EFTA01222235
Date Feb. 7, 2011
NO. CH* 1049
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill, Fredencksted. St. Croix 00840 Cyril E. King Airport, St. Thomas 00802
Tel (340) 773-1082 Fax: (340) 778-4620 Tel: (340) 774.3320 Fax: (340) 714-9532
PERMISSION IS HEREBY GRANTED TO: * LLC
TO (Construct, Repair, etc.): Construct Pool w/ Cabana. Deck & Eouioment Room
Description of structure: As Per Approved Plans
Location: Pending. Little St. James Island
Approximate cost of work: S383.300.00
Person(s) in charge of work:
REMARKS: As Per IRC 2009 and VI Code Title. 29, Ch.. 5 Code Compliance
FEE: 50.00
tssio.aer fPtanning and Natural Resources
e?2,5-i / 7)- • - /O4_
/O - -
EFTA01222236
erc_.,dc.
375-08 Date
No. BUILDING PERMIT may 16. 20fIR
GOVERNMENT OF THE VIRGIN ISLANDS
0 _____
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
' DIVISION OF PERMITS
CYRIL E. KING TERMINAL BUILDING. 2nd FLOOR
FAX. (340) 714-9532 CHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 TEL: (340) 774-3320
PERMISSION IS HEREBY GRANTED TO L.S.J., LLC
TO (ccnnium.repmr.emi Installation of Mechanical Equipment
Description of structure: Reinf. Conc.
Location: #Little St. James
Approximate cost of work: $ 1,200,000
Person(s) in charge of work: Lafayette Contractors
REMARKS:
Building Code ett,
11,704.42 entura, Territorial Director
FEE: S
Commissioner of Planning and Natural Resources
ezfri prz.enir ' Gzr- 63 - ME-
N- 2 -07
EFTA01222237
No.
11 3-08 BUILDING PERMIT Date Dec. 20, 2007
GOVERNMENT OF THE VIRGIN
ISLANDS
- 0-
DEPARTMENT OF PLANNING AND
NATURAL RESOURCES
DIVISION OF PER MITS
CYRIL E. KING TERMINAL BUIL DING
FAX: (340) 714-9532 . 2nd FLOOR
CHARLOTTE AMALIE. ST. THOMAS
. V.I. 00802 TEL: (340) 774.3320
PERMISSION IS HEREBY GRANTED
TO LSJ, LLC
TO(cwutructrepair.em) Construct Mechanical Building
Description of structure:
Reinf. Conc.
Location: #Little St. James
Approximate cost of work: S $2,000,000
Person(s) in charge of work: Lafayette Contractors, LLC
REMARKS: Construction shall be done in
accordance with Ti Section 292 of the V.I.
Building Code
FEE: S 20.00 -O4\_—
Maureen Bur —Ven ura, Territ
i ll Commissioner of Planning and Natu
orial Director
ral Resources
ern pear - 7'4 zr- 53-04
//- 7 -07
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
Coastal Zone Management Program
8100 Lindberg Bay. Ste. #61
Cyril F., King Airport. Terminal Building Second Floor
St. Thomas, Virgin Islands 00802
Tel.: (340) 774.3320 Fax: (340) 714-9524
CERTIFICATE OF OCCUPANCY
CZM PERMIT NO. CZT-61-06 (U
Pursuant to Title 12, Chapter 21, Section 910-13, of the Virgin Islands Rules and Regulations, a
"Certificate of Occupancy" is hereby approved for:
Name: LSJ. LLC.
Structure: Office building & covered pool natio
Located at: Parcel No. C. Estate Little St. James
Red Hook Quarter, Island of: St. Thomas, US Virgin Islands.
/9/ ,-34 /7
Alicia Barnes ate
Commissioner
FORM CZM-22 (Revised May 2001)
EFTA01222238
No. 084-07 BUILDING PERMIT Date Nov. 17, 2006
GOVERNMENT OF THE VIRGIN ISLANDS
— o—
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
CYRIL E. KING TERMINAL BUILDING, 2nd FLOOR
FAX: (340) 714.9532 CHARLOTTE AMALIE, ST. THOMAS, V.I. 00802 TEL: (340) 774-3320
PERMISSION IS HEREBY GRANTED TO LSJ,LLC
TO gkostrud. repat Construct Office
Description of structure: 8" CMU
Location: /Little St. James
Approximate cost of work: $ '900,000
Person(s) in charge of work: RRCI Constructors,LLC
REMARKS: Construction shall be done in accordance with Titl Section 292 of the V.I.
Building Code
/
FEE: $ 6,453.31 eat74: k : SC ii___
4 CottenIse oner of Natural Resources
EFTA01222239
•
MINOR COASTAL ZONE MANAGEMENT PERMIT NO. CZT-61-06L
L AUTHORITY This permit is issued by the Commissioner of the Department of
Planning and Natural Resources, and is administered and monitored by the Department
pursuant to Title 12, Chapter 21, Virgin Islands Code. As herein, "Permitter" is the
GOVERNMENT 01? THE VIRGIN ISLANDS and the "Permittee" is LSS, LLC.
H. SCOPE This permit allows the site preparation and construction of a 2,500 square
feet of office space, patio and pool to an existing residence located at Parcel C Little St.
James, St. Thomas, Virgin Islands.
DI TERM This permit is effective upon its signing by the Commissioner of the
Department of Planning and Natural Resources, pursuant to Virgin Islands Code, Title
12, Chapter 21. Authorization for construction under this permit will expire if the
Permittee fails to commence work within twelve (12) months from the date this permit
becomes effective.
IV. DOCUMENTS INCORPORATED BY REFERENCE
EXHIBIT A: CZM permit application dated July 10, 2006
EXHIBIT B: Required document submittal (deed, tax letter and maps)
EXHIBIT C: Site plan and drawings
V. GENERAL CONDITIONS
A. Liability The Permittee agrees to assume full and complete responsibility for all
liability to any person or persons, including employees, as a result ofits control of
• the area described in Paragraph 2 of this permit, and all improvements thereon
(which area and improvements are herein after referred to as "the premises") and
to hold the Permittor five and harmless from civil or other liability of any kind
during the time the Permittee is in control ofthe premises pursuant to this permit.
13. Personal Prope y and Damage All personal property of any kind or description
whatsoever located on the premises will be there at the Permittee's sole risk.
C. Assignments or Transfer This permit may not be transferred or assigned except
as provided in Section 910-15 of the Regulations of the Coastal Zone
Management Act.
D. Permit to be Displayed A placard evidencing the permit shall be posted in a
conspicuous place at the project site during the entire period of work.
EFTA01222240
E. Reliance oninfonnation and Data The Permittee affirms that the
information,
and data which he/she provided in connection with his/her permit
true and accurate, and acknowledges that if subsequent to the effect application is*
permit such information and data proves to.be false or inaccurate, ive date of this
the permit nay
be modified, suspended or revoked in whole or in part, and that the
Commissioner
may, in addition, institute appropriate legal action.
F. Development to be Commenced Any and all development approved by this
Coastal Zone Management Permit shall be commenced within
twelve (12) months
from the date this permit becomes effective. Failure to perfor
m substantial work
within such period and thereafter until completion of construction
will cause the
permit to lapse and render it null and void unless the Comm
ittee grants an
extension.
G. Notification of Completion Upon completion of any activity
authorized or
required by this Coastal Zone Management Permit, the Permi
ttee shall promptly
so notify the Director of the Division of CZM ("The Director")
and where the
service of a professional engineer were required in undertaking
the activity, a
certification of compliance provided by the project engineer
that the plans and
specifications of the project and all applicable Virgin Islands Code
requirements
have been met, shall be filed with the Director.
H. Inspection The Commissioner or his authorized agents or repres
entatives shall
have the power to enter at reasonable time during projects worki
ng hours upon
any lands or waters for which a Coastal Zone Permit has
been issued. The
Permittee shall permit such entry for the purpose of inspection and
ascertaining
compliance with the terms and conditions of said Coastal
Zone Management
Permit.: The Permittee shall provide access to such records as
the Commissioner
in the performance of his duties under the Act may requir
e the Pennittee to
maintain. Such records may be examined and copies shall be
submitted to the
Commissioner upon request.
I. Conditions of Premises The development authorized by this permit shall be
maintained in a safe, attractive and satisfactory condition
and in accordance with
the description, plans or drawings approved by the Commission
er.
J. Restoration of Area The Permittee, upon revocation or expira
tion of the permit,
shall upon order of the Commissioner, and his sole discre
tion, remove all
structures authorized by the permit and restore the area to its
original condition,
and/or modify such structures, and/or comply with
any directive of the
Commissioner in satisfying the original permit condition in
such time and manner
as the Commissioner may direct.
2
EFTA01222241
.
11
K. Notices All notices sent or required to be sent hereunder must be
certified mail,
return receipt requested. If addressed to the Permittor, same
shall be sent to the
Commissioner of the Department of Planning and Natur
al
Government of the Virgin• Islands, Cyril E. King Airport, Termi Resources,
nal Building-
Second Floor, St. Thomas, Virgin Islands 00802, or to such place
as the Permittor
may herein after designate by certified mail. If addressed to the•Pe
nnittee, same
shall be sent to LSJ, LLC, 6100 Red Hook Quarter, Suite B,
St. Thomas, Virgin
Islands 00802, or to such place as the Permittee may herein
after designate by
certified mail, return receipt requested.
L. Nonwaiver One or more waivers by the Permittor of any
covenant or condition
of this permit shall not be construed as a waiver or breach
of the covenant or
condition, and the consent or approval of the Permittor to or
of any acts by the
Permittee requiring the Permittor's consent or approval shall not
be construed as
approval of any subsequent similar act by the Permittee.
M. Revocation It is specifically understood that all foregoing
covenants and
agreements, as well as other terms and special conditions hereb
y agreed to by
Permittee, are to be well and faithfully kept by Permittee and that
any failure by
Permittee to keep same will result in revocation of this permit.
N. Other Approval If the development covered under this permit requir
es separate
and distinct approval from the United States Government or
the Government of
the Virgin Islands or any agencies, departments, commissions
or bureaus thereof,
then no development or occupancy is allowed under this permi
t until such permits
or approvals have been obtained.
O. Abandonment If the Permitter abandons, deserts or vacates the premises or
discontinues its operations at the premises for a period totaling
six (6) consecutive
months, then the permit will terminate automatically and be
rendered null and
void.
P. Damage and Repair of Premises Described in Paragraph 2 In the
event of
damage to or destruction of the premises described in Paragraph
2 hereof, repair
work may be done only after a request to do so has been submi
tted in writing to
the Department and permission in writing has been grante
d. Repair must
duplicate the original work, and must be in accordance with applic
able law, rules
and regulations.
Q. Signatures on the Permit Document The applicant shall sign
and return the
permit document to the Department within 60 days of receipt
thereof. Failure to
return the signed permit within the time period specified herein
will be considered
a rejection of the terms and conditions of the permit and will
render the offer of
the permit null and void, unless a written extension is reque
sted and granted.
EFTA01222242
VI. SPECIAL CONDITIONS
A. The Division of Coastal Zone Management shall be notified at least two (2)
working days before work commences.
B. This permit is valid only for work as stated in Paragraph 2, Scope.
C. The Coastal Zone Management permit placard shall be placed in a conspicuous
location on site as soon as work commences.
D. All other necessary permits, including construction permits from the Division of
Building Permits, shall be obtained prior to the commencement of work.
E. "Upon discovery of any archaeological or historical site, or human burial site or
remains upon private lands, the owner or his representative shall immediately
notify the Virgin Islands State Historic Preservation Office verbally and in
writing."
F. Silt fencing shall be installed with steel posts and wire fence support as described
in the 2002 Environmental Protection Handbook.
G. Site disturbance shall be limited to areas designated on the approved drawings.
H. Excavation shall be limited to the footprint of the structure to be constructed.
1. A protective berm shall be installed around all excavated areas to prevent silt run
off
4
EFTA01222243
C)
On this 9" `day of k\)fras a,,1/4 , 2006 the Department of Plann
ing and Natural Resources
hereby issues Minor CZM Permit No. CZT-61-06L.
can C. Plaskett, Esq.
Commissioner
I, the unders d, have read and understood all terms and conditions established in
CZT-6 Permit No.
hereby agree to be bound by the terms and conditions contained therei
4S n.
WI!
at
5
EFTA01222244
No.
084-07
Date
BUILDING PERMIT
July 13, 2007
GOVERNMENT OF TH
E VIRGIN ISLANDS
DEPARTMENT OF PL 0
ANNING AND NATURA
L RESOURCES
DIVISION OF PERMITS
CYRIL E. KING TERMINAL
FAX: (340) 714-3632 BUILDING. 2nd FLOOR
CHARLOTTE AMALIE.
ST. THOMAS. V.I. 008
02 TEL (340) 774-332
0
PERMISSION IS HEREBY
GRANTED TO
L.S.J., LLC
TO (construct. repair. etc.)
Revision to elk #084-07
Description of structure:
Location:
Little St. James
Approximate cost of wort
S
S514.000
Person(s) in charge of wort
Pneleci rlecL
REMARKS: Construction shall be don
e in accordance with Tit1
,29, Section 292 of the V.I
Building Code .
FEE: S igaZin 474.00 teen Bur - entura, Territorial
Director
Commissioner of Plannin
g and Natural Res
ources
EFTA01222245
(TOVKRNMINI ()I; I IF. UNITRI) STA'I'NS
VIRGIN ISI.ANDS
DEPARTMENT OF PLANNING
AND NATURAL RESOURCES
Coastal Zone Management
Program
45 Mas I lilt. Frederiksied
NI. Croix. I &N. Virgin Islands nON411-141.1 cycil P.. k int.. nl. lerminal Ind? 2nd 1.1~r
l'34M 77.1. 1082 Stillman'''. Virgin Islaals 0051P
I:as:13411177 I• (141 Id:1MM 774-3320
Fax 13411 7144524
REQUEST VOR AMMO
MINOR ~TAIL ZONE PERME NT/ MOINEICATIQN
MITS No. eir - 53 - O41L
This nines! is pontoon M 'homer
Å I. 'lb le I2 of the Virgin
Islands <'isle and the 'mdal
fame Managemem Rules aml
Regulations.
I. Name. Mailing address and telep
hone number of applicant S 7.)
1.1-e- 7 RØ. IS« 175, Sr 711010.f.
