MO5507/7/7
VIP Priorities:
• MC Gazebos sylvester
• MC Service gates w/10ft Colums (danny plus carpenter) it
• All service gates. New wood needed (Tunnel, Engineering & Heli)
• Jeffers roads —D am—
• Five palms bid & Franks electric? ..,
• Flagpole bid?
•
•
Engineering doors
Steel buildings ,
P.0
• Paul Gandy cables swithces trench bid
• ro trench
• cement for hell gsj? .
• pebble beach seocnnd floor,
• grotto. .
• gym. floors. layout.
• Internet. etc.
• gsj dock house. ce,
• jet ski docks. .
• trees.?
See page 2
6/9/2019 8:30am White Table Notes
CONFIDENTIAL SDNY_GM_00332640
EFTA 00205366
EFTA01309340
Little Saint James
CONFIDENTIAL
SDNYGM_00332641
EFTA_00205367
EFTA01309341
6/9/2019 8:30am White Table Notes
-Do not install GYM Doors
-Sylvester & Maurice to find help if needed
-Five Palms Completion date needed 7:30am 6/10/19 j
-Danny MC Columns for New Driveway. Gates should look like flagpole pool side
gate.
-Gerry will do all Trash Runs at 3pm going forward everyday
-Anna to call Jeffers asap (Need answers 6/10/2019)
-What are black tubing on RIO Bld. (Need answers 7:30am 6/10/2019)
-Engineering Doors (Need answers 6/10/2019)
-Hire Outside Contractors for Big Projects & Building
-Pictures needed of every project from start to finish
-Phil arriving end of June
-Tiki Kitchen Counter top (Find local vendor for purchase) Conan
-Order Fly bags
-Close all Cabana doors if no guests. Cabana doors with "No view" should stay
closed
-Install Washers & Dryers in housekeeping first thing 7:30am 6/10/19
-Fix Master Bedroom Steam shower
-7:45am Michael & Jules 6/10/2019
-Michael first thing in the morning 6/10/19 cans for at GSJ Helipad.
-Bubbler (Barge) 4 Cement trucks from HM for GSJ Helipad
-Trenching Bid needed asap (Time Sensitive)
-Jules to work at Grotto
-Order Heavy Duty Wall bracket to hold 82" Samsung TV
-Dupson to spray Main Compound (Caterpillar infestation)
CONFIDENTIAL
SDNY_GM_00332642
EFTA_00205368
EFTA01309342
VIP Priorities:
MC Gazbos....syNestet
MC Service gates w/10ft Colums (danny plus carpenter)
All service gates. New wood needed (Tunnel, Engineering & Hell)
Jeffers roads
Five palms bid & Franks electric?
Flagpole bid?
Engineering doors .
Steel buildings ,
Paul Gandy cables swithces trench bid A it
ro trench
cement for heli gsj? .
pebble beach seocnnd floor,
grotto. .
gym. floors. layout. .
internet. etc.
gsj dock house.
jet ski docks. .
trees.?
<-1
lot)
CONFIDENTIAL
SONv_GM_003326.43
EFTA_00205369
EFTA01309343
EFTA_00205370
SDNY_GM_00332644
New LSJ-GSJ Mandatory Punchlist 5-17-19 smartsheet
an MANDATORY
2 LSJ/GSJ Punchlist
3
4
Put:basing, Shipments & Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tropical FL 615, sail
1 LSJ/GSJ Daphne & Anna Seth Ettinger - Restore 6/7 - EDA on SIT 6/11. Clear, pickup equipment 6/12 - Seth and crew
& More LLC (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Mike's
Room, 2. Living Room, 3. Office,4. Twin Bedroom. 5. Master Bedroom.
(2) areas on LSJ 7. Kitchen 2. Theater. Should be added - 3. Gym.
_J
2 LSJ MC Kitchen Karyna & JE Banquette Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas.
3 Master Bedroom Karyna JE Pillow Should know more after our trip on June 3rd. 1--
4 Emergency Room Anna & J E EKG Machine Order EKG Machine. JE to advise.
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, Including the door openings. Awaiting quote
from TJ "Home Theater Marker' for Black/Blackout Curtains same
5 Theater Room Anna & JE Blackout Curtains custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
4 Panels of 11ft Sin Long (135in), AJI 12 Panels are 4ft Wide (48in).WII
need 16 Panels in Black wlBlackout backing (5130).
6 Housekeeping Anna Washers Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded. awaiting
O
7 Housekeeping Anna Dryers
pickup for transport to LSJ. 0
8 Gym Anna Flooded Gym flooded on 5/30. all equipment moved to R/0 Storage on 5/30.
Floor removal began 5/31/2019.
9 Sam's Place Anna Furniture Order Living room furniture & Kitchen Table
10 Solar lights from China - departed from China 5/21 - 45 days to MA -
LSJ/GSJ Anna & Daphne Solar Lights EDA FL 7/3.
11 LSJ/GSJ Anna & Daphne Sun Umbrellas Order 15 Cream Colored Sun Umbrellas. JE will choose.
12 Theater Room Anna & Daphne Drapes/Curtains Wrinkle out the Drapes/ Curtains in the Theater
13 Order lighting for the Saltpond water fountain. Arnving to the Palm
LSJ Salt Pond Anna Fountain Light Beach house on 5/30. Arriving on plane 6/3
14 LSJ Helipad Anna Medical Kit Purchase Medical items for Helipad Office
15 Chillax Room Anna Chillax Deep Clean Chillax room. Smells funny
Exported on Juno 9.2019 9 33 34 PM BOT
Paw. 1 oi 18
EFTA01309344
EFTA 0020537I
SONY_ GM_00332645
Intt!aUca) Date Order Date Projected Arrval Ten Cemple.tor
Dote sty: Date
Coraplet'on Date Dale
5/6/2019 6/1212019 6/13/2019
5/17/2019
5117/2020
5/17/2021
5/17/2022
5117/2019 5/17/2019 5/28/2019
5/17/2019 5/17/2019 928/2019
5/21/2019
5/17/2019
12/13/2018 12/20/2018 7/27/2019
5/17/2019
6/5/2019 5/25/2019
5/16/2020 5/23/2018 613/2019 6/4/2019
5/16/2020 5/23/2018 6/3/2019 6/412019
614/2019
Exported on .Arne 9.2019 9:33:34 PM BOT
Pape 20118
EFTA01309345
EFTA_00205372
SDNY_ GM_ 00332646
Who Items
Heli pad and tunnel gates are installed and ready for wood
17 Michael & Custom skin.
Welding - Terrance Philip Welding engineering and jurassic gates are due to be brought out to
Wed., the 12th and installed. the wood skins will start LSJ on
Welder as a carpenter
becomes available, likely mid week next week.
18 The two side windows are installed, just needing finish plaster.
Five Palms Sylvester 8 Boniface The
Large Windows large opening door panels are being built.
19 Grotto Peter Elle
20 New Road Michael & Jeffers Road Project
21 Ismail scheduled to deliver and begin install by 5/31; will work
LSJ Generator Room Michael & Contractors Hurricane Shutters weather. The installation will take around 10-14 work days. around
22 GSJ Cottage Michael & Contractors Expert Builders Completion Date ? (6-8 weeks)
23 Forms and lighting installation complete by 5125. Concre
GSJ Helipad Peter Elie te pour TBD.
Helipad JE advise *H" to be Bigger. JE to review 6/5
24 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
LSJ Tunnel Michael & Bill Terry Skin it Recommend going with Allied.
25 JB reviewed and approved drawings 5/22. MG approval and
Wreckshop Michael & Bill Terry sign off of
40x60 the plans will be sent to Buck Steel 5124.
26 Allied has provided estimate. Waiting on Buck Steel. Recom
HM Storage
27
Michael & Contractors 00x60 Bld. ? with Allied. mend going
C
LSJ Fuel Room Install Vents in Fuel storage room. Dave reduced initial quote
Reefco Vents ordered 5O4; EDA on STT by June 15th and will then schedule by 4500;
28 Engineering install.
Michael & Contractors Doors Install Engineering doors. John Bedminster has estimate fonhcom
ing.
Staff Cottage - 5127 J8 submitted the CZM Minor Permit Applica
Forms for the GSJ Cottage to EK and DKI to review the
already filled out; JB noted the portions he needs assista portions
tion
nce filling
0
29 GSJ Staff Cottage out/signing, along with a checklist of the items still needed
Jeffrey Boschulte Permits to complete
the application. 5/28 EK completed the permit application, request
the IRB tax clearance and property tax clearance letter, and ed
to sign as noted. EK win notify JB once tax clearance letters asked JE
off-island until 6/2 - on his return will submit the drawings andback; JB
to EK, who will submit the completed application on behalf maps etc
30 GSJ Barn of the owner.
Jeffrey Boschulte Permits Permits: Bam - JB awaiting selection of supplier and specs.
31 GSJ Terrace Jeffrey Boschulte Permit Build 75 foot round terrace.
32 GSJ Pool Extension Jeffrey Boschulte Permit Extend current pool to 80 feet from 15 feet.
33 Waterfall (Tiki or Juggly
Park) Peter Elie Slab
34 Gym Michael & Contractors Doors Bid coming from John Bedminster
35 Flagpole Pool Michael & Contractors Shade Structure Waiting for three bids: John Bedminster, EB, Mr. Gumbs
36 Flagpole Pool Michael & Contractors Freezer JE advised not to order a freezer.
Exported on June 9 2019 9 33 34 PM 801
Page 3 01 18
EFTA01309346
EFTA_00205373
, ,
SONY_ GM00332647
_
InitiaVon Dafe Order Date t Projected Naval Tarrative •• Cofaalelloa
Still Date ' • •
c Hate .
05/28/19
05/21/19 5/24/2019
5/28/19
5/31/19 6/21/19
8/1/19
5/17/2019 <
5/17/2019
F-
z
5/17/2019
Lu
5/17/2019 01
5/17/2019 1
5/17/2019
z
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Expated on June 9. 2019 9:33:34 PM 801" Page 4 0118
EFTA01309347
'er
r-
rn
I
SDNY_GM_00332648
No. Area Who Items Descnption
is 37 Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
LSJ Tiki Hut Michael & Contractors Freezer awaiting pickup for transport to LSJ.
38 Dock GSJ Amy Dempsey Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
•• 39 The permit for the LSJ WAVE ATTENUATOR and Dock is currently
Dock LSJ Amy Dempsey Permits under review by CZM.
i. ao Christmas Cove
Moorings Patrick Moorings Request moorings for Christmas Cove
41 Sell old Generators: Bill Terry to coordinate sale of the old generators.
Old Generators Michael & Bill Terry Old Generators Rich to speak with BIN.
42 Flagpole Pool Michael & Contractors Shade Structure Shade structure is replacing need for awning.
43 Five Palms Franks Electric Electrical work to be done at Five Palms
44 Five Palms Peter Elie Concrete Need more direction from JE. He was not pleased with current layout.
45 GSJ RIO Michael & Contractors 2nd R/0 Intake Bob Peterson coming 5/23
48
47
GSJ New Dock
GSJ New Dock
Michael & Jules
Michael & Jules
Dock Expansion JE said stop work on 5/21 FL-
Water Sport Ramp JE said stop work on 5/21
48
Michael & Paul "Global
Nico Shaner and Paul Gandy arrive Sunday. June 2. AA Flight 1391
2:57PM. depart Tuesday. June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
uu
LSJ/GSJ Cables Tech" Underwater Cable plans for both sides and thoughts on the project approach, etc. C
49
Permit Amy Dempsey Underwater Cable
ACOE has reviewed the permits; their comments were addressed by
LSJE: permit expected to be issued in the next 30-45 days. u_
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
50
Heavy Machinery
Trencher Michael
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment 0
and an operator.
51 LSJ Library Michael Roofing & Trim
52 LSJ Tiki Hut Michael Kitchen Order Conan countertop for Tiki Hut Kitchen
53 LSJ MB Bath Shower Tiles Awaiting quote from John Bedminster, this project Involves new shower
hardware, plumbing, and tile work
54 LSJ Main Compound Sylvester & James Gazebo Build 2 Gazebos at the MC. Mockup design given to Sylvester by JE. 4ft
on each side of the centered 3ft wide door.
55 Tunnel Entrance Sylvester & James Tunnel Gate Materials needed to skin the gate frame
se LSJ Helipad Sylvester & James Heli Service Gate Materials needed to skin the gate frame
57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5/31 of completion date.
Exported on June 9. 2019 9 33 34 PM 6O1
Page 5 or 18
EFTA01309348
EFTA_00205375
SONY_ GM00332649
_
IEWSW
pi.:7
4 .0niu 'a Ty
5/10/2019 928/2019
5128119
5/23/19
<
0
1 1
6/5/19 0
6/5/19
5/15/2019
5/17/2019
5/17/2019
5/17/2019
Extolled on June 9.2019 9:3134 PM BOT
Page 601 18
EFTA01309349
EFTA_00205376
SONY_ GM_ 00332650
IS IS IZISISIRISISI2.1 IS IS IS
GSJ lld Terrace Brian Bates Wooden Furniture Chest is complete. Lighting to be installed by 5125.
LSJ/GSJ Tiki sheds Brian Bates Thatch Order thatch to be installed after Hurricane Season. (70) roes ordered,
on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT.
Barn ? Barn Supplier to be awarded
GSJ Terrace Chandelier
Sam's Place Danny & Keshaun Bedroom Repair Ceiling. Lighting socket needed
Holy Shlt Point Brian & Ron Structure Build Dock structure same as LSJ
LSJ TlkiHut Maurice & Boniface Coral Stone Maurice began tile work today 5/31.
