE EXTINGUISHING ARM/DISCHARGE SWITCHES TO VERIFY CIRCUITRY
26.500 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF See Workcard AFL 38
+ 26400-00 FUNCTIONALLY CHECK CARGO FIRE EXTINGUISHING 60 MINUTE TIMER
26.530 MOS 08-OCT-1999 18-FEB-2019
HRSMSC 6000 44 6044 2290:41
REF See Workcard AFL 38
+ 27-012-00 GENERAL VISUAL INSPECTION OF THE AILERON TRANSFER MECHANISM
27.175 MOS 08-OCT-1999 18-FEB-2019
HRSMSC 6000 44 6044 2290:41
REF ETC 27-012-00-01 AFL 38
+ 27-016-00 OPERATIONAL CHECK THE AILERON SPRING CARTRIDGE AND TRANSFER MECHANISM
27.190 MOS 08-OCT-1999 18-FEB-2019
HRSMSC 6000 44 6044 2290 41
REF ETC 27-016-00-01 AFL 38
« 27-028-00 DETAILED VISUAL INSPECTION OF THE AILERON FEEL AND CENTERING SPRINGS
27.215 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290 41
REF ETC 27-028-00-01 AFL 38
(xEXT) • Extension incorporated in the next due (s) • Suppressed Requirement + • FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
63 Of 79
EFTA01190663
C4MP i•lion /r gmandufr.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
Erni AFH TIME REMAINING
+ 27-030-00 OPERATIONAL CHECK HYDRAULIC POWER OFF, THE AILERON CONTROL SURFACES FOR FULL RANGE OF TRAVEL
AND FREEDOM OF MOVEMENT
27.220 MOS 08-007-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF SIC 27-030-00-01 AFL 38
+ 27-036-00 DETAIL INSPECTION OF AFT RUDDER QUADRANT TORQUE TUBE ASSEMBLY, FEEL AND CENTERING UNIT AND
ASSOCIATED INPUT/OUTPUT RODS.
1. AFT RUDDER QUADRANT.
2. AFT RUDDER QUADRANT INPUT ROD.
3. AFT RUDDER LOWER BELLCRANK.
4. RUDDER POWER CONTROL INPUT CRANK.
5. RUDDER TRIM AND FEEL ROD.
6. RUDDER TORQUE TUBE.
7. RUDDER TORQUE TUBE CENTER CRANK.
8. RUDDER TORQUE TUBE UPPER CRANK.
9. FEEL AND CENTERING UNIT.
10. FEEL AND CENTERING UNIT OUTPUT ROD.
27.245 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF SIC 27-036-00-01 AFL 38
+ 27-038-00 GENERAL VISUAL INSPECTION OF RUDDER FORWARD MECHANICAL CONTROL PATH
27.250 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-038-00-01 AFL 38
+ 27-058-00 DETAILED VISUAL INSPECTION STANDBY RUDDER POWER CONTROL UNIT FORE AND AFT ATTACHMENT POINTS
(STRUCTURE TO PCU TO RUDDER SURFACE)
27.285 MOS 08-OCT-1999 18-FEB-2019
HRS:MSC 6000 44 6044 2290:41
REF SIC 27-058-00-01 AFL 38
+ 27-060-00 OPERATIONAL CHECK WHEEL TO RUDDER INTERCONNECT SYSTEM (WTRIS)
27.290 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF See Workcard AFL 38
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flap Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
64 Of 79
EFTA01190664
C4MP/ri•lion gromorthip.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 27-06240 OPERATIONAL CHECK RUDDER TRIM THROUGH THE FULL RANGE OF MOVEMENT
27.291 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF See Workcard AFL 38
+ 27-068-00 OPERATIONAL CHECK ELEVATOR FEEL SHIFT FUNCTION
27.311 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-068-00-01 AFL 38
+ 27-073-00 GENERAL VISUAL INSPECTION OF THE ELEVATOR MECHANICAL CONTROL PATH
27.320 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF SIC 27-073-00-01 AFL 38
+ 27-074-00 OPERATIONAL CHECK HYDRAULIC POWER OFF, THE ELEVATOR CONTROL SURFACES FOR FULL RANGE OF
TRAVEL AND FREEDOM OF MOVEMENT
27.325 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF SIC 27-074-00-01 AFL 38
+ 27-075-01 GENERAL VISUAL INSPECTION OF THE LEFT ELEVATOR BALANCE WEIGHT INSTALLATION AND ELEVATOR TAB
CONTROL MECHANISM
