EFTA02520888Set 11
2018-02-243p567w
straight pattern with 1/8 =f an inch joint TOTAL $
3,129
4P=A0 =C24, CABANA-EAST
=/div>
remove all existing floor tile- ( co=al stone) and place in dumpster ... cabin (cabanas) # 3 and
place in dum=ster, TOTAL $ 570
4k=A0 BATHROOM CABANA-EAST
remove all walls and shower floor til=- (coral stone) 132 sf of cabin (cabanas) # EAST
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02520888.pdf
EFTA02521230Set 11
2018-02-244p657w
inch joint
TOTAL $ 3,129
40=A0 =C240. 40=A0 CABANA-EAST
remove all existing floor tile- ( coral stone) and place =n dumpster, 153 sf TOTAL $ 382
dray pack ... cabanas) # 3 and
p=ace in dumpster, TOTAL $ 570
=C24) 40=A0 =C24> BATHROOM CABANA-EAST
=emove all walls and shower floor tile- (coral stone) 132 sf of =abin (cabanas
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02521230.pdf
EFTA02521552Set 11
2018-02-244p749w
pattern with 1/8 of an inch
joint TOTAL $ 3,129
=div> =C240 Q=AO CABANA-EAST
remove=all existing floor tile- ( coral stone) and place in dumpster ... cabin
(cabanas= # 3 and place in dumpster, TOTAL $ 570
=C240 40=AO =C24, BATHROOM CABANA-EAST
remove all walls and shower=C24, floor tile- (coral stone) 132 sf of cabin
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02521552.pdf
EFTA02521362Set 11
2018-02-244p625w
pattern with=1/8 of an
inch joint TOTAL $ 3,129
&n=sp; &=bsp; &=bsp; CABANA-EAST
=remove all existing floor tile- ( coral stone) and place in dumpster, 153 s=
TOTAL ... cabanas) # 3
and place in dumpster, TOTAL $ 570
3
EFTA_R1_01658536
EFTA02521364
BATHROOM CABANA-EAST
=emove all walls and shower floor tile- (coral stone
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02521362.pdf