V! 4_0 0 041.; 39 o - 7 /I- 10S-S
2. WOW, lille. mailing address and
telephone number of Hie own
er of Me properly. L.S. 7,a Ltt
litmtlik i. VI ooSoll • Seto 774-gosY Y Pi. aft 873"
UlTa Jr. Timar
3. Location of activity. l'Iol No.
ISLAUD disdale 317) ticyit
Island U. likwar
4. Summary or proposed activ
ity. Include all incidental impn
weinems such as oldigles, roads,
sheets if necessary). de. (I Ise additional
SEE. ~4,,gframi 4H4T A
This modilication if approved is
sidijd;t in the conditions of Pcrm
tpersetled by the modihealion. ii No. ( I• 77 Ss -04'L Mai an« rllll
u -e.
g/1-51O 7
Ihmr
hiSi)/ g/2-1A 7
?riv Ownei I /ale
The ('ommissioner reviewed
die requesled aniencli»enl / modifica
significandy modify. die sy;('pe. nature tion:Ind determined dial il will /
or elianiclerislies of the prop will mu
osed developmenl.
e l e
Inspector
I
Appliraiion Approved
1Y"
( /4
Applicalion l)isappnwed ( Mer
SEE finxteuia, fhp,r6e. or ArrogAlfix
EFTA01222246
I:maim:dim] Sheet A In Applicalio
n Ihr Mcalilicaticaa
ell 53-041
Page I ol'2
CONTIMInTioN SHEET A
I. Documents Comprising
Application
Ibllowing documents comprise
this Application:
1. Cover Letter Dated Septem
ber 25, 2007
2. Power of Attorney
3. This Continuation Sheet A
4. WM Drawing Package (bou
nd: Muguire Gro up) consisting of:
Drawing. No. Title
a. CZM C I00
Existing Conditions and Location
b. CZM C101 Map
Overall Site Plan
e. CZM O102
Site Plan mid ESCP
d. WM C201
Grading and Utility Plan
e. WM ('501
On Site Sewage Disposal System
& Site
Details
CZM Al00
Basement Plan
g. CZM A101
First Floor Plan
h. CZM A20 I
Building Elevations
i. CZM SI 00
Foundation Plan
j. WM SIGI Basement Wall Plan
lc. CM 8102 First Floor Framing Plan
I. WM 5103 First Floor Wall Plan
CZM SI 04 Root. Framing Plan
5. Exhibit 1: Drawing 8-1 1.00
: 1994 Drawing of Wm. Karr sho
building foot print as compared wing original
to the limn print or the building cove
Application (shown in red). red by this
6. Exhibit 2: "Little SI. James Islan
d Mechanical Building Addendum-
environmental issues with re fere evaluating
nce to "Base Line Environmental
described below. Stud y" as
II. Proposed Modifications:
The proposed modification to the
existing permit consists of the follo
the following use within a compound wing changes to
under Minor Permit No. ('ZT 53-04L:
or
buildings which had previously
been authorized
I. The original permit mentione
d above, among other things.
construction ol'an RD-Generator authorized the
Building of the size and dimensions
shown in black on Exhibit I with the which arc
ctincnt building superimposed
over it in red.
EFTA01222247
CMinflation Shed A to Application ('or Modification
WI' 53-041.
Page 2 of 2
2. Construction was started on the buildings which comp
rised the projects approved
by Minor Permit No. CZT 53-041.. including
excavation Ibr the 12O-Generator
building at issue here.
3. That work has been halted in order to revise
the plan for that building to reduce its
size and improve its efficiency as the mechanical
room structure for the uses on
the island.
4. Accordingly. the lbotprint of the building
covered by this application is smaller
and has been relocated in a way which is more favora
ble to the environment in
that is it rull covered, calls ror less excavation that
the previous building. and is
less visible. and much more fimetional than the
original approved building.
5. While the overall amount of construction has
been reduced. the fundamental
design and composition of the stnicturc is simila
r to that which was previously
submitted and approved. i.e. concrete and block
.
Illimpact to the Environment
I. The Applicant is filing an environmental
assessment report with this Application
entitled "Little St. James Island Environmental Base
Line Study" which evaluates
existing conditions for the entire island or Little
St James.
2. This filing or this document is consistent with
the understanding reached with
CZM stall' this June that the applicant submit such
a study so that these
applications for a minor permit as a tool for viewin
g such an application in the
context of the overall environment of the island.
3. The Base Line Study discusses the current
conditions of the area covered by (his
application as well as the balance of the island.
4. Also enclosed is Addendum #1 to the Base Line
Study entitled "little St. James
Island Mechanical Building Addendum" which
gives a summary of how the
changed location and size at' this building will or
will not impact existing
conditions as described in the Base Line Study.
5. In summary, the Addendum shows that within
the area or the proposed
construction and on the island as a whole, conditions
will be improved in that the
new building will he built in an area where there is
currently virtually no
vegetation which will be covered with earth, planted
with vegetation and
irrigated, all of which will improve the owner's ability
to protect the soils and
vegetation on the island there and elsewhere.
6. This Application, ilgranted. will. Ihen:thre, have
a substantial, positive impact on
the existing environment.
EFTA01222248
GRANT OF AUTHORIZATION
The Undersigned, Jeffrey E. Epstein, bein
g the sole member of L.S.J., LI.C,
limited liability company organized und
er the laws of the State of Delaware (the
"Company") which is the owner of
record title to the real property loca
States Virgin Islands and known as Littl ted in the United
e St. James Island (the "Real Property)
authorizes each of A. James Casner III, hereby
Esq., Stryker Duensing Casner & Do
Box 6785, St. Thomas, USVI, 00804, llison,.
and W. John Amerling, 6501 Rai Hoo
Suite 201, St. Thomas VI, 00802, each k Plaza,
acting individually, for, on behalf of,
name of the Company, to execute all such and in the
applications, affidavits, permits, and othe
documents, and to pay such costs, fees r
and expenses, and to take all such othe
may be necessary, appropriate, and/or r action, as
desirable in connection with any and all
Company's applications to the Departm of the
ent ofPlanning and Natural Resources
United States Virgin Islands and any othe of the
r agency of the Territory which has
over the land use and development of jurisdiction
property in the Territory for any and all
development and building permits,
including, but not limited to CZM perm
change permits, driveway and dock perm its, earth
its, as well as with any and all applicat
and/or requests of the Company made ions
to the United States Corps of Enginee
United States Enviromnental Protectio rs and the
n Agency, with respect to the Real
Property.
This Grant of Authorization superced
es all prior Grants of Authorization and
unless sooner revoked in writing, will rem ,
ain in full force ect until Mardi I,
Jeffrey E. Epstein
Sole Member of L.S.J., LLC
Witnesses
EFTA01222249
Supplemental Filing of L.S.J., LLC: October 16.2007
As requested, the following is a brief summary of the propos
ed changes covered by the
Application for modification to Permit CZT-53-04L dated
September 25, 2007:
• The mechanical building shown on A.3.00 of the origin
al drawings of Mr. Karr dated
September 10, 2004 is being changed to substitute the
building shown on A 100 and A101
of the current application
• Drawings A100 and A 101 change the structure shown
on A.3.00 as follows:
o The building foot print has been reduced from 16,500
square feet to 11,748 square
feet
o The cistern and R0 tank shown on A.3.00 have been
consolidated into one larger
cistern which has now been placed in the basement of
the new building
o The tank storage area shown on A.3.00 has been placed
in a deeper and safer area
below ground in the basement of the new building
o A locker room has been added to the balance of the
basement in the new building
o The ro, electrical, storage and other rooms shown on
A.3.00 have been rearranged
on the floor above the cistern and fuel tank areas to provid
e for more efficient use
of space as shown in A101 of the current filing
• As is shown in Exhibit I to the current filing, the new buildi
ng requires less excavation
because it is not set back as far into the hill as the previo
us building
• The new building, like the old, will have a sod roof
over the roof slab which will be
vegetated; accordingly the new building in elevation will be
very similar to that shown
in the Karr drawings
1
EFTA01222250
NO. 018-12 Date 10/14/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill, Frederlcksted, St. Croix 00840 Cyril E. King Airport, St. Thomas 00802
Tel: (340) 773.1082 Fax: (340) 778-4620 Tel: (340) 774.3320 Fax: (340) 714.9632
PERMISSION IS HEREBY GRANTED TO:
TO (Construct, renair, etc): Construct New Sheds
Description of structure: As per ApprovedPlans
Location: Parcel No. C Little St Jones
Approximate cost of work: $48,921.00
Person(s) in charge of work: TBD
REMARKS: As per 11W 2009 and VI Code Title 29 Ch.5 Code Compliance. **As per Amendment to Act
7075, permitfor the installation ofsolar thermal system is not required.
785.63
FEE: $
Com Blanco( Planning and Natural Rosoureas
EFTA01222251
No. Date 08/26/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill, Frederlcksted, St. Croix 00840 Cyril E. King Airport, St. Thomas 00802
Tel: (340) 773-1082 Fax: (340) 778-4620 Tel: (340) 774-3320 Fax: (340) 714-9532
PERMISSION IS HEREBY GRANTED TO: LSA LW
TO (Construct, repair, etc): Addition-Cabanna
Description of structure • As Per Approved Plans
Location: Plot "C" Little St James
Approximate cost of work: 123,0" 4°
Person(s) in charge of work: TBD
Code Compliance: ** As per amendment
REMARKS: As per *IRC 2009 and VI Code Tide 29, Ch. S
to Ad 7075, permitfor the installation ofsolar thermal system is not required
34840
FEE: $
ommlast and Natural Resourcin
EFTA01222252
No. 230-09 BUILDING PERMIT' Date june I, 2009
GOVERNMENT OF THE VIRGIN ISLANDS
— o—
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
CYRIL E. KING TERMINAL BUILDING. 2nd FLOOR
FAX (340) 714.9532 CHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 TEL. (340) 774-3320
PERMISSION IS HEREBY GRANTED TO Jeffrey Epstein
TO (Conseuct. repair, etc.) Renovation A Addition
Description of structure: 8" Blka te/ Stone Finish
Location: /Little St. James
Approximate cost of work: $ A1911233.99
Person(s) In charge of work: Undecided • •
REMARKS: Construction shall be done in accordance with. Titre 292 of the V 7
Building Code
FEE: 423.00 rreen 13u _WSJ, ritorial Director
Commissioner of Planning and Natural Resources
EFTA01222253
EFTA01222254
No. BP-SIT-0265-10 Date 6/23/2010
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill, Frederickstecl, St. Croix 00840 Cyril E. King Airport, St. Thomas 00802
Tel: (340) 773.1082 Fax: (340) 778.4620 Tel: (340) 774-3320 Fax: (340) 714-9532
PERMISSION IS HEREBY GRANTED TO: * LSJ. LLC
TO (Construct, Repair, etc.): Kitchen Renovation and Laundry Addition
Description of structure: As Per Approved Plans
Location: Little St. James Island
Approximate cost of work: $187,000.00
Person(s) in charge of work: TBD
REMARKS: As Per IRC 2009 & VI Code Title 29 Comoliance
FEE: $0.00
ai:17
TernlorialYre or for Comm ner of Planning and ural Resources
EFTA01222255
Buildin8 Permit
EARTH CHANGE PERMIT Na
LOCATION: Pending, Little St. James Island
BUILDING PERMIT NO. BP-STT-0265-10
DATE ISSUED: 6/23/2010
FT FCTRICAL PERMIT Na
DATE ISSUED:
PLUMBING PERMIT NO.:
DATE ISSUED:
No. 011-12 Date 10/13/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
46 Mars Hill, Fredericksted, St. Croix 00840 Cyril E. King Airport, St. Thomas 00802
Tel: (340) 773.1082 Fax: (340) 7784620 Tel: (340) 774-3320 Fax: (340) 714.9632
PERMISSION IS HEREBY GRANTED TO: I-SJ, LW.
TO (Construct, repair, etc): Addition-Music Room
Description of structure As Per Plans Submitted
Location: Little St James
71,680.00
Approximate cost of work:
Person(s) in charge of work: TBD
REMARKS: As per IRC 2009 and VI Code Title 29, Ch. 5 Code Compliance: **As per Amendment to
Act 7075, permitfor the installation ofsolar thermal system is not required.
246. 75
FEE: $
Corn Mono Planning and Natural Resources
EFTA01222256
GOVERNMENT OF THE. UNITED STATES VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
8100 Lindberg Bay STE. 861
CYRIL E. KING AIRPORT TERMINAL 13GILDING -2ND FLOOR
ST. THOMAS, VIRGIN ISLANDS 00802
TEL.: (340) 774-3320 FAX - (340) 714-9549
PERMIT TO OPERATE
Manager
L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. I. 00802
Dear Mr. Gordon:
Enclosed you will find Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10
for the operation of the following equipment respectively:
1. one (1) Ideal Manufacturing Fast-Way concrete hatching
plant, model # BPL-4, serial # 8-0707467-4 and one (1) hopper,
2. one (1) conveyor,
3. one (1) silo scale, model # 210, serial # E08307-0131,
4. one (1) Ideal Manufacturing Fast-Way silo, model # 54 7000,
serial # 0207279-4,
5. one (1) 18-bag Filter system (baghouse),
6. one (1) Kohler gasoline fired engine, model # CH15T, serial # 3626912831,
7. one (1) Lombardini diesel fired engine, model # 9LD 625-2, serial # 5485286,
8. one (1) Lombardini diesel fired engine, model # 9LD 625-2, serial # 401154.
These pieces of equipment are located at Little St. James Island.
This Permit to Operate is valid for a period of three (3) years.
Be advised that, in accordance with 12 V.I. R. & REGS. § 206-28(a) (1995), the Commissioner
may modify, suspend or revoke an authority to construct or permit to operate on any of the
following grounds:
(I) Materially false or inaccurate statements in the application or supporting papers;
(2) Failure by the perrnittee to comply with any terms and conditions of the permit;
(3) Exceeding the scope of the project as described in the application;
(4) Newly discovered information or significant physical changes since the permit was
issued; and
EFTA01222257
Manager
L.S.J., LLC
Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10
Page 2 of 5
(5) Non-compliance with any provisions of the Virgin Islands Code and Rules and
Regulations directly related to the permitted activity.
I. GENERAL CONDITIONS
A. Permit to operate this source of air pollution does not relieve the L.S.J., LLC
("Permittee") of the responsibility for compliance with the provisions of any
federal or territorial laws, rules or regulations.
B. This permit will become valid once it is signed by the Commissioner
or his designee.
C. An application for renewal of a Permit to Operate shall be filed by the owner or
operator at least sixty (60) calendar days prior to the expiration of the existing
Permit to Operate (on or before November 25, 2014), in accordance with 12
V.I. R. & REGS. § 206-27(b)(3) (1995).
D. Revisions to this permit will not alter its effective date or expiration date.
E. If this permit is challenged by third parties, the effectiveness of the permit stands
until any judicial court decides the contrary.
F. In the event of a successful challenge to any portion of this permit, all other
portions of the permit shall remain valid and effective.
H. OPERATING REQUIREMENTS
A. The equipment described above shall be operated only in accordance with the
conditions set forth in this permit as well as the conditions described in the
application and supporting documentation.
B. Prior to operation at any other location, the Permittee must submit a separate
application for a permit to operate the equipment at each new location or
construction project that will be conducted on non-contiguous property.
C. The Permittee shall control process emissions, particularly during transport,
loading and handling of raw materials on and off the plant site, to conform to
the requirements of 12 V.I. R. & REGS. § 204-22 (1995) regarding visible
emissions and 12 V.I. R. & REGS. § 204-25 (1995) pertaining to fugitive
emissions.
EFTA01222258
Manager
L.S.J., LLC
Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10
Page 3 of 5
D. The Permittee shall report to the Virgin Islands Department of Planning and
Natural Resources (VIDPNR-DEP) any physical change or changes in operation
that increase the amount of air pollutants or process production.
E. Operation of the source must not result in the contravention of any federal or
territorial ambient air quality standards.
F. During operation, any source responsible for contravening ambient air quality
standards will be required to be modified to bring operation into compliance.
G. The Permittee shall operate the baghouse according to the manufacturer's
instructions and if equipped with pressure drop gauge assure that it is both
functional and accurate.
H. Prior to start-up of baghouse, visual inspections shall be conducted on all
venting ducts/lines, fittings (including dust shroud), and the blower.
III. MONITORING AND RECORDKEEPING
A. The Permittee shall maintain a record of the number of hours of operation of the
batch plant and the emissions unit/s such as the baghouse. The number of hours
of operation shall be recorded on a daily basis.