27.330 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF SIC 27-075-01-01 AFL 38
+ 27-075-02 GENERAL VISUAL INSPECTION OF THE RIGHT ELEVATOR BALANCE WEIGHT INSTALLATION AND ELEVATOR TAB
CONTROL MECHANISM
27.331 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-075-02-01 AFL 38
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
65 Of 79
EFTA01190665
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 27-076-00 GENERAL VISUAL INSPECTION OF THE ELEVATOR POWER CONTROL UNITS WITH HYDRAULIC POWER ON
27.335 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-076-00-01 AFL 38
+ 27-080-00 DRAIN AND LEAK CHECK ELEVATOR PITOT-STATIC SYSTEM
27.340 MOS 08-OCT-I999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-080-00-01 AFL 38
+ 27-086-00 OPERATIONAL CHECK ELEVATOR TAB CONTROL SYSTEM
27.355 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-086-00-01 AFL 38
* 27-088-00 FUNCTIONAL CHECK STALL WARNING SYSTEMS
27.360 MOS 08-007-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-088-00-01 AFL 38
+ 27-09440 BITE CHECK ELEVATOR AUTOPILOT SERVO PRESSURE REGULATOR
27.370 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-094.00-01 AFL 38
+ 27-112-00 OPERATIONAL CHECK STABILIZER TRIM LIMIT SWITCHES (FLAPS UP AND FLAPS DOWN)
27.425 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-112-00-01 AFL 38
+ 27-114-00 OPERATIONAL CHECK STABILIZER TRIM CONTROL COLUMN SWITCHING.
27.430 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-114-00-01 AFL 38
(xEXT) - Extension Incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
66 Of 79
EFTA01190666
qmpAviaries. frum thvgrinend up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Hours Section
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I FNII , AFH TIME REMAINING
+ 27-116-00 OPERATIONAL CHECK MAIN CONTROL COLUMN CUTOUT SWITCHES
27.435 MOS 08-OCT-1999 18-FEB-2019
HRSMSC 6CO3 44 6044 2290A1
REF BTC 27-116-00-01 AFL 38
+ 27-118-00 OPERATIONAL CHECK AISLE STAND STABILIZER TRIM OVERRIDE SWITCH
27..:41 MOS 18-FEB-2019
HRSMSC 6003 6044 2290:41
REF AFL 3d
+ 27-120-00 DETAILED VISUAL INSPECTION OF THE UPPER AND LOWER STABILIZER TRIM FORWARD MECHANISM RETENTION
TURNBUCKLES AND TURNBUCKLE ATTACHMENT POINTS
27..:.::, MOS 18-FEB-2019
HRSMSC 6003 6044 zz.0; 41
REF B7C Aft 3
+ 27-121-00 GENERAL VISUAL INSPECTION OF THE FORWARD STABILIZER TRIM MECHANISM AND THE SPEEDBRAKE LEVER
ASSEMBLY AND AUTO SPEEDBRAKE ELECTRIC ACTUATOR, ACTUATOR ROD END. AND FORWARD ATTACHMENT
POINT
27.460 MOS 08-OCT-1999
HRSMSC 6000 44 6044 zz(0; 41
REF BTC 27-121.00-01 AFL 38
+ 27-122-00 OPERATIONAL CHECK CONTROL COLUMN STABILIZER TRIM ARM AND DIRECTIONAL SWITCHES FOR MOVEMENT OF
A SINGLE SWITCH TO CAUSE STABILIZER MOVEMENT
27.170 MOS 08-OCT-1999
HRS/MSC 6000 44 6044 zz it; 41
REF BTC 27-122-00-01 AFL 38
+ 27-158-00 FUNCTIONAL CHECK THE ALTERNATE FLAP DRIVE SYSTEM
27.541) MOS 08-OCT-1999
HRSMSC 6003 44 6044 zz66 41
REF BTC 27-158-00-01 AFL 38
(xEXT) Extension incorporated in the next due Is) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CsW
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
67 Of 79
EFTA01190667
qmatioap
.tpi /non the groesorthip.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD.
Hours Section
Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) API TIME REMAINING
+ 27-164-00 OPERATIONAL CHECK THE FLAP UN COMMANDED MOTION PROTECTION SYSTEM BY
INITIATING A BITE CHECK OF THE FLAP SLAT ELECTRONICS UNIT.
