EFTA00645595Set 9
2011-11-172p465w
pending change order that has NOT been approved for $9,730 for manufacture breezeway doors
and to manufacture the shutters for the chillax bathroom. We also have a change order ... redo the
bathroom windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with ... about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
Jeff,
The K&S guys did not show up this morning and wanted
https://www.justice.gov/epstein/files/DataSet%209/EFTA00645595.pdf
EFTA00924722Set 9
2011-11-173p586w
pending change order that has NOT been approved for $9,730 for manufacture breezeway
doors and to manufacture the shutters for the chillax bathroom. We also have a change order ... redo
the bathroom windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with ... about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
Jeff,
The K&S guys did not show up this morning and wanted
https://www.justice.gov/epstein/files/DataSet%209/EFTA00924722.pdf
EFTA00924710Set 9
2011-11-173p648w
pending change order that has NOT been approved for $9,730 for manufacture breezeway doors
and to manufacture the shutters for the chillax bathroom. We also have a change order ... redo the
bathroom windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with ... about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
Jeff,
The K&S guys did not show up this morning and wanted
https://www.justice.gov/epstein/files/DataSet%209/EFTA00924710.pdf
EFTA00687381Set 9
2011-11-173p520w
pending change order that has NOT been approved for $9,730 for manufacture breezeway doors
and to manufacture the shutters for the chillax bathroom. We also have a change order ... redo the
bathroom windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with ... about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
Jeff,
The K&S guys did not show up this morning and wanted
https://www.justice.gov/epstein/files/DataSet%209/EFTA00687381.pdf
EFTA00924698Set 9
2011-11-161p305w
pending change order that has NOT been approved for $9,730 for manufacture breezeway doors and
to manufacture the shutters for the chillax bathroom. We also have a change order ... redo the bathroom
windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with ... about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
> Jeff,
> The K&S guys did not show up this morning and wanted
https://www.justice.gov/epstein/files/DataSet%209/EFTA00924698.pdf
EFTA02104576Set 10
2014-05-223p530w
shares a
common wall or a common roof with the principal building (a breezeway
roof shall not be considered a common roof).
BUILDING, PRINCIPAL -- A building in which is conducted ... main or
principal use of the lot on which said building is situated.
BREEZEWAY -- A roofed passageway, which is open-sided or screened,
connecting a building or structure to another
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02104576.pdf
EFTA02104590Set 10
2014-05-223p530w
shares a
common wall or a common roof with the principal building (a breezeway
roof shall not be considered a common roof).
BUILDING, PRINCIPAL -- A building in which is conducted ... main or
principal use of the lot on which said building is situated.
BREEZEWAY -- A roofed passageway, which is open-sided or screened,
connecting a building or structure to another
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02104590.pdf
EFTA00369033Set 9
2014-05-225p521w
shares a common wall or a common roof with the principal building (a breezeway roof shall not be
considered a common roof).
BUILDING, PRINCIPAL -- A building in which is conducted ... main or principal use of the lot on which
said building is situated.
BREEZEWAY -- A roofed passageway, which is open-sided or screened, connecting a building or structure to
another
https://www.justice.gov/epstein/files/DataSet%209/EFTA00369033.pdf
EFTA02099349Set 10
2014-05-223p631w
shares a
common wall or a common roof with the principal building (a breezeway
roof shall not be considered a common roof).
BUILDING, PRINCIPAL -- A building in which is conducted ... main or
principal use of the lot on which said building is situated.
BREEZEWAY -- A roofed passageway, which is open-sided or screened,
connecting a building or structure to another