Cabana 1 Maurice Shower Tile Shower floor is not draining properly in Cabana 1
Flagpole Pool Sylvester Kickplate Install Kickplate
GSJ Maurice Tiki Bar Fix Cabinet & Drawers
GSJ Guest BR Sylvester Carpet Cut Carpet to size. Carpet to long. Need to be centered under both
beds
GSJ Pool 7 Wooden Steps Demo and rebuild new steps. Steps to match existing stairs at the MC
70 Tiki Terrace TJ & Oriole Brown Paint Deck to be stained
71 LSJ Dock TJ & Oriole Polyurethane Polyurethane Boardwalk
CD
72 Tunnel TJ & Oriole Roof In progress. Repair holes on tunnel roof
73 Christmas Cove TJ & Oriole Structure Material to arrive 5/28; work to start 5128.
74 Sam's Pleas TJ & Oriole Bedroom Paint after repairs are made
75
76
Main Compound TJ & Oriole Theater Roof Top Coat 0
GSJ Entrance TJ & Oriole Staircase Paint steps in epoxy grey
77 Grotto TJ & Oriole Steps Paint steps in white
78 Main Compound Maurice or Sylvester Ceiling Stain ceiling above the White Table
Nernst WIFI
79 Emergency Room Jermaine & Liston Fax Pending setup of Efax account
80 LSJ Island Jermaine & Liston Emergency PA System Island wide system for intruders
81 GSJ Island Jermaine & Liston Emergency PA System Island wide system for intruders
82 Jermaine & Liston Order 82" TV for Chinas Room and proper wall mount —5/29/19 •
ChIllax er TV Pricesmart will have the 82* Samsung in stock
83 Jermaine & Liston Order a Heavy Duty Wall Bracket to hold the 821 Samsung TV in the
Chillax 82" TV Wall mount Chillax
Exported on Juno 9.2019 9.33 34 PM BOT
Page 7o' 18
EFTA01309350
EFTA_00205377
SONY_ GM00332651
_
Initiation Date Order Date Projected Arrival Start Date Tentative Completion
Date Completion Date Date
5/17/2019 5/25/19
5/17/2019 5/22/2019
5/17/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
6/5/2019
5/17/2019
<
6/6/2019
5/17/2019
5/17/2019
5/17/2019 5/24/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
0
5/1712019
6/5/2019
5117/19
5/17/19 5/23/19
5/17/19 5/23/19
5/16/19 5/23/19 6/9/19 6/7/19
6/9/2019
Exported on June a 2019 9:33:34 PM BOT Page 8 or 18
EFTA01309351
EFTA_00205378
SDNY_GM_00332652
No. Area Who Items Description
Completion date. 15-29-19 MI WM, Access Points and switches and
84 Jerrnaine & Liston LSJ/GSJ WIFE currently waiting on 5 addition switches to handle the distribution of
New WIN Swim existing phone services] 15-29-191 GSJ Will is In progress this week]
Camera setup at Chnstmas Cove— Pending Mike to order Yeti Solar
Jermaine & Liston Units and Panels as per email 5/24/19 (5r29/19 GSJ DOck Nest
86 GSJ Cameras Camera is active)
Rio & su riesdne !aciaserelliME
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
88 LSJ astern 1 Michael & JCH Cistern Pump placed the order for the pump 5/24. Production time is 6 weela - the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on SIT 7/21
87 GSJ WO Michael & Gemini
Seawater Systems RIO Container _J
On Island on GSJ
88 GSJ RIO parts Michael & Gemini
Seawater Systems RIO Parts
On Island
89 R/O Water Michael & Smiley Water Testing 5/24 Anna emailed last test results (3/2017).
H
Lighting & Electrical
90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers
C
91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly
92 MC New Planter Danny & Keshawn MC Planter & Palm
Tree Lighting In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at
93 Tild Waterfall Anna, Danny & Keshawn Pond Fountain the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane. 0
94 Flagpole Pool Danny & Keshawn Kitchen Run wires and plugs properly. Make hole in cabinets if needed. Plugs
and wires should not be seen
95 GSJ Peters Point Danny & Keshawn Solar Lights/Other Lighting facing Peters Point for Safety
96 Cabana 1 Danny & Keshawn Rope Light Test in place. JE advise that we order more. Brighter than what's
installed at the moment.
97 Master Bedroom Danny & Keshawn Wall Sconce Wall sconce does not come on around the Master. Timer to be set
6:30pm -yam ?
98 GYM Michael & Liston Equipment & Audio Wiring need to be done for GYM Equipment & Audio
99 Chilies Danny & Keshawn Phone Plug Replace or fix phoneflntemet plug in Chinas
100 Sam's Place Danny & Keshaun Bedroom Repair Ceiling. Lighting socket needed
Plumbing & Fteeto
101 GSJ Master BR Michael & Charlie Master Bath No Hot water
Exported on June 9.2019 9.33:34 PM BOT
Page 901 18
EFTA01309352
EFTA_00205379
SONY_ GM_00332653
4810811011,12.983 , tatter CothiilaUcni
•- ••
5/17/19 5/23/19
5/22/19 6/4/19 6/11/19 5/23/19
5/17/2019 5/24/2019 7/21/2019
5/172019
5/17/2019
<
z
5/17/2019
5/17/2019
5/17/2019
5/17/2019 5/23/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
6/4/2019
6/5/2019
5/17/2019
Exported on June 9. 2019 9:33:34 PM DOT Page 10 0119
EFTA01309353
SDNY_GM_00332654
No. Ann Who Items Description
Replace air handler for the Library. Dave ordered 5/27; current lead
102 Library Reefco Air Handler time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
103 IT Server Room Reefco NC Unit Temp a/c installed. Board ordered. Waiting on schedule.
105 Cabana 1-4 Air Shipping next week and hopes to have by May 31st. Goal is to install
Conditioning Unit Reeko NC Unit
week of June 3rd. PM already on routine schedule for Cabana 4.
106 GSJ Reefco NC Unit PM already on routine schedule. Bedroom. Kitchen & Living Room
107 LSJ Laundry Reefer, NC Unit Housekeeping NC is not working
108 LSJ Landscaping Cnstobal & Fabian Irrigation Install irrigation for new palms
109 GSJ Stones Danny & Renol Stones Stones from GSJ to LSJ to create and fix all Stone walls
Order Pesticides & Fertilizer for all plants and palms: Dupson reviewed
Chemicals & inventory - requested only fertilizer and landscaping equipment.
110 LSJ / GSJ Landscaping Dupson & Daphne Landscaping Lawnmower Headquarters quote for Stihi and Silky equipment
Equipment approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
Island Wide Landscapers Orange Vines Remove all Orange Vines from plants on Island. Main Compound &
111 Island wide. Orange vines will kill the plants
112 LSJ Main Compound Danny & Philimon Pillars Build 10h. Pillars by the MC new planter
Wrackahop & Heavy Machinery Operators
0
Expone0 on June 9. 2019 9 33 34 MA BOT
Page 11 x118
EFTA01309354
EFTA_0020538 I
fi strattoana
SONY_ GM_00332655
fl aCdoP ret:on.
CDMAte09r3 Clate ‘"Cat
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
<
5/17/2019 z
6/5/2019
6/5/2019
z
Exported on Jane 9.2019 9:33:34 PM DOT
Page 12 of 18
EFTA01309355
oo
oo
O
N
p
O
rtt
SDNY_GM_00332656
No. Area %/lino Items Descriptor%
We are working On the Quadskl, 1st - The ECU was not commu
with the computer - we found an issue with a wire pulled out, nicating
now we
are communicating. The Initial tests on the Chassis wire harness
components (Fan, Blowers Throttle Nipper, bilge ) are all workingand
properly.
The Next thing we need to establish is the condition of the
Your Mechanic mentioned he removed the Clutch cover, there Clutch.
loose bolts that establish it has been worked on. There's no are still
and little land use - The clutch should not be worn out? The water time
having the fluids replaced and get Is started to evaluate why machine is
mechanic was looking at the clutch!Along with a Battery -Exhau your
113 HM Equipment Tap & Dale Muffler Rubber mount is broken in Half -The Muffler is st
Quadsig loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap Is missing - Tire Hub cap
missing - Is
Handle Bar assembly - Has been recalled - I sent that request in _J
Immediately - part are her to update the machine - No Charge
to
customer -
The Air Intake Hose to Engine - was being squished flat - The
<:_-
mounted in the wrong location -The Fuel Tank seal Is Missing hose is
seal for fuel pump assy -If things go well the machine could - rubber
be done by
end of next week - If the clutch needs work add probably another
This information will all be on a report - Before we repair we week!
making contact for approval will be
114 HM Equipment Tap & Dale
115
Fuel Truck / Flatbed Turn Fuel truck into Flatbed
The (3) 2019 Polaris Ranger EV units amved at vendor 5/23.
C
HM Equipment Tap & Dale Will be
Electric Carts
116 HM Equipment Tap & Dale
sent for undercoating (Rust proofing process) 5/31. U_
ProGator John Deere does not manufacture electric progators.
117 Arrived on STT 5/22. Cleared, off-loaded, awaiting transpo
HM Equipment
118 Old Heavy Machinery
Tap & Dale
Tap & Jules
Roller
Removal
rt to LSJ.
MG will schedule barge to pick up directly from Tropical Shippin
awaiting Barge
g STT. O
119 GSJ Engineering Shed Jules & Buck Berm Create Berm to block LSJ view across from the R./0 Contain
120 JE Bike ers
Tap Bike Handle Replace Bike handle
121 GSJ Hydroseeder Tap Hydroseeder Axle to be purchased asap
122 Polaris Tap Bike Valve needed for Polaris bike
123 GSJ Jules Trenching Trenching Area & Description needed
124 LSJ TIld Hut Jules or Peter Tiki Parking Create Parking & Driveway at LSJ Tiki Hut. JE to advise
125 Wrecicshop 6/5
Rychie Office Clean office immediately 6/5
Mete Barge & Weer Sports Mai
126 GSJ Water Front Patrick & Randy Sail Boat Remove damaged sail boat
127 Christmas Cove Patnck & Randy Boat debris Remove boat debris
Export?, ] ea ]0' 2 3 33 PI! P.C)T
Page 13 0118
EFTA01309356
EFTA 00205353
SONY_ GM_00332657
_I
<
H
z
42/2019
5/17/2019 L.u
5/17/2019 5/10/2019 6/11/2019
0
5/17/2019 EC_
5/17/2019 z
0
6/6/2019
0
6/6/2019
6/6/2019
6/52019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
Exported on June 9.2019 9:33:34 PM BOT
Page 14 of 18
EFTA01309357
SDNY_GM_00332658
No. nee Who Sterns DeBenetton
128 New Crew Boat Patrick & Randy Crew Boat
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
129 AYH / Big N Boscoe & David Fenders 5/24. Production lead time is 10 weeks. EDA to production completion
8/2.
130 - AYH/B10N Boscoe & David Cleats Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
131 AYHBIg N Boscoe & Robert Lemire Blankets discharge thru the hull must be made to match the system and two of
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
132 to support the new Flanders and pipe that was found to be necessary.
PR/ Blg N RelStni. & David PR Repairs Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5 • I'm sorry, I don't have an answer as yet* He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. He will continue to call Bobby. Barge arrival home could be
between June 100-15th
133 PR/ Big N Boscoe & David Nana Take Nana to Offshore to get the Engines Checked
Nautica delivered 5/16/19. Fiberglass modifications in progress on
Nautica Boat - NC, starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be
134 Carlos. Patrick & Randy NC shipped off. requested estimate for bow thruster replacement (cg $3400
Tubes, StnJeture C
before shipping(just need okay from JEE and Rich to proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
135 Sport's Boat
6/4 offshore scheduled maintenance replace both timing belts. sports U-
Patrick & Randy dropped off 830am.... 6/4 work completed at 130pm picked up by PC
6/4
O
Cleaning, Organizing & DEMO
136 GYM Kevin, Garth, & Mike GYM Demo Flooring in the GYM
Vetildee
Dealership diagnosed a leaking hose in the air conditioning system.
137 JE Dwell Carlos & Caribbean Auto Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
Mart aC service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
Carlos & Cliffs Auto Insurance Coverage & Repairs to be made. Carlos awaiting estimate
138 LSJ Suburban Accident from Cliff's Auto Repair - by 5131. Carts will take the vehicle to
Repairs
Guardian 5/30 for adjuster's Inspection.
Pools & Power Wisho
Exported on Juno 9.2019 9,33:34 PM 8OT
Page 15 of 18
EFTA01309358
EFTA 002053R5
Irrtia:;ci Date Cite- Date Picjectei it'r:vat start not° entritivc, Corrp)et:c
Date Coriple:rCr, Da.',e Date
5/17/2019
5/17/2019 5/24/19
812/2019
5/17/2019 .
4/23/2019
6/10/2019
6/5/2019
6/10/2019
5/17/2019 05/18/19 06/20/19
0
u_
6/4/19 6/4119 6/4/19
0
6/3/2019
5/17/2019
Expected on June 9, 2019 9:33:34 PM 807
Page 16 el 18
EFTA01309359
ea&
cey....,2 }D Pla
loes 1,(wx4, civz-`z
ko,4 kom larecb.c.
fe scopr..
T„
®50 solo., ticakts 61", 6 53 Yb...c)--
2) atAA-toits
pakk. LILL,
4,„„,,, .14,4;k kx.1 ()Lk& (eats.
hewa,,, I kooks )ors
rYlrriC
L ,;(katr.,__, io.hi loca111
le...i.,
-10
axe paiy4 14.4,.,;it ,1116)....ract. elt.o.A.;.,s,
4,— e,v,
ait tax
Rko...t,, di,-F
s6Je5...,
ror Gcm "To-oloveow
) ?)1
.,...
-Settt,,;(e.NA4/,‘
DuL itzul
ricor roc-6 2 ,
curet 4A)
-51
-171414 (t) MP ( elAtftat' 16)(14
V -11[41. eitoki %I/4GS,
v- &kpd- Yak - bx& wi,u)oos - la142801...
L ens - da.
;Dol.( W.* 4;t4VALC, 4V 614? 54,1,se Coralto
rnort-'k2IIS
3 11,..4, qrl.oe.6 - t. S3 VItAri PAry, I, 'FP CaSJ
our
\ic.,.3 Dive. &64yruhrik
0;) No.ket.. dts;
- Lbw,45T". ip( sra./
-
Gs.5 Cdtp, 64+0 t'nwaye)
AIVIEI~ to
.AA4.10, 4k+r. ivdta, 6 ,S.S
' Pt OfCIVIA".
4,10,AIt ( RA 5110 ,56- t C4\ali "
CONFIDENTIAL
SDNY_GM_00332660
EFTA_00205386
EFTA01309360
name project
date
Rederit Ia A `,///z
( - ?e,t ks
tasks
1 _..
Tx (,3si
-kaa ,
0 •4•Neas-..L.
O(Q,..r•scc,_ , sSySr
Lsn- •
!
