From: Jeanne Brennan
Sent: Saturday, December 8, 2012 2:47 PM
To: 'Jeffrey Epstein'
Cc: 'Brice'
Subject: FW: LS1 Solar
Toshiba's =esponse.
From:=/b> =ttaviano, Jeffrey [mailto =br>Sent: Saturday, December 08, 2012 10:04
AM
To:
Subject: Re: LSJ =olar
Jeanne,
I'll look into getting a power =eter. We would install it on the 480 V side of the xfmr to include the =ine and xfmr losses
in the readings. We would compare the temporary =ower meter to the utility meter, thus it would be a time and use
study. =his would be very valuable information to have to properly size the =olar and energy storage system.
I should know my schedule for =he week of January 7-11 by next week.
Jeff
From<=b>: =eanne Brennan =br>Sent: Saturday, December 08, 2012 06:53 AM
To: =ttaviano, Jeffrey
Cc =br>Subject: RE: LS1 Solar
Jeff,
The =ransformer for LSJ is located on the Island and owned by LSJ. This =aises the questions:
=/span>What is =he loss at the transformer?
=/span>Do we =eed a time and use study?
=/span>Can you =nstall the power logger?
Also let me know what day works for you and your team =uring the week of Jan 7-11 to visit the Island and I will co-
ordinate =etting it up.
Thanks =o:p>
Jeanne
EFTA_R1_00070948
EFTA01764017
From:=/b> =ttaviano, Jeffrey lmailto
Sent: Saturday, December 08, 2012 8:17 =M
To
Cc
Sub=ect: Re: LSJ Solar
Jeanne,
That would be one way to do it, =ut if you know the cable size, length and material a calculation can be =one quite
accurately. You could also install a temporary power logger =ver a week or so and then compare that to the utility
meter.
If =he cable was sized properly it should be less than 2% losses. =br>
We have an excellent electrical contractor in St. Croix that has =een working for Hovensa for many years. Let me know if
you want me to =ntroduce him.
Jeff
From<=b>: =eanne Brennan irnailto =br>Sent: Saturday, December 08, 2012 06:05 AM
To: =ttaviano, Jeffrey
Cc: 'brice gordon' =br>Subject: RE: LSJ Solar
Jeff,
We are trying to determine =f there is significant line loss between the meter on St. Thomas and =he transformer on LSJ.
One suggestion was that we purchase and =nstall an industrial grade current transformer(CT) monitor at the main
=eeder capable, to meter the power in real time and send it to a web =erver for review.
What do you =hink about this idea?
Thanks,
Jeanne
From:=/b> =eanne Brennan =br>Sent: Monday, December 03, 2012 3:59 PM
To: =Ottaviano, Jeffrey'
Cc: 'Lonkevych, Mark'; 'Sattler, =ouglas'; 'Mark White'; 'Erika Kellerhals'; 'Cecile de Jongh'; 'Richard =ahn'; 'brice gordon';
'Darren Indyke'
2
EFTA_R1_00070949
EFTA01764018
Subject: RE: LSJ =olar
Jeff,
Please see attached; =APA bills, schematic of the electrical system and the generator =pecs. I will follow with additional
requests. =0:p>
Any additional information or questions let me =now.
Best,
Jeanne
From:=/b> =ttaviano, Jeffre
Sent: Wednesday, November 21, 2012 =:25 AM
To: Jeanne Brennan
Cc: Lonkevych, Mark; =attler, Douglas; Mark White; Erika Kellerhals; Cecile de =ongh
Subject: RE: LSJ =olar
Jeanne,
An excel history will be =ine for now, but can you at least send us the latest copy of a bill so =hat we can see if there are
any time-of-use and/or demand =harges. That type of data helps in our equipment sizing =alculations.
Thanks again,
Jeff
Toshiba International Corporation
Dresher, PA 19025
http://www.toshi=a.co.jp/sis/en/solar/index.htm
3
EFTA_R1_00070950
EFTA01764019
From:=/b> =eanne Brennan irnailto =br>Sent: Wednesday, November 21, 2012 8:21 AM
To: =ttaviano, Jeffrey
Cc: Lonkevych, Mark; Sattler, Douglas; =Mark White'; 'Erika Kellerhals'; 'Cecile de Jongh'
Subject: =E: LSJ Solar
Jeff,
Thanks for the follow =p. We will compile the necessary information requests. =o:p>
Do you prefer a copy of the electricity bills or =n excel history of readings and usage?
Happy Thanksgiving to =11.
Jeanne
From:=/b> =ttaviano, Jeffrey
Sent: Tuesda November 20, 2012 3:48 =M
To:
Cc: =onkevych, Mark; Sattler, Douglas; Mark White; Erika =ellerhals
Subject: LSJ =olar
Jeanne,
Thank =ou for your time this afternoon and please forward this message to =nyone on your team that should have a
copy.
TIC =ill perform a preliminary feasibility study of solar energy production =n LSJ Island. We are familiar with the
challenges of designing =nd building solar in the Caribbean and have developed cost effective =olutions to meet these
challenges.
Our =nitial thoughts are that a solar PV plant sized to meet the entire =eeds of the island would most likely be the best
solution. This =ill require that we know as much about the electricity consumption and =eneration capabilities as
possible. Please, provide us with 12-24 =onths of VIWAPA electricity bills and if possible any interval or =ime-of-use data
4
EFTA_R1_00070951
EFTA01764020
on consumption. This data may be available from =trip charts or data logging of the generators when they were
=unning.
We would also like to have the name plate data on =he generators and a single line diagram of the electrical =ystem.
Also, please indicate on a map where we can locate =he solar array and battery station.
Thank you and have a Happy =hanksgiving,
Jeff
Jeff =ttaviano
Toshiba International =orporation
Dresher, PA =9025
http://www.toshi.a.co.jp/sisien/solar/index.htm