To:
From: Richard Bamett
Sent Wed 10/16/2013 3:02:07 PM
Subject: Final Work on Cooling Tower
Hi please ask Mr. Epstein If the electrician and I can gain access to 71st tomorrow
10/17 at 7:15 am to work on the roof cooling tower & 6th floor electrical control panel. I will
have the electrician come in the side service entrance up to the 5th floor and walk up to the 6th
floor mechanical room from the back fire stairs, not to disturb Mr. Epstein if he is on the 6th
floor. I am sorry we have to schedule this work while Mr.Epstein is in residence, but I gave the
cooling tower people a hard time to come and complete this final piece electrical and control
work. Thanks Rich B.
EFTA_R1_00759793
EFTA02123934