From: Ann Rodrique
Sent: Sunday, June 30, 2019 10:19 AM
To: Jeffrey Epstein; Lesley Groff; Rich Kahn; Daphne Wallace; Michael Glidden; MYLA
TRESTIZA
Subject: June 24th- June 28th (Work Completed or in-progress)
Hi all,
Main Compound Vulkem Roof: Completed
Theater Iron drapes: Completed
Cabana 1 New A/C installation: Completed Cabana 1 deep clean: Completed Main compound Stone Pillars: Completed
Library Roof Vulkem: Completed Flagpole Pool UV water light: Completed Main Compound UV water light: Completed
Master Bedroom UV light: Completed Main Compound Flood Lights: Completed Main compound Step lighting:
Completed Tiki Hut appliances: Completed JE bike Brakes & Rotor: Completed JE bike full maintenance: Completed GSJ
EMT Medical bag: Completed GSJ Guest bedroom carpet: Completed Main compound stone pillars: Completed Tunnel
electrical: Completed GSJ storage deep cleaning: Completed Tiki hut kitchen plumbing: Completed Theater lighting:
Completed Library window cabinet: Completed Chillax bath lighting: Completed Flag pole pool Cistern cleaning:
Completed Flag pole pool intake pipe: Completed GSJ kitchen deep cleaning: Completed Jeffers Road project sample:
Completed Lanscaping Cleanup: Completed Helipad Irrigation: Completed GSJ Main Compound Lighting: Completed MC
Power Washing roads: Completed Fiber pulled from Five Palms to GYM: Completed Cottage Hurricane Shutter:
Completed PRD New engines: Completed Nana New Steering wheel: Completed
Five Palms Plexi Door installation: Completed Plexi Door Notes: Re-painting needed from Sanding.
Tiki Hut Brown stain: 80% Completed
Notes: Tiki tiling to be completed before final portion is stained.
AYH Dock cleats: in-progress
Cabana 2 A/C: in-progress
GSJ Pool Painting: in-progress
GSJ Helipad: in-progress
Grotto Pool: in-progress
GSJ Cottage: in-progress
Tiki Hut tiling: in-progress
Sportis A \C: in-progress
Pebble Beach: in-progress
Franks electric: in-progress
Holy shit beach: in-progress
Flagpole Shade Structure: in-progress
LSJ Dock Stain boardwalk: in-progress
GSJ Main Compound Painting: in-progress
Gym stone walls: in-progress
Ann R.
340.642-2587
c?xml version="1.0" encoding="UTF-8"?>
1
EFTA_R1_00162494
EFTA01808962
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd">
<plist version="1.0">
<dict>
<key>conversation-id</key>
<integer>11241</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1561889926</integer>
<key>flags</key>
<integer>862375014S</integer>
<key>remote-id</key>
<string>302222</string>
</dict>
</plist>
2
EFTA_R1_00162495
EFTA01808963