EFTA00767816Set 9
2009-10-271p208w
level is 251 sq.m (aprox2510sq.ft). Floor to ceiling height at L62
is 4,9m (aprox 16,2ft) and at L63 — 4,6 m (aprox. 15,1ft). The Dutch designers propose
https://www.justice.gov/epstein/files/DataSet%209/EFTA00767816.pdf
EFTA00741277Set 9
2009-10-272p294w
level is 251 sq.m (aprox2510sq.ft). Floor to
ceiling height at L62 is 4,9m (aprox 16,2ft) and at L63 — 4,6 m (aprox. 15,1ft). The Dutch designers propose
https://www.justice.gov/epstein/files/DataSet%209/EFTA00741277.pdf
EFTA00798508Set 9
2018-11-303p312w
Removal of damaged or bent panels back to original building. 1.200.00 1,200.00
Add aprox 16' to front of hut, removal of back wall ... aprox 18' of new hut. Including roll down door and man door as
discussed. All material to be provided by owner.
Total \I-Nnin,
EFTA00798509
Bluewater Construction, Inc
Estimate
https://www.justice.gov/epstein/files/DataSet%209/EFTA00798508.pdf
EFTA01817397Set 10
2010-08-112p401w
didnt get paid for the last two
months of work ( my invoice was. aprox. 11,000$) even i asked lesley, darren, rich kahn, i
never got an answer..they said ... check and they will let me know, but
then..nothing. i didnt get even aprox 300$ i paid for materials and i sent to rich kahn as
reimbursement expenses.
sorry
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01817397.pdf