From: Richard Kahn
Sent: Wednesday, August 19, 2015 5:49 PM
To: jeffrey E.
Subject: Fwd: Soil boring - PB
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: 4b>LAIlenby
Subject: =/b>Soil boring - =B
Date: =/b>August 19, 2015 at 1:45:39 PM =DT
To: =/b>NYC - Richard Kahn
FYI
Leighton =llenby
Director of Properties
Begin forwarded message:
From:
Date: =ugust 19, 2015 at 1:38:38 PM AST
To: =eighton Allenby
Subject: Re: Neptune entry doors 358 El =rillo Way
Leighton,
The soil =oring test was complete this afternoon.
EFTA_R1_01612144
EFTA02490846
They made =t down 20 feet before they hit rock.
They showed =anusz and myself the samples taken every 2 feet. Their findings showed = layer of muck
and also a layer of pete the first 13 feet. from 13 feet =own to 20 was loose sand.
They will take about 4 =o 5 working days to produce a written soil report and we will forward =t to the
structural engineer for an evaluation.
Sent from my iPhone
On =ug 18, 2015, at 11:46 PM, Leighton Allenby =rote:
do these doors need to be replaced? =hy?
Leighton Allenby
Director of Properties
On Tue, Aug 18, 2015 at 7:55 =M, wrote:
Leighton,
See attached proposal for the new main and rear entry =oors.
The window quote previously sent was mis titled and does =ot include them.
Thank you,
Dan
Original Message
From: LAIlenby
To: labontedw
Sent: Tue, Aug , : am
Subject: Re: 358 El Brillo Way
2
EFTA_R1_01612145
EFTA02490847
Can you put down plywood to protect?
Leighton Allenby
Director of Properties
On Aug 18, 2015, at 7:28 AM
wrote:
There also may be some minimal sod repair after the equipment is =emoved.
Sent from my iPhone
On Aug 18, 2015, at 7:12 AM, LAIlenby
> wrote:
One or two days?
Leighton Allenby
Director of Pro •erties
On Aug 18, 2015, at 7:08 AM
rote:
I just spoke to the engineer and they could mobilize and do the soil =oring test
tomorrow which is Wednesday if that is acceptable.
Please let me know and I will confirm the schedule with them
Sent from my iPhone
On Aug 17, 2015, at 10:37 PM, Leighton Allenby
wrote:
If Mr. Epstien isn't coming this week can they do sooner - I am trying =o find out
3
EFTA_R1_01612146
EFTA02490848
Leighton Allenby
Director =f Properties
On Mon, Aug 17, 2015 at 5:14 PM, wrote:
Leighton,
I met with Nutting Engineers this afternoon at 358 El Brillo and =iscussed the
location of the soil boring test and the damage it may =ause to the site. It will be sand from the boring auger on a large
=ripod of which we will contain on tarps. We discussed this work in =etail with Janusz and he informed us Mr. Epstein
may be visiting this =eek so I scheduled the work for the following Wed.
I have contacted all of my subcontractors and we should have all the =ork
quotes ready for you late tomorrow afternoon.
Thank you,
Dan
Original Message
From: Leighton Allenby
To: labontedw
Sent: Thu, Aug 13, 2015 11:07 am
Subject: Re: Wind mitigation report
=20
price both ways please - thanks
Leighton Allenby
Director of Properties
On Thu, Aug 13, 2015 at 10:59 AM, wrote:
He told me the existing louvered shutters are not Miami Dade approved. =
He said we could use armor screen rather than rigid shutters if you are
=nterested in that option
Sent from my iPhone
4
EFTA_R1_01612147
EFTA02490849
On Aug 13, 2015, at 10:52 AM, Leighton Allenby <
wrote:
can they certify any of the items that AIG would accept instead of =eplacing?
Leighton Allenby
Director of Properties
On Thu, Aug 13, 2015 at 10:16 AM, wrote:
Leighton
I just met with
All American windows and shutters, I asked him to provide alternate =ricing
with options along with pricing to replace the front and rear =oors.
He will be sending us an itemized quote with a brochure of the products =hey're
proposing to use.
They are the company that did the original shutters on the house 10 =ears ago.
Thank you
Dan
Sent from my iPhone
5
EFTA_R1_01612148
EFTA02490850