B. The Permittee shall maintain a record of the quantity of fuel burned (in gallons)
by each emission unit, the raw materials used (in pounds) and concrete produced
(in batch) by the batch plant. The quantity shall be recorded on a daily basis.
C. The Permittee shall keep a daily record of the flowrate, visual conditions of
exhaust material, temperature, quantity of dust removal and incidents of filter
media failure/replacement of the baghouse.
D. Baghouse pressure and temperature gauges, flow meters and other associated
instruments will be checked daily for proper functioning. Any detected
equipment failures shall be remedied as soon as possible.
E. Baghouse ducts, hoods, framework and housing shall be checked daily for signs
of wear from corrosion, erosion, excessive heat and excessive moisture when
operating.
F. All records required to be kept as part of this Permit, shall be entered in indelible
ink, in a permanently bound logbook with pre-numbered pages. The logbook
EFTA01222259
Manager
L.S.J., LLC
Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10
Page 4 of 5
shall be maintained on site for a minimum of five (5) years after collection and
shall be made available to representatives of the VIDPNR-DEP upon request.
G. Additionally, the Permittee shall establish and maintain a log of all the below
occurrences for each source; said log shall include but not be limited to the date,
time, cause of occurrence, and corrective action taken. The requisite log shall be
readily available for inspection by the VIDPNR-DEP and USEPA, and kept on
site for a period of no less than five (5) years.
IV. REPORTING REQUIREMENTS
A. The Permittee must report by telephone, within twenty-four (24) hours, all
scheduled maintenance or upset conditions and breakdown situations that cause
or have caused excess emission(s) or other violations(s), spill(s), leakage(s), loss
of material, or any violation of territorial or federal laws, rules, or regulations.
B. The Permittee must report any pre-existing or newly discovered spill or
contamination situation both by phone and in writing.
C. The Permittee must report to the VIDPNR-DEP via telephone and/or telefax
immediately upon determination, any non-compliance with operating
requirements directly related to emission limits, or any non-compliance with the
conditions of this permit. The Permittee shall submit to the VIDPNR-DEP,
within seven (7) days of the occurrence, a written report detailing the nature of
the non-compliance. The written report shall include but not be limited to the
time and place of the occurrence, who first reported the occurrence, amounts
and type of material involved, corrective action taken, other agencies notified
(who and when), any proposed mitigation, and proposed time frame for any
mitigation.
D. Any operation of the equipment which may cause off-property effects, including
odors, shall be immediately reported to the VIDPNR-DEP by the Pennittee, in
writing and by phone.
E. These reporting requirements in no way relieve the Permittee of any other
reporting requirements for the above mentioned occurrences.
V. OTHER REQUIREMENTS
A. As a condition of this Permit, the Permittee shall comply with all terms and
conditions of any Administrative Order related to any violation of conditions of
this Permit.
EFTA01222260
EIMIN, Manager
L.S.J., LLC
Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10
Page 5 of 5
B. The VIDPNR-DEP reserves the right to inspect the Permittee's facilities. The
Permittee shall give the VIDPNR-DEP whatever aid is necessary to perform
inspections in a safe and timely manner. The Permittee shall keep the area clean
where the generator is located.
C. A person who has been granted a permit under the provisions of the 12 V.I. R. &
REGS. § 206-20(c) (1995), shall firmly affix such Permit to Operate, an
approved facsimile, or other approved identification bearing the permit number
upon the article, machine, equipment, or other contrivance in such a manner as
to be clearly visible and accessible in accordance with 12 V.I. R. & REGS. §
206-20(d) (1995). In the event that the article, machine, equipment, or other
contrivance is so constructed or operated that the Permit to Operate cannot be so
placed, then the permit should be maintained so as to be readily available at all
times on the operating premises.
D. The Permittee is required to be in compliance with 12 V.I. R. & REGS. § 206-
27 (1995).
Your cooperation in complying with these regulations will be most appreciated.
Sincerely,
Nadine Noorhasan,
Director
NN:ACO:ao
Enclosure: eight (8) certificates
EFTA01222261
Government Of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
0 AUTHORITY TO CONSTRUCT • PERMIT TO OPERATE
a. • Permit Renewal
b. a New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. 1.00802
Permit No.: STT-8-020-D-10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air Pollution
Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of the following: one (1) one (1) Ideal Manufacturing Fast-Way concrete
hatching plant, model # BPL-4, serial # 8-0707467-4 and one (1) hopper.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with the
statements and supporting data entered therein, all of which are filed with the Department and
are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year period
ending on: January 24, 2014.
04 '1 Nadine Noorhasan,
Director
EFTA01222262
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
DAUTHORITY TO CONSTRUCT PERMIT TO OPERATE
a. • Permit Renewal
b. a New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V.I. 00802
Permit No.: STT-8-020-E-10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 06, Sub-Section 20, this Pemdt is issued to:
L.S.J., LLC
For the operation of the following: one (1) conveyor.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 011 for a three (3) year
period ending on: January 24, 2014.
'Nadine Noorhasan,
Director
EFTA01222263
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
OAUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. a New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. 1.00802
Permit No.: STT-8-020-F -10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of: one (1) silo scale, model # 210, serial # F08307-0131.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24, 2014.
adine Noorhasan,
Director
EFTA01222264
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
oAurHoRrry TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. a New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. 'Thomas, V. I. 00802
Permit No.: STT-8-020-G -10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of: one (1) Ideal Manufacturing Fast-Way silo, model # S4 7000,
serial # 0207279-4.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24, 2014.
yz Nadine Noorhasan,
Director
EFTA01222265
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
DAUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. El New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. I. 00802
Permit No.: STT-8-020-H -10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of: one (1) 18-bag Filter system (baghouse).
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24, 2014.
Nadine Noorhasan,Er
Director
EFTA01222266
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
❑AUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. o New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. I. 00802
Permit No.: STT-8-020-1 -10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
LLC
For the operation of: one (1) Kohler gasoline fired engine, model # CH15T, serial
# 3626912831.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24, 2014.
Nadine Noorhasan,
Director
EFTA01222267
61
. _
%aka:
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
DAUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. 0 New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. I. 00802
Permit No.: STT-8-020-.1 -10 Date: December 16. 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of: one (1) Lombardini diesel fired engine, model # 9LD 625-2,
serial # 5485286.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in conformity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24. 2014.
a.,- Nadine Noorhasan,
Director
EFTA01222268
Government of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
OAUTI-IORITY TO CONSTRUCT ■ PERMIT TO OPERATE
a. ■ Permit Renewal
b. ❑ New Permit
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V. I.00802
Permit No.: STT-8-020-K -10 Date: December 16, 2010
Phone: (340) 775-8100
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the operation of: one (1) Lombardini diesel fired engine, model # 9LD 625-2,
serial # 401154.
Located at: Little St. James Island
In accordance with the renewal request dated: October 29, 2010 and in confonnity with
the statements and supporting data entered therein, all of which are filed with the
Department and are considered a part of this permit.
This permit shall be effective from the date of: January 24, 2011 for a three (3) year
period ending on: January 24, 2014.
o'" Nadine Noorhasan,
Director
EFTA01222269
GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
8100 Lindberg Bay STE. #6I
CYRIL E. KING AIRPORT TERMINAL BUILDING -2ND FLOOR
ST. THOMAS, VIRGIN ISLANDS 00802
TEL.: (340) 774.3320 FAX - (340) 714-9549
AUTHORITY TO CONSTRUCT
MEM
L.S.J., LLC
, Manager
6100 Red Hook
Quarters 13-3
St. Thomas, V. I. 00802
Dear Mr. Gordon:
Enclosed you will find Authority to Construct #'s STT-8-020-L-10 and STT-8-020-M-
10 respectively for the installation of: one (1) 500 kW Caterpillar diesel generator,
model # LC7, serial # G7A03132, engine model # C18, serial # EST01043 (Generator
# 1) and one (1) 500 kW Caterpillar diesel generator, model # LC7, serial #
G7A03133, engine model # C18, serial # EST01042 (Generator # 2), for standby use
only.
These pieces of equipment are located at Little St. James Island, V.I.
This Authority to Construct Permit is valid for a period of one (1) year.
Be advised that, in accordance with 12 V.I. R. & REGS. § 206-28(a) (1995), the
Commissioner may modify, suspend or revoke an authority to construct or permit to
operate on any of the following grounds:
Materially false or inaccurate statements in the application or supporting papers;
Failure by the Perrnittee to comply with any terms and conditions of the permit;
Exceeding the scope of the project as described in the application;
Newly discovered information or significant physical changes since the permit
was issued; and
Non-compliance with any provisions of the Virgin Islands Code and Rules and
Regulations directly related to the permitted activity.
This Authority to Construct Permit is not a Permit to Operate. This is a permit to
construct only.
EFTA01222270
, Manager
L.S.J., LLC
Authority to Construct #'s STT-8-020-L-10 and STT-8-020-M-10
Page 2 of 6
Authority to construct or operate this source does not relieve L.S.J., LLC ("the
Permittee") of the responsibility of compliance with the provisions of any federal,
territorial laws, rules or regulations. [12 V.I. R. & REGS. § 206-26(a)(I) (1995)]
This source shall operate as a minor source and is subject to 40 Code of Federal
Regulations (CFR), Part 60, Subpart IIII, "Performance Standards for Stationary
Compression-Ignition of Internal Combustion Engines".
A. Operating Requirements
I. The pieces of equipment described above shall be constructed and
operated only in accordance with the conditions set forth in this permit as
well as the conditions described in the application, manufacturer's
specifications and other supporting documentation. [49O712.60.4211,
12V.I.R.& R §206-26(d)(2) (1995), 12V.I.R.& R §206-27(c)(2)]
2. Prior to operation at any other location, the Permittee must submit a
separate application for an authority to construct and permit to operate the
equipment at each new location or construction project that will be
conducted on non-contiguous property.[ 12V.I.R.& R §206-21(a)(1995)]
3. The Permittee shall operate the emission units with the given limitations
described below:
Unit # Permit Unit Description Fuel Yearly No. of Emission
# 'Type Fuel fuel usage hours of standards
Usage operation H0CER60.4202,
40CPR89.112]
(gram/hp-hr)
Generator STT-8- 500 kW Caterpillar Diesel H 28.5 3562.5 125
#I 020-L- diesel generator, 2 g/hr gal hrs/year CO 2.6
10 model # LC7, serial
# G7A03132, engine NOx+
model # C18, serial /I NMHC 3.0
EST01043
Generator STT-8- 500 kW Caterpillar Diesel # 28.5 3562.5 125hrs/year
#2 020-M- diesel generator, 2 Whr gal
10 model # LC7, serial SOx 3.67
# G7A03133, engine
model # CIS, serial #
EST01042
PM 0.15
EFTA01222271
MEM
L.S.J., LLC
Manager
Authority to Construct #'s STT-8-020-L-10 and S1T-8-020-M-10
Page 3 of 6
4. Construction and operation of the source must not result in the
contravention of any federal or territorial ambient air quality standards.
[12V.I.R.& R §206-26(a)(2); 12V.I.R.& R §206-27(a)(1)(B)]
5. The Permittee shall operate the generator (emission unit) for standby
use
only. The use of the generator for prime power is prohibited.
[40CFR60.4211(e)]
6. The Permittee shall install and maintain a non-resettable hour meter to
indicate the hours of operation of the engine. [40CFR60.4209(a)]
7. The Permittee shall limit the use of the stand-by generator to no more than
five hundred (500) hours of operation on a 365-day rolling average.
8. The Permittee shall use a continuous operational fuel flow device to
monitor the fuel consumption.
9. The Permittee shall use diesel oil with Sulfur content of 15 parts per
million (ppm) maximum. [40CFR80.510(b)]
10. The Permittee shall not emit any air contaminant that causes an opacity of
more than twenty percent (20%) except during start up. [ 12V.I.R.& R
§204-28(b)(i) (1995)]
11. The Permittee shall operate the emission unit and maintain the achieved
emission standards over the entire life of the engine. [40CFR60.4206]
12. The Permittee shall install a backpressure monitor if the engine is
equipped with a diesel particulate filter.
B. Monitoring and Recordkeeping
I. The Permittee shall maintain a logbook for each generator recorded on a
monthly basis indicating but not limited to the following
information:[40CFR60.4214(b)]
a. date, time and number of hours of operation of the generator (emission
unit)
b. the reason for the operation of the generator such as power failure,
start up, maintenance conducted, etc.
EFTA01222272
Manager
L.S.J., LLC
Authority to Construct It's STT-8-020-L-10 and STT-8-020-M-10
Page 4 of 6
c. quantity (in gallons) of fuel burned by the emission unit during
the operation
d. any malfunction of the emission unit, date, time, duration of
occurrence and corrective action taken
2. The Permittee shall retain fuel purchase records that account for all fuel
used in the generator and all fuel purchased for use in the emission unit.
3. All records required to be kept as part of this Permit shall be entered in
indelible ink in a permanently bound logbook with pre-numbered pages.
The logbook shall be maintained on site for a minimum of five (5) years
after collection and shall be made available to representatives of the
VIDPNR-DEP and USEPA upon request.
4. The Permittee shall maintain records of the sulfur content of the fuel oil
received through the Supplier's Invoice with the attached Certificate of
analyses performed.
5. The Permittee shall keep records of corrective action taken after the
backpressure monitor has notified the Permittee that the high backpressure
limit of the engine is approached if the engine is equipped with a diesel
particulate filter.
C. Reporting Requirements
1. The Permittee must report by telephone, within twenty-four (24) hours, all
scheduled maintenance or upset conditions and breakdown situations that
cause or have caused excess emission(s) or other violations(s), spill(s),
leakage(s), loss of material, or any violation of territorial or federal laws,
rules, or regulations.
2. The Permittee must report any pre-existing or newly discovered spill or
contamination situation both by phone and in writing.
3. The Permittee must report to the VIDPNR-DEP via telephone and/or
telefax immediately upon determination, any non-compliance with
operating requirements directly related to emission limits, or any non-
compliance with the conditions of this permit. The Permittee shall submit
EFTA01222273
Manager
L.S.J., LLC
Authority to Construct #'s STT-8-020-L-10 and STT-8-020-M-10
Page 5 of 6
to the VIDPNR-DEP, within seven (7) days of the occurrence, a written
report detailing the nature of the non-compliance. The written report shall
include but not be limited to the time and place of the occurrence, who
first reported the occurrence, amounts and type of material involved,
corrective action taken, other agencies notified (who and when), any
proposed mitigation, and proposed time frame for any mitigation.
4. Any operation of the equipment which may cause off-property effects,
including odors, shall be immediately reported to the VIDPNR-DEP by
the Permittee, in writing and by phone.
5. The Permittee must report to the Virgin Islands Department of Planning
and Natural Resources (VIDPNR-DEP) any physical change or changes in
construction and operation that increase the amount of air pollutants or
process production.
6. The Permittee shall submit an annual report of the fuel consumption.
7. These reporting requirements in no way relieve the Permittee of any other
reporting requirements for the above mentioned occurrences.
D. Other Requirements
1. As a condition of this Permit, the Permittee shall comply with all terms and
conditions of any Administrative Order related to any violation of
conditions of this Permit.
2. The VIDPNR-DEP reserves the right to inspect the Permittee's facilities.
The Permittee shall give the VIDPNR-DEP whatever aid is necessary to
perform inspections without delay in a safe manner. The Permittee shall
keep the area clean where the generator is located.
