From: < Date: Mon Nov 28, 2011 at 4:00 PM
Re: Anthony barrett <a.
, Penn baluyut < > We are now on the
construction of the 2 closets inside the bedroom and the drop ceiling of the bathroom. Completed
demolitions of bedroom closets, bathroom and bedroom metal frames and entire bathroom. Tomorrow
the plumber is doing the shut off valves for the sink and toilet. I am still waiting fora to order the
bath tub. Penn
EFTA_R1_00483593
EFTA01990848