EFTA01048228Set 9
2018-06-019p1,735w
INSPECTIONS
o FINAL
o FIRE-RESISTIVE RATED CONSTRUCTION
o AS-BUILT ENERGY ANALYSIS (EN2)
• Structural
Pending the Mechanical Inspection Report (TR-I & TR-8) to be submitted by the Special ... INSPECTIONS
o FINAL
o FIRE-RESISTIVE RATED CONSTRUCTION
o AS-BUILT ENERGY ANALYSIS (EN2)
• Structural
Pending the Mechanical Inspection Report (TR-I & TR-8) to be submitted by the Special
https://www.justice.gov/epstein/files/DataSet%209/EFTA01048228.pdf