Kerri Holmes-Eubanks
May 16, 2012
Brice Gordon
Little Saint James Island
Invoicefor Additional coats applied tofloor and doors
Description of Work Amount
Due to coverage and the concrete floor being very rough and porous, an additional 3 coals
of product was applied to the floor to ensure protection and for even coverage, for a total
of $ coats being applied
The above work was performed andbilled ma at a rate of $22.00 per hour per man
Amount dueler additional coats onfloor $1,408.00
Due to coverage on the metal sliding doors (exterior) and the walls around the doors. an
additional 2 coats of "dim acrylic" was applied for a total of 4 coats
The above work was performed and billed out at a rate of $22.00 per hour per man
Amount duefor additional coals on doors and surrounding walls $704.00
Total amount duefor extra applications on exterior doors, walls andfloor $2,112.00
(17-AA w att--2_
EFTA_R1_02059615
EFTA02698680