To: Je vacatio
Cc: Rich Kahn
From: Larry Visoski
Sent Thur 3/24/2016 1:21:02 PM
Subject GIV update
Jeffrey,
Elevator flight control cable was changed due to ware.
While doing flight control checks, Gulfstream mechanic noticed a clicking sound in control yoke,
while rotating aileron yoke.
They removed the Yoke from cockpit, replacing nut plate under floor board in cockpit, time
consuming,. Better update on delivery status later today.,Dave and I plan to arrive at Westfield at
noon tomorrow.
Thx
Larry
Pete and Larry,
Aircraft is still in tail dock. Wing leak checks ongoing as some panels have leaked and require
corrective action.
O2 bottles installed and leak checked.
We have run into some challenge's with the yoke repair/installation. This is pushing our time
frame back. We will access any revision to delivery later today as work progresses and we can
make an accurate estimate.
Thank You,
Mike Tucker
Gulfstream
Westfield Ma.
Ofce
Fax-
Sent from my iPhone
EFTA_R1_00596727
EFTA02055366