-••••• 4 ,•••••• S. - •
--1••• 142.-
• ,
12,6e
n
•••••••
LJRW ,
CAA:,
If ers
•-ra • nue,C, f
CONFIDENTIAL
SDNY_GM_0033266,
EFTA_00203387
EFTA01309361
project
name
date
?re.seir'r F,1
tasks
CONFIDENTIAL
SONY_GM_00332662
EFTA 01205388
EFTA01309362
SDNY_GM_00332663
SIM Bailaii______ MIMI= TRA
ENGINEERING • EQUIPMENT __Ilkcien kills Sheridan Caribbean Motod
ENGINEERING - EQUIPMENT Broken tractors Sheridan Caribbean Motoring
MARINE. BOATS Broken boats Randy/Patrick Offshore Marine
MARINE Nadia - rotten wood on floor and mkiship entrance Carlos Mil Painters
MARINE - HAVOC* Utde C- needs nine engines Rarely/Pabick Offshore Marine
GS1 - SOLAR FARM Dad Soar batteries Mike Glidden Pro Solar
No Quonset hut Starting lith January. Max AS weeks barring no
GS1• BACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Buikling/Generator bunker: Need an Architect for —ff .
plumbIng/dectrical drawings for RO system design. This we
G51- BACK OF THE HOUSE causes changes to layout inside budding drawn. Kyle
GS1Staff Cottage and Bedroom Addition: Tile is being laid, siding
GU- STAFF COTTAGE Ito start roof Instillation in progress window door Install Kyle 1PK Development 2/U2019
Stairs and Grotto Sun Louvers: EB pricing received. Was Mid to
put them off and sun louver company wig do this? El an still do
LS1- GROTTO this If green light Is given. It will be 2 weeks iron. start date. Kyle Builders
Five Palms Windows and Doors Reviewing Pit bid on 7th
January. Eli has missing scope off verbal, so sent detailed scope
III • FIVE PALMS
151- FIVE PALMS
for odds".
Five Palms dome
Kyle
Kyle
1PK Development/Expert Builders
Samson Builders uu
L51• FIVE PALMS
LSI- GYM
Ave Palms *Harks'
Gym doors to he nmilaced
Mike Glidden
,Kyle EGS
0
(Si- RO RO still not working property: Seawater Intake pump 151 Mike Gidden Gent Seawater Systems
1.51-MECHANICAL BUILDING
(Si- ELECTRICAL
;wintering doorsstlft not even dervered — Kele Tayki 'Cotton II Ridley w
Rusted Lights Mike Gidden
LSI • LANDSCAPING No solar lets Anna Innovedons i CRS
Cabana 3 Inoperablm The back up and pipes repaired. Awaking
arched dates olds, Mooring compeer (2 weeks horn arrival of
151-MAINCOMPOUND Rood% company(. Kyle JPK DevelopmentASIE
LSI - MAIN COMPOUND Cabana de redo? Kyle JPK Development?
LS/- MAIN COMPOUND Ogles bath Kyle
Cabana and albs Floor= MP has been contacted. PK and AHF
1.51- MAIN COMPOUND to dscuss pricing for Insurance. Kyle PK/AHF
LS1- MAIN COMPOUND Chain Tray Ceiling Kyle
lid Idtchentille samples awaiting approval, kitchen demi:Mettle
LS1-TIC HOUSE Is next step, then cabinets. etc. ISLE
MR 1/25/2019
Big Mk Brian to finish deck 2 days, roof starting (leaves 3.5
Gil -71K1 HOUSE weeks for roof Install and finishes Kyle Brian Bates 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
LS1- OFFICE PAVILION each roof). BWC on site 7th January 11 am to review. Kyle PK/Augustus Hemy/BWC
EFTA01309363
SDNY_GM_00332664
MGR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
W- MAIN COMPOUND EIWC on site 7th January 11am to review. Kyle AL/Augustus Henry/BWC
Cabana 4 rook Awaiting BWC Sub-ProPosal. Pokey on site 7th
January 9am to review. MS weeks each roof). BWC on site 7th
LSI - MAIN COMPOUND January 11am to review. Kyle SPIC/Augustus Nenry/BWC
ENGINEERING -EQUIPMENT Dump truck Shaklee
ENGINEERING • EQUIPMENT Fuel truck Sheridan
ENGINEERING -EQUIPMENT Flatbed Sheridan
ENGINEERING. EQUIPMENT Trendier Sheldon
GSI • GENERATORS Generators not yet online Mike Geddes
GO -SEPTIC Septic not yet connected Mils Glidden San Jan eolailla
GM • RO RO dawned end cannery 2019 Mike Glkiden Gemini Seawater Systens
Pumps: interconnectinliddeg.Perear end end conduks,
power to the seawater pump station and the andawIng of the _J
GO - RO container. Mike Glidden Gent Seawater Systems
W -TERMINAL FROM'' Pumps not working Mae Glidden
LW - TECHNOLOGY No Nibble WWI or Internet Outsourced Jennies VITA/2Guysigert)7
GM - TECHNOUDGT No Reliable WWI or hittMt Outsourced illinaille
p
IVIMAGUYS (Ear)?
Pebble beach not poured:To begin next week on rebar footing
and pour for FM. Then stone wall and roof schedule dependent
LSJ - PEBBLE BEACH on wall. 8 weeks tentative finish.
K/440 DNYTNN WE 3/8/2019
11.1
Roads not started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January—lifters in discussion with CD
W• ROADS lawyers cot:edit. Kye Eason Jeffers
LSI- MAINCOMPOUND Master shower
Oft
(Si.LANDSCAPING Palm trees- need start data EMPean Meyer's Turf& landscape Nursery
Lel - *DMUS Staffing
VIER
LSI- FLAGPOLE POOL CouMertopc Nide:lien company to came down Kyle
(Si- MAIN COMPOUND Cabanas 1-4 Vanities III.kitchen company towns doss Kyle O
GS!- STAFF0317AG( Furniture for Staff Cottage
W- MAIN COMIVUWO Wardrcbes for ii Cabanas and Carpets for Oaks
JE/Tarles
JOKaryna Stark Carpet
0
MICHELLE'S TRANSPORT Big N repels Roscoe Marina Del Rey PR
W- MKNANICAL BUILDING Engineering building fixed Kyle
Gil- MECHANICAL BUILDING Enertmaing building new one but Kyle Med Steel
ENGINEERING -EQUIPMENT Carts Sheridan Palmetto Motorsports
(Si - lANDSCATING Landscape equipment Denson
LSJ - IANDSCAPING Forster and apropos Dotson Site One LandsCajat
GO - COCKS Docks constructks Kyle
151• DOCK Dock • NE Kyle American Expert
Cables to be run: Installation and termination of the fiber op&
LS' • RO :cable between the RO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems
EFTA01309364
EFTA_0020539 I
SDNY GM_ 00332665
Conduit Bank LSJ - Seawater and fiber • started: WAPA Switches
LSI - ELECTRICAL to be purchased Mike Glidden
Stone Wall to be built Schedule and budget established -starting
1.51- MAIN COMPOUND 10th January Kyle 'Danny
151- MAIN COMPOUND MaM COMpound pool awnings to be put up_ 3/29/2019
Kyle Sylvester
Abort° be run Mice Glidden
MARINE /at skh Rendy/fratdck Shaklee
MARINE Boat fl iers RandY/Patrkk South Pori* Trailers
Water trailers Mike Glidden AR Attadmiants
151- MAIN COMPOUND Shower dles to be redone Kyle PK Development
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our sbb (with post haw-outs) -
LSI- IANDSCAPING erect post and Kyk
LSI - LANDSCAPING Nursery steps to be Axed KyM INC
LSI • MAIN COMPOUND Cabanas curtelns Alberto Pinto 1/18/20/5
IS1- MAIN COMPOUND
151• MAIN COMPOUND
Kitchen banquette
Cabanas Bed Netting
Custom Canvas
Oatom Canvas <
CD
u_
0
EFTA01309365
@" 静
64
堑!,
扣d~山
CONF一DENTIAL
SONY GM 00332666
EElA00205392
EFTA01309366
en
O
N
p
O
!
LC
11.
SDNY_GM_00332667
MEMO MinagMaltia
Sheridan Cai00nn Motoring
EIMINEERING•IAUIPMENT Broken kills Caribbean Motoring
Shidden
ENGINEERING-EQUIPMENT Broken tractors Offshoot Marine
Randy/Pa idc
MARINE -BOATS Broken boats PI Painters
nidihipenerance Curbs
MARINE Nougat • rotten wood on floor and Onshore Marine
Little C - needs new enignes Raretrintrick
WANE • NAUTICA Mike WM Pro Solar
Deed Solar batteries
GS1• SOLAR FARM Max 45 weeks boning no
No Quonset hut Starting 14th January. 2/13/2019
Kyle Expert Builders
GSI • BACK Of THE HOUSE DPNR Issues
RO sollealfG enerato r bunker: Need an Architect for
No
plumbing/Salad drawings for RO system design This will
Kyle
tifil • BACK Of THE HOUSE causes changes to layout Inside Mang drawn-
being laid, siding
651Staff Cottage and Bedroom Addition: Tile is Inc Development
2/1/2013
_J
door install Kyle
GS! - STAFF COTTAGE to start, roof last:Nadal in progniss, window
Was told to
Stairs and Grotto Sun Lateen: Ell pricing received.
CB an still do
put them off and sun louver company will do this? Expert Builders
Kyle
z
light is (ven. It will be 2 weeks from sten date.
LSI-GROTTO this if green
FtrOewin g OK bid on 7th
Five Palms Windows and Doors:
sent detailed scope
January. CB has missing scope off verbal, so
IS)- FIVE PALMS for pal%
Kyle n Development/Exnert Buodors
Samson Builders
LU
Klee—
LSI -FIVE PAWS Ave Palms dome
Mike Glidden
LSI- AVE PALMS FivePalms *Ma EGS
be Kyle
Gym doors to mixed C
LSI •GYM
LSI- RO RO still notnorldiaarNierir SennaIntakeptimp
LSI Mike Glidden Gamed Seawater Systems
Taylor, Cotton & Ridley
U_
Kyle
LSI-MECHANICAL BUILDING
LW ELECTRICAL
Engineering doorsill not even dawned
Rusted Usher
IMce Glidden
Montan(0IMA)
z
Anna
LW - LUIDSCAPING No solarAlits
. Awaiting O
Cabana 3 Inoperable: Tile back up and pipes repaired
of
arrival dates of the flooring company (1weeks from arrival JPK Develamentfisfr
!Kyle
III -MAIN COMPOUND Goofing company1. la Development?
Kyle
LW - MAN COMPOUND Cabana the redo?
Kyle
LSI • MINI COMPOUND Oenbath
MN
Cabana and ChM floors: AHf has been contacted. RIK and
JPIUMIF
IS1- MAIN COMPOUND to discuss pridng for Insurance. V °
Kyle
IS1• MAIN COMPOUND Chile:Tray Ceiling
'd,ilk
Old kitchenlb samples mid% approval,kitchen demo 1/15/2019
Kyle WE
LSI -TIM HOUSE Is next step, Men cabinets, etc.
BigTIM Brian to finish deck 2 days, roof starting (Imes 33 IMAMS
Kyle Brian Bates
GE4•TIKINOISE weeks for roofInstal and finishes
Office Pavillon roof material not ordered: Awaiting BWC Sub.
Proposal. Pokey on site 7th January 9am to review. (4.5 weeks
Kyle JPKiAugUStut Henry/BWC
ISJ• OFRCE PAV1UON each roof). BWC on site 7th Januar/liens to review.
EFTA01309367
SDNY_GM_00332668
ing MC Sub-proposal.
hiflit roof material not ordered: Await
. (4.5 weeks each roof).
Pokey on site 7th January 9am to review PX/Atewstus Nsaiy/BWC
Janua ry 11 am to review . Kyle
BWC on site 7th
LSI - MAIN COMPOUND !MC Sub propo sal. Pokey on site 7th
Cabana 4 roof. Awaking
BWCon site 7th
January 9am to review. DLS weeks each rail WIC/Augustus Fienty/BWC
am to review . Eta
January 11
L.S1- MAIN COMPOUND Sheridan
PMEN T Dump tract
ENGINEERING -EQUI Sheridan
Fuel buck
ENGINEERING -EQUIPMENT madden
ENGINEERING -EQUIPMENT Flat bed Sheridan
Wet
ENGINEERING -EQUIPMENT online
Mike Walden
Gene rate(' 'sati n
GS1• GENERATORS Mike Glidden San Jan Botanic'
Sapde not yet conne cted
GSI - SEPTIC Mike Glidden Gemini Seawater Systems
Reg delivered end oflanuary 2019
Gil - RO newe r and control conduit',
Pumpsl Intercom/ a% 0104
anchoring of the
power to the seawater pump Haden and the Gemini Seawater Systems
Mike Glidden
conta iner.
GSJI• RO Mike Glidden
Pumps not waitin g reiViGtlys (WI)?
(Si -TERMINAL FACIUTY /ermine
No Reliable YAFI or Internet Outrouroed
III -TECHNOLOGY Jennie* VIWIGull (Fad)7
No Reliab le Varier Internet Outwitted
GSJ -TECHNOLOGY
Pebble bad) not poure d: To begin
and pour for FIN. Then stone wall and roof
next week on rebar footing
schedule dependent
LSJE
uu
LSJ - PEBBLE BEACH on wall II weeks
Roads not starts
tentative fintslt
* Jeffers 2 Roads • offers to confir m sciwdule.
ilfTWOLIPsoll
0
ry. Jeffers in discussion with
— ..... Tentative start date lath Janua
lawye rs on aedif • Kyle Eason Jeffs LL
LSI - ROADS Kyle
Master skew s Meyer's Turf & Landscape Nursery
ISJ • MAIN COMPOUND date 'Dups on
LSI- LANDSCAPING Palatines - need start
NARA
LSI -ADMIN Statin g
dam Kyle
LSI - RAGPOLE POOL Countertops EL kitChen company to come We
Caban as 1.4Va nldet Ft kitchen company to come down
LSI - MAIN COMPOUND iffil•Pfla
Furnit ure for Staff Cottag e
GS1- STAFF COTTAGE CMOs NAOMI' Stark Carpet
131- MAIN COMPOUND Wardrobes for all Cabanas and Carpets for Maine Del Rey PR
Bosco,
Bit N repair s
MICHEILES TRANSPORT
Enshw ering buildin g ibred
1S1- MECHANICAL BUILDING Kyle Miled Steel
GS/- MECHANICAL BUILDING Engineering buildingnew one bulk Palmetto Motorsmns
Sheridan
ENGINEERING - EQUIP MENT Carts
ment Oupson
Lands cape ecruip
I.Sl• LANDSCAPING q n Site OneIambs*
Ferdlizer and
1ST -LANDSCAPING
GS' - 0005 Docks annum:don Medan Export
Dock - IPE Kyle
151-DOCK
ation of the fiber optic
Cables to be run: Installation and termin Gemini Seawater Systems
plant and the seawa ter pump station. Mike Glidden
able betwe en the RO
151-RD
EFTA01309368
EF1'A_00205395
SDNY_GM_00332669
Conduit Bank IS1- Seawater and Fiber - started: WAPA Switches
Mike Glidden
AL to be purchased
_LSI- ELECTRIC Stone WIN to be built Schedule and budget established
-starting 3/29/ 19
Kyle Danny
LSI- MAW COMPOUND 10th Janus ey
Sony
Lll - MAIN COMPOUND Maln compound pool awnings to be put up 49
Mike Glidden
fiber to baton
Randy/Pat:kit Sheldon
let skis
MARINE fteerlY/Patridt South Florida Tillers
MARINE Boat trailers
Mike Glidden AM Attachments
Water trailers
Kyle JPK Development
Shower Mesta be redone
LS• MAIN COMPOUND
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (MS post leave-out:I/ -
Kyle
LSI- LANDSCAPING erect post end
Kyle JPK Development
LSI -1ANDSOSING Norway steps to be Reed
1/*/ 2019
Alberto Pinto
LSI - MAIN COMPOUND Cabenes curtains
Custom Canvas
LSI - MAIN COMPOUND ItIbthen banquette
01Stigni Cantle
W- MAIN COMPOUND Cabanas Bed Netting H
z
w
LL
EFTA01309369
44 Amex.
At 1\4-.4 AMEX Air Covic);lieners -1-httinseAvel,
r
le gs
Vat A' L,23%, grL(1 ,4
0 56c. 1,0)Flav,
III Yha".1 2 "3/4 '2.
