To: 'eevacation mail.com eevacation@gmail.comb Jeffrey Epsteinbeeyacation©gmail.com];
From: Carlos Rodriguez
Sent Sat 9/1/2012 6:20:15 PM
Subject Big N Overhaul
Greetings all as per my visit today to haulover marine, there has been quite a lot of work done on
Big N. The front part of the gate has been repaired it was completely broken away they put a
new metal piece all the way across. Both sides of the front part of the hull had heavy pitting
possibly leaking into the haul were repaired with new half inch aluminum plate welded on. The
struts these hold the shaft and prop both were loose and had heavy pitting, they were rewelded to
the hull. New flanges were welded to rudder and rudder posts, propellers were polished and hull
was sanded and painted. Bosco has been managing all these projects, purchasing materials while
also working on the hydraulics so haulover could remove bottles, hes also been dealing with
engine alignment. They should be able to splash tuesday and come to red hook to do rest of
inhouse work.
thankyou
Carlos Rodriguez
EFTA_R1_00516229
EFTA02013762