27.550 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-164-00-01 AFL 38
+ 27-178-00 CHECK ALTERNATE FLAP DRIVE GEARBOX OIL LEVEL AND SERVICE AS REQUIRED
27.590 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-178-00-01 AFL 38
+ 27-188-00 OPERATIONAL CHECK SPEEDBRAKE REFUSED TAKEOFF (RTO) SYSTEM
27.615 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 27-188-00-01 AFL 38
+ 27-214-00 OPERATIONAL CHECK LEADING EDGE STANDBY ACTUATION SYSTEM
27.645 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-214.00-01 AFL 38
+ 27.225-01 GENERAL VISUAL INSPECTION LEFT WING LEADING EDGE FLAP AND SLAT ACTUATORS AND LEFT WING LEADING
EDGE FLAP AND SLAT ACTUATION MECHANISMS
27.680 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-225-01-01 AFL 38
+ 27-225-02 GENERAL VISUAL INSPECTION RIGHT WING LEADING EDGE FLAP AND SLAT ACTUATORS AND RIGHT WING
LEADING EDGE FLAP AND SLAT ACTUATION MECHANISMS
27.681 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 27-225-02-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
68 Of 79
EFTA01190668
Due List Hours Section
C OAviation/row
I P 00, frond up' 737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB)): 3753:19 HRS, 922 AFL as of 30-)un-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I POO ATH TIME REMAINING
29-100-00 OPERATIONAL CHECK OF THE A & B SYSTEM ENGNE PUMP (EDP) SHUTOFF VALVES
29.095 1408 08-OCT-1999 18-FEB-2019
HRSIWSC 6000 44 6044 2290:41
REF BTC 29-100-00-01 AFL 38
29-200-00 OPERATIONAL CHECK STANDBY HYDRAULIC ELECTRIC MOTOR DRIVEN PUMP TO INCLUDE OBSERVING LOW
PRESSURE LIGHT ILLUMINATION AND THEN GOING OUT.
Z.2 b MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 29-200-00-01 AFL 38
+ 29-240-00 OPERATIONAL CHECK ALTERNATE LEADING EDGE FLAPS AND SLATS SYSTEM
29.500 MOS 08-OCT-1999 18-FEB-2019
HRS/NISC 6000 44 6044 2290:41
REF BIC 29-240-00-01 AFL 38
• 29-250-00 OPERATIONAL CHECK POWER TRANSFER UNIT CONTROL SYSTEM TO INCLUDE A VISUAL CHECK OF THE CONTROL
VALVE FOR PROPER POSITION
29.510 MOS 08-OCT-1999 18-FEB-2019
HRSIWSC 6000 44 6044 2290:41
REF BTC 29-250.00-01 AFL 38
• 31-010-00 FUNCTIONAL CHECK AURAL WARNING MODULE (AWM) USING BITE CHECK
11.060 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 31-010.00-01 AFL 38
+ 31-020-00 FUNCTIONAL CHECK CABIN PRESSURE SWITCH
31.070 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 31-020-00-01 AFL 38
(xEXT)- Extension incorporated in the next due (s) - Suppressed Requirement 4.- FAA manual flag is set (EBT) - Estimated Base Time (EFF) Effective CM/
• - Estimated Due (applies to New Requirement)
@CAMP SYSTEMS
69 Of 79
EFTA01190669
qmp Ari•lionfrum the vv.:adult'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 31-03040 OPERATIONAL CHECK MACH/AIRSPEED SYSTEMS 1 AND 2 DISCRETE OUTPUTS FOR AURAL WARNING SYSTEM
31.080 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 31-030-00-01 AFL 38
+ 31-040-00 OPERATIONAL CHECK OF LANDING GEAR LOGIC MODULE OUTPUT TO THE AWM SYSTEMS 1 AND 2
31.090 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 31-040-00-01 AFL 38
+ 31450.00 FUNCTIONAL CHECK OF THE: TRAILING EDGE AND LEADING EDGE FLAP, THRUST LEVER, UPPER AND LOWER
STABILIZER TRIM LIMIT, GROUND SPOILER PRESSURE, SPEED BRAKE, PARK BRAKE AND GROUND SPOILER
BYPASS VALVE SWITCHES FOR THE AURAL WARNING MODULE (AWM).