1,-;6y,xy,
Mow bcdt
14a,tArt'co-4- lAsiniDoeis
vt-kys -4- "PokciA 1,otco estlxwtas.
va CiAb4alvte, 11O f.)
140ale_s
TUl
CONFIDENTIAL
SONY_GM_00332670
EFTA 00205396
EFTA01309370
SONY_GM_00332671
Jammu imam 4 ,A.Ap
sMMaggagagg
ENGINEERING -EQUIPMENT Broken lulls
`Sheradon
Iregans gtojs
ENGINEERING -EQUIPMENT Broken tractors Caribbean Motoring
MARINE -BOATS Sherklon Caribbean Motoring
Broken boats
MARINE Randy/Patrick Offshore Marine
Maude.- rotten wood on floor and midgdp entrance
MARINE - NAUTICA Corks BM Pettey:
tilde C- needs new engines
4351- SOLAR FARM Randy/Patrick Offshore Marble
Deed Solar Wearies
Mike Glidden Pro Sobr
No Quonset hut Starting 14th January. Max AS weeks
barring no
GU - BACKOF NE HOUSE OHM Issues
Kyle &Pert Builders
No RO Doildln8/GeMrator bunker: Need an Architect for 2/15/2019
plumbing/electrical drawings for RO system design.
TMs will
Gil • BACK OF THE HOUSE causes changes to layout Inside Madrid:awn.
Kyle
G51 StyeCottage and Bedroom Addition*. Tile is being
laid, siding
151- STAFF COTTAGE to start roof Insmilation In progress, window door install
Kyle 1PK Development
2/1/20191
Stairs and Grotto Sun Louvers: ES pridng received. Was told
to
put them off and sun louver company will do this? Efl can
still do
1.51-GROTTO thisIf green light is given. It will be 2 weeks from start
date. Kyle &pert Builders
Five Palms Windows and DOOM ReviewingPK bid on 7th
Annan% ES has missing scopeoff verbal, so sent detailed
scope
LS1- FIVE PALMS for acidic
LL- AVE PALMS
LSI • RVE PALMS
Fite Palms dome
Five Palms electrical
Kyle
Kyle
JPK Development/DPert
Samson Builders
Bulkier; 0
LSI-GYM MIke Glidden
%radon:a to be aleced
Ls,-RO lryle • EGS
RO still not workingpronedy: Seawater intake pomp LSI
(51- MECIUNICAL BUIUNNG Mike Glidden Gemini Seawater Systems
Enghwering doors still not even delivered
IS1-ELECTRICAL Kyle Taylor Cotton & Ridley
Rusted Lights
IS/ - LANDSCAPING No solar lights
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
Mike Glidden
Anna innovadons (CHINA)
0
arrival dates of the flooring company (2 wade from
aMval of
111- MAIN COMPOUND flooring company).
IS% • MAIN COMPOUND Kyle JPK Develmwroent/LSM
Cabana tile redo?
I.5.1 MAIN COMPOUND Kyle JPK Development?
Chiba bath
Kyle
Cabana end Chiba *OM MN has been contacted. We and ANT
LSJ• MAIN COMPOUND to dbans pricing for Insurance.
LS1- MAIN COMPOUND Kyle JPII/NIF
Chiles Trey Ceding
Kyle
TIN kfldeen: Tile samples awaiting approval, kitchen
demo d, tie
1.51 - 1110 HOUSE is next step, then athinets, etc.
Kyle ISA
Big Tad: Man to ankh deck 2 days, roof sorting (leaves 1/25/2019
35
G51• TIKI HOUSE weeks for roof install and finishes
Kyle Brian Bates
1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January gam to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review.
I Kyle JPK/Augustus Henry/BWC
EFTA01309371
SDNY_GM_00332672
MBR roof material not ordered: Await
ing BWC Sub-proposai.
Pokey on site 7th January 9am to review.
15$- MAIN COMPOUND (4.5 weeks each roof).
BWC on site 7th January 11 am to review.
Cabana 4 roof: Malting BWC Sub-propo iKyle inamentus ii.m/awc
sal. Pokey as site 7th
Januar/9am to review. (43 steels each
ISI - MAIN COMPOUND roof). BWC on ske lth
January 11 am (preview.
ENGINEERING - EQUIPMENT Dump truck Kyle UPK/Augustus Henry/BWC
ENGINEERING - EQUIPMENT Fuel truck Sheldon
ENGINEERING -EQUIPMENT Flatbed Sheridan
ENGINEERING -EQUIPMENT Trencher Sheldon
451-GENERATORS Generators not yet online Sherkke
G51- SEPIK Septic not yet connected Mike GRdMtt
651-RO RO delivered end Warman/ 2019 lace Glidden San Jan Botanica
Purlieu *Mercer/recline piping, power Orne Glidden Gemini Seawater Systems
and control conduits,
power to the seawater pump station and
651 - RO the anchoring of the
container.
(Si -TERMINAL FAcarry hanot wrens Mike Glidden Genki Seawater Systems
151-TECHNOLOGY No Reliable WIFI or Internet Outwitted Mike Glidden
65l• TECHNOLOGY NO Reliable WIR or Internet Outtourced lumens viYA/26urs RAW
Herein. VIYA/2GunNari)7
Tebbe bath not Peat To bese next weak on rebar
fooling
and pow for RN Then Rom wall end
L51- PEBBLE BEACH roof schedule dependent
on wall. 8 weeks tentative1RWL
Roads not started: Jeffers 2 Roads Iffie/OuPSoll WE
- Jolters w coneys schedule.
Tentative startdate ?AO Benham Milers 3/11/7019
'SI - ROADS in discussion wle
-- lawyers riellettlt.
W- MAIN COMPOUND Master shower Kyle Eason laNeN
LII - LANDSCAPING nab, toes- need aft date Kyle
L.51 • ADMIN Staffing
I.S1 - FLAGPOLE POOL ./4
Castettafa R.Iltdsen company to come dorm
LSI- MAIN COMPOUND Cabanas 1-4 Vane's: FL kitchen compa Kyle
GU -STAFF COTTAGE ny to come dawn
Furniture for Staff Cottage .S 4
I.S1- MAIN COMPOUND Wardrobes focal Cabanas and Carpe JE/Kuyna
MICHEUE5 TRANSPORT ts for Chile 1E/Karyna
Ole N repirs Stark Carpet
Le -MECHANICAL BUILDING Engineering buildingfixed BC•10:00 Manna Del Rey PR
GS1 - MECHANICAL BUILDING Engineering building new cee bunt Kyle
ENGINEERING - EQUIPMENT Cans Kyle Allied Steel
(Si - LANDSCAPING Lands e*albeTnat Sheldon Palmetto Motorsports
LS/- IANDSCAPING Finlike and spraying Duman
651-DOCKS Docks constructran Duman Site One landscape
1S1-DOCK Dock -1PE Kyle
Arnerkan Export
Cables to be run: Installation and termination
LSI - RO of the fiber optic
cable between the RO plant and the seawa
ter pump station. Mike Glidden Gemini Seawater Systems
EFTA01309372
SDNY_GM_00332673
Conduit Bank MI - Seawater and Fiber • started: WAPA
ISJ • ELECTRICAL Switches
to be purchased
Mks Glidden
Stone Wall to be built: Schedule and budget established
- stetting
1.51 • MAIN COMPOUND 10th January
1.51 - MAIN COMPOUND Kyle Danny
Main compound pool awnings to be put up 3/29/2019
Kyle *Nester
Rber to be run
MARINE Mike Glidden
Jet slds
MARINE Rade/Petrldr Sheri:Ion
goat trailers
Randy/PaDick South Ronde Trailer{
Water trailers
(Si- MAIN COMPOUND Mike GlIdclan MR AtIschwants
Shower Ulu to be redone
Kyle Ja Development
Pergola waterfsel tu be poured and shelter bunt: Need to
establish layout of post. then our slab Keith post Nave-ou
ts) -
IS- LANDSCAPING erect postiand
151 - IANDSCAPING Kyle
Nunety_steps to be Reed
Kyle NIt Development
LSI - MAIN COMPOUND Cabanas curtains
(Si- MAIN COMPOUND Kitchen banquette Alberto Pinto
1/19/2019
151- MAIN COMPOUND Cabanas Bed Netting Custom Carnes
Custom Canvas
C
u_
EFTA01309373
SDNY_GM_00332674
L
ENGINEERING • EQUIPMENT TMkI N
Broken lulls IMAM i wagemate START DATE
ENGINEERING - EQUIPMENT Broken anon SherIda, Caribbean Motoring If
MARINE - BOATS Broken beats Sheldon Caribbean Motoring
MARINE Neutka - rotten wood on floor and midship ftandy/Patride Offshore Marine
MARINE- NAUT/CA entrance Carlos
Utile C - needs new engines BVI Painters
CV- SOLAR FARM Dead Solar batteries Randy/Patrick Offshore Maybe
No Quonset hut Starting 14th January, Max Mike Glidden Pro Solar
GTd - BMX OF THE NOUSE 4.5 weeks barring no
DPNR bsues -
No RO BuildIng/Generator bunker: Need an Kyle Expert Builders
Anhltect for 2/15/2019
plumbing/electricaldrawings for RO
GSJ -BACILOF THE HOUSE system design. This will
causes changes to layout Inside building drawn
. Kyle
G51Staff Cottage and Bedroom Addidon: Me
Is being laid, siding
GSJ-STAFF COTTAGE to start roof installation
_htrrogress, window door instal
Kyle
_J
IJpK Development
Stabs and Grotto Sun Louvers: EB pricing receiv 2/3/1019
ed. Was told to
put them offend sun lower company will
do this? Ell an OM do
L51-GROTTO this If green light is given. It will be 2 weeks
from start date- Kyle
Fn.
Five Palms Windows and Doom Reviewing Wert Builders
PK bid on 7th
January. Eft has missing scope off verbal, so sentinelle
IS1- FIVE PALMS d scope
LS1- FIVE PALMS
for prking.
Five Palms dome Kyle JPK Davebpment/Expert Bulk:hes
1,11
LSI - AVE PALMS Kyle Samson Widen
Rae Paints electrkal C
W- GYM Ginn doors tote rsPbsed Mike Glidden
IS/ - RO Kyle
- - ROstill not world:Itp
lil- MECHAIIICAL BUILDING
-ripe Seawater intake PumPla
Engineering doors al not even delivered Mike Glidden
EGS
Gemini Seawater Systems
U_
IS) • FIECTRICAL Rusted Ilkda Kyle Taylor, Cotton & Ridley
I.51- LANDSCAPING No solar lights Mike Glidden
Chem 3 inoperable: Tile back up and
pipes repaired. Awaiting
Ama Innovations (CHINA) 0
entail dates of the Roaring compa (2 weeks
I.S1• MAIN COMPOUND ny from arrival of
flooring company).
LSI - MAIN COMPOUND Cabana tie redo? Kyle n Development/WE
LSI • MAIN COMPOUND Cigna bath Kyle JPK Development?
Oben* and Odllax NOM AMP has beet contac Kyle
(Si • MAIN COMPOUND ted. JPK and ANC
t deans trials for Insurance.
I.S1- MAIN COMPOUND _RN INANE
Chill/taw Ceiling
Kyle
ru *sham TIle FlimPles waking approval, kitchen derno'd,
LSI -TIKI HOUSE le
knee/ step, then cabinets, etc.
Big Mk Brian to ankh deck 2 days, roof ITS LSJE
GSJ -TIM HOUSE starting (leaves 3.5 1/25/1019
weeks formatInstal and finishes
Kyle Brien Bates
Office PaAllon roof material not ordered: Await 1/31/2029
ing BWC Sub-
proposal. Pokey on site 7th January Pam
LSI-OFFICE PAVILION to review. (45 weeks
each roof). MSC on site 7th January 11
am to review. Kyle PK/Augustus Henry/BWC
EFTA01309374
EFTA_0020540 1
SDNY_GM_00332675
MBR roof material not ordered: Awaiting BWC Sub-proposal.
:Pokey on site 7th January 9am to review. (4.5 weeks each tool?
LL • MAIN COMPOUND I BWC on site 7th January 11 am to review. Kyle WE/AuguStus Nenry/SWC
Cabana 4 roof: Awaldng BWC Sub-proposal. Potty on site 7th
lantory gam to review. (4.5 weeks each roof). BWC on site 7th
LSI- MAIN COMPOUND Mir/ 11am to review. If fiK/AujuStuS leasSIYNC
ENGINEERING -EQUIPMENT Dump truck Sheldon
ENGINEERING -EQUIPMENT Fuel Mick SMrldort
ENGINEERING - EQUIPMENT Flat bed Sheldon
ENGINEERING - EQUIPMENT Ttencher Haddon
Gil -GENERATORS Generators not yet wine Mice Glidden
GU •SEPTC Septic not yet connected Mis Glidden San Mn Botanic"
GS,- RO ROdeRvenid end of/ant/my 2019 Mike GiSden Gerrard Seawater Systems
Pumps: Interconnecting Pining. power and control conduits.
power to the seawater pump station and the anchoring of the
GM - RO container. take Glidden Gemini Seawater Systems
III -TERM*/ MOUT/
LSI -TEOINOLOGY
Punps not working
No Reliable WIFI or Internet Outtourced
Mike Glidden
Winkle VITATIOW1 (Lad)?
H
MI• TECHNOLOGY INo Reliable WIN or Internet 0utsouroed lennalne VP/Af2Guys (Earl)?
