To: Jeffrey Epsteinueevacation@gmail.com]
From: Richard Kahn
Sent Fri 8/ 8 PM
Subject Fwd:
PRIVATE RESI
attached is the first proposal obtained by Merwin from crystal comfort (a company merwin just
worked with at caryle hotel)
proposal did not breakout each line item (i have requested this) however pricing was 219,000 as
compared to ad winston bid of 357,255
merwin said one of the big factors was that crystal comfort is a nonunion shop and ad winston is
union
i asked rich barnett to review and his comments were:
Rich this contractor did a rush job on walk through he did not write anything down , or
account for electrical panel costs , piping configuration valve costs , no re insulation of
pipeing included .This quote may be coming in with a low price up front and charge us for
everything else as an extra cost/ exclusion. Lets see where the second contractor comes in at
with his proposal he was very good , spent a lot of time with the equipment and was very
thorough, lets see if the second proposal reflects the higher costs ?
i still need to review bid line by line and verify the validity of rich barnett comma i,
second bid should arrive on monday..
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From:
Date: ugu
To:
Subject: Fw
Hi Rich.
This proposal is from Crystal Comfort.
Merwin Dela Cruz I Engineering Foreman
EFTA_R1_00283310
EFTA01874935
The Ca e, A Rosewood Hotel
The Carlyle, A Rosewood Hotel Named Top Hotel in New York in Travel & Leisure's 500
World's Best Hotels/Critics' Choice 2010.
Please consider the environment before printing.
— Forwarded by Menvin DeLaCrurCARtRHR on 08'0912012 01:37 PM
From: "Joseph DaMaie
To: 'Monvin Dela CNC <
Date: 0.1.53
Subject
Here is your quote.
From: image runner
Sent: Thursday, August 09, 2012 12:25 PM
To: 10emaio
Subject: Attached Image
EFTA_R1_00283311
EFTA01874936