31.100 MOS 08-OCT-1999 I8-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 31-050-00-01 AFL 38
« 31-120-00 FUNCTIONAL CHECK OF REQUIRED PARAMETERS (FDR, INTERFACING SYSTEMS)
31.110 MOS 08-OCT-1999 18-FEB-20I9
HRSIMSC 6000 44 6044 2290:41
REF BTC 31-720-00-02 AFL 38
31.130-00 FUNCTIONALLY CHECK OF REQUIRED PARAMETERS (FDR, DFDAU OUTPUT).
31.085 MOS 08-OCT-1999 18-FEB-20I9
HRSIMSC 6000 44 6044 2290:41
REF BTC 31-730-00-02 AFL 38
+ 34-070-00 DETAIL INSPECTION OF THE PITOT PROBES.
34.405 MOS 08-OCT-1999 18-FEB-20I9
HRS/MSC 6000 44 6044 2290:41
REF BTC 34-070-00-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
70 Of 79
EFTA01190670
OMP
Due List Hours Section
Avislioogrum the groom( up' 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 34480-00 DETAIL INSPECTION OF THE STATIC PORTS.
34.410 M0S 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 34-080-00-01 AFL 38
+ 34-09040 DETAILED INSPECTION FOR MOISTURE IN THE PITOT SYSTEMS
34.415 MOS 08-OCT-1999 18-FEB-2019
HRSiMSC 6000 44 6044 2290:41
REF BTC 34-090-00-01 AFL 38
34-14040 OPERATIONALLY CHECK THE INTEGRATED STANDBY FLIGHT DISPLAY DEDICATED BATTERY/CHARGER.
34.440 MOS 08-OCT-1999 18-FEB-2019
HRSiMSC 6000 44 6044 2290:41
REF BTC 34-140-00 AFL 38
+ 38-10040 REPLACE WASTE TANK WATER SEPARATOR
38.170 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 38-100-00-01 AFL 38
+ 72-07041 NO. 1 ENGINE - VISUAL CHECK ENGINE TRANSFER AND/OR ACCESSORY GEARBOX MOUNT FLANGES AND FAN
CASE AND FAN FRAME ATTACHMENT MOUNTS
72.090 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 (6044)6044 2290:41
REF BTC 72-070-01-01 ENC 15
+ 72-07041 NO. 2 ENGINE - VISUAL CHECK ENGINE TRANSFER AND/OR ACCESSORY GEARBOX MOUNT FLANGES AND FAN
CASE AND FAN FRAME ATTACHMENT MOUNTS
72.090 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 (6044)6044 2290:41
REF BTC 72-070-02-01 ENC 15
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
71 Of 79
EFTA01190671
C4MP i•lion /r gmandufr.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Hours Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH l AFH TIME REMAINING
+ 72-110-01 VISUAL CHECK OF THE LEFT ENGINE THRUST MOUNT FITTINGS.
72.300 14O8 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 72-110-01-01 AFL 38
+ 72-110-02 VISUAL CHECK OF THE RIGHT ENGINE THRUST MOUNT FITTINGS
72.310 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 72-110-02-01 AFL 38
+ 72.300-01 VISUAL CHECK OF THE LEFT ENGINE AFT MOUNTS CLEVIS FOR STRUCTURAL INTEGRITY FAILURE.
72.740 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 72-300-01-01 AFL 38
+ 72400-02 VISUAL CHECK OF THE RIGHT ENGINE AFT MOUNTS CLEVIS FOR STRUCTURAL INTEGRITY FAILURE.
72.750 14O5 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 72-300-02-01 AFL 38
+ 78-050-01 VISUALLY CHECK THE LEFT ENGINE THRUST REVERSER FAN DUCT WALLS.
78.060 14O5 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 78-050-01-01 AFL 38
+ 78-050-02 VISUALLY CHECK THE RIGHT ENGINE THRUST REVERSER FAN DUCT WALLS.