'Pebble beach not poured: To beginnext week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
(Si - PEBBLE BEACH on wet 8 weeks tentative finish. Kyle/Dupeon 1511 3/8/2019
Roads not stared: Jeffers 2 Roads -Jeffers to confirm schedule. 0
Tentative startdate 14thJanuary. JeffersIn discusPon with
LSI-ROADS lawyers on credit Kyle Eason Jeffers
LSI- MAIN COMPOUND Master shower Nye
LSI- LANDSCAPING Palm trees- need start date Dupeon Meyer' Turf& Landscape Nursery
LSI - ADMIN
LSI - RAGPOLE POOL
Stafing
Countertopt FL kitchen company to cane down
SAM
KW
0
IS1- MAIN COMPOUND Cabanas 1-4Vanillas: A. kitchen ecapany to come down Kyle
GSI -STAFF COITAGE Furniture for Staff Cottage 1F/Keryw
ISI - MAINCOMPOUND Wardrobes for all Cabanas and CarPets for Chas SE/Karpr Stark Carpet
MICHELLE'S TRANSPORT Big N repairs BONA Marina Del Rey PR
LSI- MECHANICAL BUILDING Engineering building fixed Kyle
GU- MECHANICAL BUILDING Enginearing building new one brAt Rye MUM Steel
ENGINEERING -EQUIPMENT Carts Sheridan Palmetto Mcgcomorts
LSI-LANDSCAPING Landscape equipment Duper
LSI • LANDSCAPING renter and spraying Dimon Site One Landscape
G51- COOLS Docks construction KW
ISI - DOCX WA - IDE Kyle Amerkan smart
Cables to be nal: installation and termination of the fiber optic
LSI-RD cable between the RO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems
EFTA01309375
N
O
O
N
p
O
r._
<I
111
SONY_GM_00332676
Conduit Bank ISJ - Seawater and Frier- started: WAPA Switches
LSI -ELECTRICAL to be purchased Mike Glidden
Stone Wall to be built Schedule and budget established -stating
151- MAIN COMPOUND 1Oth January Kyle Danny
(S1- MAIN COMPOUND 3/29/2019
Main compound pool awnings to be put up_ Kyle Sylvester
Aber to be nun Mike Glidden
MARINE Jet slds Randy/Patrick Sheridan
MARINE Boat trailers Randy/Patrick South Florida Trailers
Water trailers Mike Glidden All Attachments
(Si - MAIN COMPOUND Shower tiles to be redone Kyle ink Development
Pergale waterfall to be poured and shelter be: Need to
establish layout of post, then our dab (with post leavemuts) -
Lel- tANDSCAPING erect post and Kyle
151-LANDSCAPING Nurser/steps to be feed Kyle Jilt Owebpment
I.S1- MAIN COMPOUND Cabanas curtains Alberto Pinto
LSJ • MAIN COMPOUND 1/18/2019
Kitchen banquette Custom Canvas
LSI- MAIN COMPOUND Cabanas Bed Netting Custom Canvas
0
0
EFTA01309376
en
O
O
N
p
O
r_
etI
LU
SONY_GM_00332677
ENGINEERING -EQUIPMENT Broken kills Sheridan Caribbean Motorirg
ENGINEERING -EQUIPMENT Broken Imams Sherbat Caribbean Motoring
MARINE- BOATS Broken boats flanckfiratrkk Offshore Marine
MARINE Nation- rotten wood on floor and mkishlp entrance Carlos IV, Painters
MARINE- NAUT1CA URN C • needs new engines Randy/Patrkk Offshore Marine
al - SOLAR FARM Dead Solar batteries Mike Gadder, Pro Solar
No Quonset hut Starting 14th January. Max 4.5 weeks barring no
651- BACK OF THE HOUSE DPNR Wild Kyle fart Builders 7./15/2019
No RO BulidingfGenerator bunker. Need an Architect for
pfurafing/electrical drawings for RO system design. This will
GS! - BACK OF THE HOUSE causes dunes to layout inside bulding drawn.
KIN
GS' Staff Cottage and Bedroom Addition: 'Me Is beinglaid, siding
GS! - STAFF COTTAGE to start, roof InstallatiOn in progress, window door Instal Kyle MC Development
2/1/ 2019
Slairs and Grotto Sun lowers: Ell p116mg received. Was told to
put them off and sun lower company will do NO Ea call
LSJ -GROTTO
Idli do
this If green right is given. It will be 2 weeb from start date. Kyle Expert Builders
H
Five Palms Windows and Doom Reviewing INC bid on 7th
January. E8 has missing scope off verbal, so sent detailed scope
LSI- FIVE PALMS for pricing._ Kyle JPK Development/Espert Wilder'
IS1- FIVE PALMS Five Palms dome
LSI- FIVE PALMS Five Palms electrical
Kyle
Mike Glidden
Samson Builders
C
LSI • GYM Gym doors to be replaced iEGS
LSI • MECHANICAL BUILDING
ROANnot weildng properIrSerweter Intake pump LSI - -
V.
Mike Odd', Gemini Seawater Systems I.,_
EnOneedng doors sde not even delivered Ryle Taylor, Cotton & Ridley
LSI • ELECTRICAL Rusted lights MON Glidden
LS1- LANDSCAPING No solar %Ms
Cabana 3 incomble: Tie back up and pipes repaired. Awaiting
Arms Innovates (CHINA)
0
arrivaldial of the loon* company (2 weeks from arrival of
131- MAIN COMPOUND Roofing company). Kyle WK Development/l32
IS1• MAIN COMPOUND Cabana de redo? Kyle IPK Development?
LSI- MAIN COMPOUND Chaim bed, Kyle
Cabana and oaax Doors:MD has been contacted. JPK andNW
LSI- MAIN COMPOUND to discuss pridng for Insurance. Kyle PK/AHF
LSI- MAIN COMPOUND alba Tray Gang Kyle
Ted tithe t Tile samples awaking aPPriairlik IdtthIll
demo% KW
LSJ - TIN HOUSE is next step, then cabinets, etc. Kyle IS 1/25/1013
Big 'nick Brian to Rath deck 2 days, roof starting (leaves 3.5
GII - Tun HOUSE weeks for roof install and finishes Kyje Brian Bates 1/31/2019
Office Pavilion roof material not ordered: Awaiting
Pwcsub•
'Proposal. Pokey on site 7th January 9am to review. (0.5 weeks
151. OFFICE PAVILION each roof). BWC on site 7th January 11 am to review. Kyle JPK/Augustus llenry/BWC
EFTA01309377
a
in
in
0
rtt
SDNY_GM_00332678
MBA roof material rot ordered: Awaiting BWC Sub-ProPosaL
Pokey on site 7th January 9am to review. (4.5 wastages), roof).
LS1 • MAIN COMPOUND BWC on site 7th January 11am to review.
Rile JPIC/ users Henry/BWC
'Cabana 4 roof: Awaiting BWC Sub-proposel. Pokey an she 7th
January gam to review. MS weeks each roof). BWC on site 7th
LSI • MAIN COMPOUND January 11am to review,
KIM PK/Augustus Nervy/BWC
ENGINEERING - EQUIPMENT Dump truck Sheridan
ENGINEERING -EQUIPMENT Fuel truck Sheridan
ENGINEERING -EQUIPMENT Rat bed Meriden
ENGINEERING - EQUIPMENT Trencher Sharidon
GSA -GENERATORS Generators not yet online Mike Gldden
GSA -SEPTIC Sep* not yet connected Mike Glidden San Jan Botanic*
GSJ• RO RO delivered end ofJanuary 2019
Pumps: Interconnecting piping, power and control Conduit%
Mike Glidden Gent Seawater Systems _J
power to the seawater pump station and the anchoring of the
G51-RO container. Mike Glidden Gemini Seawater %/stems
LSJ -TERMINAL FACRRY Pumps not working
LS1 • TECHNOLOGY No Reliable WIR or Internet Outsourced
Mike Glidden H
Jermalne VITA/2Guys Harp
GL -TECHNOLOGY No Reliable YOH or Internet Outwitted Jermalne VITAfiGuYS (ENO?
Pebble beach not poured: lb beginnext week on rebel /canoe
and pour for FOs. Then stone wall and roof schedule dependent LU
LSI • PEBBLE BEACH on wall. 8 weeks tentative finish. Kyle/Dupson WE 3/8/2019
Roads not started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January. Jeffers In discussion with C
IS-ROADS • - lawyers on credit. Kyle Eason Jeffers
U_
ILSI - MAIN COMPOUND Master shower Kyle
LSI - LANDSCAPING Palm trees- need start date Dupson Meyer's Ref& landscape Nursery
131- ADMIN Staffing
1E/HM 0
IS - FLAGPOLE POOL C011ntertcbc FL iltchen totally tO come down Kyle
LSI • MAIN COMPOUND i
Cabanas 14 Vanden FIL kitchen company to come down Kyle
GSA- STAFF COTTAGE Furniture for Staff Cottage
FE/KalWill
LSI • MAIN COMPOUND Wardrobes for ell Cabanas and Carpets for Chiba
clE/FarYll/ Stark greet
MICHELLE'S TRANSPORT NN repairs Roscoe Manna Del Rey PR
III- MECHANICAL BUILDING Engineering building fixed Kyle
GSJ- MECHANKAL BUILDING Engineering building new one built Kyle ABS Steel
ENGINEERING -EQUIPMENT Cart Sherldon Palmetto Motorsports
LS) -LANDSCAPING landscape madame* Dupson
LS1- LANDSCAPING Fetter and spraying Dodson Site One Landscape
GS1• DOCKS Daces construction Eyle
LSI - DOCK Dock -APE Kyle American Export
Cables to be run: Installation and termination of the fiber optic
ISI- RO cable between the RO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems
EFTA01309378
EFTA_0O205405
SDNY_GM_00332679
Conduit Bank LSI - Seawater and Fiber - started: WAPA Switches
LSI - ELECTRICAL to be purchased Mike Gadden
Stone Wall to be butt Schedule and budget established -sterling
LSI • MAIN COMPOUND 10th know Kyle Danny 3/29/2019
L51- MAIN COMPOUND Main compound pool awnings tote put up Kyle Sylvester
Elbert° be run MaeLikklen
MARINE let skls Randy/Paned Sheridan
MARINE Boat trams Randy/Patna South Nandi Trales
Water trailers Mpn Skiden AN Attachments
151- MAIN COMPOUND Siemer des to be redone Kyle DK Devotee/Mtn
Pergola waterfall to be poured and sheker but : Need to
establish blade( post, then our slab (with post leave-odd -
LSI • LANDSCAPING erect post and Kyle
151-LANDSCAPING Nursery steps to be fixed Kyle JPIC Development
LSI - MAIN COMPOUND Cabana curtains AlrentiMnto 1/18/2019
IS1- MAIN COMPOUND Ntdien banquette Custom Canvas
LSI• MAIN COMPOUND Cabanas Bed Neale adornCanvas
EFTA01309379
Rough Notes/Punch List from January 6, 2019 meeting on LSJ
JE, DKI, BG, KG, Kyle Reavis, Mike Glidden and Dupson Donnissaint attending
1. Confirm turbo charger for lull was on plane — confirmed. Brice sent picture.
2. order new lull
3. order new dump truck
4. order new fuel truck
S. order new flat bed
6. order new tractor
7. order new hydro seeder
8. order new man lift
9. order new push lawn mower
10. order new roller
11. order new trencher
12. order new larger fertilizer sprayer
13. order hydraulic hose machine
14. order tire changer for commercial vehicles
15. order new jet ski
16. Confirm condition of most recently purchased tractor and what needs to be done to it
to make it fully operable.
17. Nautica and Sportis are both to be ready by January 30, 2019
18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica
and Sport's are back up and running — est. to start by Feb 1.
19. new barge that is wider to accommodate two concrete trucks
CONFIDENTIAL SDNY_GM_00332680
EFTA 00205406
EFTA01309380
20. barge and "Bubblerisp?)
Omega Electric— Darren to handle demand letter after getting backup from Mike
21.
Glidden.
22. Pro Solar — follow up with Erika
23. Generator Bunker — Architect and Engineer
24. Mike's Cottage —addition and main — by February 15, 2019
25. Gym — Replace Equipment
26. Fiber to be installed for RO by Feb 20, 2019
27. RO for GS' —work to be done; and by whom
28. Step Up Transformer for Cable
29. Step down transformer for Cable
30. Need to engineer a switch for when Cable from LSJ to GSJ fails
31. Engineering doors (28)— confirm arrival dates
32. Chillax Bath A/C— Reefco — when will it be finished
33. Roof Materials — No new EFIS — check with Rich Kahn
34. Septic Tanks — hole dug — dates from Adam Cook
35. WIFI — Review ABI. bids by Friday — Brice to send bids to Darren and Darren to review.
36. (Dock?) pebble beach — Friday
37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019
38. Wooden Nursery Steps —JE to review
39. Service Doors and Service Gates — Bamboo Coverings
40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or
January 10, 2019
CONFIDENTIAL SDNY_GM_00332681
EFTA_00205407
EFTA01309381
41. Planter by Pool wall
42. Christmas Cove Dock
43. Tiki Hut Kitchen—JE to choose color
44. Nursery Steps —JE to review
45. Waterfall layout —JE to review
46. Grotto — JE to review
47. Five Palms Electrical —Answer by January 9, 2019
48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019
49. Maids and crew— Decision regarding Stephanie to serve as point person for supervision
50. Debris and materials on top of RO to be cleaned up immediately
51. Cost You Less — Karen to sort out by January 10, 2019
52. L51 —Jeffers doing Roads — DKI to speak to RK
53. Dock Lights — Mike Glidden to follow up with the person hired for this work
54. Staff Bathrooms
55. Under Cabana 2 — storage and piping
56. Island Oxygen bottles
57. First Aid Kits for all locations on both Islands
58. Pool Heater
59. Cistern Drains for Main Compound
60. Hurricane Prep Materials organized and accounted for
61. Solar System for Flagpole on GSJ
62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc.
