From: Marc Dober
Sent: Thursday, November 17, 2011 2:24 PM
To: Jeffre E stein
Cc: thomas melnick
Subject: Re:
The =all by the bench needed to have a sprinkler head moved and plants moved =o accommodate the wall. That will be
done today. We did not want to =isrupt the border on the tile so we are building the wall from the dirt =evel up. Is that
ok?
Mosaic light are not done as =here is air ducts where the lights are supposed to do and Gary needs =o do
measurements to see if there is enough room. He has been focusing =n getting the relax room bathroom and cabana 4
electrical =ompleted.
Main engineering road not done yet, =et me follow up with Tom on timing.
Let me =heck on the boulders
On Nov 17, 2011, at 9:39 AM, Jeffrey =pstein wrote:
i do not see the little wall at my bench outsdie by =edroom igala said it would be done the day after i left. .. did
=t lights above the mosaic, get done. the lights in the condors =ear the breezeway door.s// did the main road get
engineered yet. = did jules store boulders nearby for the rip rap road on the =ervice entry/library
=br>
The =nformation contained in this communication is
confidential, may be =ttorney-client privileged, may
constitute inside information, and is =ntended only for
the use of the addressee. It is the property of
Jeffrey Epstein =br>Unauthorized use, disclosure or copying of this
communication or =ny part thereof is strictly prohibited
and may be unlawful. If you =ave received this
communication in error, please notify us immediately by
return e-mail =r by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this =ommunication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00085593
EFTA01773041