From:
Sent: Wednesday, March 2, 2011 9:22 PM
To: jeevacation@gmail.com
Subject: Gil update
Jeffrey,
Gulfstream is planning to work APU and boost pump on second shift tod=y at 3pm, Quality Control is researching and
hopes to approve the T-Stat install that I brought with on plane, the paper work that came with=the Tstat is 1970 build
date, three other Tstat's are listed=20 in parts data base system, but are not ready to ship since they are waiting bench
testing,. There is also a pressure test of pneumati= system for Tstat, Gulfstream is checking to see if this break out box=is
on hand in Long Beach,.
-Boost pump issue's will be addressed by Avionics tonight,. suspect=20 corrosion on canon plug in wheel well, and filter
down stream of pump,. ar= area's we are looking, in addition to Circuit Breaker integrality, 50amp,.
If you approve of below floor inspection in Long Beach, Gulfstream ca= start Thursday,.
I will keep you posted,
thanks,
Larry
1
EFTA_R1_00119243
EFTA01790610