From: Eric Roth <eroth@intljet.com>
Sent: Wednesday, June 21, 2017 9:50 PM
To: jeffrey E.
Cc: Richard Kahn; LVJET@aol.com
Subject: Preliminary for review
Jeffrey,
As per our discussion a few minutes ag=, I did not include the work TBD on the pocket door for the cabin side.
CHANGE ORDER ITEMS R=QUESTED
</=>
316 Fwd Lavato=y Door $ 870
Design and fabricate a wood ven=er overlay cover for the vacant / occupied sign to make it
aesthetically blend in with the=interior and not make it so conspicuously obvious. The cover will
have one (1) hole that will dis=lay either color green (for vacant) or red (for occupied) and a thin
horizontal slot for the lock ov=rride pin.
</=>
</=>
317 Fwd Crew G=lley $ 15,780
Remove=the existing hot water container and associated wiring. Modify the space t= accept a customer supplied carry
on small coffee maker (loose equipment). Relocate existing drawer if possible. All interio= surfaces to be painted to
match existing. Install new 110v 60Hz provision=l outlet and associated wiring.
404 Hand Rails=$ 4,820
Unfast=n the cabin area PSU / valence assemblies to gain access to the wood venee=ed hand
EFTA_R1_01884090
EFTA02646811
rails.=nbsp; Remove the hand rails from the PSU assemblies. Prep and cover =he hand rails in the
same u=traleather material as the PSU's to match. Reinstall newly cov=red hand rails and
reinst=ll PSU assemblies.
412 Fwd Cabin =ulkheads $ 5,060
Remove the two (2) leather cove=ed seat belt bumper pads. Template and fabricate thin kydex
overlay panels. Cover pan=ls in Hermes fabric to match the lower side walls. Remove and
reinstall existing magazine rac=s (R/H has cabin temp sensor). Relocate any required placards
and ash tray.=/p>
413 Fwd Cabin =oor $
420 Cabin Sing=e Seats $ 18,190
Relocate the R/H #2 and 1/H #2 =eats approximately 4.0— aft to increase leg room. Insta=l seat
track as required including eng=neering and certification. Close off floor decompression blow out
panel at R/H #3 seat position a=d install one (1) decompression blow out panel in the cabin area.
Relocate the existing subwoofer=from L/H #3 seat position.
423 Divan End =rm Cabinets $ 20,350
Design=and fabricate light weight composite "sleeve" to fit over the =our (4) existing end arm cabinets. Increase the
height of the four (4) end arm cabinets by approximately 3.0" — Angle the inside of each arm rest starting at the
top of the bott=m cushions as a decorative feature. Relocate existing Cabin Management Swi=ches to the outboard side
of the arm rests to create a clean inboard end arm(s).
2
EFTA_M_01884091
EFTA02646812
503 Aft L/H Ga=ley (Coffee Makers) $ 2,920
Remove the existing dual coffee=makers from the upper galley area. Finish out area to conceal
all non-essential wiring / plum=ing / etc. Cap and stow existing electrical wiring and plumbing for
the coffee makers. New in=erior surfaces painted to match the existing laminate.</=>
503 Aft L/H Ga=ley (Oven) $ 2,920
Remove the existing oven from t=e lower galley area. Finish out area to conceal all non-essential
wiring / plumbing / etc. =ap and stow existing electrical wiring for the oven. New interior su=faces
painted to match the existing l=minate.
606 =nbsp; Aft Lavatory Potty Seat & Shroud $ 3,210<=>
Laminat= an additional .75" foam to the top of the potty seat for additional=comfort. Laminate the potty seat deck with
high gloss white high pressure laminate. Prep and paint toilet seat ring high g=oss white to match new laminate.
&n=sp;
&n=sp;
611 =nbsp; R/H Aft Lavatory Closet $ 2,560
Modify =loset by fabricating and installing a recessed cavity toilet paper holder.=Inside of cavity will be laminated in
wood veneer. Finish wood veneer in a high build finish.
3
EFTA_R1_01884092
EFTA02646813
Best Regards,
Eric
ERIC H. ROTH<=> I PRESIDENT
P</=pan> 631.737.5900 I C=/b> 516.857.6533 I eroth@intl=et.com <mailto::eroth@intljet.com> I www.intljet.=om
<http://www.intljet.com/> <http://twitter.com/#!/intljet> <http://www.facebook.com/intljet>
2221 S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p>
4
EFTA_R1_01884093
EFTA02646814