Material is in Florida, I will have to confirm but probably a week
The flagpole parking area lattice box. We are not putting in a gate on the back side but you can decide
that later. There is a mechanical room on the back side of the cabana that will need to be accessed but
we can figure out another way to get there.
I gave you the new dimensions, sorry. The dimensions from your placement are:
2r from corner
12'6" to the left marks 1st tree
20'6" to the right tree #2
Equal distance to tree # 3,4,5
Marc
From: Jeffrey Epstein [mailto:jeevacation@gmail.com]
Sent: Monday, November 21, 2011 11:55 AM
To: Marc Dober
Subject: Re: Construction questions
how long will it take to get material. ?? what is a gate on the lattice box? # 7 i had asked you
to get the measuemnets from igalga that he said he had from my placement.
On Mon, Nov 21, 2011 at 11:43 AM, Marc Dober wrote:
EFTA_R1_00481542
EFTA01989342
Jeff,
Here are most of the construction questions:
I. Need a decision on the dock house railing paint color
2. Tom needs to get architectural drawings and final design for 5 palms. He will be back in this
area during your visit and we need some direction there or we will need to stop.
3. Flagpole — sent many pictures with the walls painted — do you still want to raise the gates to
hide arca all together.
4. Flagpole — do you want a gate on the lattice box — there needs to be access to the back
equipment room
5. Flagpole — what landscaping do you want along the lattice wall that faces the road. You
originally wanted ficus but please confirm
6. Do you want us to finish the wall to the info center? We are 95% complete
7. Palm tree placement on big hill — the new measurements arc - the distance from the wall to
the line, is 13'6" which is 8'6" closer to the wall than the last line which was 22 feet from the wall.
The "new line" is a line made by Shane the surveyor and myself based on your request to have a
line "level with the foundation of the Cabana 4 wall" . Please confirm
8. Gym renovations — need a scope of what you want done here.
9. Flagpole pool — sent you an email on proposed schedule to re-plaster. Basically he said he can
be in and out in 5 days once all material is on island. 5 days does not seem logical here.
10. Dock shelter- all the material for the dock shelter is on island. We need a design to get
started.
II. New Helipad — when do you want to do this so I can get it scheduled with Tom.
12. Staff cottage — we need a full set of plans and architectural drawings. Tom can't build off
what we have been given.
Thanks
NI arc
EFTA_R1_00481543
EFTA01989343
*************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any pan thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jecvacation@gmail,com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00481544
EFTA01989344