78.065 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-050-02-01 AFL 38
+ 78-060-01 DETAILED INSPECTION LEFT ENGINE THRUST REVERSER DRAG LINK SPHERICAL BEARINGS
78.070 14O5 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 78-060-01-01 AFL 38
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
72 Of 79
EFTA01190672
OMP
Due List Hours Section
AvisPow /rum the ground up' 737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: 0S-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 78-060-02 DETAILED INSPECTION RIGHT ENGINE THRUST REVERSER DRAG LINK SPHERICAL BEARINGS
78.075 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-060-02-01 AFL 38
+ 78-070-01 VISUALLY CHECK THE LEFT ENGINE BLOCKER DOORS
78.100 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 78-070-01-01 AFL 38
+ 78-070-02 VISUALLY CHECK THE RIGHT ENGINE BLOCKER DOORS
78.110 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-070-02-01 AFL 38
+ 78-080-01 VISUAL CHECK LEFT ENGINE BULLNOSE SEAL AND RETAINER
78.120 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-080-01-01 AFL 38
+ 78-080-02 VISUAL CHECK RIGHT ENGINE BULLNOSE SEAL AND RETAINER
78.130 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 78-080-02-01 AFL 38
+ 78-100-01 DETAILED INSPECTION OF THE LEFT ENGINE T/R FIRE SEAL
78.160 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-100-01-01 AFL 38
+ 78-100-02 DETAILED INSPECTION OF THE RIGHT ENGINE TIR FIRE SEAL
78.170 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-100-02-01 AFL 38
(xEXT) - Extension Incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
73 Of 79
EFTA01190673
OM P
Due List Hours Section
Aviclioi• /rpm tAt groom( up 737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 78-130-01 OPERATIONAL CHECK OF THE LEFT ENGINE "REVERSER" LIGHT INDICATION SYSTEM
78.220 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 6044 2290:41
REF BTC 78-130-01-01 AFL 38
+ 78-130-02 OPERATIONAL CHECK OF THE RIGHT ENGINE "REVERSER" LIGHT INDICATION SYSTEM
78.230 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 6044 2290:41
REF BTC 78-130-02-01 AFL 38
+ 79-010-01 NO. 1 ENGINE - REMOVE AND REPLACE OIL SUPPLY FILTER ELEMENT
79.010 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 (6044)6044 2290:41
REF BTC 79-010-01-01 ENC 15
+ 79-010-01 NO. 2 ENGINE - REMOVE AND REPLACE OIL SUPPLY FILTER ELEMENT
79.010 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 (6044)6044 2290:41
REF BTC 79-010-02-01 ENC 15
+ 79-040-01 NO. 1 ENGINE - REMOVE AND REPLACE SCAVANGE FILTER ELEMENT
79.040 MOS 08-OCT-1999 18-FEB-2019
HRS/MSC 6000 44 (6044)6044 2290:41
REF BTC 79-040-01-01 ENC 15
+ 79440-01 NO. 2 ENGINE • REMOVE AND REPLACE SCAVANGE FILTER ELEMENT
79.040 MOS 08-OCT-1999 18-FEB-2019
HRSIMSC 6000 44 (6044)6044 2290:41
REF BTC 79-040-02-01 ENC 15
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
74 Of 79
EFTA01190674
C4MP i•lion /r gmnndup
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
AFL Section
Operator: PICTON II LTD. Report Date: 0SAUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
72-025-01 LUBRICATE LEFT ENGINE FAN BLADES DOVETAIL
MOS 20-OCT-2017
HRSMSC
REF SIC 72-025-01-01 AFL 1500 1500 M 578
72-025-02 LUBRICATE RIGHT ENGINE FAN BLADES DOVETAIL
MOS 20-OCT-2017
HRS:MSC
REF BIC 72-025-02-01 AFL 1500 1500 NI 578
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
75 Of 79
EFTA01190675
qmp AL,iariost frum thvgrAmmd up'
Due List
737-72UB1 REVISION 21 S/N 29273 (YG006) (VP-BEU): 3753:19 liRS, 922 AFL as of 30-3un-2014
ENC Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
