STA MBA U G A V I A T I ON
Work scope Agreement
Stambaugh Aviation and JEGE
1.0 Introduction
1.1 The purpose of the following proposal is to provide pricing for the exterior repainting of
A Boeing 727-100.
2.0 Maintenance
2.1 Commercial Quality sand and paint $110,000.00
Solid colors similar to existing paint livery
Includes repainting of the wings, fuselage,
Vertical and horizontal stabilizer, all required placards
Flight control balancing will be as required.
2.0 Materials
3.1 All paint (Jet Glo Express) materials and hazardous waste disposal charges are included.
4.0 Scheduling
4.1 The scheduling for the proposed work scope is 12 calendar days. And will be completed
during the C check. SAI will put forth a maximum effort to ensure a timely delivery.
5.0 Payment Terms
5.1 The payment schedule will be in accordance with the following:
50% of costs at induction
Balance of labor and materials at delivery
JEGE Stambaugh Aviation
TITLE TITLE
DATE DATE
1000 Jetport Rd. Brunswick, Ga. 31525 912-265-7244 FAA Repair Station Certificate EB I RIO7K
EFTA01204212