3. A person who has been granted a permit under the provisions of the 12
V.I. R. & REGS. § 206-20(a) and (c) (1995), shall firmly affix such
Authority to Construct permit and Permit to Operate, an approved
facsimile, or other approved identification bearing the permit number upon
the article, machine, equipment, or other contrivance in such a manner as
to be clearly visible and accessible in accordance with 12 V.I. R. &
EFTA01222274
Ma
LLC
Manager
Authority to Construct /Ps STT-8-020-L-10 and STT-8-020-
M-10
Page 6 of 6
REGS.§ 206-20(d) (1995). In the event that the article, mach
ine,
equipment, or other contrivance is so constructed or opera
ted that the
Permit to Operate cannot be so placed, then the permit shoul
d be
maintained so as to be readily available at all times on the
construction
and operating premises.
4. The Permittee is required to be in compliance with
12 V.I. R. & REGS. §
206-26 and 12 V.I. R. & REGS. § 206-27 (1995).
Your cooperation in complying with these regulations will
be most appreciated.
Sincerely,
Nadine Noorhasan,
Director, DEP
NN:ACO:ao
Enclosure: two (2) certificates
EFTA01222275
Government Of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
■ AUTHORITY TO CONSTRUCT ❑ PERMIT TO OPERATE
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. Thomas, V.I. 00802
Permit No.: STT-8-020-M-10 Date: December 16. 2010
Phone: (340) 513-9855
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the construction of the following: one (1) 500 kW Caterpillar diesel generator,
model # LC7, serial # G7A03133, engine model # C18, serial # EST01042 (Generator
# 2), for standby use only.
Located at: Little St. James Island
In accordance with the application dated: October 29, 2010 and in conformity with the
statements and supporting data entered therein, all of which are filed with the Department
and arc considered a part of this permit.
This permit shall be effective from the date of: December 16. 2010 for a one (1)
year period ending on: December
Nadine Noorhasan,
pi-, Director
EFTA01222276
Government Of
The Virgin Islands of the United States
DEPARTMENT OF PLANNING & NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
Charlotte Amalie, St. Thomas, Virgin Islands
AIR POLLUTION CONTROL
II AUTHORITY TO CONSTRUCT PERMIT TO OPERATE
For: L.S.J., LLC
6100 Red Hook
Quarters B-3
St. homas, v. . 00802
Permit No.: STT-8-020-L-10 Date: December 16, 2010
Phone: (340) 513-9855
Pursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air
Pollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to:
L.S.J., LLC
For the construction of the following: one (1) 500 kW Caterpillar diesel generator, model
# LC7, serial # G7A03132, engine model # C18, serial # EST01043 (Generator # 1), for
standby use only.
Located at: Little St. James Island
In accordance with the application dated: October 29 2010 and th conformity with the
statements and supporting data entered therein, all of which are filed with the Department
and are considered a part of this permit.
This permit shall be effective from the date Of: December 16. 2010 for a one (I)
year period ending on: December 16. 2011 .
Nadine oorhasan,
Director
EFTA01222277
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES
DEPARTMENT OF PLANNING AND NATURAL. RESOURCES
DIVISION OF ENVIRONMENTAL PROTECTION
fu ll) Linillm•rg III:4y. Sic W; I
'yril E. King Ammo Tc.rminal mummy s.,„,„,i
TIII.IMAS. VI IKIWI:
lc 'NE CHID) 77•I.3:120. PAN• Gi ic4 it i.lif. it)
This Territorial Pollutant Discharge Elimination System (TPDES) permit is issued in compliance with 12 V.I. CODE
ANN. § 185 in accordance with the provisions of the Federal Water Pollution Control Act, as amended, (33 USC 1251 et
seq.) (hereinafter referred to as The Act").
LITTLE ST. JAMES (herein referred to as the Permittee)
Little St. James Nang VI 00902
The Permittee is authorized to discharge from a facility located at to the receiving waters listed in the
table below, in accordance with effluent limitations and monitoring requirements and other conditions set forth in in I
and U hereof, including the collection system(s) outfalls.
BEST PROFESSIONAL CONDOMINIUMS/NOTES/RESORTS/MARINAS R/O
JUDGMENT (BPJ) (STT-STJ)
CATEGORY - RL.L. Little St. James Subwatershed MINOR TPDES Permit
TPDES Permit No. Wastewater Process Daily Monthly Disinfection Type RECEIVING WATER
VI0040525 and/or Product Maximum Average
001 FLOW (MGD) Reverse Osmosis Brine 0.3 0.3 NA Drainage System
Date Original Application Received: 3/11/11 Date Completed Application Received: 7/29/11
TPDES Permit Administrator Date: j_01.a/j/_
Rhonda L Glued,
Program Manager Approval: - Ltte Date: ith.d/_li
Progarn Manager
Acting Director Approval: Date:a) ge) /A
David Alvaro Sirs"
This permit shall me effective on November I, 2011 and authorization to din:barge expires October 31, 2016 with a
6
Alicia V.
/4,O4511
Date
Commissioner
EFTA01222278
R/O-FtLL
Page 2
Part 1
During the period beginning on the effective date of the permit and lasting
through the expiration date of the permit, the
Pennittee is authorized to discharge from outfall number 001(reverse osmos
is brine). Such discharges shall be limited
and monitored by this Pamittee as specified below:
Receiving Water Chnsificadon: B (BPJ)
Table IA: REQUIRED EFFLUENT LIMITATIONS AND MONITORI
NG
Effluent Effluent Concentration Limitations
Characteristic Monitoring Requirements
(parameter) Maximum Percent Average Sample Sample Type
Daily Limit Removal Monthly Limit Location Frequency
001 FLOW
(MGD)
0.3 N/A 0.3 Effluent Continuous Continuous
Temp (t) 32 N/A N/A Effluent WEEKLY Grab
PR 7 to 8.3 N/A N/A Effluent WEEKLY Grab
Salinity (mg/1) REPORT N/A N/A Effluent QUARTERLY Grab
Total Dissolved
Solids (m8/1)
REPORT N/A N/A Effluent
QUARTERLY Grab
oiia Grease REPORT N/A N/A Effluent ANNUALLY Grab
Samples collected in compliance with the monitoring requirements
specified in 'Bible 1A shall be taken at any point after
the treatment process has commenced but prior to being discharged
into the receiving waters. Compliance sampling
points must be labeled.
DISCHARGE MONITORING REPORTS MUS
T BE SUBMITTED ON A MONTHLY
BASIS.
EFTA01222279
SPECIAL CONDITIONS - R/O-RLL Page 3
Part I
Special conditions arc hereby incorporated into this permit in order to satisfy the provisions Title 12 of the Virgin Islands
Code, Chapter 7, Section 185 (f) (1981), and Section 301 (b) (1) (C) of the Federal Clean Water Act (PL 95-217). As
part of the administration of the Territorial Pollutant Discharge Elimination System (TPDES), the TPDES Permit
Administrator is the primary permit writer. Further, a TPDES Permit Compliance Evaluation Inspector (TPDES CEI
Inspector) will conduct routine and follow-up inspections for this facility and report subsequent findings to the U.S.
Environmental Protection Agency (EPA) and the TPDES Permit Administrator. The TPDES Permit Administrator and
CEI Inspector are the authorized twicamtatives of the Commissioner of DPNR for the sole purpose of insuring the
following special conditions:
I. This permit is for a five year period. Within that period, the Pertain= is required to report any management
changes by submitting an updated EPA Form I. An annual re-certification must be performed if there are any
management changes at the pet:minces facility. This annual re-certification must occur thirty (30) days prior to the
anniversary of the effective date of the permit and on the same date each year by submitting an updated EPA Form I.
The EPA Form 1 must be accompanied by a cover letter on official stationary, addressed to the TPDES Permit
Administrator, certifying that it's current general manager, director of engineering, condominium association president
and/or certified plant operator have read and understood all parts and special conditions of this permit (see Part II (B) II
(a) & (c) for "Signatory requirements"). Certification Letters serve to inform the Division of Environmental Protection
(DEP) of any changes in management DEP must be informed of any interim management changes or changes in the
plant operator.
The Permittee has a "Duty to Comply" subject to fines during that permitting cycle, and a "Duty to Reapply" at
least 180 days prior (about 6-months) to the permit's expiration date, pursuant to Part R (B) 1&2 of this permit
The renewal application, EPA Form 2C, must be completed at that time pursuant to 40 CFR 122.21(e).
Therefore, it is recommended, but not required, that the Pennittee request an application meeting at least 60
days earlier. An application fee may apply at that time, in accordance with 12 V.I. R. & REGS. § 184-26,
pursuant to 12 V.I. CODE ANN. § 184 (a) and (p) and (q) (1976).
Annually, the manager, operator or contact person must attend a mandatory Regulatory Question &
Answer
Meeting with the TPDES Permit Administrator. During that meeting, the Permittee must, if applicable,
provide
proof of current applicable permits for waste oil, standby generators, boilers, well appropriation and an
approved spill prevention plan or terminal facilities license.
2. Prior to Compliance Evaluation Inspections (CEIs), the Permittee or designated representative must review
following sections of this permit "Monitoring and Records" Part 11(B) 10 (b)&(c); "Inspection and the
Entry' Part II (B) 9
(d); and "Proper Operation aid Maintenance" Part II (B) 5. M a minimum, flow meters must
also be installed at the
labeled effluent sampling points for the brine discharge (outfal1001). Discharge Monitoring
Reports (DMRs) and
logbook records must be presented for applicable permit limits, instrument
calibration, and equipment maintenance
including standby generators. A calibration and maintenance schedule must be provided. A filter
or system backwash
schedule is required for seawater intakes. All logbooks must contain time, date and signatures. Used
oil must be labeled.
Further, a demonstration of any standard operating procedure may also be required. This permit is
subject to
modification based on violations of permit conditions including any interim schedule of compliance,
pursuant to 12 V.I.
CODE ANN. § 185 (f) 2 (A) and (i) (2000). The Permit Administrator, CEI inspector or
any other DEP officer, may
conduct additional follow-up inspections each quarter to ascertain compliance. A noncompliance corrective
action plan
may be required within 30 days of written notification of deficiencies discovered during these
inspections. This permit,
including all pages, must be prominently displayed onsitc at the reverse osmosis water treatment plant.
EFTA01222280
Page 4
Part I
3. This permit may be transferred to a new owner if the curren
thirty (30) days prior to the transfer date of its intent The notific t Permittee notifies the TPDES Permit Administrator,
ation must contain a cover letter on official stationary,
with a copy of the written agreement between the old and new
owner on the terms of the transfer (operational control,
responsibility, coverage and liability), along with EPA Form I
competed by the new owner. This is subject to DPNR
Commissioner's modification or revocation of the permit, pursua
nt to 40 CFR 122.63 (d). The new owners must also
independently certify that they have read and understood the permit
and all special conditions. In the case of foreclosure,
DPNR-DEP does not establish ownership.
4. In the event of leaks, spills or overflows at this permitted facility
any and all notifications: , the following individuals must be included in
Wayne Donadelle, Environmental Specialist I, TPDES CEI Inspec
tor at 774-3320 extension 5156,
Rhonda L. Liburd, Environmental Specialist Ile TPDES Permit
Administrator at eid 5188, and
lira Casey, EPA/CEPD, VI Coordinator at 714-2333.
EFTA01222281
Pagc 5
Part Il
B. MONITORING AND REPORTING REQUIREMENTS
I. Monitoring and records. See Part II.B.10.
2. Discharge Monitoring Reverts (DMPJ.
a. Sec Pan II.B.12.d.
b. Monitoring results obtained during the previous month shall be summarized and reported on a
Discharge Monitoring Report Form (EPA No. 3320_1), postmarked no later than the 28th day
of the month following the completed reporting period. The first report is due on the effective
date of the permit (EDP) +28 days. The permittee shall sign and certify all DMRs, and all
other reports, in accordance with the requirements of Pan 1lb of this permit ("Signatory
Requirements"). The permittee shall submit legible originals of these documents to DPNR,
with copies to EPA at the following addresses:
Regional Administrator Government of the U.S. Virgin Islands
USEPA Region II Dept. of Planning & Natural Resources
290 Broadway Office of the Commissioner
New York, NY 10007-1866 Division of Environmental Protection
Attn: Permits Admin. Branch Water Pollution Control Program
8100 Lindberg Bay, Ste. 61
Cyril E. King Airport, Terminal Building, r l Floor
St. Thomas, VI 00802
3. Quality assurance practices. The Permittee is required to show the validity of all data by requiring
its laboratory to adhere to the following minimum quality assurance practices:
a. Duplicate' and spiked2 samples must be run for each constituent analyzed for permit
compliance on 5% of the samples, or at least on one (I) sample per month, whichever is
greater. If analysis frequency is less than one (1) sample per month, duplicate and spiked
samples must be run for each analysis.
b. For spiked samples, a known amount of each constituent is to be added to the discharge
sample. The amount of constituent added should be approximately the same amount
present in the unspiked sample, or must be approximately that stated as maximum or
average in the discharge permit
c. The data obtained in 3. a above shall be summarized in an annual report submitted at the
end of the fourth quarter of repotting in terms of precision, percent recovery, and the
number of duplicate and spiked samples run.
d. Precision for each parameter shall be calculated by the formula, standard deviation s =(❑
D'/2K)1'2, where "D" is the difference between duplicate results, and "K" is the number of
duplicate pairs used in the calculation.
Duplicate ~es are not required For the following perameters: Color, Temperature, Turbidity.
2
Spited samples an not required for the following parameters listed in Table 1 of 40 CFR 136: Acidity, Alkalinity,
Bacteriological, ~Mine, Chlorine, Color, Dissolved Oxygen, Hardness, pH, Oll i Gram Radiological, Residues,
Temperature, Turbidity. Procedurs for spiking simples and spiked sample requirements for parameters not listed on the
above referenced table an available through EPA's Regional Quality Assurance Coordinator.
EFTA01222282
Page 6
Part II
e. Percent recovery for each parameter shall be calculated by the formula R = 100 (F IYA,
where "F" is the analytical result of the spiked sample, and "I" is the result before spiking
the sample, and "A" is the amount of constituent added to the sample.
1. The percent recovery," R", for each parameter in 3. e. above shall be summarized yearly
in terms of nil percent recovery and standard deviation from the mean. The formula, s
= f0(x_0)2/ )1"2, where "s" is the standard deviation around the mean "0", "x" is an
individual recovery value, and "n" is the number of data points which shall be applied.
g The Permittee or his contract laboratory is required to annually analyze an external
quality control reference sample for each pollutant. These are available through the
Regional Quality Assurance Coordinator, Region II, U.S. Environmental Protection
Agency, Edison Environmental Laboratory, Edison, New Jersey 08817.
h. The Permittee and/or his contract laboratory is required to maintain records of the
specific analytical methods used, including options employed, if any, within a particular
method, and of reagent standardization and equipment calibration operations.
i. If a contract laboratory is utilized, the Permittee shall submit the name and address of the
laboratory and the parameters analyzed at the time it submits its discharge monitoring
reports (see Section 8.2.b. above). Any change in the contract laboratory being used or
the parameters analyzed shall be reported prior to or together with the monitoring report
covering the period during which the change was made.
OTHER REQUIREMENTS
1. N/A.
2. N/A.
a. N/A.
3. N/A.
4. Alterations There are material and substantial changes or additions to the permitted facility or
activity which occurred after permit issuance which justify the application of permit conditions
that are different or absent in the existing permit.
5. MQPitiVinft
a. N/A.
b. N/A.
c. N/A.