CONFIDENTIAL SDNY_GM_00332682
EFTA 00205408
EFTA01309382
63. Staff Cottage Dryer — Purchase one appropriate for propane use
64. Pool Rooms electrical panels replacement
65. Power to beach for Captains below staff cottage.
66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift
67. Blue Beach office — electric transformer
68. Staff Cottage water heater issues — dugout underneath Staff Cottage.
69. Refurbish water distribution manifold
70. Furniture package — Karen to complete by January 11, 2019
71. Pebble Beach house — 2 additional crew members requested
72. Security — including power & internet to docks so motion detecting Ring devices can be
Installed
73. Karen to review household supplies and cleaning equipment and materials needed
74. Water flowing up hillside on GSJ {location not clear from notes]
75. New kitchen fridge for Mike's cottage
76. Countertops and Vanities everywhere on GSJ and LSJ
77. Pinto's people — June 17
CONFIDENTIAL
SDNY_GM_00332683
EFTA 00205409
EFTA01309383
Little Saint James
CONFIDENTIAL
SDNY_GM_00332684
EFTA_002054 10
EFTA01309384
EFTA_002054II
SDNY_ GM_ 00332685
LOCATION TASK SCOPE MANAGER CONTRACTOR/4Si STAFF START DATE COMPLETION DATE
ENGINEERING EQUIPMENT Broken lulls Sheridon Caribbean Motoring
ENGINEERING - EQUIPMENT Broken tractors Sheridon Caribbean Motoring
MARINE - BOATS Broken boats Randy/Patrick Offshore Marine
MARINE Nautica rotten wood on floor and midship entrance Carlos BVI Painters
MARINE NAUTICA Uttle C needs new engines Randy/Patrkk Offshore Marine
GSJ - SOLAR FARM Dead Solar batteries Mike Glidden Pro Solar
No Quonset hut• Starting 14th January. Max 4.5 weeks barring no
GSJ - BACK OF THE HOUSE DPNR Issues Kyle Expert Builders 2/15/2019
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This MI
GSJ BACK OF NE HOUSE causes changes to layout inside budding drawn. Kyle
GS/ Staff Cottage and Bedroom Addition: Tile is being laid, siding
GSJ STAFF COTTAGE to start, roof installation in proven, window door install Kyle IPK Development 2/1/2019
Stairs and Grotto Sun Louvers: EB pricing received. Was told to cC
put them off and sun louver company will do this? ES can still do
LSJ GROTTO this if green light is given. It will be 2 weeks from start date. Kyle Expert Builders
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. ES has missing scope off verbal, so sent detailed scope
LSI - FIVE PALMS for pricing. Kyle JPK Development/Expert Builders
L.S1 - FIVE PALMS Rye Palms dome Kyle Samson Builders
LSI • FIVE PALMS
LS) - GYM
Five Palms electrical
Gym doors to be replaced
Mike Glidden
Kyle EGS
C
LSJ RO
IS) - MECHANICAL BUILDING
RO still not working property: Seawater intake pump MI
Engineering doors still not even delivered
Mike Glidden
Kyle
Gemini Seawater Systems
Taylor, Cotton & Ridley
Li_
IS) -ELECTRICAL Rusted Lights Mike Glidden
LSJ -LANDSCAPING No solar lights Anna
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the Booring company weeks from arrival of
innovations (CHINA/
O
LSI - MAIN COMPOUND flooring company)... Kyle 1F-K Development/LYE
LSJ - MAIN COMPOUND Cabana tile redo? Kyle IPS Development?
LSJ - MAIN COMPOUND Chillax bath Kyle
Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
LS) - MAIN COMPOUND to discuss pricing for insurance. Kyle IPK/AHF
LSJ • MAIN COMPOUND Chillax Tray Ceiling Kyle
MI kitchen: Tile samples awaiting approval, kitchen demosd, tile
LSJ - TIKI HOUSE is next step, then cabinets, etc. Kyle ISLE
Big Tad: Brian to finish deck 2 days, roof starting (leaves 3.5 1/25/2019
GSJ - ma HOUSE weeks for roof install and finishes Kyle Brian Bates 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
PcoPosal. Pokey on site 7th January 9am to review. (4.5 weeks
LSJ - OFFICE PAVIUON each roof). BWC on site 7th January 11 am to review. kyle IPK/Augustus Henry/BWC
EFTA01309385
ti
71:
in
O
N
p
O
r_et
SONY_GM_00332686
MBA roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
(Si - MAIN COMPOUND MC on site 7th January 11am to review. Kyle JPK/Atlustus Henry/BWC
Cabana 4 root Awaiting BWC Sub-proposal Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
1.51- MAIN COMPOUND 'January 11am to review. Kyle JPK/Augustus Henry/BWC
ENGINEERING- EQUIPMENT Dump truck Sheridan
ENGINEERING -EQUIPMENT Fuel buck Sheddon
ENGINEERING -EQUIPMENT Flatbed Sheldon
ENGINEERING -EQUIPMENT Tender Meriden
651-GENERATORS Gerwmators not Let online Mike Glidden
CH -SEPTIC Septic net yet connected MB* Gliddrm %elan Botanic&
G51- RO RO delivered end of January 2019 Mike Glidden Gemini Seawater Systems
Pumps: Interconnecting piping, power end control conduits,
power to the seawater pump station and the anchoring of the
651- RO container. Mike Glidden GeMni Seawater Systems
LSI - TERMINAL FACILITY Pumps not working fa Glidden
I51- TECHNOU3GT NORMS* WM or Internet Outsourced Remain. VITA/2Guys (Earl)?
GO -TECHNOLOGY No Rabble WIR or Internet Outsarced *Male VW-4UP(Carl)?
Pebble beach not poured: To begin neat week on rebar footing
end pour for FDs. Then stare wall and roof schedule dependent
III- PEBBLE BEACH on wall g weeks tentative Pith. Mile/DePson ISIS 3/8/7019
Rost net started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January. Jeffers In discussion with
151-ROADS lawyers on credit. KS* Easonleffers — —
IS'- MAIN COMPOUND Muter shower Kyle
LSI - IMIDSCAPING Palm trees- need start date Masco MeTeeS Turf & Landscape Nursery
LL • ADMIX Staffing JE/HM
LSI - FLAGPOLE POOL Countertops: a kitchen company to come down Kyle
LSI - MAIN COMPOUND Cabanas 14 Vanities: a kitchen company to come down Kyle
651- STAFF COTTAGE Furniture for Staff Cottage JUICerwie
W- MAIN COMPOUND Wardrobes for all Cabanas and Carpetsfor chiles 1E/Kanma Stark Carpet
MICHELLE'S TRANSPORT gig N repairs Pascoe Mate Del Rey PR
LS1- MECHANICAL BUILDING Engineering budding fted Kyle
G51- MECHANICAL BUILDING EngbeerIng bulltlingnew one bulk Kyle Ailed Steel
ENGINEERING - EQUIPMENT Carts Sheldon Palmetto MotorSPons
III - IANDSCAPING Landscape oc&ment
.f on
...—
ISO- LANDSCAPING Fertilizer and spraying Damson Stream Landscape
611- DOCKS Docks consOlietiOn ti Kyle
L51- DOCK Dock - IPE
--k le Amerken Erport
Cables to be run: Installation and termination of the fiber optic
W• RO cable between the PO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems
EFTA01309386
en
§I
SDNY_GM_00332687
Condon BM* LSI • Seawater and Fiber - started: WAPA Switches
1.53 • ELKIRICAL to be purdwei , Mike Glidden
Slone Wall to be butt Schedule and budgeter/abashed • starting
'SI - MAIN COMPOUND 10th January Kyle Danny 3/29/2019
LSI - MAIN COMPOUND Maln compound pool earnings to be put up Kyle Sylvester
Fiber to be run Mike Glidden I
MARINE let ads RIMY/Pend Sheldon
MARINE Boat trailers * Randy/Parkk South Florida Stagers
Water trailers Make Glidden AM Attachments
LSI- MAIN COMPOUND Shower tiles to be redone 4* PK Development
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leavewetD •
LSI-LANDSCAPING erect post and Kyle
151-LANDSCAPING Nursery steps to be feed Kyle WE Development
LSI- MAIN COMPOUND Cabanas curtains Alberto Panto 1/12(1059
ISI • MAIN COMPOUND Kitdien banquet. Custer, Carnes
ISI - MAIN COMPOUND Cabanas Bed Neter, Custom Canvas
uu
C
u
0
EFTA01309387
CONFIDENTIAL
SDNY_GM_00332888
EF1,00205414
EFTA01309388
EFTA_00205415
SDNY GM_ 00332689
New LSJ-GSJ Mandatory Punchlist 5-17-19 a smartsheet
**** MANDATORY
LSJ/GSJ Punchlist
%theeing, Stipmenti & Vlttg Vendors
MoldlbefAnediation
on STT
Ahedge:
Clear,
equipment Iiiii 2rotihcatInFLngis. sail
ikew
LSJ/GSJ Daphne 8 Anna Seth Ettinger - Restore 8
1 (2-3) arrive 61I2 remediatircen'beeginseEM.e(5) areas on e GSJ Mike's
More LLC
Room, 2. Living Room, 3. Office.4. Twin Bedroom, 5. Master Bedroom.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym.
2 LSJ MC Krtchen Karyna & JE Project ON HOLD until the decorators come, per JE. Will review with
Banquette decorators for different ideas.
3 Master Bedroom Karyna JE Pillow Should know more after our trip on June 3rd.
4 Emergency Room Anna 8 JE EKG Machine Order EKG Machine. JE to advise.
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the door openings. Awaiting quote
5 Theater Room Anna 8 JE Blackout Curtains
from TJ "Home Theater Markel" for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
C
4 Panels of 11ft Sin Long (135in), All 12 Panels are 4ft Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/30).
u_
6 Housekeeping Anna Washers Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
7 Housekeeping Anna Dryers Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
0
12 8 Gym Anna Gym flooded on 5/30. all equipment moved to R/O Storage on 5/30.
Flooded Floor removal began 5/31/2019.
10 9 Sam's Place Anna Furniture Order Living room furniture 8 Kitchen Table
Solar lights from China - departed from China 5/21 - 45 days to MIA -
.4 10 LSJ/GSJ Anna 8 Daphne Solar Lights EDA FL 7/3.
11 LSJ/GSJ Anna & Daphne Sun Umbrellas Order 15 Cream Colored Sun Umbrellas. JE will choose.
.t' 12 Theater Room Anna 8 Daphne Drapes/Curtains Wrinkle out the Drapes/ Curtains in the Theater
Order lighting for the Saltpond water fountain. Arriving to the Palm
13 LSJ Salt Pond Anna Fountain Light Beach house on 5/30. Arriving on plane 6/3
14 LSJ Helloed Anna Medical Kit Purchase Medical items for Helipad Office
15 Chillax Room Anna Chillax Deep Clean Chillax room. Smells funny
Exported on Juno 6. 2019 6127'52 AM BOT Page 1 of 18
EFTA01309389
EFTA_00205416
SONY_ GM_ 00332690
No. Ares Who , Items Descim:
Michael & Custom Temente Philip. Custom welding has stated that he will be movig the
18 Welding - Terrance Welding gate sections out to LSJ 5/29 on Little C but cannot proceed with the
Philip installation due to the rain. Mike told him to proceed with moving the
Welder material to the island for now.
17 Five Palms Sylvester & Boniface Large Windows Large Windows on each side to be installed
18 Grotto Peter Elie
19 New Road Michael & Jeffers Road Project
20 Ismail scheduled to deliver and begin install by 5/31; will work around
LSJ Generator Room Michael & Contractors Hurricane Shutters weather. The installation will take around 10-14 work days.
21 GSJ Cottage Michael & Contractors Expert Builders Completion Date ? (6-8 weeks)
22 Forms and lighting installation complete by 5/25. Concrete pour TBD.
GSJ Helloed Peter Elie Helloed JE advise "H to be Bigger. JE to review 6/5
23 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
LSJ Tunnel
24
Wreckshop
Michael & Bill Terry
Michael & Bill Terry
Skin it Recommend going with Allied.
JB reviewed and approved drawings 5/22. MG approval and sign off of
FL
40x60 Bld. the plans will be sent to Buck Steel 5/24.
25 HM Storage Michael & Contractors 00x00 Bpd.
Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied. uu
28
LSJ Fuel Room Reefco Vents
Install Vents in Fuel storage room. Dave reduced initial quote by 4500.
ordered 5124; EDA on STT by June 15th and will then schedule install
C
27 Engineering Michael & Contractors Doors Install Engineering doors. John Bedminster has estimate forthcoming.
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
u_
Forms for the GSJ Cottage to EK and DKI to review the portions
28 GSJ sum Cottage Jeffrey Boschulte Permits
already filled out: JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
0
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK will notify JB once tax clearance letters back: JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to Ex. who will submit the completed application on behalf of the owner.
I1S 11218181
GSJ Barn Jeffrey Boschulte Permits Permits: Barn - JB awaiting selection of supplier and specs.
GSJ Terrace Jeffrey Boschulte Permit Build 75 foot round terrace.
GSJ Pool Extension Jeffrey Boschulte Permit Extend current pool to 80 feet from 15 feet.
Waterfall (711d or Juggly
Park) Peter Elie Slab
Gym Michael & Contractors Doors Bid coming from John Bedminster
INItl
Flagpole Pool Michael & Contractors Shade Structure Waiting for three bids. John Bedminster. EB. Mr. Gumbs
Flagpole Pool Michael & Contractors Freezer JE advised not to order a freezer.
Expired on June 6,2019 60752 AM BOT
Page 3 or 16
EFTA01309390
EFTA_00205417
SDNY_ GM_ 00332691
No. Who Items Description
36 Order Freezer for Tikl hut kitchen: on STT 5/28 • cleared. off-loaded,
LSJ TR' Hut Michael & Contractors Freezer awaiting pickup for transport to LSJ.
37 Dock GSJ Amy Dempsey Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
Permits North). 2. Christmas Cove Service Doc*. 3. GSJ Southern Dock
38 The permit for the LSJ WAVE ATTENUATOR and Dock is currently
Dock LSJ Amy Dempsey Permits under review by CZM.
Christmas Cove
38 Moorings Patrick Moorings Request moorings for Christmas Cove
40 Sell old Generators: Bill Terry to coordinate sale of the old generators.
Old Generators Michael & Bill Terry Old Generators Rich to speak with Bill.
41 Flagpole Pool Michael & Contractors Shade Structure Shade structure is replacing need for awning.
42 Five Palms Franks Electric Electrical work to be done at Five Palms
43 Five Palms Peter Elie Concrete Need more direction from JE. He was not pleased with current layout.
44 GSJ R/O Michael & Contractors 2nd R/O Intake Bob Peterson coming 5/23
45 GSJ New Dock Michael & Jules Dock Expansion JE said stop work on 5/21
46 GSJ New Dock Michael & Jules Water Sport Ramp JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday, June 2. AA Flight 1391
47 2:57PM. depart Tuesday. June 4, AA Flight 943 2:41PM. Monday 6/3
Michael & Paul review the existing facilities. discuss the recent/previous improvements.
LSJ/GSJ Cables "Global Tech" Underwater Cable plans for both sides and thoughts on the protect approach. etc.
