To: Doug Schoettle
From: Jeffrey Epstein
Sent: Wed 6/17/2009 6:59:38 PM
Subject: Re: FW: Conduit Bank Approval.
ok
On Wcd, Jun 17, 2009 at 2:47 PM, Doug Schoenlc <= > wrote:
Jeffrey, I recommend that the electrical and technology conduit bank that was
installed under the concrete plant be extended to the new electrical building at this
time. A trench is being dug for the extension of the under sea power cable to the
electrical building, now is the time to install the extra conduit in the same trench.
Regards, Doug
--- On Wed, 6/17/09, Brice Gordon < > wrote:
From: Brice Gordon <n>
Subject: FW: Conduit Bank A royal.
To: "Doug Schoettle" < >
Date: Wednesday, June 17, 2009, 3:19 PM
Doug,
FYI Brice
Forwarded Message
From: J Epstein <jeevacation@gmail.com>
Date: Wed, 17 Jun 2009 13:56:32 -0400
To: Brice Gordon <
Subject: Re: Conduit Bank Approval.
this is a doug issue
On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordon < > wrote:
To: JEE
Attached is a proposal for a 2soft extension of the 10 Pipe Conduit bank to
the new Electrical building.
After reviewing with Tom and Doug , I would like to submit the above
proposal for your review/approval
The first leg was installed (early 2006) prior to cement plant installation
Tom is now trenching for the new electrical supply to mechanical building.
Proposed 10 pipe Conduit bank is for the future build out of the existing
compound and if this work is not performed at this time we are effectively
abandoning existing Conduit bank.
EFTA_R1_00204196
EFTA01828680
Amount: $21,610.00
F3rICe
End of Forwarded Message