To:
From:
Sent: Wed 9/25/2013 5:56:13 PM
Subject: Re: Deposit
Oh man 1 Better get those pictures and make copies! Thx
Sent from my iPhonc
On Sep 25, 2013, at 1:52 PM, "Vicki Bcitzt wrote:
Hi
Bob was in and gave me a check for final on the Master tile and a deposit on the other
areas except the Basement Bath. I will let you both know when everything is ready for
pick up. I also gave him a copy of the layouts that Dale went over with you. This way he
can communicate with the installer directly and hopefully you wont need worry about
that too much. Let me know if you need anything else.
Thanks,
Vicki A. Beltz
Design Consultant
Stepping Stones Marble & Granite
EFTA_R1_00768240
EFTA02127967