ACOE has reviewed the permits: their comments were addressed by
CD
48 Permit Amy Dempsey Underwater Cable LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
u_
and operates a trenching company. Mr. Pemberton would like to
49 conduct a site visit to review the project prior to submitting a bid. He can
Heavy Machinery
Trencher Michael
be available week of 6/3. His rental includes the trenching equipment
and an operator.
0
50 LSJ Library Michael Roofing & Trim
51 LSJ Fadlty Entrance Sylvester & James Service Gates Carpenters will skin gates after welder hangs frames. Material on site.
52 LSJ MB Bath Sylvester & James Shower Tiles Awaiting quote from John Bedminster. this project involves new shower
hardware, plumbing, and tile work
53 LSJ Main Compound Sylvester & James Mockup Planter Mockup built (Measurments still in question) In•progress. On hold until
JE advise.
54 Tunnel Entrance Sylvester & James Tunnel Gate See ft49
55 LSJ Helipad Sylvester & James Hell Service Gate See #49
56 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5131 of completion date.
Exporters on Juno 6. 2019 6 07 52 ALl BOT
Page 5 0118
EFTA01309391
EFTA_002054 18
SDNY_ GM_ 00332692
No Area Who Items Description
Ig ISI5ISISIRISISI2 IS IS IS 19
Chrietrnas Cove Brian Bates Container shed Structure complete. TJ to paint (Paint began 5/24)
GSJ Tiki Terrace Brian Bates Small Dock box Small dock boxes for Towels and other items (Measurments ?) Is this
new or is this the dock box Brian already built.
GSJ Tiki Terrace Brian Bates Wooden Furniture Chest is complete. Lighting to be installed by 5125.
LSJ/GSJ Ilk' sheds Brian Bates Thatch Order thatch to be installed after Hurricane Season. (70) rolls ordered,
on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT.
Barn ? Barn Supplier to be awarded
GSJ Terrace Chandelier
Sam's Place Danny & Keshaun Bedroom Repair Ceiling. Lighting socket needed
GSJ New Dock Brian & Ron Dock Shed Build New Dock Shed. JE to Advise (4 Posts in place at sight) See #70
LSJ Tildflut Maurice & Boniface Coral Stone Maurice began tile work today 5/31.
Cabana 1 Maurice or Sylvester Shower Tile Shower floor is not draining properly
Flagpole Pool Maurice or Sylvester Kickplate Install Kickplate
GSJ Maurice or Sylvester Tiki Bar Fix Cabinet & Drawers
GSJ Guest BR Maurice or Sylvester Carpet Cut Carpet to size. Carpet to long. Need to be centered under both
beds
to Main Compound Maurice or Sylvester Ceiling Stain ceiling above the White Table
C
71 Tiki Terrace TJ & Oriole Brown Paint Deck to be stained
72 LSJ Dock TJ & Oriole Polyurethane Polyurethane Boardwalk
73 Tunnel TJ & Oriole Roof In progress. Repair holes on tunnel roof
74 Christmas Cove TJ & Oriole Structure Material to arrive 5/28 work to start 5/28. 0
75 Sam's Place TJ & Oriole Bedroom Paint after repairs are made
Phomnismet & WA
76 Emergency Room Jermaine & Liston Fax Pending setup of Efax account
77 LSJ Island Jermaine & Liston Emergency PA System Island wide system for intruders
78 GSJ Island Jermaine & Liston Emergency PA System Island wide system for intruders
79 Jermaine & Liston Order 82 TV for Chides Room and proper wall mount — 5/29/19 -
Chilies 8T TV Pricesmart will have the 82* Samsung in stock
Completion date. [5-29-19 All Will, Access Points and switches and
80 Jermaine & Liston LSJ/GSJ WIFI currently waiting on 5 addition switches to handle the distribution of
New WIFI System existing phone services.) [5-29-19) GSJ Wifi is in progress this week]
I x;..xt,,n on June 6. 2019 6 0? 52 AM BOT
Page 7 of 16
EFTA01309392
EFTA_00205419
SDNY_ GM_ 00332693
No. Area Items DescnMon
Camera setup at Christmas Ceram Pending Mike to order Yeti Solar
Jermaine & Liston Units and Panels as per email 5/24/19 (5/29/19 GSJ Dock Nest
81 GSJ Cameras Camera is active)
WO&Enolneedni
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
placed the order for the pump 5/24. Production time is 6 weeks • the
82 LSJ Cistern 1 Michael & JCH Cistern Pump
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7f21
Michael & Gemini
83 GSJ RIO Seawater Systems R/O Container On Island on GSJ
Michael & Gemini
84 GSJ RIO parts Seawater Systems
R/O Parts
On Island
85 R/O Water Michael & Smiley Water Testing 5/24 Anna emailed last test results (3/2017).
<
Lighting & Electrical
86 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers
87 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly
MC Planter & Palm Tree
88 MC New Planter Danny & Keshawn
Lighting In progress CD
Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at
89 Tiki Waterfall Anna, Danny &
Keshawn Pond Fountain the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house. or on the plane.
u_
Flagpole Pool Danny & Keshawn Run wires and plugs property. Make hole in cabinets if needed. Plugs
90 Kitchen and wires should not be seen
91 GSJ Peters Point Danny & Keshawn Solar Lights/Other Lighting facing Peters Point for Safety 0
Cabana 1 Danny & Keshawn Test in place. JE advise that we order more. Brighter than what's
92 Rope Light
installed at the moment.
Master Bedroom Danny & Keshawn Wall Sconce Wall sconce does not come on around the Master. Timer to be set
6:30pm -5am ?
94 GYM Michael 8 Liston Equipment & Audio Wiring need to be done for GYM Equipment & Audio
95 Chillax Danny & Keshawn Phone Plug Replace or fix phone/Internet plug in Chillax
PkwribIng & Reefoo
96 GSJ Master BR Michael & Charlie Master Bath No Hot water
Replace air handler for the Library. Dave ordered 5/27: current lead
97 Library Reefco Air Handler time 7-8 weeks plus transit time (4.5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
Exported on June 6. 2019 807'52 AM BOT Page 90118
EFTA01309393
0
N
In
O
N
p
O
r_94
SDNY_GM_00332694
Area Who Items Description
98 IT Server Room Reek* NC Unit Temp arc installed. Board ordered. Waiting on schedule.
Cabana 1-4 Air Shipping next week and hopes to have by May 31st. Goal is to install
99 Conditioning Units
Reefco A/C Unit
week of June 3rd. PM already on routine schedule for Cabana 4.
100 GSJ Reefco NC Unit PM already on routine schedule. Bedroom. Kitchen & Living Room
101 LSJ Laundry Reefco NC Unit Housekeeping NC is not working
WISIIIIIMaasairromona stonswiais
12'. Install Solar light on GSJ so JE can see those lights from Master
102 GSJ Solar Lights Gael & Nicholas Solar lights
Bedroom on LSJ.
124 103 LSJ Landscaping Cnstobal & Fabian Irrigation Install irrigation for new palms
125 104 GSJ Stones Danny & Renol Stones Stones from GSJ to LSJ to create and fix all Stone walls
Plant oleanders on the left side of the MC staircase (behind the parking
126 108 - Dupson & Deice White Oleanders on the Beach). (50) 3 gallon White Oleanders purchased 5/22 from ABC
GSJ Nursery. Cliff updated container EDA on STT 5/29: should be off-loaded
and available for LSJ to pick up on 5/31. pending weather.
(12) Ficus trees (6-T OA) and (200) 3 gallon White Fountain grass
V 108 Dupson Ficus & White Fountain purchased 5/22 from ABC Nursery. Cliff updated container EDA on STT
Grass 5/29: should be off-loaded and available for LSJ to pick up on 5/31.
pending weather.
Dupson Jute Erosion Control JE sourced on Online Fabric Store: purchased 5000 yards for all LSJ C
107 Cloth and GSJ erosion control projects. EDA to Tropical FL 6/7.
Order Pesticides & Fertilizer for all plants and palms Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
u_
108 LSJ / GSJ Landscaping Dupson & Daphne Chemicals & Lawnmower Headquarters quote for Stihl and Silky equipment
Landscaping Equipment approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7. 0
109 GSJ Beach Landscapers Teak Furniture Move teak furniture off of GSJ waterfront to Flagpole at Holy Shit Point
Island Wide Landscapers Orange Vines Remove all Orange Vines from plants on Island. Main Compound &
110 Island wide. Orange vines will kill the plants
Wreckshop & Heavy Machinery Operatiar*
Exported en June 6. 2019 6'.0752 AM B07 Pepe 11 of 16
EFTA01309394
EF1'A_0020542 I
SDNY GM_ 00332695
We are working On the Ouadski, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan. Blowers Throttle Blipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
is: 111 HM Equipment Tap & Dale Ouadski Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by H
end of next week - If the dutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
115 112 HM Equipment Tap & Dale Fuel Truck / Flatbed
making contact for approval
Turn Fuel truck into Flatbed
uu
1 14., 113 HM Equipment Tap & Dale Mules Kawasaki does not manufacture electric vehicles yet.
C
137 114 The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
HM Equipment Tap & Dale Electric Carts sent for undercoating (Rust proofing process) 5/31.
116 John Deere does not manufacture electric progators, only electric
HM Equipment Tap & Dale ProGator gators.
139 118 Arrived on STT 5/22. Cleared, off-loaded. awaiting transport to LSJ.
HM Equipment Tap & Dale Roller MG will schedule barge to pick up directly from Tropical Shipping STT.
I4 ` 117 Old Heavy Machinery Tap & Jules Removal
41 118 GSJ Engineering Shed Jules & Buck Bens Create Berm to block LSJ view across from the R/O Containers
119 GSJ Jules Trenching Trenching Area & Description needed
120 LSJ Tild Hut Jules or Peter Tiki Parking Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5
121 Wreelcshop Rychie Office Clean office immediately 6/5
RaiIts Sporb
Nautica Boat - NC, Carlos, Patrick & Nautica delivered to Offshore Marine Subbase 05/18/19. Offshore
122 Tubes. Structure Randy NC Marine has scheduled Jesus the tube guy for 5/31 to remove tube and
ship out. Fiberglass repairs will start right after.
123 Sport's Boat Patrick & Randy NC
Exported on June 6.2019 697'.52 AM BOT Pape 13 of 1B
EFTA01309395
N
in
O
N
p
O
r_<
SDNY_GM_00332696
124 GSJ Water Front Patrick & Randy Sail Boat Remove damaged sail boat
125 Christmas Cove Patrick & Randy Boat debris Remove boat debris
126 New Crew Boat Patrick & Randy Crew Boat
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
127 AYH / Big N Boscoe & David Fenders 5/24. Production lead time is 10 weeks. EDA to production completion
8/2.
128 AYH / Big N Boscoe & David Cleats Install Cleats al AYH Barge slip
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
AYH/Big N Boscoe & Robed discharge thru the hull must be made to match the system and two of
129 Blankets
Lemire the flange blankets were too shod and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
130 PR /Big N Boscoe & David PR Repairs Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5' I'm sorry. I don't have an answer as yet' He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. He will continue to call Bobby. Barge arrival home could be
$tween June 10th-15th
131 PR / Big N Boscoe & David Nana Take Nana to Offshore to get the Engines Checked
C
Cleaning. Organizing & DEMO
132 GYM Kevin, Garth, & Mike GYM Demo Flooring in the GYM
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
0
133 JE Denali Carlos & Caribbean NC Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
Auto Mart service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
Carla & Cliff's Auto Insurance Coverage & Repairs to be made. Carlos awaiting estimate
134 LSJ Suburban Repairs Accident from Cliffs Auto Repair - by 5/31. Carlos will take the vehicle to
Guardian 5/30 for adjuster's inspection.
- &Power
Exported on June 6. 2019 6.07'52 AM BOT Pe 16 al ill
EFTA01309396
CONFIDENTIAL
SDNY_GM0033269,
EFTA_00205423
EFTA01309397
SWIL IaliteLn
SAL_ Motoring
_Ragan Sheridan
Caribbean
3 ' Mk_ Caribbean Motoring
MENT Broken lulls Sheridan
ENGINEERING-EQUIP 'Offshore Marine
ME NT Broken tractors Re /Patrick
ENGINEERI NG -EQ UIP
Carlos EMI Painters
Broken boats entrance
MARINE -BOAR on Boor and midship Randy/Patrick Offshore Marine
Navdca - rotten wood
MARINE rie s Pro Solar
Little C • needs new ret Mike Glidden VLS/2029
MARINE • NAUTICA
Dead Solar batteries weeks barring no
GSJ • SOLAR FARM g 14th January. Max 4,5 Expert Builders
No Quonset hut Startin Kyle
USE DPN R Su n hitect for
GS.I • BACK OF THE HO rator bunker: Need an Arc
No RO Building/Gene sys tem design. This SU
cal dra win gs for RD
plumbing/electri Kyle
0 GS) • BACK OF THE NO USE causes changes to lay
out Inside building dra
m.
2/1/2019
0 GSJSIeff Cottage and
Bedroom Addition: Tee
Is being laid, siding
door install Kyle
JPK Development
z G51- STAFF CO TTA GE to start, roof Installatio
Stairs and Grotto Sun Lou
n In pro gre ss, win dow
vers: ER pricing receiv
ed. Was told to
pan y wil l do this ? CB can still do Wert Builders
ver com
put them off and sun lou 2 wee ks fro m start date. Kyle
en. It wil! be
C IS/ - GROTTO
thls if green light is giv
Five Palms Windows and
mis sin g
Doors: Reviewing JPK
sco pe off verbal, so sent
bid on lth
detailed stone 1PX Cemplopment/Eme
rt builders
Januar y. EIS has IKyle
Samson Builders
for ek ing. Kyle
(Si - FIVE PALMS Fiv e Palms dome Mike Glidden
z WS
LSI • FIVE PALMS Five Pal ms ele ctri cal Kyle tems
Lil- FIVE PALMS laced Genial Seawater Sys
Gym doors to be rep pu rnI S Mike Glidden Li Rid ley_
ke Taylor, Co tton
LSI - GYM no t wo rkin g property: Seawater Inta Kyie
BO stil l
LS) - RD l not even delves Mike Geddes
ING Engineering doors stil Innovations (CHINA)
- LSI • MECHANICA
LSI - ELECTRICAL
L BU ILD
Ru
No
ste
sol
d Lights
ar Reis repaire d. Aw aki ng
Anna
ISI - lANOSCAPING The badt op and pipes
Cabana 3 inoperable: ival of In Development/W
E
of the floo ring com pany (2 weeks how arr Kyle
anivaldates OK Development?
