EFTA00283319Set 9
2010-12-0613p4,082w
infrastructure upgrade plan as required, including conceptual level
drawings as needed.
Engineering and Cost/Benefit Analysis
Potential energy conservation measures and other client specified measures would be
subjected to intensive engineering
https://www.justice.gov/epstein/files/DataSet%209/EFTA00283319.pdf