• 74-010-01 NO. 1 ENGINE - DETAILED INSPECTION MAIN IGNITER PLUG
74.010 MOS 08-OCT-1999 22-AUG-2018
HRSMSC 44
REF BTC 74-010-01-01 ENC 1600 IS (1615)1651 729
• 74-010-01 NO. 2 ENGINE - DETAILED INSPECTION MAIN IGNITER PLUG
74.010 MOS 08-OCT-1999 22-AUG-2018
HRSMSC 44
REF BTC 74-010-02-01 ENC 1600 IS (1615) 1651 729
SB 72-0326 NO. 1 ENGINE ON-WING BORESCOPE INSPECTION OF HPT BLADES, SERVICE BULLETIN
MOS 22-AUG-2008 14-MAY-2019
HRSMSC 3260:48
REF BULLETINS ENC 1000 746 (1746) 1782 860
SB 72-0326 NO. 2 ENGINE - ON-WING BORESCOPE INSPECTION OF HPT BLADES, SERVICE BULLETIN
MOS 22-AUG-2008 14-MAY-2019
HRSMSC 3260:48
REF BULLETINS ENC 1000 746 (1746) 1782 860
xE X7) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
@ CAMP SYSTEMS
76 Of 79
EFTA01190676
OMP
Due List APU Hours Section
Ari•lionfrum tfir gmnndup 737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 49-190-00 APU - VISUAL INSPECTION LUBE MODULE FOR LEAKAGE, GENERAL CONDITION, AND SECURITY OF INSTALLATION
49.100 P/N: PN 1.105 28-SEP-2009 13-JUL-2015
SIN: SN-UNKNOWN HRS:MSC 1000 2905:08 3905:08 449:50
REF BTC 49-190-00-01 APUS 2397
+ 49-200-00 APU - DETAILED INSPECTION OIL FILTER DELTA P INDICATOR
49.105 MOS 28-SEP-2009 13-JUL-20I5
HRS:MSC 1000 2905:08 3905:08 449:50
REF BTC 49-200-00-01 APUS 2397
49.102-00 APU - DISCARD FUEL CONTROL INLET FILTER
49.055 PIN: PN MOS 08-OCT-1999 23-SEP-20I5
SIN: SN-UNKNOWN HRSIMSC 4000 TSI:77 77 4000 544:42
REF BTC 49-102-00-01 APUS TSI:98 98
+ 49-110-00 APU - GENERAL VISUAL INSPECTION FUEL CONTROL OF THE FCU SEALS,FUEL LINES AND INTERFACING
CONNECTIONS FOR LEAKAGE, GENERAL CONDITION, AND SECURITY OF INSTALLATION.
49.060 PIN: PN MOS 22-AUG-2008 06-JUL-2016
SIN: SN-UNKNOWN HRSIMSC 1600 2778 4378 922:42
REF BTC 49-110-00-01 APUS 2287
+ 49.212-00 APU - VISUAL INSPECT EDUCATOR (ON THE APU) FOR GENERAL CONDITION
49.120 MOS 08-OCT-1999 22-OCT-20I7
HRS/MSC 5000 TSI:77 77 5000 1544:42
REF BTC 49-212-00-01 APUS TSI:98 98
+ 49-132-00 APU - DETAILED INSPECTION IGNITER PLUG
49.070 PIN: 305766-1 MOS 25-JUN-2010 23-OCT-20I7
SIN: N/SN HRS/MSC 2000 3001 5001 1545:42
REF BTC 49-132-00-01 APUS 2487
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
77 Of 79
EFTA01190677
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 IIRS, 922 AFL as of 30-3un-2014
Special Requirements Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
C 28-AWL-19 FUNCTIONALLY CHECK THE CENTER TANK FUEL BOOST PUMP AUTOMATIC SHUTOFF SYSTEM PER AMM 28.22-00 ALI
28.205 MOS 12 30-OCT-2013 30-OCT-2014 86 30-OCT-2014
HRSMSC 3728:53
REF BTC 28-AWL AFL 911
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) C - Task also due In calendar due list
CAMP SYSTEMS
78 Of 79
EFTA01190678
qmpAL,iariost frum thvgriramd up'
Due List
737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-3un-2014
APH Section
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) ArH TIME REMAINING
49-090-00 GENERAL VISUAL INSPECTION OF THE APU DRAIN MAST FOR FLUIDS LEAKAGE
MOS 22-AUG-2008 06-JUL-2016
HRSMSC
REF BTC 49-090-00-01 AFL
APH 1600 2778 4378 922:42
49-140-00 OPERATIONAL CHECK OF THE FOLLOWING BY INTERROGATING THE CDU'S APU MAINTENANCE PAGES. APU DATA
MEMORY MODULE(DMM)-ELECTRONICS CONTROL UNIT(ECU)-SPEED SENSOR-EGT RAKE
MOS 22-AUG-2008 06-JUL-2016
HRSMSC
REF BTC 49-140-00-01 AFL
APH 1600 2778 4378 922:42
49-180-00 OPERATIONAL CHECK APU MUFFLER ASSEMBLY OF THE DRAIN FITTING ON THE EXHAUST DUCT MUFFLER
MOS 08-OCT-1999 22-OCT-2017
HRSMSC
REF BTC 49-180-00-01 AFL
APH 5000 77 5000 M 1544:42
(xEXT) - Extension incorporated in the next due Is) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
79 Of 79
EFTA01190679