). Kyle
W• MAIN COMPOUND Cab ana the redo? Kyle
ISJ - MAIN COMP OU ND
iCh illax bath tac ted . 'PK and AI *
(Si- MAIN COMPOUND rs: ANI has been con !ISMS
Cabana and Chian floo 9 1
S uss pric ing for Ma rmot. Elle 1/25/2019
ND to disc
869ZECOO-W9-ANG
ISI - MAIN COMP OU
Og les Tray Ceiling kit ten dem o% tile -----";
IS) • MAIN COMPOUND s awaidng approval. WE
Mt Idtchem Tile sample Kim 2/31/2019
t ste p, the n cab ine ts, etc
is nex s, ro d sta r*, Cle ave s 35 Marl Bates
LSI -TIM HOUSE Big rad: Brian to relish
deck 2 day Kyle
finishes
we eks for roof install and
Gli • TIM NOUSE
aiting MC Sob-
terial not ordered: Aw
Office Pavillon roof ma to rev iew. (CS weeks JPK/Augustus Henry
/MC
7th January 9am
proposal Pokey on site 'Kyle
ri:KOZ.00- VJL43
Jan uar y 21 am to review.
7th
ILIO N each roof). BWC on site
IS) - OFFICE PAV
EFTA01309398
EFTA01309399
CONFIDENTIAL
SONY_GM_00332699
EFTA_00205425
Conduit Bank IS) • Seawater and Fiber - started: WAPA Switches
LSI - ELECIRICAL to be purchased Mete Glidden
Stone Wall to be bolt Schedule and budget established • starting
LSI- MAIN COMPOUND 10th January Kyle Danny 3/29/2019
ISI - MAIN COMPOUND Main compound pool awnings to be put up Kyle Sylvester
Ebert° bent Mile Golden
MARINE let skis Randy/Patrick gladden
MARINE Boat trailers Randy/Patrick South Florida Trailers
Water balers Make Glidden AN Attachments
LSI • MAIN COMPOUND Shower Mes to be redone Kyle /PK Development
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leave-outs) -
151-LANDSCAPING erect POSY and Kyle
131• LANDSOWING Nursery steps to be fixed
(-) 151- MAIN COMPOUND Cabanas curtains
Kyle PK Development
Alberto lento 1/18/201!
0 LSI- MAIN COMPOUND
151- MAIN COMPOUND
Kitchen banquette
Cabanas Bed Netting
Custom Canvas
z Custom Canvas
m
m
z
r
00LZIE00- 01O- AN0S
EFTA01309400
CONFIDENTIAL
SDNY_GM_00332701
EFTA_00205427
EFTA01309401
00
N
411
in
O
N
p
O
I
et
smartsheet
SDNY_GM_00332702
LSJ and GSJ Schedule
IW/;fill11.7C-1 vit 0
Taak Name Finish Assigned To Comments
2 GSJ Projeds:
North T.
4 See Wait • Grading Jtres
5 Dig Out Small Gen Butter Kyle cLl
6 Underground DectrC . Mho
7 Won ktesh1Framework for Pad led
e Concrete Pour Ind Center Point Set 8115,18 by JEE
9 Saw Cuts and Seaang led
IV Sign ON (Work Up b Standards) Kyle
11
12 RO Scam GS)
13 Onste Dairen 1.54 &sang delivery
14 Installation and testing IS/
15 Seawater intake Gemini need to dig hole
16
17 GS/ Big Tild 01125/19 Brian to finish roof / test S of decking Monday LLI
18
19 05.1Bunker Building RO / Gen Contractors to Bd (ED /JPW:) DPNR • Need Melted
20
21
Site Prep
Construction
LSJ
TOO (Select Contractor)
Jules to dig out tinker area (Kyle and EIG to layout)
12 nook Construction Schedule (CMU Intl) L
22 Tinting of Equiptmont Mite
23 Sign Offs Kyle
24
25 Refurtish/ExterW 0 Hut Rigth 02115/19 DPNR Issues • proceeding
0
28 Repair and Extend 0 Hut EB ED to start 15:h Moir Masai trol0 he hip back on 15th
27 Roller Doors EB
28 Sign Offs Kyle
29
30 GSJ Start Cottage Finish 0201/18 DPNR • Staling Back Thursdoy Interior
31 GSJ Septic Tank Adam Cock Baton
32 Construction JPK
33 Furetwe Package Karen Karen to order
34 Sign Offs Kyle
35
38 GSJ Mar House Sepik Tank Finish stopped after DPNR eel trio to proceed Jan 2nd
37 Installation of New System Adam Cook Beata
Page 1 Crti5
EFTA01309402
O
N
p
O
ct
is.
SDNY_GM_00332703
PrOied Name =nc 1/iltir •
38 Ocencitron Of Old Sysylen Adam Cock
39 Sile Week/Sign Offs Kylo
40
41 GSJ IT Work Contractor
42 ALV 11/30/18 earl • SG
43
44 LSJ Projects:
45
46 Main Cenwund Wail Finish 03/2819 Darny to cane out friday, Kyle larked to him last Friday lo ember
49 Master Rod Finish tad All materials on LSJ /SST - Receiving 2 mar bids this week
49
50 Master 8Mhroom Finish
51 Extend terrace Design TBConlin-ad JEE lo deed°
52 New Shower Hardware Plumber tbd
53 Repair Shower / Light Tie Work
54 New Shower Floors
55
56 Library Roof Flash and All Materials on LSJ I SST - Receiving 2 mac ads this week
57
58 Flag Pool Cabana Interior Finish :td Temp Counters to start, ordering from FL
59 Ktchen Remodel
GO
61 Main Compound Cabanas ltd Final Counters Punagst cleanup! flaws to be redone C8-3
62 Gran:erten E8 From FL now? 0
63 Maio in LSJ In Progress 2/4
64
65 Chile Room ter
65 AC Unt rrika I reek° In Progress
67
68 TIM Kitten 01/25,(19 Demo clone - lie next glen catinels installed, counter lops, Slashes
69 Electrical / Plumbing tad Centralia Mike Mike
70 Larger Store Apron Front ltd Contractor Use new Carrie
71
77 Dock Sheller
13 New Decking td LSJ IPE order amount confrmed -design needs confirmation and to be pactased
74 Storage Lockers ltd B.1 Sample material cn Dock - Waiting Approval
75
Page 2 of 5
EFTA01309403
SDNY_GM_00332704
76 Smal deck Shalom
77 Planters tbd LSJ SW want planters?
78
79 Pops Garden
80 Order New Shade House tat 88 JEE to review midge
81
82 Generator 2 Retail Elnish take sent VR bSnco 1147 due back 11-30. install then lesbrg (2 Wan)
83
84 Engineering Bulging
85 Demo / Construm row Bulang ltd Design tbd Brice reached obi to John Wads with comments, no response yet (10(10)
86
87 Pebble Beech
88 Fisheannsna Hut onsf19 Dupson / Kyle Redg Foolng ar4 Start Pour
89 Foundation Gipson / Kyle Push after NY0 to dig our again. lay rebar. pots FDs
90
91 Flie Palms Reviewing Bids now / Gass order reviewed and resubmit requested
92 New Roof ltd Design TBD new 904 Dome (Salami is pricing vigh Anna) • drawing giren by LSJ
93 Light Ste Work ltd Design TBD Garden design needed la wall and slab
94 New Volndows ltd Design TBD Rectived 04 had issues. Rev6e and resubmit
95 New Doors tbd Design TM) Need to Sea new dams for openng size for oontraclas
96 New electric/ Feeder tine Ion Desip TBD Mice to do wak grcugh wig contractor (electrical)
97
98 SEW Bathroans Gas Stales,
99 Doers and Haidivare replace tbd
100 Window Replacement ltd
101 Plumbing issues lbd
102 Gamete tbd
103
104 IT Issues
105 Now Cell Tower Bid rod Bnce
106
107 Perrrittkg
108 Cables LSJ•GSJ
109 Deck LSaGSJ
110 &Wars) Permits
7.1
112 Emergency Room
13 Design Matena List ltd Owner to confirm
•ter Design Approval
Page 3 of 5
EFTA01309404
EFTA_0020543 I
SDNY_ GM_ 00332705
Project Namo
115 Equipment Ceded
116 Installabon
111
118 Hanger Saint
119 Rod Roper TBD awaiting permits
120 New Doors TBD awaiting permed
12;
122 Roods
123 Jeffers Prkkg Revisions Jan 1401 tentative start dale given by Jeffers
124
125 Seaga Gates Finish
126
127
Build New Gates
Ostia/atm
Bamboo for Gates -J
LSJ Carpenters? Or Ell for small nook
128
129 Boat List
130 Spu0s Tube Replacement Fine, tbd Captains
131 Ink C Reit rod Captains
132 Big N Nudes Firish ttd Captains
133
134 Equipment C
135 TL1295D Ind IS) EDA lo TX
136 272 D2 Skid Steer ltd IS) TX 10/31 EDA to FL pending
137 John Deer Tractor led LS) Brice selected model and pricing
138
139
140 Mike G. Elootrioal List
O
141 Palm Tree Wiling lake Ongoing
142 Courtyard Lighting take Ongoing
143 Pod cabana kitchen electric bike Ongoing
144 Calle" AC hIM Ongong
145 Dock Lighting aid tine hike Ongoing
146 Camera for Staff dotage Mee Pending
141 °Mem drains for Main Compound Mite Pendng
148 ductank goon GenBld to Tunnel hike Ongalig
149 Movie Room Speakers take Ongoing
150 ReplacePool Heater Milo Ongoing
151 Repair both Fuel Pumps Mite Ongoing
152 Raper Diesel Feeding Owned Mktg Pending
153 Install Water altribution Pumps LS! take Pending
Page 4 of 5
EFTA01309405
EFTA_0O205432
SONY_ GM_ 00332706
Er 45SigneC
Project Name
Irike 0W 919
15e. Returtish way elistribdion menaced
Mike Ongoing
155 Instal New Sewage IA LSJ
Mike POndin
156 Ds Walerheater Staff Cottage
lake Organ;
157 LSI Tiki Kitchen Rernalel ElectricfRumbing
Mere Mike to Outsource
156 Blue Beach Transformer Replacement
Mike Charles tact& to Price
159 Electrical and Data lo 5 Palms
Nike Organ]
160 Dectrical Conduit Work at Toner
Mke Roof Dane -Ongoing
161 Solar System and Electric Pebble Beath
Mile Pending
162 Power to Beach for Captains
Mike Pairing
163 Fear Replacement Seawater Intake
hake PericIng
164 Refurbish Fee System &Weld
Mite Pending • Orioles To be colocled
165 Fuel Truck Replacement
MAE Penang
166 Replacement of Elec Panels Pool Rooms
Mire pending
167 Electric out to new wale/81area H
Mice panda;
169 Replace Al Emma" Light Tnm to White
Mike Ongoing
169 Replace MI Exterior Swathes
170
171
Staff Collage Dryer Cnange to Propane
instal Lights low Library Statues
hike
Mike
Perang
Pending
uu
Mke Pending C
172 New Awnings Both Pool Areas
Mho Ongong
173 Install New Sewage Troop-will Punt
Mike Pending
174 Wire New Generators GSJ
Mike Ongoing
175 Install Electric GSJ TM
!Aka Percher,
176 Replace Batteries GS) Solar
160
161
67
Rosen
EFTA01309406
Jim Dalton & Co., Inc.
Schedule of Values
Ardcn, NC 28704
DATE
dba Jim Dalton VI
116119
LSJ
•
PROJECT
LSJ
DESCRIPTION CITY RATE TOTAL
Residence: Deposit I 25,000.00 25,000.00
Demolition and Dry-in includes remove existing copper and thy in 1 23,600.00 23,600.00
Copper bend copper and install, all locked and soldered. I 19,500.00 19,500.00
Roofing Installation I 45,400.00 45,400.00
Library: Deposit I 25,000.00 25,000.00
Demolition and Dry-in: includes remove existing copper and dry-in I 21,800.00 21,800.00
Copper: bend and install, all locked and soldered 1 22,500.00 22,500.00
Roofing 1 34,000.00 34,000.00
1_1
/44
(t? \ /4
1O-Cli • ‘— — IrVIDISti e: !
k it
I irif
-
TOTAL S216,800.00
Phone It Fax 4 E-mail
CONFIDENTIAL
SDNY_GM_00332707
EFTA_00205433
EFTA01309407
EFTA_00205434
smartsheet
SDNY_ GM_ 00332708
7 Week Look Ahead Schedule
tan; b arn..)...~.4n P. dx•
.1~100 le.n.1.19,,..~
~h 33 raa, W tv.".I
On. b ba mf , R.~0
8, 4
µ.> bp 45.44. Nar,. gMR issa
" Sab'S "bel 1. 4 114. 441,1444 I ~a Yrt
Oc~t~i
br 7b4.
OW1.1 i 4Mb bern ialwookeeier~
0 .~ ~ 4~x, 02.”
V. reid wAnnaea Pl...17) NO. ~Ib 14, W "am!~
Sbn Bøn« d I
T b to...u.P . 4 01~ ~smi ~g REM 44~ 04 11344.410449.fly a neLl
Mn nat
001 j.. ~soya.. teictiaa2.« ,. ol.wetl ib w10444 ~loe
ad. bø II .nlIcnbf
fi.ob.7øø/".09.29.4,•~1~..)04~ >sn b ba at (4
inna a...b14...
wa .1,0 !Stana 'bevis/nakne. tnt.,
pr.2,3 W.121,113 b/ Ven,* ra .kbbirr•
J ~N d114444149.444, se barn 0 1 1rea
Jan b Ca~ 7.240. I lm ~1~ J.. 1411
1 44»
b lell ~ab, snd an14,44 i4447 2 4444,1414 4on n4,
17 Jelh." I gesi. 44:'n4.W4TM1 caunl 44.nus !MC
I} 1,..1~ kei • A'.1.
bnb0 ~al
14 4.1 441 G6! n4Y.f
1.114.4,1,444111 L1
IS Caf... boy LSJ.
14 cnintS1
I7 DaSS.4.4n NN, L5I Møna ~y< cia I!~
la Nøss Elialcal FL m0.0~ co'.4 O s'
IS' Pv:1ol.entuars 11.1~ ..~y 14
10
SI
MiC Caf.. la toe",
ega to 114407
Cale• ant 0444. Rom
444 ia tan
WantabnlWtl.apO•eN
444 arif 4.4 Mt li Stoa prcne 14. nunn z
11.1
721
z
0
0
Page 1 of 1
PST
Exporled on Januar/ 6, 2019 8.01:12 AM
EFTA01309408
c Cc-0 I.)?)
CAL
Ak
CONFIDENTIAL
SDN,GM_00332709
EFTA_00205435
EFTA01309409