6. Twenty four hour reporting.
a. The Pennittoe must report violations of maximum daily discharge limitations in
accordance with the reporting requirements set forth in Part II.8.12.1 (twenty-four (24)
hour reporting followed by five (5) day written submission).
EFTA01222283
Page 7
Part 11
Additional mooning requirements. The Permittee shall notify the Regional Administrator and
Commissioner as soon as it knows or has reason to believe:
a. That any activity has occurred or will occur which would result in the discharge, on a
routine or frequent basis, of any toxic pollutant which is not limited in the permit, if that
discharge will exceed the highest of the following "notification levels":
(1) One hundred micrograms per liter (100 02/1); or
(2) Two hundred micrograms pa liter (200 0g/l) for acrolein and acrylonitrile; five
hundred micrograms per liter (500 0g/1) for 2,4_dinitrophenol and for
2_methyl_4,6_dinitrophenol; and one milligram per liter (I mg/I) for antimony;
or
(3) Five (5) times the maximum concentration value reported for that pollutant in
the permit application; or
(4) The notification level, if any, established by the Commissioner in the permit.
b. That any activity has occurred or will occur which would result in any discharge, on a
non routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if
that discharge will exceed the highest of the following 'notification levels":
(I) Five hundred micrograms politer (500 0O); or
(2) One milligram per liter 0 mg/I) for antimony; or
(3) Ten (10) times the maximum concentration value reported for that pollutant in
the permit application; or
(4) The notification level, if any, established by the Commissioner in the permit.
c. Compliance Schedule'. N/A
EFTA01222284
Page
Part II
DEFINITIONS
I. "Average monthly discharge limitation" means the highest allowable average of "daily discharge?
over a calendar month, calculated as the sum of all daily discharges measured during a calendar
month divided by the number of daily discharges measured during that month.
2. "Average weekly discharge limitations" means the highest allowable average of "daily discharge?
over a calendar week, calculated as the sum of all daily discharges measured during a calendar
week divided by the number of daily discharges measured during that week.
3. "Bypass" means the intentional diversion of wastes from any portion of a treatment facility.
4. "Composite" means a combination of individual (or continuously taken) samples obtained at
regular intervals over the entire discharge day. The volume of each sample shall be proportional
to the discharge flow rate. For a continuous discharge, a minimum of twenty-four (24) individual
grab samples (at hourly intervals) shall be collected and combined to constitute a 24hour
composite sample. For intermittent discharges of more than four (4) hours duration, grab samples
shall be taken at a minimum of thirty (30) minute intervals.
5. "Commissioner" means the Commissioner of the Department of Planning and Natural Resources
or his duly authorized representative.
6. "Daily discharge` means the discharge of a pollutant measured during a calendar day or any
24_hour period that reasonably represents the calendar day for purposes of sampling. For
pollutants with limitations expressed in units of mass, the "daily discharge" is calculated as the
total mass of the pollutant discharge over the day. For pollutants with limitations expressed in
other units of measurement, the "daily discharge' is calculated as the average measurement of
pollutant over the day. For purposes of sampling, "daily" means an operating day or 24_hour
period.
7. "Discharge Monitoring Report" or "DMR" means the EPA uniform national form, including any
subsequent additions, revisions, or modifications, for reporting of self monitoring results by
Permittees.
8. "Grab" means an individual sample collected in less than fifteen ( I5) minutes.
9. "Gross" means the weight or concentration contained in the discharge. (Unless a limitation is
specified as a net limitation, the limitation contained in this permit is a gross limitation).
10. "Maximum daily discharge limitation" means the highest allowable "daily discharge".
I I. "Monthly" means one day each month (the same day each month) and a normal operating day
(e.g., the 2nd Tuesday of each month).
12. "Net" means the amount of a pollutant contained in the discharge measured in appropriate units as
specified herein, less the amount contained in the surface water body intake source, measured in
the same units, over the same period of time, provided:
a. The intake water source must be drawn from the same body of water into which the
discharge is made; and
EFTA01222285
Page 9
Part II
b. In cases where the surface water body intake source is pretreated for the removal of
pollutants, the intake level of a pollutant to be used in calculating the net is that level
contained after the pretreatment steps.
13. "Regional Administrator" means the Regional Administrator of Region II of EPA or the
authorized representative of the Regional Administrator.
14. "Severe property damage" means that substantial physical damage to the treatment facilities which
would cause them to become inoperable or substantial and permanent loss of natural resources
which can reasonably be expected to occur in the absence of a bypass. Severe property damage
does not mean economic loss caused by delays in production.
15. "Toxic pollutant" means any of the pollutants listed in 40 C.F.R. 401.15 (45 F.R. 44503, July 30,
1979) and any modification to that list in accordance with Section 307(aX1) of the Clean Water
Act.
16. "Upset" means an exceptional incident in which there is unintentional and temporary
noncompliance with technology_based effluent limitations because of factors
beyond the reasonable control of the Permittee. An upset dots not include noncompliance to the
extent caused by operational error, improperly designed treatment facilities, inadequate treatment
facilities, lack of preventive maintenance, or careless or improper operation.
17. "Weekly" means every seventh day (the same day of each week) and a normal operating day.
18. "TPDES Permit Administrator" means the author of this permit
EFTA01222286
Page 10
Pond
B. GENERAL CONDMONS
Duty to Comply
a. The Permittee must comply with all conditions of this permit Any permit
noncompliance constitutes a violation of the Environmental Laws and Regulations of the
Virgin Islands and Federal Clean Water Act and is ground for enforcement action; for
permit terntination, revocation and reissuance, or modification; or the denial of a permit
renewal application.
b. The Permittee shall comply with effluent standards or prohibitions established under
Section 307(a) of the Federal Clean Water Act for toxic pollutants within the time
provided in the regulations that establish these standards or prohibitions, even if the
permit has not been modified to incorporate the requirement.
c. ( I) Tide 12, Section 190 of the Virgin Islands Code, Water Pollution Control Act
provides that any person who violates any permit condition is subject to a civil
penalty not to exceed 550,000 per day of violation. Any person who willfully or
negligently discharges pollutants in violation of any condition or limitation
included in a permit; or violates requirements of 12 V.I.C. Section 189; or with
respect to introductions of pollutants into publicly owned treatment works,
violates a pretreatment standard or toxic effluent standard, shall upon
conviction, be punished by a fine not less than $5,000 per day of violation. If
the conviction is for a violation committed after a first conviction of the person
under this subsection, punishment is by a fine of not more than 5100,000 per day
of violation. Any person who knowingly makes any
false statements, representation or certification in any application, record,
report, plan or other documents filed or required to be maintains under this
chapter or by any permit, rule, regulation or order issued under the Act, or who
falsifies, tampers with or knowingly readers inaccurate any monitoring device or
method required to be maintained under the Act, shall upon conviction, be
punished by a fine of not mom than $10,000 or by imprisonment for not more
than six (6) months or both.
(2) The Clean Water Act, Section 309(c) provides that any person who violates a
permit condition implementing Section 301, 302, 306, 308, 318, or 405 of the
Clean Water Act is subject to civil and criminal penalties which in several of its
provisions exceed those imposed under the Virgin Islands Water Pollution
Control Act.
2. puty to Reapply. This permit and the authorization to discharge shall terminate on the expiration
date indicated on the first page. In order to receive authorization to discharge after the expiration
date of this permit, the Permittee must file for reissuance at least one hundred and eighty (180)
days prior to the permit's expiration.
3. Need to Halt or Reduce not a Defense. It shall not be a defense for a Penninee in au enforcement
action that it would have been necessary to halt or reduce the permitted activity in order to
maintain compliance with the conditions of this permit.
4. Duty to Mitigate. The Perntittee shall take all reasonable steps to minimize or prevent any
discharge in violation of this permit which has a reasonable likelihood of adversely affecting
human health or the environment
EFTA01222287
Page I I
Part II
5. Prover Operation and Maintenance. The Fermium shall at all times properly operate and maintain
all facilities and systems of treatment and control (and related appurtenances) which are installed
or used by the Pennittee to achieve compliance with the conditions of this permit. Proper
operation and maintenance also includes adequate laboratory controls and appropriate quality
assurance procedures. This provision requires the operation of backup or auxiliary facilities or
similar systems, installed by the Permittee, when the operation is necessary to achieve compliance
with the conditions of the permit.
6. Permit Actions.
a. This permit may be modified, revoked and. reissued, or terminated during its term for
cause. The filing of a request by the Permittee for a permit modification, revocation and
reissuance, or termination, or a notification of planned changes or anticipated
noncompliance, does not stay any permit condition.
b. Causes for modification, revocation and reissuance, and termination are set forth in 40
C.F.R. 122.62 and 122.64, and 185(i) and 12 V.I.R.&R. Subsection 184_34(O and
184_51.
(1) Specified causes for modification, revocation and reissuance, and termination
include:
(a) Noncompliance by the Pemititee with any condition of the permit;
(b) The Permittee's failure in the application or during the permit issuance
process to disclose fully all relevant facts, or the Permittee's
misrepresentation of any relevant facts at any time;
(c) A determination that the permitted discharge endangers human health
or the environment and can only be regulated to acceptable levels by
permit modification or termination; or
(d) There is a change in any condition that requires either a temporary or a
permanent reduction or elimination of any discharge controlled by the
permit.
(2) Specified causes for modification and, upon request or agreement of the
Ferrante°, revocation and reissuance of the permit include material and
substantial alterations or additions to the Permittee's operation which occurred
after permit issuance and which justify the application of permit conditions that
are different or absent from this permit,
(e.g., production changes, relocation or combination of discharge points,
changes in the nature or mix of products produced) provided the reconstruction
activities do not cause the new source permit issuance provisions of 40 C.F.R.
122.29 to be applicable.
c. With the exception of permit modifications which satisfy the criteria in 40 C.F.Ft. 122.63
and V.I.ft&R. Section 18451(c) for "minor modification? the applicable procedures
required by 40 C.F.R. Part 124 and 12 V.I.C. Section 188(c) shall be followed before this
permit is modified, revoked, reissued or terminated. Notice and opportunity for hearing
are as provided under T. 12 V.I.C. Sections 188 (b) and (c).
EFTA01222288
Page 12
Part ll
7. Property rights. The issuance of this permit does not convey any property rights or any exclusive
privileges, nor does it authorize any injury to persons or property or invasion of other private
rights, or any infringement of Virgin Islands laws or regulations.
8. Duty to provide information The Permittee shall furnish to the Commissioner within a reasonable
time, any information which the Commissioner may request to determine whether cause exists for
modifying, revoking and reissuing, or terminating this permit or to determine compliance with
this permit. The Permittee shall also furnish to the Commissioner, upon request, copies of records
required to be kept by this permit.
9. Inspection and Entry. The Perrnittee shall allow the Regional Administrator, the Commissioner,
or any other authorized representative(s), upon the presentation of credentials and other documents
as may be required by law, to:
a. Enter upon the Pennittee's premises where a regulated facility or activity is located or
conducted, or where records must be kept under the conditions of this permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the
conditions of this permit;
c. Inspect at reasonable times any facilities, equipment(including monitoring and control
equipment), practices, or operations regulated or required under this permit and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or
as otherwise authorized by the Environmental Laws and Regulations of the Virgin Islands
and the Clean Water Act, any substances or parameters at any location.
10. mcingS.
a. Samples and measurements taken for the purpose of monitoring shall be representative of
the monitored activity.
b. The Permittee shall retain records of all monitoring information, including all calibration
and maintenance records and all original strip chart recordings for continuous monitoring
instrumentation, copies of all reports required by this permit, for a period of at least three
(3) years from the date of the sample, measurement report or application. This period
may be extended by request of the Commissioner at any time.
c. Records of monitoring information shall be recorded with indelible ink in a bound log
book with pre-numbered pages and shall include:
(I) The date, exact place, and time of sampling or measurement;
(2) The individual(s) who performed the sampling or measurements;
(3) The date(s) analyses were performed:
(4) The individual(s) who performed the analyses;
(3) The analytical techniques or methods used;
(6) The quality assurance information specified in Part I of this permit; and
(7) The results of such analyses.
d. Monitoring shall be conducted according to test procedures approved under 40 CFR, Past
136.
EFTA01222289
Page 13
Pan ❑
c. The Clean Water Act provides that any person who knowingly makes any false
statement, representation, or certification in any record or other document submitted or
required to be maintained under this permit, including monitoring reports or reports of
compliance or noncompliance shall upon conviction, under the Virgin Islands Water
Pollution Control Act be punished by a fine of not more than S10,000, or by
imprisonment for not more than six (6) months, or by both, or under the Clean Water Act
be fined not more than S10,000 or imprisoned for not more than two (2) years.
11. Sianatory reattirements
a. All permit applications shall be signed as follows:
(1) For a municipality, State, Federal or other public agency, by either a principal
executive officer or ranking elected official, or other duly authorized employee.
(2) In any other case, by the individual duly authorized to act, as evidenced by
documentation acceptable to the Commissioner.
b. All reports required by this permit, and other information requested by the Regional
Administrator or Commissioner of DPNR pursuant to the terms of this permit, including
DMRs and reports of noncompliance, shall be signed as follows:
(1) By a person described in subsection a, or by a duly authorized representative of
that person.
(2) A person is a duly authorized representative only if:
(a) The authorization is made in writing by a person described in
subsection a.;
(b) The authorization specifies either an individual or a position having
responsibility for the overall operation of the regulated facility or
activity such
as the position of plant manager, operator of a well or well field,
superintendent, position of equivalent responsibility, or an individual or
position having overall responsibility for environmental matters for the
company.
(c) The written authorization is submitted to the:
Regional Administrator, as noted in Part I., section R.
(3) If a written authorization pursuant to subsection II. b. is no longer accurate
because a different individual or position has responsibility for the overall
operation of the facility, a new authorization satisfying the requirements of
paragraph II. b. must be submitted to the Regional Administrator and the
Commissioner ofDPNR prior to or together with any reports or information to
be signed by an authorized representative.
EFTA01222290
Page I4
Part Ii
c. Certification. Any person signing a document under subsection a. orb. shall make the
following certification:
"I certify under penalry ofthe law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualifiedpersonnelproperlygather and evaluate the information submitted Based on my
inquiry ofthe person or persons who manage the system, or those persons cllrectty
responsiblefor gathering the information, the information submitted is. to the best ofmy
knowledge andbelief true, accurate andcomplete. I am aware that there are significant
penaltiesfor submittingfalse information, including the possibility offine and
imprisonmentfor knowing violations."
12. Remitting Requirement§
a. Planned changes. The Permittee shall give notice to the Regional Administrator and
Commissioner of DPNR as soon as possible of any planned physical alterations or
additions to the permitted facility. Notice is required only when:
(I) The alteration or addition to a permitted facility may meet one of the criteria for
determining whether a facility is a "new source" in 40 CFR, Part 122.29(b); or
(2) The alteration or addition could significantly change the nature or increase the
quantity of pollutants discharged. This notification requirement applies to
pollutants which are subject neither to effluent limitations in the permit, nor to
notification requirements under Part I.C.7, above.
b. Anticipated noncompliance. The Permittee shall give advance notice to the Regional
Administrator and the Commissioner of DPNR of any planned changes in the facility or
activity which may result in noncompliance with permit requirements as soon as it
becomes aware of the circumstances.
c. Transfers
(1) This permit is not transferable to any person except after notice to the Regional
Administrator and the Commissioner of DPNR. Except as provided in
paragraph c.(2) below, a permit may be transferred by the existing Permittee to a
new owner or operator only if the permit has been modified or revoked and
:tele:wet or a minor modification made, to identify the new Pennittee and
incorporate such other requirements as may be necessary under the Clean Water
Act.
(2) This permit may be automatically transferred to a new Pennittee
(a) The existing Pennittee notifies the Regional Administrator and the
Commissioner of DPNR at least thirty (30) days in advance of the
proposed transfer date in subparagraph (b);
(b) The notice contains a written agreement between the evicting and new
Permittee containing a specific date for transfer of permit
responsibility, coverage, and liability between them; and
EFTA01222291
Page 15
Part If
(e) The Commissioner does not notify the existing Permittee and the
proposed new Permittee of his or her intent to modify or revoke and
reissue the permit (A modification under this paragraph may also be a
minor modification under 40 CFR, Part 122.63.) If this notice is not
received, the transfer is effective on the date specified in the agreement
mentioned in subparagraph (b).
(3) If this permit is automatically transferred in accordance with the provisions of
paragraph (2), the permit maybe modified to reflect the automatic transfer after
its effective date.
d. Monitoring Reports.
(1) Monitoring results shall be reported at the intervals specified in Part I of this
permit
(2) Monitoring results shall be reported on a Discharge Monitoring Report (DMR).
(3) If the Perminee monitors any pollutant more frequently than required by the
permit, using test procedures approved under 40 CFR 136 or as specified in the
permit, the results of this monitoring shall be included in the calculation and
reporting of the data submitted in the DMR.
(4) Calculations for all limitations which require averaging of measurements shall
utilize an arithmetic mean unless otherwise specified in the permit.
e. Compliance Schedules. Reports of compliance or noncompliance with, or any progress
reports on, interim or final requirements contained in any compliance schedule of this
permit shall be submitted no later than fourteen (14) days following each schedule date.
f. Twenty_four hour reporting.
(1) The following information shall be reported orally to the Regional Administrator
at (212) 267-5000, the US EPA VI Coordinator's Office at (340) 714-2333,
DEPARTMENT OF HEALTH AT (340) 774-9000 and the Commissioner of
DPNR at (340) 774-3320 immediately upon detection and at least within
twenty-four (24) hours from the time the Permitter becomes aware of the
circumstances:
(a) Any noncompliance which may endanger health or the environment;
(b) My unanticipated bypass (see 13 below) which violates any effluent
limitation in the permit;
(c) Any upset (see 14 below) which violates any effluent limit in the
permit; or
(d) The violation of a maximum daily discharge limitation for any of the
pollutants listed in Part 1 of this permit is required to be reported within
twenty-four (24) hours. This list includes any toxic pollutant or
hazardous substance, or any pollutant specifically identified as the
method to control a toxic pollutant or hazardous substance.
EFTA01222292
Page 16
Part II
(2) In addition to the oral twenty-four (24) hour report, the Permittee shall also
provide a written submission to the Regional Administrator, the US EPA VI
Coordinator, THE DEPARTMENT OF HEALTH and the Commissioner of
DPNR within five (5) days of the time the Permittee becomes aware of the
circumstances. The written submission shall contain:
a) a description of the noncompliance and its cause;
b) the period of noncompliance, including exact dates and times;
c) the estimated time noncompliance is expected to continue if it has not been
corrected; and
d) steps taken or planned to reduce, eliminate, and prevent recurrence of the
noncompliance.
e) if the noncompliance involves an overflow, the written submission must
contain:
(i) The location of the overflow;
(ii) The receiving water, including bays, guts, ponds, etc.;
(iii) An estimate of the volume of the overflow;
(iv) A description of the sewer system component from which the
release occurred (e.g., manhole, constructed overflow pipe, crack in
Pipe);
(v) The estimated date and time when the overflow began and stopped
or will be stopped;
(vi) The cause or suspected cause of the overflow;
(vii) Steps taken or planned to reduce, eliminate, and prevent
reoccurrence of the overflow and a schedule of major milestones for
those steps;
(viii) An estimate of the number of persons who came into contact with
wastewater from the overflow; and
(3) Except with respect to written reports required under paragraph (1)(a) of
subsection f. above, the Commissioner may waive the written report on a case
by case basis if the oral report has been received within twenty_four (24) hours.
Public notification.
(1) The Permittee shall, in the event of a sewage bypass or upset with a duration of
more than eight [8J hours:
(a) Furnish a copy of the notice of potential health risk, to a radio station
serving the area affected as soon as possible, but in no event later than
twenty-four [24) hours following the violation.
EFTA01222293
Page I7
Part II
(b) Furnish a copy of the notice of potential health risk, to a television
station serving the area affected as soon as possible, but in no event
later than twenty-four [24J hours following the violation.
(c) Submit for publication a notice of potential health risk in a newspaper
of general circulation in the area affected, as soon as possible, but in no
event later than twenty-four 1241 hours following the violation and
continue daily publication for as long as the violation exists.
(d) Post a sign(s) in a conspicuous place in the area affected that will warn
the public of the potential health risk, as soon as possible, but in no
event later than twenty-four (24) hours following the violation. Posting
shall continue for as long as the potential risk to health exists.
(e) In the event of a continuing sewage bypass lasting greater than forty-
eight (48) hours, public notice shall be updated and reissued as outlined
in (a), (b), and (c) above and every twenty four 124) hours of sewage
bypassing thereafter.
(e) At the end of a continuing bypass lasting greater than eight [8) hours,
public notice shall be issued by mans of the same media listed in (a),
(b). and (c) above, informing the public of the end of the bypass and the
extent of remaining health risks, if any.
(2) The Pennittoe shall, in the event of an anticipated
sewage bypass or upset, with a duration expected to last more than eight [8)
hours, give the public notification, at least, one day in advance of the anticipated
bypass or upset, consistent with the notice requirements contained in (a) through
(d) of this section.
(3) The following public notice, properly, completed,
shall be used in compliance with (I) and (2) of this section.
PUBLIC NOTICE
On Morel the IDeuarrorent or Command (has begun to/wlllj discharge [bypass) sewage into
(location/water body( from the [pumping station/sewer line).
The reason for this discharge is istatereasonJ . This discharge will continue until Mated.
Standing or running water in these areas may contain contaminants or pollutants harmful to human health.
As a
result of such discharge, sewage is reaching the Paster WA. The water quality of fhttuaded warm
body(
will be tested by the Department of Planning and Natural Resources [DPNIII. This discharge may increase
the bacteriological levels in the water at /water bodvl , The public is advised to refrain from using the
waters at !water bodvl until the problem is corrected and the public health concern has been alleviated. This
includes activities such as fishing and bathing
For additional information please call /name and telephone number/
h. Other noncompliance. The Pennittee shall report to the Regional Administrator and the
Commissioner of DPNR of all instances of noncompliance not reported under subsections e.
d.
and fat the time the monitoring report covering the period of noncompliance is submitted. The
reports shall contain the information listed in paragraph (2) of subsection C, above.
EFTA01222294
Page 18
P811 II
I. Other information. Where the Permittee becomes aware that it failed to submit any
relevant facts in a permit application, or submitted incorrect information in a permit application or
in any report to the Regional Administrator or the Commissioner of DPNR, it shall promptly
submit such facts or information to the Regional Administrator and the Commissioner of DPNR.
13. Bypassing.
a. Bypass not violating limitations. The Permittee may allow any bypass
to occur which does not cause effluent limitations to be violated, but only if it also is for
essential maintenance to assure efficient operation. These bypasses are not subject to the
provisions of subsections I3.b. and 13.c. below.
b. Notice
( I) Anticipated bypass. If the Permittee knows in advance of the need for a bypass,
it shall submit prior notice, if possible at least ten (10) days before the date of
the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated
bypass as required in subsection f. of section 12 above.
c. Prohibition of bypass.
( 1) Bypass is prohibited and the Commissioner may take enforcement action against
a Pennittee for bypass, unless:
(a) Bypass was unavoidable to prevent loss of life, personal injury, or
severe property damage;
(b) There was no feasible alternatives to the bypass, such as auxiliary
treatment facilities, retention of untreated wastes, or maintenance
during normal periods of equipment downtime. This condition is not
satisfied if adequate back up equipment should have been installed in
the exercise of reasonable engineering judgement to prevent a bypass
which occurred during normal periods of equipment downtime or
maintenance; and
(c) The Permittee submitted notices as required under subsection 13.b.
14. Upset
a. Effect of an upset. An upset constitutes an affirmative defense to an
action brought for noncompliance with technology_based effluent limitations if the
requirements of subsection b. arc met. No determination made during administrative
review of claims that noncompliance was caused by upset, and before an action for
noncompliance, is final administrative action subject to judicial review.
b. Conditions necessary for a demonstration of upset. A Permittee who
wishes to establish the affirmative defense of upset shall demonstrate, through properly
signed, contemporaneous operating logs, or other relevant evidence that:
EFTA01222295
Page I9
Pan II
(I) An upset occurred and that the Pennittee can identify the cause(s) of the upset;
(2) The permitted facility was at the time being properly operated: and
(3) The Pemiittee submitted notice of the upset as required in subsection f. of
section 12 above; and
(4) The Permittee complied with any remedial measures required under section 4
above (duty to mitigate).
(5) Burden of proof. In any enforcement proceeding the Permittee seeking to
establish the occurrence of an upset has the burden of proof.
15. Removed substances. Solids, sludges, filter backwash or other pollutants removed in the
course of treatment or control of wastewaters and/or the treatment of intake waters shall be
disposed of in a manner such as to prevent any pollutant from such materials from entering
navigable waters. The following data shall be reported together with the monitoring data required
in Pan 1, 8.2.:
a. The sources of the materials to be disposed of;
b. The approximate volumes and weights;
c. The method by which they were removed and transported; and
d. Their final disposal locations.
16. Oil and hazardous substance liability. The imposition of responsibilities upon, or the
institution of any legal action against the Permittee under section 311 of the Clean Water Act shall
be in conformance with regulations promulgated pursuant to Section 311 to discharges from
facilities with NPDES permits.
17. Reopener clause for toxic effluent limitations.
Notwithstanding any other condition of this permit, if any applicable toxic effluent standard or
prohibition is promulgated under Section 301(b)(2)(C) and (d), 304(bX2) and 307(aX2) of the
Clean Water Act and that effluent standard or limitation is more stringent than any effluent
limitation in the permit or controls a pollutant not limited in the permit, this permit shall be
promptly modified or revoked and reissued to conform to that effluent standard or prohibition.
18. Availability of information.
a. NPDES permits, effluent data, and information required by NPDES
application forms provided by the Commissioner under 40 CFR, Part 122.21 (including
information submitted on the forms themselves and any attachments used to supply
information required by the forms) shall be available for public inspection at the offices
of the Regional Administrator and the Commissioner of DPNR.
b. In addition to the information set forth in subsection a. Any other
information submitted to EPA in accordance with the conditions of this permit shall be
made available to the public without further notice unless a claim of business
confidentiality is asserted at the time of submission in accordance with the procedures in
40 CFR, Part 2 (Public Information).
EFTA01222296
MAJOR COASTAL ZONE MANAGEMENT PERMIT NO. CZT-
5-99W
I. ADDIORITY. This permit is issued by the St. Thomas Comm
ittee of the Virgin Islands
Coastal Zone Management (CZM) Commission and is administere
d and monitored by the
Department of Planning and Natural Resources (DPNR) on behal
f of the Coastal zone
Management Commission pursuant to.Title 12, Chapter 21, V.I.
Code, Section.910 and 911,
and all other provisions of chapter 21 that apply. As herein
, "Pennittor" is the St. Thomas
Committee of the V.I. CZM Commission, and "Permittee"
is L.S.J., LLC ( LITTLE S-11.
JAMES, LLC)
2. SCOTF,.
(a). This permit approves the renovation and expansion of an
existing dock which is 73
feet, 8 inches by 8 feet. A 30 feet by 34 feet platfonn will
be added at the end of the
existing dock and a 12 feet by 12 feet floating swim platfo
rm will be placed within
the bay. The total area impacted by these structures is 1739
square feet. The project
is located on Little St. James Island. Little St. James is
located between St. Thomas
and St. John, U.S. Virgin Islands.
(b). This Permit allows the Permittee continued use of the dock
described above for the
term ("TERM") set forth below. It shall not constitute a
property right and may be
renewed only in accordance with Section 911 of the Act.
3. TERM. This permit is effective upon its signing by the
Chairman of the St. Thomas
Committee of the V.I. CZM Commission, the Governor
of the Virgin Islands, and ratified
by the Legislature of the Virgin Islands or by the Committee on
Planning and Environmental
Protection, if the Legislature is not in session. As used herein
, the "Effective Date" or "the
date hereof' means the date of such ratification. This permi
t will expire twenty (20) years
after the Effective Date. The Permittee shall have the
option to renew the permit within
ninety (90) days before the permit expires and the terms
are subject to negotiations. This
permit is issued for a definite term, twenty (20) years, and
shall not constitute-a property
right. The Permit shall be renewed only if the requiremen
ts of Title 12 of the V.LCode,
Section 911 are met.
DOCUMENTS INCORPORATED BY REFERENC
E
Exhibit A: Joint Army Corps/CZM Application dated April 12, 1999.
Exhibit B: CZT-156-81W issued February 1982.
Exhibit C: Site Plan dated April 5, 1999.
1
EFTA01222297
5. COMPLIANCE WITH TERMS OF APPLICATION AND
LEGALREQHME
, RENTS
The Permittee covenants and agrees that the project shall be used only
for the purposes, and
in the manner, set forth in the application, including all attachments
and exhibits thereto and
in compliance with applicable laws.
6. OWNERSHIP OF IMPROVEMENTS All improvements to the
premises made by the
Perrnittee shall remain the property of the permittee and may
be removed by the permittee
at the termination of this permit for any reason. Any impro
vements remaining on the
premises following the expiration or termination of this permi
t shall be subject to removal
or modification as provided in Section 7, Subsection (k) below
.
7. GENERAL CONDITIONS
(a) Inability. The Permittee agrees to assume full and complete
responsibility for all
liability to any person or persons, including employees, as a
result of its control of
the area described in Paragraph 2 of this permit, and all
improvements thereon
(which area and improvements are hereinafter referred to
as"the premises"), and to
hold the Permittor free and harmless for civil or other liabili
ties of any kind during
the time the Permittee is in control of the premises pursuant
to this permit.
(b) personal Property and Damage. All personal property of any
kind or description
whatsoever located on the premises shall be there at the Permittee's
sole risk.
(c) Assignment or Transfer. This permit may not be transferred or
assigned except as
provided in Section 910-15 of the V.I. R& BEGS.
(d) Permit to be Displayed A placard evidencing the permit shall be
posted in a
conspicuous place at the project site during the entire work period
.
(e) Reliance on Information and Data The Permitter affirms that
the information and
data which it provided in connection with its permit applic
ation are true and
accurate, and acknowledges that if subsequent to the effective
date of this permit
such information and data prove to be false or inaccurate, the
permit may be
modified, suspended or revoked in whole or in part, and that
the Commissioner or
the Committee may, in addition, institute appropriate legal action
.
(f) Development Any and all development approved by this Coastal
Zone Permit shall begin within twelve (12) months from
the date this permit
becomes effective and shall be continuous until completion
. Failure to perform at
least fifty (50%) percent of the work within such period and contin
uously construct
thereafter until the completion of construction shall cause the
permit to terminate
automatically and render it null and void, unless the permittee
requests an extension
2
EFTA01222298
in writing and demonstrates to the satisfaction of the Committee that good cause
exists for granting such extension.
(g). Notification of Completion Upon completion of any activity authorized or required
by this CZM Permit, the Permittee shall promptly so notify the Director of the
Division of CZM and where the services of a professional engineer were required in
undertaking the activity, a certification of compliance provided, by the project
engineer that the plans and specifications of the project and all applicable V.I. Code
requirements have been met, shall be filed with said Director.
(h) Inspection. The Commission, its Committee, the Commissioner or their authorized
agents or representatives shall have the power to enter at reasonable times during
project working hours upon any lands or waters in the coastal zone for which this
Coastal Zone Permit has been issued. The Permittee shall permit such entry for the
purpose of inspection and ascertaining compliance with the terms and conditions of
said Coastal Zone Permit. The Permittee shall provide access to such records as the
Commission, its Committee, or the Commissioner in the performance of it or his
duties under the CZM Act may require the Permittee to maintain. Such records may
be examined, and copies shall be submitted to the Commission, its Committee or
the Commissioner upon request
(i) conditions of Premises. The Development authorized by this permit shall he
maintained in a safe condition and in accordance with the description, plans, or
drawings approved by the Committee and all applicable V.I. Laws.
(j) Public Access to Shoreline The development shall be operated so as to assure
optimum public access to the shoreline.
(k) Restoration of Area, The Permittee, upon revocation or expiration of the permit,
shall upon order of the Committee or the Commissioner, and in their sole discretion,
remove all structures authorized by the permit and restore the area to its original
condition, and/or modify such structures or site, and/or comply with any directive of
the Committee or the Commissioner in satisfying the original permit conditions in
such time and manner as the Committee, or the Commissioner may direct.
(I) Notices. All notices sent or required to be sent hereunder must be by certified mail,
return receipt requested. If addressed to the Permittor, same shall be sent to the
Commissioner of the Department of Planning and Natural Resources, Foster Plaza,
396-1 Annas Retreat, St. Thomas, US Virgin Islands 00802 or to such other place
as the Pennittor may hereinafter designate. If addressed to the Pennittee, same shall
be sent to L.S.J.,LLC, Little St. James Islands Inc. do Paul Hoffman, 41-42 Kongens
Cade, P.O. Box 870, St. Thomas, Virgin Islands, 00804, or to such place as the
Permittee may hereinafter designate by certified mail, return receipt requested.
3
EFTA01222299
(m) Non Waiver. One or more waivers by the Perrnittor of any covenant or condition of
this permit shall not be construed as a waiver of a further breach of the covenant or
condition. The consent or approval of the Pennittor to or of any acts by the
Pennittee requiring the Permittor's . consent or approval shall not be construed as
approval of any subsequent similar act by the Permittee.
(n) Revocation. It is specifically understood that all the foregoing covenants and
agreements, as well as other terms and special conditions hereby agreed to by the
Permittee, are to be well and faithfully kept by Pennittee and that any failure by
Permittee to keep same will result in revocation of this permit.
(o) Other _Approval. if the development covered wider this permit requires separate and
distinct approval from the United States Government or any agency, department,
commission or bureau thereof, then no development or occupancy is allowed under
this permit until such permits or approvals have been obtained.
(p) Abandonment. If the Permittee abandons, deserts or vacates the premises or
discontinues its operation at the premises for a period totaling six (6) consecutive
months, the permit will terminate automatically and be rendered null or void.
(q) Signatures on the Permit Document The applicant shall sign and return the permit
document to the DPNR within sixty (60) days of receipt thereof. Failure to return
the signed permit within the time period specified herein will be considered a
rejection of the terms and conditions of the permit and will render the offer of the
permit null and void, unless the applicant request a written extension and DPNR
grants the written extension.
(r) Damage as Repair ofPremises Described in Para anh 2. In the event of damage
to or destruction of the premises described in paragraph 2 hereof, repair work may
be done only after a request to do so has been Submitted in writing to DPNR and
written permission has been granted by the DPNR.
8). SPECIA I CONDITIONS
a. All special conditions of approved pennit CZT-156-81W shall remain in full force
and effect.
b. No dredging is permitted.
c. The use of propelling for maintenance dredging is prohibited. No prop-wash is
allowed.
d. All concrete structures must be pre-poured. There shall be no pouring of concrete
underwater.
4
EFTA01222300
9). MS
Pursuant to section 910-5 (e) 8, of the rules and Regulations, V.I. Code, Title 12, Chapter
21, the Commissioner of the Department of Panning and Natural Resources negotiated the
following fees to be paid by the Permittee. Certified or bank draft checks shall be made
payable to DPNR five (5) days after the Legislature ratifies this permit.
(a). A permit term of twenty (20) years with an option to renew as stated in paragraph
three (3) of this permit.
(b). A fee of two thousand five hundred dollars ($2,500.00) per year was negotiated.
(c). On the first 5* anniversary, the fees shall be adjusted pursuant to applicable Rules
and Regulations, or re-negotiated not to exceed 25% of the assessed fee. Failure of
the permittee to re-negotiate fees will result in an automatic increase of 25%, or a
fee adjustment pursuant to applicable Rules and Regulations, whichever is higher.
After the first fifth anniversary, fee adjustments for each additional fifth anniversary
shall be pursuant to applicable Rules and Regulations.
(d). All fees payable under this permit shall be paid to the Permittor regardless as to
whether Permittee actually occupies or uses the submerged land described herein,
provided, however that if the permit is modified to decrease/increase the submerged
lands so occupied, then the fees may also be decreased/increased consistent
herewith.
5
EFTA01222301
IT IS EXPRESSLY UNDERSTOOD by the part
ies hereto that the title to all submerged
land which is altered or occupied on the basi or filled
s of this permit is in the Government of the
Islands, and the Permittee shall have no right or Virgin
interest therein, of any kind whatsoever,
such rights as are expressly set forth herein, and other than
that this instrument is not a lease.
IN TESTIMONY WHEREOF, the parties
herein have hereunto set their hands and
days -and-years appearing herein below. seals on the
ST. THOMAS COMMITTEE OF THE
VIRGIN ISLANDS CZM COMMISS
ION
Permittor
By://64/e7y0.e....,-/5.4,
Albert Paiewonslcy, Cud an
/0-7- F?
Date
St. Thomas CZM Committee
L.S.J., LLC ( LITTLE ST. JAMES, LLC
)
By.
Paul Hoffman , Attorney for LSJ,LLC
Date
Governor of the Virgin Islands
RATIFIED
Legislature of the Virgin Islands
President of the Legislature
Date
Or if the I tislature is not in session
Committee
ring & Environmental Protection
Chairman
3-30- OO
Date
6
EFTA01222302
I, Mr. Paul Hoffman, Attorney for L.S.J., LLC.,
the legal representative for L.S.J., LLC.,
LITTLE ST. JAMES, LLC do hereby certify that as
LITTLE ST. JAMES, LLC, I am duly authorized
empowered to sign this Permit on behalf of L.S.J., LLC., and
1 LITTLE ST. JAMES, LLC.
Paul offman, Attorney for LSJ, LW. Date / •
SWORN AND SUBSCRIBED before me
this/Cfay of E2e-eam- e, - 1999
Notary Public
Weatherly
ZOO
Barbara Mignon 21,
Commission es November
xpirommission No. 1.141 134)7
Notary Pubic EC
7
EFTA01222303
lVAINOR COASTAL ZONE MANAGEMENT PERMIT NQ. C4T-25-1.01
-
1. AUTHORITY, This permit is issued by the Commissioner of the Department of Planning
and Natural Resources and is administered and monitored by the Department pursuant
to
Title 12, Chapter 21, Virgin Islands Code. As herein, "Pcmdttor is the Government of the
Virgin Islands and "Pennittee" is ISJ, LLC.
2. SCOPE. This permit allows the site preparation and construction of 25' x 70 sq. ft.
swimming pool with a 2000 sq. ft. cabana, Corral stone deck; living space, rest room, pool
equipment room and a 1,800 sq. ft music room with living area. This project is located at
parcel A Little St. James, St. Thomas, Virgin Islands.
3. TERM% This permit is effective upon its signing by the Commissioner of the Department of
Planning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization
for construction under this permit will expire if the Pennittee fails to commence work within
twelve (12) months from the date this permit becomes effective.
4. DOCUIVIENTS INCORPORATED BY REFERENCE,
EXHIBIT A - CZM Permit Application dated April 8, 2010
EXHIBIT B - Required document submittal (deed, tax letter and mans).
EXHIBIT C Site plan and Drawings dated July 7, 2010.
S. GENERAL CONDITIONS.
(a) Liability& The Pennittee agrees to assume full and complete responsibility for all
liability to any person or persons, including employees, as a result of its control of the
area described in Paragraph 2 of this permit, and all improvements thereon (which
area and improvements arc herein after referred to as" the premises") and to hold the
Permitter free and harmless from civil or other liability of any kind during the time
the pennittee is in control of the premises pursuant to this permit.
(b) Personal Property aad Dargagej. All personal property of any kind or description
whatsoever, located on the premises will be there at the Pennittec's sole risk.
(c) Assignments or Transfer, This permit may not be transient(' or assigned except as
provided in Section 910-15 of the Regulations of the Coastal Zone Management Act.
(d) Permit .19_1/e_displavd., A placard evidencing the permit shall be posted in a
conspicuous place at the project site during the entire period of work.
EFTA01222304
CZT-25-10I.
(e) gelmnpaidemaand Dal& The permittee affirms that the information, and
data which he/she provided in connection with his/her permit application is true and
accurate, and acknowledges that if subsequent to the effective date of this permit
such information and data proves to be false or inaccurate, the permit may be
modified, suspended or revoked in whole or in part, and that the Commissioner may,
in addition, institute appropriate legal action.
(1) Development to be Commenced, Any and all development approved by this Coastal
Zone Management Permit shall be commenced within twelve (12) months from the
date this permit becomes effective. Pail= to perform substantial work within such
period and thereafter until completion of construction will cause the permit to lapse
and render it null and void unless an extension is granted by the Commissioner.
(g) Notification of Completion. Upon completion of any activity authorized or required
by this Coastal Zone Management Permit, the permittee shall promptly so notify the
Director of the Division of CZM ("The Director") and where the service of a
professional engineer were required in undertaking the activity, a certification of
compliance provided by the project engineer that the plans and specifications of the
project and all applicable Virgin Islands Code requirements have been met, shall be
filed with the Director.
(11) Inspection, The Commissioner or his authorized agents or representatives shall have
the power to enter at reasonable time during projects working hours upon any lands
or waters for which a Coastal Zone Permit has been issued. The Pennine° shall
permit such entry for the purpose of inspection and ascertaining compliance with the
terms and conditions of said Coastal Zone Management Permit. The Permittee shall
provide access to such records as the Commissioner in theperfonnance of his duties
under the Act may require the Permittee to maintain. Such records may be examined
and copies shall be submitted to the Commissioner upon request.
oC_nditions of premises, The development authorized by this permit shall be
maintained in a safe, attractive and satisfactory condition and in accordance with the
description, plans or drawings approved by the Commissioner.
Restoration a :Ea The pennittee, upon revocation or expiration of the pennit,
shall upon order of the Commissioner, and his sole discretion, remove all structures
authorized by the permit and restore the area to its original condition, and/or modify
such structures, and/or comply with any directive of the Commissioner in satisfying
the original permit condition in such time and manner as the Commissioner may
direct.
2
EFTA01222305
CZT25-1011.
(k) Notices, All notices sent or requited to be seat hereunder must be certified mail,
return receipt requested. If addressed to the permitter, same shall be sent to the
Commissioner of the Department of Planning and Natural Resources, Cyril B. King
Airport, Second Floor, St. Thomas, VI 00802 or to suchplace as the Permitter may
herein after designate by certified mail. If addressed to the Permittee, same shall be
sent to LSJ, LLC, 6100 Red Hook Quarter, Suite B, St. Thomas, USVI 00802 or to
such place as the Pennittee may hereinafter designate by certified mail, return receipt
requested.
(I) Nonwaiver, One or more waivers by the Permitter of any covenant or condition of
this permit shall not be construed as a waiver or breach of the covenant or condition,
and the consent or approval of the Permitter to or of any acts by the Permittee
requiring the Permittor's consent or approval shall not be construed as approval of
any subsequent similar act by the Pennittee.
(in) Revocation. It is specifically understood that all foregoing covenants and
agreements, as well as other terms and special conditions hereby agreed to by
Permitter', are to be well and faithfully kept by Permillee and that any failure by
Pennittee to keep same.will result in revocation of this permit.
(n) Other Approval. If the development covered under this permit requires separate and
distinct approval from the United States Government or any agency, department,
commission or bureau thereof, then no development or occupancy is allowed under
this permit until such permits or approvals have been obtained.
(o) Abandonment. If the Permittee abandons, deserts or vacates the premises or
discontinues its operations at the premises for a period totaling six (6) consecutive
months, then the permit will terminate automatically and be rendered null and void.
(p) NputioaLe fadtroApflaking r thAi n the event of damage to
or destruction of the premises described in Paragraph 2 hereof, repair work may be
done only after a request to do so has been submitted in writing to the Department
and permission in writing has been granted. Repair must duplicate the original work,
and must be in accordance with applicable law, rules and regulations.
(q) Signatures on the Permit Document, The applicant shall sign and return the permit
document to the Department within sixty (60) days of receipt thereof. Failure to
return the signed permit within the time period specified herein will be considered a
rejection of the terms and conditions of the permit and will render the offer of the
permit null and void, unless a written extension is requested and granted.
3
EFTA01222306
(21-25-401.
B. The Coastal Zone Management permit placard shall be placed in a conspicuous
location on the site as soon as work commences.
C. The permit is valid only for work as stated in Paragraph 2 "Scope."
D. Erosion/Sedimentation control measures shall be installed and maintained until all
development activities are completed. All excavated areas shall be protectively
berm to prevent silt runoff.
E. Site disturbance shall be limited to areas designated on the approved drawings.
P. All other necessary permits shall be obtained prior to commencement of work.
O. "Upon discovery of any archaeological or historical site, or human burial site or
remains upon private lands, the owner or the representative shall immediately
notify the State Historic Preservation Office verbally and in writing."
H. The scope of Permit CZT-25-10T, is confined to the footprint approved in Permit.
No development activities may occur outside the footprint ofthe approved Permit.
I. Silt fencing must be installed with steel posts and wire fence support as described in
the 2002 Environmental Protection Handbook.
orinicreportslupda
tiding-oda graphs of the-slferl he monitor
e un r a sta rs m onn Ztlat hdevelopmTL-rretivitie.
urntant to this vermit.ars-eornpleted-and-a-cortificate-atoneunancy is issu
4
EFTA01222307
CZT-25-101,
On this Day o 10 theDepartment ofPla ming and Natural Resources hereby
issues Minor CZM Permit No. CZT-25-101,
I, the undersigned, have read and understood all terms and conditions established in Permit No.
CZT-25-101, and hereby agree to be bound by the terms and conditions contained therein.
hha
Date
. .
. .
. . . .
. . . . •
• • • • • • • •
..!.• . 11
. . . . • . . . . .•••. .•.. ••. . .
5
EFTA01222308
MINOR COASTAL ZONE MANAGEMENT' PERMIT NO. C27-27-1,0L
1. AUTHORITY. This permit is issued by the Commissioner of the Department of Planning
and Natural Resources and is administered and monitored by the Department pursuant to
Title 12, Chapter 21, Virgin Islands Code. As herein, "Permittoe" is the Government of the
Virgin Islands and "Permittee" is LSJ, LLC.
2. SCOPE This permit allows the site preparation and construction of a 1,320 sq. ft ATV
garage made of natural stone. This project is located at parcel C Little St. James, St. Thomas,
Virgin Islands.
3. TERM. This permit is effective upon its signing by the Commissioner of the Department of
Planning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization
for construction under this permit will expire if the Permittee fails to commence work within
twelve (12) months from the date this permit becomes effective.
4. DOCUMENTS INCORPORATED BY REFERENCE,
EXHIBIT A - CZM Permit Application dated April 8, 2010
EXHIBIT B - Required document submittal (deed, tax letter and maps).
EXHIBIT C - Site plan and Drawings dated July 7, 2010.
5. GENERAL CONDITIONS.
(a) Liability. The Pennittee agrees to assume full and complete responsibility for all
liability to any person or persons, including employees, as a result of its control ofthe
area described in Paragraph 2 of this permit, and all Improvements thereon (which
area and improvements are herein after referred to as" the premises") and to hold the
Permitter free and harmless from civil or other liability of any kind during the time
the pennittee is in control of the premises pursuant to this permit.
(b) Personal Property and Damage, All personal property of any kind or description
whatsoever, located on the premises will be there at the Permittee's solo risk.
(c) Assignments ()rigida. This permit may not be transferred or assigned except as
provided in Section 910-15 ofthe Regulations of the Coastal Zone Management Act.
(d) Permit to be displayed. A placard evidencing the pennit shall be posted in a
conspicuous place at the project site during the entire period of work.
EFTA01222309
CZT-27-101.
(c) Rename on Information* Data, The permittee affirms that the information, and
data which he/she provided in connection with his/her permit application is true and
accurate, and acknowledges that if subsequent to the effective date of this permit
such information and data proves to be false or inaccurate, the permit may be
modified, suspended or revoked in whole or in part, and that the Commissioner may,
in addition, institute appropriate legal action.
(0 Development to be Commenced, Any and all development approved by this Coastal
Zone Management Pennit shall be commenced within twelve (12) months from the
date this permit becomes effective. Failure to perform substantial work within such
period and thereafter until completion of construction will cause the permit to lapse
and render it null and void unless an extension is granted by the Commissioner.
islotification of Completion, Upon completion of any activity authorized or required
by this Coastal Zone Management Permit, the permittee shall promptly so notify the
Director of the Division of CZM ("The Director") and where the service of a
professional engineer were required in undertaking the activity, a certification of
compliance provided by the project engineer that the plans and specifications of the
project and all applicable Virgin Islands Code requirements have been met, shall be
filed with the Director.
(h) Inspection, The Commissioner or his authorized agents or representatives shall have
the power to enter at reasonable time during projects working hours upon any lands
or waters for which a Coastal Zone Permit has been issued. The Permittee shall
permit such entry for the purpose of inspection and ascertaining compliance with the
terms and conditions of said Coastal Zone Management Permit. The Permittee shall
provide access to suchrecords as the Commissioner in the performance of his duties
under the Act may require the Pennittee to maintain. Such records may be examined
and copies shall be submitted to the Commissioner upon request.
(i) Conditions of premises, The development authorized by this permit shall be
maintained in a safe, attractive and satisfactory conditionand in accordance with the
description, plans or drawings approved by the Commissioner.
0) Restoration of Area. The permittee, upon revocation or expiration of the permit,
shall upon order of the Commissioner, and his sole discretion, tomove all structures
authorized by the permit and restore the area to its original condition, and/or modify
such structures, and/or comply with any directive of the Commissioner in satisfying
the original permit condition in such time and manlier as the Commissioner may
direct.
2
EFTA01222310
ca-27- lei.
Notices. All notices sent or required to be sent hereunder must be certified mail,
return receipt requested. If addressed to the permitter, sante shall be sent to the
Commissioner of the Department of Planning and Natural Resources, Cyril E. King
Airport, Second Floor, St. Thomas, V100802 or to such place as the Pennittor may
herein after designate by certified mail. If addressed to the Famine*, same shall be
sent to LSJ, lie, 6100 Red Hook Quarter, Suite 13, St. Thomas, USVI 00802 or to
such place as the Permittee may hereinafter designate by certified mail, return receipt
requested.
(1) Nonwaiver. One or more waivers by the Pennittor of any covenant or condition of
this permit shall not be construed as a waiver or breach of the covenant or condition,
and the consent or approval of the Permitter to or of any acts by the Permittee
requiring the Permittor's consent or approval shall not be construed as approval of
any subsequent similar act by the Pennittee.
(m) Revocation, It is specifically understood that all foregoing covenants and
agreements, as well as other terms and special conditions hereby agreed to by
Permittee, are to be well and faithfully kept by Permittee and that any failure by
Permittee to keep same will result in revocation of this permit.
(n) Other Approval. If the development covered under this permit requites separate and
distinct approval from the United States Government or any agency, department,
commission or bureau thereof, then no development or occupancy is allowed under
this permit until such permits or approvals have been obtained.
(o) Abandonment. If the Permittee abandons, deserts or vacates the premises or
discontinues its operations at the premises for a period totaling six (6) consecutive
months, then the permit will terminate automatically and be rendered null and void.
(p) Damage and Repair of Premises Described in Paragraph 2. In the event of damage to
or destruction of the premises described in Paragraph 2 hereof, repair work may be
done only after a request to do so has been submitted in writing to the Department
and permission in writing has been granted. Repair must duplicate the original work,
and must be in accordance with applicable law, rules and regulations.
(q) Signatures on the Permit Document. The applicant shall sign and return the permit
document to the Department within sixty (60) days of receipt thereof. Failure to
return the signed permit within the time period specified herein will be considered a
rejection of the terms and conditions of the permit and will render the offer of the
permit null and void, unless a written extension is requested and granted.
3
EFTA01222311
CZT-27-101,
6. SPECIAL CONDITIONS.
A. The Division of Coastal Zone Management shall be notifie
d in writing at leas forty-
eight (48) hours before work commences.
B. The Coastal Zone Management permit placard shall be placed
in a conspicuous
location on the site as soon as work tommences.
C. The permit is valid only for work as stated in Paragraph 2 "Scop
e."
D. Erosion /Sedimentation control measures shall be installed and
maintaineduntil all
development activities are completed. All excavated areas
shall be protectively
berm to prevent silt runoff.
E. Site disturbance shall be limited to areas designated on the approv
ed drawings.
F. All other necessary permits shall be obtained pier to commencem
ent of work.
CI. "Upon discovery of any archaeological or historical site,
or human burial site or
remains upon private lands, the owner or the representative
shall inunediately
notify the State Historic Preservation Office verbally and in writin
g."
Ii. The scope of Permit CZT-27-1 0L is confined to the footpr
int approved in Permit.
No development activities may occur outside the footprint of the approv
ed Permit
I. Silt fencing must be installed with steel posts and wire fence suppo
rt as described in
the 2002 Environmental Protection Handbook.
tR`Itlymnrittmi tcpons/upda . t-p
the-poi mIctl8W- amp o phs of the site.) The monior
re tiis nua.a.:,4m.Mie_until-a-staff4s inforsit kievelept t,- etivti
----rstiont-toiliirieirit are amp
comp l-a-cedifteate of occupancy is is
4
EFTA01222312
CZT-27-10L
On thisa,q_pay of 2010 theDepartment ofPlanning and Natural Resources hereby
issues Minor CZM Permit No. CZT-27-101...
I, the undersigned, have read and understood all terms and conditions established in Permit No.
CZT-27-10I, and hereby agree to be bound by the terms and conditions contained therein.
Signatur
cc: Filo
5
EFTA01222313
MINOR COASTAL ZONE MANAGEMENT PERMIT NO. CLT-26-10L
1. AUTHORITY. This permit is issued by the Commissioner of the Department of Planning
and' atural Resources and is administered and monitored by the Department pursuant to
Title 12, Chapter 21, Virgin Islands Code. As herein, "Pennittor" is the Government of the
Virgin Islands and "Permittee" is LSI, LLC.
2. SCOPE. This permit allows the she preparation and construction of 5,000 sq. ft suest
cottage. This project is located at parcel B Little St. James, St. Thomas, Virgin Islands.
3. TERM, This permit is effective upon its signing by the Commissioner of the Department of
Planning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization
for construction under this permit will expire if the Pemattee fails to commence work within
twelve (12) months from the date tlds permit becomes effective.
4. DOCUMENTS INCORPORATED BY REFERENCE.,
EXHIBIT A COI Pernik Application dated April 8, 2010
Exinorr - Required document submittal (deed, tax letter and snaps).
EXHIBIT C- Site plan and Drawings dated July '7, 2010.
5. GENERAL CONDITIONS.
(a) Lhtbility. The Permittee agrees to assume fill and complete responsibility for all
liability to any person or persons, including employees, as a result of its control of the
area described in Paragraph 2 of this permit, and all improvements thereon (which
area and improvements are herein after referred to as" the premises") and to hold the
Pennittor five and harmless from civil or other liability of any kind d tiring the time the
pennittee is in control of the premises pursuant to this pertrdt.
(b) Lemma Property endthuma All personal property of any kind or description
whatsoever, located on the premises will be there at the Permittec's sole risk.
(c) Assirunnems or Taut This permit may not be transferred or assigned except as
provided in Section 910-15 of the Regulations of the Coastal Zone Management Act.
(d) rifle i a _da A placard evidencing the permit shall be posted in a
conspicuous place at the project site during the entire period of work
EFTA01222314
Eglianowanfonnation and Data. The permittee affirms that the information, and
data which he/she provided in connection with his/her permit application is true and
accurate, and acknowledges thatifsubsequent to the effective date ofthis permit such
information and data proves to be false or inaccurate, the permit may be modified,
suspended or revoked in whole or in part, and that the Commissioner may, in
addition, institute appropriate legal action.
(f) Devekmftenkftaeca gminarmt Any and all development approval by this Coastal
Zone Management Permit shall be commenced within twelve (12) months from the
date this permit becomes effective. Failure to perfonn substantial work within such
period and thereafter until completion of construction will cause the permit to lapse
and render it null and void unless an extension is granted by the Commissioner.
(g) Notification of Completion. Upon completion of any activity authorized or required
by this Coastal Zone Management Permit, the permiuee shall promptly so notify the
Director of the Division of CZM ("The Director") and where the service of a
professional engineer were required in undertaking the activity, a certification of
compliance provided by the project engineer that the plans and specifications of the
project and all applicable Virgin Islands Code requirements have been met, shall be
filed with the Director.
(10 Juspectirm, The Commissioner or his authorized agents or representatives shall have
the power to enter at reasonable time during projects working hours upon any lands
or waters for which a Coastal Zone Permit has been issued. The Permitter shall
permit such entry for the purpose ofinspection and ascertaining compliance with the
terms and conditions of said Coastal Zone Management Permit. ThePermittee shall
provide access to such records as the Commissioner in the performance ofhis duties
under the Act may require the Permittee to maintain. Such records may be examined
and copies shall be submitted to the Commissioner upon request.
Conditions Of...fiataiel, The development authorized by this permit shall be
maintained in a safe, attractive and satisfactory condition and in accordance with the
description, plans or drawings approved by the Commissioner.
Restorationothrn The pennittee, upon revocation or expirationofthepenult, shall
upon order of the Commissioner, and his solo discretion, remove all structures
authorized by the permit and restore the area to its original condition, and/or modify
such structures, and/or comply with any directive of the Commissioner in satisfying
the original permit condition in such time and manner as the Commissioner may
direct.
2
EFTA01222315
&dot All notices sent or required to be sent hereunder must be certified mail,
return receipt requested. If addressed to the pennittor, same shall be sent to the
Commissioner of the Department ofPlanning and Natural Resources, Cyril E. King
Airport, Second Floor, St. Thomas, VI 00802 or to such place as the Permitter may
herein after designate by certified mail. If addressed to the retrainee, same shall be
sent to LSI, LEC, 6100 Red Hook Quarter, Suite B, St. Thomas, USVI 00802 or to
such place as the Permittee may hereinafter designate by certified mail, return receipt
requested.
(I) Nonwalver, One or more waivers by the Pennittor of any covenantor condition of
tliis permit shall not be construed as a waiver or breach of the covenant or condition,
and the consent or approval of the Pennittor to or of any acts by the Permittee
requiring the rennittoes consent or approval shall not bo construed as approval of
any subsequent similar act by the romance.
(m) Revocation. It is specifically understood that all foregoing covenants and agreement;
as well as other terms and special conditions hereby agreed to by Pennine°, are to be
well and faithflilly kept by Permittec and that any failure by Permittee to keep same
will result in revocation of this permit.
(n) Other Approval,. lithe development covered under this permit requires separate and
distinct approval from the United States Government or any agency, department,
commission or bureau thereof, then no development or occupancy is allowed under
this permit until such permits or approvals have been obtained.
Abandonment If the Pennine° abandon; deserts or vacates the premises or
discontinues its operations at the premises for a period totaling six (6) consecutive
months, then the permit will terminate automatically and be rendered null and void.
Repair ofPremises in
S' eagaIn the event ofdamage to
or destruction of the premises described in Paragraph 2 hereof, repair work may bo
done only after a request to do so has been submitted in writing to the Department
and permission in writing has been granted. Repair must duplicate the original work,
and must be in accordance with applicable law, rules and regulations.
$iguatima on ie Permit Document The applicant shall sign and return the permit
document to the Department within sixty (60) days of receipt thereof. Failure to
return the signed permit within the time period specified herein will be considered a
rejection of the tern and conditions of the permit and will render the offer of the
permit null and void, unless a written extension is requested and granted.
3
EFTA01222316
CZT-26-10L
6. SPECIAL CONDITIONS.
A. The Division of Coastal Zone Management shall be notified in writing at leas forty-
eight (48) hours before work commences.
B. The Coastal Zone Management permit placard shall be placed in a conspicuous
location on the site as soon as work commences.
C. The permit is valid only tbr work as stated in Paragraph 2 "Scope."
D. Erosion /Sedimentation control measures shall bo installed and maintained until all
development activities are completed. MI excavated areas shall be protectively
berm to prevent silt runoff.
E. Site disturbance shall be limited to areas designated on the approved drawings.
F. All other necessary permits shall be obtained prior to commencement of work.
O. "Upon discovery of any archaeological or historical site, or human burial site or
remains upon private lands, the owner or the representative shall immediately notify
the State Historic Preservation Office verbally and in writing."
The scope of Permit CZT-26-101, is confined to the footprint approved in Permit.
No development activities may occur outside the footprint of the approved Permit.
1. Silt fencing must be installed with steel posts and wire fence support as described in
the 2002 Environmental Protection Handbook.
bitat-en-h6hsainddy seven ly corn ro
i n —collabonithrerith—the--Division of
E.f_21
A. rstoraliotArst 'vitiosallIhrprisenitnest ivisiono,
nt and Wildt e.
mPed-Pholo8mPits-of-1 8_O Ilio_monitonn
Tinueuntrieteffismformed-thatandevelopment %Owner:Furst
4
EFTA01222317
CZT-26-1
On this __Day of ,
2010 the Department of Planning and Natural Resources hereby
issues Minor CZM Permit No. CZT-26-10L.
1, the undersigned, have read mid understood all terms and conditions established in
Permit No.
CZT-26-10L and hereby agree to be bound by the terms and conditions contained therein.
Date
cc: File
5
EFTA01222318